[go: up one dir, main page]

CN108708577A - Dry zoning chassis between a kind of integral bathroom and using between its integral bathroom - Google Patents

Dry zoning chassis between a kind of integral bathroom and using between its integral bathroom Download PDF

Info

Publication number
CN108708577A
CN108708577A CN201810635699.7A CN201810635699A CN108708577A CN 108708577 A CN108708577 A CN 108708577A CN 201810635699 A CN201810635699 A CN 201810635699A CN 108708577 A CN108708577 A CN 108708577A
Authority
CN
China
Prior art keywords
area
dry
wet
wet area
chassis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810635699.7A
Other languages
Chinese (zh)
Other versions
CN108708577B (en
Inventor
关孝海
杨立鑫
廖冶涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Innoci Toilet And Bathroom Article Co Ltd
Guangdong Dongpeng Holdings Co Ltd
Foshan Dongpeng Sanitary Ware Co Ltd
Original Assignee
Guangdong Innoci Toilet And Bathroom Article Co Ltd
Guangdong Dongpeng Holdings Co Ltd
Foshan Dongpeng Sanitary Ware Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Innoci Toilet And Bathroom Article Co Ltd, Guangdong Dongpeng Holdings Co Ltd, Foshan Dongpeng Sanitary Ware Co Ltd filed Critical Guangdong Innoci Toilet And Bathroom Article Co Ltd
Priority to CN201810635699.7A priority Critical patent/CN108708577B/en
Publication of CN108708577A publication Critical patent/CN108708577A/en
Application granted granted Critical
Publication of CN108708577B publication Critical patent/CN108708577B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/125Small buildings, arranged in other buildings
    • E04H1/1266Cubicles for dressing; Toilets
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Sink And Installation For Waste Water (AREA)
  • Residential Or Office Buildings (AREA)

Abstract

The invention discloses the dry zoning chassis between a kind of integral bathroom,Including the chassis Gan Qu,Wet area chassis and dry and wet zone door,The left side on the chassis Gan Qu is abutted with the right side on wet area chassis,Dry and wet zone door includes left interconnecting piece,Middle interconnecting piece and right interconnecting piece,Left interconnecting piece and right interconnecting piece are rectangular plate-like,The upper end of left interconnecting piece is connect with the left end of middle interconnecting piece,The upper end of right interconnecting piece is connect with the right end of middle interconnecting piece,Dry and wet zone door is buckled on the bearing surface on the chassis Gan Qu and wet area chassis,The upper surface on the chassis Gan Qu is equipped with dry area's decorative panel,The upper surface on wet area chassis is equipped with wet area's decorative panel,The left side of dry area's decorative panel uses waterproof glue bond with the right surface of right interconnecting piece,The right side of wet area's decorative panel uses waterproof glue bond with the left surface of left interconnecting piece,The middle interconnecting piece of dry and wet zone door is respectively higher than the upper surface of the upper surface and wet area's decorative panel of dry area's decorative panel;The ponding that the application can be effectively prevent in wet area flows in dry area.

Description

Dry zoning chassis between a kind of integral bathroom and using between its integral bathroom
Technical field
The present invention relates between field between integral bathroom more particularly to a kind of integral bathroom dry zoning chassis and act on it Integral bathroom between.
Background technology
Due between integral bathroom compared to traditional bathroom have be easily installed, waterproof effect is excellent, heat-insulating property is outstanding The reliable advantage with sound construction, so more and more people are more partial to installation entirety when carrying out bathroom finishing now Bathroom, but since the chassis between traditional integral bathroom uses integrated design, corresponding separator is had no on chassis Dry area (toilet) and wet area (shower cabinet) is separated, so when the ponding in wet area is more, ponding can be from shower doors Bottom pass through, and enter in Gan Qu chassis, waterproof effect is poor, and the bottom of entire bathroom can be made when wet area is taken a shower Ponding is on disk everywhere, using being inconvenient.
Invention content
It is an object of the invention to propose a kind of dry zoning chassis between integral bathroom and using between its integral bathroom, To solve the above problems.
For this purpose, the present invention uses following technical scheme:
A kind of dry zoning chassis between integral bathroom, including the chassis Gan Qu, wet area chassis and dry and wet zone door, it is described dry The left side on area chassis is abutted with the right side on the wet area chassis, and the dry and wet zone door includes left interconnecting piece, middle interconnecting piece With right interconnecting piece, the left interconnecting piece and the right interconnecting piece are rectangular plate-like, the upper end of the left interconnecting piece with it is described in The left end of interconnecting piece connects, and the upper end of the right interconnecting piece is connect with the right end of the middle interconnecting piece, the dry and wet zone door button On the bearing surface on the chassis Gan Qu and the wet area chassis, the upper surface on the chassis Gan Qu is equipped with dry area's decorative panel, The upper surface on the wet area chassis is equipped with wet area's decorative panel, the right table of the left side and the right interconnecting piece of dry area's decorative panel Face uses waterproof glue bond, the right side of wet area's decorative panel to use waterproof glue bond with the left surface of the left interconnecting piece, The middle interconnecting piece of the dry and wet zone door is respectively higher than the upper surface of the upper surface and wet area's decorative panel of dry area's decorative panel.
The chassis Gan Qu includes dry area's support leg, dry area's supporting rack, dry area's bottom plate, dry area's aluminum honeycomb panel, the surfaces Gan Qu Connector, dry area's support leg are fixed on the lower surface of dry area's supporting rack, and dry area's bottom plate is arranged in the dry area The upper surface of supporting rack, dry area's aluminum honeycomb panel are arranged in the upper surface of dry area's bottom plate, the surfaces Gan Qu connector It is arranged in the upper surface of the aluminum honeycomb panel;
The wet area chassis includes wet area's support leg, wet area's supporting rack, wet area's bottom plate, wet area's aluminum honeycomb panel, wet area surface Connector, wet area's support leg are fixed on the lower surface of wet area's supporting rack, and wet area's bottom plate is arranged in the wet area The upper surface of supporting rack, wet area's aluminum honeycomb panel are arranged in the upper surface of wet area's bottom plate, the wet area surface connector It is arranged in the upper surface of the aluminum honeycomb panel.
The surfaces Gan Qu connector is rectangular disk structure, and dry area's decorative panel is layered on the surfaces Gan Qu connector In inner bottom surface, the top of the side wall of the surfaces Gan Qu connector is higher than the upper surface of dry area's decorative panel, the dry area Waterproof glue bond is used between the end face of decorative panel and the madial wall of the surfaces Gan Qu connector;
The wet area surface connector is rectangular disk structure, and wet area's decorative panel is laid on the wet area surface connection In the inner bottom surface of part, the top of the side wall of the wet area surface connector is higher than the upper surface of wet area's decorative panel, described Waterproof glue bond is used between the end face of wet area's decorative panel and the madial wall of the wet area surface connector;
The left side wall of the surfaces Gan Qu connector is abutted with the right side wall of the wet area surface connector, the left side wall It is stretched into the dry and wet zone door with the right side wall.
Dry area's supporting rack includes dry area's frame, dry area's supporting beam and the dry area installation nut of rectangle, the sides Gan Qu Four sides of frame are rectangular tubular structure, and the rectangle surrounded in dry area's frame is arranged in dry area's supporting beam crisscrossly Interior, dry area's installation nut is multiple, and dry area's installation nut is uniformly arranged on dry area's frame and dry area's branch The bottom surface of beam is supportted, the upper end of dry area's support leg is equipped with screw thread, and dry area's support leg installs nut thread with the dry area Connection;
The wet supporting rack includes wet area's frame, wet area's supporting beam and the wet area installation nut of rectangle, wet area's frame Four sides be rectangular tubular structure, wet area's supporting beam is arranged in wet area's frame, and wet area's installation nut is Multiple, wet area's installation nut is uniformly arranged on the bottom surface of wet area's frame and wet area's supporting beam, wet area's branch Spike upper end is equipped with screw thread, and wet area's support leg is connect with wet area's installation nut thread.
The upper end of each dry area's support leg is equipped with dry area's adjusting nut, dry area's adjusting nut and dry area's branch The screw-thread fit of the upper end of spike, the upper surface of dry area's adjusting nut are against the lower surface of dry area's installation nut;
The upper end of each wet area's support leg is equipped with wet area's adjusting nut, wet area's adjusting nut and wet area's branch The screw-thread fit of the upper end of spike, the upper surface of wet area's adjusting nut are against the lower surface of wet area's installation nut.
The lower surface of dry area's installation nut and dry area's frame or dry area's supporting beam is welded and fixed, described dry The lower surface of area's frame and dry area's supporting beam be equipped with multiple dry area's mounting holes, dry area's mounting hole respectively with the dry area Installation nut is concentric, and dry area's frame or the dry area are stretched into the upper end of dry area's support leg across dry area's mounting hole The inside of supporting beam;
The lower surface of wet area's installation nut and wet area's frame is welded and fixed, and the lower surface of wet area's frame is set Have multiple wet area's mounting holes, wet area's mounting hole is concentric with wet area's installation nut respectively, wet area's support leg it is upper The inside of wet area's frame is stretched at end across wet area's mounting hole.
Dry area's decorative panel and wet area's decorative panel are respectively one or more in ceramics, glass or stone material.
The top of the dry and wet zone door is higher 2cm-5cm than the upper surface of dry area's decorative panel, the dry and wet zone door Top be higher by 2cm-5cm than the upper surface of wet area's decorative panel.
The side wall top of the surfaces Gan Qu connector is higher 1.5cm-4.5cm than the upper surface of dry area's decorative panel;Institute The side wall top of the areas Shu Shi surface connector is higher 1.5cm-4.5cm than the upper surface of the wet decorative panel.
Between a kind of integral bathroom using the dry zoning chassis between a kind of above-mentioned integral bathroom.
The beneficial effects of the invention are as follows:Due to generally including dry area and wet area between integral bathroom, due to being carried out in wet area When shower, the ponding water on the ground in wet area readily flows on the ground in dry area, and the ground in the areas Shi Gan also generates ponding, uses ten Divide inconvenience;Chassis between integral bathroom is divided into the chassis Gan Qu and wet area chassis by the application, and by dry and wet zone door to doing area Chassis and wet area chassis are separated, and the water that can be effectively prevent in wet area flows to Gan Qu, and the surface on the areas Shi Gan chassis keeps dry Refreshing, dry area's decorative panel and wet area's decorative panel can carry out bonding to play preventing from accumulating with dry and wet zone door using marine glue respectively Gap of the water between dry and wet zone door and dry area's decorative panel or wet area's decorative panel is penetrated into chassis, and waterproof action is played;Dry area Chassis can have more matched combineds with wet area chassis using split-type design, and it is empty to be adapted to bathroom of different shapes Between, and the chassis Gan Qu and wet area chassis are smaller than the chassis volume of monoblock type after fractionation, more convenient can transport.
Description of the drawings
The present invention will be further described for attached drawing, but the content in attached drawing does not constitute any limitation of the invention.
Fig. 1 is the structural schematic diagram between the integral bathroom of the one of embodiment of the present invention;
Fig. 2 is the attachment structure schematic diagram on the chassis Gan Qu and wet area chassis of the one of embodiment of the present invention;
Fig. 3 is the overlooking structure diagram of dry area's supporting rack of the one of embodiment of the present invention;
Fig. 4 is the overlooking structure diagram of wet area's supporting rack of the one of embodiment of the present invention;
Wherein:The chassis Gan Qu 1, wet area chassis 2, dry and wet zone door 3, dry area's decorative panel 11, dry area's support leg 12, dry area's branch Support 13, dry area's bottom plate 14, dry area's aluminum honeycomb panel 15, the surfaces Gan Qu connector 16, dry area's adjusting nut 17, wet area's decorative panel 21, wet area's support leg 22, wet area's supporting rack 23, wet area's bottom plate 24, wet area's aluminum honeycomb panel 25, wet area surface connector 26, wet area Adjusting nut 27, left interconnecting piece 31, middle interconnecting piece 32, right interconnecting piece 33, dry area's frame 131, dry area's supporting beam 132, dry area's peace Nut 233 is installed in loading nut 133, wet area's frame 231, wet area's supporting beam 232, wet area.
Specific implementation mode
Technical solution to further illustrate the present invention below with reference to the accompanying drawings and specific embodiments.
A kind of dry zoning chassis between the integral bathroom of the present embodiment, as depicted in figs. 1 and 2, including the chassis Gan Qu 1, Wet area chassis 2 and dry and wet zone door 3, the left side on the chassis Gan Qu 1 is abutted with the right side on the wet area chassis 2, described Dry and wet zone door 3 includes left interconnecting piece 31, middle interconnecting piece 32 and right interconnecting piece 33, the left interconnecting piece 31 and the right interconnecting piece 33 be rectangular plate-like, and the upper end of the left interconnecting piece 31 is connect with the left end of the middle interconnecting piece 32, the right interconnecting piece 33 Upper end connect with the right end of the middle interconnecting piece 32, the dry and wet zone door 3 is buckled in the chassis Gan Qu 1 and the wet area bottom On the bearing surface of disk 2, the upper surface on the chassis Gan Qu 1 is equipped with dry area's decorative panel 11, and the upper surface on the wet area chassis 2 is set The areas You Shi decorative panel 21, the left side of dry area's decorative panel 11 use waterproof gluing with the right surface of the right interconnecting piece 33 It closes, the right side of wet area's decorative panel 21 uses waterproof glue bond, the dry and wet zone with the left surface of the left interconnecting piece 31 The middle interconnecting piece 32 of door 3 is respectively higher than the upper surface of the upper surface and wet area's decorative panel 21 of dry area's decorative panel 11.
It is when in use due to wet area, wet due to being generally included between integral bathroom dry area (toilet) and wet area (shower cabinet) Ponding water on the ground in area readily flows on the ground in dry area, and the ground in the areas Shi Gan also generates ponding, using being inconvenient;This Chassis between integral bathroom is divided into the chassis Gan Qu 1 and wet area chassis 2 by application, and by dry and wet zone door 3 to 1 He of the chassis Gan Qu Wet area chassis 2 is separated, and the water that can be effectively prevent in wet area flows to Gan Qu, and the surface on the areas Shi Gan chassis 1 keeps dry and comfortable, does Area's decorative panel 11 and wet area's decorative panel 21 can carry out bonding with dry and wet zone door 3 using marine glue respectively to be played prevents from accumulating Gap of the water between dry and wet zone door 3 and dry area's decorative panel 11 or wet area's decorative panel 21 is penetrated into chassis, and waterproof action is played; The chassis Gan Qu 1 can have more matched combineds with wet area chassis 2 using split-type design, be adapted to of different shapes defend Space is bathed, and the chassis Gan Qu 1 and wet area chassis 2 are smaller than the chassis volume of monoblock type after fractionation, more convenient can transport It is defeated.
The chassis Gan Qu 1 include dry area's support leg 12, dry area's supporting rack 13, dry area's bottom plate 14, dry area's aluminum honeycomb panel 15, The surfaces Gan Qu connector 16, dry area's support leg 12 are fixed on the lower surface of dry area's supporting rack 13, dry area's bottom plate 14 are arranged in the upper surface of dry area's supporting rack 13, and the upper table in dry area's bottom plate 14 is arranged in dry area's aluminum honeycomb panel 15 Face, the surfaces Gan Qu connector 16 are arranged in the upper surface of the aluminum honeycomb panel;
The wet area chassis 2 include wet area's support leg 22, wet area's supporting rack 23, wet area's bottom plate 24, wet area's aluminum honeycomb panel 25, Wet area surface connector 26, wet area's support leg 22 are fixed on the lower surface of wet area's supporting rack 23, wet area's bottom plate 24 are arranged in the upper surface of wet area's supporting rack 23, and the upper table in wet area's bottom plate 24 is arranged in wet area's aluminum honeycomb panel 25 Face, the wet area surface connector 26 are arranged in the upper surface of the aluminum honeycomb panel.
Dry area's aluminum honeycomb and wet area's aluminum honeycomb panel 25 have that light weight, intensity are high, rigidity is big and that heat-insulating property is remarkable is excellent Point, it is ensured that there is larger load-bearing capacity, long-time service to be unlikely to deform for the chassis Gan Qu 1 and wet area chassis 2;Lighter quality It can the 2 more convenient transport of the areas Shi Gan chassis 1 and wet area chassis;Remarkable heat-insulating property can make user in integral bathroom When being taken a shower, heat is not easy to scatter and disappear from the chassis Gan Qu 1 and wet area chassis 2, makes to be maintained at certain humidity model between integral bathroom It encloses, user is not easy to catch a cold, and experience of taking a shower is preferable;Dry area's support leg 12, dry area's supporting rack 13, wet area's support leg 22 and the support of wet area The areas Jia23Dui Gan chassis 1 and wet area chassis 2 play the role of support, the areas Shi Gan chassis 1 and wet area chassis 2 and keep certain with ground Distance, chassis will not be impacted ponding occurs in ground.
The surfaces Gan Qu connector 16 is rectangular disk structure, and dry area's decorative panel 11 is layered on the surfaces Gan Qu and connects In 16 inner bottom surface of fitting, the top of the side wall of the surfaces Gan Qu connector 16 is higher than the upper table of dry area's decorative panel 11 Face uses waterproof glue bond between the end face and the madial wall of the surfaces Gan Qu connector 16 of dry area's decorative panel 11;
The wet area surface connector 26 is rectangular disk structure, and wet area's decorative panel 21 is laid on the wet area surface In the inner bottom surface of connector 26, the top of the side wall of the wet area surface connector 26 is upper higher than wet area's decorative panel 21 Surface uses waterproof glue bond between the end face of wet area's decorative panel 21 and the madial wall of the wet area surface connector 26;
The left side wall of the surfaces Gan Qu connector 16 is abutted with the right side wall of the wet area surface connector 26, the left side Side wall and the right side wall stretch into the dry and wet zone door 3.
The surfaces Gan Qu connector 16 and wet area surface connector 26 are respectively set to disk-like structure it is possible to prevente effectively from dry area The ponding on chassis 1 and wet 2 surface of area chassis flows out from the surrounding on the chassis Gan Qu 1 or wet area chassis 2 and causes drainage.
As shown in figure 3, dry area's supporting rack 13 includes dry area's frame 131, dry area's supporting beam 132 and the dry area peace of rectangle Four sides of loading nut 133, dry area's frame 131 are rectangular tubular structure, and dry area's supporting beam 132 is set crisscrossly It sets in the rectangle that dry area's frame 131 surrounds, dry area's installation nut 133 is multiple, and nut 133 is installed in the dry area It is uniformly arranged on the bottom surface of dry area's frame 131 and dry area's supporting beam 132, the upper end of dry area's support leg 12 is equipped with Screw thread, dry area's support leg 12 are threadedly coupled with dry area's installation nut 133;
As shown in figure 4, the wet supporting rack includes wet area's frame 231, wet area's supporting beam 232 and the wet area installation spiral shell of rectangle Mother 233, four sides of wet area's frame 231 are rectangular tubular structure, and wet area's supporting beam 232 is arranged on the wet area side In frame 231, wet area's installation nut 233 is multiple, and wet area's installation nut 233 is uniformly arranged on wet area's frame 231 and wet area's supporting beam 232 bottom surface, wet 22 upper end of area's support leg be equipped with screw thread, wet area's support leg 22 with Wet area's installation nut 233 is threadedly coupled.
Dry area's supporting rack 13 and wet area's supporting rack 23 are respectively set dry area's supporting beam 132 and wet area's supporting beam 232 and can carry The intensity on high level cadre area chassis 1 and wet area chassis 2 improves the load-bearing capacity on the chassis Gan Qu 1 and wet area chassis 2, even if making for a long time With the phenomenon that recessed among chassis or other chassis deformations will not occur.
The upper end of each dry area's support leg 12 is equipped with dry area's adjusting nut 17, dry area's adjusting nut 17 with it is described The upper surface of the screw-thread fit of the upper end of dry area's support leg 12, dry area's adjusting nut 17 is against dry area's installation nut 133 lower surface;
The upper end of each wet area's support leg 22 be equipped with wet area's adjusting nut 27, wet area's adjusting nut 27 with it is described The upper surface of the screw-thread fit of the upper end of wet area's support leg 22, wet area's adjusting nut 27 is against wet area's installation nut 233 lower surface.
Ground out-of-flatness between integral bathroom is installed, the meeting areas Shi Gan chassis 1 and wet chassis are susceptible to shaking when mounted, It is done at each and dry area's adjusting nut 17 and wet area's adjusting nut 27 is respectively set in area's support leg 12 and wet area's support leg 22, it can Height to do area's support leg 12 and each wet area's support leg 22 to each respectively is finely adjusted, to adapt to different ground Highly, prevent the chassis Gan Qu 1 and wet area chassis 2 from shaking after mounting.
Dry area's installation nut 133 and the welding of the lower surface of dry area's frame 131 or dry area's supporting beam 132 are solid Fixed, the lower surface of dry area's frame 131 and dry area's supporting beam 132 is equipped with multiple dry area's mounting holes, dry area's installation Hole is concentric with dry area's installation nut 133 respectively, and the upper end of dry area's support leg 12 is stretched into across dry area's mounting hole The inside of dry area's frame 131 or dry area's supporting beam 132;
Wet area's installation nut 233 and the lower surface of wet area's frame 231 are welded and fixed, wet area's frame 231 Lower surface be equipped with multiple wet area's mounting holes, wet area's mounting hole is concentric with the wet area installation nut 233 respectively, described wet The upper end of area's support leg 22 stretches into the inside of wet area's frame 231 across wet area's mounting hole.
It the head of dry area's support leg 12 and wet area's support leg 22 can be upper and lower in dry area's mounting hole and wet area's mounting hole respectively Mobile, the stroke bigger of the up and down adjustment of the areas Shi Gan support leg 12 and wet area's support leg 22 is suitable for the larger ground of difference in height, Application is wider.
Dry area's decorative panel 11 and wet area's decorative panel 21 are respectively ceramics, glass or one kind or more in stone material Kind.
The plank of unlike material has different decorative effects, can meet the esthetic requirement of different clients.
The top of the dry and wet zone door 3 is higher 2cm-5cm than the upper surface of dry area's decorative panel 11, the dry and wet zone gear The top of lid 3 is higher by 2cm-5cm than the upper surface of wet area's decorative panel 21.
When the difference in height of the top of dry and wet zone door 3 and the upper surface of wet area's decorative panel 21 is less than 2cm, then it is difficult to play pair The compartmentation on the chassis Gan Qu 1 and wet area chassis 2, the water on wet area chassis 2, which is easy to cover dry and wet zone door 3, flows to the chassis Gan Qu 1;Top when dry and wet zone door 3 and decorative panel
The side wall top of the surfaces Gan Qu connector 16 is higher 1.5cm- than the upper surface of dry area's decorative panel 11 4.5cm;The side wall top of the wet area surface connector 26 is higher 1.5cm-4.5cm than the upper surface of the wet decorative panel.
The side wall of the surfaces Gan Qu connector 16 and the side wall of wet area surface connector 26, which each serve as, prevents the areas Shui Conggan bottom The effect of the surrounding of disk 1 and the outflow of the surrounding on wet area chassis 2:When the side of 16/ wet area surface connector 26 of the surfaces Gan Qu connector When the difference in height of the upper surface of 11/ wet area's decorative panel 21 of the areas Bi Yugan decorative panel is less than 1.5cm, 1/ wet area chassis 2 of the chassis Gan Qu Interior ponding is easy to diffuse out from the side of 16/ wet area surface connector 26 of the surfaces Gan Qu connector, forms drainage, Dang Ganqu The height of the side wall of 16/ wet area surface connector 26 of surface connector and the upper surface of 11/ wet area's decorative panel 21 of dry area's decorative panel When difference is more than 4.5cm, the waste of material can be caused, and user is easy to be wet by the surfaces Gan Qu connector 16/ when coming in and going out bathroom The side wall of area surface connector 26 is mixed down.
Between a kind of integral bathroom using the dry zoning chassis between a kind of above-mentioned integral bathroom.
The technical principle of the present invention is described above in association with specific embodiment.These descriptions are intended merely to explain the present invention's Principle, and it cannot be construed to limiting the scope of the invention in any way.Based on the explanation herein, the technology of this field Personnel would not require any inventive effort the other specific implementation modes that can associate the present invention, these modes are fallen within Within protection scope of the present invention.

Claims (10)

1. the dry zoning chassis between a kind of integral bathroom, which is characterized in that kept off including the chassis Gan Qu, wet area chassis and dry and wet zone Lid, the left side on the chassis Gan Qu abuts with the right side on the wet area chassis, the dry and wet zone door include left interconnecting piece, Middle interconnecting piece and right interconnecting piece, the left interconnecting piece and the right interconnecting piece are rectangular plate-like, the upper end of the left interconnecting piece It is connect with the left end of the middle interconnecting piece, the upper end of the right interconnecting piece is connect with the right end of the middle interconnecting piece, the dry and wet Area's door is buckled on the bearing surface on the chassis Gan Qu and the wet area chassis, and the upper surface on the chassis Gan Qu is equipped with dry area The upper surface of decorative panel, the wet area chassis is equipped with wet area's decorative panel, left side and the right connection of dry area's decorative panel The right surface in portion uses waterproof glue bond, the right side of wet area's decorative panel to use waterproof with the left surface of the left interconnecting piece Glue bond, the middle interconnecting piece of the dry and wet zone door be respectively higher than dry area's decorative panel upper surface and wet area's decorative panel it is upper Surface.
2. the dry zoning chassis between a kind of integral bathroom according to claim 1, which is characterized in that the chassis Gan Qu Including dry area's support leg, dry area's supporting rack, dry area's bottom plate, dry area's aluminum honeycomb panel, the surfaces Gan Qu connector, dry area's support leg It is fixed on the lower surface of dry area's supporting rack, dry area's bottom plate is arranged in the upper surface of dry area's supporting rack, described dry Area's aluminum honeycomb panel is arranged in the upper surface of dry area's bottom plate, and the surfaces Gan Qu connector is arranged in the upper of the aluminum honeycomb panel Surface;
The wet area chassis includes wet area's support leg, wet area's supporting rack, wet area's bottom plate, wet area's aluminum honeycomb panel, the connection of wet area surface Part, wet area's support leg are fixed on the lower surface of wet area's supporting rack, and wet area's bottom plate setting supports in the wet area The upper surface of frame, wet area's aluminum honeycomb panel are arranged in the upper surface of wet area's bottom plate, the wet area surface connector setting In the upper surface of the aluminum honeycomb panel.
3. the dry zoning chassis between a kind of integral bathroom according to claim 2, which is characterized in that the surfaces Gan Qu Connector is rectangular disk structure, and dry area's decorative panel is layered in the surfaces the Gan Qu connector inner bottom surface, the dry area The top of the side wall of surface connector is higher than the upper surface of dry area's decorative panel, and the end face of dry area's decorative panel is done with described Waterproof glue bond is used between the madial wall of area surface connector;
The wet area surface connector is rectangular disk structure, and wet area's decorative panel is laid on the wet area surface connector In inner bottom surface, the top of the side wall of the wet area surface connector is higher than the upper surface of wet area's decorative panel, the wet area Waterproof glue bond is used between the end face of decorative panel and the madial wall of the wet area surface connector;
The left side wall of the surfaces Gan Qu connector is abutted with the right side wall of the wet area surface connector, the left side wall and institute Right side wall is stated to stretch into the dry and wet zone door.
4. the dry zoning chassis between a kind of integral bathroom according to claim 2, which is characterized in that dry area's support Frame includes dry area's frame, dry area's supporting beam and the dry area installation nut of rectangle, and four sides of dry area's frame are rectangular tubular Structure, dry area's supporting beam are arranged crisscrossly in the rectangle that dry area's frame surrounds, and nut is installed in the dry area To be multiple, dry area's installation nut is uniformly arranged on the bottom surface of dry area's frame and dry area's supporting beam, the dry area The upper end of support leg is equipped with screw thread, and dry area's support leg is connect with dry area's installation nut thread;
The wet supporting rack includes wet area's frame of rectangle, wet area's supporting beam and wet area installation nut, and the four of wet area's frame While be rectangular tubular structure, wet area's supporting beam is arranged in wet area's frame, wet area's installation nut be it is multiple, The wet area installation nut is uniformly arranged on the bottom surface of wet area's frame and wet area's supporting beam, in wet area's support leg End is equipped with screw thread, and wet area's support leg is connect with wet area's installation nut thread.
5. the dry zoning chassis between a kind of integral bathroom according to claim 4, which is characterized in that each dry area The upper end of support leg is equipped with dry area's adjusting nut, and dry area's adjusting nut and the screw thread of the upper end of dry area's support leg are matched It closes, the upper surface of dry area's adjusting nut is against the lower surface of dry area's installation nut;
The upper end of each wet area's support leg is equipped with wet area's adjusting nut, wet area's adjusting nut and wet area's support leg Upper end screw-thread fit, the upper surface of wet area's adjusting nut is against the lower surface of wet area's installation nut.
6. the dry zoning chassis between a kind of integral bathroom according to claim 4, which is characterized in that dry area's installation The lower surface of nut and dry area's frame or dry area's supporting beam is welded and fixed, dry area's frame and dry area's support The lower surface of beam is equipped with multiple dry area's mounting holes, and dry area's mounting hole is concentric with dry area's installation nut respectively, described dry The upper end of area's support leg stretches into the inside of dry area's frame or dry area's supporting beam across dry area's mounting hole;
The lower surface of wet area's installation nut and wet area's frame is welded and fixed, and the lower surface of wet area's frame is equipped with more The areas Ge Shi mounting hole, wet area's mounting hole is concentric with wet area's installation nut respectively, and the upper end of wet area's support leg is worn Cross the inside that wet area's mounting hole stretches into wet area's frame.
7. the dry zoning chassis between a kind of integral bathroom according to claim 1, which is characterized in that dry area's decoration Plate and wet area's decorative panel are respectively one or more in ceramics, glass or stone material.
8. the dry zoning chassis between a kind of integral bathroom according to claim 1, which is characterized in that the dry and wet zone gear The top of lid is higher 2cm-5cm than the upper surface of dry area's decorative panel, and the top of the dry and wet zone door is decorated than the wet area The upper surface of plate is higher by 2cm-5cm.
9. the dry zoning chassis between a kind of integral bathroom according to claim 3, which is characterized in that the surfaces Gan Qu The side wall top of connector is higher 1.5cm-4.5cm than the upper surface of dry area's decorative panel;The side of the wet area surface connector Wall top is higher 1.5cm-4.5cm than the upper surface of the wet decorative panel.
10. between a kind of integral bathroom on the dry zoning chassis between any a kind of integral bathroom using claim 1-9.
CN201810635699.7A 2018-06-20 2018-06-20 Dry-wet partition chassis of integral bathroom and integral bathroom using same Active CN108708577B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810635699.7A CN108708577B (en) 2018-06-20 2018-06-20 Dry-wet partition chassis of integral bathroom and integral bathroom using same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810635699.7A CN108708577B (en) 2018-06-20 2018-06-20 Dry-wet partition chassis of integral bathroom and integral bathroom using same

Publications (2)

Publication Number Publication Date
CN108708577A true CN108708577A (en) 2018-10-26
CN108708577B CN108708577B (en) 2023-11-14

Family

ID=63872908

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810635699.7A Active CN108708577B (en) 2018-06-20 2018-06-20 Dry-wet partition chassis of integral bathroom and integral bathroom using same

Country Status (1)

Country Link
CN (1) CN108708577B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110541469A (en) * 2019-09-30 2019-12-06 谢伦杰 Waterproof chassis of integrated bathroom of assembled
CN110541467A (en) * 2019-09-30 2019-12-06 贵州群之英科技铸造有限公司 Waterproof chassis of integrated bathroom of assembled
CN113180520A (en) * 2020-11-06 2021-07-30 深圳海智创科技有限公司 Toilet structure with integrated chassis combined with traditional process and construction process thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2586753Y (en) * 2002-07-16 2003-11-19 千宝实业股份有限公司 combined bathroom
US20050211717A1 (en) * 2004-03-26 2005-09-29 Decker Christopher V Dispenser capable of dispensing sheet-like articles
KR20060071273A (en) * 2004-12-21 2006-06-26 김원대 Dry plate for dry method and manufacturing method
CN103397790A (en) * 2013-07-08 2013-11-20 万科企业股份有限公司 Assembled bathroom and installation process
CN106760374A (en) * 2017-03-20 2017-05-31 李西安 A kind of separate assembling chassis system
CN107869233A (en) * 2017-11-21 2018-04-03 上海聚通装饰集团有限公司 Reduce peculiar smell technique in a kind of wet area ground
CN208502332U (en) * 2018-06-20 2019-02-15 佛山东鹏洁具股份有限公司 Between a kind of dry zoning chassis between integral bathroom and the integral bathroom using it

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2586753Y (en) * 2002-07-16 2003-11-19 千宝实业股份有限公司 combined bathroom
US20050211717A1 (en) * 2004-03-26 2005-09-29 Decker Christopher V Dispenser capable of dispensing sheet-like articles
KR20060071273A (en) * 2004-12-21 2006-06-26 김원대 Dry plate for dry method and manufacturing method
CN103397790A (en) * 2013-07-08 2013-11-20 万科企业股份有限公司 Assembled bathroom and installation process
CN106760374A (en) * 2017-03-20 2017-05-31 李西安 A kind of separate assembling chassis system
CN107869233A (en) * 2017-11-21 2018-04-03 上海聚通装饰集团有限公司 Reduce peculiar smell technique in a kind of wet area ground
CN208502332U (en) * 2018-06-20 2019-02-15 佛山东鹏洁具股份有限公司 Between a kind of dry zoning chassis between integral bathroom and the integral bathroom using it

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110541469A (en) * 2019-09-30 2019-12-06 谢伦杰 Waterproof chassis of integrated bathroom of assembled
CN110541467A (en) * 2019-09-30 2019-12-06 贵州群之英科技铸造有限公司 Waterproof chassis of integrated bathroom of assembled
CN113180520A (en) * 2020-11-06 2021-07-30 深圳海智创科技有限公司 Toilet structure with integrated chassis combined with traditional process and construction process thereof

Also Published As

Publication number Publication date
CN108708577B (en) 2023-11-14

Similar Documents

Publication Publication Date Title
CN208502332U (en) Between a kind of dry zoning chassis between integral bathroom and the integral bathroom using it
CN108708577A (en) Dry zoning chassis between a kind of integral bathroom and using between its integral bathroom
CN215631299U (en) Assembled floor system
CN107397482A (en) A kind of compound high waterproof ceramic tile bathroom chassis
CN209941837U (en) Adjustable combined tile waterproof plate
CN204492040U (en) A kind of Soundless canopy
CN208404312U (en) A composite type high waterproof ceramic tile bathroom chassis
CN220557873U (en) Combined bath tub
KR200308714Y1 (en) Cylindrical capsule cabin
CN209585372U (en) Full frame concealed curtain wall structure
CN209211730U (en) A kind of light steel house sound insulation waterproof floor slab structure
CN204626663U (en) Waterproof construction in a kind of Novel house decoration engineering
CN215254239U (en) A ground overhead device and a prefabricated aging-suitable floor system
CN216109056U (en) Waterproof roll with high stability
CN208416100U (en) The outdoor tent of good waterproof performance
CN209547486U (en) A kind of bathroom adjustment foot
CN219100466U (en) Adjustable prefabricated drop ceiling
CN206128331U (en) Fly ash foam magnesite heated board
CN201492068U (en) Folding stool with self-stool surface balance
CN205296429U (en) Anti -drop's polyurethane composite sheet heat preservation system
CN207275979U (en) A kind of novel elevator decoration panel
JP2000179065A (en) Storage
KR20110077176A (en) Removable Multi-purpose Kitchenette
CN207122076U (en) A kind of compound Wall or floor tile of porcelain wood
TWM669608U (en) Multifunctional sink structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant