CN108547277A - A kind of four spud leg offshore wind farm jackets - Google Patents

A kind of four spud leg offshore wind farm jackets Download PDF

Info

Publication number
CN108547277A
CN108547277A CN201810619216.4A CN201810619216A CN108547277A CN 108547277 A CN108547277 A CN 108547277A CN 201810619216 A CN201810619216 A CN 201810619216A CN 108547277 A CN108547277 A CN 108547277A
Authority
CN
China
Prior art keywords
pipe
supporting steel
steel pipe
pipe casing
diagonal brace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810619216.4A
Other languages
Chinese (zh)
Inventor
胡静波
顾赛华
刘国欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Changfeng new energy equipment Technology Co.,Ltd.
Original Assignee
Jiangsu Changfeng Marine Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Changfeng Marine Equipment Manufacturing Co Ltd filed Critical Jiangsu Changfeng Marine Equipment Manufacturing Co Ltd
Priority to CN201810619216.4A priority Critical patent/CN108547277A/en
Publication of CN108547277A publication Critical patent/CN108547277A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Foundations (AREA)
  • Wind Motors (AREA)

Abstract

The present invention discloses a kind of four spud leg offshore wind farm jackets, including a support element group, support element group includes four supporting steel pipes being vertically obliquely installed, and is from top to bottom equipped with multiple diagonal brace groups between two neighboring supporting steel pipe, diagonal brace group is formed by two diagonal brace steel pipes are arranged in a crossed manner;One pipe casing group, pipe casing group includes being respectively placed in the pipe casing of supporting steel pipe lower outside position, pipe casing is hollow-core construction and is vertically arranged, multiple connector sleeves being from top to bottom arranged are equipped between pipe casing and corresponding supporting steel pipe, the second horn mouth that the top of pipe casing is equipped with the first horn mouth and is placed in above the first horn mouth, first bell-mouthed diameter is arranged more than pipe casing, second bell-mouthed diameter is arranged more than the first horn mouth, and connector sleeve is horizontally disposed and the both ends of connector sleeve are set in the outside of corresponding pipe casing and supporting steel pipe.The present invention has the advantages that easy to operate, reduction difficulty of construction, raising support stability and connectivity robustness.

Description

A kind of four spud leg offshore wind farm jackets
Technical field:
The present invention relates to offshore wind farm field, a kind of specifically four spud leg offshore wind farm jackets.
Background technology:
China's oceanic area is vast, and offshore wind energy resource is abundant, very big using the potential of wind-power electricity generation, with wind-powered electricity generation new technology, The independent development application of new material and new process, China's offshore wind farm enter the Large scale construction stage.Blower foundation construction is sea One of the important link that windward electric construction is set.The foundation pattern of offshore wind turbine has gravity type foundation, pile formula basis, separately Outer buoyant foundation technology is also in research and development.Pile formula basis includes single-pile foundation again, more pile concrete cushion cap foundations and more Pile leader frame basis.Traditional jacket structure is relatively difficult in constructing operation, such as underwater pile driving, pile pile positioning, pile pile Internal impurity removes, underwater grouting and wind turbine column foot seat leveling etc. are there are problems, and tradition is by steel-pipe pile with leading The inclined supporting steel pipe of pipe support squeezes into jacket and squeezes into seabed, drives piles due to tilting, difficulty of construction is big, while being unfavorable for level The measurement of degree adjusts.
201721398822.5 jacket of the patent No., solves the above problems, but due to blower foundation heavier mass, conduit The firm effect of the support of frame is poor, may result in jacket for a long time and the phenomenon that shaking or deviating occurs, which realizes steel Pile pile is driven piles vertically, but vertical piling is high for the requirement that is connected firmly between pipe casing and supporting steel pipe, and the patent Main cylinder and pipe casing only by being welded to connect, connection is insecure, is immersed in seawater for a long time hereinafter, junction is easy to happen corrosion Damage.
Invention content:
It is above the purpose of the invention is to overcome the shortcomings of, one kind easy to operate is provided, reduction difficulty of construction, improves support surely Four spud leg offshore wind farm jackets of solidity and connectivity robustness.
The purpose of the present invention is achieved through the following technical solutions:A kind of four spud leg offshore wind farm jackets, including
One support element group, support element group include four supporting steel pipes being vertically obliquely installed, and four supporting steel pipes surround rectangular-shaped Structure, supporting steel pipe are from top to bottom inclined outwardly setting, multiple diagonal brace groups are from top to bottom equipped between two neighboring supporting steel pipe, Diagonal brace group is formed by two diagonal brace steel pipes are arranged in a crossed manner;
One pipe casing group, pipe casing group include being respectively placed in the pipe casing of supporting steel pipe lower outside position, and pipe casing is hollow It structure and is vertically arranged, multiple connector sleeves being from top to bottom arranged, stake is equipped between pipe casing and corresponding supporting steel pipe The second horn mouth that the top of casing is equipped with the first horn mouth and is placed in above the first horn mouth, the first bell-mouthed diameter are big It is arranged in pipe casing, the second bell-mouthed diameter is arranged more than the first horn mouth, and connector sleeve is horizontally disposed with and the both ends of connector sleeve It is set in the outside of corresponding pipe casing and supporting steel pipe.
Further improvement of the present invention is:The both ends of diagonal brace steel pipe are respectively equipped with external member, and external member is sleeved on supporting steel pipe Outer wall, the side of diagonal brace steel pipe is with external member by being welded to connect.
Compared with the prior art, the present invention has the following advantages:
1, the present invention includes support element group and pipe casing group, and simple in structure, reasonable design realizes vertical piling, reduces construction Difficulty, multiple diagonal brace groups are from top to bottom equipped between two neighboring supporting steel pipe, and diagonal brace group is arranged in a crossed manner by two diagonal brace steel pipes Composition, ensures the stable connection between two neighboring supporting steel pipe, further increases the supportive of support element group, make entire wind It is firm that conductance pipe support more consolidates;It is hollow-core construction inside pipe casing, steel-pipe pile, which is inserted vertically to pipe casing, enters seabed, pipe casing Upper end be equipped with the first horn mouth and the second horn mouth, steel-pipe pile plays the role of guiding when being inserted into, easy to operation, while just Multiple connector sleeves being from top to bottom arranged are equipped between later stage grouting treatment, pipe casing and corresponding supporting steel pipe, it is more Stable connection is played the role of in the setting of a connector sleeve between supporting steel pipe and pipe casing, prevents pipe casing and supporting steel pipe Link position be placed in the connection effect that corrosion and damage occurs in seawater and both influences for a long time.
2, the both ends of diagonal brace steel pipe are respectively equipped with external member, and external member is sleeved on the outer wall of supporting steel pipe, ensure diagonal brace steel pipe with Fastness of the supporting steel pipe in connection, the design is easy to disassemble, is readily transported.
Description of the drawings:
Fig. 1 is a kind of structural schematic diagram of four spud legs offshore wind farm jacket of the present invention.
Figure label:1- supporting steel pipes, 2- diagonal braces steel pipe, 3- pipe casings, 4- connector sleeves, the first horn mouths of 5-, 6- second Horn mouth, 7- external members.
Specific implementation mode:
In order to deepen the understanding of the present invention, below in conjunction with embodiment and attached drawing, the invention will be further described, the implementation Example is only used for explaining the present invention, is not intended to limit the scope of the present invention..
As Fig. 1 shows a kind of a kind of embodiment of four spud legs offshore wind farm jacket of the present invention, including
One support element group, support element group include four supporting steel pipes being vertically obliquely installed 1, and four supporting steel pipes 1 surround rectangle Shape structure, supporting steel pipe 1 are from top to bottom inclined outwardly setting, are from top to bottom equipped between two neighboring supporting steel pipe 1 multiple oblique Support group, diagonal brace group are formed by two diagonal brace steel pipes 2 are arranged in a crossed manner;
One pipe casing group, pipe casing group include being respectively placed in the pipe casing 3 of 1 lower outside position of supporting steel pipe, and pipe casing 3 is sky It core structure and is vertically arranged, multiple connector sleeves being from top to bottom arranged is equipped between pipe casing 3 and corresponding supporting steel pipe 1 4, the top of pipe casing 3 is equipped with the first horn mouth 5 and is placed in the second horn mouth 6 of 5 top of the first horn mouth, the first horn mouth 5 diameter is arranged more than pipe casing 3, and the diameter of the second horn mouth 6 is more than the first horn mouth 5 and is arranged, connector sleeve 4 be horizontally disposed with and The both ends of connector sleeve 4 are set in the outside of corresponding pipe casing 3 and supporting steel pipe 1.
The both ends of diagonal brace steel pipe 2 are respectively equipped with external member 7, and external member 7 is sleeved on the outer wall of supporting steel pipe 1, the side of diagonal brace steel pipe 2 End, by being welded to connect, ensures fastness of the diagonal brace steel pipe 2 with supporting steel pipe 1 when connecting, while the design is convenient for external member 7 Dismounting, is readily transported.
The present invention includes support element group and pipe casing group, and simple in structure, reasonable design realizes that vertical piling, reduction are applied Work difficulty, multiple diagonal brace groups are from top to bottom equipped between two neighboring supporting steel pipe 1, and diagonal brace group is intersected by two diagonal brace steel pipes 2 Setting composition, ensures the stable connection between two neighboring supporting steel pipe 1, further increases the supportive of support element group, make It is firm that entire wind-powered electricity generation jacket more consolidates;3 inside of pipe casing is hollow-core construction, and steel-pipe pile, which is inserted vertically to pipe casing 3, enters sea The upper end at bottom, pipe casing 3 is equipped with the first horn mouth 5 and the second horn mouth 6, and steel-pipe pile plays the role of guiding when being inserted into, just In operation, while being convenient for later stage grouting treatment, is from top to bottom arranged equipped with multiple between pipe casing 3 and corresponding supporting steel pipe 1 The setting of the connector sleeve 4 of setting, multiple connector sleeves 4 plays the role of stable connection between supporting steel pipe 1 and pipe casing 3, It prevents from the link position of pipe casing 3 and supporting steel pipe 1 to be placed in seawater the connection for both corrosion and damage occurring and influences for a long time to imitate Fruit.
Wind-powered electricity generation jacket installation:Land installation is carried out to wind-powered electricity generation jacket first, is transported after installing to regulation marine site, Wind-powered electricity generation jacket is lifted straight down to the position, it is whole survey Heibei provincial opera, while steel-pipe pile is from top to bottom inserted into wind respectively In the pipe casing 3 of conductance pipe support, after steel-pipe pile is firm, grouting sealing will be carried out between steel-pipe pile and pipe casing.
It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, above-described embodiment and explanation Merely illustrating the principles of the invention described in book, without departing from the spirit and scope of the present invention, the present invention also has Various changes and modifications, these changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention It is defined by the appending claims and its equivalent thereof.

Claims (2)

1. a kind of four spud leg offshore wind farm jackets, it is characterised in that:Including
One support element group, the support element group include four supporting steel pipes being vertically obliquely installed, and four supporting steel pipes surround square Shape and structure, the supporting steel pipe are from top to bottom inclined outwardly setting, are from top to bottom set between the two neighboring supporting steel pipe There are multiple diagonal brace groups, the diagonal brace group to be formed by two diagonal brace steel pipes are arranged in a crossed manner;
One pipe casing group, the pipe casing group include being respectively placed in the pipe casing of supporting steel pipe lower outside position, the pile protection Pipe is hollow-core construction and is vertically arranged, and is from top to bottom arranged equipped with multiple between the pipe casing and corresponding supporting steel pipe Connector sleeve, the second horn mouth that the top of the pipe casing is equipped with the first horn mouth and is placed in above the first horn mouth, institute It states the first bell-mouthed diameter more than pipe casing to be arranged, the second bell-mouthed diameter is arranged more than the first horn mouth, the connection Cover the outside that horizontally disposed and connector sleeve both ends are set in corresponding pipe casing and supporting steel pipe.
2. a kind of four spud leg offshore wind farm jackets according to claim 1, it is characterised in that:The both ends of the diagonal brace steel pipe It is respectively equipped with external member, the external member is sleeved on the outer wall of supporting steel pipe, and side and the external member of the diagonal brace steel pipe pass through the company of welding It connects.
CN201810619216.4A 2018-06-15 2018-06-15 A kind of four spud leg offshore wind farm jackets Pending CN108547277A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810619216.4A CN108547277A (en) 2018-06-15 2018-06-15 A kind of four spud leg offshore wind farm jackets

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810619216.4A CN108547277A (en) 2018-06-15 2018-06-15 A kind of four spud leg offshore wind farm jackets

Publications (1)

Publication Number Publication Date
CN108547277A true CN108547277A (en) 2018-09-18

Family

ID=63492697

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810619216.4A Pending CN108547277A (en) 2018-06-15 2018-06-15 A kind of four spud leg offshore wind farm jackets

Country Status (1)

Country Link
CN (1) CN108547277A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109469089A (en) * 2018-12-03 2019-03-15 中交三航(上海)新能源工程有限公司 A kind of plug-in offshore wind power jacket foundation with self-contained pile-stabilizing casing and construction method
CN109518711A (en) * 2018-12-24 2019-03-26 熊翱 A kind of jacket basis of conduit leg column bifurcated and its construction method
CN111549813A (en) * 2020-06-05 2020-08-18 中国电建集团华东勘测设计研究院有限公司 Deep sea wind power generation jacket type single-pile composite structure and construction method thereof
CN114753414A (en) * 2022-04-13 2022-07-15 中交三航局第三工程有限公司 Intelligent anti-scouring device and method for annular grid type fluidized soil steel pipe pile

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202450543U (en) * 2012-02-01 2012-09-26 天津市海王星海上工程技术有限公司 Foundation structure of novel guide frame-type marine anemometer tower
US20150337517A1 (en) * 2014-05-23 2015-11-26 Keystone Engineering Inc. Offshore support structure
CN205224074U (en) * 2015-11-03 2016-05-11 浙江华蕴海洋工程技术服务有限公司 Power generating equipment on water and installation basis thereof
CN206298888U (en) * 2016-11-30 2017-07-04 中国电建集团华东勘测设计研究院有限公司 Shoe Jacket Structure for Offshore Booster Station
CN208415222U (en) * 2018-06-15 2019-01-22 江苏长风海洋装备制造有限公司 A kind of four spud leg offshore wind farm jackets

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202450543U (en) * 2012-02-01 2012-09-26 天津市海王星海上工程技术有限公司 Foundation structure of novel guide frame-type marine anemometer tower
US20150337517A1 (en) * 2014-05-23 2015-11-26 Keystone Engineering Inc. Offshore support structure
CN205224074U (en) * 2015-11-03 2016-05-11 浙江华蕴海洋工程技术服务有限公司 Power generating equipment on water and installation basis thereof
CN206298888U (en) * 2016-11-30 2017-07-04 中国电建集团华东勘测设计研究院有限公司 Shoe Jacket Structure for Offshore Booster Station
CN208415222U (en) * 2018-06-15 2019-01-22 江苏长风海洋装备制造有限公司 A kind of four spud leg offshore wind farm jackets

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109469089A (en) * 2018-12-03 2019-03-15 中交三航(上海)新能源工程有限公司 A kind of plug-in offshore wind power jacket foundation with self-contained pile-stabilizing casing and construction method
CN109518711A (en) * 2018-12-24 2019-03-26 熊翱 A kind of jacket basis of conduit leg column bifurcated and its construction method
CN111549813A (en) * 2020-06-05 2020-08-18 中国电建集团华东勘测设计研究院有限公司 Deep sea wind power generation jacket type single-pile composite structure and construction method thereof
CN114753414A (en) * 2022-04-13 2022-07-15 中交三航局第三工程有限公司 Intelligent anti-scouring device and method for annular grid type fluidized soil steel pipe pile

Similar Documents

Publication Publication Date Title
CN108547277A (en) A kind of four spud leg offshore wind farm jackets
CN206706811U (en) A kind of offshore wind turbine single-pile foundation
CN109469089B (en) An internally inserted offshore wind power conductor frame foundation with self-contained pile stabilizing casing and construction method
CN103233481B (en) Jacket supporting structure capable of being connected in grouting mode
CN202787299U (en) Multi-pile pipe guide frame type foundation for offshore wind turbine
CN109853609A (en) A kind of offshore wind farm combination foundation
CN110258611A (en) A kind of offshore wind farm and aquafarm integral structure system
CN106245671A (en) A kind of combination type offshore wind power foundation and construction method thereof
CN203475459U (en) Three-pile guide pipe frame foundation structure of offshore wind turbine
CN209603168U (en) A kind of offshore wind farm combination foundation
CN206971250U (en) A kind of offshore wind farm engineering jacket basis
CN204825949U (en) Marine fan basis connection structure of pipe posture of driving piles in advance
CN106381881A (en) Gravity-type single-pile foundation
CN204676584U (en) A kind of high stake truss-like offshore wind turbine foundation structure
CN209538210U (en) A kind of interpolation type offshore wind farm jacket basis carrying steady pipe casing
CN202543954U (en) Multiangular frame foundation for offshore wind power generator
CN204212174U (en) Single pile adds taper pile brace type offshore wind turbine foundation structure
CN208415222U (en) A kind of four spud leg offshore wind farm jackets
CN106930291A (en) A kind of many position-limited racks in sea and its construction method
CN203977417U (en) Ribs built-in steel casing for a kind of pile of deep water pile foundation
CN103277262A (en) An offshore wind turbine foundation structure
CN202440828U (en) Separate Jacket Device
CN209398542U (en) An offshore wind turbine foundation with adjustable bending moment load distribution of wind turbines
CN207160011U (en) A kind of more position-limited racks in sea
CN202466618U (en) Integrated jacket device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210222

Address after: 226300 inner side of sanjiasha harbor in Tongzhou Bay River Sea joint development demonstration zone, Nantong City, Jiangsu Province

Applicant after: Nantong Changfeng new energy equipment Technology Co.,Ltd.

Address before: 224000 88 Jinhai Avenue, Sheyanggang Economic Zone, Sheyang County, Yancheng City, Jiangsu Province

Applicant before: JIANGSU STRONGWIND MARINE EQUIPMENT Co.,Ltd.

RJ01 Rejection of invention patent application after publication

Application publication date: 20180918