[go: up one dir, main page]

CN108687954A - A kind of hybrid system of efficient well cementing operation - Google Patents

A kind of hybrid system of efficient well cementing operation Download PDF

Info

Publication number
CN108687954A
CN108687954A CN201810425559.7A CN201810425559A CN108687954A CN 108687954 A CN108687954 A CN 108687954A CN 201810425559 A CN201810425559 A CN 201810425559A CN 108687954 A CN108687954 A CN 108687954A
Authority
CN
China
Prior art keywords
aggregated
high energy
diffusion chamber
hybrid system
clear water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810425559.7A
Other languages
Chinese (zh)
Inventor
王彦峰
刘仁
李恩杰
刘士堂
李心成
崔树桢
刘光宇
贾芝
李明升
袁寅龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yantai Jereh Petroleum Equipment and Technologies Co Ltd
Original Assignee
Yantai Jereh Petroleum Equipment and Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yantai Jereh Petroleum Equipment and Technologies Co Ltd filed Critical Yantai Jereh Petroleum Equipment and Technologies Co Ltd
Priority to CN201810425559.7A priority Critical patent/CN108687954A/en
Publication of CN108687954A publication Critical patent/CN108687954A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C5/00Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions
    • B28C5/08Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions using driven mechanical means affecting the mixing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C5/00Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions
    • B28C5/08Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions using driven mechanical means affecting the mixing
    • B28C5/0806Details; Accessories
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C7/00Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
    • B28C7/02Controlling the operation of the mixing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C7/00Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
    • B28C7/04Supplying or proportioning the ingredients
    • B28C7/12Supplying or proportioning liquid ingredients
    • B28C7/126Supply means, e.g. nozzles
    • B28C7/128Nozzles; Valves; Valve-actuating means
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Dispersion Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)

Abstract

The present invention relates to petroleum equipment technical fields, more particularly to a kind of hybrid system of efficient well cementing operation, it is aggregated into including measuring tank, water pipe, upper ash pipe is aggregated into, high energy mixers, slurry mixing tank and mud line manifold assembly, slurry mixing tank is at least connected with there are two high energy mixers, the inlet of slurry mixing tank is connect with diffusion chamber, diffusion chamber is connect with high energy mixers, and high energy mixers discharging is directed by diffusion chamber in slurry mixing tank, and at least one diffusion chamber is connect with density control system.The present invention covers mixer more and integrates, with existing operating condition, it can be achieved that huge discharge, efficient mixed effect.

Description

A kind of hybrid system of efficient well cementing operation
Technical field
The present invention relates to petroleum equipment technical fields, more particularly to a kind of hybrid system of efficient well cementing operation.
Background technology
It is reported that oilfield applications drilling period was reduced to about half 75 days or so from 175 days;And U.S.'s shale gas is from 2013 Start in year just to have put forward effect 40%.With the raising of oilfield applications operating efficiency, the appearance of ultradeep well and curing sleeve distance Increase, for example, horizontal segment can only accomplish 1000 meters in the past, buried depth can only accomplish 2500 meters, can accomplish to current horizontal segment 2500 meters, buried depth increases to more than 4300 meters, and such operation is to the well cementing operation demand of huge discharge it is also proposed that higher and higher wants It asks.On the other hand, due to the limitation of field operation condition, for example, live dry ash quality, the factors such as speed and size for ash, The mixed of mixer is generally in 1.5m3/ min, operating efficiency is relatively low, and mixing discharge capacity is small, cannot achieve continuous operation.
Invention content
It is an object of the present invention to overcome the above-mentioned technical problems, and to provide a kind of hybrid systems of efficient well cementing operation, can To be fully solved above-mentioned technical problem.
The technical solution for solving above-mentioned technical problem is as follows:
A kind of hybrid system of efficient well cementing operation, including measuring tank, water pipe are aggregated into, upper ash pipe is aggregated into, high energy Mixer, slurry mixing tank and mud line manifold assembly, the slurry mixing tank are at least connected with there are two high energy mixers, the slurry mixing tank Inlet connect with diffusion chamber, the diffusion chamber is connect with high energy mixers, the high energy mixers discharge by spreading Case is directed into slurry mixing tank, and at least one diffusion chamber is connect with density control system.
The diffusion chamber is at least one.
Water pipe is aggregated into and is provided with injection centrifugal pump, y-type filter and clear water flow meter, clear water flow meter can be shown The flow for showing clear water can adjust uninterrupted according to design requirement, keep mud mixing more equal according to the clear water flow of display It is even.
The measuring tank includes the rooms A and the rooms B, and the rooms A and the rooms B can realize independent metering, also can two Room intercommunications, pass through discharge Butterfly valve empties raffinate, and the emptying butterfly valve is pneumatic control, and strainer is arranged in the tank bottom exit of the measuring tank.Measuring tank It can be with the discharge capacity of metering liquid and mixing water capacity, it can also be used to input and batch mixed chemical addition agent.
The mud line manifold assembly includes circular centrifugal pump and perfusion centrifugal pump, and the circular centrifugal is pumped from slurry mixing tank Middle sucking cement mortar, then by circular centrifugal pump discharge, cycle manifold, high energy mixers, in diffusion chamber with dry ash and Water carries out secondary mixing, then cement mortar is discharged to completion secondary cycle slurry in slurry mixing tank, keeps cement mortar mixed effect more preferable, protects It is uniform to demonstrate,prove cement slurry density;And centrifugal pump is perfused by being delivered in diffusion chamber after density control system, utilize density domination By the actual density of manifold, measuring numerical value can directly show sensor test cement mortar in system on the touchscreen, It can be directly displayed on secondary meter.
The water pipe is aggregated into from measuring tank or external source and sucks clear water, and the centrifugal pump that water pipe is aggregated into is more Independent injection centrifugal pump is covered, clear water is delivered in high energy mixers after being aggregated into supercharging, summarizes with from upper ash pipe by water pipe Tentatively mixed at the dry ash of entrance, but also with cycle manifold in mud carry out it is secondary mix, so as to more fill Divide ground mixing mud.The clear water flow that can be measured using clear water flow meter can directly display on the touchscreen, according to test institute Data are obtained, rotational handle adjusts clear water flow to suitable size, keeps mud mixing more uniform.Spray centrifugal pump simultaneously The water source that certain pressure is provided for the post-job cleaning of vehicle, meets the needs of cleaning.
It is the pipeline of solid carbon dioxide plaster to be provided for the hybrid system of efficient well cementing operation, including connect that the upper ash pipe, which is aggregated into, Take over line, upper grey sebific duct and ash discharging valve.The solid carbon dioxide plaster of ash can is connected to ash discharging valve, high energy mixers high speed by connecting pipeline The flow of injection forms vacuum suck solid carbon dioxide plaster and is mixed with fluid.Mixed cement mortar agitated blade in cement stock tank Further mixing, circular centrifugal pump realize the secondary and multiple mixing of cement mortar.Cement slurry density meter is by the true close of cement mortar Degree feeds back to computer.Flowmeter is installed in injection line, the flow signal of water is fed back to computer by it.Computer root The injection rate that solid carbon dioxide plaster and clear water are automatically controlled according to the cement slurry density and clear water flow that collect, to reach setting Cement slurry density value.
The ash discharging valve that the high energy mixers are aggregated by the clear water for being aggregated into entrance by water pipe and by upper ash pipe into The concrete grey entered and the cement mortar by cycle manifold cycle are mixed together.High energy mixers are that entire slurry system is total Core component in is the critical piece for carrying out mud mixture.
The beneficial effects of the invention are as follows:
The present invention provides a kind of hybrid system of efficient well cementing operation, the mixers that cover integrated more, with existing operation item Part is, it can be achieved that huge discharge.The system can realize the rapid translating of automatic slurry and manual slurry, easy to operate practicality.By adopting Collect and show the data such as several centrifugation pump pressures, density, discharge capacity and clear water flow, is controlled by computer, realize the automatic of density Control.Purge valve, ash discharging valve are automatically controlled using bivariate, slurry mixing tank liquid automatic control.The invention has the characteristics that:Association Regulation and control system, i.e., multiple mixers, realization control, can also jointly control respectively;Hand automatically controls, i.e., multiple purge valves, multiple Ash discharging valve realizes that carrying out hand respectively automatically controls;Automatic distribution, i.e., it is to cover mixer more, it covers purge valve and ash discharging valve more, realizes one Part quickly adjust, a part fine tuning, can also use multiple automatically controlled toggle switch, and manually simultaneously control purge valve or under Grey valve events realize that density is adjusted simultaneously.
Core of the present invention is to use multiple mixers and mating component, promotes mixed, but still retain original Automatic premixing and automatic density slurry function.To meet current industry inner part drilling completion plate improved efficiency to mixed of cementing the well The requirements at the higher level of proposition also successfully overcome the problems, such as that the mixed that the various restriction bands of field operation condition are come reduces.
The present invention both can independently be used as injection centrifugal pump using more set mixers and matching component, clear water centrifugal pump, Side can be used as to spray centrifugal pump for waterside, centrifugal pump can also be spare;Centrifugal slurry pump both can independently be used as circular centrifugal Pump can also be used as and centrifugal pump is perfused in cycle, and centrifugal pump can also be spare;Mostly set hybrid systems can also be used as spare, Reduce hybrid system damage risk.
Using more set hybrid systems, construction operation scene needs to ensure that hybrid density is unified and automatically controls the present invention, right The present invention proposes another technological difficulties, therefore the present invention solves in the following ways:1, realize that hybrid system water, ash are independent It automatically controls;2, multiple hybrid system schemes realize that a density, multiple mixers simultaneously or separately control, reach one it is close Degree, the requirement of huge discharge.
The present invention solves the higher that current industry inner part drilling completion plate improved efficiency proposes well cementation mixed and wants It asks, also successfully overcomes the problems, such as that the mixed that the various restriction bands of field operation condition are come reduces, band is improved immediately following operation technique The equipment come improves paces, is the development of petroleum equipment field cementing equipment, the milestone new into one!
Description of the drawings
The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
The electric control theory schematic diagram that Fig. 1 is high energy mixers of the present invention when being 2;
Fig. 2 is the flow diagram of the embodiment of the present invention 1;
Fig. 3 is the flow diagram of the embodiment of the present invention 2;
Fig. 4 is the flow diagram of the embodiment of the present invention 3;
In figure:1 is aggregated into for water pipe, and 2 be cycle manifold, and 3 be mud line manifold assembly, and 4 are aggregated into for upper ash pipe, and C1 is Centrifugal pump is sprayed, C2 pumps for circular centrifugal, and C3 is perfusion centrifugal pump, and Y is y-type filter, and FM is clear water flow meter, and E is density Control system, D1 are centering type ash discharging valve, and D2 is diffusion chamber, and D3 is high energy mixers.
Specific implementation mode
Embodiment 1:
As shown in Fig. 2, a kind of hybrid system of efficient well cementing operation, including measuring tank, water pipe are aggregated into 1, upper ash pipe It is aggregated into 4, high energy mixers D3, slurry mixing tank and mud line manifold assembly 3, there are two high energy mixers D3, slurries for slurry mixing tank connection The inlet of tank is connect with diffusion chamber D2, and diffusion chamber D2 is connect with high energy mixers D3, and high energy mixers D3 dischargings are by diffusion chamber D2 is directed into slurry mixing tank, and density control system E is concatenated on mud line manifold assembly 3.Diffusion chamber is two.
Water pipe, which is aggregated on 1, is provided with injection centrifugal pump C1, y-type filter Y and clear water flow meter FM, clear water flow meter FM can show the flow of clear water, according to the clear water flow of display, can adjust uninterrupted according to design requirement, mud is made to mix More uniformly.
Measuring tank includes the rooms A and the rooms B, and the rooms A and the rooms B can realize independent metering, also can two Room intercommunications, pass through be discharged butterfly valve row Empty raffinate, emptying butterfly valve are pneumatic control, and strainer is arranged in the tank bottom exit of measuring tank.Measuring tank can be with the discharge capacity of metering liquid With mixing water capacity, it can also be used to input and batch mixed chemical addition agent.
Mud line manifold assembly 3 includes circular centrifugal pump C2 and perfusion centrifugal pump C3, and circular centrifugal pump C2 is inhaled from slurry mixing tank Enter cement mortar, C2 outlets, cycle manifold 2, high energy mixers D3 are then pumped by circular centrifugal, it is in diffusion chamber D2 and dry Ash and water carry out secondary mixing, then cement mortar is discharged to completion secondary cycle slurry in slurry mixing tank, make cement mortar mixed effect more It is good, ensure that cement slurry density is uniform;And centrifugal pump C3 is perfused and is delivered in diffusion chamber D2 later by density control system E, profit With the sensor test cement mortar on density control system E by the actual density of manifold, measuring numerical value can directly touch Screen display can also directly display on secondary meter.
Water pipe is aggregated into 1 and sucks clear water from measuring tank or external source, and the centrifugal pump that water pipe is aggregated into is two sets only Clear water is delivered in high energy mixers D3 by vertical injection centrifugal pump C1, water pipe after being aggregated into 1 supercharging, and from upper grey manifold Assembly 4 enter dry ash tentatively mixed, but also with cycle manifold 2 in mud progress it is secondary mix, so as to more Add and is sufficiently mixed mud.The clear water flow that can be measured using clear water flow meter FM, can directly display on the touchscreen, according to The data obtained is tested, rotational handle adjusts clear water flow to suitable size, keeps mud mixing more uniform.Spray centrifugal pump C1 also provides the water source of certain pressure for the post-job cleaning of vehicle simultaneously, meets the needs of cleaning.
It is that the pipeline of solid carbon dioxide plaster, including connecting tube are provided for the hybrid system of efficient well cementing operation that upper ash pipe, which is aggregated into 4, Line, upper grey sebific duct and centering type ash discharging valve D1.The solid carbon dioxide plaster of ash can is connected to centering type ash valve D1, high energy by connecting pipeline The flow of mixer D3 high speed injections forms vacuum suck solid carbon dioxide plaster and is mixed with fluid.Mixed cement mortar is in cement stock tank In agitated blade further mix, circular centrifugal pump C2 realize cement mortar secondary and multiple mixing.Cement slurry density meter will The real density of cement mortar feeds back to computer.Flowmeter is installed in injection line, it feeds back to the flow signal of water Computer.Computer automatically controls the injection of solid carbon dioxide plaster and clear water according to the cement slurry density and clear water flow that collect Amount, to reach the cement slurry density value of setting.
The centering type ash discharging valve that high energy mixers D3 is aggregated by the clear water for being aggregated into 1 entrance by water pipe and by upper ash pipe The concrete grey that D1 enters and the cement mortar by the cycle cycle of manifold 2 are mixed together.High energy mixers D3 is entire mixed The core component in system synthesis is starched, is the critical piece for carrying out mud mixture.
Embodiment 2:
As shown in figure 3, a kind of hybrid system of efficient well cementing operation, including measuring tank, water pipe are aggregated into 1, upper ash pipe It is aggregated into 4, high energy mixers D3, slurry mixing tank and mud line manifold assembly 3, there are two high energy mixers D3, slurries for slurry mixing tank connection The inlet of tank is connect with diffusion chamber D2, and diffusion chamber D2 is connect with high energy mixers D3, and high energy mixers D3 dischargings are by diffusion chamber D2 is directed into slurry mixing tank, is recycled and is serially connected with density control system E, diffusion chamber two on manifold 2 and mud line manifold assembly 3 It is a.
Water pipe, which is aggregated on 1, is provided with injection centrifugal pump C1, y-type filter Y and clear water flow meter FM, clear water flow meter FM can show the flow of clear water, according to the clear water flow of display, can adjust uninterrupted according to design requirement, mud is made to mix More uniformly.
Measuring tank includes the rooms A and the rooms B, and the rooms A and the rooms B can realize independent metering, also can two Room intercommunications, pass through be discharged butterfly valve row Empty raffinate, emptying butterfly valve are pneumatic control, and strainer is arranged in the tank bottom exit of measuring tank.Measuring tank can be with the discharge capacity of metering liquid With mixing water capacity, it can also be used to input and batch mixed chemical addition agent.
Mud line manifold assembly 3 includes circular centrifugal pump C2 and perfusion centrifugal pump C3, and circular centrifugal pump C2 is inhaled from slurry mixing tank Enter cement mortar, C2 outlets, cycle manifold 2, high energy mixers D3 are then pumped by circular centrifugal, it is in diffusion chamber D2 and dry Ash and water carry out secondary mixing, then cement mortar is discharged to completion secondary cycle slurry in slurry mixing tank, make cement mortar mixed effect more It is good, ensure that cement slurry density is uniform;And centrifugal pump C3 is perfused and is delivered in diffusion chamber D2 later by density control system E, profit With the sensor test cement mortar on density control system E by the actual density of manifold, measuring numerical value can directly touch Screen display can also directly display on secondary meter.
Water pipe is aggregated into 1 and sucks clear water from measuring tank or external source, and the centrifugal pump that water pipe is aggregated into is two sets only Clear water is delivered in high energy mixers D3 by vertical injection centrifugal pump C1, water pipe after being aggregated into 1 supercharging, and from upper grey manifold Assembly 4 enter dry ash tentatively mixed, but also with cycle manifold 2 in mud progress it is secondary mix, so as to more Add and is sufficiently mixed mud.The clear water flow that can be measured using clear water flow meter FM, can directly display on the touchscreen, according to The data obtained is tested, rotational handle adjusts clear water flow to suitable size, keeps mud mixing more uniform.Spray centrifugal pump C1 also provides the water source of certain pressure for the post-job cleaning of vehicle simultaneously, meets the needs of cleaning.
It is that the pipeline of solid carbon dioxide plaster, including connecting tube are provided for the hybrid system of efficient well cementing operation that upper ash pipe, which is aggregated into 4, Line, upper grey sebific duct and centering type ash discharging valve D1.The solid carbon dioxide plaster of ash can is connected to centering type ash valve D1, high energy by connecting pipeline The flow of mixer D3 high speed injections forms vacuum suck solid carbon dioxide plaster and is mixed with fluid.Mixed cement mortar is in cement stock tank In agitated blade further mix, circular centrifugal pump C2 realize cement mortar secondary and multiple mixing.Cement slurry density meter will The real density of cement mortar feeds back to computer.Flowmeter is installed in injection line, it feeds back to the flow signal of water Computer.Computer automatically controls the injection of solid carbon dioxide plaster and clear water according to the cement slurry density and clear water flow that collect Amount, to reach the cement slurry density value of setting.
The centering type ash discharging valve that high energy mixers D3 is aggregated by the clear water for being aggregated into 1 entrance by water pipe and by upper ash pipe The concrete grey that D1 enters and the cement mortar by the cycle cycle of manifold 2 are mixed together.High energy mixers D3 is entire mixed The core component in system synthesis is starched, is the critical piece for carrying out mud mixture.
Embodiment 3:
As shown in figure 4, a kind of hybrid system of efficient well cementing operation, including measuring tank, water pipe are aggregated into 1, upper ash pipe It is aggregated into 4, high energy mixers D3, slurry mixing tank and mud line manifold assembly 3, there are two high energy mixers D3, slurries for slurry mixing tank connection The inlet of tank is connect with diffusion chamber D2, and diffusion chamber D2 is connect with high energy mixers D3, and high energy mixers D3 dischargings are by diffusion chamber D2 is directed into slurry mixing tank, and density control system E is concatenated on mud line manifold assembly 3.Diffusion chamber is one.
Water pipe, which is aggregated on 1, is provided with injection centrifugal pump C1, y-type filter Y and clear water flow meter FM, clear water flow meter FM can show the flow of clear water, according to the clear water flow of display, can adjust uninterrupted according to design requirement, mud is made to mix More uniformly.
Measuring tank includes the rooms A and the rooms B, and the rooms A and the rooms B can realize independent metering, also can two Room intercommunications, pass through be discharged butterfly valve row Empty raffinate, emptying butterfly valve are pneumatic control, and strainer is arranged in the tank bottom exit of measuring tank.Measuring tank can be with the discharge capacity of metering liquid With mixing water capacity, it can also be used to input and batch mixed chemical addition agent.
Mud line manifold assembly 3 includes circular centrifugal pump C2 and perfusion centrifugal pump C3, and circular centrifugal pump C2 is inhaled from slurry mixing tank Enter cement mortar, C2 outlets, cycle manifold 2, high energy mixers D3 are then pumped by circular centrifugal, it is in diffusion chamber D2 and dry Ash and water carry out secondary mixing, then cement mortar is discharged to completion secondary cycle slurry in slurry mixing tank, make cement mortar mixed effect more It is good, ensure that cement slurry density is uniform;And centrifugal pump C3 is perfused and is delivered in diffusion chamber D2 later by density control system E, profit With the sensor test cement mortar on density control system E by the actual density of manifold, measuring numerical value can directly touch Screen display can also directly display on secondary meter.
Water pipe is aggregated into 1 and sucks clear water from measuring tank or external source, and the centrifugal pump that water pipe is aggregated into is two sets only Clear water is delivered in high energy mixers D3 by vertical injection centrifugal pump C1, water pipe after being aggregated into 1 supercharging, and from upper grey manifold Assembly 4 enter dry ash tentatively mixed, but also with cycle manifold 2 in mud progress it is secondary mix, so as to more Add and is sufficiently mixed mud.The clear water flow that can be measured using clear water flow meter FM, can directly display on the touchscreen, according to The data obtained is tested, rotational handle adjusts clear water flow to suitable size, keeps mud mixing more uniform.Spray centrifugal pump C1 also provides the water source of certain pressure for the post-job cleaning of vehicle simultaneously, meets the needs of cleaning.
It is that the pipeline of solid carbon dioxide plaster, including connecting tube are provided for the hybrid system of efficient well cementing operation that upper ash pipe, which is aggregated into 4, Line, upper grey sebific duct and centering type ash discharging valve D1.The solid carbon dioxide plaster of ash can is connected to centering type ash valve D1, high energy by connecting pipeline The flow of mixer D3 high speed injections forms vacuum suck solid carbon dioxide plaster and is mixed with fluid.Mixed cement mortar is in cement stock tank In agitated blade further mix, circular centrifugal pump C2 realize cement mortar secondary and multiple mixing.Cement slurry density meter will The real density of cement mortar feeds back to computer.Flowmeter is installed in injection line, it feeds back to the flow signal of water Computer.Computer automatically controls the injection of solid carbon dioxide plaster and clear water according to the cement slurry density and clear water flow that collect Amount, to reach the cement slurry density value of setting.
The centering type ash discharging valve that high energy mixers D3 is aggregated by the clear water for being aggregated into 1 entrance by water pipe and by upper ash pipe The concrete grey that D1 enters and the cement mortar by the cycle cycle of manifold 2 are mixed together.High energy mixers D3 is entire mixed The core component in system synthesis is starched, is the critical piece for carrying out mud mixture.
The above is only presently preferred embodiments of the present invention, not does limitation in any form to the present invention, as opening up Exhibition, needs high energy mixers being designed as 2 or more according to field operation, and centrifugal pump makees corresponding simple designs as needed, Equivalent variations or density control system are using multiple, and each road manifold carries out simple modification and equivalents each fall within the present invention Protection domain within.

Claims (9)

1. a kind of hybrid system of efficient well cementing operation, including measuring tank, water pipe are aggregated into, upper ash pipe is aggregated into, high energy is mixed Clutch, slurry mixing tank and mud line manifold assembly, which is characterized in that the slurry mixing tank is at least connected with there are two high energy mixers, institute The inlet for the slurry mixing tank stated is connect with diffusion chamber, and the diffusion chamber is connect with high energy mixers, the high energy mixers Discharging is directed by diffusion chamber in slurry mixing tank, and at least one diffusion chamber is connect with density control system.
2. the hybrid system of efficient well cementing operation according to claim 1, which is characterized in that the diffusion chamber is at least One.
3. the hybrid system of efficient well cementing operation according to claim 1, which is characterized in that the water pipe is aggregated into On be provided with injection centrifugal pump, y-type filter, purge valve and clear water flow meter, clear water flow meter can show the flow of clear water, According to the clear water flow of display, uninterrupted can be adjusted according to design requirement, keep mud mixing more uniform.
4. the hybrid system of efficient well cementing operation according to claim 1, which is characterized in that the measuring tank includes A Room and the rooms B, the rooms A and the rooms B can realize independent metering, also can two Room intercommunications, pass through be discharged butterfly valve empty raffinate, the emptying butterfly Valve is pneumatic control, and strainer is arranged in the tank bottom exit of the measuring tank.
5. the hybrid system of efficient well cementing operation according to claim 1, which is characterized in that the mud line manifold assembly Centrifugal pump is pumped and is perfused including circular centrifugal, and circular centrifugal pump sucks cement mortar from slurry mixing tank, then passes through cycle Centrifuge pump discharge, cycle manifold, high energy mixers, carried out with dry ash and water in diffusion chamber it is secondary mix, then by cement mortar It is discharged to completion secondary cycle slurry in slurry mixing tank, and centrifugal pump is perfused and is delivered in diffusion chamber later by density control system, The actual density for passing through manifold using the sensor test cement mortar on density control system.
6. the hybrid system of the efficient well cementing operation according to any one of claim 1,3 or 5, which is characterized in that described Water pipe be aggregated into from measuring tank or external source and suck clear water, clear water is delivered in high energy mixers after supercharging, with from The dry ash that upper ash pipe is aggregated into entrance is tentatively mixed, but also carries out secondary mix with the mud in cycle manifold.
7. the hybrid system of efficient well cementing operation according to claim 1, which is characterized in that the upper ash pipe is aggregated into It is that the pipeline of solid carbon dioxide plaster is provided for the hybrid system of efficient well cementing operation, including connecting pipeline, upper grey sebific duct and ash discharging valve.
8. the hybrid system of efficient well cementing operation according to claim 1 or claim 7, which is characterized in that the high energy mixing The concrete grey and pass through cycle that the ash discharging valve that device is aggregated by the clear water for being aggregated into entrance by water pipe and by upper ash pipe enters The cement mortar of manifold cycle is mixed together.
9. according to the hybrid system of the efficient well cementing operation of claim 1-5 any one of them, which is characterized in that water pipe summarizes At purge valve, the ash discharging valve that is aggregated into of upper ash pipe be all made of bivariate and automatically control, slurry mixing tank liquid level is using automatically controlling.
CN201810425559.7A 2018-05-07 2018-05-07 A kind of hybrid system of efficient well cementing operation Pending CN108687954A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810425559.7A CN108687954A (en) 2018-05-07 2018-05-07 A kind of hybrid system of efficient well cementing operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810425559.7A CN108687954A (en) 2018-05-07 2018-05-07 A kind of hybrid system of efficient well cementing operation

Publications (1)

Publication Number Publication Date
CN108687954A true CN108687954A (en) 2018-10-23

Family

ID=63846202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810425559.7A Pending CN108687954A (en) 2018-05-07 2018-05-07 A kind of hybrid system of efficient well cementing operation

Country Status (1)

Country Link
CN (1) CN108687954A (en)

Cited By (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173476A (en) * 2020-01-20 2020-05-19 烟台杰瑞石油装备技术有限公司 A new type of cementing equipment with ultra-large displacement and ultra-high pressure
WO2020252908A1 (en) * 2019-06-21 2020-12-24 烟台杰瑞石油装备技术有限公司 Multifunctional compounding device
US10895202B1 (en) 2019-09-13 2021-01-19 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US10907459B1 (en) 2019-09-13 2021-02-02 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
CN112502662A (en) * 2020-10-30 2021-03-16 中油国家油气钻井装备工程技术研究中心有限公司 Multifunctional metering water tank for well cementing truck
US10954770B1 (en) 2020-06-09 2021-03-23 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US10961908B1 (en) 2020-06-05 2021-03-30 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US10968837B1 (en) 2020-05-14 2021-04-06 Bj Energy Solutions, Llc Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge
CN112677316A (en) * 2020-11-16 2021-04-20 中油国家油气钻井装备工程技术研究中心有限公司 Well cementation slurry blending device, blending method and cleaning method thereof
CN112684775A (en) * 2020-12-16 2021-04-20 四机赛瓦石油钻采设备有限公司 Detection system of ACM mixed slurry density liquid level automatic controller
US10989180B2 (en) 2019-09-13 2021-04-27 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11002189B2 (en) 2019-09-13 2021-05-11 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11015594B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11015536B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11022526B1 (en) 2020-06-09 2021-06-01 Bj Energy Solutions, Llc Systems and methods for monitoring a condition of a fracturing component section of a hydraulic fracturing unit
US11028677B1 (en) 2020-06-22 2021-06-08 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11066915B1 (en) 2020-06-09 2021-07-20 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
WO2021146846A1 (en) * 2020-01-20 2021-07-29 烟台杰瑞石油装备技术有限公司 Novel ultra-large displacement ultrahigh pressure well cementing device
US11109508B1 (en) 2020-06-05 2021-08-31 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11125066B1 (en) 2020-06-22 2021-09-21 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11149533B1 (en) 2020-06-24 2021-10-19 Bj Energy Solutions, Llc Systems to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11193360B1 (en) 2020-07-17 2021-12-07 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11208953B1 (en) 2020-06-05 2021-12-28 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11208880B2 (en) 2020-05-28 2021-12-28 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11220895B1 (en) 2020-06-24 2022-01-11 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11236739B2 (en) 2019-09-13 2022-02-01 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11268346B2 (en) 2019-09-13 2022-03-08 Bj Energy Solutions, Llc Fuel, communications, and power connection systems
US11408794B2 (en) 2019-09-13 2022-08-09 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11415125B2 (en) 2020-06-23 2022-08-16 Bj Energy Solutions, Llc Systems for utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11428165B2 (en) 2020-05-15 2022-08-30 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11473413B2 (en) 2020-06-23 2022-10-18 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11560845B2 (en) 2019-05-15 2023-01-24 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11624326B2 (en) 2017-05-21 2023-04-11 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11635074B2 (en) 2020-05-12 2023-04-25 Bj Energy Solutions, Llc Cover for fluid systems and related methods
US11639654B2 (en) 2021-05-24 2023-05-02 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
CN116065984A (en) * 2021-11-04 2023-05-05 中石化石油工程技术服务有限公司 A control system and method for multi-tank feeding and fluid mixing in well drilling
US11867118B2 (en) 2019-09-13 2024-01-09 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11933153B2 (en) 2020-06-22 2024-03-19 Bj Energy Solutions, Llc Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control
US11939853B2 (en) 2020-06-22 2024-03-26 Bj Energy Solutions, Llc Systems and methods providing a configurable staged rate increase function to operate hydraulic fracturing units
US12065968B2 (en) 2019-09-13 2024-08-20 BJ Energy Solutions, Inc. Systems and methods for hydraulic fracturing
US12281964B2 (en) 2019-09-13 2025-04-22 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US12338772B2 (en) 2019-09-13 2025-06-24 Bj Energy Solutions, Llc Systems, assemblies, and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US12378864B2 (en) 2021-10-25 2025-08-05 Bj Energy Solutions, Llc Systems and methods to reduce acoustic resonance or disrupt standing wave formation in a fluid manifold of a high-pressure fracturing system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1883907A (en) * 2006-05-26 2006-12-27 中国海洋石油总公司 Method for mixing solid powder and liquid and axial flow type mixer therefor
CN201507271U (en) * 2009-10-21 2010-06-16 烟台杰瑞石油装备技术有限公司 Automatic control continuous batch slurry mixing pry
CN205778719U (en) * 2016-05-18 2016-12-07 四机赛瓦石油钻采设备有限公司 A kind of double slurry system
US20170259457A1 (en) * 2016-03-14 2017-09-14 Schlumberger Technology Corporation Mixing System for Cement and Fluids
CN206937600U (en) * 2017-04-24 2018-01-30 中国海洋石油总公司 The double mixing type fluid delivery systems of one kind well cementation pump sledge
CN208576026U (en) * 2018-05-07 2019-03-05 烟台杰瑞石油装备技术有限公司 A kind of hybrid system of efficient well cementing operation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1883907A (en) * 2006-05-26 2006-12-27 中国海洋石油总公司 Method for mixing solid powder and liquid and axial flow type mixer therefor
CN201507271U (en) * 2009-10-21 2010-06-16 烟台杰瑞石油装备技术有限公司 Automatic control continuous batch slurry mixing pry
US20170259457A1 (en) * 2016-03-14 2017-09-14 Schlumberger Technology Corporation Mixing System for Cement and Fluids
CN205778719U (en) * 2016-05-18 2016-12-07 四机赛瓦石油钻采设备有限公司 A kind of double slurry system
CN206937600U (en) * 2017-04-24 2018-01-30 中国海洋石油总公司 The double mixing type fluid delivery systems of one kind well cementation pump sledge
CN208576026U (en) * 2018-05-07 2019-03-05 烟台杰瑞石油装备技术有限公司 A kind of hybrid system of efficient well cementing operation

Cited By (161)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11624326B2 (en) 2017-05-21 2023-04-11 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11560845B2 (en) 2019-05-15 2023-01-24 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
WO2020252908A1 (en) * 2019-06-21 2020-12-24 烟台杰瑞石油装备技术有限公司 Multifunctional compounding device
US11280331B2 (en) 2019-09-13 2022-03-22 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US10895202B1 (en) 2019-09-13 2021-01-19 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US12510070B2 (en) 2019-09-13 2025-12-30 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11598263B2 (en) 2019-09-13 2023-03-07 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11655763B1 (en) 2019-09-13 2023-05-23 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US10982596B1 (en) 2019-09-13 2021-04-20 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US12497879B2 (en) 2019-09-13 2025-12-16 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US12467348B2 (en) 2019-09-13 2025-11-11 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US10989180B2 (en) 2019-09-13 2021-04-27 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11002189B2 (en) 2019-09-13 2021-05-11 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11015594B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11578660B1 (en) 2019-09-13 2023-02-14 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11015536B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11460368B2 (en) 2019-09-13 2022-10-04 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US12338772B2 (en) 2019-09-13 2025-06-24 Bj Energy Solutions, Llc Systems, assemblies, and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11060455B1 (en) 2019-09-13 2021-07-13 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US12281964B2 (en) 2019-09-13 2025-04-22 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11408794B2 (en) 2019-09-13 2022-08-09 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US12276577B2 (en) 2019-09-13 2025-04-15 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11092152B2 (en) 2019-09-13 2021-08-17 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11608725B2 (en) 2019-09-13 2023-03-21 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11613980B2 (en) 2019-09-13 2023-03-28 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US12092100B2 (en) 2019-09-13 2024-09-17 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US12065968B2 (en) 2019-09-13 2024-08-20 BJ Energy Solutions, Inc. Systems and methods for hydraulic fracturing
US11149726B1 (en) 2019-09-13 2021-10-19 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11156159B1 (en) 2019-09-13 2021-10-26 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US12049808B2 (en) 2019-09-13 2024-07-30 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11971028B2 (en) 2019-09-13 2024-04-30 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11619122B2 (en) 2019-09-13 2023-04-04 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11604113B2 (en) 2019-09-13 2023-03-14 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11401865B1 (en) 2019-09-13 2022-08-02 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11555756B2 (en) 2019-09-13 2023-01-17 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11530602B2 (en) 2019-09-13 2022-12-20 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11867118B2 (en) 2019-09-13 2024-01-09 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11236739B2 (en) 2019-09-13 2022-02-01 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11859482B2 (en) 2019-09-13 2024-01-02 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11852001B2 (en) 2019-09-13 2023-12-26 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11649766B1 (en) 2019-09-13 2023-05-16 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11268346B2 (en) 2019-09-13 2022-03-08 Bj Energy Solutions, Llc Fuel, communications, and power connection systems
US10907459B1 (en) 2019-09-13 2021-02-02 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US12510028B2 (en) 2019-09-13 2025-12-30 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11287350B2 (en) 2019-09-13 2022-03-29 Bj Energy Solutions, Llc Fuel, communications, and power connection methods
US11629584B2 (en) 2019-09-13 2023-04-18 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11767791B2 (en) 2019-09-13 2023-09-26 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11512642B1 (en) 2019-09-13 2022-11-29 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11761846B2 (en) 2019-09-13 2023-09-19 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11280266B2 (en) 2019-09-13 2022-03-22 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11319878B2 (en) 2019-09-13 2022-05-03 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11473503B1 (en) 2019-09-13 2022-10-18 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11725583B2 (en) 2019-09-13 2023-08-15 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11346280B1 (en) 2019-09-13 2022-05-31 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11719234B2 (en) 2019-09-13 2023-08-08 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11473997B2 (en) 2019-09-13 2022-10-18 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
CN111173476A (en) * 2020-01-20 2020-05-19 烟台杰瑞石油装备技术有限公司 A new type of cementing equipment with ultra-large displacement and ultra-high pressure
WO2021146846A1 (en) * 2020-01-20 2021-07-29 烟台杰瑞石油装备技术有限公司 Novel ultra-large displacement ultrahigh pressure well cementing device
US11635074B2 (en) 2020-05-12 2023-04-25 Bj Energy Solutions, Llc Cover for fluid systems and related methods
US11708829B2 (en) 2020-05-12 2023-07-25 Bj Energy Solutions, Llc Cover for fluid systems and related methods
US12404856B2 (en) 2020-05-12 2025-09-02 Bj Energy Solutions, Llc Cover for fluid systems and related methods
US11898504B2 (en) 2020-05-14 2024-02-13 Bj Energy Solutions, Llc Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge
US10968837B1 (en) 2020-05-14 2021-04-06 Bj Energy Solutions, Llc Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge
US11428165B2 (en) 2020-05-15 2022-08-30 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11624321B2 (en) 2020-05-15 2023-04-11 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11698028B2 (en) 2020-05-15 2023-07-11 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11959419B2 (en) 2020-05-15 2024-04-16 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11434820B2 (en) 2020-05-15 2022-09-06 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11542868B2 (en) 2020-05-15 2023-01-03 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11603745B2 (en) 2020-05-28 2023-03-14 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11365616B1 (en) 2020-05-28 2022-06-21 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11313213B2 (en) 2020-05-28 2022-04-26 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11208880B2 (en) 2020-05-28 2021-12-28 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11814940B2 (en) 2020-05-28 2023-11-14 Bj Energy Solutions Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11746698B2 (en) 2020-06-05 2023-09-05 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11891952B2 (en) 2020-06-05 2024-02-06 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11300050B2 (en) 2020-06-05 2022-04-12 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11627683B2 (en) 2020-06-05 2023-04-11 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11208953B1 (en) 2020-06-05 2021-12-28 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11378008B2 (en) 2020-06-05 2022-07-05 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11129295B1 (en) 2020-06-05 2021-09-21 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11109508B1 (en) 2020-06-05 2021-08-31 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US12408291B2 (en) 2020-06-05 2025-09-02 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11598264B2 (en) 2020-06-05 2023-03-07 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US10961908B1 (en) 2020-06-05 2021-03-30 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11723171B2 (en) 2020-06-05 2023-08-08 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11261717B2 (en) 2020-06-09 2022-03-01 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11939854B2 (en) 2020-06-09 2024-03-26 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US10954770B1 (en) 2020-06-09 2021-03-23 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11867046B2 (en) 2020-06-09 2024-01-09 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11339638B1 (en) 2020-06-09 2022-05-24 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11015423B1 (en) 2020-06-09 2021-05-25 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11022526B1 (en) 2020-06-09 2021-06-01 Bj Energy Solutions, Llc Systems and methods for monitoring a condition of a fracturing component section of a hydraulic fracturing unit
US11566506B2 (en) 2020-06-09 2023-01-31 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US12385379B2 (en) 2020-06-09 2025-08-12 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US11512570B2 (en) 2020-06-09 2022-11-29 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11319791B2 (en) 2020-06-09 2022-05-03 Bj Energy Solutions, Llc Methods and systems for detection and mitigation of well screen out
US11629583B2 (en) 2020-06-09 2023-04-18 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11208881B1 (en) 2020-06-09 2021-12-28 Bj Energy Solutions, Llc Methods and systems for detection and mitigation of well screen out
US12305495B2 (en) 2020-06-09 2025-05-20 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11085281B1 (en) 2020-06-09 2021-08-10 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11066915B1 (en) 2020-06-09 2021-07-20 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US12286874B2 (en) 2020-06-22 2025-04-29 Bj Energy Solutions, Llc Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control
US11639655B2 (en) 2020-06-22 2023-05-02 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11125066B1 (en) 2020-06-22 2021-09-21 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US12326075B2 (en) 2020-06-22 2025-06-10 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11952878B2 (en) 2020-06-22 2024-04-09 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11939853B2 (en) 2020-06-22 2024-03-26 Bj Energy Solutions, Llc Systems and methods providing a configurable staged rate increase function to operate hydraulic fracturing units
US11028677B1 (en) 2020-06-22 2021-06-08 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11933153B2 (en) 2020-06-22 2024-03-19 Bj Energy Solutions, Llc Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control
US11408263B2 (en) 2020-06-22 2022-08-09 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11208879B1 (en) 2020-06-22 2021-12-28 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11898429B2 (en) 2020-06-22 2024-02-13 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11236598B1 (en) 2020-06-22 2022-02-01 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11572774B2 (en) 2020-06-22 2023-02-07 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11732565B2 (en) 2020-06-22 2023-08-22 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11598188B2 (en) 2020-06-22 2023-03-07 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US12065917B2 (en) 2020-06-23 2024-08-20 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11719085B1 (en) 2020-06-23 2023-08-08 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11566505B2 (en) 2020-06-23 2023-01-31 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11473413B2 (en) 2020-06-23 2022-10-18 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11466680B2 (en) 2020-06-23 2022-10-11 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11649820B2 (en) 2020-06-23 2023-05-16 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11428218B2 (en) 2020-06-23 2022-08-30 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11661832B2 (en) 2020-06-23 2023-05-30 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11939974B2 (en) 2020-06-23 2024-03-26 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11415125B2 (en) 2020-06-23 2022-08-16 Bj Energy Solutions, Llc Systems for utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11506040B2 (en) 2020-06-24 2022-11-22 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11220895B1 (en) 2020-06-24 2022-01-11 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11391137B2 (en) 2020-06-24 2022-07-19 Bj Energy Solutions, Llc Systems and methods to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US12534992B2 (en) 2020-06-24 2026-01-27 Bj Energy Solutions, Llc Systems and methods to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11542802B2 (en) 2020-06-24 2023-01-03 Bj Energy Solutions, Llc Hydraulic fracturing control assembly to detect pump cavitation or pulsation
US11692422B2 (en) 2020-06-24 2023-07-04 Bj Energy Solutions, Llc System to monitor cavitation or pulsation events during a hydraulic fracturing operation
US11668175B2 (en) 2020-06-24 2023-06-06 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11512571B2 (en) 2020-06-24 2022-11-29 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11274537B2 (en) 2020-06-24 2022-03-15 Bj Energy Solutions, Llc Method to detect and intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11746638B2 (en) 2020-06-24 2023-09-05 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11299971B2 (en) 2020-06-24 2022-04-12 Bj Energy Solutions, Llc System of controlling a hydraulic fracturing pump or blender using cavitation or pulsation detection
US12286872B2 (en) 2020-06-24 2025-04-29 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11255174B2 (en) 2020-06-24 2022-02-22 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11149533B1 (en) 2020-06-24 2021-10-19 Bj Energy Solutions, Llc Systems to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11920450B2 (en) 2020-07-17 2024-03-05 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11603744B2 (en) 2020-07-17 2023-03-14 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11193360B1 (en) 2020-07-17 2021-12-07 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11994014B2 (en) 2020-07-17 2024-05-28 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11193361B1 (en) 2020-07-17 2021-12-07 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11608727B2 (en) 2020-07-17 2023-03-21 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11255175B1 (en) 2020-07-17 2022-02-22 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11365615B2 (en) 2020-07-17 2022-06-21 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
CN112502662B (en) * 2020-10-30 2023-03-10 中油国家油气钻井装备工程技术研究中心有限公司 Multifunctional metering water tank for well cementing truck
CN112502662A (en) * 2020-10-30 2021-03-16 中油国家油气钻井装备工程技术研究中心有限公司 Multifunctional metering water tank for well cementing truck
CN112677316A (en) * 2020-11-16 2021-04-20 中油国家油气钻井装备工程技术研究中心有限公司 Well cementation slurry blending device, blending method and cleaning method thereof
CN112684775B (en) * 2020-12-16 2022-04-22 四机赛瓦石油钻采设备有限公司 Detection system of ACM mixed slurry density liquid level automatic controller
CN112684775A (en) * 2020-12-16 2021-04-20 四机赛瓦石油钻采设备有限公司 Detection system of ACM mixed slurry density liquid level automatic controller
US11732563B2 (en) 2021-05-24 2023-08-22 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
US12428943B2 (en) 2021-05-24 2025-09-30 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
US11639654B2 (en) 2021-05-24 2023-05-02 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
US11867045B2 (en) 2021-05-24 2024-01-09 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
US12378864B2 (en) 2021-10-25 2025-08-05 Bj Energy Solutions, Llc Systems and methods to reduce acoustic resonance or disrupt standing wave formation in a fluid manifold of a high-pressure fracturing system
CN116065984A (en) * 2021-11-04 2023-05-05 中石化石油工程技术服务有限公司 A control system and method for multi-tank feeding and fluid mixing in well drilling
CN116065984B (en) * 2021-11-04 2025-08-29 中石化石油工程技术服务有限公司 A control system and method for multi-tank feeding and liquid mixing in drilling

Similar Documents

Publication Publication Date Title
CN108687954A (en) A kind of hybrid system of efficient well cementing operation
CN208576026U (en) A kind of hybrid system of efficient well cementing operation
CN104652816B (en) A kind of microcomputer-recognized intelligent mud jacking system and operational approach thereof
CN206937600U (en) The double mixing type fluid delivery systems of one kind well cementation pump sledge
CN210948703U (en) Double-liquid mixed grouting preparation system
CN203990481U (en) Polymer negative pressure suction dispersal device
CN109931043A (en) A kind of online filling apparatus and method of slippery water powder drag reducer
CN105064974B (en) Static mixing system and fracturing blender truck
CN205135586U (en) A polymer injection allocation device for strong heterogeneous body oil reservoir
CN110886590B (en) Rapid grouting device for coal body partition grouting
CN101519957A (en) Proportion regulating and injecting system
CN103975680B (en) A kind of movable sprinkler irrigation fertilizer apparatus
CN104437229A (en) Electric-driven liquid-powder continuous mixing device
CN207614767U (en) A kind of continuous molten medicine mixing arrangement of more material solid-liquids
CN209724309U (en) A kind of online filling apparatus of slippery water powder drag reducer
CN105126697A (en) Fracturing fluid mass flow continuous liquid preparation system for hydraulic fracturing and liquid preparation process of system
CN105274993A (en) Novel stirring type grouter, and control system and stirring method thereof
CN204891787U (en) Large -traffic liquid system of joining in marriage in succession of fracturing fluid that hydraulic fracturing used
CN103939743B (en) The Slurry Pipeline Transportation system of a kind of low abrasion and carrying method
CN202133915U (en) Fully-automatic self-operated solution blending device
CN209408933U (en) A kind of full-automatic foam light soil production equipment
CN216031607U (en) Negative pressure formula grout mixes thick liquid ware
CN102117080B (en) Fully-automatic operated solution mixing device
CN212433636U (en) Skid-mounted liquid additive accurate adding device
CN210868737U (en) Fertilizer applying device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181023