CN108775190A - A kind of municipal administration electric power first-aid interim stringing pole being easily installed - Google Patents
A kind of municipal administration electric power first-aid interim stringing pole being easily installed Download PDFInfo
- Publication number
- CN108775190A CN108775190A CN201810904040.7A CN201810904040A CN108775190A CN 108775190 A CN108775190 A CN 108775190A CN 201810904040 A CN201810904040 A CN 201810904040A CN 108775190 A CN108775190 A CN 108775190A
- Authority
- CN
- China
- Prior art keywords
- connect
- easily installed
- electric power
- aid
- installs case
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000005553 drilling Methods 0.000 claims abstract description 36
- 244000309464 bull Species 0.000 claims abstract description 19
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 8
- 230000000694 effects Effects 0.000 abstract description 10
- 230000005540 biological transmission Effects 0.000 abstract description 7
- 238000000034 method Methods 0.000 description 4
- 230000005611 electricity Effects 0.000 description 3
- 239000002689 soil Substances 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 230000000452 restraining effect Effects 0.000 description 2
- 230000003139 buffering effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/18—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Electric Cable Installation (AREA)
Abstract
The present invention relates to municipal technical field more particularly to a kind of municipal electric power first-aid interim stringing poles being easily installed.The technical problem to be solved by the present invention is to interim stringing poles to be not easy to installing and dismounting.In order to solve the above-mentioned technical problem, the present invention provides a kind of municipal electric power first-aid interim stringing poles being easily installed, including line bar, the bottom of the line bar is connected with bull stick, the bottom of the bull stick is connect by bearing with the center at the top of support plate, the top of the support plate and the bottom of installs case connect, and the bottom of installs case is run through in the bottom of bull stick.The present invention drives main drilling rod to rotate by the transmission that the rotation of clockwise and anticlockwise motor makes first rotating shaft pass through driving wheel and driven wheel, the rotation of first rotating shaft and the second shaft simultaneously drives the first secondary drilling rod and the second secondary drilling rod to be rotated, to enable drilling rod to pierce underground, the reversion of clockwise and anticlockwise motor can then be such that drilling rod is taken out from underground, to achieve the effect that be easily installed.
Description
Technical field
The present invention relates to municipal technical field, specially a kind of municipal electric power first-aid interim stringing pole being easily installed.
Background technology
Chinese early stage infrastructure, the pole installed electricity lines, material develop to armored concrete by wooden.Electric pole, which cares for name, to be thought
Justice is exactly the pole installed electricity lines.Suitable for the transformation of city net rural power grids height piezoelectric forces and various power overhead networks and communication cable frame
If being to power and communicate important one of infrastructure.
Due to the uncertainty of weather, often some street facilities are damaged, and wherein electric power is then weight
In weight, and when needing to repair communal facility, ensure that electric power is usually then one of which critical event, electric power robbed
It repaiies and just may require that and first set up interim stringing pole, then carry out erection cable, to ensure the normal electricity consumption of various equipment, but mesh
Preceding interim stringing pole in the market can be used for the interim use of cable erection, need to remove it after completion, due to being
Prevention temporary cable, thus worker during the installation process, only it is simply fixed or by its buried underground, it is simple to set up
It meets high wind easily to blow down, to cause safety accident and heavy losses, buried underground again can be time-consuming and laborious, and is inconvenient to tear open
It removes, it is extremely urgent with the interim stringing pole being easily installed to produce municipal electric power first-aid thus.
Invention content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of municipal electric power first-aid interim stringings being easily installed
Bar solves the problems, such as that interim stringing pole is not easy to installing and dismounting.
(2) technical solution
To achieve the above object, the present invention provides the following technical solutions:It is a kind of municipal administration electric power first-aid faced with what is be easily installed
When stringing pole, including line bar, the bottom of the line bar is connected with bull stick, the bottom of the bull stick pass through bearing at the top of support plate
Center connection, the bottom of the top of the support plate and installs case connects, and the bottom of installs case, institute are run through in the bottom of bull stick
It states and is connected with clockwise and anticlockwise motor on the right side of installation chamber interior wall bottom, the output end of the clockwise and anticlockwise motor is connected with active helical teeth
The top of wheel, the right side installed at the top of chamber interior wall and first rotating shaft is connected by bearing, and the bottom of first rotating shaft passes through
Bearing is through the bottom of installs case and extends to below, the bottom of the first rotating shaft and is connected by flat key in the installs case
It is connected to driven helical gear, and driven helical gear is engaged with active oblique gear, the bottom of the first rotating shaft and the first secondary drilling rod
Top connects, and the bearing that passes on left at the top of the installation chamber interior wall is connect with the top of the second shaft, and the bottom of the second shaft
Portion through the bottom of installs case and is extended to below by bearing, the top of the bottom of second shaft and the second secondary drilling rod
Connection, the top of the first rotating shaft are connected with the first driving wheel by flat key, and the top of second shaft is connected by flat key
It is connected to the second driving wheel, and the second driving wheel is connect with the first driving wheel by belt, the centre position of the first rotating shaft is logical
It crosses flat key and is connected with driving wheel, driven wheel is connected with by flat key on the bull stick, and driven wheel is connected with driving wheel by belt
It connects, the bottom of the bull stick is connected with limited block, and the bottom of the limited block is connect with the top of main drilling rod.
Preferably, the centre position of the line bar is connected with link block, and the side of the link block is connected with the first fixation
Ring.
Preferably, it is connect with one end of steel wire rope in first fixed ring, and the other end of steel wire rope is connected with second
Fixed ring.
Preferably, the bottom of second fixed ring and the top of earth anchor connect, the outer surface connection of the earth anchor bottom
Restraining position ring block.
Preferably, the quantity of the earth anchor is three, and three earth anchors are distributed at equilateral triangle.
Preferably, the bottom of the clockwise and anticlockwise motor is connected with pedestal, and the bottom of pedestal is connected with beam.
(3) advantageous effect
The present invention provides a kind of municipal electric power first-aid interim stringing poles being easily installed.Has following advantageous effect:
(1), the municipal administration electric power first-aid interim stringing pole being easily installed, due to being improved to stringing pole, by just
The main drilling rod of transmission drive that the rotation of reversion motor makes first rotating shaft pass through driving wheel and driven wheel is rotated, while first turn
The rotation of axis and the second shaft drives the first secondary drilling rod and the second secondary drilling rod to be rotated, to enable drilling rod to pierce underground,
The reversion of clockwise and anticlockwise motor can then be such that drilling rod is taken out from underground, to achieve the effect that be easily installed.
(2), the municipal administration electric power first-aid passes through steel wire with the interim stringing pole being easily installed due to being improved to line bar
The mutual cooperation of rope and earth anchor can make the standing of line bar more firm, and three directions can be carried out to line bar by three earth anchors
It is fixed, according to the stability of triangle, so that line bar has been achieved the effect that encountering high wind is not easy to blow down, to enable line bar to bear
Certain high wind, and earth anchor can be made tightly to be engaged with soil by spacing ring, to enhance the stability of earth anchor, in turn
Improve the stability of line bar.
Description of the drawings
Fig. 1 is the sectional view of structure of the invention installs case;
Fig. 2 is the partial schematic diagram of structure of the invention;
Fig. 3 is the front schematic view of structure of the invention earth anchor.
In figure:1 line bar, 2 bull sticks, 3 support plates, 4 installs cases, 5 clockwise and anticlockwise motors, 6 active oblique gears, 7 first rotating shafts, 8
Driven helical gear, 9 first secondary drilling rods, 10 second shafts, 11 first driving wheels, 12 second driving wheels, 13 second secondary drilling rods, 14 masters
Driving wheel, 15 driven wheels, 16 limited blocks, 17 main drilling rods, 18 link blocks, 19 first fixed rings, 20 steel wire ropes, 21 second fixed rings,
22 earth anchors, 23 spacing rings.
Specific implementation mode
As shown in Figs. 1-3, the present invention provides a kind of technical solution:A kind of municipal administration electric power first-aid interim frame being easily installed
The centre position of line bar, including line bar 1, line bar 1 is fixedly connected with link block 18, and the side of link block 18 is fixedly connected with first
Fixed ring 19 is fixedly connected with one end of steel wire rope 20 in first fixed ring 19, and the other end of steel wire rope 20 is fixedly connected with
The bottom of second fixed ring 21, the second fixed ring 21 is fixedly connected with the top of earth anchor 22, and the outer surface of 22 bottom of earth anchor is fixed
Restraining position ring block 23 is connected, the quantity of earth anchor 22 is three, and three earth anchors 22 are distributed at equilateral triangle, pass through steel wire rope 20 and ground
The mutual cooperation of anchor 22 can make the standing of line bar 1 more firm, and three directions can be carried out to line bar 1 by three earth anchors 22
It is fixed, according to the stability of triangle, so that line bar 1 has been achieved the effect that encountering high wind is not easy to blow down, to enable line bar 1 to hold
Earth anchor 22 can be made tightly to be engaged with soil by certain high wind, and by spacing ring 23, to enhance the steady of earth anchor 22
Qualitative, and then improve the stability of line bar 1, the bottom of line bar 1 is fixedly connected with bull stick 2, the bottom of bull stick 2 by bearing with
The center at 3 top of support plate is fixedly connected, and the top of support plate 3 is fixedly connected with the bottom of installs case 4, and the bottom of bull stick 2
Through the bottom of installs case 4, installs case is fixedly connected with clockwise and anticlockwise motor 5, the bottom of clockwise and anticlockwise motor 5 on the right side of 4 inner wall bottom
Portion is fixedly connected with pedestal 24, and the bottom of pedestal 24 is fixedly connected with beam, and pedestal 24 can be such that clockwise and anticlockwise motor 5 passes through
The bottom of bolt and 4 inner wall of installs case is fixed, beam generated vibrations progress when can be run to clockwise and anticlockwise motor 5
Buffering, to achieve the effect that mitigate vibrations, the output end of clockwise and anticlockwise motor 5 is fixedly connected with active oblique gear 6, installs case 4
Right side at the top of inner wall is fixedly connected with the top of first rotating shaft 7 by bearing, and the bottom of first rotating shaft 7 is run through by bearing
The bottom of installs case 4 simultaneously extends to below, the bottom of first rotating shaft 7 and is fixedly connected with by flat key in the installs case 4
Driven helical gear 8, and driven helical gear 8 is engaged with active oblique gear 6, the top of the bottom of first rotating shaft 7 and the first secondary drilling rod 9
It is fixedly connected, the bearing that passes on left at the top of 4 inner wall of installs case is fixedly connected with the top of the second shaft 10, and the second shaft 10
Bottom through the bottom of installs case 4 and extended to below by bearing, the bottom of the second shaft 10 and the second secondary drilling rod 13
Top be fixedly connected, the top of first rotating shaft 7 is fixedly connected with the first driving wheel 11, the top of the second shaft 10 by flat key
It is fixedly connected with the second driving wheel 12 by flat key, and the second driving wheel 12 is connect with the first driving wheel 11 by belt transmission,
The centre position of first rotating shaft 7 is fixedly connected with driving wheel 14 by flat key, and driven wheel is fixedly connected with by flat key on bull stick 2
15, and driven wheel 15 is connect with driving wheel 14 by belt transmission, the bottom of bull stick 2 is fixedly connected with limited block 16, limited block
16 bottom is fixedly connected with the top of main drilling rod 17, and the present invention passes through clockwise and anticlockwise motor 5 due to being improved to stringing pole
Rotation makes first rotating shaft 7 drive main drilling rod 17 to be rotated by the transmission of driving wheel 14 and driven wheel 15, while first rotating shaft 7
Rotation with the second shaft 10 drives 9 and second secondary drilling rod 13 of the first secondary drilling rod to be rotated, to enable drilling rod to pierce ground
Under, the reversion of clockwise and anticlockwise motor 5 can then be such that drilling rod is taken out from underground, to achieve the effect that be easily installed.
Operation principle:In use, first rotating shaft 7 is made to pass through 14 He of driving wheel by the rotation of clockwise and anticlockwise motor 5
The transmission of driven wheel 15 drives main drilling rod 17 to be rotated, while the rotation of first rotating shaft 7 and the second shaft 10 drives the first pair
Drilling rod 9 and the second secondary drilling rod 13 are rotated, to enable drilling rod to pierce underground.
In summary:The municipal administration electric power first-aid interim stringing pole being easily installed leads to due to being improved to stringing pole
Crossing the rotation of clockwise and anticlockwise motor 5 makes first rotating shaft 7 drive main 17 turns of drilling rod by the transmission of driving wheel 14 and driven wheel 15
It is dynamic, while the rotation of first rotating shaft 7 and the second shaft 10 drives 9 and second secondary drilling rod 13 of the first secondary drilling rod to be rotated, to
Drilling rod is set to pierce underground, the reversion of clockwise and anticlockwise motor 5 can then be such that drilling rod is taken out from underground, is easily installed to reach
Effect, the interim stringing pole that is easily installed of the municipal administration electric power first-aid, due to being improved to line bar, by steel wire rope 20 with
The mutual cooperation of earth anchor 22 can make the standing of line bar 1 more firm, and three sides can be carried out to line bar 1 by three earth anchors 22
Line bar 1 is set to have achieved the effect that encountering high wind is not easy to blow down, to enable line bar 1 according to the stability of triangle to fixation
Certain high wind is born, and earth anchor 22 can be made tightly to be engaged with soil by spacing ring 23, to enhance earth anchor 22
Stability, and then improve the stability of line bar 1.
The electric elements occurred in this article are electrically connected with extraneous main controller and 220V alternating currents, and main controller can be meter
Calculation machine etc. plays the conventionally known equipment of control.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
Claims (6)
1. a kind of municipal administration electric power first-aid interim stringing pole being easily installed, including line bar (1), it is characterised in that:The line bar
(1) bottom is connected with bull stick (2), and the bottom of the bull stick (2) is connect by bearing with the center at the top of support plate (3), institute
The top for stating support plate (3) is connect with the bottom of installs case (4), and the bottom of installs case (4), institute are run through in the bottom of bull stick (2)
It states and is connected with clockwise and anticlockwise motor (5) on the right side of installs case (4) inner wall bottom, the output end of the clockwise and anticlockwise motor (5) is connected with
Active oblique gear (6), the right side at the top of installs case (4) inner wall are connect with the top of first rotating shaft (7) by bearing, and
The bottom of one shaft (7) through the bottom of installs case (4) and is extended to below, the bottom of the first rotating shaft (7) by bearing
Portion and driven helical gear (8), and driven helical gear (8) and active oblique gear (6) are connected with by flat key in the installs case (4)
Engagement, the bottom of the first rotating shaft (7) are connect with the top of the first secondary drilling rod (9), the left side at the top of installs case (4) inner wall
Side is connect by bearing with the top of the second shaft (10), and installs case (4) is run through in the bottom of the second shaft (10) by bearing
Bottom and extend to below, the bottom of second shaft (10) is connect with the top of the second secondary drilling rod (13), described the
The top of one shaft (7) is connected with the first driving wheel (11) by flat key, and the top of second shaft (10) is connected by flat key
It is connected to the second driving wheel (12), and the second driving wheel (12) is connect with the first driving wheel (11) by belt, the first rotating shaft
(7) centre position is connected with driving wheel (14) by flat key, and driven wheel (15) is connected with by flat key on the bull stick (2),
And driven wheel (15) is connect with driving wheel (14) by belt, the bottom of the bull stick (2) is connected with limited block (16), the limit
The bottom of position block (16) is connect with the top of main drilling rod (17).
2. a kind of municipal electric power first-aid interim stringing pole being easily installed according to claim 1, it is characterised in that:Institute
The centre position for stating line bar (1) is connected with link block (18), and the side of the link block (18) is connected with the first fixed ring (19).
3. a kind of municipal electric power first-aid interim stringing pole being easily installed according to claim 2, it is characterised in that:Institute
It states and is connect with one end of steel wire rope (20) in the first fixed ring (19), and the other end of steel wire rope (20) is connected with the second fixed ring
(21)。
4. a kind of municipal electric power first-aid interim stringing pole being easily installed according to claim 3, it is characterised in that:Institute
The bottom for stating the second fixed ring (21) is connect with the top of earth anchor (22), and the outer surface of earth anchor (22) bottom is connected with limit
Ring (23).
5. a kind of municipal electric power first-aid interim stringing pole being easily installed according to claim 4, it is characterised in that:Institute
The quantity for stating earth anchor (22) is three, and three earth anchors (22) are distributed at equilateral triangle.
6. a kind of municipal electric power first-aid interim stringing pole being easily installed according to claim 1, it is characterised in that:Institute
The bottom for stating clockwise and anticlockwise motor (5) is connected with pedestal (24), and the bottom of pedestal (24) is connected with beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810904040.7A CN108775190A (en) | 2018-08-09 | 2018-08-09 | A kind of municipal administration electric power first-aid interim stringing pole being easily installed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810904040.7A CN108775190A (en) | 2018-08-09 | 2018-08-09 | A kind of municipal administration electric power first-aid interim stringing pole being easily installed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108775190A true CN108775190A (en) | 2018-11-09 |
Family
ID=64028531
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810904040.7A Withdrawn CN108775190A (en) | 2018-08-09 | 2018-08-09 | A kind of municipal administration electric power first-aid interim stringing pole being easily installed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108775190A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114875925A (en) * | 2022-05-30 | 2022-08-09 | 中铁一局集团(广州)建设工程有限公司 | Construction method for extra-large deep foundation pit of sea-filling stratum close to subway tunnel |
-
2018
- 2018-08-09 CN CN201810904040.7A patent/CN108775190A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114875925A (en) * | 2022-05-30 | 2022-08-09 | 中铁一局集团(广州)建设工程有限公司 | Construction method for extra-large deep foundation pit of sea-filling stratum close to subway tunnel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108412527B (en) | A kind of constructing tunnel reinforcing anchor pole | |
CN105442934B (en) | Bi-directional torque cement pole pole centralizing device | |
CN205955358U (en) | Group's tower device of interior floated armful of pole of acting as go -between | |
CN202187601U (en) | Single-twisting-grinder double-pole iron tower erecting device of high-voltage power transmission line | |
CN103243963B (en) | A kind of suspended holding pole segmental hoisting steel pipe pole method | |
CN102587367A (en) | Mechanical connection type anchor rod | |
CN105905815A (en) | Work method of seating-type self-balance holding pole | |
CN204343771U (en) | A kind of convenient line bar | |
CN108775190A (en) | A kind of municipal administration electric power first-aid interim stringing pole being easily installed | |
CN104196072A (en) | Plateau mountain foundation pit excavation construction device | |
CN103806735B (en) | Based on to the electric pole replacing options in electric power pipe network | |
CN105298205B (en) | A device for strengthening and heightening power grid poles and its construction method | |
CN202260265U (en) | Wire stretcher for emergency rapid first-aid repair | |
CN206987509U (en) | Supply line's electric pole plants lever apparatus | |
CN106374242A (en) | A grounding network constructed by steel pipe pole pile foundation | |
CN109468974A (en) | Single-column sign installation method suitable for expressway median | |
CN105350816A (en) | Power grid telegraph pole strengthening and heightening device and construction method thereof | |
CN107327196A (en) | A kind of smooth type splices electric pole | |
CN211228496U (en) | Spiral foundation pile for electrified railway contact net support in high-altitude frozen soil area | |
CN112978561A (en) | Hoisting construction method of shield machine under 220kV high-voltage line | |
CN205046927U (en) | Improved generation is joined in marriage net overhead line and is prevent wind draw off mechanism | |
CN204343778U (en) | A kind of line bar | |
CN207409933U (en) | The fixture that a kind of overhead transmission line is crossed over | |
CN204385762U (en) | A kind of Rock Bolt Foundation structure | |
CN104074191A (en) | Screw-in device for mounting and overhauling power transmission and transformation device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20181109 |
|
WW01 | Invention patent application withdrawn after publication |