CN108589735A - A kind of Tunnel gushing treatment method - Google Patents

A kind of Tunnel gushing treatment method Download PDF

Info

Publication number
CN108589735A
CN108589735A CN201810444008.5A CN201810444008A CN108589735A CN 108589735 A CN108589735 A CN 108589735A CN 201810444008 A CN201810444008 A CN 201810444008A CN 108589735 A CN108589735 A CN 108589735A
Authority
CN
China
Prior art keywords
issue
grouting
plain stake
pressure
sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810444008.5A
Other languages
Chinese (zh)
Inventor
翟利华
农兴中
王凌
张晓光
袁泉
卢小莉
陈彦晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Metro Design and Research Institute Co Ltd
Original Assignee
Guangzhou Metro Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Metro Design and Research Institute Co Ltd filed Critical Guangzhou Metro Design and Research Institute Co Ltd
Priority to CN201810444008.5A priority Critical patent/CN108589735A/en
Publication of CN108589735A publication Critical patent/CN108589735A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/16Restraining of underground water by damming or interrupting the passage of underground water by placing or applying sealing substances

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention provides a kind of Tunnel gushing treatment methods, include the following steps, S1, draw water in the foundation pit that water burst occurs, primarily determine the direction and position of issue;S2, a plurality of drainpipe of setting at the foundation pit close to the issue;S3, the multiple sand hills of accumulation at the foundation pit close to the issue, make the sand hill cover the issue;S4, the plain stake progress bored grouting close to the issue is filled and is diffused in layer of sand according to the direction and position of the step S1 issues determined;S5, it is drilled to obtain multiple fill orifices between the plain stake and the diaphragm wall, and slip casting is carried out to the fill orifice, filling is diffused in layer of sand;S6, bored grouting is carried out to the Grouting Pipe in the diaphragm wall, filling is diffused in layer of sand.The present invention can solve the problems, such as that uniformity, bad to the physical and mechanical property improvement of soil layer and cost is excessively high to lacking when issue progress slip casting in the prior art.

Description

A kind of Tunnel gushing treatment method
Technical field
The present invention relates to a kind of construction of railway project technical field more particularly to a kind of Tunnel gushing treatment methods.
Background technology
Currently, the case where there are water bursts during constructing metro tunnel, adversely affects to the construction of subway tunnel. In processing subway tunnel there are when the case where water burst, generally use steel tube shed adds small-lead-tube advanced slip-casting method for protecting support, partly Area is handled using freezing, but steel tube shed adds grouting with small pipe easy, causes to lack when carrying out slip casting to issue uniform Property, it is bad to the physical and mechanical property improvement of soil layer, while such slip casting can not cope with water burst the problem of;Pass through freezing Method handles water burst, and freezing has that cost is excessively high and can not be fully solved water burst.
Invention content
Based on this, the purpose of the present invention is to provide a kind of Tunnel gushing treatment methods, to solve to handle subway in the prior art When the water burst situation in tunnel, exists and issue is carried out lacking uniformity when slip casting, the physical and mechanical property of soil layer is improved The ineffective and excessively high problem of cost.
The technical scheme is that:A kind of Tunnel gushing treatment method, includes the following steps:
S1, it draws water in the foundation pit that water burst occurs, primarily determines the direction and position of issue;
S2, a plurality of drainpipe of setting at the foundation pit close to the issue;
S3, the multiple sand hills of accumulation at the foundation pit close to the issue, make the sand hill cover the issue;
S4, according to the direction and position of the step S1 issue determined, drill to the plain stake close to the issue Slip casting, filling are diffused in layer of sand;
S5, drilled to obtain multiple fill orifices between the plain stake and the diaphragm wall, and to the fill orifice into Row slip casting, filling are diffused in layer of sand;
S6, bored grouting is carried out to the Grouting Pipe in the diaphragm wall, filling is diffused in layer of sand.
Optionally, in the step S2, specific operation process is:
S21, it is punched on the surface of the drainpipe side close to the water inlet, and after the completion of punching, it will Protection iron net is set in the surface close to the drainpipe side of the water inlet;
S22, the water inlet of the drainpipe is inserted into close to the foundation pit vicinity of the issue, the drainpipe Water outlet be inserted into the water pumper.
Optionally, in the step S3, the sand hill is deposited on the surface of the protection iron net.
Optionally, in the step S4, the center location for determining the plain stake is first had to, the drill bit of rotary drilling rig is aligned Then the drill bit of the rotary drilling rig is moved down and touches the plain stake by the center location of plain stake, starter motor drilling, until The hole of the plain stake is drilled into and reaches preset altitude range, slip casting finally is carried out to the plain stake after drilling.
Optionally, in the step S5, drilled to obtain between the plain stake and the diaphragm wall the first hole row and Second hole arranges, and first hole row and the second hole row respectively include 12 fill orifices, each of adjacent fill orifice it Between distance be 1000mm.
Optionally, in the step S4, the process of the hole slip casting of the element stake is:First after the plain stake has drilled Afterwards, high-pressure slip-casting is carried out to the hole of the plain stake;Then after the slurries condensation in the hole of the plain stake, to the hole of the plain stake into Row low-pressure grouting.
Optionally, it is to the process of the fill orifice slip casting:High-pressure slip-casting is carried out to the fill orifice first, then in institute After the slurries condensation for stating fill orifice, low-pressure grouting is carried out to the fill orifice.
8, Tunnel gushing treatment method as claimed in claim 5, which is characterized in that in the step S6, to the Grouting Pipe The process of slip casting is:High-pressure slip-casting is carried out to the Grouting Pipe first, then in the peaceful mechanism of slurries of the Grouting Pipe, to described Grouting Pipe carries out low-pressure grouting.
Optionally, the grouting pressure of the high-pressure slip-casting is 3MPa, and the flow rate of grouting of the high-pressure slip-casting is 110L/mi n;
The grouting pressure of the low-pressure grouting is 1MPa, and the flow rate of grouting of the low-pressure grouting is 70L/mi n.
Optionally, in described step S4, S5 and S6, grouting mode uses cement-water glass double grouting.
Implement the embodiment of the present invention, has the advantages that:
The Tunnel gushing treatment method of the present invention can be so that constructor's Ming and Qing Chu by drawing water to the foundation pit that water burst occurs The direction and position for understanding issue, construct convenient for constructor;By to a plurality of row of setting at the foundation pit of issue Water pipe, if at the position of issue after accumulation sand hill, also there is water burst situation in issue, can will be in foundation pit by drainpipe Water burst pump drainage is gone out, and the water burst volume in foundation pit is reduced;By the multiple sand hills of accumulation at the foundation pit close to issue, to make It obtains sand hill to cover issue, avoids the occurrence of the dilutional hyponatremia gushed out from issue, diaphragm wall is impacted;By being gushed to close The plain stake of water spot carries out bored grouting and avoids underground water to realize effective diffusion of the slurries in plain stake and flowed from plain stake Enter into issue;Since there is also soil layers between plain stake and diaphragm wall, there is the issues in foundation pit to extend to element Soil layer between stake and diaphragm wall, therefore, by carrying out slip casting toward fill orifice, so as to realize slurries plain stake and diaphragm wall it Between soil layer in effective diffusion, avoid underground water flowed into from the soil layer between plain stake and diaphragm wall it is effective in issue Diffusion, avoids underground water and is flowed into issue from the figure layer between plain stake and diaphragm wall;Pass through the Grouting Pipe in diaphragm wall Bored grouting is carried out, realizes effective diffusion of the slurries in Grouting Pipe, and slurries can pass through issue from subterranean layer, realize and reinforce Diaphragm wall and foundation pit block underground water burst, to improve the construction quality of subway tunnel construction, improve economy.Therefore, pass through To carrying out bored grouting, by carrying out slip casting toward fill orifice in the soil layer between plain stake and diaphragm wall close to the plain stake of issue Bored grouting is carried out with by the Grouting Pipe in diaphragm wall, slip casting can be carried out to the construction site near issue, realize slip casting Uniformity, improve soil layer physical property.
Description of the drawings
Fig. 1 is the sand hill of the Tunnel gushing treatment method of the present invention and drainpipe is placed on the schematic diagram of issue.
Fig. 2 is the schematic diagram of the drainpipe and protection iron net of the present invention.
Fig. 3 be the diaphragm wall of the present invention, plain stake and fill orifice schematic diagram.
Reference sign:
1, drainpipe;11, water inlet;12, water outlet;2, iron net is protected;3, sand hill;4, plain stake;5, diaphragm wall;6, it is perfused Hole;7, issue;8, geologic prospect hole.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without creative efforts Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that, the instructions such as term "upper", "lower", "left", "right", "top", "bottom" Orientation or positional relationship be based on the orientation or positional relationship shown in the drawings, be merely for convenience of description the present invention and simplification retouch It states, does not indicate or imply the indicated device or element must have a particular orientation, with specific azimuth configuration and operation, Therefore it is not considered as limiting the invention.
As shown in Figures 1 to 3, a kind of Tunnel gushing treatment method comprising following steps:
S1, it draws water in the foundation pit that water burst occurs, primarily determines the direction and position of issue 7;
S2, a plurality of drainpipe 1 is set at the foundation pit close to issue 7;
S3, the multiple sand hills 3 of accumulation at the foundation pit close to issue 7, make sand hill 3 cover issue 7;
S4, according to the direction and position of the step S1 issue 7 determined, to carrying out drilling note close to the plain stake 4 of issue 7 Slurry, filling are diffused in layer of sand;
S5, it is drilled to obtain multiple fill orifices 6 between plain stake 4 and diaphragm wall 5, and slip casting is carried out to fill orifice 6, filled It fills out and is diffused in layer of sand;
S6, bored grouting is carried out to the Grouting Pipe in diaphragm wall 5, filling is diffused in layer of sand.
Based on above-mentioned setting, Tunnel gushing treatment method of the invention can be made by drawing water to the foundation pit that water burst occurs The bright direction and position for having a clear understanding of issue 7 of constructor, constructs convenient for constructor;By to the base close to issue 7 A plurality of drainpipe 1 is set at hole, if after accumulation sand hill 3 at the position of issue 7, water burst situation also occurs in issue 7, can lead to It crosses drainpipe 1 the water burst pump drainage in foundation pit is gone out, reduces the water burst volume in foundation pit;By in the foundation pit close to issue 7 Place accumulates multiple sand hills 3 and avoids the occurrence of the dilutional hyponatremia gushed out from issue 7 so that sand hill 3 covers issue 7, to even Continuous wall 5 impacts;By carrying out bored grouting to the plain stake 4 close to issue 7, to realize slurries having in plain stake 4 Effect diffusion, avoids underground water and is flowed into issue 7 from plain stake 4;Due to there is also soil layer between plain stake 4 and diaphragm wall 5, There is the issues 7 in foundation pit to extend to the soil layer between plain stake 4 and diaphragm wall 5, therefore, by plain stake 4 and even Slip casting is carried out toward fill orifice 6 in soil layer between continuous wall 5, so as to realize in soil layer of the slurries between plain stake 4 and diaphragm wall 5 Effective diffusion, avoid soil layer of the underground water between plain stake 4 and diaphragm wall 5 and flow into issue 7;Pass through diaphragm wall 5 In Grouting Pipe carry out bored grouting, realize effective diffusion of the slurries in Grouting Pipe, and slurries can pass through water burst from subterranean layer Point 7 is realized and reinforces diaphragm wall 5 and foundation pit, and underground water burst is blocked, and to improve the construction quality of subway tunnel construction, improves warp Ji property.Therefore, by carrying out bored grouting close to the plain stake 4 of issue 7, passing through the soil layer between plain stake 4 and diaphragm wall 5 In carry out slip casting toward fill orifice 6 and bored grouting carried out by Grouting Pipe in diaphragm wall 5, can be to the construction near issue 7 Scene carries out slip casting, realizes the uniformity of slip casting, improves the physical property of soil layer.
In the present embodiment, as shown in Figures 1 to 3, in order to enable the water that issue 7 is gushed out can be detached quickly, it is convenient for step The progress of S4, S5 and S6, in step S2, specific operation process is:
S21, it is punched close to the surface of 1 side of drainpipe of water inlet 11, and after the completion of punching, by anti-break iron Net 2 is set in the surface close to 1 side of drainpipe of water inlet 11;
S22, the water inlet 11 of drainpipe 1 is inserted into close to the foundation pit vicinity of issue 7, the water outlet 12 of drainpipe 1 It is inserted into water pumper.Specifically, the water inlet 11 due to drainpipe 1 is located near issue 7, by close to water inlet 11 The surface of the side of drainpipe 1 is punched, to obtain osculum, when the water of issue 7 is gushed out, the water gushed out in addition to from Except the water of drainpipe 1 enters, also enter from the hole on 1 surface of drainpipe, improves drainage efficiency, in the embodiment of the present invention, row Water hole equidistant interval in the surface of drainpipe 1 is arranged;Protection iron net 2 can protect drainpipe 1, avoid sand hill 3 directly with draining Pipe 1 contacts and causes the damage of drainpipe 1;It draws water function and provides power to detach the water that issue 7 is gushed out.
In the present embodiment, in step S3, sand hill 3 is deposited on the surface of protection iron net 2, issue 7 is gushed in sand hill 3 While the water gone out plays the role of back-pressure, the water of issue 7 can preferably be flowed out from the discharge outlet of drainpipe 1 and osculum.
In the present embodiment, in order to realize effective diffusion of the slurries in plain stake 4, avoids underground water and flowed into from plain stake 4 Into issue 7, in step S4, the center location for determining plain stake 4 is first had to, by the circle of the drill bit alignment element stake 4 of rotary drilling rig Then the drill bit of rotary drilling rig is moved down and touches plain stake 4 by heart position, starter motor drilling, until the hole of plain stake 4 is drilled into Reach preset altitude range, slip casting finally is carried out to the plain stake 4 after drilling.It is drilled as a result, to plain stake 4 using this method Slip casting avoids and carries out bored grouting using complex mechanical equipment, and operation is very simple, has saved a large amount of cost, economy effect With height, the loss of underground water can be effectively reduced, underground water is avoided to flow into water burst eye from plain stake 4.
In the present embodiment, in order to further increase can realize it is effective in soil layer of the slurries between plain stake 4 and diaphragm wall 5 Diffusion, avoids soil layer of the underground water between plain stake 4 and diaphragm wall 5 and flows into issue 7, in step S4, in 4 He of plain stake It is drilled to obtain the first hole row and the second hole row between diaphragm wall 5, the first hole row and the second hole row respectively include 12 perfusions Hole 6, the distance between adjacent each fill orifice 6 are 1000mm.By the way that multiple fill orifices 6 are arranged, slurries can be realized from perfusion Hole 6 enters the soil layer between plain stake 4 and diaphragm wall 5 so that slurries filling is diffused in layer of sand.
In the present embodiment, in order to enable the hole slip casting effect of plain stake 4 is more notable, in step S4, the hole slip casting of plain stake 4 Process is:After first after plain stake 4 has drilled, high-pressure slip-casting is carried out to the hole of plain stake 4;Then solidifying in the slurries in the hole of plain stake 4 After knot, low-pressure grouting is carried out to the hole of plain stake 4.Specifically, when the water that issue 7 is gushed out is more, using high-pressure slip-casting;When When the water of 7 use of issue is less, using low-pressure grouting.
In the present embodiment, as shown in Figures 1 to 3, in order to enable the slip casting effect of fill orifice 6 becomes apparent, it is right in step S5 The process of 6 slip casting of fill orifice is:High-pressure slip-casting is carried out to fill orifice 6 first, then after the condensation of the slurries of fill orifice 6, to filling Orifice 6 carries out low-pressure grouting.Specifically, when the water that issue 7 is gushed out is more, using high-pressure slip-casting;When 7 use of issue Water it is less when, using low-pressure grouting.
In the present embodiment, in order to enable the slip casting effect of Grouting Pipe becomes apparent, in step S6, to the mistake of Grouting Pipe slip casting Cheng Wei:High-pressure slip-casting is carried out to Grouting Pipe first, then in the peaceful mechanism of the slurries of Grouting Pipe, low-pressure grouting is carried out to Grouting Pipe. Specifically, when the water that issue 7 is gushed out is more, using high-pressure slip-casting;When the water of 7 use of issue is less, use Low-pressure grouting.
In the present embodiment, in order to enable the slip casting effect difference between high-pressure slip-casting and low-pressure grouting becomes apparent, high pressure The grouting pressure of slip casting is 3MPa, and the flow rate of grouting of high-pressure slip-casting is 110L/mi n;
In the present embodiment, the grouting pressure of low-pressure grouting is 1MPa, and the flow rate of grouting of low-pressure grouting is 70L/mi n.
In the present embodiment, step S4, in S5 and S6, grouting mode uses cement-water glass double grouting, wherein cement It is matched 1 with the slurry volume of waterglass:1~3:Between 1, cement slurry density is 1.80~2.00g/cm3, it is dense be 43~ 45Be。
In the present embodiment, the side of plain stake 4 is equipped with multiple geologic prospect holes 8, convenient for the progress of construction.
To sum up, Tunnel gushing treatment method of the invention can be so that constructor be bright by drawing water to the foundation pit that water burst occurs The direction and position for having a clear understanding of issue 7, construct convenient for constructor;By to being arranged at the foundation pit of issue 7 A plurality of drainpipe 1, if after accumulation sand hill 3 at the position of issue 7, also there is water burst situation in issue 7, can pass through drainpipe 1 goes out the water burst pump drainage in foundation pit, reduces the water burst volume in foundation pit;It is more by being accumulated at the foundation pit close to issue 7 A sand hill 3 avoids the occurrence of the dilutional hyponatremia gushed out from issue 7 so that sand hill 3 covers issue 7, is made to diaphragm wall 5 At influence;By carrying out bored grouting to the plain stake 4 close to issue 7, to realize effective diffusion of the slurries in plain stake 4, Underground water is avoided to flow into issue 7 from plain stake 4;Due to there is also soil layer between plain stake 4 and diaphragm wall 5, there is Issue 7 in foundation pit extends to the soil layer between plain stake 4 and diaphragm wall 5, therefore, by carrying out slip casting toward fill orifice 6, So as to realizing effective diffusion in soil layer of the slurries between plain stake 4 and diaphragm wall 5, avoiding underground water from plain stake 4 and connecting Soil layer between continuous wall 5 flows into issue 7;Bored grouting is carried out by the Grouting Pipe in diaphragm wall 5, realizes that slurries are being noted Effective diffusion in pipe is starched, and slurries can pass through issue 7 from subterranean layer, realize and reinforce diaphragm wall 5 and foundation pit, block underground and gush Water improves economy to improve the construction quality of subway tunnel construction.Therefore, by the plain stake 4 close to issue 7 into Row bored grouting, by carrying out slip casting and by diaphragm wall 5 toward fill orifice 6 in the soil layer between plain stake 4 and diaphragm wall 5 Grouting Pipe carries out bored grouting, can carry out slip casting to the construction site near issue 7, realize the uniformity of slip casting, improve soil The physical property on stratum.It should be understood that various information are described using term " first ", " second " etc. in the present invention, but These information should not necessarily be limited by these terms, these terms are only used for same type of information being distinguished from each other out.For example, not taking off In the case of from the scope of the invention, " first " information can also be referred to as " second " information, similar, and " second " information can also It is referred to as " first " information.
The above is the preferred embodiment of the present invention, it is noted that for those skilled in the art For, without departing from the principle of the present invention, several improvement and deformations can also be made, these improvement and deformations are also considered as Protection scope of the present invention.

Claims (10)

1. a kind of Tunnel gushing treatment method, which is characterized in that include the following steps:
S1, it draws water in the foundation pit that water burst occurs, primarily determines the direction and position of issue;
S2, a plurality of drainpipe of setting at the foundation pit close to the issue;
S3, the multiple sand hills of accumulation at the foundation pit close to the issue, make the sand hill cover the issue;
S4, according to the direction and position of the step S1 issue determined, bored grouting is carried out to the plain stake close to the issue, Filling is diffused in layer of sand;
S5, it is drilled to obtain multiple fill orifices between the plain stake and the diaphragm wall, and the fill orifice is noted Slurry, filling are diffused in layer of sand;
S6, bored grouting is carried out to the Grouting Pipe in the diaphragm wall, filling is diffused in layer of sand.
2. Tunnel gushing treatment method as described in claim 1, which is characterized in that in the step S2, specific operation process is:
S21, it is punched on the surface of the drainpipe side close to the water inlet, and after the completion of punching, will be protected Iron net is set in the surface close to the drainpipe side of the water inlet;
S22, the water inlet of the drainpipe is inserted into close to the foundation pit vicinity of the issue, the drainpipe goes out The mouth of a river is inserted into the water pumper.
3. Tunnel gushing treatment method as claimed in claim 2, which is characterized in that in the step S3, the sand hill is deposited in On the surface of the protection iron net.
4. Tunnel gushing treatment method as claimed in claim 3, which is characterized in that in the step S4, first have to determine the element The center location of stake, it is then that the drill bit of the rotary drilling rig is downward by the center location of the plain stake of drill bit alignment of rotary drilling rig Mobile to touch the plain stake, starter motor drilling reaches preset altitude range until the hole of the plain stake is drilled into, finally right The plain stake after drilling carries out slip casting.
5. Tunnel gushing treatment method as claimed in claim 4, which is characterized in that in the step S5, in the plain stake and described It is drilled to obtain the first hole row and the second hole row between diaphragm wall, the first hole row and the second hole row respectively include 12 institutes Fill orifice is stated, the distance between each of adjacent described fill orifice is 1000mm.
6. Tunnel gushing treatment method as claimed in claim 5, which is characterized in that in the step S4, the hole slip casting of the element stake Process be:After first after the plain stake has drilled, high-pressure slip-casting is carried out to the hole of the plain stake;Then in the plain stake After the slurries condensation in hole, low-pressure grouting is carried out to the hole of the plain stake.
7. Tunnel gushing treatment method as claimed in claim 5, which is characterized in that in the step S5, to the fill orifice slip casting Process be:High-pressure slip-casting is carried out to the fill orifice first, then after the condensation of the slurries of the fill orifice, to the perfusion Hole carries out low-pressure grouting.
8. Tunnel gushing treatment method as claimed in claim 5, which is characterized in that in the step S6, to the Grouting Pipe slip casting Process be:High-pressure slip-casting is carried out to the Grouting Pipe first, then in the peaceful mechanism of slurries of the Grouting Pipe, to the slip casting Pipe carries out low-pressure grouting.
9. such as claim 6~8 any one of them Tunnel gushing treatment method, which is characterized in that the slip casting pressure of the high-pressure slip-casting Power is 3MPa, and the flow rate of grouting of the high-pressure slip-casting is 110L/min;
The grouting pressure of the low-pressure grouting is 1MPa, and the flow rate of grouting of the low-pressure grouting is 70L/min.
10. Tunnel gushing treatment method as claimed in claim 7, which is characterized in that in described step S4, S5 and S6, grouting mode Using cement-water glass double grouting.
CN201810444008.5A 2018-05-10 2018-05-10 A kind of Tunnel gushing treatment method Pending CN108589735A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810444008.5A CN108589735A (en) 2018-05-10 2018-05-10 A kind of Tunnel gushing treatment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810444008.5A CN108589735A (en) 2018-05-10 2018-05-10 A kind of Tunnel gushing treatment method

Publications (1)

Publication Number Publication Date
CN108589735A true CN108589735A (en) 2018-09-28

Family

ID=63637112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810444008.5A Pending CN108589735A (en) 2018-05-10 2018-05-10 A kind of Tunnel gushing treatment method

Country Status (1)

Country Link
CN (1) CN108589735A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610412A (en) * 2018-11-29 2019-04-12 云南省红河州水利水电勘察设计研究院 A kind of karst area underground underground river plugging structure and method for blocking
CN110284908A (en) * 2019-07-26 2019-09-27 济南城建集团有限公司 A kind of circumferential grouting for water plugging method in shield received well
CN112609720A (en) * 2020-12-04 2021-04-06 中建五局土木工程有限公司 Precipitation construction method suitable for deep foundation pit of high-pressure-bearing water-rich karst stratum
CN115030755A (en) * 2022-06-25 2022-09-09 中电建十一局工程有限公司 Construction method for quickly blocking water and sand gushes of tunnel portal
CN115110556A (en) * 2022-07-21 2022-09-27 广州地铁设计研究院股份有限公司 Foundation pit water inrush treatment method based on water storage back pressure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1257569A (en) * 1969-03-13 1971-12-22
CN205742237U (en) * 2016-06-08 2016-11-30 中国建筑一局(集团)有限公司 Deep basal pit construction piping processing apparatus
CN107761753A (en) * 2017-10-17 2018-03-06 山东大学 A kind of foundation ditch water burst rapid rescue slip casting method for blocking

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1257569A (en) * 1969-03-13 1971-12-22
CN205742237U (en) * 2016-06-08 2016-11-30 中国建筑一局(集团)有限公司 Deep basal pit construction piping processing apparatus
CN107761753A (en) * 2017-10-17 2018-03-06 山东大学 A kind of foundation ditch water burst rapid rescue slip casting method for blocking

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
林清基: ""岩溶地区深基坑涌水的防治例析"", 《建筑》 *
段军等: "《高原坝区高速公路施工实用新技术》", 31 July 2016, 西南交通大学出版社 *
洪三金等: ""深基坑内岩溶水反涌处理技术研究与实践"", 《建筑施工》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610412A (en) * 2018-11-29 2019-04-12 云南省红河州水利水电勘察设计研究院 A kind of karst area underground underground river plugging structure and method for blocking
CN109610412B (en) * 2018-11-29 2020-12-04 云南省红河州水利水电勘察设计研究院 Blocking structure and blocking method for underground river in karst area
CN110284908A (en) * 2019-07-26 2019-09-27 济南城建集团有限公司 A kind of circumferential grouting for water plugging method in shield received well
CN112609720A (en) * 2020-12-04 2021-04-06 中建五局土木工程有限公司 Precipitation construction method suitable for deep foundation pit of high-pressure-bearing water-rich karst stratum
CN115030755A (en) * 2022-06-25 2022-09-09 中电建十一局工程有限公司 Construction method for quickly blocking water and sand gushes of tunnel portal
CN115110556A (en) * 2022-07-21 2022-09-27 广州地铁设计研究院股份有限公司 Foundation pit water inrush treatment method based on water storage back pressure

Similar Documents

Publication Publication Date Title
CN108589735A (en) A kind of Tunnel gushing treatment method
CN108060908A (en) Water-rich sand layer long range horizontal orientation drilling grouting and reinforcing technology under groups of building
CN206337474U (en) The slip casting structure of covered karst embankment
CN209066465U (en) A kind of deep basal pit structure with ejectment side wall water burst
CN109736338A (en) A kind of hydraulic engineering foundation pit pipe well combination light well point Yield rainfall relation method
CN110318410A (en) A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method
CN209339169U (en) A kind of precipitation well in foundation pit plugging device
CN105821894B (en) With the large-scale solution cavity underground underground river processing method and its structure of water burst
CN102535490A (en) Method for dewatering foundation pit by using bored cast-in-place pile
CN108797621A (en) A kind of water sealing structure and its construction method in rich water depth ovum gravel erratic boulder stratum front pre-grouting
CN107747312A (en) A kind of method of sand and gravel stratum well cementing construction
CN107191001B (en) Construction Method of Foundation Reinforcement for Demolition and Construction of House Foundation
CN108149672A (en) The processing method of underground karst cavity
CN118241679B (en) Method for plugging large water burst in foundation pit rock fracture zone
CN106907152A (en) A kind of soil type inlet well arrangement and grouting method
CN107313420B (en) The construction method of strong rammer densification block pier is replaced using high pressure water
CN106088123A (en) A kind of sand geology steel tube well fall water level device and construction method thereof
CN109555140A (en) Foundation pit and Tunnel Base spring pump drainage method for blocking and device
CN204940314U (en) A kind of bellend pressure reduction well and deep foundation ditch structure thereof
CN104294806A (en) Excavation, diversion and drainage method for inter-pile water above water-resisting layer of deep foundation pit
CN107542097A (en) The drainage system and its construction method of the seam crossing infiltration of deep footing groove enclosing structure
CN106869934B (en) A kind of slip casting recovery method suitable for inclined seam
CN104975610A (en) Expanded-end decompression well, deep foundation pit structure and construction method for expanded-end decompression well
CN208949889U (en) Deep basal pit karst base lime rock stratum groundwater treatment system
CN211230546U (en) Drainage type drainage system for karst tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 510000 No. 204 Huanshi West Road, Yuexiu District, Guangzhou City, Guangdong Province

Applicant after: Guangzhou Metro Design and Research Institute Co., Ltd.

Address before: 510000 No. 204 Huanshi West Road, Yuexiu District, Guangzhou City, Guangdong Province

Applicant before: Guangzhou Metro Design & Research Institute Co., Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20180928

RJ01 Rejection of invention patent application after publication