CN108560826A - A kind of assembled partial precast steel sections outsourcing coupled column and its construction method - Google Patents
A kind of assembled partial precast steel sections outsourcing coupled column and its construction method Download PDFInfo
- Publication number
- CN108560826A CN108560826A CN201810565092.6A CN201810565092A CN108560826A CN 108560826 A CN108560826 A CN 108560826A CN 201810565092 A CN201810565092 A CN 201810565092A CN 108560826 A CN108560826 A CN 108560826A
- Authority
- CN
- China
- Prior art keywords
- concrete
- shaped steel
- steel
- outsourcing
- precast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/32—Columns; Pillars; Struts of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/34—Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
Description
技术领域technical field
本发明涉及建筑工程领域,具体是一种装配式部分预制型钢部分外包组合柱及其施工方法。The invention relates to the field of construction engineering, in particular to an assembled partially prefabricated section steel partially outsourcing composite column and a construction method thereof.
背景技术Background technique
型钢部分外包柱作为一种新型组合构件,其充分发挥型钢构件的强轴方向刚度,同时又弥补弱轴方向的刚度。与传统RC柱相比,具有强度高,横截面积小,减轻构件自重等优点;与SRC柱相比,具有造价低,施工便宜等优点。As a new type of composite member, the partly-wrapped steel column can give full play to the stiffness in the strong axis direction of the shaped steel member, and at the same time make up for the stiffness in the weak axis direction. Compared with traditional RC columns, it has the advantages of high strength, small cross-sectional area, and light weight of components; compared with SRC columns, it has the advantages of low cost and cheap construction.
现有的组合柱施工仍旧以湿作业为主,存在施工工序繁杂、施工周期长等缺点,严重制约组合柱的工程应用。建筑工程的工业化、产业化发展,催生装配式混凝土结构的产生,其采用工厂预制、现场连接的施工方法,具有施工速度快、节约模板等优点。The existing composite column construction is still dominated by wet work, which has the disadvantages of complicated construction procedures and long construction period, which seriously restricts the engineering application of composite columns. The industrialization and industrialization development of construction engineering has given birth to the production of prefabricated concrete structures. It adopts the construction method of factory prefabrication and on-site connection, which has the advantages of fast construction speed and saving formwork.
型钢混凝土柱由于其高承载力多用于超高层或者大跨结构,由于其高造价及施工繁杂的因素限制在多、高层建筑中的应用。因此,针对以上现状,迫切需要开发一种新型的装配式部分预制型钢部分外包组合柱及其施工方法,以克服当前实际应用中的不足。Due to its high bearing capacity, steel concrete columns are mostly used in super high-rise or long-span structures, but due to their high cost and complicated construction factors, their application is limited to multi-story and high-rise buildings. Therefore, in view of the above status quo, it is urgent to develop a new type of prefabricated partially prefabricated steel partially outsourcing composite column and its construction method to overcome the shortcomings in current practical applications.
发明内容Contents of the invention
本发明的目的在于提供一种装配式部分预制型钢部分外包组合柱及其施工方法,以解决上述背景技术中提出的问题。The object of the present invention is to provide a prefabricated partially prefabricated steel partially outsourcing composite column and its construction method to solve the problems raised in the above-mentioned background technology.
为实现上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:
一种装配式部分预制型钢部分外包组合柱,包括型钢;设置于所述型钢翼缘间同时位于所述型钢腹板两侧的预制混凝土;拉接所述型钢翼缘并内置于所述预制混凝土的拉杆;内置于所述预制混凝土沿所述型钢长度方向并紧贴所述拉杆的若干纵筋;填充于所述型钢与所述预制混凝土组成的封闭空间中的现浇混凝土。A prefabricated partially prefabricated section steel partially outsourcing composite column, including section steel; prefabricated concrete arranged between the section steel flanges and located on both sides of the section steel web; pulling the section steel flanges and built into the precast concrete tie rods; several longitudinal bars built into the precast concrete along the length direction of the section steel and close to the tie bars; cast-in-situ concrete filled in the closed space formed by the section steel and the precast concrete.
作为本发明进一步的方案:所述预制混凝土在所述型钢翼缘之间且分设于所述型钢腹板两侧;所述预制混凝土与所述型钢的翼缘组成组合柱的横截面四边;俯看横截面,所述预制混凝土与所述型钢翼缘组成中空封闭空间。As a further solution of the present invention: the prefabricated concrete is arranged between the shaped steel flanges and on both sides of the shaped steel web; the prefabricated concrete and the shaped steel flanges form the four sides of the cross-section of the composite column; Looking at the cross section, the prefabricated concrete and the shaped steel flange form a hollow closed space.
作为本发明进一步的方案:所述拉杆内置于所述预制混凝土;所述拉杆沿所述型钢长度方向等间距分布;所述拉杆连接所述型钢翼缘。As a further solution of the present invention: the tie rods are embedded in the prefabricated concrete; the tie rods are equally spaced along the length direction of the shaped steel; the tie rods are connected to the flange of the shaped steel.
作为本发明进一步的方案:所述纵筋内置于所述预制混凝土;所述纵筋紧贴所述拉杆;所述纵筋与所述型钢同方向布置。As a further solution of the present invention: the longitudinal reinforcement is embedded in the precast concrete; the longitudinal reinforcement is close to the tie rod; the longitudinal reinforcement is arranged in the same direction as the section steel.
作为本发明进一步的方案:所述现浇混凝土浇筑于所述型钢与所述预制混凝土组成的封闭空间;所述现浇混凝土被所述型钢腹板一分为二。As a further solution of the present invention: the cast-in-place concrete is poured in the closed space formed by the section steel and the prefabricated concrete; the cast-in-place concrete is divided into two by the web of the section steel.
作为本发明进一步的方案:所述预制混凝土为普通混凝土或者改性混凝土。As a further solution of the present invention: the prefabricated concrete is ordinary concrete or modified concrete.
作为本发明进一步的方案:所述现浇混凝土为普通混凝土或者改性混凝土。As a further solution of the present invention: the cast-in-place concrete is ordinary concrete or modified concrete.
一种装配式部分预制型钢部分外包组合柱的施工方法,包括如下步骤:A construction method for an assembled partially prefabricated section steel partially outsourcing composite column, comprising the following steps:
1)在构件制作厂将型钢或者焊接好的型钢就位,把拉杆按照设计间距及位置焊接于型钢翼缘,纵筋沿型钢长度方向布设并紧贴拉杆绑扎,支模并浇筑混凝土完成预制部分;1) Put the section steel or welded section steel in place in the component manufacturing plant, weld the tie rods to the section steel flange according to the designed spacing and position, arrange the longitudinal reinforcement along the length direction of the section steel and tie them close to the tie bars, set up the formwork and pour concrete to complete the prefabricated part ;
2)运输预制件至施工现场,吊装就位;2) Transport the prefabricated parts to the construction site and hoist them in place;
3)浇筑现浇混凝土于预制件中空部分。3) Pour cast-in-place concrete in the hollow part of the prefabricated part.
与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:
1)性能优良---新型部分预制装配式型钢部分外包组合柱,与型钢柱相比,其强度高,双轴刚度相近,应用范围更广;与现浇混凝土柱相比具有承载力高、减轻构件自重,减小横截面的优势;与型钢混凝土柱相比,具有施工更方便、造价更低廉的优点,具有广阔的应用前景。1) Excellent performance --- the new partly prefabricated steel partly outsourced composite column, compared with the steel column, its strength is higher, the biaxial stiffness is similar, and the application range is wider; compared with the cast-in-place concrete column, it has higher bearing capacity, It has the advantages of reducing the self-weight of components and reducing the cross section; compared with steel concrete columns, it has the advantages of more convenient construction and lower cost, and has broad application prospects.
2)施工快速、便宜---新型装配式部分预制型钢部分外包组合柱大部分制作在工厂完成,工艺简单,极大的提高构件制作效率,同时不受天气因素的影响,进一步提高施工效率。施工现场吊装,预制部分的构件可作为下一步浇筑混凝土的模板,进一步节省支模版的时间,提高施工效率,同时又能降低造价,整个施工过程相对简洁、方便。2) Fast and cheap construction---Most of the new prefabricated steel and outsourcing composite columns are mostly manufactured in the factory. The process is simple, which greatly improves the production efficiency of components, and is not affected by weather factors, further improving construction efficiency. The construction site is hoisted, and the prefabricated components can be used as the formwork for the next step of pouring concrete, which further saves the time for setting up the formwork, improves construction efficiency, and at the same time reduces the cost. The entire construction process is relatively simple and convenient.
3)施工质量易于控制---与传统的现场制作构件容易出现混凝土养护不到位、振捣不密实的情况相比,大规模的工厂制作更能保证材料的统筹利用与质量控制,从而保证构件的质量;同时与现场施工相比,工厂生产环境与劳动保护措施均有较大改善,能有效的保证施工工人的健康及人身安全。3) The construction quality is easy to control---compared with the situation that the traditional on-site production of components is prone to insufficient concrete curing and insufficient vibration, large-scale factory production can better ensure the overall utilization and quality control of materials, so as to ensure the quality of the components. At the same time, compared with on-site construction, the factory production environment and labor protection measures have been greatly improved, which can effectively ensure the health and personal safety of construction workers.
总体来讲,新型装配式部分预制型钢部分外包组合柱既能发挥组合结构的优点、又能兼顾其施工的便宜性,同时又相对保证施工质量,解决型钢混凝土柱不便于推广的问题,可广泛的应用于各类建筑结构中,极为推动组合构件在工程应用的发展。Generally speaking, the new prefabricated partially prefabricated steel partially outsourced composite column can not only give full play to the advantages of the composite structure, but also take into account the cheapness of its construction, and at the same time relatively guarantee the construction quality. It is widely used in various building structures, which greatly promotes the development of composite components in engineering applications.
附图说明Description of drawings
图1是本发明装配式部分预制型钢部分外包组合柱横截面示意图。Fig. 1 is a cross-sectional schematic diagram of a prefabricated partly prefabricated steel partly outsourcing composite column of the present invention.
图2是本发明装配式部分预制型钢部分外包组合柱预制部分立体图。Fig. 2 is a perspective view of the prefabricated part of the prefabricated part of the prefabricated section steel part of the outsourcing composite column of the present invention.
图3是本发明装配式部分预制型钢部分外包组合柱预制部分俯视图。Fig. 3 is a top view of the prefabricated part of the prefabricated part of the prefabricated section steel part of the outer composite column of the present invention.
图4是本发明装配式部分预制型钢部分外包组合柱立体图。Fig. 4 is a perspective view of the prefabricated partly prefabricated steel partly outsourcing combined column of the present invention.
图5是本发明装配式部分预制型钢部分外包组合柱俯视图。Fig. 5 is a top view of the prefabricated partly prefabricated steel partly outsourcing composite column of the present invention.
图中:1-型钢,2-预制混凝土,3-拉杆,4-纵筋,5-现浇混凝土。In the figure: 1-section steel, 2-prefabricated concrete, 3-tie rod, 4-longitudinal reinforcement, 5-cast-in-situ concrete.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
请参阅图1~5,本发明实施例中,一种装配式部分预制型钢部分外包组合柱,包括型钢1;设置于所述型钢1翼缘间同时位于所述型钢1腹板两侧的预制混凝土2;拉接所述型钢1翼缘并内置于所述预制混凝土2的拉杆3;内置于所述预制混凝土2沿所述型钢1长度方向并紧贴所述拉杆3的若干纵筋4;填充于所述型钢1与所述预制混凝土2组成的封闭空间中的现浇混凝土5。Please refer to Figures 1 to 5. In an embodiment of the present invention, an assembled partly prefabricated section steel section outsourcing composite column includes section steel 1; Concrete 2; tie rods 3 that are connected to the flange of the profiled steel 1 and built into the precast concrete 2; several longitudinal reinforcements 4 built into the precast concrete 2 along the length direction of the profiled steel 1 and close to the tie rods 3; The cast-in-place concrete 5 filled in the closed space formed by the section steel 1 and the precast concrete 2 .
本实施例中,所述预制混凝土2在所述型钢1翼缘之间且分设于所述型钢1腹板两侧;所述预制混凝土2与所述型钢1的翼缘组成组合柱的横截面四边;俯看横截面,所述预制混凝土2与所述型钢1翼缘组成中空封闭空间。In this embodiment, the precast concrete 2 is arranged between the flanges of the profiled steel 1 and on both sides of the web of the profiled steel 1; the precast concrete 2 and the flanges of the profiled steel 1 form the cross section of the composite column Four sides; looking down at the cross section, the precast concrete 2 and the flange of the section steel 1 form a hollow closed space.
本实施例中,所述拉杆3内置于所述预制混凝土2;所述拉杆3沿所述型钢1长度方向等间距分布;所述拉杆3连接所述型钢1翼缘。In this embodiment, the tie rods 3 are built into the precast concrete 2; the tie rods 3 are distributed at equal intervals along the length direction of the shaped steel 1; the tie rods 3 are connected to the flange of the shaped steel 1.
本实施例中,所述纵筋4内置于所述预制混凝土2;所述纵筋4紧贴所述拉杆3;所述纵筋4与所述型钢1同方向布置。In this embodiment, the longitudinal reinforcement 4 is built into the precast concrete 2; the longitudinal reinforcement 4 is close to the tie rod 3; and the longitudinal reinforcement 4 is arranged in the same direction as the section steel 1.
本实施例中,所述现浇混凝土5浇筑于所述型钢1与所述预制混凝土2组成的封闭空间;所述现浇混凝土5被所述型钢1腹板一分为二。In this embodiment, the cast-in-place concrete 5 is poured in the closed space formed by the shaped steel 1 and the precast concrete 2 ; the cast-in-place concrete 5 is divided into two by the web of the shaped steel 1 .
本实施例中,所述预制混凝土2为普通混凝土或者改性混凝土。In this embodiment, the precast concrete 2 is ordinary concrete or modified concrete.
本实施例中,所述现浇混凝土5为普通混凝土或者改性混凝土。In this embodiment, the cast-in-place concrete 5 is ordinary concrete or modified concrete.
本发明实施例中,一种装配式部分预制型钢部分外包组合柱的施工方法,包括如下步骤:In an embodiment of the present invention, a construction method for an assembled partially prefabricated section steel partially outsourcing composite column includes the following steps:
1)在构件制作厂将型钢1或者焊接好的型钢1就位,把拉杆3按照设计间距及位置焊接于型钢1翼缘,纵筋4沿型钢1长度方向布设并紧贴拉杆3绑扎,支模并浇筑混凝土完成预制部分,完成预制件详见图2;1) Put the section steel 1 or the welded section steel 1 in place in the component manufacturing plant, weld the tie rod 3 to the flange of the section steel 1 according to the designed spacing and position, and arrange the longitudinal reinforcement 4 along the length direction of the section steel 1 and tie it close to the tie rod 3. Molding and pouring concrete to complete the prefabricated part, see Figure 2 for details of the completed prefabricated parts;
2)运输预制件至施工现场,吊装就位;2) Transport the prefabricated parts to the construction site and hoist them in place;
3)浇筑现浇混凝土5于预制件中空部分,完成本发明所述装配式部分预制型钢部分外包组合柱的施工。3) Pour cast-in-place concrete 5 in the hollow part of the prefabricated part, and complete the construction of the prefabricated part of the prefabricated section steel part of the outsourcing composite column described in the present invention.
该装配式部分预制型钢部分外包组合柱,具有以下优点:The prefabricated partially prefabricated steel partially outsourced composite column has the following advantages:
1)性能优良---新型部分预制装配式型钢部分外包组合柱,与型钢柱相比,其强度高,双轴刚度相近,应用范围更广;与现浇混凝土柱相比具有承载力高、减轻构件自重,减小横截面的优势;与型钢混凝土柱相比,具有施工更方便、造价更低廉的优点,具有广阔的应用前景。1) Excellent performance --- the new partly prefabricated steel partly outsourced composite column, compared with the steel column, its strength is higher, the biaxial stiffness is similar, and the application range is wider; compared with the cast-in-place concrete column, it has higher bearing capacity, It has the advantages of reducing the self-weight of components and reducing the cross section; compared with steel concrete columns, it has the advantages of more convenient construction and lower cost, and has broad application prospects.
2)施工快速、便宜---新型装配式部分预制型钢部分外包组合柱大部分制作在工厂完成,工艺简单,极大的提高构件制作效率,同时不受天气因素的影响,进一步提高施工效率。施工现场吊装,预制部分的构件可作为下一步浇筑混凝土的模板,进一步节省支模版的时间,提高施工效率,同时又能降低造价,整个施工过程相对简洁、方便。2) Fast and cheap construction---Most of the new prefabricated steel and outsourcing composite columns are mostly manufactured in the factory. The process is simple, which greatly improves the production efficiency of components, and is not affected by weather factors, further improving construction efficiency. The construction site is hoisted, and the prefabricated components can be used as the formwork for the next step of pouring concrete, which further saves the time for setting up the formwork, improves construction efficiency, and at the same time reduces the cost. The entire construction process is relatively simple and convenient.
3)施工质量易于控制---与传统的现场制作构件容易出现混凝土养护不到位、振捣不密实的情况相比,大规模的工厂制作更能保证材料的统筹利用与质量控制,从而保证构件的质量;同时与现场施工相比,工厂生产环境与劳动保护措施均有较大改善,能有效的保证施工工人的健康及人身安全。3) The construction quality is easy to control---compared with the situation that the traditional on-site production of components is prone to insufficient concrete curing and insufficient vibration, large-scale factory production can better ensure the overall utilization and quality control of materials, so as to ensure the quality of the components. At the same time, compared with on-site construction, the factory production environment and labor protection measures have been greatly improved, which can effectively ensure the health and personal safety of construction workers.
总体来讲,新型装配式部分预制型钢部分外包组合柱既能发挥组合结构的优点、又能兼顾其施工的便宜性,同时又相对保证施工质量,解决型钢混凝土柱不便于推广的问题,可广泛的应用于各类建筑结构中,极为推动组合构件在工程应用的发展。Generally speaking, the new prefabricated partially prefabricated steel partially outsourced composite column can not only give full play to the advantages of the composite structure, but also take into account the cheapness of its construction, and at the same time relatively guarantee the construction quality. It is widely used in various building structures, which greatly promotes the development of composite components in engineering applications.
以上的仅是本发明的优选实施方式,应当指出,对于本领域的技术人员来说,在不脱离本发明构思的前提下,还可以作出若干变形和改进,这些也应该视为本发明的保护范围,这些都不会影响本发明实施的效果和专利的实用性。The above are only preferred embodiments of the present invention, and it should be pointed out that for those skilled in the art, some modifications and improvements can be made without departing from the concept of the present invention, and these should also be regarded as protection of the present invention. None of these will affect the implementation effect of the present invention and the practicability of the patent.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810565092.6A CN108560826A (en) | 2018-06-04 | 2018-06-04 | A kind of assembled partial precast steel sections outsourcing coupled column and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810565092.6A CN108560826A (en) | 2018-06-04 | 2018-06-04 | A kind of assembled partial precast steel sections outsourcing coupled column and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108560826A true CN108560826A (en) | 2018-09-21 |
Family
ID=63552899
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810565092.6A Pending CN108560826A (en) | 2018-06-04 | 2018-06-04 | A kind of assembled partial precast steel sections outsourcing coupled column and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108560826A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111119384A (en) * | 2020-02-18 | 2020-05-08 | 孙叶根 | Steel plate composite shear wall integrating fire prevention and corrosion prevention |
CN111119412A (en) * | 2020-02-18 | 2020-05-08 | 孙叶根 | Partially-filled reinforced combined concrete-filled steel tube column |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0498921U (en) * | 1991-02-04 | 1992-08-26 | ||
JPH0849349A (en) * | 1994-08-08 | 1996-02-20 | Toshiro Suzuki | Structure for reinforcing steel structural member |
JPH10196046A (en) * | 1997-01-17 | 1998-07-28 | Taisei Corp | Steel members |
JP2008069605A (en) * | 2006-09-15 | 2008-03-27 | Nippon Steel Corp | Reinforcing structure and reinforcing method for H-section steel material |
KR101622522B1 (en) * | 2015-11-11 | 2016-05-19 | 진흥건설공업(주) | Concrete Filled Steel Tube Columns using H-beam and bending iron plate |
KR101862278B1 (en) * | 2017-10-30 | 2018-05-29 | 주식회사 목양디자인그룹건축사사무소 | Steel composite concrete member |
-
2018
- 2018-06-04 CN CN201810565092.6A patent/CN108560826A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0498921U (en) * | 1991-02-04 | 1992-08-26 | ||
JPH0849349A (en) * | 1994-08-08 | 1996-02-20 | Toshiro Suzuki | Structure for reinforcing steel structural member |
JPH10196046A (en) * | 1997-01-17 | 1998-07-28 | Taisei Corp | Steel members |
JP2008069605A (en) * | 2006-09-15 | 2008-03-27 | Nippon Steel Corp | Reinforcing structure and reinforcing method for H-section steel material |
KR101622522B1 (en) * | 2015-11-11 | 2016-05-19 | 진흥건설공업(주) | Concrete Filled Steel Tube Columns using H-beam and bending iron plate |
KR101862278B1 (en) * | 2017-10-30 | 2018-05-29 | 주식회사 목양디자인그룹건축사사무소 | Steel composite concrete member |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111119384A (en) * | 2020-02-18 | 2020-05-08 | 孙叶根 | Steel plate composite shear wall integrating fire prevention and corrosion prevention |
CN111119412A (en) * | 2020-02-18 | 2020-05-08 | 孙叶根 | Partially-filled reinforced combined concrete-filled steel tube column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105256891B (en) | High-strength bottom muscle Precast Concrete Frame | |
CN104453093B (en) | Prefabricated steel reinforced concrete beam with transversal high-strength concrete clapboard, and construction method | |
CN104594561A (en) | Prefabricated reinforced concrete column with high-performance concrete frame and construction method | |
CN204983143U (en) | End muscle precast concrete frame construction excels in | |
CN207277561U (en) | Built-in profile steel high-strength concrete stem superposed column-girder steel group frame | |
CN103883051A (en) | Assembling type plate-beam connecting joint and construction method thereof | |
CN105625572A (en) | Prefabricated prestressed concrete frame beam-column joint making disparate use of high performance materials | |
CN104652705B (en) | Prefabricated and assembly type steel reinforced concrete column with high-performance concrete frame and construction method | |
CN108755975A (en) | A kind of the assembled connecting node and construction method of replaceable Self-resetting | |
CN212200035U (en) | A prefabricated composite bridge pier | |
CN206737199U (en) | A kind of light steel foam concrete assembled wall of assembled | |
CN104594556A (en) | Prefabricated type steel reinforced concrete beam with transverse steel partition boards and construction method | |
CN203808235U (en) | Integral special-shaped column structure of prefabricated assembly | |
CN106638951A (en) | Novel assembly type concrete beam column joint and construction method thereof | |
CN203129359U (en) | Single row reinforced concrete shear wall with cross inclined ribs | |
CN103498569A (en) | Steel frame concrete structure for floor-adding transformation inside old factory building and construction method thereof | |
CN103711232B (en) | L-shaped frame component and lightweight concrete wall prefabricated type shear wall and connection construction method | |
CN209907608U (en) | Prefabricated Shear Wall Connection Nodes | |
CN102704597A (en) | Encased concrete composite shear wall embedded with dense steel plate beams between concrete-filled steel tube columns and construction method thereof | |
CN108166681A (en) | A kind of assembled partial precast part external wrapping concrete combination beam and its construction method | |
CN108560826A (en) | A kind of assembled partial precast steel sections outsourcing coupled column and its construction method | |
CN101021088A (en) | Steel reinforcement assembling integral structural vertical pole hollow rack building floor slab structure | |
CN203603522U (en) | Steel frame concrete structure used for transforming inner portion of old factory building in floor adding mode | |
CN105735470A (en) | Precast concrete frame system using high-performance materials differentially | |
CN204357000U (en) | A kind of precast and assembled reinforced concrete spinous process of the seventh cervical vertebra frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180921 |