CN108678417A - A kind of floor of steel structure transformation node - Google Patents
A kind of floor of steel structure transformation node Download PDFInfo
- Publication number
- CN108678417A CN108678417A CN201810856089.XA CN201810856089A CN108678417A CN 108678417 A CN108678417 A CN 108678417A CN 201810856089 A CN201810856089 A CN 201810856089A CN 108678417 A CN108678417 A CN 108678417A
- Authority
- CN
- China
- Prior art keywords
- floor
- steel
- support plate
- girder steel
- welded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 85
- 239000010959 steel Substances 0.000 title claims abstract description 85
- 230000009466 transformation Effects 0.000 title description 7
- 239000003351 stiffener Substances 0.000 claims abstract description 28
- 239000002131 composite material Substances 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 8
- 230000005540 biological transmission Effects 0.000 abstract description 5
- 238000005516 engineering process Methods 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
- E04G23/0237—Increasing or restoring the load-bearing capacity of building construction elements of storey floors
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a kind of floor of steel structure, and node is transformed, and the floor of steel structure includes original floor, and original floor edge is equipped with girder steel, is connected and fixed by peg between original floor and girder steel;Girder steel is H profile steel, and upper lower flange is each parallel to original floor;Girder steel top flange edge is welded with the support plate for being parallel to original floor;Multigroup support plate ribbed stiffener is welded in the support plate and girder steel between lower flange and web;Steel beam web plate other side position corresponding with support plate ribbed stiffener is welded with girder steel ribbed stiffener;Multiple newly-increased pegs are welded on form bracing plate, newly-increased floor is connected and fixed by peg and support plate.Way of the present invention is simple and direct, can ensure the secure support of newly-increased floor, while the setting of newly-increased peg can also ensure the horizontal power transmission of floor, this node construction is convenient, power transmission is clear, safe and reliable, is suitable for the structural steelwork of various scales.
Description
Technical field
The present invention relates to building engineering field, node is transformed in specifically a kind of floor of steel structure.
Background technology
Now with the requirement of urban renewal development, the quantity of existing building strengthening reconstruction project increases year by year in China,
And the case where being frequently encountered reconstruction of floor slab, for the engineering containing steel construction, tradition of the new and old floor at steel beam bearing
Way is to reject a part of concrete so that newly-increased concrete floor can ride on girder steel.Though this way is possible in theory,
But cumbersome and quality of constructing in practical operation is not easy to ensure, often also needs to remove the peg on original girder steel so that new steel is held
Plate can be laid with, while also need to complement peg again, and difficulty of construction is larger.
To solve the above problems, needing to design a kind of floor of steel structure transformation node, solves difficulty of construction greatly and quality can
By the problem of property difference.The design requirement that node is transformed in floor of steel structure is that way is simple and direct, power transmission is clear, safe and reliable, is suitable for
The steel construction improvement project of various scales.
Invention content
The present invention is exactly to solve the above-mentioned problems, to provide a kind of floor of steel structure transformation node.
The present invention is implemented according to following technical scheme.
A kind of floor of steel structure transformation node, the floor of steel structure includes original floor, and original floor edge is equipped with steel
Beam is connected and fixed between original floor and girder steel by peg;Girder steel is H profile steel, and upper lower flange is each parallel to original building
Plate;Girder steel top flange edge is welded with the support plate for being parallel to original floor;On the support plate and girder steel lower flange and
Multigroup support plate ribbed stiffener is welded between web;Steel beam web plate other side position corresponding with support plate ribbed stiffener is welded with
Girder steel ribbed stiffener;Multiple newly-increased pegs are welded on form bracing plate, newly-increased floor is fastened on by peg and support plate
Together.
Further, the newly-increased floor is normal concrete floor, composite deck slabs or reinforcing bar purlin
Frame plate floor.
Further, the support plate is welded on the outside of girder steel top flange, and support plate is the steel plate not less than 8mm.
Further, the support plate ribbed stiffener and girder steel ribbed stiffener are each perpendicular to web and lower flange.
The present invention achieves following advantageous effect.
The present invention solves the problems, such as that general floor of steel structure rebuilding construction difficulty is ropy greatly, can avoid removing original
Part concrete on girder steel and peg can ensure that being reliably connected for original floor and girder steel be not disturbed, while avoid tearing open
Except work causes original girder steel different degrees of injury.This floor of steel structure transformation node way is simple and direct, can ensure to increase newly
The secure support of floor, while the setting of newly-increased peg can also ensure the horizontal power transmission of floor, this node construction convenience, power transmission
It is clear, safe and reliable, it is suitable for the structural steelwork of various scales.
Description of the drawings
Fig. 1 is the structural schematic diagram of the present invention;
Fig. 2 is the left view of the present invention.
Wherein, 1. original floor;2. newly-increased floor;3. girder steel;301. top flange;302. lower flange;303. web;4. steel
Beam ribbed stiffener;5. support plate ribbed stiffener;6. support plate;7. peg.
Specific implementation mode
Referring to the drawings and embodiment carries out further technology explanation to the present invention.
As shown in Fig. 1~2, a kind of floor of steel structure transformation node, the floor of steel structure includes original floor 1, original
1 edge of floor is equipped with girder steel 3, is connected and fixed by peg 7 between original floor 1 and girder steel 3;Girder steel 3 is H profile steel, on
Lower flange is each parallel to original floor 1;3 top flange of the girder steel, 301 edge is welded with the support plate 6 for being parallel to original floor 1;
Multigroup support plate ribbed stiffener 5 is welded in the support plate 6 and girder steel 3 between lower flange and web 303;3 web 303 of girder steel is another
Side position corresponding with support plate ribbed stiffener 5 is welded with girder steel ribbed stiffener 4;It is welded on form bracing plate 6 multiple newly-increased
Peg 7, newly-increased floor 2 are connected and fixed by peg 7 and support plate 6.
The newly-increased floor 2 is normal concrete floor, composite deck slabs or steel bar girder slab-type apartment building plate.
The support plate 6 is from 3 top flange of girder steel, 301 outside welding, and support plate is the steel plate not less than 8mm.
The support plate ribbed stiffener 5 and girder steel ribbed stiffener 4 are each perpendicular to web 303 and lower flange 302.
The principle of the present invention and application method are:
The node is by girder steel 3, newly-increased floor 2, support plate 6, support plate ribbed stiffener 5, girder steel ribbed stiffener 4, peg 7 and original building
Plate 1 is constituted.It is mainly used for floor of steel structure improvement project.
When construction, first, by the side of the top flange of girder steel 3 301 welding form bracing plate 6, form bracing plate 6 with
Support plate ribbed stiffener 5 is welded on girder steel 3 between lower flange and web 303, corresponding to 5 position of support plate ribbed stiffener in the girder steel other side welds
Girder steel ribbed stiffener 4 is connect, then formwork pours floorslab concrete to weld stud 7 on form bracing plate 6, when floor is profiled sheet
When concrete combined floor or steel bar girder slab-type apartment building plate, first laying profiled sheet or steel bar girder plate, weld stud 7 is then again
Pour floorslab concrete.
The specification and spacing of support plate ribbed stiffener 5, girder steel ribbed stiffener 4, are determined on a case-by-case basis, its role is to enhance to hold
Power and stability are carried, such as newly-increased load of floor is larger, the support plate that thickness can be used larger, while increasing and being propped up in unit length
The quantity of fagging ribbed stiffener.
Claims (5)
1. node is transformed in a kind of floor of steel structure, the floor of steel structure includes original floor(1), original floor(1)Edge is set
There is girder steel(3), original floor(1)With girder steel(3)Between pass through peg(7)It is connected and fixed;Girder steel(3)For H profile steel, up and down
The edge of a wing is each parallel to original floor(1);It is characterized in that, the girder steel(3)Top flange(301)Edge be welded be parallel to it is original
Floor(1)Support plate(6);The support plate(6)With girder steel(3)Upper lower flange and web(303)Between be welded with multigroup support
Plate ribbed stiffener(5);Girder steel(3)Web(303)The other side and support plate ribbed stiffener(5)Corresponding position is welded with girder steel and adds
Strength rib(4);Form bracing plate(6)On be welded with multiple newly-increased pegs(7), increase floor newly(2)Pass through peg(7)With support plate
(6)It is connected and fixed.
2. node is transformed in a kind of floor of steel structure as described in claim 1, which is characterized in that the newly-increased floor(2)It is general
Logical concrete floor, composite deck slabs or steel bar girder slab-type apartment building plate.
3. node is transformed in a kind of floor of steel structure as described in claim 1, which is characterized in that the support plate(6)It is from steel
Beam(3)Top flange(301)Outside is welded, and support plate is the steel plate not less than 8mm.
4. node is transformed in a kind of floor of steel structure as described in claim 1, which is characterized in that the support plate ribbed stiffener(5)
It is each perpendicular to web(303)The lower flange and(302), and and support plate(6)And girder steel(3)Upper lower flange(301、302), web
(303)Welding.
5. node is transformed in a kind of floor of steel structure as described in claim 1, which is characterized in that the girder steel ribbed stiffener(4)
Perpendicular to web(303)The lower flange and(302), and with support plate ribbed stiffener(5)It is corresponding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810856089.XA CN108678417B (en) | 2018-07-31 | 2018-07-31 | Steel construction floor reforms transform node |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810856089.XA CN108678417B (en) | 2018-07-31 | 2018-07-31 | Steel construction floor reforms transform node |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108678417A true CN108678417A (en) | 2018-10-19 |
CN108678417B CN108678417B (en) | 2023-07-21 |
Family
ID=63814944
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810856089.XA Active CN108678417B (en) | 2018-07-31 | 2018-07-31 | Steel construction floor reforms transform node |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108678417B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110042962A (en) * | 2019-05-20 | 2019-07-23 | 中建钢构有限公司 | Board connecting structure and its construction method drop |
CN110284716A (en) * | 2019-07-18 | 2019-09-27 | 成都建工第四建筑工程有限公司 | The construction method of the lifter plate node structure of steel bar truss floor support plate |
CN110821157A (en) * | 2019-11-28 | 2020-02-21 | 中国一冶集团有限公司 | Exempt from to support detachable steel bar truss building carrier plate side forms |
CN115354798A (en) * | 2022-08-17 | 2022-11-18 | 中建一局集团建设发展有限公司 | H-shaped steel and T-shaped steel combined variable cross-section floor slab supporting structure and construction method |
CN115467548A (en) * | 2022-08-23 | 2022-12-13 | 中国京冶工程技术有限公司 | Method for reinforcing lower chord of steel truss gallery |
Citations (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3812447A1 (en) * | 1988-04-14 | 1989-10-26 | Rheinhold & Mahla Gmbh | Process for renovating a wooden-joist floor in old buildings, and renovated wooden-joist floor |
JPH07217226A (en) * | 1994-02-01 | 1995-08-15 | Kajima Corp | Reinforcement method for reinforced concrete floor slabs |
JP2004308204A (en) * | 2003-04-04 | 2004-11-04 | Shimizu Corp | Double floor structure for renovation |
US20090025308A1 (en) * | 2007-07-26 | 2009-01-29 | Deans Brian W | Seismic support and reinforcement systems |
CN201695550U (en) * | 2010-06-22 | 2011-01-05 | 中国建筑第二工程局有限公司 | Closed profiled steel sheet-concrete composite floor |
CN202090619U (en) * | 2011-05-30 | 2011-12-28 | 苏州二建建筑集团有限公司 | Combination reinforcing structure of building roofing concrete beam |
CN202969578U (en) * | 2012-08-13 | 2013-06-05 | 黄智辉 | Connecting node of newly increased reinforced concrete earthquake-resistant wall and original beam |
CN103498570A (en) * | 2013-10-12 | 2014-01-08 | 北京筑福国际工程技术有限责任公司 | Floor-adding transformation structure inside old factory building and construction method thereof |
CN104746893A (en) * | 2015-03-31 | 2015-07-01 | 铁道第三勘察设计院集团有限公司 | Connecting method for newly added steel beam and existing steel reinforced concrete beam |
CN204571349U (en) * | 2015-04-24 | 2015-08-19 | 贵州中建建筑科研设计院有限公司 | A kind of beam slab transformation load-carrying members |
CN105804428A (en) * | 2016-03-25 | 2016-07-27 | 浙江省建筑设计研究院 | Manufacturing method of vertical deformation control structure of additionally-arranged structure column |
CN105863289A (en) * | 2016-04-15 | 2016-08-17 | 山东省建筑科学研究院 | Steel structure spatial system for reinforcement and construction method thereof |
CN205875780U (en) * | 2016-06-29 | 2017-01-11 | 杭州九米建筑设计有限公司 | Back adds structural slab and original floor connection structure |
CN106869515A (en) * | 2015-12-10 | 2017-06-20 | 中天建设集团有限公司天津分公司 | The dismountable top plate supporting device of regularization |
CN206487167U (en) * | 2016-12-30 | 2017-09-12 | 西安五和土木工程新材料有限公司 | A kind of reinforcing device for slab |
CN206513056U (en) * | 2017-01-14 | 2017-09-22 | 上海中测行工程检测咨询有限公司 | Prefabricated porous plate end anti-slip ruggedized construction |
CN206562792U (en) * | 2016-10-13 | 2017-10-17 | 浙江杰地建筑设计有限公司 | Overlapping for existing structure strengthening reconstruction changes antitorque structure |
CN206737461U (en) * | 2017-03-06 | 2017-12-12 | 上海泰大建筑科技有限公司 | A kind of light-weight building sandwich system |
CN207673032U (en) * | 2017-11-24 | 2018-07-31 | 华东建筑设计研究院有限公司 | A kind of combination beam of existed concrete bridge floor and girder steel |
CN208792806U (en) * | 2018-07-31 | 2019-04-26 | 天津市建筑设计院 | A kind of floor of steel structure transformation node |
-
2018
- 2018-07-31 CN CN201810856089.XA patent/CN108678417B/en active Active
Patent Citations (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3812447A1 (en) * | 1988-04-14 | 1989-10-26 | Rheinhold & Mahla Gmbh | Process for renovating a wooden-joist floor in old buildings, and renovated wooden-joist floor |
JPH07217226A (en) * | 1994-02-01 | 1995-08-15 | Kajima Corp | Reinforcement method for reinforced concrete floor slabs |
JP2004308204A (en) * | 2003-04-04 | 2004-11-04 | Shimizu Corp | Double floor structure for renovation |
US20090025308A1 (en) * | 2007-07-26 | 2009-01-29 | Deans Brian W | Seismic support and reinforcement systems |
CN201695550U (en) * | 2010-06-22 | 2011-01-05 | 中国建筑第二工程局有限公司 | Closed profiled steel sheet-concrete composite floor |
CN202090619U (en) * | 2011-05-30 | 2011-12-28 | 苏州二建建筑集团有限公司 | Combination reinforcing structure of building roofing concrete beam |
CN202969578U (en) * | 2012-08-13 | 2013-06-05 | 黄智辉 | Connecting node of newly increased reinforced concrete earthquake-resistant wall and original beam |
CN103498570A (en) * | 2013-10-12 | 2014-01-08 | 北京筑福国际工程技术有限责任公司 | Floor-adding transformation structure inside old factory building and construction method thereof |
CN104746893A (en) * | 2015-03-31 | 2015-07-01 | 铁道第三勘察设计院集团有限公司 | Connecting method for newly added steel beam and existing steel reinforced concrete beam |
CN204571349U (en) * | 2015-04-24 | 2015-08-19 | 贵州中建建筑科研设计院有限公司 | A kind of beam slab transformation load-carrying members |
CN106869515A (en) * | 2015-12-10 | 2017-06-20 | 中天建设集团有限公司天津分公司 | The dismountable top plate supporting device of regularization |
CN105804428A (en) * | 2016-03-25 | 2016-07-27 | 浙江省建筑设计研究院 | Manufacturing method of vertical deformation control structure of additionally-arranged structure column |
CN105863289A (en) * | 2016-04-15 | 2016-08-17 | 山东省建筑科学研究院 | Steel structure spatial system for reinforcement and construction method thereof |
CN205875780U (en) * | 2016-06-29 | 2017-01-11 | 杭州九米建筑设计有限公司 | Back adds structural slab and original floor connection structure |
CN206562792U (en) * | 2016-10-13 | 2017-10-17 | 浙江杰地建筑设计有限公司 | Overlapping for existing structure strengthening reconstruction changes antitorque structure |
CN206487167U (en) * | 2016-12-30 | 2017-09-12 | 西安五和土木工程新材料有限公司 | A kind of reinforcing device for slab |
CN206513056U (en) * | 2017-01-14 | 2017-09-22 | 上海中测行工程检测咨询有限公司 | Prefabricated porous plate end anti-slip ruggedized construction |
CN206737461U (en) * | 2017-03-06 | 2017-12-12 | 上海泰大建筑科技有限公司 | A kind of light-weight building sandwich system |
CN207673032U (en) * | 2017-11-24 | 2018-07-31 | 华东建筑设计研究院有限公司 | A kind of combination beam of existed concrete bridge floor and girder steel |
CN208792806U (en) * | 2018-07-31 | 2019-04-26 | 天津市建筑设计院 | A kind of floor of steel structure transformation node |
Non-Patent Citations (1)
Title |
---|
张哲辉;: "楼房改造工程中新加悬臂结构的探讨与实践", 施工技术 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110042962A (en) * | 2019-05-20 | 2019-07-23 | 中建钢构有限公司 | Board connecting structure and its construction method drop |
CN110284716A (en) * | 2019-07-18 | 2019-09-27 | 成都建工第四建筑工程有限公司 | The construction method of the lifter plate node structure of steel bar truss floor support plate |
CN110284716B (en) * | 2019-07-18 | 2021-06-29 | 成都建工第四建筑工程有限公司 | Construction method of lifting plate node structure of steel bar truss floor bearing plate |
CN110821157A (en) * | 2019-11-28 | 2020-02-21 | 中国一冶集团有限公司 | Exempt from to support detachable steel bar truss building carrier plate side forms |
CN115354798A (en) * | 2022-08-17 | 2022-11-18 | 中建一局集团建设发展有限公司 | H-shaped steel and T-shaped steel combined variable cross-section floor slab supporting structure and construction method |
CN115354798B (en) * | 2022-08-17 | 2024-04-09 | 中建一局集团建设发展有限公司 | Variable cross-section floor slab supporting structure combining H-shaped steel and T-shaped steel and construction method |
CN115467548A (en) * | 2022-08-23 | 2022-12-13 | 中国京冶工程技术有限公司 | Method for reinforcing lower chord of steel truss gallery |
Also Published As
Publication number | Publication date |
---|---|
CN108678417B (en) | 2023-07-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108678417A (en) | A kind of floor of steel structure transformation node | |
CN202925762U (en) | Novel reinforced concrete superposed beam | |
CN212534174U (en) | Raft foundation steel bar supporting tool | |
CN207194268U (en) | Steel bar truss floor support plate with reusable bottom die | |
CN204098313U (en) | Two-way mixing cross wise reinforcement truss self-supporting hollowcore slab | |
CN113653235A (en) | Laminated slab, connecting structure of laminated slab and combination beam and construction method | |
CN110067185A (en) | A kind of steel pipe-steel plate combination web steel reinforced concrete combined box beam | |
CN102926504A (en) | Connecting steel construction member for steel and concrete overlapped beam combined part and construction method thereof | |
CN103643625B (en) | A kind of steel truss-concrete slab composite beam based on shear connections structure | |
CN208792806U (en) | A kind of floor of steel structure transformation node | |
CN204570446U (en) | The T-shaped simply supported beam of a kind of precast assembly | |
CN103243638A (en) | Bridge space radioactive concrete-filled steel tube bridge pier and construction method thereof | |
CN108104263A (en) | A kind of novel fabricated steel-regeneration concrete combination frame structural system | |
CN107724540A (en) | Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates | |
CN103821234A (en) | Joint construction for steel-reinforced concrete column and reinforced concrete beam | |
CN103205930A (en) | Structure for continuous transformation of existing simply supported hollow slab girder bridge and construction method of structure | |
CN205259417U (en) | Novel connection structure of steel construction house floor and girder steel | |
CN107989391A (en) | A kind of combination beam of existed concrete bridge floor and girder steel | |
CN104831628B (en) | A permanent formwork for the bridge deck of a multi-girder steel mixed structure bridge | |
CN219863582U (en) | Assembled self-supporting prestress stacking bearing plate | |
CN103741857B (en) | U-shaped girder steel and steel bar truss floor support plate floor system | |
CN217734445U (en) | Prefabricated steel-precast concrete composite shear wall | |
CN110295536A (en) | Using the prefabricated crossbeam structure and its construction method of complete prefabricated diaphragm plate | |
CN206591684U (en) | The connecting node of round steel tubing string and concrete shear force wall | |
CN206599882U (en) | Embedded individual layer steel plate concrete combined shear wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |