CN108547277A - A kind of four spud leg offshore wind farm jackets - Google Patents
A kind of four spud leg offshore wind farm jackets Download PDFInfo
- Publication number
- CN108547277A CN108547277A CN201810619216.4A CN201810619216A CN108547277A CN 108547277 A CN108547277 A CN 108547277A CN 201810619216 A CN201810619216 A CN 201810619216A CN 108547277 A CN108547277 A CN 108547277A
- Authority
- CN
- China
- Prior art keywords
- pipe
- supporting steel
- steel pipe
- pipe casing
- diagonal brace
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 62
- 239000010959 steel Substances 0.000 claims abstract description 62
- 238000010276 construction Methods 0.000 claims abstract description 11
- 238000003466 welding Methods 0.000 claims 1
- 230000009467 reduction Effects 0.000 abstract description 3
- 230000005611 electricity Effects 0.000 description 6
- 238000013461 design Methods 0.000 description 4
- 230000007797 corrosion Effects 0.000 description 3
- 238000005260 corrosion Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 239000013535 sea water Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 230000003319 supportive effect Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 239000012535 impurity Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Mechanical Engineering (AREA)
- Foundations (AREA)
- Wind Motors (AREA)
Abstract
The present invention discloses a kind of four spud leg offshore wind farm jackets, including a support element group, support element group includes four supporting steel pipes being vertically obliquely installed, and is from top to bottom equipped with multiple diagonal brace groups between two neighboring supporting steel pipe, diagonal brace group is formed by two diagonal brace steel pipes are arranged in a crossed manner;One pipe casing group, pipe casing group includes being respectively placed in the pipe casing of supporting steel pipe lower outside position, pipe casing is hollow-core construction and is vertically arranged, multiple connector sleeves being from top to bottom arranged are equipped between pipe casing and corresponding supporting steel pipe, the second horn mouth that the top of pipe casing is equipped with the first horn mouth and is placed in above the first horn mouth, first bell-mouthed diameter is arranged more than pipe casing, second bell-mouthed diameter is arranged more than the first horn mouth, and connector sleeve is horizontally disposed and the both ends of connector sleeve are set in the outside of corresponding pipe casing and supporting steel pipe.The present invention has the advantages that easy to operate, reduction difficulty of construction, raising support stability and connectivity robustness.
Description
Technical field:
The present invention relates to offshore wind farm field, a kind of specifically four spud leg offshore wind farm jackets.
Background technology:
China's oceanic area is vast, and offshore wind energy resource is abundant, very big using the potential of wind-power electricity generation, with wind-powered electricity generation new technology,
The independent development application of new material and new process, China's offshore wind farm enter the Large scale construction stage.Blower foundation construction is sea
One of the important link that windward electric construction is set.The foundation pattern of offshore wind turbine has gravity type foundation, pile formula basis, separately
Outer buoyant foundation technology is also in research and development.Pile formula basis includes single-pile foundation again, more pile concrete cushion cap foundations and more
Pile leader frame basis.Traditional jacket structure is relatively difficult in constructing operation, such as underwater pile driving, pile pile positioning, pile pile
Internal impurity removes, underwater grouting and wind turbine column foot seat leveling etc. are there are problems, and tradition is by steel-pipe pile with leading
The inclined supporting steel pipe of pipe support squeezes into jacket and squeezes into seabed, drives piles due to tilting, difficulty of construction is big, while being unfavorable for level
The measurement of degree adjusts.
201721398822.5 jacket of the patent No., solves the above problems, but due to blower foundation heavier mass, conduit
The firm effect of the support of frame is poor, may result in jacket for a long time and the phenomenon that shaking or deviating occurs, which realizes steel
Pile pile is driven piles vertically, but vertical piling is high for the requirement that is connected firmly between pipe casing and supporting steel pipe, and the patent
Main cylinder and pipe casing only by being welded to connect, connection is insecure, is immersed in seawater for a long time hereinafter, junction is easy to happen corrosion
Damage.
Invention content:
It is above the purpose of the invention is to overcome the shortcomings of, one kind easy to operate is provided, reduction difficulty of construction, improves support surely
Four spud leg offshore wind farm jackets of solidity and connectivity robustness.
The purpose of the present invention is achieved through the following technical solutions:A kind of four spud leg offshore wind farm jackets, including
One support element group, support element group include four supporting steel pipes being vertically obliquely installed, and four supporting steel pipes surround rectangular-shaped
Structure, supporting steel pipe are from top to bottom inclined outwardly setting, multiple diagonal brace groups are from top to bottom equipped between two neighboring supporting steel pipe,
Diagonal brace group is formed by two diagonal brace steel pipes are arranged in a crossed manner;
One pipe casing group, pipe casing group include being respectively placed in the pipe casing of supporting steel pipe lower outside position, and pipe casing is hollow
It structure and is vertically arranged, multiple connector sleeves being from top to bottom arranged, stake is equipped between pipe casing and corresponding supporting steel pipe
The second horn mouth that the top of casing is equipped with the first horn mouth and is placed in above the first horn mouth, the first bell-mouthed diameter are big
It is arranged in pipe casing, the second bell-mouthed diameter is arranged more than the first horn mouth, and connector sleeve is horizontally disposed with and the both ends of connector sleeve
It is set in the outside of corresponding pipe casing and supporting steel pipe.
Further improvement of the present invention is:The both ends of diagonal brace steel pipe are respectively equipped with external member, and external member is sleeved on supporting steel pipe
Outer wall, the side of diagonal brace steel pipe is with external member by being welded to connect.
Compared with the prior art, the present invention has the following advantages:
1, the present invention includes support element group and pipe casing group, and simple in structure, reasonable design realizes vertical piling, reduces construction
Difficulty, multiple diagonal brace groups are from top to bottom equipped between two neighboring supporting steel pipe, and diagonal brace group is arranged in a crossed manner by two diagonal brace steel pipes
Composition, ensures the stable connection between two neighboring supporting steel pipe, further increases the supportive of support element group, make entire wind
It is firm that conductance pipe support more consolidates;It is hollow-core construction inside pipe casing, steel-pipe pile, which is inserted vertically to pipe casing, enters seabed, pipe casing
Upper end be equipped with the first horn mouth and the second horn mouth, steel-pipe pile plays the role of guiding when being inserted into, easy to operation, while just
Multiple connector sleeves being from top to bottom arranged are equipped between later stage grouting treatment, pipe casing and corresponding supporting steel pipe, it is more
Stable connection is played the role of in the setting of a connector sleeve between supporting steel pipe and pipe casing, prevents pipe casing and supporting steel pipe
Link position be placed in the connection effect that corrosion and damage occurs in seawater and both influences for a long time.
2, the both ends of diagonal brace steel pipe are respectively equipped with external member, and external member is sleeved on the outer wall of supporting steel pipe, ensure diagonal brace steel pipe with
Fastness of the supporting steel pipe in connection, the design is easy to disassemble, is readily transported.
Description of the drawings:
Fig. 1 is a kind of structural schematic diagram of four spud legs offshore wind farm jacket of the present invention.
Figure label:1- supporting steel pipes, 2- diagonal braces steel pipe, 3- pipe casings, 4- connector sleeves, the first horn mouths of 5-, 6- second
Horn mouth, 7- external members.
Specific implementation mode:
In order to deepen the understanding of the present invention, below in conjunction with embodiment and attached drawing, the invention will be further described, the implementation
Example is only used for explaining the present invention, is not intended to limit the scope of the present invention..
As Fig. 1 shows a kind of a kind of embodiment of four spud legs offshore wind farm jacket of the present invention, including
One support element group, support element group include four supporting steel pipes being vertically obliquely installed 1, and four supporting steel pipes 1 surround rectangle
Shape structure, supporting steel pipe 1 are from top to bottom inclined outwardly setting, are from top to bottom equipped between two neighboring supporting steel pipe 1 multiple oblique
Support group, diagonal brace group are formed by two diagonal brace steel pipes 2 are arranged in a crossed manner;
One pipe casing group, pipe casing group include being respectively placed in the pipe casing 3 of 1 lower outside position of supporting steel pipe, and pipe casing 3 is sky
It core structure and is vertically arranged, multiple connector sleeves being from top to bottom arranged is equipped between pipe casing 3 and corresponding supporting steel pipe 1
4, the top of pipe casing 3 is equipped with the first horn mouth 5 and is placed in the second horn mouth 6 of 5 top of the first horn mouth, the first horn mouth
5 diameter is arranged more than pipe casing 3, and the diameter of the second horn mouth 6 is more than the first horn mouth 5 and is arranged, connector sleeve 4 be horizontally disposed with and
The both ends of connector sleeve 4 are set in the outside of corresponding pipe casing 3 and supporting steel pipe 1.
The both ends of diagonal brace steel pipe 2 are respectively equipped with external member 7, and external member 7 is sleeved on the outer wall of supporting steel pipe 1, the side of diagonal brace steel pipe 2
End, by being welded to connect, ensures fastness of the diagonal brace steel pipe 2 with supporting steel pipe 1 when connecting, while the design is convenient for external member 7
Dismounting, is readily transported.
The present invention includes support element group and pipe casing group, and simple in structure, reasonable design realizes that vertical piling, reduction are applied
Work difficulty, multiple diagonal brace groups are from top to bottom equipped between two neighboring supporting steel pipe 1, and diagonal brace group is intersected by two diagonal brace steel pipes 2
Setting composition, ensures the stable connection between two neighboring supporting steel pipe 1, further increases the supportive of support element group, make
It is firm that entire wind-powered electricity generation jacket more consolidates;3 inside of pipe casing is hollow-core construction, and steel-pipe pile, which is inserted vertically to pipe casing 3, enters sea
The upper end at bottom, pipe casing 3 is equipped with the first horn mouth 5 and the second horn mouth 6, and steel-pipe pile plays the role of guiding when being inserted into, just
In operation, while being convenient for later stage grouting treatment, is from top to bottom arranged equipped with multiple between pipe casing 3 and corresponding supporting steel pipe 1
The setting of the connector sleeve 4 of setting, multiple connector sleeves 4 plays the role of stable connection between supporting steel pipe 1 and pipe casing 3,
It prevents from the link position of pipe casing 3 and supporting steel pipe 1 to be placed in seawater the connection for both corrosion and damage occurring and influences for a long time to imitate
Fruit.
Wind-powered electricity generation jacket installation:Land installation is carried out to wind-powered electricity generation jacket first, is transported after installing to regulation marine site,
Wind-powered electricity generation jacket is lifted straight down to the position, it is whole survey Heibei provincial opera, while steel-pipe pile is from top to bottom inserted into wind respectively
In the pipe casing 3 of conductance pipe support, after steel-pipe pile is firm, grouting sealing will be carried out between steel-pipe pile and pipe casing.
It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, above-described embodiment and explanation
Merely illustrating the principles of the invention described in book, without departing from the spirit and scope of the present invention, the present invention also has
Various changes and modifications, these changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention
It is defined by the appending claims and its equivalent thereof.
Claims (2)
1. a kind of four spud leg offshore wind farm jackets, it is characterised in that:Including
One support element group, the support element group include four supporting steel pipes being vertically obliquely installed, and four supporting steel pipes surround square
Shape and structure, the supporting steel pipe are from top to bottom inclined outwardly setting, are from top to bottom set between the two neighboring supporting steel pipe
There are multiple diagonal brace groups, the diagonal brace group to be formed by two diagonal brace steel pipes are arranged in a crossed manner;
One pipe casing group, the pipe casing group include being respectively placed in the pipe casing of supporting steel pipe lower outside position, the pile protection
Pipe is hollow-core construction and is vertically arranged, and is from top to bottom arranged equipped with multiple between the pipe casing and corresponding supporting steel pipe
Connector sleeve, the second horn mouth that the top of the pipe casing is equipped with the first horn mouth and is placed in above the first horn mouth, institute
It states the first bell-mouthed diameter more than pipe casing to be arranged, the second bell-mouthed diameter is arranged more than the first horn mouth, the connection
Cover the outside that horizontally disposed and connector sleeve both ends are set in corresponding pipe casing and supporting steel pipe.
2. a kind of four spud leg offshore wind farm jackets according to claim 1, it is characterised in that:The both ends of the diagonal brace steel pipe
It is respectively equipped with external member, the external member is sleeved on the outer wall of supporting steel pipe, and side and the external member of the diagonal brace steel pipe pass through the company of welding
It connects.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810619216.4A CN108547277A (en) | 2018-06-15 | 2018-06-15 | A kind of four spud leg offshore wind farm jackets |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810619216.4A CN108547277A (en) | 2018-06-15 | 2018-06-15 | A kind of four spud leg offshore wind farm jackets |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108547277A true CN108547277A (en) | 2018-09-18 |
Family
ID=63492697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810619216.4A Pending CN108547277A (en) | 2018-06-15 | 2018-06-15 | A kind of four spud leg offshore wind farm jackets |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108547277A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109469089A (en) * | 2018-12-03 | 2019-03-15 | 中交三航(上海)新能源工程有限公司 | A kind of plug-in offshore wind power jacket foundation with self-contained pile-stabilizing casing and construction method |
CN109518711A (en) * | 2018-12-24 | 2019-03-26 | 熊翱 | A kind of jacket basis of conduit leg column bifurcated and its construction method |
CN111549813A (en) * | 2020-06-05 | 2020-08-18 | 中国电建集团华东勘测设计研究院有限公司 | Deep sea wind power generation jacket type single-pile composite structure and construction method thereof |
CN114753414A (en) * | 2022-04-13 | 2022-07-15 | 中交三航局第三工程有限公司 | Intelligent anti-scouring device and method for annular grid type fluidized soil steel pipe pile |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202450543U (en) * | 2012-02-01 | 2012-09-26 | 天津市海王星海上工程技术有限公司 | Foundation structure of novel guide frame-type marine anemometer tower |
US20150337517A1 (en) * | 2014-05-23 | 2015-11-26 | Keystone Engineering Inc. | Offshore support structure |
CN205224074U (en) * | 2015-11-03 | 2016-05-11 | 浙江华蕴海洋工程技术服务有限公司 | Power generating equipment on water and installation basis thereof |
CN206298888U (en) * | 2016-11-30 | 2017-07-04 | 中国电建集团华东勘测设计研究院有限公司 | Shoe Jacket Structure for Offshore Booster Station |
CN208415222U (en) * | 2018-06-15 | 2019-01-22 | 江苏长风海洋装备制造有限公司 | A kind of four spud leg offshore wind farm jackets |
-
2018
- 2018-06-15 CN CN201810619216.4A patent/CN108547277A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202450543U (en) * | 2012-02-01 | 2012-09-26 | 天津市海王星海上工程技术有限公司 | Foundation structure of novel guide frame-type marine anemometer tower |
US20150337517A1 (en) * | 2014-05-23 | 2015-11-26 | Keystone Engineering Inc. | Offshore support structure |
CN205224074U (en) * | 2015-11-03 | 2016-05-11 | 浙江华蕴海洋工程技术服务有限公司 | Power generating equipment on water and installation basis thereof |
CN206298888U (en) * | 2016-11-30 | 2017-07-04 | 中国电建集团华东勘测设计研究院有限公司 | Shoe Jacket Structure for Offshore Booster Station |
CN208415222U (en) * | 2018-06-15 | 2019-01-22 | 江苏长风海洋装备制造有限公司 | A kind of four spud leg offshore wind farm jackets |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109469089A (en) * | 2018-12-03 | 2019-03-15 | 中交三航(上海)新能源工程有限公司 | A kind of plug-in offshore wind power jacket foundation with self-contained pile-stabilizing casing and construction method |
CN109518711A (en) * | 2018-12-24 | 2019-03-26 | 熊翱 | A kind of jacket basis of conduit leg column bifurcated and its construction method |
CN111549813A (en) * | 2020-06-05 | 2020-08-18 | 中国电建集团华东勘测设计研究院有限公司 | Deep sea wind power generation jacket type single-pile composite structure and construction method thereof |
CN114753414A (en) * | 2022-04-13 | 2022-07-15 | 中交三航局第三工程有限公司 | Intelligent anti-scouring device and method for annular grid type fluidized soil steel pipe pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108547277A (en) | A kind of four spud leg offshore wind farm jackets | |
CN206706811U (en) | A kind of offshore wind turbine single-pile foundation | |
CN109469089B (en) | An internally inserted offshore wind power conductor frame foundation with self-contained pile stabilizing casing and construction method | |
CN103233481B (en) | Jacket supporting structure capable of being connected in grouting mode | |
CN202787299U (en) | Multi-pile pipe guide frame type foundation for offshore wind turbine | |
CN109853609A (en) | A kind of offshore wind farm combination foundation | |
CN110258611A (en) | A kind of offshore wind farm and aquafarm integral structure system | |
CN106245671A (en) | A kind of combination type offshore wind power foundation and construction method thereof | |
CN203475459U (en) | Three-pile guide pipe frame foundation structure of offshore wind turbine | |
CN209603168U (en) | A kind of offshore wind farm combination foundation | |
CN206971250U (en) | A kind of offshore wind farm engineering jacket basis | |
CN204825949U (en) | Marine fan basis connection structure of pipe posture of driving piles in advance | |
CN106381881A (en) | Gravity-type single-pile foundation | |
CN204676584U (en) | A kind of high stake truss-like offshore wind turbine foundation structure | |
CN209538210U (en) | A kind of interpolation type offshore wind farm jacket basis carrying steady pipe casing | |
CN202543954U (en) | Multiangular frame foundation for offshore wind power generator | |
CN204212174U (en) | Single pile adds taper pile brace type offshore wind turbine foundation structure | |
CN208415222U (en) | A kind of four spud leg offshore wind farm jackets | |
CN106930291A (en) | A kind of many position-limited racks in sea and its construction method | |
CN203977417U (en) | Ribs built-in steel casing for a kind of pile of deep water pile foundation | |
CN103277262A (en) | An offshore wind turbine foundation structure | |
CN202440828U (en) | Separate Jacket Device | |
CN209398542U (en) | An offshore wind turbine foundation with adjustable bending moment load distribution of wind turbines | |
CN207160011U (en) | A kind of more position-limited racks in sea | |
CN202466618U (en) | Integrated jacket device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210222 Address after: 226300 inner side of sanjiasha harbor in Tongzhou Bay River Sea joint development demonstration zone, Nantong City, Jiangsu Province Applicant after: Nantong Changfeng new energy equipment Technology Co.,Ltd. Address before: 224000 88 Jinhai Avenue, Sheyanggang Economic Zone, Sheyang County, Yancheng City, Jiangsu Province Applicant before: JIANGSU STRONGWIND MARINE EQUIPMENT Co.,Ltd. |
|
RJ01 | Rejection of invention patent application after publication |