CN108708732A - A kind of mud stone compound stratum slurry shield cutterhead, shield machine, speedy drivage method - Google Patents

A kind of mud stone compound stratum slurry shield cutterhead, shield machine, speedy drivage method Download PDF

Info

Publication number
CN108708732A
CN108708732A CN201810291286.1A CN201810291286A CN108708732A CN 108708732 A CN108708732 A CN 108708732A CN 201810291286 A CN201810291286 A CN 201810291286A CN 108708732 A CN108708732 A CN 108708732A
Authority
CN
China
Prior art keywords
wear
cutterhead
mud
shield
slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810291286.1A
Other languages
Chinese (zh)
Inventor
孟庆军
刘新荣
刘东双
李振勇
安宏斌
左龙
郑中刚
缪兴琦
务玉龙
钟祖良
李鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN201810291286.1A priority Critical patent/CN108708732A/en
Publication of CN108708732A publication Critical patent/CN108708732A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/08Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明涉及一种泥岩复合地层泥水盾构刀盘、盾构机、快速掘进方法,刀盘包括刀盘架、设置在刀盘架上的刀具组件、若干主辐臂和副辐臂,每条副辐臂由多块耐磨复合钢板组合焊接而成,相邻两块耐磨复合钢板之间设有缝隙结构,每块耐磨复合钢板的中间均设有开孔焊接结构。本发明可以减少刀盘使用过程中磨损的问题,提供的盾构机,能提高掘进的速度,增加了隧道掘进的效率。

The invention relates to a slurry mud-water shield cutter head in a mudstone composite stratum, a shield machine and a rapid excavation method. The auxiliary radial arm is welded by multiple wear-resistant composite steel plates. There is a gap structure between two adjacent wear-resistant composite steel plates, and an open-hole welding structure is provided in the middle of each wear-resistant composite steel plate. The invention can reduce the problem of wear and tear of the cutter head during use, and the shield machine provided can increase the speed of excavation and increase the efficiency of tunnel excavation.

Description

一种泥岩复合地层泥水盾构刀盘、盾构机、快速掘进方法Mud-water shield cutter head, shield machine and rapid excavation method in mudstone composite stratum

技术领域technical field

本发明属于盾构技术领域,涉及一种泥岩复合地层泥水盾构刀盘、盾构机、快速掘进方法。The invention belongs to the field of shield technology, and relates to a mud-water shield cutter head, a shield machine and a rapid tunneling method in a mudstone composite stratum.

背景技术Background technique

盾构机是一种使用盾构法的隧道掘进机。盾构的施工法是掘进机在掘进的同时构建(铺设)隧道之“盾”(指支撑性管片),它区别于敞开式施工法在我国,习惯上将用于软土地层的隧道掘进机称为(狭义)盾构机,将用于岩石地层的称为(狭义)TBM。用盾构法的机械进行隧洞施工具有自动化程度高、节省人力、施工速度快、一次成洞、不受气候影响、开挖时可控制地面沉降、减少对地面建筑物的影响和在水下开挖时不影响地面交通等特点,在隧洞洞线较长、埋深较大的情况下,用盾构机施工更为经济合理。A shield machine is a tunnel boring machine that uses the shield method. The construction method of the shield machine is the "shield" (referring to the supporting segment) of the tunnel constructed (laid) by the roadheader while driving. It is different from the open construction method. In my country, it is customarily used for tunneling in soft soil strata. The machine is called (narrow sense) shield machine, and the one used for rock formation is called (narrow sense) TBM. Tunnel construction with shield machine has the advantages of high degree of automation, saving manpower, fast construction speed, one-time hole formation, no climate influence, control of ground subsidence during excavation, reduced impact on ground buildings and underwater excavation. It does not affect ground traffic during excavation, and it is more economical and reasonable to use a shield machine for construction when the tunnel line is long and the buried depth is large.

盾构机的基本工作原理就是一个圆柱体的钢组件沿隧洞轴线边向前推进边对土壤进行挖掘。该圆柱体组件的壳体即护盾,它对挖掘出的还未衬砌的隧洞段起着临时支撑的作用,承受周围土层的压力,有时还承受地下水压以及将地下水挡在外面。挖掘、排土、衬砌等作业在护盾的掩护下进行。The basic working principle of the shield machine is that a cylindrical steel component is pushed forward along the tunnel axis to excavate the soil. The shell of the cylindrical assembly is the shield, which acts as a temporary support for the excavated, unlined tunnel section, withstands the pressure of the surrounding soil and sometimes groundwater pressure and keeps it out. Excavation, soil dumping, lining and other operations are carried out under the cover of the shield.

在盾构穿越圆砾、泥岩土层施工过程中,泥水处理系统无法满足需要,泥浆循环系统的沉淀池也无法进行浆液指标的调整,颗粒太细无法进行沉淀。经过颗粒筛分后发现泥浆中悬浮物基本上大多是0.020mm左右甚至更小的超细颗粒,造成了泥浆性能指标严重失调,进浆比重将变得很大,粘度也将变大,泥浆无法将盾构掘削渣土悬浮流动,导致无法满足施工掘进,严重时导致地表出现沉降过大现象;而且刀盘扭矩很小,推力很大,掘进速度很小,甚至掘进不动,已表明开挖舱内已经大量开始结泥饼,施工风险巨大。During the construction of the shield tunneling through the round gravel and mudstone soil layers, the mud water treatment system cannot meet the needs, and the sedimentation tank of the mud circulation system cannot adjust the slurry index, and the particles are too fine to settle. After particle screening, it is found that the suspended solids in the mud are mostly ultrafine particles of about 0.020mm or smaller, resulting in a serious imbalance in mud performance indicators, the proportion of incoming slurry will become large, and the viscosity will also increase. The shield excavation excavation dregs are suspended and flowed, resulting in the inability to meet the construction and excavation, and in severe cases, excessive subsidence of the ground surface; and the torque of the cutter head is small, the thrust is large, the excavation speed is small, and even the excavation does not move, which has shown that the excavation A large number of mud cakes have begun to form in the cabin, and the construction risk is huge.

随着盾构机的不断发展,对盾构机的要求也越来越高,全断面泥岩地层在掘进过程中,刀盘很容易受到磨损,影响盾构机的寿命。并且经盾构机切削下来的黏土块会在盾构开挖舱内产生堆积,粘结在刀盘盘面上,形成泥饼,导致盾构机切削能力下降,甚至无法继续掘进施工,影响加工进度的继续进行。With the continuous development of the shield machine, the requirements for the shield machine are getting higher and higher. During the excavation process of the full-section mudstone formation, the cutter head is easily worn, which affects the life of the shield machine. In addition, the clay blocks cut by the shield machine will accumulate in the excavation chamber of the shield machine, stick to the surface of the cutter head, and form a mud cake, resulting in a decrease in the cutting ability of the shield machine, and even the inability to continue the excavation construction, affecting the processing progress continue.

发明内容Contents of the invention

有鉴于此,本发明的目的在于提供一种泥岩复合地层泥水盾构刀盘,可以减少刀盘使用过程中磨损的问题,提供的盾构机,能提高掘进的速度,增加了隧道掘进的效率。In view of this, the object of the present invention is to provide a mudstone composite formation mud-water shield cutter head, which can reduce the wear and tear problem of the cutter head during use, and the shield machine provided can increase the speed of excavation and increase the efficiency of tunnel excavation .

为达到上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:

一种泥岩复合地层泥水盾构刀盘,所述刀盘采用辐板式结构,包括刀盘架、设置在刀盘架上的刀具组件、若干主辐臂和副辐臂,每条副辐臂由多块耐磨复合钢板组合焊接而成,相邻两块耐磨复合钢板之间设有用于焊接的缝隙结构,每块耐磨复合钢板的中间均设有方形开孔,还包括设置在所述开孔内与耐磨复合钢板焊接为一体的方块。A mud-water shield cutter head in a mudstone composite formation, the cutter head adopts a radial plate structure, including a cutter head frame, a tool assembly arranged on the cutter head frame, a plurality of main spoke arms and auxiliary spoke arms, and each auxiliary spoke arm is composed of A plurality of wear-resistant composite steel plates are combined and welded. A gap structure for welding is provided between two adjacent wear-resistant composite steel plates. A square hole is provided in the middle of each wear-resistant composite steel plate. It is a square welded with wear-resistant composite steel plate in the opening.

进一步,所述耐磨焊缝的高度为4mm。Further, the height of the wear-resistant welding seam is 4mm.

进一步,所述主辐臂和副辐臂之间设有加强环筋。Further, a reinforcing ring rib is provided between the main spoke arm and the auxiliary spoke arm.

进一步,还包括用于检测所述耐磨复合钢板磨损情况的磨损检测装置。Further, it also includes a wear detection device for detecting the wear condition of the wear-resistant composite steel plate.

进一步,刀盘边缘设置保径刀,所述刀盘边缘保径刀高度为15mm,宽度150mm。Further, a gauge knife is arranged on the edge of the cutter head, and the height of the gauge knife on the edge of the cutter head is 15 mm, and the width is 150 mm.

一种盾构机,包括上述的刀盘,还包括泥水处理系统和泥水冲刷系统。A shield machine includes the above-mentioned cutter head, and also includes a muddy water treatment system and a muddy water flushing system.

一种盾构机的快速掘进方法,开挖仓压力每埋深1m为0.115bar,气垫仓压力比开挖仓压力高0.3bar,所述刀盘的转速为0.8-1.0r/min,掘进推力为1000-1300T,掘进速度为25~40mm/min,注浆量为4.7-5.5m3,注浆压力为3-3.5bar,进泥量为850—900m3/h、排泥量为900—950m3/h。A rapid excavation method of a shield machine, the pressure of the excavation chamber is 0.115 bar per buried depth of 1m, the pressure of the air cushion chamber is 0.3 bar higher than the pressure of the excavation chamber, the speed of the cutter head is 0.8-1.0r/min, and the thrust of the excavation The excavation speed is 1000-1300T, the excavation speed is 25-40mm/min, the grouting volume is 4.7-5.5m 3 , the grouting pressure is 3-3.5bar, the mud feeding volume is 850-900m 3 /h, and the mud discharge volume is 900- 950m 3 /h.

进一步,所述泥水处理系统采用压滤设备进行处理废浆,将废浆压成泥饼,滤出的清进行新鲜泥浆的调制。Further, the muddy water treatment system uses filter press equipment to process the waste slurry, presses the waste slurry into a mud cake, and prepares fresh mud with the filtered liquid.

进一步,所述泥水冲刷系统采用高压冲刷方式,对排渣口格栅前方、刀盘背面以及刀具组件进行冲刷。Further, the muddy water flushing system adopts a high-pressure flushing method to flush the front of the slag outlet grille, the back of the cutter head and the cutter assembly.

本发明的有益效果在于:The beneficial effects of the present invention are:

可以减少刀盘使用过程中磨损的问题,提供的盾构机,有效降低中心结泥饼的概率,能提高掘进的速度,增加了隧道掘进的效率,保证盾构机在上软下硬地层的正常掘进。It can reduce the problem of wear and tear during the use of the cutter head. The shield machine provided can effectively reduce the probability of mud cake formation in the center, increase the speed of excavation, increase the efficiency of tunnel excavation, and ensure that the shield machine can operate in the upper soft and lower hard strata. Normal digging.

附图说明Description of drawings

为了使本发明的目的、技术方案和有益效果更加清楚,本发明提供如下附图进行说明:In order to make the purpose, technical scheme and beneficial effect of the present invention clearer, the present invention provides the following drawings for illustration:

图1为本发明刀盘的结构示意图;Fig. 1 is the structural representation of cutterhead of the present invention;

图2为图1沿A-A的结构示意图。Fig. 2 is a schematic diagram of the structure along A-A in Fig. 1 .

具体实施方式Detailed ways

下面将结合附图,对本发明的优选实施例进行详细的描述。The preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings.

一种泥岩复合地层泥水盾构刀盘,所述刀盘采用辐板式结构,包括刀盘架1、设置在刀盘架上的刀具组件2、若干主辐臂3和副辐臂4,每条副辐臂4由多块耐磨复合钢板组合焊接而成,相邻两块耐磨复合钢板之间设有缝隙结构,每块耐磨复合钢板的中间均设有方形开孔5,还包括设置在所述开孔内与耐磨复合钢板焊接为一体的方块。A slurry shield cutter head for mudstone composite formation, the cutter head adopts a radial plate structure, including a cutter head frame 1, a cutter assembly 2 arranged on the cutter head frame, several main radial arms 3 and auxiliary radial arms 4, each The auxiliary radial arm 4 is welded together by a plurality of wear-resistant composite steel plates, a gap structure is provided between two adjacent wear-resistant composite steel plates, and a square opening 5 is provided in the middle of each wear-resistant composite steel plate, and a set A block welded as a whole with the wear-resistant composite steel plate in the opening.

本实施例中,相邻两块耐磨复合钢板之间的焊缝处,还增设有耐磨焊缝。所述耐磨焊缝的高度为4mm。主辐臂3和副辐臂4之间设有加强环筋6。本实施例还包括用于检测所述耐磨复合钢板磨损情况的磨损检测装置7。刀盘边缘设置保径刀,所述刀盘边缘保径刀高度为15mm,宽度150mm。由于圆砾地层不能换刀,因此,设置保径刀可以很好的保护刀盘。In this embodiment, a wear-resistant welding seam is additionally provided at the welding seam between two adjacent wear-resistant composite steel plates. The height of the wear-resistant weld is 4mm. A reinforcing ring rib 6 is provided between the main spoke arm 3 and the auxiliary spoke arm 4 . This embodiment also includes a wear detection device 7 for detecting the wear of the wear-resistant composite steel plate. A gauge knife is arranged on the edge of the cutterhead, and the height of the gauge knife on the edge of the cutterhead is 15mm and the width is 150mm. Since the round gravel formation cannot change the cutter, setting the gage cutter can protect the cutter head very well.

一种盾构机,包括上述的刀盘,还包括泥水处理系统和泥水冲刷系统。A shield machine includes the above-mentioned cutter head, and also includes a muddy water treatment system and a muddy water flushing system.

一种盾构机的快速掘进方法,采用了上述刀盘,具体掘进过程采用现有技术的方式,本方法中,开挖仓8压力每埋深1m为0.115bar,气垫仓9压力比开挖仓8压力高0.3bar,其中10为设置在开挖仓8与气垫仓9之间的埋墙门,所述刀盘的转速为0.8-1.0r/min,掘进推力为1000-1300T,掘进速度为25~40mm/min,注浆量为4.7-5.5m3,注浆压力为3-3.5bar,进泥量为850—900m3/h、排泥量为900—950m3/h。A rapid excavation method of a shield machine, which adopts the above-mentioned cutter head, and the specific excavation process adopts the method of the prior art. In this method, the pressure of the excavation chamber 8 is 0.115 bar per buried depth of 1m, and the pressure ratio of the air cushion chamber 9 is 0.115bar. The pressure of bin 8 is 0.3 bar higher, of which 10 is a buried wall door arranged between excavation bin 8 and air cushion bin 9, the speed of the cutter head is 0.8-1.0r/min, the thrust of excavation is 1000-1300T, and the excavation speed The grouting volume is 25-40mm/min, the grouting volume is 4.7-5.5m 3 , the grouting pressure is 3-3.5bar, the mud entry volume is 850-900m 3 /h, and the mud discharge volume is 900-950m 3 /h.

所述泥水处理系统采用压滤设备进行处理废浆,将废浆压成泥饼,滤出的清进行新鲜泥浆的调制。所述泥水冲刷系统采用高压冲刷方式,对排渣口格栅前方、刀盘背面以及刀具组件进行冲刷,改善了排渣口堵塞现象和刀盘结泥饼现象。The muddy water treatment system uses filter press equipment to process the waste slurry, presses the waste slurry into a mud cake, and prepares fresh mud with the filtered liquid. The muddy water flushing system adopts a high-pressure flushing method to flush the front of the slag outlet grid, the back of the cutter head and the cutter assembly, which improves the phenomenon of clogging of the slag outlet and mud cake formation on the cutter head.

本实施例选用一台APN型压滤设备及外加剂添加设备进行处理废浆,由被动变主动来调整泥浆性能指标。通过压滤设备进行废浆处理,满足了现有条件下的浆液形成指标调整,做到了“3R”原则,即减少原料(reduce)、重新利用(reuse)和物品回收(recycle)。经过压滤设备将废浆压成泥饼,滤出的清水又将进行新鲜泥浆调制,压制泥饼同时还可以进行车站顶板回填等作业,同时又降低施工成本。In this embodiment, an APN type filter press equipment and admixture adding equipment are selected to process the waste slurry, and the mud performance index is adjusted from passive to active. The waste slurry treatment through the filter press equipment meets the adjustment of the slurry formation index under the existing conditions, and achieves the "3R" principle, that is, reduce raw materials (reduce), reuse (reuse) and recycle (recycle). The waste slurry is pressed into a mud cake by the filter press equipment, and the filtered water will be prepared with fresh mud. At the same time, the pressing of the mud cake can also be used for station roof backfilling and other operations, while reducing construction costs.

同步注浆量考虑到浆液扩散系数,调整为4.7-5.5m3,泥水盾构超挖量少,泥浆产生的泥膜能抑制浆液的扩散,考虑盾尾同步注浆与刀盘开挖仓是连通状态,因此注浆压力应略大于开挖仓压力,控制在3-3.5bar之间(防止压力过小同步注浆量不足、压力过大浆液可能从盾尾漏出)。同步注浆量的分布是下穿期间控制重点,直线段加大上部注浆抑制管片上浮,转弯段加大上部与曲线外侧注浆抑制管片上浮与侧偏。排浆量过大将导致部分泥浆不能筛分直接进入储浆池导致泥浆比重上升影响正常施工;因此本实施例,将进泥量控制在850—900m3/h、排泥量控制900—950m3/h。The amount of synchronous grouting is adjusted to 4.7-5.5m 3 considering the diffusion coefficient of the slurry. The amount of overbreak of the mud-water shield is small, and the mud film produced by the mud can inhibit the diffusion of the slurry. Therefore, the grouting pressure should be slightly greater than the excavation chamber pressure, controlled between 3-3.5bar (to prevent insufficient synchronous grouting if the pressure is too low, and the grout may leak from the tail of the shield if the pressure is too high). The distribution of synchronous grouting amount is the key point of control during the downrunning period. Increase the upper grouting in the straight section to suppress the floating of the segment, and increase the grouting in the upper and outside of the curve to suppress the floating and lateral deviation of the segment. Excessive slurry discharge will result in part of the slurry not being screened and directly entering the slurry storage tank, resulting in an increase in the specific gravity of the slurry and affecting normal construction; therefore, in this embodiment, the mud intake is controlled at 850-900m 3 /h, and the mud discharge is controlled at 900-950m 3 /h.

将本实施例装置运用到具体一个工程运用中,取得了有益的效果。Applying the device of this embodiment to a specific engineering application has achieved beneficial effects.

1)对地表沉降的控制较好,同土压盾构机相比,优势非常明显。平均地表沉降量仅为3mm左右,而使用土压盾构机的相邻标段地表沉降量已经超过30mm。1) The control of surface settlement is better, and compared with the earth pressure shield machine, the advantage is very obvious. The average surface settlement is only about 3mm, while the surface settlement of adjacent sections using earth pressure shield machines has exceeded 30mm.

2)掘进速度理想。平均月进度达到270m/月。2) The tunneling speed is ideal. The average monthly progress reaches 270m/month.

3)对刀具的保护较好。根据全线经验,土压盾构机在圆砾地层中平均300~500m需要更换刀具一次。而本标段泥水盾构机一次掘进1468m,未更换刀具,贯通后的盾构机刀具85%仍可继续使用。3) Better protection for knives. According to the experience of the whole line, the earth pressure shield machine needs to replace the tool once in the round gravel formation on average 300-500m. However, the muddy water shield machine in this bidding section has excavated 1468m at a time, and the cutters have not been replaced, and 85% of the shield machine cutters can continue to be used after penetration.

最后说明的是,以上优选实施例仅用以说明本发明的技术方案而非限制,尽管通过上述优选实施例已经对本发明进行了详细的描述,但本领域技术人员应当理解,可以在形式上和细节上对其作出各种各样的改变,而不偏离本发明权利要求书所限定的范围。Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that it can be described in terms of form and Various changes may be made in the details without departing from the scope of the invention defined by the claims.

Claims (10)

1. a kind of mud stone compound stratum slurry shield cutterhead, the cutterhead uses plate spoke structure, including cutterhead frame, setting in knife Toolbox, several main spoke arms on plate rail and secondary spoke arm, it is characterised in that:Every secondary spoke arm is by polylith wear-resistant composite steel board group Conjunction is welded, and the gap structure for welding is equipped between adjacent two pieces of Wear-Resistant Compound Steel Plates, every piece of Wear-Resistant Compound Steel Plate Centre is equipped with square opening, further includes the square that setting is welded as a whole with Wear-Resistant Compound Steel Plate in the opening.
2. mud stone compound stratum slurry shield cutterhead according to claim 1, it is characterised in that:Adjacent two pieces wear-resisting compound Commissure between steel plate also has additional wear-resisting weld seam.
3. mud stone compound stratum slurry shield cutterhead according to claim 2, it is characterised in that:The height of the wear-resisting weld seam Degree is 4mm.
4. mud stone compound stratum slurry shield cutterhead according to claim 1, it is characterised in that:The main spoke arm and secondary spoke Enhancing steel ring is equipped between arm.
5. mud stone compound stratum slurry shield cutterhead according to claim 1, it is characterised in that:Further include for detecting State the wear detector of Wear-Resistant Compound Steel Plate abrasion condition.
6. mud stone compound stratum slurry shield cutterhead according to claim 1, it is characterised in that:Gauge is arranged in cutterhead edge Knife.
7. mud stone compound stratum slurry shield cutterhead according to claim 6, it is characterised in that:The gauge knife up degree is 15mm, width 150mm, quantity are 4.
8. a kind of shield machine, it is characterised in that:Further include Slurry treatment including such as claim 1-7 any one of them cutterhead System and muddy water flushing system, it is 0.115bar to excavate storehouse pressure per buried depth 1m, and it is high that air cushion storehouse pressure ratio excavates storehouse pressure The rotating speed of 0.3bar, the cutterhead are 0.8-1.0r/min, and driving thrust is 1000-1300T, and driving speed is 25~40mm/ Min, grouting amount 4.7-5.5m3, grouting pressure 3-3.5bar, inputiing mud volume is 850-900m3/ h, sludge volume are 900- 950m3/h。
9. a kind of speedy drivage method of shield machine, it is characterised in that:The Slurry treatment system is using at filtering equipment Useless slurry is managed, useless slurry is pressed into mud cake, the clear water filtered out carries out the modulation of fresh mud.
10. speedy drivage method according to claim 9, it is characterised in that:The muddy water flushing system is rushed using high pressure Brush mode washes away slag-drip opening grid front, the cutterhead back side and toolbox.
CN201810291286.1A 2018-03-30 2018-03-30 A kind of mud stone compound stratum slurry shield cutterhead, shield machine, speedy drivage method Pending CN108708732A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810291286.1A CN108708732A (en) 2018-03-30 2018-03-30 A kind of mud stone compound stratum slurry shield cutterhead, shield machine, speedy drivage method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810291286.1A CN108708732A (en) 2018-03-30 2018-03-30 A kind of mud stone compound stratum slurry shield cutterhead, shield machine, speedy drivage method

Publications (1)

Publication Number Publication Date
CN108708732A true CN108708732A (en) 2018-10-26

Family

ID=63866615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810291286.1A Pending CN108708732A (en) 2018-03-30 2018-03-30 A kind of mud stone compound stratum slurry shield cutterhead, shield machine, speedy drivage method

Country Status (1)

Country Link
CN (1) CN108708732A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206939A (en) * 2020-02-20 2020-05-29 浙江鼎昊新能源设备股份有限公司 Shield tunneling machine cutter head applied to multi-rock environment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000297595A (en) * 1999-04-15 2000-10-24 Komatsu Ltd Tunnel excavating method and shield excavator therefor
CN101838062A (en) * 2010-06-01 2010-09-22 中铁隧道股份有限公司 Slurry shield slurry modulation process
CN102071942A (en) * 2010-12-02 2011-05-25 沈阳重型机械集团有限责任公司 Processing method for protecting excavation place of shield machine from mudlining
CN202194670U (en) * 2011-08-30 2012-04-18 中国铁建重工集团有限公司 Shield cutter head for mix ground
CN106555594A (en) * 2016-12-05 2017-04-05 中铁工程装备集团有限公司 A kind of normal pressure tool changing cutterhead
CN206352506U (en) * 2016-08-31 2017-07-25 中铁十六局集团北京轨道交通工程建设有限公司 A kind of cutter head of shield machine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000297595A (en) * 1999-04-15 2000-10-24 Komatsu Ltd Tunnel excavating method and shield excavator therefor
CN101838062A (en) * 2010-06-01 2010-09-22 中铁隧道股份有限公司 Slurry shield slurry modulation process
CN102071942A (en) * 2010-12-02 2011-05-25 沈阳重型机械集团有限责任公司 Processing method for protecting excavation place of shield machine from mudlining
CN202194670U (en) * 2011-08-30 2012-04-18 中国铁建重工集团有限公司 Shield cutter head for mix ground
CN206352506U (en) * 2016-08-31 2017-07-25 中铁十六局集团北京轨道交通工程建设有限公司 A kind of cutter head of shield machine
CN106555594A (en) * 2016-12-05 2017-04-05 中铁工程装备集团有限公司 A kind of normal pressure tool changing cutterhead

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
房中玉: "Φ14.9m超大直径泥水平衡盾构隧道施工与防水关键技术研究", <<中南大学硕士学位论文>> *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206939A (en) * 2020-02-20 2020-05-29 浙江鼎昊新能源设备股份有限公司 Shield tunneling machine cutter head applied to multi-rock environment
CN111206939B (en) * 2020-02-20 2022-02-11 浙江鼎昊新能源设备股份有限公司 Shield tunneling machine cutter head applied to multi-rock environment

Similar Documents

Publication Publication Date Title
Maidl et al. Mechanised shield tunnelling
CN104653191B (en) A kind of method of earth pressure shield tunneling machine high efficient driving in rich water round gravel stratum
CN102364049B (en) Hard rock composite TBM (Tunnel Boring Machine) suitable for composite stratum and tunneling mode thereof
CN103938617B (en) A kind of ultra-deep underground continuous wall and construction method thereof
CN105443138A (en) Small-diameter hard rock pipe-jacking machine suitable for complex strata
CN104594912A (en) Method for grinding and penetrating through pile groups through shield tunneling machine
CN109812271B (en) Construction method for shield-crossing limited box culvert
CN112392500A (en) High-strength rock crushing push bench for composite stratum
CN112576263A (en) Special cleaning mechanism for shield tunnel of soft soil foundation and using method
CN208669306U (en) One kind being adapted to existing tunnel enlarged diameter type shield machine
CN117703408A (en) A construction method for continuous shield cutting through reinforced concrete ground connecting walls
CN103953354A (en) Open type shield machine
CN108708732A (en) A kind of mud stone compound stratum slurry shield cutterhead, shield machine, speedy drivage method
CN105114087A (en) Cutter head of shield tunneling machine
CN114183139A (en) Control method and control device for working face affected by mining
CN109707394B (en) A construction method for the tunnel door at the receiving end of the shield tunnel of the subway tunnel
CN207934897U (en) A kind of shield tool changing ground-connecting-wall ruggedized construction
CN206942770U (en) A kind of shape of a hoof development machine promoted by crawler belt
JP2010013905A (en) Excavated soil treating system in shield method
CN112709579A (en) Quick-forming development machine for river and canal
Chen et al. Cutting, Wear and replacement of cutting tools during shield tunneling
CN111852554B (en) Rapid trenching method for large water inrush quantity pit open-pit mine small-block full-section deep one-time blasting
CN214366069U (en) A shield cutter head suitable for soft and hard composite formation
CN205025468U (en) Cutter disc for shield tunneling machine
Newman et al. Effects of changing geology on the performance of a tunnel boring machine for the Thames Tideway Tunnel, London, UK

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181026

RJ01 Rejection of invention patent application after publication