[go: up one dir, main page]

CN108680377B - Installation-free electric hoist energy efficiency test bench - Google Patents

Installation-free electric hoist energy efficiency test bench Download PDF

Info

Publication number
CN108680377B
CN108680377B CN201810777599.8A CN201810777599A CN108680377B CN 108680377 B CN108680377 B CN 108680377B CN 201810777599 A CN201810777599 A CN 201810777599A CN 108680377 B CN108680377 B CN 108680377B
Authority
CN
China
Prior art keywords
pulley
installation
electric hoist
wheel
energy efficiency
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810777599.8A
Other languages
Chinese (zh)
Other versions
CN108680377A (en
Inventor
王松雷
邓宏康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Special Equipment Safety Supervision Inspection Institute of Jiangsu Province
Original Assignee
Special Equipment Safety Supervision Inspection Institute of Jiangsu Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Special Equipment Safety Supervision Inspection Institute of Jiangsu Province filed Critical Special Equipment Safety Supervision Inspection Institute of Jiangsu Province
Priority to CN201810777599.8A priority Critical patent/CN108680377B/en
Publication of CN108680377A publication Critical patent/CN108680377A/en
Application granted granted Critical
Publication of CN108680377B publication Critical patent/CN108680377B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • G01M99/005Testing of complete machines, e.g. washing-machines or mobile phones
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B50/00Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The electric hoist energy efficiency test bed free of installation comprises support legs which are arranged in parallel at intervals, wherein support plates are arranged on the inner sides of the two support legs, a main beam is arranged on each support plate, and an upper pulley is arranged at the middle position of the upper part of each main beam; the electric hoist is arranged on the traveling rack through a wedge-shaped cushion block; the lower pulley is installed to the below that is located the girder, and the side pulley is installed to the below of electric block, and the side pulley is located one side of lower pulley, and electric block draws forth the lifting hook, still includes the weight subassembly of installing in the pit, and wire rope passes the hanging hole of weight subassembly and loops through the hanging hole, walk around upper pulley, lower pulley, side pulley, finally is connected to on the lifting hook. Through ingenious design electric block's mounted position, simplified the structure, make its pit area little, installation and dismantlement and convenient, need not professional installation team, improved operational reliability greatly.

Description

免安装电动葫芦能效试验台Installation-free electric hoist energy efficiency test bench

技术领域Technical field

本发明涉及试验装置技术领域,尤其是一种免安装电动葫芦能效试验台。The invention relates to the technical field of testing devices, in particular to an installation-free electric hoist energy efficiency test bench.

背景技术Background technique

目前,电动葫芦试验台基本上都是“四梁四腿桥架式试验台”,即试验台由两根主梁、两根端梁、四个支腿组成,两根端梁通过焊接或螺栓连接在支腿上,两根主梁搭在两根端梁上并用螺栓固定,两根主梁的上侧布置小车轨道,下侧焊接工字钢,四根梁和轨道都通过支腿架在空中。电动葫芦试验之前,小车式电动葫芦需要通过试验车间的起重机将小车式电动葫芦吊到主梁上方并安装于两根主梁上侧的轨道上;悬挂式电动葫芦需要通过试验车间的起重机将悬挂式电动葫芦吊到主梁下方,将电动葫芦的运行小车安装于主梁下侧的工字钢上。At present, electric hoist test benches are basically "four-beam four-leg bridge test benches", that is, the test bench consists of two main beams, two end beams, and four legs. The two end beams are connected by welding or bolts. On the support legs, two main beams are placed on the two end beams and fixed with bolts. The upper sides of the two main beams are arranged with trolley tracks, and the lower sides are welded with I-beams. The four beams and tracks are all raised in the air through the support legs. . Before the electric hoist test, the trolley-type electric hoist needs to be hoisted to the main beam by the crane in the test workshop and installed on the tracks on the upper sides of the two main beams; the suspension electric hoist needs to be suspended by the crane in the test workshop Lift the electric hoist to the bottom of the main beam, and install the electric hoist's operating trolley on the I-beam on the lower side of the main beam.

从现有传统电动葫芦试验台的结构和电动葫芦安装方式可以看出,传统的电动葫芦试验台及试验技术存在如下不足:It can be seen from the structure of the existing traditional electric hoist test bench and the installation method of the electric hoist that the traditional electric hoist test bench and test technology have the following shortcomings:

(1)试验台机构复杂(1) The test bench mechanism is complex

试验台由两根主梁、两根端梁、四个支腿、上轨道、下轨道组成,主梁为焊接五边形箱型梁,箱型梁上方焊接或者螺栓压板固定小车轨道,主梁下方焊接工字钢作为悬挂电动葫芦运行小车的轨道,主梁两端沿Z轴变截面;端梁通过螺栓或者焊接在支腿上,端梁也为箱型梁;主梁螺栓固定在端梁上;支腿为圆柱形或者焊接矩形箱型梁支腿。The test bench consists of two main beams, two end beams, four outriggers, an upper track, and a lower track. The main beam is a welded pentagonal box beam. The top of the box beam is welded or bolted to the trolley track, and the bottom of the main beam is The welded I-beam is used as the track for the suspended electric hoist to run the trolley. The two ends of the main beam change the cross-section along the Z-axis; the end beam is bolted or welded to the support leg, and the end beam is also a box beam; the main beam is bolted to the end beam. ; The legs are cylindrical or welded rectangular box beam legs.

(2)需要地坑和预埋(2) Pit and pre-embedding are required

支腿为了承重和稳定,支腿下方需要做预埋件。In order to support the load-bearing and stability of the outriggers, embedded parts need to be made under the outriggers.

为了满足电动葫芦起升高度,葫芦试验台高度需要9-11米,而为了满足试验车间高度和起吊起重机的起吊高度,以及为了安装和试验人员上下方面,试验台又越低越好,这样就需要在试验台下方挖出数米的深坑放置砝码。In order to meet the lifting height of the electric hoist, the height of the hoist test bench needs to be 9-11 meters. In order to meet the height of the test workshop and the lifting height of the lifting crane, as well as for the installation and test personnel, the lower the test bench, the better. This way A deep pit of several meters needs to be dug under the test bench to place the weights.

(3)电动葫芦安装不方便(3) It is inconvenient to install the electric hoist

电动葫芦安装需要通过起重机吊装到高空,不要精准的安装到主梁上侧的小车轨道上或者悬挂于主梁下侧的工字钢上。需要多人配合,涉及到捆扎、起吊、安装、调试等工序,并且高空作业,安装及其不便。The installation of the electric hoist needs to be hoisted to a high altitude by a crane. It should not be installed accurately on the trolley track on the upper side of the main beam or suspended on the I-beam on the lower side of the main beam. It requires the cooperation of many people and involves processes such as bundling, lifting, installation, and debugging. It also works at high altitudes, making installation extremely inconvenient.

(4)要求有资质的安装队,试验人员不能自行安装(4) A qualified installation team is required. Testers cannot install by themselves.

电动葫芦是起重机的一种,属于特种设备。电动葫芦的安装单位需要“特种设备安装改造维修许可证”,安装人员需要安装资格许可证,葫芦的起吊需要司索工资格证和起重机操作资格证。The electric hoist is a type of crane and is a special equipment. The installation unit of the electric hoist needs a "Special Equipment Installation, Modification and Maintenance License", the installer needs an installation qualification license, and the lifting of the hoist requires a rigging qualification certificate and a crane operation qualification certificate.

有时安装需要外包给专业安装公司,这样安装的时间又要协调安装公司,安装效率大大降低。Sometimes the installation needs to be outsourced to a professional installation company, so the installation time has to be coordinated with the installation company, which greatly reduces the installation efficiency.

(5)试验效率低(5) Low test efficiency

试验前期安装和后期拆卸时间长,90%以上的时间用在了电动葫芦安装和拆卸上,试验效率低。如果再算上等待安装公司派员到达现场安装和拆卸,试验效率更不敢保证了。The early installation and later disassembly of the test took a long time. More than 90% of the time was spent on the installation and disassembly of the electric hoist, and the test efficiency was low. If you also include waiting for the installation company to send personnel to the site for installation and disassembly, the test efficiency cannot be guaranteed.

(6)试验费用高(6) Testing costs are high

试验台的造价高,试验安装费用高,试验时间成本高。The cost of the test bench is high, the test installation cost is high, and the test time cost is high.

(7)试验台通用性差(7) The test bench has poor versatility

试验台主梁上侧的小车轨道焊接或焊接压板固定在主梁上,规格不能变动;主梁下侧的工字钢焊接在主梁下侧,规格也不能变动;悬挂于箱型梁下翼缘板等新型电动葫芦试验;电动葫芦吨位和起升高度的不同,小车轨距也不同,而传统的电动葫芦轨距也不能变动,有些主梁可以沿端梁移动,小范围改变轨距,但也及其复杂,效率极低。The trolley track on the upper side of the main beam of the test bench is welded or the welded pressure plate is fixed on the main beam, and the specifications cannot be changed; the I-beam on the lower side of the main beam is welded on the lower side of the main beam, and the specifications cannot be changed; it is suspended from the lower wing of the box beam Testing of new electric hoists such as edge plates; the trolley gauge is also different depending on the tonnage and lifting height of the electric hoist, and the track gauge of the traditional electric hoist cannot be changed. Some main beams can move along the end beams to change the track gauge in a small range. But it is also extremely complicated and extremely inefficient.

(8)试验风险高(8) High test risk

安装人员和试验人员均需要高空作业,爬上爬下,存在高空跌落风险。Both installers and testers need to work at high altitudes, climbing up and down, and there is a risk of falling from high altitudes.

发明内容Contents of the invention

本申请人针对上述现有生产技术中的缺点,提供一种结构合理的免安装电动葫芦能效试验台,从而简化了结构,使其地坑面积小、安装和拆卸及其方便,无需专业的安装团队。In view of the shortcomings in the above-mentioned existing production technology, the applicant provides a reasonably structured installation-free electric hoist energy efficiency test bench, thereby simplifying the structure, making the pit area small, and easy to install and disassemble, without the need for professional installation. team.

本发明所采用的技术方案如下:The technical solutions adopted by the present invention are as follows:

一种免安装电动葫芦能效试验台,包括间隔平行设置的支腿,两根支腿的内侧均安装有支撑板,所述支撑板上安装主梁,所述主梁的上部中间位置安装上滑轮;还包括布置在葫芦台侧面的地面上的台车轨道,所述台车轨道上安装有运行台架,所述运行台架上通过楔形垫块安装电动葫芦;位于主梁的下方安装有下滑轮,所述电动葫芦的下方安装有侧滑轮,所述侧滑轮位于下滑轮的一旁,所述电动葫芦引出有吊钩,还包括安装在地坑中的砝码组件,钢丝绳穿过砝码组件的吊孔并依次通过吊孔、绕过上滑轮、下滑轮、侧滑轮、最终连接到吊钩上。An installation-free electric hoist energy efficiency test bench, including legs arranged in parallel at intervals. Support plates are installed on the inner sides of the two legs. A main beam is installed on the support plate, and a pulley is installed at the upper middle position of the main beam. ; It also includes a trolley track arranged on the ground on the side of the hoist platform. A running platform is installed on the trolley track, and the electric hoist is installed on the running platform through wedge-shaped pads; a sliding device is installed below the main beam. A side pulley is installed below the electric hoist, and the side pulley is located next to the lower pulley. A hook is drawn out from the electric hoist. It also includes a weight assembly installed in the pit, and the steel wire rope passes through the weight assembly. The lifting hole is passed through the lifting hole in turn, bypassing the upper pulley, lower pulley, side pulley, and finally connected to the hook.

作为上述技术方案的进一步改进:As a further improvement of the above technical solution:

所述上滑轮的安装结构为:包括法兰顶板,所述法兰顶板的上部通过固定螺栓和锁紧螺帽安装有法兰底板,所述法兰底板中部安装有滑轮支撑,所述滑轮支撑上部通过滑轮轴安装上滑轮,所述上滑轮端部安装有端盖。The installation structure of the upper pulley is: including a flange top plate, a flange bottom plate is installed on the upper part of the flange top plate through fixing bolts and locking nuts, and a pulley support is installed in the middle of the flange bottom plate. The pulley support An upper pulley is installed on the upper part through a pulley shaft, and an end cover is installed on the end of the upper pulley.

所述上滑轮、下滑轮和侧滑轮三个滑轮的结构相同。The structures of the upper pulley, lower pulley and side pulley are the same.

砝码组件的中部安装有吊杆,所述吊杆上部开有吊孔。A suspension rod is installed in the middle of the weight assembly, and a suspension hole is provided in the upper part of the suspension rod.

运行台架平行间隔设置有两组,每组的结构为:包括焊接在运行台架下部的车轮组面板,所述车轮组面板的下方设置有车轮轴,所述车轮轴上安装车轮,车轮一旁设置有轮缘,所述车轮的两端车轮轴上分别安装有侧板,车轮轴的端部通过大螺帽锁紧。The running platform is provided with two groups at parallel intervals. The structure of each group is as follows: including a wheel set panel welded to the lower part of the running platform. A wheel axle is provided below the wheel set panel. Wheels are installed on the wheel axle. A wheel rim is provided, side plates are respectively installed on the wheel axles at both ends of the wheel, and the ends of the wheel axles are locked by large nuts.

所述支撑板下端通过法兰用高强度螺栓固定在地面预埋件上,上端沿圆柱圆周方向焊接半周扇形支撑板,支撑板下方沿圆柱轴向方向焊接加强筋。The lower end of the support plate is fixed on the ground embedded part with high-strength bolts through the flange, the upper end is welded with a semicircular fan-shaped support plate along the circumferential direction of the cylinder, and the reinforcing ribs are welded below the support plate along the axial direction of the cylinder.

所述主梁为矩形焊接箱型梁。The main beam is a rectangular welded box beam.

本发明的有益效果如下:The beneficial effects of the present invention are as follows:

本发明结构紧凑、合理,操作方便,通过巧妙的设计电动葫芦的安装位置,简化了结构,使其地坑面积小、安装和拆卸及其方便,无需专业的安装团队,大大提高了工作可靠性。The invention has a compact, reasonable structure and is easy to operate. By ingeniously designing the installation position of the electric hoist, the structure is simplified, making the pit area small, easy to install and disassemble, without the need for a professional installation team, and greatly improving work reliability. .

同时,还具备如下优点:At the same time, it also has the following advantages:

(一)结构简单(1) Simple structure

采用单梁双柱结构,主梁采用等截面的矩形焊接箱型梁,上下都无焊接轨道,也不需要五边形截面,更不需要端部沿Z轴方向变截面,极大地降低了试验台的制造和组装。It adopts a single-beam and double-column structure. The main beam adopts a rectangular welded box beam with equal cross-section. There are no welded rails above and below. There is no need for a pentagonal cross-section, and there is no need for the end to change the cross-section along the Z-axis direction, which greatly reduces the load of the test bench. Manufacturing and assembly.

(二)地坑面积小(2) The pit area is small

传统的电动葫芦试验台地坑面积及是主梁和端梁组成的矩形的投影面积,本发明试验台的地坑只需要满足砝码和下滑轮及侧滑轮的放置空间即可。The pit area of the traditional electric hoist test bench is the projected area of the rectangle formed by the main beam and the end beam. The pit of the test bench of the present invention only needs to provide space for the weights, lower pulleys and side pulleys.

(三)安装和拆卸及其方便(3) Installation and disassembly are extremely convenient

只需将电动葫芦放置在运行台架上即可,不需安装,对于不带小车架的悬挂式电动葫芦,为了防止滚动,只需在电动葫芦两端的左右两侧分别放置一个楔形垫块即可,实验结束后电动葫芦直接吊走即可。Just place the electric hoist on the running platform, no installation is required. For suspended electric hoists without a small frame, in order to prevent rolling, you only need to place a wedge-shaped pad on the left and right sides of both ends of the electric hoist. That’s it. After the experiment, the electric hoist can be lifted directly away.

(四)不需要专业的安装团队(4) No professional installation team is required

电动葫芦试验不需要安装和拆卸,不需要专业的有资质的安装公司和安装人员。The electric hoist test does not require installation and disassembly, and does not require professional and qualified installation companies and installers.

(五)试验效率高(5) High test efficiency

不需要安装、拆卸,不需要试验人员爬上爬下,不需要等待、协调安装队,所以节省了试验准备时间,试验效率大大提高,试验时间缩短了90%以上。There is no need for installation or disassembly, no need for test personnel to climb up and down, no need to wait and coordinate the installation team, so the test preparation time is saved, the test efficiency is greatly improved, and the test time is shortened by more than 90%.

(六)试验费用低(6) Low test cost

试验台造价低、地坑工程量小、不需要安装和拆卸、试验人员工作量小、试验效率高,综合起来试验费用大幅下降。The cost of the test bench is low, the amount of pit work is small, no installation and disassembly is required, the workload of test personnel is small, and the test efficiency is high. Overall, the test cost is significantly reduced.

(七)试验台通用型好(7) The test bench is versatile and good

试验台可以适用于所有型号的电动葫芦,轨距、轨道型号、电动葫芦长度等均不受限制。The test bench can be applied to all types of electric hoists, and there are no restrictions on track gauge, track model, electric hoist length, etc.

(八)安全可靠(8) Safe and reliable

电动葫芦放置在高度较矮的运行台架上,运行台架轨道在地面上,试验人员的所有操作均在地面上进行,并且不存在电动葫芦的安装和拆卸。所以试验过程中风险较小。The electric hoist is placed on a short operating platform, and the operating platform track is on the ground. All operations of the test personnel are performed on the ground, and there is no installation and disassembly of the electric hoist. So there are fewer risks during the trial.

(九)特别适合于电动葫芦的能效试验和出厂试验(9) Particularly suitable for energy efficiency testing and factory testing of electric hoists

电动葫芦的能效试验和出厂试验主要是起升机构的试验,不需要小车运行,因此本发明的试验台特别适用。The energy efficiency test and factory test of the electric hoist are mainly tests of the lifting mechanism and do not require the operation of the trolley. Therefore, the test bench of the present invention is particularly suitable.

附图说明Description of the drawings

图1为本发明的主视图。Figure 1 is a front view of the present invention.

图2为图1的侧视图Figure 2 is a side view of Figure 1

图3为图1的俯视图。FIG. 3 is a top view of FIG. 1 .

图4为本发明上滑轮的安装示意图。Figure 4 is a schematic diagram of the installation of the upper pulley of the present invention.

图5为本发明砝码组件的安装示意图。Figure 5 is a schematic diagram of the installation of the weight assembly of the present invention.

图6为本发明车轮组件的安装示意图。Figure 6 is a schematic diagram of the installation of the wheel assembly of the present invention.

其中:1、支腿;2、主梁;3、上滑轮;4、支撑板;5、加强筋;6、台车轨道;7、运行台架;8、楔形垫块;9、砝码组件;10、钢丝绳;11、下滑轮;12、侧滑轮;13、地坑;14、电动葫芦;15、吊钩;16、法兰顶板;17、法兰底板;18、固定螺栓;19、锁紧螺帽;20、滑轮支撑;21、滑轮轴;22、端盖;23、吊杆;24、吊孔;25、车轮轴;26、大螺帽;27、侧板;28、轮缘;29、车轮;30、车轮组面板。Among them: 1. Support legs; 2. Main beam; 3. Upper pulley; 4. Support plate; 5. Reinforcing ribs; 6. Trolley track; 7. Running platform; 8. Wedge block; 9. Weight assembly ; 10. Wire rope; 11. Lower pulley; 12. Side pulley; 13. Pit; 14. Electric hoist; 15. Hook; 16. Flange top plate; 17. Flange bottom plate; 18. Fixing bolts; 19. Lock Tightening nut; 20. Pulley support; 21. Pulley shaft; 22. End cover; 23. Suspension rod; 24. Suspension hole; 25. Wheel axle; 26. Large nut; 27. Side plate; 28. Rim; 29. Wheels; 30. Wheel set panel.

具体实施方式Detailed ways

下面结合附图,说明本发明的具体实施方式。The specific embodiments of the present invention will be described below with reference to the accompanying drawings.

如图1、图2和图3所示,本实施例的免安装电动葫芦能效试验台,包括间隔平行设置的支腿1,两根支腿1的内侧均安装有支撑板4,支撑板4上安装主梁2,主梁2的上部中间位置安装上滑轮3;还包括布置在葫芦台侧面的地面上的台车轨道6,台车轨道6上安装有运行台架7,运行台架7上通过楔形垫块8安装电动葫芦14;位于主梁2的下方安装有下滑轮11,电动葫芦14的下方安装有侧滑轮12,侧滑轮12位于下滑轮11的一旁,电动葫芦14引出有吊钩15,还包括安装在地坑13中的砝码组件9,钢丝绳10穿过砝码组件9的吊孔24并依次通过吊孔24、绕过上滑轮3、下滑轮11、侧滑轮12、最终连接到吊钩15上。As shown in Figures 1, 2 and 3, the installation-free electric hoist energy efficiency test bench of this embodiment includes legs 1 arranged in parallel at intervals. Support plates 4 are installed on the inner sides of the two legs 1. The support plates 4 A main beam 2 is installed on the main beam 2, and an upper pulley 3 is installed at the upper middle position of the main beam 2; it also includes a trolley track 6 arranged on the ground on the side of the hoist platform, and a running platform 7 is installed on the trolley track 6. The running platform 7 The electric hoist 14 is installed on the top through the wedge-shaped spacer 8; a lower pulley 11 is installed below the main beam 2, and a side pulley 12 is installed below the electric hoist 14. The side pulley 12 is located next to the lower pulley 11. The electric hoist 14 leads to a lifting The hook 15 also includes a weight component 9 installed in the pit 13. The wire rope 10 passes through the lifting hole 24 of the weight component 9 and passes through the lifting hole 24 in sequence, bypassing the upper pulley 3, the lower pulley 11, the side pulley 12, Finally connected to the hook 15.

如图4所示,上滑轮3的安装结构为:包括法兰顶板16,法兰顶板16的上部通过固定螺栓18和锁紧螺帽19安装有法兰底板17,法兰底板17中部安装有滑轮支撑20,滑轮支撑20上部通过滑轮轴21安装上滑轮3,上滑轮3端部安装有端盖22。As shown in Figure 4, the installation structure of the upper pulley 3 is: including a flange top plate 16, a flange bottom plate 17 is installed on the upper part of the flange top plate 16 through fixing bolts 18 and locking nuts 19, and a flange bottom plate 17 is installed in the middle. Pulley support 20, the upper pulley 3 is installed through the pulley shaft 21 on the upper part of the pulley support 20, and the end cover 22 is installed on the end of the upper pulley 3.

上滑轮3、下滑轮11和侧滑轮12三个滑轮的结构相同。The structures of the upper pulley 3, the lower pulley 11 and the side pulley 12 are the same.

如图5所示,砝码组件9的中部安装有吊杆23,吊杆23上部开有吊孔24。As shown in Figure 5, a suspension rod 23 is installed in the middle of the weight assembly 9, and a suspension hole 24 is provided in the upper part of the suspension rod 23.

如图6所示,运行台架7平行间隔设置有两组,每组的结构为:包括焊接在运行台架7下部的车轮组面板30,车轮组面板30的下方设置有车轮轴25,车轮轴25上安装车轮29,车轮29一旁设置有轮缘28,车轮29的两端车轮轴25上分别安装有侧板27,车轮轴25的端部通过大螺帽26锁紧。As shown in Figure 6, two groups are arranged in parallel and spaced apart on the operating platform 7. The structure of each group is as follows: including a wheel set panel 30 welded to the lower part of the operating platform 7. A wheel axle 25 is provided below the wheel set panel 30. A wheel 29 is installed on the wheel axle 25. A rim 28 is provided on the side of the wheel 29. Side plates 27 are respectively installed on the wheel axles 25 at both ends of the wheel 29. The ends of the wheel axle 25 are locked by large nuts 26.

支撑板4下端通过法兰用高强度螺栓固定在地面预埋件上,上端沿圆柱圆周方向焊接半周扇形支撑板4,支撑板4下方沿圆柱轴向方向焊接加强筋5。The lower end of the support plate 4 is fixed to the ground embedded parts with high-strength bolts through flanges. The upper end is welded with a semicircular fan-shaped support plate 4 along the circumferential direction of the cylinder. The lower end of the support plate 4 is welded with reinforcement ribs 5 along the axial direction of the cylinder.

主梁2为矩形焊接箱型梁。Main beam 2 is a rectangular welded box beam.

本发明所述的试验台采用两腿一梁结构,电动葫芦14不需要安装到试验台架上,只需放在地面上可移动的台架上即可,试验台的机构也及其方便。试验台主要由:支腿1、主梁2、上滑轮3、台车轨道6、运行台架7、砝码组件9、钢丝绳系统10、下滑轮11、侧滑轮12组成。The test bench of the present invention adopts a two-legged and one-beam structure. The electric hoist 14 does not need to be installed on the test bench, but only needs to be placed on a movable bench on the ground. The mechanism of the test bench is also extremely convenient. The test bench mainly consists of: support leg 1, main beam 2, upper pulley 3, trolley track 6, running bench 7, weight assembly 9, wire rope system 10, lower pulley 11, and side pulley 12.

支腿1有两根,圆柱形结构;主梁2有一根,矩形焊接箱型梁;台车轨道6在地面上。There are two support legs 1, cylindrical structure; one main beam 2, a rectangular welded box beam; the trolley track 6 is on the ground.

支腿1为圆柱结构,主梁2两端各一个支腿1,支腿1下端通过法兰用高强度螺栓固定在地面预埋件上,上端沿圆柱圆周方向焊接半周扇形支撑板4,支撑板4下沿圆柱轴向焊接加强筋5,加强筋5加强支撑板4的强度,支撑板4上焊接主梁2;主梁2有一根,为矩形焊接箱型梁,两端焊接在支撑板4上;上滑轮3由滑轮体、法兰顶板16、法兰底板17、固定螺栓18、锁紧螺帽19、滑轮支撑20、滑轮轴21、端盖22组成,法兰顶板16焊接在主梁2上,法兰底板17焊接在滑轮支撑20底端,法兰底板17和法兰顶板16通过固定螺栓18和锁紧螺帽19连接在一起,滑轮轴21支撑滑轮,并使滑轮绕其旋转,端盖22位于滑轮轴21两端,通过螺栓规定在滑轮支撑20的两个侧面上,挡住滑轮轴21,防止滑轮轴21轴向窜动;试验台下方挖出地13,用于放置砝码组件9、布置下滑轮11和侧滑轮12;砝码组件9放置在地坑中,由砝码块、吊杆23、吊孔24组成,砝码组件9通过吊孔24连接到起吊装置上;下滑轮11和侧滑轮12结构与上滑轮3一样,布置在地坑13中,起到改变力的方向的作用,下滑轮11布置在主梁2下方,侧滑轮12布置在电动葫芦14的下方;钢丝绳10通过吊孔24、绕过上滑轮3、下滑轮11、侧滑轮12、最终连接到电动葫芦14的吊钩15上;台车轨道6有平行的两根,布置在葫芦台侧面的地面上,用于引导和支撑运行台架7;运行台架7为可以沿轨道运行的小车架,有两个,分别支撑电动葫芦14的两端,运行台架7由锥形车轮29、轮缘28、车轮侧板27、车轮轴25、车轮组面板30、固定大螺帽26、楔形垫块8组成,车轮组面板30焊接在运行台架7的下侧,车轮侧板27作为车轮轴25的支撑,车轮29绕车轮轴25转动,大螺帽26固定车轮轴25,以防车轮轴25轴向窜动;楔形垫块8有四个,放置在运行台架7上面,用于支撑和固定电动葫芦14。The support leg 1 is a cylindrical structure, with one support leg 1 at each end of the main beam 2. The lower end of the support leg 1 is fixed on the ground embedded part through a flange with high-strength bolts, and the upper end is welded with a semicircular fan-shaped support plate 4 along the circumferential direction of the cylinder. Reinforcing ribs 5 are welded along the cylindrical axis under the plate 4. The reinforcing ribs 5 strengthen the support plate 4. The main beam 2 is welded on the support plate 4. There is one main beam 2, which is a rectangular welded box beam, and both ends are welded to the support plate. 4 on; the upper pulley 3 consists of the pulley body, flange top plate 16, flange bottom plate 17, fixing bolts 18, locking nuts 19, pulley support 20, pulley shaft 21, and end cover 22. The flange top plate 16 is welded to the main body. On the beam 2, the flange bottom plate 17 is welded to the bottom end of the pulley support 20. The flange bottom plate 17 and the flange top plate 16 are connected together through fixing bolts 18 and locking nuts 19. The pulley shaft 21 supports the pulley and allows the pulley to rotate around it. Rotate, the end caps 22 are located at both ends of the pulley shaft 21, and are fixed on both sides of the pulley support 20 through bolts to block the pulley shaft 21 and prevent the pulley shaft 21 from moving axially; the ground 13 is dug out below the test bench for placement The weight component 9 is arranged with a lower pulley 11 and a side pulley 12; the weight component 9 is placed in the pit and consists of a weight block, a boom 23, and a lifting hole 24. The weight component 9 is connected to the lifting device through the lifting hole 24. The upper and lower pulleys 11 and side pulleys 12 have the same structure as the upper pulley 3 and are arranged in the pit 13 to change the direction of the force. The lower pulley 11 is arranged under the main beam 2 and the side pulley 12 is arranged on the electric hoist 14 below; the wire rope 10 passes through the lifting hole 24, bypasses the upper pulley 3, the lower pulley 11, the side pulley 12, and is finally connected to the hook 15 of the electric hoist 14; the trolley track 6 has two parallel ones, arranged on the hoist platform The ground on the side is used to guide and support the operating platform 7; the operating platform 7 is a small frame that can run along the track. There are two, respectively supporting the two ends of the electric hoist 14. The operating platform 7 is composed of conical wheels. 29. It consists of wheel rim 28, wheel side plate 27, wheel axle 25, wheel set panel 30, fixed large nut 26, and wedge-shaped spacer 8. The wheel set panel 30 is welded to the lower side of the running platform 7, and the wheel side plate 27 As a support for the wheel axle 25, the wheel 29 rotates around the wheel axle 25, and the large nut 26 fixes the wheel axle 25 to prevent the wheel axle 25 from moving axially; there are four wedge-shaped pads 8, which are placed on the running platform 7. Used to support and secure electric hoists14.

本发明的试验方法如下:The test method of the present invention is as follows:

试验时,不需要安装电动葫芦14,只需要将电动葫芦14放在运行台架7上面,根据电动葫芦14的长短,沿台车轨道6移动运行台架7,调节两个运行台架7的间距,悬挂式的葫芦没有小车架,可以通过楔形垫块8垫在电动葫芦14的下面,防止电动葫芦14滚动,对于有小车架的电动葫芦14,只需要将小车架放在运行台架7的上面即可,电动葫芦14的吊钩15勾住钢丝绳10的绳头即可,电动葫芦14的升降,通过上滑轮3、下滑轮11和侧滑轮12转化为砝码组件9的升降,从而实现了电动葫芦14的试验。During the test, there is no need to install the electric hoist 14. You only need to place the electric hoist 14 on the operating platform 7. According to the length of the electric hoist 14, move the operating platform 7 along the trolley track 6 and adjust the distance between the two operating platforms 7. Spacing, the suspended hoist does not have a small frame, the wedge-shaped spacer 8 can be padded under the electric hoist 14 to prevent the electric hoist 14 from rolling. For the electric hoist 14 with a small frame, only the small frame needs to be placed on the running Just above the platform 7, the hook 15 of the electric hoist 14 hooks the rope head of the wire rope 10. The lifting and lowering of the electric hoist 14 is converted into the weight component 9 through the upper pulley 3, the lower pulley 11 and the side pulley 12. Lifting and lowering, thus realizing the test of electric hoist 14.

该试验台可以实现电动葫芦14的载荷试验、起升速度试验、能效测试等除了要求小车运行的所有试验项目。The test bench can realize the load test, lifting speed test, energy efficiency test and other test items of the electric hoist 14 except for the operation of the trolley.

以上描述是对本发明的解释,不是对发明的限定,本发明所限定的范围参见权利要求,在本发明的保护范围之内,可以作任何形式的修改。The above description is an explanation of the present invention, not a limitation of the invention. Please refer to the claims for the limited scope of the present invention. Any modifications may be made within the protection scope of the present invention.

Claims (6)

1. An exempt from to install electric block energy efficiency test bench which characterized in that: the support legs (1) are arranged in parallel at intervals, support plates (4) are arranged on the inner sides of the two support legs (1), a main beam (2) is arranged on each support plate (4), and an upper pulley (3) is arranged at the middle position of the upper part of each main beam (2); the electric hoist is characterized by further comprising a trolley track (6) arranged on the ground on the side surface of the hoist platform, wherein an operation bench (7) is arranged on the trolley track (6), and an electric hoist (14) is arranged on the operation bench (7) through a wedge-shaped cushion block (8); the lower pulley (11) is arranged below the main beam (2), the side pulley (12) is arranged below the electric hoist (14), the side pulley (12) is arranged beside the lower pulley (11), the electric hoist (14) is led out of the lifting hook (15), the electric hoist further comprises a weight assembly (9) arranged in the pit (13), and the steel wire rope (10) passes through a hanging hole (24) of the weight assembly (9) and sequentially passes through the hanging hole (24), bypasses the upper pulley (3), the lower pulley (11), the side pulley (12) and is finally connected to the lifting hook (15); the running rack (7) is provided with two groups at intervals in parallel, and the structure of each group is as follows: the wheel assembly comprises a wheel assembly panel (30) welded at the lower part of a running rack (7), a wheel shaft (25) is arranged below the wheel assembly panel (30), a wheel (29) is arranged on the wheel shaft (25), a wheel rim (28) is arranged beside the wheel (29), side plates (27) are respectively arranged on the wheel shafts (25) at the two ends of the wheel (29), and the end parts of the wheel shaft (25) are locked through large nuts (26).
2. The installation-free electric block energy efficiency test stand of claim 1, wherein: the mounting structure of the upper pulley (3) is as follows: the novel pulley support comprises a flange top plate (16), wherein a flange bottom plate (17) is arranged on the upper portion of the flange top plate (16) through a fixing bolt (18) and a locking nut (19), a pulley support (20) is arranged in the middle of the flange bottom plate (17), an upper pulley (3) is arranged on the upper portion of the pulley support (20) through a pulley shaft (21), and an end cover (22) is arranged at the end portion of the upper pulley (3).
3. The installation-free electric block energy efficiency test stand of claim 1, wherein: the upper pulley (3), the lower pulley (11) and the side pulley (12) have the same structure.
4. The installation-free electric block energy efficiency test stand of claim 1, wherein: the middle part of the weight component (9) is provided with a suspender (23), and the upper part of the suspender (23) is provided with a hanging hole (24).
5. The installation-free electric block energy efficiency test stand of claim 1, wherein: the lower end of the supporting plate (4) is fixed on the ground embedded part through a flange by using a high-strength bolt, the upper end of the supporting plate is welded with the half-circumference sector supporting plate (4) along the circumferential direction of the cylinder, and the lower part of the supporting plate (4) is welded with the reinforcing rib (5) along the axial direction of the cylinder.
6. The installation-free electric block energy efficiency test stand of claim 1, wherein: the main beam (2) is a rectangular welding box beam.
CN201810777599.8A 2018-07-16 2018-07-16 Installation-free electric hoist energy efficiency test bench Active CN108680377B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810777599.8A CN108680377B (en) 2018-07-16 2018-07-16 Installation-free electric hoist energy efficiency test bench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810777599.8A CN108680377B (en) 2018-07-16 2018-07-16 Installation-free electric hoist energy efficiency test bench

Publications (2)

Publication Number Publication Date
CN108680377A CN108680377A (en) 2018-10-19
CN108680377B true CN108680377B (en) 2023-09-08

Family

ID=63814196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810777599.8A Active CN108680377B (en) 2018-07-16 2018-07-16 Installation-free electric hoist energy efficiency test bench

Country Status (1)

Country Link
CN (1) CN108680377B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110160817B (en) * 2019-06-19 2024-04-16 江苏省特种设备安全监督检验研究院 Boosting weight system for electric hoist test and use method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2238820T3 (en) * 1998-06-16 2005-09-01 Kalmar Industries Oy Ab LIFTING DEVICE FOR HIGH PORTIC CHASSIS TRUCK.
CN201716198U (en) * 2010-05-26 2011-01-19 卫华集团有限公司 Electric hoist test auxiliary device and test equipment using same
CN102323100A (en) * 2011-06-02 2012-01-18 江苏省特种设备安全监督检验研究院无锡分院 Integrated trolley type electric hoist test stand
CN203190958U (en) * 2013-04-10 2013-09-11 新乡市恒创机械设备有限公司 Detection device for hook height of electric hoist, and electric hoist using detection device
CN203820350U (en) * 2014-03-19 2014-09-10 无锡耐博机器人科技有限公司 Distance measurer of electric hoist
CN204848094U (en) * 2015-05-21 2015-12-09 河南省中原凌空起重设备有限公司 Electric block range finder
CN205015415U (en) * 2015-09-19 2016-02-03 纽科伦(新乡)起重机有限公司 Electric block test bench
CN208459040U (en) * 2018-07-16 2019-02-01 江苏省特种设备安全监督检验研究院 Exempt from that electric block efficiency testing stand is installed

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2238820T3 (en) * 1998-06-16 2005-09-01 Kalmar Industries Oy Ab LIFTING DEVICE FOR HIGH PORTIC CHASSIS TRUCK.
CN201716198U (en) * 2010-05-26 2011-01-19 卫华集团有限公司 Electric hoist test auxiliary device and test equipment using same
CN102323100A (en) * 2011-06-02 2012-01-18 江苏省特种设备安全监督检验研究院无锡分院 Integrated trolley type electric hoist test stand
CN203190958U (en) * 2013-04-10 2013-09-11 新乡市恒创机械设备有限公司 Detection device for hook height of electric hoist, and electric hoist using detection device
CN203820350U (en) * 2014-03-19 2014-09-10 无锡耐博机器人科技有限公司 Distance measurer of electric hoist
CN204848094U (en) * 2015-05-21 2015-12-09 河南省中原凌空起重设备有限公司 Electric block range finder
CN205015415U (en) * 2015-09-19 2016-02-03 纽科伦(新乡)起重机有限公司 Electric block test bench
CN208459040U (en) * 2018-07-16 2019-02-01 江苏省特种设备安全监督检验研究院 Exempt from that electric block efficiency testing stand is installed

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
电动葫芦质量安全性能分析与研究;苏万斌;朱建新;全维军;柯韬;;起重运输机械(第08期);第49-53页 *

Also Published As

Publication number Publication date
CN108680377A (en) 2018-10-19

Similar Documents

Publication Publication Date Title
CN205501818U (en) Steel truss arch bridge maintenance car
CN101580211B (en) Multifunctional combined type lifting framework for installing large scale electrical power unit
CN105152032A (en) Installing method for bridge crane in enclosed environment workshop
CN101624164B (en) Hoisting method of machine set generator stator and special mechanism thereof
CN105621280B (en) The apparatus and method for mounting and dismounting crane arm
CN105565175A (en) Installation method for large bridge crane
CN110104564A (en) A kind of bridge crane total coating process
CN208459040U (en) Exempt from that electric block efficiency testing stand is installed
CN201619953U (en) Special hoisting mechanism for hoisting set generator stator
CN108680377B (en) Installation-free electric hoist energy efficiency test bench
CN107938507A (en) The mobile construction platform of steel truss arched bridge coating project
CN104973517A (en) Electric gantry platform for installing sintering machine head equipment and application method thereof
CN103147401B (en) Construction method of self-climbing portal frame
CN202092861U (en) Electric cucurbit testing stand of integrated dolly type
CN205603125U (en) Special hoist device that horizontal water tube cooler heat exchange tube was changed
CN108639947B (en) Suspended electric hoist test bench hoisting device
CN217398277U (en) Integral hoisting device of girder transporting vehicle
CN207498824U (en) A kind of hanger radial type single track bridge inspection car
CN113896089B (en) Construction method of oversized blast furnace
CN201793331U (en) Translational crane for steel pipes
CN111139742B (en) Method for mounting and dismounting highway bridge girder erection machine
CN217498458U (en) Airport assembled pavement slab mounting machine
CN201309802Y (en) Walking assembly-type gantry hoisting apparatus
CN205369033U (en) Gallows formula bridge tool car
CN109378767A (en) A kind of lifting engineering method of hoist engine to skyscraper electricity well inner cable

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant