CN108643586A - A kind of the transporting and hoisting device and application method of assembled wall support system - Google Patents
A kind of the transporting and hoisting device and application method of assembled wall support system Download PDFInfo
- Publication number
- CN108643586A CN108643586A CN201810343421.2A CN201810343421A CN108643586A CN 108643586 A CN108643586 A CN 108643586A CN 201810343421 A CN201810343421 A CN 201810343421A CN 108643586 A CN108643586 A CN 108643586A
- Authority
- CN
- China
- Prior art keywords
- steel plate
- trolley frame
- frame body
- diagonal brace
- support system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/167—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域technical field
本发明涉及装配式建筑施工领域,尤其是涉及一种装配式墙体支撑体系的运输吊装装置及使用方法。The invention relates to the field of prefabricated building construction, in particular to a transport and hoisting device for a prefabricated wall support system and a method for using it.
背景技术Background technique
装配式预制墙体在吊装就位时采用斜撑进行固定,并通过调整斜撑的长度保证墙体的垂直度。墙体装配结束,当预制构件间后浇混凝土或灌浆料强度达到设计强度后,对墙体斜撑进行拆除,并将拆除的斜撑移至上一层楼层重复使用。目前,现场斜撑拆除后,操作人员将斜撑随意堆放,未进行统一分类和标识,待运至上一层使用时,又重新拾取任意斜撑,再根据墙体预埋件及底板预埋件位置,重新调整斜撑长度至适合位置固定,工作效率较低。实际上,装配式建筑标准层中,上、下层同一部位相同类型墙板的预埋件高度是一致的(深化设计时根据不同构件尺寸和重量进行预埋件高度的确定),因此,在斜撑拆除时,可以进行分类摆放,等运至其上其他楼层施工时可直接将斜撑放置对应位置,无需再随意挑选并大范围调节斜撑长度,通过简单调节即可满足使用要求,可极大提高斜撑安装效率。此外,拆除的斜撑一般用塔吊运至上层,起吊时,对临时堆放的斜撑进行常规简单捆绑,会带来较大的安全隐患,所以拆除的斜撑在起吊时要加强安全措施。When the assembled prefabricated wall is hoisted in place, it is fixed with diagonal braces, and the verticality of the wall is ensured by adjusting the length of the diagonal braces. After the wall assembly is completed, when the strength of the post-cast concrete or grout between the prefabricated components reaches the design strength, the diagonal braces of the wall are removed, and the removed diagonal braces are moved to the upper floor for reuse. At present, after the oblique braces are removed on site, the operators pile up the oblique braces randomly without uniform classification and identification. position, readjust the length of the diagonal brace to a suitable position and fix it, and the work efficiency is low. In fact, in the standard floor of a prefabricated building, the height of the embedded parts of the same type of wall panels in the same part of the upper and lower floors is the same (the height of the embedded parts is determined according to the size and weight of different components during the deepening design), therefore, in the inclined When the braces are dismantled, they can be sorted and placed. When they are transported to other floors above them for construction, the braces can be directly placed in the corresponding positions. There is no need to choose randomly and adjust the length of the braces in a large range. Simple adjustments can meet the use requirements. Greatly improve the installation efficiency of the diagonal brace. In addition, the removed diagonal braces are generally transported to the upper floor by tower cranes. During lifting, conventional and simple binding of temporarily stacked diagonal braces will bring great safety hazards. Therefore, safety measures must be strengthened when lifting the removed diagonal braces.
发明内容Contents of the invention
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种装配式墙体支撑体系的运输吊装装置及使用方法。The object of the present invention is to provide a transportation and hoisting device and a usage method of a prefabricated wall support system in order to overcome the above-mentioned defects in the prior art.
本发明的目的可以通过以下技术方案来实现:The purpose of the present invention can be achieved through the following technical solutions:
一种装配式墙体支撑体系的运输吊装装置,用以运输斜撑,该装置包括小车架体、设置在小车架体顶部的矩形钢板以及设置在钢板两侧短边边缘上的端槽,所述的端槽上连续设有多个用以放置斜撑的弧形槽口。A transport and hoisting device for a prefabricated wall support system, used for transporting diagonal braces, the device includes a trolley frame body, a rectangular steel plate set on the top of the trolley frame body, and end grooves set on the short edges of both sides of the steel plate , the end groove is continuously provided with a plurality of arc-shaped notches for placing diagonal braces.
所述的钢板两侧长边边缘上设有多个用以穿过缆绳固定斜撑的吊环。A plurality of suspension rings are provided on the long side edges on both sides of the steel plate to pass through the cables to fix the braces.
所述的小车架体的四面中部分别设有卡扣,每个卡扣分别通过卡环与钢板卡接。The middle parts of the four sides of the trolley frame body are respectively provided with buckles, and each buckle is respectively connected to the steel plate through a snap ring.
所述的钢板上还设有用以识别斜撑类型的编码器。The steel plate is also provided with an encoder for identifying the type of the brace.
所述的编码器包括四位数据,第一位为26个大写英文字母,用以表示装配式标准层不同房间类型,第二位和第三位为0到9的自然数,用以表示装配式同一种房间类型的不同房间数,第四位为E、S、W、N四个字母,用以表示东、南、西、北向墙体斜撑的起始方向。The encoder includes four bits of data, the first bit is 26 uppercase English letters, which are used to represent different room types on the prefabricated standard floor, and the second and third bits are natural numbers from 0 to 9, which are used to represent prefabricated standard floors. For the number of different rooms of the same room type, the fourth digit is the four letters E, S, W, and N, which are used to indicate the starting direction of the east, south, west, and north wall diagonal braces.
所述的小车架体底部设有四个滚轮,所述的滚轮上设有刹车件。The bottom of the trolley frame is provided with four rollers, and brakes are arranged on the rollers.
所述的滚轮为万向滚轮。Described roller is universal roller.
所述的端槽焊接在钢板两侧短边边缘上。The end grooves are welded on the short edges of both sides of the steel plate.
所述的斜撑上设有用以穿过缆绳固定的斜撑提手。The diagonal brace is provided with a diagonal brace handle for fixing through the cable.
一种使用方法,包括以下步骤:A method of use comprising the steps of:
1)对本层装配式标准层各户型进行编号;1) Number each house type on the prefabricated standard floor of this floor;
2)当该层装配式墙体斜撑即将拆除时,将小车架体推至装配式标准层房间,通过刹车件将下方滚轮刹紧,并固定小车架体;2) When the prefabricated wall bracing on this floor is about to be removed, push the trolley frame to the room on the prefabricated standard floor, brake the lower rollers through the brake parts, and fix the trolley frame;
3)将钢板放置在小车架体上,通过卡环与卡扣连接扣紧,使钢板和小车架体固定;3) Place the steel plate on the trolley frame, fasten the steel plate and the trolley frame through the connection of the snap ring and the buckle;
4)旋转钢板上的编码器至该房间编号,定义该房间的装配式墙体支撑件编号;4) Rotate the encoder on the steel plate to the room number, and define the number of the prefabricated wall support in the room;
5)依次将该房间内的装配式墙体斜撑进行拆除,并依次将斜撑放置在钢板的槽口上。5) Remove the prefabricated wall braces in the room in turn, and place the braces on the notches of the steel plates in turn.
6)采用缆绳分别穿过吊环、斜撑提手和斜撑两端,使斜撑和钢板绑紧固定;6) Use cables to pass through the suspension ring, the handle of the diagonal brace and the two ends of the diagonal brace respectively, so that the diagonal brace and the steel plate are fastened and fixed;
7)放松刹车件,转动小车滚轮,将小车架体推动小车到指定吊装区域;7) Loosen the brakes, turn the rollers of the trolley, and push the trolley frame to the designated hoisting area;
8)将塔吊吊钩绳索与钢板上的吊环相连扣紧,松开卡环与卡扣,将捆绑好的钢板和斜撑一起起吊至上一层;8) Connect the hook rope of the tower crane to the ring on the steel plate and fasten it, loosen the snap ring and the buckle, and lift the bundled steel plate and the diagonal brace to the upper floor together;
9)当吊至上层制定区域后,将钢板放置在上层等候的同样规格的小车架体上,通过卡环与该上层小车架体上的卡扣固定,使钢板与上层小车架体固定;9) After hoisting to the designated area on the upper floor, place the steel plate on the waiting trolley frame of the same specification on the upper floor, and fix it with the snap ring on the trolley frame on the upper floor, so that the steel plate and the trolley frame on the upper floor fixed;
10)将小车架体推至该层装配式预制墙体即将吊装就位区域,通过刹车件限定滚轮,固定小车架体;10) Push the trolley frame to the area where the prefabricated prefabricated wall of this floor is about to be hoisted in place, limit the rollers through brakes, and fix the trolley frame;
11)从槽口上依次取下斜撑,并按顺序依次对该房间内的预制墙体进行就位固定,完成既定工作。11) Remove the diagonal braces from the slots one by one, and fix the prefabricated walls in the room in order to complete the scheduled work.
与现有技术相比,本发明具有以下优点:Compared with the prior art, the present invention has the following advantages:
一、编码识别:对装配式墙体斜撑进行了数字编码,可很快找到上层对应位置处的斜撑,迅速进行安装就位,大幅度提高了装配式墙体斜撑拆卸及安装效率。1. Coding identification: digital coding is carried out on the diagonal bracing of the prefabricated wall, and the diagonal bracing at the corresponding position on the upper layer can be quickly found and quickly installed in place, which greatly improves the removal and installation efficiency of the prefabricated wall bracing.
二、操作方便:斜撑拆卸后直接放到小车架体上进行固定,运至楼层外侧,用塔吊进行斜撑的整体提升,减少了斜撑随意丢弃至地面、再捆绑提升、吊至第二层地面、再任意拾取调整的工序,节约了时间。2. Easy to operate: After dismantling the braces, put them directly on the trolley frame for fixing, transport them to the outside of the floor, and use the tower crane to lift the braces as a whole, reducing the need for random discarding of the braces to the ground, then binding and lifting, and hoisting to the second floor The process of picking and adjusting the second floor at random saves time.
三、平稳安全:斜撑固定在小车架体的钢板装置上,并用缆绳固定,当塔吊提升时,钢板4点起吊,斜撑上升平稳,保证了斜撑在吊装中的安全。3. Stable and safe: The diagonal brace is fixed on the steel plate device of the trolley frame and fixed with cables. When the tower crane is lifted, the steel plate is lifted at 4 points, and the diagonal brace rises steadily, which ensures the safety of the diagonal brace during hoisting.
四、随意组合:小车架体与上面固定的钢板装置可以分离,多个小车与多个钢板装置可以任意组合,流水作业,提高了运输效率。4. Random combination: the trolley frame can be separated from the steel plate device fixed on it, and multiple trolleys and multiple steel plate devices can be combined arbitrarily, and the assembly line operation improves the transportation efficiency.
五、效益高:本发明制作容易,拆卸方便,可重复使用,具有良好的经济效益和社会效益。5. High benefit: the present invention is easy to manufacture, convenient to disassemble, reusable, and has good economic and social benefits.
附图说明Description of drawings
图1为本发明运输及吊装装置结构示意图。Fig. 1 is a structural schematic diagram of the transportation and hoisting device of the present invention.
图中标记说明:Instructions for marks in the figure:
1、钢板,2、端槽,3、槽口,4、吊环,5、缆绳,6、卡环,7、卡扣,8、编码器,9、斜撑,10、斜撑提手,11、小车架体,12、滚轮,13、刹车件。1. Steel plate, 2. End groove, 3. Notch, 4. Hanging ring, 5. Cable, 6. Snap ring, 7. Buckle, 8. Encoder, 9. Diagonal brace, 10. Diagonal brace handle, 11 , trolley frame body, 12, roller, 13, brake piece.
具体实施方式Detailed ways
下面结合附图和具体实施例对本发明进行详细说明。The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
实施例Example
如图1所示,提出一种便捷实用的装配式墙体支撑体系的运输吊装装置,包括钢板1、端槽2、槽口3、吊环4、缆绳5、卡环6、卡扣7、编码器8、斜撑9、斜撑提手10、小车架体11、滚轮12、刹车件13。其中,钢板1放置在小车架体11上,卡环6布置在钢板1上,卡扣7固定在小车架体11上,钢板1通过卡环6和卡扣7的连接与小车架体11固定,端槽2位于钢板1两端,装配式墙体的斜撑9放至在端槽2的槽口3上,吊环4固定在钢板1上,通过缆绳5将斜撑9和吊环4固定在钢板1上,编码器8固定在钢板1上,滚轮12位于小车架体11下方,滚轮12外侧布置刹车件13,钢板1采用矩形钢板,端槽2布置在钢板1短边的两端,吊环4对称布置在钢板1长边的两侧,且每侧各布置2个吊环4,卡环6布置在钢板1的四边中部位置,卡扣7固定在小车架体9四边中部位置,且卡环6与卡扣7位置一一对应。As shown in Figure 1, a convenient and practical transport and hoisting device for an assembled wall support system is proposed, including a steel plate 1, an end groove 2, a notch 3, a lifting ring 4, a cable 5, a snap ring 6, a buckle 7, a code Device 8, diagonal brace 9, diagonal brace handle 10, trolley frame body 11, roller 12, brake 13. Among them, the steel plate 1 is placed on the trolley frame body 11, the snap ring 6 is arranged on the steel plate 1, the buckle 7 is fixed on the trolley frame body 11, the steel plate 1 is connected to the trolley frame through the connection of the snap ring 6 and the buckle 7 The body 11 is fixed, the end groove 2 is located at both ends of the steel plate 1, the diagonal brace 9 of the assembled wall is placed on the notch 3 of the end groove 2, the lifting ring 4 is fixed on the steel plate 1, and the diagonal brace 9 and the lifting ring are connected by the cable 5 4 is fixed on the steel plate 1, the encoder 8 is fixed on the steel plate 1, the roller 12 is located under the trolley frame body 11, the brake parts 13 are arranged outside the roller 12, the steel plate 1 is a rectangular steel plate, and the end groove 2 is arranged on the short side of the steel plate 1. At both ends, the suspension rings 4 are symmetrically arranged on both sides of the long side of the steel plate 1, and two suspension rings 4 are arranged on each side, the snap ring 6 is arranged in the middle of the four sides of the steel plate 1, and the buckle 7 is fixed in the middle of the four sides of the trolley frame body 9 position, and the positions of snap ring 6 and buckle 7 correspond one-to-one.
编码器8有四位字母和数字组成,第一位为26个大写英文字母,分别表示装配式标准层不同房间类型,第二位和第三位为0到9的自然数,表示装配式同一种房间类型的不同房间数,第四位为E、S、W、N四个字母,表示东、南、西、北向墙体斜撑的起始方向。可通过旋转编码器上的数字和字母,标识不同类型的斜撑。Encoder 8 is composed of four letters and numbers, the first is 26 capital English letters, which respectively represent different room types of the prefabricated standard floor, the second and third are natural numbers from 0 to 9, which represent the same type of prefabricated The number of different rooms of the room type, the fourth character is E, S, W, N, indicating the starting direction of the east, south, west, and north wall diagonal braces. The different types of braces can be identified by numbers and letters on the rotary encoder.
滚轮12为万向滑轮,可以保证小车架体任意方向运动,带有刹车件13,可以通过滚轮12将小车架体11随时停止,缆绳5要穿过吊环4和斜撑提手10将斜撑9固定在钢板1上,钢板1短边上的端槽2各有多个连续的弧形槽口3,以较好的放置多个斜撑9。所述端槽2焊接在钢板1两端的短边上。The roller 12 is a universal pulley, which can ensure that the trolley frame moves in any direction. It has a brake 13, and the trolley frame 11 can be stopped at any time by the roller 12. The cable 5 will pass through the suspension ring 4 and the diagonally braced handle 10. The diagonal brace 9 is fixed on the steel plate 1, and the end grooves 2 on the short sides of the steel plate 1 each have a plurality of continuous arc-shaped notches 3, so as to better place a plurality of diagonal braces 9. The end grooves 2 are welded on the short sides of the two ends of the steel plate 1 .
本装置的安装使用方法如下:The installation method of this device is as follows:
步骤1:将本层装配式标准层各户型进行编号,如A03,B07分别表示该层A户型的第3个房间及该层B户型的第7个房间。Step 1: Number each apartment type on the prefabricated standard floor of this floor, such as A03 and B07 respectively represent the third room of the A apartment on this floor and the seventh room of the B apartment on this floor.
步骤2:待该层装配式墙体斜撑9即将拆除时,将小车架体11推至装配式标准层房间如A03房间,通过刹车件13将下方滚轮12刹紧,固定小车架体11。Step 2: When the prefabricated wall bracing 9 of this layer is about to be removed, push the trolley frame body 11 to the room of the prefabricated standard floor such as room A03, brake the lower roller 12 through the brake part 13, and fix the trolley frame body 11.
步骤3:将钢板1放置在小车架体11上,通过卡环6与卡扣7连接,将钢板1和小车架体11固定。Step 3: Place the steel plate 1 on the trolley frame body 11, connect the snap ring 6 with the buckle 7, and fix the steel plate 1 and the trolley frame body 11.
步骤4:旋转钢板1上的编码器8至A03N,定义该房间的装配式墙体支撑件编号,其中,N指从该A03房间北侧斜撑开始拆卸。Step 4: Rotate the encoder 8 on the steel plate 1 to A03N to define the number of the prefabricated wall support in this room, where N refers to dismantling from the north side brace of the room A03.
步骤5:依次将该房间内的装配式墙体斜撑9进行拆除,并依次将斜撑9放置在钢板1上的槽口3上。Step 5: Remove the prefabricated wall braces 9 in the room in sequence, and place the braces 9 on the notches 3 on the steel plate 1 in sequence.
步骤6:用缆绳5穿过吊环4、斜撑提手10、斜撑9两端,将斜撑9和钢板1绑紧。Step 6: Use the cable 5 to pass through the suspension ring 4, the handle 10 of the diagonal brace, and the two ends of the diagonal brace 9, and tie the diagonal brace 9 and the steel plate 1 tightly.
步骤7:放松刹车件13,转动小车滚轮12,将小车架体11推动小车到指定吊装区域。Step 7: Loosen the brakes 13, turn the rollers 12 of the trolley, and push the trolley frame 11 to the designated hoisting area.
步骤8:将塔吊吊钩绳索与钢板上的吊环4相连扣紧,松开卡环6与卡扣7,将捆绑好的钢板1连同斜撑9一块起吊至上一层。Step 8: Connect the hook rope of the tower crane with the ring 4 on the steel plate and fasten it, loosen the snap ring 6 and the buckle 7, and lift the bundled steel plate 1 together with the brace 9 to the upper floor.
步骤9:当吊至上层制定区域后,将钢板1放置在上层等候的同样规格的小车架体11上,通过卡环6与该等候小车架体11上的卡扣7固定,将钢板1与小车架体11固定。Step 9: After hoisting to the designated area on the upper floor, place the steel plate 1 on the waiting trolley frame body 11 of the same specification on the upper floor, and fix the steel plate 1 with the snap ring 6 and the buckle 7 on the waiting trolley frame body 11. 1 is fixed with trolley frame body 11.
步骤10:将小车架体11推至该层装配式预制墙体即将吊装就位区域A03N,通过刹车件13限定滚轮12,固定小车架体11。Step 10: Push the trolley frame body 11 to the area A03N where the assembled prefabricated wall is about to be hoisted in place, limit the rollers 12 through the brakes 13, and fix the trolley frame body 11.
步骤11:从槽口3上依次取下斜撑9,并按顺序从北侧依次对该A03房间内的预制墙体进行就位固定,完成既定工作。Step 11: Remove the diagonal braces 9 from the notch 3 in sequence, and fix the prefabricated walls in the room A03 in order from the north side in order to complete the scheduled work.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810343421.2A CN108643586B (en) | 2018-04-17 | 2018-04-17 | A construction method for transportation and hoisting of a prefabricated wall support system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810343421.2A CN108643586B (en) | 2018-04-17 | 2018-04-17 | A construction method for transportation and hoisting of a prefabricated wall support system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108643586A true CN108643586A (en) | 2018-10-12 |
CN108643586B CN108643586B (en) | 2019-08-06 |
Family
ID=63746696
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810343421.2A Active CN108643586B (en) | 2018-04-17 | 2018-04-17 | A construction method for transportation and hoisting of a prefabricated wall support system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108643586B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110397289A (en) * | 2019-08-14 | 2019-11-01 | 武汉通联路桥机械技术有限公司 | A kind of comprehensive setting up girder stood in house capital and have automatic traveling function |
CN114973297A (en) * | 2022-06-17 | 2022-08-30 | 广州市圆方计算机软件工程有限公司 | Wall area identification method, system, equipment and medium for planar house type graph |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4805537A (en) * | 1986-10-28 | 1989-02-21 | Romeo Desroches | Vehicle and joist monorail trackway and method of transporting roof decking thereover |
CN102747841A (en) * | 2012-06-27 | 2012-10-24 | 浙江宝业幕墙装饰有限公司 | Curtain wall assembly, turnover and hoisting equipment and construction method thereof |
CN202672753U (en) * | 2012-06-27 | 2013-01-16 | 浙江宝业幕墙装饰有限公司 | Curtain wall assembling, overturning and hoisting equipment |
CN203531277U (en) * | 2013-11-13 | 2014-04-09 | 森特士兴集团股份有限公司 | Roofing transportation system for roofing composite board |
CN104179343A (en) * | 2014-08-28 | 2014-12-03 | 河北省第二建筑工程有限公司 | Movable scaffold with feeding function |
CN204081527U (en) * | 2014-10-15 | 2015-01-07 | 宿州学院 | Be applicable to different length tubing and push car |
CN106121257A (en) * | 2016-08-16 | 2016-11-16 | 郑州暖树实业有限公司 | Component Intelligent transport method and system for assembled architecture |
CN106223627A (en) * | 2016-08-31 | 2016-12-14 | 中建四局第三建筑工程有限公司 | A kind of portable discharging platform |
CN206693640U (en) * | 2017-03-30 | 2017-12-01 | 中冶建工集团有限公司 | A kind of space sheet steel-tube construction overall package platform |
-
2018
- 2018-04-17 CN CN201810343421.2A patent/CN108643586B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4805537A (en) * | 1986-10-28 | 1989-02-21 | Romeo Desroches | Vehicle and joist monorail trackway and method of transporting roof decking thereover |
CN102747841A (en) * | 2012-06-27 | 2012-10-24 | 浙江宝业幕墙装饰有限公司 | Curtain wall assembly, turnover and hoisting equipment and construction method thereof |
CN202672753U (en) * | 2012-06-27 | 2013-01-16 | 浙江宝业幕墙装饰有限公司 | Curtain wall assembling, overturning and hoisting equipment |
CN203531277U (en) * | 2013-11-13 | 2014-04-09 | 森特士兴集团股份有限公司 | Roofing transportation system for roofing composite board |
CN104179343A (en) * | 2014-08-28 | 2014-12-03 | 河北省第二建筑工程有限公司 | Movable scaffold with feeding function |
CN204081527U (en) * | 2014-10-15 | 2015-01-07 | 宿州学院 | Be applicable to different length tubing and push car |
CN106121257A (en) * | 2016-08-16 | 2016-11-16 | 郑州暖树实业有限公司 | Component Intelligent transport method and system for assembled architecture |
CN106223627A (en) * | 2016-08-31 | 2016-12-14 | 中建四局第三建筑工程有限公司 | A kind of portable discharging platform |
CN206693640U (en) * | 2017-03-30 | 2017-12-01 | 中冶建工集团有限公司 | A kind of space sheet steel-tube construction overall package platform |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110397289A (en) * | 2019-08-14 | 2019-11-01 | 武汉通联路桥机械技术有限公司 | A kind of comprehensive setting up girder stood in house capital and have automatic traveling function |
CN110397289B (en) * | 2019-08-14 | 2021-09-17 | 武汉通联路桥机械技术有限公司 | All-dimensional beam erecting equipment standing on top of house column and having automatic walking function |
CN114973297A (en) * | 2022-06-17 | 2022-08-30 | 广州市圆方计算机软件工程有限公司 | Wall area identification method, system, equipment and medium for planar house type graph |
Also Published As
Publication number | Publication date |
---|---|
CN108643586B (en) | 2019-08-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205955236U (en) | Container formula of taking pulley platform of unloading of encorbelmenting | |
CN103790390B (en) | Glass plate hoisting system for large-span dome glass curtain wall construction and construction method thereof | |
CN108643586B (en) | A construction method for transportation and hoisting of a prefabricated wall support system | |
CN211470599U (en) | Auxiliary carrying pole beam for hoisting | |
CN206680994U (en) | Assembled steel reinforced cage descending frame | |
CN204282843U (en) | The sliding hoisted in position device of steel girder erection in a kind of stiffness combination construction | |
CN106012854B (en) | The transporting equipment of prefabricated assembled overpass bridge plate | |
CN206693641U (en) | The irregular alien invasion glass curtain wall positioning apparatus of high-rise building | |
CN212452317U (en) | A bridge deck rotation system | |
CN213059778U (en) | Crane for civil engineering | |
CN211769762U (en) | Concrete box girder steel reinforcement cage integral hoisting device | |
CN210152290U (en) | Portable secondary structure drawknot muscle and constructional column stirrup are stacked and lifting device | |
CN203808532U (en) | Mold plate hoisting device | |
CN110255389B (en) | Fixed-angle rotation operation method for cylindrical pile leg | |
CN203856216U (en) | Complete transportation equipment for arc-shaped light-transmitting roof component | |
CN210888045U (en) | Assembled lifting die | |
CN201686458U (en) | Movable operating platform used for quickly processing welding seam at end opening of steel box girder | |
CN109403674B (en) | Assembled prefabrication factory for bridge construction and construction method thereof | |
CN215107469U (en) | Vertical stacking and transporting building block device capable of achieving rapid turnover | |
CN212076145U (en) | Coincide floor hoisting accessory, lift by crane structure and deposit hoisting system | |
CN220663339U (en) | Air entrainment piece transportation base device | |
CN206408919U (en) | A kind of hoistway operation stage apparatus | |
CN211034870U (en) | Steel plate hoisting clamp | |
KR20090115272A (en) | Foam lifting machine for outer wall of high-rise building | |
CN107700854B (en) | Steel plate wall sliding installation device and installation method for super high-rise core tube |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |