CN108716396A - A kind of development approach of coal bed gas multiple-limb distal end connected well - Google Patents
A kind of development approach of coal bed gas multiple-limb distal end connected well Download PDFInfo
- Publication number
- CN108716396A CN108716396A CN201810292530.6A CN201810292530A CN108716396A CN 108716396 A CN108716396 A CN 108716396A CN 201810292530 A CN201810292530 A CN 201810292530A CN 108716396 A CN108716396 A CN 108716396A
- Authority
- CN
- China
- Prior art keywords
- well
- cave
- drill
- branch
- drilling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000011161 development Methods 0.000 title claims abstract description 14
- 239000003245 coal Substances 0.000 title abstract description 3
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 claims abstract description 42
- 238000005553 drilling Methods 0.000 claims abstract description 33
- 238000000034 method Methods 0.000 claims abstract description 28
- 238000013461 design Methods 0.000 claims abstract description 21
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 4
- 238000005259 measurement Methods 0.000 claims description 9
- 230000006854 communication Effects 0.000 claims description 7
- 239000012530 fluid Substances 0.000 claims description 7
- 239000010410 layer Substances 0.000 claims description 6
- 238000004891 communication Methods 0.000 claims description 4
- 239000004568 cement Substances 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 claims description 3
- 210000002445 nipple Anatomy 0.000 claims description 3
- 239000002002 slurry Substances 0.000 claims description 3
- 239000007788 liquid Substances 0.000 claims description 2
- 239000002344 surface layer Substances 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 10
- 238000011084 recovery Methods 0.000 abstract description 6
- 230000009286 beneficial effect Effects 0.000 abstract description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 3
- 230000005484 gravity Effects 0.000 abstract description 2
- 238000005755 formation reaction Methods 0.000 abstract 1
- 238000002955 isolation Methods 0.000 abstract 1
- 238000005457 optimization Methods 0.000 description 7
- 238000010276 construction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
- E21B43/305—Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/022—Determining slope or direction of the borehole, e.g. using geomagnetism
- E21B47/0228—Determining slope or direction of the borehole, e.g. using geomagnetism using electromagnetic energy or detectors therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
Abstract
本发明涉及煤层气开采技术领域,涉及一种煤层气多分支远端连通井的开发方法,具体包括以下步骤:1)一开采用Φ311.1mm钻头钻至设计表层套管深度,下入Φ244.5mm套管封固上部不稳定易漏、易塌层段;2)二开采用Φ215.9mm钻头钻至设计靶点,井斜角达到84°,下入Φ177.8mm技术套管固井封隔易漏地层;3)三开斜井段采用Φ155.6mm钻头钻至设计靶点;4)各分支井段依次采用Φ155.69mm钻头钻至对应设计靶点。本发明的多分支水平井与直井、水平井相比,提高了导流能力,增加了波及面积,大大提高了单井产量;本发明采用沿储层下倾方向钻井,有利于井眼轨迹控制,有利于煤层中的水在重力作用下流入到生产井井底,提高生产井的排水采气效率。
The present invention relates to the technical field of coalbed methane exploitation, and relates to a development method of multi-branched remote connected wells of coalbed methane, which specifically includes the following steps: 1) Firstly, a Φ311.1mm drill bit is used to drill to the designed surface casing depth, and then drilled into a Φ244. 5mm casing is used to seal the upper part which is unstable, easy to leak and easy to collapse; 2) In the second opening, a Φ215.9mm drill bit is used to drill to the design target point, the inclination angle reaches 84°, and the Φ177.8mm technical casing is run in for cementing and isolation Leakage-prone formations; 3) The three deviated well sections were drilled to the design target point with a Φ155.6mm drill bit; 4) Each branch well section was drilled to the corresponding design target point with a Φ155.69mm drill bit in turn. Compared with vertical wells and horizontal wells, the multi-branch horizontal well of the present invention has improved conductivity, increased sweep area, and greatly increased single well production; the present invention adopts drilling along the downdip direction of the reservoir, which is beneficial to the control of wellbore trajectory , is conducive to the water in the coal seam to flow into the bottom of the production well under the action of gravity, and improves the drainage and gas recovery efficiency of the production well.
Description
技术领域technical field
本发明涉及煤层气开采技术领域,具体涉及一种煤层气多分支远端连通井的开发方法。The invention relates to the technical field of coalbed methane exploitation, in particular to a development method for multi-branched remote connected wells of coalbed methane.
背景技术Background technique
煤层气开采过程中主要存在钻遇率低、采收率低的问题,而且简单结构井开发效率更低,因此,需要通过钻井工程根据煤层气的地质特点设计出能够高效开发的生产井。In the process of coalbed methane exploitation, there are mainly problems of low drilling rate and low recovery rate, and the development efficiency of simple structure wells is lower. Therefore, it is necessary to design production wells that can be developed efficiently through drilling engineering according to the geological characteristics of coalbed methane.
现有技术采用直井开发方案,在煤层气区块内布置多口井形成开发井网,大大增加了井的数量,作业成本高,开发效率低;另一种方案采用水平井及直井连通,考虑排水采气的问题,是对原有方案的改进,但是油气采收波及范围小,在采收率方面仍然有待于提高。总体而言,现有技术对于煤层气开采的单井产量不高。The existing technology adopts the vertical well development scheme, and arranges multiple wells in the coalbed methane block to form a development well pattern, which greatly increases the number of wells, high operating costs, and low development efficiency; another scheme uses horizontal wells and vertical wells connected, considering The problem of water drainage and gas recovery is an improvement to the original scheme, but the oil and gas recovery has a small spread area, and the recovery factor still needs to be improved. Generally speaking, the existing technology is not high for single well production of coalbed methane exploitation.
发明内容Contents of the invention
针对现有技术中存在的问题,本发明的目的是提供一种煤层气多分支远端连通井的开发方法。Aiming at the problems existing in the prior art, the object of the present invention is to provide a method for developing coalbed methane multi-branch remote connected wells.
为了实现上述目的,本发明采用如下技术方案:In order to achieve the above object, the present invention adopts the following technical solutions:
一种煤层气多分支远端连通井的开发方法,具体包括以下步骤:A method for developing multi-branched remote connected wells of coalbed methane, specifically comprising the following steps:
1)一开采用Φ311.1mm钻头钻至设计表层套管深度,下入Φ244.5mm套管封固上部不稳定易漏、易塌层段,采用内管法固井工艺,水泥浆返至地面,建立井口,安装防喷器;1) Drill with a Φ311.1mm drill bit to the designed depth of the casing at the surface layer, and run a Φ244.5mm casing to seal the upper unstable, easy to leak, and easy-to-collapse layer, and use the inner pipe cementing process to return the cement slurry to the surface , establish the wellhead and install the blowout preventer;
2)二开采用Φ215.9mm钻头钻至设计靶点,井斜角达到84°,下入Φ177.8mm技术套管固井封隔易漏地层;2) In the second opening, the Φ215.9mm drill bit was used to drill to the design target point, the inclination angle reached 84°, and the Φ177.8mm technical casing was put into the well for cementing to seal the leaky formation;
3)三开斜井段采用Φ155.6mm钻头钻至设计靶点;3) The Φ155.6mm drill bit is used to drill to the design target point in the third deviated well section;
4)各分支井段依次采用Φ155.69mm钻头钻至对应设计靶点;4) Each branch well section is drilled to the corresponding design target with Φ155.69mm drill bit in turn;
5)各层套管的下深按设计原则,以实钻地层深度加以修正。5) The casing depth of each layer shall be corrected according to the actual drilling depth according to the design principle.
工程井是多分支井,生产井是洞穴直井,多分支水平井是沿着储层下倾方向钻进的。Engineering wells are multi-lateral wells, production wells are cave vertical wells, and multi-lateral horizontal wells are drilled along the downdip direction of the reservoir.
本技术方案的进一步优化,所述多分支远端连通井为多分支水平井与远端洞穴直井连通的连通井。Further optimization of the technical solution, the multi-branched distal communicating well is a communicating well in which a multi-branched horizontal well communicates with a vertical well in a distal cave.
本技术方案的进一步优化,所述多分支井与洞穴直井的连通工艺为:Further optimization of the technical solution, the communication process between the multi-branch well and the cave vertical well is:
1)当环接水平井钻进距洞穴直井相距50~60m时,在洞穴直井下入强磁性测距仪器,水平井下入寻迹短节强磁接头;1) When the drilling of the circular horizontal well is 50-60m away from the vertical cave well, a strong magnetic ranging instrument is run in the vertical well of the cave, and a strong magnetic joint of the tracing nipple is run in the horizontal well;
2)依据仪器给出的数据进行轨迹调整,使实钻轨迹与连通点相碰;2) Adjust the trajectory according to the data given by the instrument, so that the actual drilling trajectory collides with the connected point;
3)每钻进3~5m进行轨迹测量,及时调整工具面做好井眼轨迹控制;3) Trajectory measurement is carried out every 3 to 5 meters of drilling, and the tool face is adjusted in time to control the wellbore trajectory;
4)采用无磁短节,尽量减小井底到MWD测量点的距离;4) Use non-magnetic short joints to minimize the distance from the bottom of the well to the MWD measurement point;
5)水平井钻至洞穴附近,轨迹的垂深应位于洞穴的中部或中上部,若连通失败,可进一步侧钻找洞穴。5) When the horizontal well is drilled to the vicinity of the cave, the vertical depth of the trajectory should be in the middle or upper middle of the cave. If the connection fails, further sidetracking can be used to find the cave.
本技术方案的进一步优化,所述多分支井与洞穴直井连通的控制方法为:Further optimization of this technical solution, the control method for the communication between the multi-branch well and the cave vertical well is:
1)三开后,在洞穴直井中下电磁发生装置,水平井中MWD下入寻迹短节;1) After the third opening, run the electromagnetic generating device in the vertical well of the cave, and run the MWD into the tracking sub in the horizontal well;
2)电磁发生装置发出时强时弱的信号,由寻迹短节接收到后发送到MWD中,再由MWD发送到钻井液中;2) The electromagnetic generating device sends out strong and sometimes weak signals, which are sent to the MWD after being received by the tracking sub, and then sent to the drilling fluid by the MWD;
3)地面上的接收装置从上返钻井液中接收到脉冲信号后再转换成电信号,显示在地面工作人员的电脑中形成一定的电磁传感线,由此判断钻具与洞穴井间方位;3) The receiving device on the ground receives the pulse signal from the upward drilling fluid and then converts it into an electrical signal, which is displayed in the computer of the ground staff to form a certain electromagnetic sensing line, thereby judging the orientation between the drilling tool and the cave well ;
4)每钻进3~5m进行轨迹测量,及时调整工具面做好井眼轨迹控制;4) Trajectory measurement is carried out every 3-5m, and the tool face is adjusted in time to control the wellbore trajectory;
5)预计距直井洞穴2~3m水平井停止钻进,直井将仪器起出,井口闸门微开,主井眼继续钻进,钻进过程出现泵压下降、井口不返泥浆,直井井口有液体排出现象表示连通成功。5) It is estimated that the drilling of the horizontal well 2-3m away from the vertical well cave will stop. The vertical well will pull out the instrument, the wellhead gate will be slightly opened, and the main wellbore will continue to drill. During the drilling process, the pump pressure will drop, the wellhead will not return mud, and there will be liquid at the wellhead of the vertical well. The discharge phenomenon indicates that the connection is successful.
本技术方案的进一步优化,所述连通工艺的步骤1)中使用的钻具组合主要部件为:钻头+马达+MWD+无磁钻铤+钻杆。Further optimization of this technical solution, the main components of the drill tool assembly used in step 1) of the communication process are: drill bit + motor + MWD + non-magnetic drill collar + drill pipe.
本技术方案的进一步优化,所述控制方法的步骤5)中连通成功后继续钻进10米左右,起钻甩掉强磁接头。Further optimization of the technical solution, in the step 5) of the control method, after the connection is successful, continue to drill about 10 meters, and pull out the drill to get rid of the strong magnetic joint.
本技术方案的进一步优化,所述连通井的主井眼采用沿储层下倾方向钻井。Further optimization of the technical solution, the main wellbore of the connected well is drilled along the downdip direction of the reservoir.
本技术方案的进一步优化,所述连通井依据设计参数进行三维井眼轨道绘制,可以根据储层的情况进行分支井眼数量的增减。Further optimization of the technical solution, the connected wells are drawn according to the design parameters for three-dimensional wellbore trajectory, and the number of branch wellbores can be increased or decreased according to the reservoir conditions.
本发明的有益效果在于:The beneficial effects of the present invention are:
(1)本发明的多分支水平井与直井、水平井相比,提高了导流能力,增加了波及面积,大大提高了单井产量;(1) Compared with vertical wells and horizontal wells, the multi-branch horizontal well of the present invention has improved the flow conductivity, increased the swept area, and greatly improved the single well production;
(2)本发明采用沿储层下倾方向钻井,有利于井眼轨迹控制,有利于煤层中的水在重力作用下流入到生产井井底,提高生产井的排水采气效率。(2) The present invention adopts drilling along the downdip direction of the reservoir, which is beneficial to the control of the wellbore trajectory and the water in the coal seam to flow into the bottom of the production well under the action of gravity, so as to improve the drainage and gas recovery efficiency of the production well.
(3)本发明的特色多分支井对于煤层气开采能够极大地提高单井产量,对于全国煤层气的开采具有借鉴意义,“减煤、保油、增气”的能源发展要求下能够更好地满足国内需求。(3) The characteristic multi-branch well of the present invention can greatly improve the output of a single well for the exploitation of coalbed methane, and has reference significance for the exploitation of coalbed methane in the whole country. to meet domestic demand.
附图说明Description of drawings
图1是本发明的工艺图;Fig. 1 is a process diagram of the present invention;
图2是本发明模拟区块内多分支水平井和远端直井井身的结构图;Fig. 2 is the structural diagram of multi-branch horizontal well and far-end vertical well shaft in the simulated block of the present invention;
图3是本发明多分支水平井与远端直井连通的连通井的设计数据绘图;Fig. 3 is the design data drawing of the communicating well that multi-branch horizontal well of the present invention is communicated with far-end vertical well;
其中,a为水平井主井眼、远端连通的洞穴直井,b为各个分支井眼。Among them, a is the main wellbore of the horizontal well and the cave vertical well connected at the far end, and b is each branch wellbore.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
如图1所示,一种煤层气多分支远端连通井的开发方法,具体包括以下步骤:As shown in Figure 1, a method for developing multi-branched remote connected wells of coalbed methane specifically includes the following steps:
(1)一开采用Φ311.1mm钻头钻至设计表层套管深度,下Φ244.5mm套管封固上部不稳定易漏、易塌层段,采用内管法固井工艺,水泥浆返至地面,建立井口,安装防喷器,以保证二开井控要求和顺利施工。(1) Drill with a Φ311.1mm drill bit to the designed surface casing depth at the first opening, seal the upper unstable, easy to leak, and easy-to-collapse layer with a Φ244.5mm casing, and use the inner pipe cementing process to return the cement slurry to the surface , establish the wellhead, and install blowout preventers to ensure the second well control requirements and smooth construction.
(2)二开采用Φ215.9mm钻头钻至设计靶点,井斜角达到84°,下入Φ177.8mm技术套管固井封隔易漏地层,为三开水平井段安全施工提供有利条件,施工风险。(2) The 215.9mm drill bit was used to drill to the design target point in the second opening, and the inclination angle reached 84°, and the Φ177.8mm technical casing cementing was run in to seal the leakage-prone formation, which provided favorable conditions for the safe construction of the third opening horizontal well section. construction risk.
(3)三开斜井段采用Φ155.6mm钻头钻至设计靶点。(3) The Φ155.6mm drill bit is used to drill to the design target point in the third deviated well section.
(4)各分支井段依次采用Φ155.69mm钻头钻至对应设计靶点。(4) Each branch well segment is sequentially drilled to the corresponding design target point with a Φ155.69mm drill bit.
(5)各层套管的下深按设计原则,以实钻地层深度加以修正。(5) The casing depth of each layer is corrected according to the actual drilling depth according to the design principle.
工程井是多分支井,生产井是洞穴直井,多分支水平井是沿着储层下倾方向钻进的。Engineering wells are multi-lateral wells, production wells are cave vertical wells, and multi-lateral horizontal wells are drilled along the downdip direction of the reservoir.
本发明的多分支远端连通井为多分支水平井与远端洞穴直井连通的连通井。The multi-branch distal communicating well of the present invention is a communicating well in which a multi-branch horizontal well communicates with a vertical well in a distal cave.
如图1~2所示,所述多分支井与洞穴直井的连通工艺为:As shown in Figures 1-2, the communication process between the multi-branch well and the vertical cave well is as follows:
(1)当环接水平井钻进距洞穴直井相距50~60m时,在洞穴直井下入强磁性测距仪器,水平井下入寻迹短节强磁接头,钻具组合主要部件为:钻头+马达+MWD+无磁钻铤+钻杆;(1) When the circular horizontal well is drilled at a distance of 50-60m from the cave vertical well, a strong magnetic ranging instrument is run in the cave vertical well, and a tracking nipple strong magnetic joint is run in the horizontal well. The main components of the drilling tool assembly are: drill bit + Motor+MWD+non-magnetic drill collar+drill pipe;
(2)依据仪器给出的数据进行轨迹调整,使实钻轨迹与连通点相碰;(2) Adjust the trajectory according to the data given by the instrument, so that the actual drilling trajectory collides with the connected point;
(3)每钻进3~5m进行轨迹测量,及时调整工具面做好井眼轨迹控制;(3) Trajectory measurement is carried out every 3 to 5 meters of drilling, and the tool face is adjusted in time to control the wellbore trajectory;
(4)采用无磁短节,尽量减小井底到MWD测量点的距离;(4) Use non-magnetic short joints to minimize the distance from the bottom of the well to the MWD measurement point;
(5)水平井钻至洞穴附近,轨迹的垂深不应该位于洞穴的下部,应位于洞穴的中部或中上部。若连通失败,可进一步侧钻找洞穴。若位于下部,增斜侧钻困难,不利于采取后续措施。(5) When the horizontal well is drilled to the vicinity of the cave, the vertical depth of the trajectory should not be located in the lower part of the cave, but should be located in the middle or upper middle of the cave. If the connection fails, you can drill further to find the cave. If it is located in the lower part, it is difficult to increase the slope and sidetrack, which is not conducive to taking follow-up measures.
如图1~2所示,所述多分支井与洞穴直井连通的控制方法为:As shown in Figures 1-2, the control method for the communication between the multi-branch well and the cave vertical well is as follows:
(1)三开后,在洞穴井中下电磁发生装置,水平井中MWD下入寻迹短节;(1) After three openings, the electromagnetic generating device is installed in the cave well, and the MWD is installed in the tracking joint in the horizontal well;
(2)电磁发生装置发出时强时弱的信号,由寻迹短节接收到后发送到MWD中,再由MWD发送到钻井液中;(2) The electromagnetic generating device sends out strong and sometimes weak signals, which are sent to the MWD after being received by the tracking sub, and then sent to the drilling fluid by the MWD;
(3)地面上的接收装置从上返钻井液中接收到脉冲信号后再转换成电信号,显示在地面工作人员的电脑中形成一定的电磁传感线,由此判断钻具与洞穴井间方位;(3) The receiving device on the ground receives the pulse signal from the upward drilling fluid and then converts it into an electrical signal, which shows that a certain electromagnetic sensing line is formed in the computer of the ground staff, thereby judging the distance between the drilling tool and the cave well. position;
(4)每钻进3~5m进行轨迹测量,及时调整工具面做好井眼轨迹控制;(4) Trajectory measurement is carried out every 3 to 5 meters of drilling, and the tool face is adjusted in time to control the wellbore trajectory;
(5)预计距直井洞穴2~3米水平井停止钻进,直井将仪器起出,井口闸门微开,主井眼继续钻进,钻进过程出现泵压下降、井口不返泥浆,直井井口有液体排出现象表示连通成功。连通后继续钻进10米左右,起钻甩掉强磁接头。(5) It is estimated that the drilling of the horizontal well 2 to 3 meters away from the vertical well cave will stop. The vertical well will pull out the instrument, the wellhead gate will be slightly opened, and the main wellbore will continue to drill. During the drilling process, the pump pressure will drop and the wellhead will not return mud. Fluid discharge indicates successful connection. After connecting, continue to drill for about 10 meters, pull out the drill and get rid of the strong magnetic joint.
本发明连通井的主井眼采用沿储层下倾方向钻井。The main wellbore of the communication well of the present invention is drilled along the downdip direction of the reservoir.
如图3所示的多分支水平井与远端直井连通的连通井的设计数据绘图,通过轨道设计数据(轨道设计数据根据具体的区块、具体的煤层气藏确定垂深、N坐标、E坐标、井斜角、井斜方位等),绘制出三维井眼轨道的可视化图形。本发明连通井依据设计参数进行三维井眼轨道绘制,可以根据储层的情况进行分支井眼数量的增减。As shown in Figure 3, the design data drawing of the connected well with the multi-branch horizontal well and the remote vertical well is connected, and the vertical depth, N coordinate, E Coordinates, well inclination angle, well inclination azimuth, etc.), and draw the visualization graph of three-dimensional wellbore trajectory. The interconnected well of the present invention draws the three-dimensional wellbore trajectory according to the design parameters, and can increase or decrease the number of branch wellbores according to the conditions of the reservoir.
以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still understand the foregoing embodiments Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present invention shall be included in the scope of protection of the present invention. Inside.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810292530.6A CN108716396A (en) | 2018-03-30 | 2018-03-30 | A kind of development approach of coal bed gas multiple-limb distal end connected well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810292530.6A CN108716396A (en) | 2018-03-30 | 2018-03-30 | A kind of development approach of coal bed gas multiple-limb distal end connected well |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108716396A true CN108716396A (en) | 2018-10-30 |
Family
ID=63898687
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810292530.6A Pending CN108716396A (en) | 2018-03-30 | 2018-03-30 | A kind of development approach of coal bed gas multiple-limb distal end connected well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108716396A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109736769A (en) * | 2019-01-15 | 2019-05-10 | 中国矿业大学 | A system and method for horizontal branch well pattern exploitation of natural gas hydrate in permafrost layer |
CN111043780A (en) * | 2018-10-11 | 2020-04-21 | 中国石油化工集团公司 | Hydrothermal multi-branch directional mining and grouting geothermal well and construction method |
CN112343555A (en) * | 2020-11-24 | 2021-02-09 | 中国海洋石油集团有限公司 | Relay well development method for expanding offshore oil and gas reserve utilization range |
CN112377168A (en) * | 2020-11-11 | 2021-02-19 | 中联煤层气有限责任公司 | Coal bed gas multi-branch horizontal well suitable for tectonic coal and drilling method |
CN114198016A (en) * | 2021-12-31 | 2022-03-18 | 北京派创石油技术服务有限公司 | Geothermal closed-loop working medium circulating exploitation method |
CN116025328A (en) * | 2022-11-25 | 2023-04-28 | 中国地质大学(武汉) | Stacked horizontal well gas production system and construction method for inclined-vertical gas-bearing layers |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203334956U (en) * | 2013-05-31 | 2013-12-11 | 华北石油管理局 | Multi-branch horizontal well system suitable for coalbed methane of uniclinal structure |
CN104481495A (en) * | 2014-11-05 | 2015-04-01 | 辽宁石油化工大学 | Coalbed methane (CBM) cluster double multi-branch horizontal well and drilling method relative to discharging and mining vertical well system |
WO2015157812A1 (en) * | 2014-04-14 | 2015-10-22 | Peabody Energy Australia | A multi purpose drilling system and method |
CN105134162A (en) * | 2015-08-28 | 2015-12-09 | 中国神华能源股份有限公司 | U-shaped well system and drilling method thereof |
-
2018
- 2018-03-30 CN CN201810292530.6A patent/CN108716396A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203334956U (en) * | 2013-05-31 | 2013-12-11 | 华北石油管理局 | Multi-branch horizontal well system suitable for coalbed methane of uniclinal structure |
WO2015157812A1 (en) * | 2014-04-14 | 2015-10-22 | Peabody Energy Australia | A multi purpose drilling system and method |
CN104481495A (en) * | 2014-11-05 | 2015-04-01 | 辽宁石油化工大学 | Coalbed methane (CBM) cluster double multi-branch horizontal well and drilling method relative to discharging and mining vertical well system |
CN105134162A (en) * | 2015-08-28 | 2015-12-09 | 中国神华能源股份有限公司 | U-shaped well system and drilling method thereof |
Non-Patent Citations (2)
Title |
---|
吴彬彬: "晋平2井组煤层气羽状多分支水平井钻井工程设计与实践", 《中国优秀硕士学位论文全文数据库 工程科技 1辑》 * |
邓钧耀 等: "水平连通井关键技术及在三交地区的应用", 《2011年煤层气学术研讨会论文集》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111043780A (en) * | 2018-10-11 | 2020-04-21 | 中国石油化工集团公司 | Hydrothermal multi-branch directional mining and grouting geothermal well and construction method |
CN111043780B (en) * | 2018-10-11 | 2021-12-24 | 中国石油化工集团公司 | Hydrothermal multi-branch directional mining and grouting geothermal well and construction method |
CN109736769A (en) * | 2019-01-15 | 2019-05-10 | 中国矿业大学 | A system and method for horizontal branch well pattern exploitation of natural gas hydrate in permafrost layer |
CN112377168A (en) * | 2020-11-11 | 2021-02-19 | 中联煤层气有限责任公司 | Coal bed gas multi-branch horizontal well suitable for tectonic coal and drilling method |
CN112377168B (en) * | 2020-11-11 | 2023-03-10 | 中联煤层气有限责任公司 | Coal bed gas multi-branch horizontal well suitable for tectonic coal and drilling method |
CN112343555A (en) * | 2020-11-24 | 2021-02-09 | 中国海洋石油集团有限公司 | Relay well development method for expanding offshore oil and gas reserve utilization range |
CN112343555B (en) * | 2020-11-24 | 2022-11-18 | 中国海洋石油集团有限公司 | Relay well development method for expanding offshore oil and gas reserve utilization range |
CN114198016A (en) * | 2021-12-31 | 2022-03-18 | 北京派创石油技术服务有限公司 | Geothermal closed-loop working medium circulating exploitation method |
CN116025328A (en) * | 2022-11-25 | 2023-04-28 | 中国地质大学(武汉) | Stacked horizontal well gas production system and construction method for inclined-vertical gas-bearing layers |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108716396A (en) | A kind of development approach of coal bed gas multiple-limb distal end connected well | |
CN102979498B (en) | Coal bed gas multi-branch horizontal well system | |
CN110397428B (en) | Displacement coalbed methane yield increasing method for coalbed methane jointly mined by vertical well and U-shaped butt well | |
CN104806217B (en) | Combined separated layer fracturing, grouping and layer-combining mining method for coal bed well group | |
CN104481495A (en) | Coalbed methane (CBM) cluster double multi-branch horizontal well and drilling method relative to discharging and mining vertical well system | |
CN103883304B (en) | A kind of gasifying underground coal method building gasification furnace passage | |
CN103857872A (en) | Method for real-time monitoring and transmitting hydraulic fracture seismic events to surface using the pilot hole of the treatment well as the monitoring well | |
CN104011326A (en) | System For Real-Time Monitoring and Transmitting Hydraulic Fracture Seismic Events to Surface Using the Pilot Hole of the Treatment Well as the Monitoring Well | |
US20230235647A1 (en) | Multilateral junction with twisted mainbore and lateral bore legs | |
CN104612691B (en) | Single borehole multilateral directional butted well salt mining method | |
CN112593910B (en) | Efficient mining method for broken low-permeability coal bed gas short horizontal well group | |
CN109236186A (en) | New well drilling casing and big wellbore multilateral well quick drill completion method | |
CN105952378A (en) | Tree-shape structure well drilling and completion and yield increasing method | |
CN105134162A (en) | U-shaped well system and drilling method thereof | |
CN103161440A (en) | Single-well coalbed methane horizontal well system and finishing method thereof | |
CN108894765A (en) | The major-minor well construction and its method of deep water shallow layer gas hydrate exploitation | |
CN112832766A (en) | A method of unloading coal ahead and eliminating outburst in vertical shaft shaft based on ground directional drilling | |
CN103422813B (en) | Individual well eye multi-lateral horizontal well system for coal bed gas and boring method | |
CN109403923A (en) | A kind of coal bed gas T-type wears the short horizontal well construction method in goaf | |
CN203335053U (en) | Roadway coal bed gas multi-branch horizontal well system | |
CN103924958A (en) | Coal bed gas multi-branch horizontal well applicable to syncline structures | |
CN105569602A (en) | Method for sealing channeling outside oil well pipe | |
CN116122774B (en) | Outburst prevention method for combined operation layer gas extraction area of ultra-close coal seam well up-down combination operation | |
CN106337667A (en) | Secondary-exploitation horizontal well cementing and completion construction method | |
CN208803840U (en) | Structure of Main and Auxiliary Wells for Deep Water Shallow Gas Hydrate Exploitation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181030 |
|
RJ01 | Rejection of invention patent application after publication |