CN108590332A - Prefabricated concrete structure peripheral protective construction method - Google Patents
Prefabricated concrete structure peripheral protective construction method Download PDFInfo
- Publication number
- CN108590332A CN108590332A CN201810451915.2A CN201810451915A CN108590332A CN 108590332 A CN108590332 A CN 108590332A CN 201810451915 A CN201810451915 A CN 201810451915A CN 108590332 A CN108590332 A CN 108590332A
- Authority
- CN
- China
- Prior art keywords
- wall body
- guard rail
- precast wall
- rail rod
- service sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 230000002093 peripheral effect Effects 0.000 title claims abstract description 28
- 238000010276 construction Methods 0.000 title claims abstract description 12
- 230000001681 protective effect Effects 0.000 title claims abstract description 11
- 229910000831 Steel Inorganic materials 0.000 claims description 5
- 239000010959 steel Substances 0.000 claims description 5
- 238000000034 method Methods 0.000 abstract description 4
- 238000009434 installation Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H17/00—Fencing, e.g. fences, enclosures, corrals
- E04H17/14—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The present invention relates to construction techniques, specifically a kind of prefabricated concrete structure peripheral protective construction method.It carries out in the steps below:When making precast wall body, the pre-buried service sleeve for inserting peripheral guard rail rod in precast wall body;When site operation, precast wall body installs, and peripheral guard rail rod is inserted into service sleeve;It waits for that precast floor slab installs, in pouring concrete after pouring, peripheral guard rail rod is removed and seals the rear pouring concrete of service sleeve.The present invention, which is effectively avoided, to be set up scaffold outside wall and is gone along with sb. to guard him to install, while being avoided and being drilled on precast wall body, and the repairing of later stage wall is reduced, and dramatically saves the artificial and duration.
Description
Technical field
The present invention relates to construction techniques, specifically a kind of prefabricated concrete structure peripheral protective construction method.
Background technology
In traditional prefabricated concrete structure peripheral protective installing engineering, need to set up scaffold in advance, and scaffold
Fixation and the installation needs of peripheral guard rail rod drill on precast wall body, fixed by bolt.Aforesaid way, due to needing
It drills, wall body structure can be damaged to wall, when removing peripheral protective, also need to repair wall.
Invention content
The present invention in view of the above-mentioned problems existing in the prior art, provides a kind of prefabricated concrete structure peripheral protective construction party
Method, this method need not remove conveniently wall body hole, peripheral guard rail rod installation.
The present invention solve its technical problem the technical solution adopted is that:
A kind of prefabricated concrete structure peripheral protective construction method, carries out in the steps below:
(1)When making precast wall body, the pre-buried service sleeve for inserting peripheral guard rail rod in precast wall body;
(2)When site operation, precast wall body installs, and peripheral guard rail rod is inserted into service sleeve;
(3)Wait for that precast floor slab installs, in pouring concrete after pouring, after peripheral guard rail rod is removed and uses service sleeve
Pouring concrete seals.
Using the present invention of above-mentioned technical proposal, compared with prior art, advantageous effect is:
Effective avoid is set up scaffold outside wall and is gone along with sb. to guard him to install, while avoiding and being bored on precast wall body
Hole reduces the repairing of later stage wall, dramatically saves the artificial and duration.
Further, preferred embodiment of the present invention is:Fixed steel bars are connected between service sleeve.
Description of the drawings
Fig. 1 is peripheral guard rail rod in-site installation vertical view;
Fig. 2 is 1-1 cut away views in Fig. 1;
Fig. 3 is 2-2 cut away views in Fig. 1;
Fig. 4 is construction drawing after peripheral guard rail rod is removed;
In figure:1-precast wall body internal lobe;2-precast wall body inner thermal insulating layers;3-precast wall body siphonal lobes;4-service sleeves;5—
Peripheral guard rail rod;6-fixed steel bars;7-precast floor slabs 7;8-after-pouring concrete.
Specific implementation mode
The present invention is described in detail with reference to the accompanying drawings and embodiments.
Referring to Fig. 1 to Fig. 4, a kind of prefabricated concrete structure peripheral protective construction method carries out in the steps below:
First when making precast wall body, the pre-buried service sleeve 4 for inserting peripheral guard rail rod 5 in precast wall body internal lobe 1,
It is connected with fixed steel bars 6 between service sleeve 4, so that service sleeve 4 is fixed in precast wall body by fixed steel bars 6.
When then constructing at the scene, precast wall body installs, and peripheral guard rail rod 5 is inserted into service sleeve 4, waits for prefabricated
Floor 7 installs, and in pouring concrete 8 after pouring, peripheral guard rail rod 5 is removed, and finally pours rear pouring concrete 8, and pre-
Casing 4 in wall processed is sealed by after-pouring concrete eight.
Precast wall body is made of precast wall body internal lobe 1, precast wall body inner thermal insulating layer 2, precast wall body siphonal lobe 3 in figure.
The foregoing is merely preferably feasible embodiments of the invention, not thereby limit to the interest field of the present invention,
Equivalence changes made by all contents with description of the invention are both contained within the interest field of the present invention.
Claims (2)
1. a kind of prefabricated concrete structure peripheral protective construction method, which is characterized in that carry out in the steps below:
(1)When making precast wall body, the pre-buried service sleeve for inserting peripheral guard rail rod in precast wall body;
(2)When site operation, precast wall body installs, and peripheral guard rail rod is inserted into service sleeve;
(3)Wait for that precast floor slab installs, in pouring concrete after pouring, after peripheral guard rail rod is removed and uses service sleeve
Pouring concrete seals.
2. prefabricated concrete structure peripheral protective construction method according to claim 1, it is characterised in that:Service sleeve it
Between be connected with fixed steel bars.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810451915.2A CN108590332A (en) | 2018-05-12 | 2018-05-12 | Prefabricated concrete structure peripheral protective construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810451915.2A CN108590332A (en) | 2018-05-12 | 2018-05-12 | Prefabricated concrete structure peripheral protective construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108590332A true CN108590332A (en) | 2018-09-28 |
Family
ID=63636850
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810451915.2A Withdrawn CN108590332A (en) | 2018-05-12 | 2018-05-12 | Prefabricated concrete structure peripheral protective construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108590332A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110644800A (en) * | 2019-09-16 | 2020-01-03 | 佛山建装建筑科技有限公司 | Outer periphery of construction edge and using method thereof |
CN111042556A (en) * | 2019-12-04 | 2020-04-21 | 佛山建装建筑科技有限公司 | Edge protection device and construction method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2267102A (en) * | 1992-05-19 | 1993-11-24 | Gary Martin Price | Improvements in or relating to installation of posts |
CN201280837Y (en) * | 2008-09-11 | 2009-07-29 | 南京建工集团有限公司 | Inserting type enclosure towards the limb for construction engineering |
CN201915506U (en) * | 2010-12-28 | 2011-08-03 | 中建三局第二建设工程有限责任公司 | Embedded fitting for railing bases |
CN104790676A (en) * | 2015-04-29 | 2015-07-22 | 中国十七冶集团有限公司 | Rapid leveling and alignment device and method for installation of prefabricated wallboards |
CN105297921A (en) * | 2015-09-17 | 2016-02-03 | 中民筑友有限公司 | Prefabricated plate and prefabricated wall joint and construction method thereof |
-
2018
- 2018-05-12 CN CN201810451915.2A patent/CN108590332A/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2267102A (en) * | 1992-05-19 | 1993-11-24 | Gary Martin Price | Improvements in or relating to installation of posts |
CN201280837Y (en) * | 2008-09-11 | 2009-07-29 | 南京建工集团有限公司 | Inserting type enclosure towards the limb for construction engineering |
CN201915506U (en) * | 2010-12-28 | 2011-08-03 | 中建三局第二建设工程有限责任公司 | Embedded fitting for railing bases |
CN104790676A (en) * | 2015-04-29 | 2015-07-22 | 中国十七冶集团有限公司 | Rapid leveling and alignment device and method for installation of prefabricated wallboards |
CN105297921A (en) * | 2015-09-17 | 2016-02-03 | 中民筑友有限公司 | Prefabricated plate and prefabricated wall joint and construction method thereof |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110644800A (en) * | 2019-09-16 | 2020-01-03 | 佛山建装建筑科技有限公司 | Outer periphery of construction edge and using method thereof |
CN111042556A (en) * | 2019-12-04 | 2020-04-21 | 佛山建装建筑科技有限公司 | Edge protection device and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2382143C2 (en) | Block of curb for limitation of wall section in soil, element of curb block and method for wall erection in soil | |
CN103924793B (en) | Old house reinforcement structure and reinforcement means thereof | |
CN106193141B (en) | A kind of impaired pier footing method for reinforcing of earthquake | |
CN104060634B (en) | Water-stopping method and the structure of push pipe work well reserving hole | |
CN104695626B (en) | A kind of separate type prefabricated reinforced concrete bracket column and construction method | |
CN105952030A (en) | Insert bolt type prefabricated shear wall vertical joint connecting structure and construction method thereof | |
CN108824676B (en) | Bottom joint structure of double-sided superimposed shear wall and installation construction method thereof | |
CN108590332A (en) | Prefabricated concrete structure peripheral protective construction method | |
JP5202708B2 (en) | Steel pipe pile and pile foundation method using the steel pipe pile | |
CN211344262U (en) | Air-defense embedded sleeve device for air-defense basement | |
CN109695452A (en) | A kind of single layer pit shaft and its construction method that can axially allow pressure | |
CN1086435C (en) | A set of parts for use in building and a method of using same | |
JP2011094430A (en) | Method for constructing steel pipe sheet pile, and structure using the same | |
JPS6354093B2 (en) | ||
JP5281919B2 (en) | Outside heat insulation foundation structure and its construction method | |
JP2009102818A (en) | Connection structure between pillar and steel pipe pile | |
CN205711786U (en) | Big cross section porous overlength cast-in-place box culvert formwork system | |
CN109296204A (en) | Shear wall steel structural embedded parts exempt to pick chisel construction method | |
CN204492000U (en) | A kind of separate type prefabricated reinforced concrete bracket column | |
JP5881320B2 (en) | Reinforcement method of old and new concrete joints and reinforcement structure of joints | |
CN108442698B (en) | Deformation joint split bolt pvc sleeve plugging method and plugging fixing sleeve | |
JPH09209361A (en) | Pile driving method in pit structure | |
JP2002089051A (en) | Crack reinforcing method for concrete structure and crack reinforcing structure | |
JP2004293210A (en) | Renovation method for electric pole | |
JPH06272246A (en) | Pile head processing method for precast prestressed concrete pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180928 |