CN108554626A - Blast furnace granulated slag deironing apparatus - Google Patents
Blast furnace granulated slag deironing apparatus Download PDFInfo
- Publication number
- CN108554626A CN108554626A CN201810314987.2A CN201810314987A CN108554626A CN 108554626 A CN108554626 A CN 108554626A CN 201810314987 A CN201810314987 A CN 201810314987A CN 108554626 A CN108554626 A CN 108554626A
- Authority
- CN
- China
- Prior art keywords
- slag
- water
- blast furnace
- grain
- belt conveyor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B03—SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
- B03C—MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
- B03C1/00—Magnetic separation
- B03C1/02—Magnetic separation acting directly on the substance being separated
- B03C1/16—Magnetic separation acting directly on the substance being separated with material carriers in the form of belts
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B3/00—General features in the manufacture of pig-iron
- C21B3/04—Recovery of by-products, e.g. slag
- C21B3/06—Treatment of liquid slag
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/50—Reuse, recycling or recovery technologies
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Separation Of Solids By Using Liquids Or Pneumatic Power (AREA)
Abstract
Description
技术领域technical field
本发明涉及钢铁冶金设备的回收利用领域,特别涉及一种高炉水渣除铁装置。The invention relates to the field of recycling of iron and steel metallurgical equipment, in particular to a blast furnace slag iron removal device.
背景技术Background technique
高炉炼铁产品中,炉渣是其副产品。出铁过程中,由于炉渣与铁分离时间短、或分离设备效率差,导致炉渣中常夹杂一定的金属铁粒。目前钢铁企业大多是直接将水渣卖给水泥生产企业,其中夹杂的铁粒并没有回收。考虑到钢铁企业炉渣量大,因此夹杂铁量较为可观。因此,在现有工艺基础上,对炉渣夹杂铁进行回收,有利于节约成本。Slag is a by-product of blast furnace ironmaking products. During the tapping process, due to the short separation time between slag and iron, or the poor efficiency of separation equipment, certain metal iron particles are often mixed in the slag. At present, most iron and steel enterprises directly sell water slag to cement production enterprises, and the iron particles mixed in it are not recycled. Considering the large amount of slag in iron and steel enterprises, the amount of iron inclusions is considerable. Therefore, on the basis of the existing technology, recycling the slag mixed with iron is beneficial to save costs.
因此,本领域需要一种新式的高炉水渣除铁装置,以便于对炉渣夹杂铁回收利用。Therefore, there is a need in the art for a new blast furnace slag iron removal device to facilitate the recycling of slag-laden iron.
发明内容Contents of the invention
鉴于现有技术中的上述问题,本发明目的在于提供一种高炉水渣除铁装置,其由熔渣沟、冲渣水管、水渣沟、集渣池、皮带传送机、分离装置、集铁池、水渣运输装置、集水池以及循环水泵组成,其中,通过设置带磁性的分离装置,例如设置皮带传送机的主动轮为带磁性轮,使得水渣经皮带传送至分离装置时,由于分离装置的磁性,使得水渣中渣铁能够吸附于分离装置附近,并随着皮带转动从水渣中分离出,从而实现对水渣中夹杂铁粒的有效回收。In view of the above-mentioned problems in the prior art, the object of the present invention is to provide a blast furnace slag iron removal device, which is composed of a slag ditch, a slag flushing water pipe, a slag ditch, a slag collecting tank, a belt conveyor, a separating device, an iron collecting Pool, water slag transport device, sump and circulating water pump, among them, by setting a magnetic separation device, for example, setting the driving wheel of the belt conveyor as a magnetic wheel, so that when the water slag is conveyed to the separation device by the belt, due to the separation The magnetism of the device enables the slag and iron in the water slag to be adsorbed near the separation device and separated from the water slag with the rotation of the belt, so as to realize the effective recovery of iron particles in the water slag.
因此,根据本发明一实施方式,提供一种高炉水渣除铁装置,其包括:熔渣沟、冲渣水管、水渣沟、集渣池、皮带传送机、分离装置、集铁池、水渣运输装置、集水池以及循环水泵,其中,Therefore, according to one embodiment of the present invention, a blast furnace slag iron removal device is provided, which includes: slag ditch, slag flushing water pipe, water slag ditch, slag collection pool, belt conveyor, separation device, iron collection pool, water slag transportation device, sump and circulating water pump, among which,
所述熔渣沟的一端接收高炉排出的熔渣,并在另一端连接至所述水渣沟的入口端以将熔渣转移至所述水渣沟;One end of the slag ditch receives the slag discharged from the blast furnace, and the other end is connected to the inlet end of the slag ditch to transfer the slag to the slag ditch;
所述冲渣水管安装在所述水渣沟的所述入口端附近,以使来自所述循环水泵的水通过所述冲渣水管对从所述熔渣沟排出的熔渣进行水淬处理,形成水渣;The slag flushing water pipe is installed near the inlet end of the water slag ditch, so that the water from the circulating water pump passes through the slag flushing water pipe to perform water quenching treatment on the slag discharged from the slag flushing ditch, form dregs;
所述集渣池连接至所述水渣沟的出口端以接收所述水渣沟排出的水渣和冲渣水,并且一方面将冲渣水过滤并排出到所述集水池,另一方面将水渣转移至倾斜放置在所述集渣池上方的所述皮带传送机;以及The slag collection pool is connected to the outlet of the slag ditch to receive the slag and slag washing water discharged from the slag ditch, and on the one hand, the slag washing water is filtered and discharged to the sump, on the other hand transferring water slag to the belt conveyor placed obliquely above the slag collection tank; and
在所述皮带传送机的皮带末端设置有所述分离装置,所述分离装置带磁性,将水渣中夹杂的铁粒从水渣中分离出并落入所述集铁池,其余杂质转移至所述水渣运输装置。The separation device is provided at the belt end of the belt conveyor, and the separation device is magnetic, and the iron particles mixed in the water slag are separated from the water slag and dropped into the iron collection pool, and the remaining impurities are transferred to the The slag transport device.
在一实施方式中,所述分离装置可包括所述皮带传送机的带磁性主动轮、以及在所述皮带传送机的皮带末端下方并邻近皮带末端设置的分离板。In one embodiment, the separation device may comprise a magnetic drive pulley of the belt conveyor, and a separation plate disposed below and adjacent to the belt end of the belt conveyor.
进一步地,所述分离板可呈倒V形,所述倒V形包括接近皮带传送机的第一侧边和远离皮带传送机的第二侧边,所述集铁池设置在所述倒V形的第一侧边的下方,且所述水渣运输装置设置在所述倒V形的第二侧边的下方。Further, the separation plate may be in an inverted V shape, and the inverted V shape includes a first side close to the belt conveyor and a second side far away from the belt conveyor, and the iron collecting pool is arranged on the inverted V Below the first side of the inverted V shape, and the water slag transport device is arranged below the second side of the inverted V shape.
在一实施方式中,所述集水池可位于所述集渣池下方,以回收从所述集渣池过滤并排出的冲渣水。In one embodiment, the water collection tank may be located below the slag collection tank to recover the slag flushing water filtered and discharged from the slag collection tank.
进一步地,所述集水池可连接至所述循环水泵,以使回收的冲渣水经由所述循环水泵以再用于水淬处理高炉熔渣。Further, the sump can be connected to the circulating water pump, so that the recovered slag flushing water passes through the circulating water pump to be reused for water quenching treatment of blast furnace slag.
本发明的优势在于,通过在现有的高炉水冲渣工艺基础上,添设简易除铁装置,能有效回收炉渣中夹杂的铁粒,从而解决了以往钢炉水渣中铁粒无法回收的问题,且工艺简单,投入成本低。The advantage of the present invention is that by adding a simple iron removal device on the basis of the existing blast furnace water slag flushing process, the iron particles mixed in the slag can be effectively recovered, thereby solving the problem that the iron particles in the steel furnace slag cannot be recovered in the past , and the process is simple and the input cost is low.
附图说明Description of drawings
此处所说明的附图用来提供对本发明实施方式的进一步理解,构成本发明的一部分,本发明的示意性实施方式及其说明用于解释本发明,并不构成对本发明的不当限定。在附图中:The drawings described here are used to provide a further understanding of the embodiments of the present invention, and constitute a part of the present invention. The schematic embodiments of the present invention and their descriptions are used to explain the present invention, and do not constitute improper limitations to the present invention. In the attached picture:
图1为根据本发明一实施方式的高炉水渣除铁装置的示意图。Fig. 1 is a schematic diagram of a blast furnace slag iron removal device according to an embodiment of the present invention.
附图元件符号说明Explanation of symbols in drawings
1:高炉;2:熔渣沟;3:水渣沟;4:集渣池;5:皮带传送机;6:分离板;7:水渣运输装置;8:集铁池;9:集水池;10:冲渣水管;11:循环水泵;12:主动轮。1: blast furnace; 2: slag ditch; 3: water slag ditch; 4: slag collection pool; 5: belt conveyor; 6: separation plate; 7: water slag transport device; 8: iron collection pool; 9: water collection pool ; 10: flushing slag water pipe; 11: circulating water pump; 12: driving wheel.
具体实施方式Detailed ways
为使本发明的目的、技术方案和优点更加清楚,下面将结合本发明具体实施方式及相应附图对本发明技术方案进行清楚完整地描述。显然,所描述的实施方式仅是本发明的一部分实施方式,而不是全部实施方式。基于本发明实施方式,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with specific embodiments of the present invention and corresponding drawings. Apparently, the described embodiments are only some, not all, embodiments of the present invention. Based on the implementation of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.
以下结合附图,详细描述根据本发明一实施方式的一种高炉水渣除铁装置。A blast furnace slag iron removal device according to an embodiment of the present invention will be described in detail below with reference to the accompanying drawings.
参见图1,一种高炉水渣除铁装置包括:熔渣沟2、冲渣水管10、水渣沟3、集渣池4、皮带传送机5、分离装置、集铁池8、水渣运输装置7、集水池9以及循环水泵11。Referring to Figure 1, a blast furnace water slag iron removal device includes: slag ditch 2, slag flushing water pipe 10, water slag ditch 3, slag collection pool 4, belt conveyor 5, separation device, iron collection pool 8, water slag transportation Device 7, sump 9 and circulating water pump 11.
在上述高炉水渣除铁装置中,熔渣沟2的一端接收高炉1排出的熔渣,并在另一端连接至水渣沟3的入口端以将熔渣转移至水渣沟3;冲渣水管10安装在水渣沟3的入口端附近,以使来自循环水泵11的水通过冲渣水管10对从熔渣沟2排出的熔渣进行水淬处理,形成水渣;集渣池4连接至水渣沟3的出口端以接收水渣沟3排出的水渣和冲渣水,并且一方面将冲渣水过滤并排出到集水池9,另一方面将水渣转移至倾斜放置在集渣池4上方的皮带传送机5;以及在皮带传送机5的皮带末端设置有分离装置,分离装置带磁性,将水渣中夹杂的铁粒从水渣中分离出并落入集铁池8,其余杂质转移至水渣运输装置7。In the above blast furnace slag iron removal device, one end of the slag ditch 2 receives the slag discharged from the blast furnace 1, and the other end is connected to the inlet end of the slag ditch 3 to transfer the slag to the slag ditch 3; The water pipe 10 is installed near the inlet end of the slag ditch 3, so that the water from the circulating water pump 11 passes through the slag flushing water pipe 10 to perform water quenching treatment on the slag discharged from the slag ditch 2 to form water slag; To the outlet end of the water slag ditch 3 to receive the water slag and slag flushing water discharged from the water slag ditch 3, and on the one hand filter the slag flushing water and discharge it to the sump 9, on the other hand transfer the water slag to an inclined place The belt conveyor 5 above the slag pool 4; and the belt end of the belt conveyor 5 is provided with a separation device, the separation device is magnetic, and the iron particles mixed in the water slag are separated from the water slag and fall into the iron collection pool 8 , and the rest of the impurities are transferred to the water slag transport device 7.
上述分离装置可包括皮带传送机5的带磁性主动轮12、以及在皮带传送机5的皮带末端下方并邻近皮带末端设置的分离板6。如图1所示,带磁性主动轮12也位于皮带传送机5的皮带末端。The above-mentioned separation device may include a magnetic driving pulley 12 of the belt conveyor 5 and a separation plate 6 disposed below and adjacent to the belt end of the belt conveyor 5 . As shown in FIG. 1 , the magnetic driving pulley 12 is also located at the belt end of the belt conveyor 5 .
如图1所示,分离板6可呈倒V形,该倒V形包括接近皮带传送机5的第一侧边和远离皮带传送机5的第二侧边。集铁池8设置在倒V形的第一侧边的下方,且水渣运输装置7设置在倒V形的第二侧边的下方。As shown in FIG. 1 , the separating plate 6 may be in an inverted V shape, and the inverted V shape includes a first side close to the belt conveyor 5 and a second side away from the belt conveyor 5 . The iron collecting pool 8 is arranged under the first side of the inverted V shape, and the slag transport device 7 is arranged under the second side of the inverted V shape.
集水池9可位于集渣池4下方,以回收从集渣池4过滤并排出的冲渣水。The water collection tank 9 can be located below the slag collection tank 4 to recycle the slag flushing water filtered and discharged from the slag collection tank 4 .
集水池9可连接至循环水泵11,以使回收的冲渣水经由循环水泵11以及冲渣水管10,回到水渣沟3喷射从熔渣沟2转移来的高炉熔渣以进行水淬处理,从而实现对冲渣水的再循环利用。The sump 9 can be connected to the circulating water pump 11, so that the recovered slag washing water passes through the circulating water pump 11 and the slag washing water pipe 10, and returns to the water slag ditch 3 to spray the blast furnace slag transferred from the slag ditch 2 for water quenching , so as to realize the recycling of flushing slag water.
以下描述上述高炉水渣除铁装置的操作过程。The operation process of the blast furnace slag iron removal device is described below.
操作时,如图1所示,高炉1排出高炉熔渣,高炉熔渣通过熔渣沟2转移至水渣沟3。在熔渣进入水渣沟3的入口端附近时,来自循环水泵11的水经由冲渣水管10喷射熔渣进行水淬处理,然后在水渣沟3内形成水渣。接着,冲渣水和水渣流至集渣池4。在集渣池4,一方面,冲渣水经过滤后排放到集渣池4下方的集水池9,另一方面,水渣被转移到皮带传送机5上。During operation, as shown in FIG. 1 , blast furnace 1 discharges blast furnace slag, and blast furnace slag is transferred to water slag ditch 3 through slag ditch 2 . When the slag enters near the entrance of the slag ditch 3 , water from the circulating water pump 11 sprays the slag through the slag flushing water pipe 10 for water quenching, and then slag is formed in the slag ditch 3 . Then, the slag flushing water and water slag flow to the slag collecting tank 4 . In the slag collection tank 4, on the one hand, the slag washing water is filtered and discharged to the sump 9 below the slag collection tank 4; on the other hand, the water slag is transferred to the belt conveyor 5.
接着,一方面,过滤后的冲渣水进入集水池9后,被泵吸到循环水泵11、再经由冲渣水管10进入水渣沟3,继续喷射从熔渣沟2排出的高炉熔渣进行水淬处理。这样就实现了对冲渣水的再循环利用。Next, on the one hand, after the filtered slag flushing water enters the sump 9, it is pumped to the circulating water pump 11, and then enters the slag flushing ditch 3 through the slag flushing water pipe 10, and continues to spray the blast furnace slag discharged from the slag ditch 2 for further cleaning. Water quenching treatment. In this way, the recycling of the flushing slag water is realized.
另一方面,在皮带传送机5的皮带末端设置有带磁性的主动轮12。因而,水渣经过主动轮12时,由于主动轮12的磁性,水渣中夹杂的铁粒吸附到皮带上、继而随着皮带的转动离开水渣,并在重力作用下、从分离板6的接近皮带传送机5的第一侧边与皮带传送机5之间的间隙处下落到集铁池8内;而水渣中的其余杂质则不受磁力影响,由于惯性沿着分离板6的远离皮带传送机5的第二侧边,下落至水渣运输装置7。这样就可以实现对水渣中夹杂铁粒的有效回收。On the other hand, a magnetic driving pulley 12 is provided at the belt end of the belt conveyor 5 . Therefore, when the water slag passes through the driving wheel 12, due to the magnetism of the driving wheel 12, the iron particles mixed in the water slag are adsorbed on the belt, and then leave the water slag with the rotation of the belt, and are separated from the separation plate 6 under the action of gravity. Close to the gap between the first side of the belt conveyor 5 and the belt conveyor 5, it falls into the iron pool 8; while the rest of the impurities in the slag are not affected by the magnetic force, due to the inertia along the separation plate 6 away from The second side of the belt conveyor 5 drops to the water slag transport device 7 . In this way, the effective recovery of iron particles contained in water slag can be realized.
需要说明的是,在本文中,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。另外,本文中“前”、“后”、“左”、“右”、“上”、“下”均以附图中表示的放置状态为参照。此外,本文中的术语“连接”既包括直接连接,也包括间接连接。It should be noted that, in this document, the terms "comprising", "comprising" or any other variation thereof are intended to cover a non-exclusive inclusion such that a process, method, article or apparatus comprising a set of elements includes not only those elements, It also includes other elements not expressly listed, or elements inherent in the process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article or apparatus comprising said element. In addition, "front", "rear", "left", "right", "upper", and "lower" in this text all refer to the placed state shown in the drawings. In addition, the term "connection" herein includes both direct connection and indirect connection.
最后应说明的是:以上实施方式仅用于说明本发明的技术方案,而非对其限制;尽管参照前述实施方式对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施方式所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施方式技术方案的精神和范围。Finally, it should be noted that: the above embodiments are only used to illustrate the technical solutions of the present invention, not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: it can still Modifications are made to the technical solutions described in the foregoing embodiments, or equivalent replacements are made to some of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the various embodiments of the present invention.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810314987.2A CN108554626A (en) | 2018-04-10 | 2018-04-10 | Blast furnace granulated slag deironing apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810314987.2A CN108554626A (en) | 2018-04-10 | 2018-04-10 | Blast furnace granulated slag deironing apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108554626A true CN108554626A (en) | 2018-09-21 |
Family
ID=63534559
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810314987.2A Pending CN108554626A (en) | 2018-04-10 | 2018-04-10 | Blast furnace granulated slag deironing apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108554626A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110721977A (en) * | 2019-08-29 | 2020-01-24 | 内蒙古赛思普科技有限公司 | Method for directly preparing active iron powder by utilizing slag generated by smelting reduction furnace |
CN114507757A (en) * | 2022-02-15 | 2022-05-17 | 中冶东方工程技术有限公司 | Water granulated slag dewatering device and process |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0729789A1 (en) * | 1995-02-28 | 1996-09-04 | IFE Industrie-Einrichtungen Fertigungs-Aktiengesellschaft | Magnetic separator |
CN201871419U (en) * | 2010-12-01 | 2011-06-22 | 山东华特磁电科技股份有限公司 | Dry-method extracting machine for garnet |
CN105149088A (en) * | 2015-09-21 | 2015-12-16 | 重庆新铝城幕墙工程有限公司 | Production line for automatically separating slag iron |
CN206082826U (en) * | 2016-09-22 | 2017-04-12 | 山东钢铁股份有限公司 | Blast furnace grain slag deironing device |
CN206577897U (en) * | 2016-12-30 | 2017-10-24 | 山东钢铁股份有限公司 | A kind of clinker magnetic separation tripper |
CN207857114U (en) * | 2018-04-10 | 2018-09-14 | 山东钢铁股份有限公司 | Blast furnace granulated slag deironing apparatus |
US20180280990A1 (en) * | 2015-10-15 | 2018-10-04 | Sintokogio, Ltd. | Molding sand reclamation method and reclamation system |
-
2018
- 2018-04-10 CN CN201810314987.2A patent/CN108554626A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0729789A1 (en) * | 1995-02-28 | 1996-09-04 | IFE Industrie-Einrichtungen Fertigungs-Aktiengesellschaft | Magnetic separator |
CN201871419U (en) * | 2010-12-01 | 2011-06-22 | 山东华特磁电科技股份有限公司 | Dry-method extracting machine for garnet |
CN105149088A (en) * | 2015-09-21 | 2015-12-16 | 重庆新铝城幕墙工程有限公司 | Production line for automatically separating slag iron |
US20180280990A1 (en) * | 2015-10-15 | 2018-10-04 | Sintokogio, Ltd. | Molding sand reclamation method and reclamation system |
CN206082826U (en) * | 2016-09-22 | 2017-04-12 | 山东钢铁股份有限公司 | Blast furnace grain slag deironing device |
CN206577897U (en) * | 2016-12-30 | 2017-10-24 | 山东钢铁股份有限公司 | A kind of clinker magnetic separation tripper |
CN207857114U (en) * | 2018-04-10 | 2018-09-14 | 山东钢铁股份有限公司 | Blast furnace granulated slag deironing apparatus |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110721977A (en) * | 2019-08-29 | 2020-01-24 | 内蒙古赛思普科技有限公司 | Method for directly preparing active iron powder by utilizing slag generated by smelting reduction furnace |
CN114507757A (en) * | 2022-02-15 | 2022-05-17 | 中冶东方工程技术有限公司 | Water granulated slag dewatering device and process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104972401A (en) | Cutting fluid recovering device for grinding machine | |
CN101559405B (en) | High-efficiency permanent magnet drum magnetic separator | |
CN207857114U (en) | Blast furnace granulated slag deironing apparatus | |
CN105169806A (en) | Stone processing sewage treatment system | |
CN108554626A (en) | Blast furnace granulated slag deironing apparatus | |
CN110665934A (en) | Construction waste's recovery processing system | |
US3237351A (en) | Method for handling grit | |
CN112317524A (en) | Contaminated soil leaching treatment system and method | |
JP2016036874A (en) | Magnet type chip conveyor | |
CN205151935U (en) | Stone material processing sewage silt processing apparatus | |
CN205398268U (en) | Water, sand and oxide separator | |
JPH11253833A (en) | Contaminant separation and cleaning equipment | |
CN115846046B (en) | Metal slag sorting method | |
JP4077718B2 (en) | Melt treatment facility in waste melting treatment | |
US7318528B1 (en) | Precious metal recovery | |
JPH11199047A (en) | Residue slurry transfer device | |
CN210560514U (en) | Blast furnace slag treatment device | |
CN210787749U (en) | A rubbish splitter for river course bed mud is dealt with | |
JPH07148665A (en) | Waste liquid disposal device for water jet machining device | |
CN209685884U (en) | A kind of clinker RO phase separation system | |
CN105585163B (en) | Water, sand and oxide separator | |
CN214234505U (en) | A polymetallic ore dust recycling system | |
CN222534233U (en) | Mud-discharging and dredging slag-separating device of water treatment system | |
CN219043386U (en) | System for separating tailings from raw ore | |
CN218048369U (en) | Water granulated slag iron separation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180921 |
|
RJ01 | Rejection of invention patent application after publication |