[go: up one dir, main page]

CN108520473A - The control method and system of complete buried prepackage type intelligent green substation - Google Patents

The control method and system of complete buried prepackage type intelligent green substation Download PDF

Info

Publication number
CN108520473A
CN108520473A CN201810246775.5A CN201810246775A CN108520473A CN 108520473 A CN108520473 A CN 108520473A CN 201810246775 A CN201810246775 A CN 201810246775A CN 108520473 A CN108520473 A CN 108520473A
Authority
CN
China
Prior art keywords
control
substation
staff
instruction
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810246775.5A
Other languages
Chinese (zh)
Inventor
肖谢科
游波
曾智
周谈平
周斌
黎灿兵
黎戈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaxiang Xiangneng Electric Co Ltd
Original Assignee
Huaxiang Xiangneng Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaxiang Xiangneng Electric Co Ltd filed Critical Huaxiang Xiangneng Electric Co Ltd
Priority to CN201810246775.5A priority Critical patent/CN108520473A/en
Publication of CN108520473A publication Critical patent/CN108520473A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Water Supply & Treatment (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention discloses a kind of control method and system of complete buried prepackage type intelligent green substation, and the wherein control method includes establishing substation operation state diagram;Verify the identity information of staff;Substation operation state diagram is shown in control interface;According to identity information, the controllable state of primary equipment and secondary device in control interface is determined;Obtain the control instruction that staff is sent based on control option;When control instruction is legal, control instruction is executed, and after the completion of control instruction, updates substation operation state diagram;When control instruction is illegal, prompts " instruction is illegal " and exit the interface where control option.Technical solution proposed by the present invention avoids the inconvenience that staff brings to full burned prefabricated substation site examining and repairing, maintenance and control, it can be achieved that remote service, maintenance and the control of burned prefabricated substation entirely.

Description

The control method and system of complete buried prepackage type intelligent green substation
Technical field
The present invention relates to technical field of power systems, and in particular to a kind of control of complete buried prepackage type intelligent green substation Method and system processed.
Background technology
Preassembled transformer station is indispensable pith in electric system, it is by being pressed as defeated in 10KV or 20KV Distribution force feed is 220/380 volt through pre-installed transformer sub-station transformation to load center, low tension force feed to user, and this form is main It can guarantee that user uses the stabilization of voltage, reduce line loss, reduce pressure drop, improve power supply quality, the transformation device pair of this form Power consumption brings the current best distribution form of many benefits and the world.But a large amount of pre-installed transformer sub-station, switchyard, , there is the contradiction of electricity consumption auxiliary facility and installation environment in ring main unit, and bring uncoordinated contradiction to surrounding enviroment, with being arranged Apply the contradiction with Living environment safety of human being, the contradiction of corollary apparatus and beautification, green planted city environment, although the case of past on the ground The decoration of some beautifications has made in shape in formula substation or periphery is done some with some billboards or fence and interspersed, but to periphery Environment still brings certain influence, it is not only uncoordinated with periphery, but also occupies safety to people and also affect the generation of case change such as Noise, radiation, influence view visual field of people etc., each prefabricated box change will occupy one block of no small soil.And entirely It buries preassembled transformer station and solves the above problem well, but substation is embedded in underground by full burned prefabricated substation, it is existing Maintenance is safeguarded and to control full burned prefabricated substation highly inconvenient, and great difficulty is brought to staff.
Invention content
The main object of the present invention is to provide a kind of control method and system of complete buried prepackage type intelligent green substation, Aim to solve the problem that existing full burned prefabricated substation site examining and repairing, maintenance and the full burned prefabricated substation of control be not extremely square Just, the problem of bringing extreme difficulties to staff.
To achieve the above object, the control method of a kind of complete buried prepackage type intelligent green substation proposed by the present invention, Include the following steps:
It generates icon according to the appearance of each equipment in substation and forms substation operation state diagram and be shown in control interface On, wherein the icon carries out different displays according to the level of equipment, and the level of equipment is divided into primary equipment and secondary sets Standby, user can show the current state of each equipment by clicking the icon, and control it;
When receiving the identity information of staff's input, the identity information is verified;
When the identity information is verified, the substation operation state diagram is shown in the control interface;
According to the identity information, the controllable of primary equipment described in the control interface and the secondary device is determined State, as the identity information staff of the primary equipment in order to control, the control option of the primary equipment is can Control state, the control option of the secondary device be uncontrollable state, when the identity information secondary device in order to control When staff, the control option of the primary equipment is uncontrollable state, and the control option of the secondary device is controllable shape State;
Obtain the control instruction that staff is sent based on the control option;
When the control instruction is legal, the control instruction is executed, and after the completion of the control instruction, update the change Power station running status figure;
When the control instruction is illegal, prompts " instruction is illegal " and exit the interface where the control option.
Preferably, it is also wrapped after described the step of obtaining the control instruction that staff is sent based on the control option It includes:
Obtain the conditions present of the corresponding execution condition of the control instruction and the substation;
When the execution condition is consistent with the conditions present, judge that the control instruction is legal;
When the execution condition and the conditions present are inconsistent, judge that the control instruction is illegal.
Preferably, include after the update substation operation state diagram:
Obtain updated electrical parameter, the electrical parameter includes three-phase voltage, three-phase current, active power, idle Power and power factor (PF);
Judge the electrical parameter whether in values;
If so, when receiving staff and exiting the instruction of the substation operation state diagram, by the substation Operating status figure exits presently described control interface, release control permission;
If it is not, then obtaining the electrical parameter beyond the values, and show opposite with the electrical parameter The warning message answered.
Preferably, the control method further includes:
When the electrical parameter is to be in values, and do not receive staff in preset time and exit institute When stating the instruction of substation operation state diagram, presently described control interface, release control are exited into the substation operation state diagram Permission processed.
Preferably, described to obtain the electrical parameter beyond the values, and show and the electrical parameter Include after the step of corresponding warning message:
It shows the corresponding control option of the warning message, and obtains the control that staff is sent based on the control option System instruction.
To achieve the above object, the control system of a kind of complete buried prepackage type intelligent green substation provided by the invention, Including:
Display module, it is aobvious for generating icon according to the appearance of each equipment in substation and forming substation operation state diagram Show in control interface, wherein the icon carries out different displays according to the level of equipment, and the level of equipment, which is divided into, once to be set Standby and secondary device, user can show the current state of each equipment by clicking the icon, and control it;
Authentication module, for when receiving the identity information of staff's input, being verified to the identity information;
The display module is additionally operable to when the identity information is verified, and the power transformation is shown in the control interface Operating status of standing figure;
The authentication module is additionally operable to, according to the identity information, determine primary equipment described in the control interface and institute The controllable state for stating secondary device, it is described primary as the identity information staff of the primary equipment in order to control The control option of equipment is controllable state, and the control option of the secondary device is uncontrollable state, when the identity information is When controlling the staff of the secondary device, the control option of the primary equipment is uncontrollable state, the secondary device Control option be controllable state;
Acquisition module, the control instruction sent based on the control option for obtaining staff;
Execution module, for when the control instruction is legal, executing the control instruction, and the control instruction is completed Afterwards, the substation operation state diagram is updated;
The execution module is additionally operable to when the control instruction is illegal, is prompted " instruction is illegal " and is exited the control Interface where option processed.
Preferably, the acquisition module is used to obtain the corresponding execution condition of the control instruction and the substation Conditions present;
The authentication module is additionally operable to, when the execution condition is consistent with the conditions present, judge the control instruction It is legal;
When the execution condition and the conditions present are inconsistent, judge that the control instruction is illegal.
Preferably, the acquisition module is additionally operable to obtain updated electrical parameter, and the electrical parameter includes three-phase electricity Pressure, three-phase current, active power, reactive power and power factor (PF);
Whether the authentication module is additionally operable to judge the electrical parameter in values;
If so, when receiving staff and exiting the instruction of the substation operation state diagram, by the substation Operating status figure exits presently described control interface, release control permission;
If it is not, then obtaining the electrical parameter beyond the values, and show opposite with the electrical parameter The warning message answered.
Preferably, the execution module is additionally operable to when the electrical parameter be in the values, and when default In when not receiving staff and exiting the instruction of the substation operation state diagram, the substation operation state diagram is moved back Go out presently described control interface, release control permission.
Preferably, the display module is additionally operable to show the corresponding control option of the warning message, and obtains work people The control instruction that member is sent based on the control option.
In technical scheme of the present invention, by establishing the operating status figure of full burned prefabricated substation, remote monitoring is pre- State is made in the operation of Zhuan Shi substations, while control adjustment can be carried out to the working condition of the equipment to realize complete buried prepackage type Remote service, maintenance and the control of substation, avoid staff to full burned prefabricated substation site examining and repairing, safeguard and Control the inconvenience brought.Meanwhile primary equipment and secondary device divide professional staff to perform overhauling and maintenance and control it, And the control instruction that staff sends out verify whether legal, staff is avoided caused by being unfamiliar with equipment Maloperation.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with The structure shown according to these attached drawings obtains other attached drawings.
Fig. 1 is the flow signal of the control method first embodiment of the complete buried prepackage type intelligent green substation of the present invention Figure;
Fig. 2 is the flow signal of the control method second embodiment of the complete buried prepackage type intelligent green substation of the present invention Figure;
Fig. 3 is the modular structure signal of one embodiment of control system of the complete buried prepackage type intelligent green substation of the present invention Figure.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiment is only a part of the embodiment of the present invention, instead of all the embodiments.Base Embodiment in the present invention, those of ordinary skill in the art obtained without creative efforts it is all its His embodiment, shall fall within the protection scope of the present invention.
In addition, the technical solution between each embodiment of the present invention can be combined with each other, but must be general with this field Logical technical staff can be implemented as basis, will be understood that when the combination of technical solution appearance is conflicting or cannot achieve this The combination of technical solution is not present, also not the present invention claims protection domain within.
The present invention proposes a kind of control method of complete buried prepackage type intelligent green substation.
Fig. 1 is please referred to, Fig. 1 is the control for the complete buried prepackage type intelligent green substation that first embodiment of the invention proposes Method, the control method of buried prepackage type intelligent green substation includes the following steps entirely in this embodiment:
Step S100 generates icon according to the appearance of each equipment in substation and forms substation operation state diagram and be shown in In control interface, wherein the icon carries out different displays according to the level of equipment, the level of equipment be divided into primary equipment and Secondary device, user can show the current state of each equipment by clicking the icon, and control it.
Specifically, when implementing the control method of complete buried prepackage type intelligent green substation proposed by the present invention, in advance According to the electric connecting relation between each equipment in substation, and the work by obtaining primary each equipment every preset time Dynamic substation operation state diagram is established as state, and can include in control interface by this substation operation state diagram On, to achieve the purpose that remote monitoring.Wherein, the icon in substation operation state diagram is given birth to according to the face shaping of each equipment At being easily understood and readable strong;Meanwhile the icon of primary equipment and secondary device by the apparent two kinds of colors of contrast come It distinguishes.Implementing that the purpose for facilitating differentiation can be played when maintenance, maintenance and control.The current working status of each equipment It can be obtained, and the working condition can be controlled by clicking icon of the equipment in substation operation state diagram, it can Keep maintenance, maintenance and control more convenient simple and direct.
Step S200 verifies the identity information when receiving the identity information of staff's input.
Specifically, transformer substation system is by illegal invasion in order to prevent, the work that need to be performed overhauling and maintenance and control to substation The identity information for making personnel is verified;The mode of verification can be;Each staff gathers around that there are one independent with other works Make the different account of personnel and password, and the mobile phone of account staff corresponding with the account is bound, carries out body When part Information Authentication, the mobile phone of the staff will receive an identifying code, only when the account and its password and identifying code are complete When portion is correct, just think that the identity information of the staff is legal.The account of each staff is according to the special of staff Industry technical ability is divided into profession maintenance, maintenance and the control staff of primary equipment and the profession maintenance of secondary device, safeguards and control Staff processed;Primary equipment profession maintenance, safeguard and control staff account can be unified for " 1 " beginning, behind plus The form of staff's name;The profession maintenance of secondary device, the account for safeguarding and controlling staff can be unified for " 2 " and open Head, behind plus staff's name form.
Step S300 shows the substation operation shape when the identity information is verified in the control interface State figure.
Specifically, if the account password of staff's input and when correct identifying code, change is shown in control interface Power station running status figure, so that the operating status of whole transformer station is checked in staff's understanding.
Step S400 determines primary equipment described in the control interface and described secondary sets according to the identity information Standby controllable state, as the identity information staff of the primary equipment in order to control, the control of the primary equipment Option processed is controllable state, and the control option of the secondary device is uncontrollable state, when the identity information is described in order to control When the staff of secondary device, the control option of the primary equipment is uncontrollable state, and the control of the secondary device is selected Item is controllable state.
Specifically, judged by the identity information to input, determine that identity information is the staff of primary equipment Or the staff of secondary device.If it is the staff of primary equipment, then primary equipment can only be controlled, it is secondary Equipment can inquire current working condition but can not control it;If it is secondary device staff, then phase Instead.
Step S500 obtains the control instruction that staff is sent based on the control option.
Specifically, staff is by the control mode of mouse-keyboard, or is directly chosen from the control interface of touching Device to be controlled is needed, the current working condition of this equipment can be shown by clicking, it can be to this work shape after input instruction State is modified.
Step S600 executes the control instruction, and after the completion of the control instruction when the control instruction is legal, Update the substation operation state diagram.
Specifically, after some control instruction, which executes, to be completed, the operating status of substation will change, and substation is transported Row state is updated and is shown in control interface, and substation is current after staff can be facilitated to understand execution control instruction in time State.
Step S700 prompts " instruction is illegal " and exits control option institute when the control instruction is illegal Interface.
Specifically, the operation of control instruction control power transformation station equipment will be led if control instruction is wrong or illegal The operation entanglement of mutagens electricity station equipment, to cause economic loss.The control instruction of input is required for doing its legitimacy Go out verification, only when this control instruction be it is legal, could be performed by the equipment by substation.
In technical scheme of the present invention, by establishing the operating status figure of full burned prefabricated substation, remote monitoring is pre- The operating status of Zhuan Shi substations, and the equipment can be obtained by clicking the icon of each equipment in substation operation state diagram Current working condition, while control adjustment can be carried out to the working condition of the equipment to realize full burned prefabricated substation Remote service, maintenance and control avoid staff and are brought to full burned prefabricated substation site examining and repairing, maintenance and control Inconvenience.Meanwhile primary equipment and secondary device divide professional staff to perform overhauling and maintenance and control it, and to work It is legal that the control instruction that personnel send out verify whether, avoids staff's maloperation caused by being unfamiliar with equipment.
Fig. 2 is please referred to, Fig. 2 is the second of the control method of complete buried prepackage type intelligent green substation proposed by the present invention Embodiment, first of the control method based on complete buried prepackage type intelligent green substation proposed by the present invention implements, described to obtain Further include after the step of control instruction for taking staff to be sent based on the control option:
Step S800 obtains the conditions present of the corresponding execution condition of the control instruction and the substation;
Step S801 judges that the control instruction is legal when the execution condition is consistent with the conditions present;
Step S802 judges that the control instruction is illegal when the execution condition and the conditions present are inconsistent.
Specifically, when staff chooses some equipment to send out control instruction, hold corresponding with the control instruction is obtained The conditions present of row condition and substation, for example, when staff overhaul substation ventilation equipment whether operational excellence when, The control instruction for starting ventilation equipment is sent out, whether the corresponding execution condition of the control instruction is current ventilation equipment in startup State;Whether the conditions present of the substation of the control instruction is the humidity of external environment residing for substation beyond default humidity Value.If ventilation equipment are in starting state, which is unsatisfactory for execution condition, starts ventilation equipment if executed by force Control instruction, then may cause the damage of ventilation equipment.If the humidity of the external environment residing for substation exceeds default humidity Value, then the control instruction is unsatisfactory for the conditions present of substation, if fruit executes the control instruction for starting ventilation equipment by force, opens Ventilation equipment increase the humidity caused in substation, influence the normal operation of other equipment in substation.By verifying work The control instruction that personnel send out it is whether legal come achieve the purpose that protect substation safety operation.
Further, the third of the control method of complete buried prepackage type intelligent green substation proposed by the present invention is implemented Example, the first implementation or the second implementation of the control method based on complete buried prepackage type intelligent green substation proposed by the present invention Example, the update substation operation state diagram include later:
Step S900, obtains updated electrical parameter, and the electrical parameter includes three-phase voltage, three-phase current, active Power, reactive power and power factor (PF);
Whether step S901 judges the electrical parameter in values;
Step S902, if so, when receiving staff and exiting the instruction of the substation operation state diagram, by institute It states substation operation state diagram and exits presently described control interface, release control permission;
Step S903 if it is not, then obtaining the electrical parameter beyond the values, and is shown and the electricity The corresponding warning message of parameter.
Specifically, after having executed current control instruction, the electrical parameter of substation is obtained, whether judges these electrical parameters Have beyond values, shows that unusual condition does not occur in substation after having executed the control instruction if not, it will Control interface is exited in substation operation state diagram, and release control permission completes this maintenance, safeguards and control work.If there is electricity It measures parameter and exceeds values, then obtain this and exceed the electrical parameter for presetting to range, and prompt related to the electrical parameter Warning message, prompt staff to adjust in time, in order to avoid cause unnecessary loss.
Further, the 4th of the control method of complete buried prepackage type intelligent green substation proposed by the present invention implements Example, first of the control method based on complete buried prepackage type intelligent green substation proposed by the present invention implements to 3rd embodiment In any embodiment, the control method further includes:
Step S904, when the electrical parameter is to be in values, and do not receive work in preset time When personnel exit the instruction of the substation operation state diagram, presently described control circle is exited into the substation operation state diagram Face, release control permission.
Specifically, the work of staff is neglected and forgets to exit substation operation state in control interface in order to prevent Figure, if the finger for exiting substation operation state diagram described in control interface has not been obtained in substation control system after preset time The control instruction to substation's other equipment is enabled or had not been obtained, then automatically exits from substation operation state in control interface Figure ensures the control safety of substation.
Further, the 5th of the control method of complete buried prepackage type intelligent green substation proposed by the present invention implements Example, first of the control method based on complete buried prepackage type intelligent green substation proposed by the present invention implements to fourth embodiment In any embodiment, the control method includes:
Step S905 shows the corresponding control option of the warning message, and obtains staff and selected based on the control The control instruction that item is sent.
Specifically, if there is electrical parameter to be not at values, staff need to carry out timely regulating measures, make Electrical parameter is in values, and the execution step of regulating measures is consistent with the execution step of control instruction, to ensure to become The safe handling in power station.
Fig. 3 is please referred to, the present invention also proposes a kind of control system of complete buried prepackage type intelligent green substation, including:
Display module 100, for generating icon according to the appearance of each equipment in substation and forming substation operation state Figure is shown in control interface, wherein the icon carries out different displays according to the level of equipment, and the level of equipment is divided into one Secondary device and secondary device, user can show the current state of each equipment by clicking the icon, and be controlled to it System.
Specifically, when implementing the control method of complete buried prepackage type intelligent green substation proposed by the present invention, in advance According to the electric connecting relation between each equipment in substation, and the work by obtaining primary each equipment every preset time Dynamic substation operation state diagram is established as state, and can include in control interface by this substation operation state diagram On, to achieve the purpose that remote monitoring.Wherein, the icon in substation operation state diagram is given birth to according to the face shaping of each equipment At being easily understood and readable strong;Meanwhile the icon of primary equipment and secondary device by the apparent two kinds of colors of contrast come It distinguishes.Implementing that the purpose for facilitating differentiation can be played when maintenance, maintenance and control.The current working status of each equipment It can be obtained, and the working condition can be controlled by clicking icon of the equipment in substation operation state diagram, it can Keep maintenance, maintenance and control more convenient simple and direct.
Authentication module 200, for when receiving the identity information of staff's input, testing the identity information Card.
Specifically, transformer substation system is by illegal invasion in order to prevent, the work that need to be performed overhauling and maintenance and control to substation The identity information for making personnel is verified;The mode of verification can be;Each staff gathers around that there are one independent with other works Make the different account of personnel and password, and the mobile phone of account staff corresponding with the account is bound, carries out body When part Information Authentication, the mobile phone of the staff will receive an identifying code, only when the account and its password and identifying code are complete When portion is correct, just think that the identity information of the staff is legal.The account of each staff is according to the special of staff Industry technical ability is divided into profession maintenance, maintenance and the control staff of primary equipment and the profession maintenance of secondary device, safeguards and control Staff processed;Primary equipment profession maintenance, safeguard and control staff account can be unified for " 1 " beginning, behind plus The form of staff's name;The profession maintenance of secondary device, the account for safeguarding and controlling staff can be unified for " 2 " and open Head, behind plus staff's name form.
The display module 100 is additionally operable to when the identity information is verified, shown in the control interface described in Substation operation state diagram.
Specifically, if the account password of staff's input and when correct identifying code, change is shown in control interface Power station running status figure, so that the operating status of whole transformer station is checked in staff's understanding.
The authentication module 200 be used for according to the identity information, determine primary equipment described in the control interface and The controllable state of the secondary device, as the identity information staff of the primary equipment in order to control, described one The control option of secondary device is controllable state, and the control option of the secondary device is uncontrollable state, when the identity information In order to control when the staff of the secondary device, the control option of the primary equipment is uncontrollable state, described secondary to set Standby control option is controllable state.
Specifically, judged by the identity information to input, determine that identity information is the staff of primary equipment Or the staff of secondary device.If it is the staff of primary equipment, then primary equipment can only be controlled, it is secondary Equipment can inquire current working condition but can not control it;If it is secondary device staff, then phase Instead
Acquisition module 300, the control instruction sent based on the control option for obtaining staff.
Specifically, staff is by the control mode of mouse-keyboard, or is directly chosen from the control interface of touching Device to be controlled is needed, the current working condition of this equipment can be shown by clicking, it can be to this work shape after input instruction State is modified.
Execution module 400, for when the control instruction is legal, executing the control instruction, and the control instruction After the completion, the substation operation state diagram is updated.
Specifically, after some control instruction, which executes, to be completed, the operating status of substation will change, and substation is transported Row state is updated and is shown in control interface, and substation is current after staff can be facilitated to understand execution control instruction in time State.
The execution module 400 is used for when the control instruction is illegal, is prompted " instruction is illegal " and is exited described Control the interface where option.
Specifically, the operation of control instruction control power transformation station equipment will be led if control instruction is wrong or illegal The operation entanglement of mutagens electricity station equipment, to cause economic loss.The control instruction of input is required for doing its legitimacy Go out verification, only when this control instruction be it is legal, could be performed by the equipment by substation.
In technical scheme of the present invention, by establishing the operating status figure of full burned prefabricated substation, remote monitoring is pre- The operating status of Zhuan Shi substations, and the equipment can be obtained by clicking the icon of each equipment in substation operation state diagram Current working condition, while control adjustment can be carried out to the working condition of the equipment to realize full burned prefabricated substation Remote service, maintenance and control avoid staff and are brought to full burned prefabricated substation site examining and repairing, maintenance and control Inconvenience.Meanwhile primary equipment and secondary device divide professional staff to perform overhauling and maintenance and control it, and to work It is legal that the control instruction that personnel send out verify whether, avoids staff's maloperation caused by being unfamiliar with equipment.
Preferably, the acquisition module 300 is additionally operable to obtain the corresponding execution condition of the control instruction and the change The conditions present in power station;
The authentication module 200 is additionally operable to, when the execution condition is consistent with the conditions present, judge the control It is legal to instruct;
When the execution condition and the conditions present are inconsistent, judge that the control instruction is illegal.
Specifically, when staff chooses some equipment to send out control instruction, hold corresponding with the control instruction is obtained The conditions present of row condition and substation, for example, when staff overhaul substation ventilation equipment whether operational excellence when, The control instruction for starting ventilation equipment is sent out, whether the corresponding execution condition of the control instruction is current ventilation equipment in startup State;Whether the conditions present of the substation of the control instruction is the humidity of external environment residing for substation beyond default humidity Value.If ventilation equipment are in starting state, which is unsatisfactory for execution condition, starts ventilation equipment if executed by force Control instruction, then may cause the damage of ventilation equipment.If the humidity of the external environment residing for substation exceeds default humidity Value, then the control instruction is unsatisfactory for the conditions present of substation, if fruit executes the control instruction for starting ventilation equipment by force, opens Ventilation equipment increase the humidity caused in substation, influence the normal operation of other equipment in substation.By verifying work The control instruction that personnel send out it is whether legal come achieve the purpose that protect substation safety operation.
Preferably, the acquisition module 300 is additionally operable to obtain updated electrical parameter, and the electrical parameter includes three-phase Voltage, three-phase current, active power, reactive power and power factor (PF);
Whether the authentication module 200 is additionally operable to judge the electrical parameter in values;
If so, when receiving staff and exiting the instruction of the substation operation state diagram, by the substation Operating status figure exits presently described control interface, release control permission;
If it is not, then obtaining the electrical parameter beyond the values, and show opposite with the electrical parameter The warning message answered.
Specifically, after having executed current control instruction, the electrical parameter of substation is obtained, whether judges these electrical parameters Have beyond values, shows that unusual condition does not occur in substation after having executed the control instruction if not, it will Control interface is exited in substation operation state diagram, and release control permission completes this maintenance, safeguards and control work.If there is electricity It measures parameter and exceeds values, then obtain this and exceed the electrical parameter for presetting to range, and prompt related to the electrical parameter Warning message, prompt staff to adjust in time, in order to avoid cause unnecessary loss.
Preferably, the execution module 400 is additionally operable to when the electrical parameter be to be in values, and presetting When not receiving staff in the time and exiting the instruction of the substation operation state diagram, by the substation operation state diagram Exit presently described control interface, release control permission.
Specifically, the work of staff is neglected and forgets to exit substation operation state in control interface in order to prevent Figure, if the finger for exiting substation operation state diagram described in control interface has not been obtained in substation control system after preset time The control instruction to substation's other equipment is enabled or had not been obtained, then automatically exits from substation operation state in control interface Figure ensures the control safety of substation.
Preferably, the display module 100 is additionally operable to show the corresponding control option of the warning message, and obtains work The control instruction that personnel are sent based on the control option.
Specifically, if there is electrical parameter to be not at values, staff need to carry out timely regulating measures, make Electrical parameter is in values, and the execution step of regulating measures is consistent with the execution step of control instruction, to ensure to become The safe handling in power station.
The foregoing is merely the preferred embodiment of the present invention, are not intended to limit the scope of the invention, every at this Under the design of invention, using equivalent structure transformation made by description of the invention and accompanying drawing content, or directly/it is used in it indirectly His relevant technical field is included in the scope of patent protection of the present invention.

Claims (10)

1. a kind of control method of complete buried prepackage type intelligent green substation, which is characterized in that include the following steps:
It generates icon according to the appearance of each equipment in substation and forms substation operation state diagram and be shown in control interface, In, the icon carries out different displays according to the level of equipment, and the level of equipment is divided into primary equipment and secondary device, user The current state of each equipment can be shown by clicking the icon, and is controlled it;
When receiving the identity information of staff's input, the identity information is verified;
When the identity information is verified, the substation operation state diagram is shown in the control interface;
According to the identity information, the controllable shape of primary equipment described in the control interface and the secondary device is determined State, as the identity information staff of the primary equipment in order to control, the control option of the primary equipment is controllable State, the control option of the secondary device are uncontrollable state, when the work of the identity information secondary device in order to control When making personnel, the control option of the primary equipment is uncontrollable state, and the control option of the secondary device is controllable state;
Obtain the control instruction that staff is sent based on the control option;
When the control instruction is legal, the control instruction is executed, and after the completion of the control instruction, update the substation Operating status figure;
When the control instruction is illegal, prompts " instruction is illegal " and exit the interface where the control option.
2. the control method of complete buried prepackage type intelligent green substation as described in claim 1, which is characterized in that described to obtain Further include after the step of control instruction for taking staff to be sent based on the control option:
Obtain the conditions present of the corresponding execution condition of the control instruction and the substation;
When the execution condition is consistent with the conditions present, judge that the control instruction is legal;
When the execution condition and the conditions present are inconsistent, judge that the control instruction is illegal.
3. the control method of buried prepackage type intelligent green substation as described in claim 1 complete, which is characterized in that it is described more Include after the new substation operation state diagram:
Updated electrical parameter is obtained, the electrical parameter includes three-phase voltage, three-phase current, active power, reactive power And power factor (PF);
Judge the electrical parameter whether in values;
If so, when receiving staff and exiting the instruction of the substation operation state diagram, by the substation operation Presently described control interface, release control permission are exited in state diagram;
If it is not, then obtaining the electrical parameter beyond the values, and show corresponding with the electrical parameter Warning message.
4. the control method of complete buried prepackage type intelligent green substation as claimed in claim 3, which is characterized in that the control Method processed further includes:
When the electrical parameter is to be in values, and do not receive staff in preset time and exit the change When the instruction of power station running status figure, presently described control interface, release control power are exited into the substation operation state diagram Limit.
5. the control method of complete buried prepackage type intelligent green substation as claimed in claim 3, which is characterized in that described to obtain Take the electrical parameter beyond the values, and the step of showing warning message corresponding with the electrical parameter Include later:
It shows the corresponding control option of the warning message, and obtains the control that staff is sent based on the control option and refer to It enables.
6. a kind of control system of complete buried prepackage type intelligent green substation, which is characterized in that including:
Display module is shown in for generating icon according to the appearance of each equipment in substation and forming substation operation state diagram In control interface, wherein the icon carries out different displays according to the level of equipment, the level of equipment be divided into primary equipment and Secondary device, user can show the current state of each equipment by clicking the icon, and control it;
Authentication module, for when receiving the identity information of staff's input, being verified to the identity information;
The display module is additionally operable to when the identity information is verified, and substation's fortune is shown in the control interface Row state diagram;
The authentication module is additionally operable to, according to the identity information, determine primary equipment described in the control interface and described two The controllable state of secondary device, as the identity information staff of the primary equipment in order to control, the primary equipment Control option be controllable state, the control option of the secondary device is uncontrollable state, when the identity information in order to control When the staff of the secondary device, the control option of the primary equipment is uncontrollable state, the control of the secondary device Option processed is controllable state;
Acquisition module, the control instruction sent based on the control option for obtaining staff;
Execution module, for when the control instruction is legal, executing the control instruction, and after the completion of the control instruction, Update the substation operation state diagram;
The execution module is additionally operable to when the control instruction is illegal, is prompted " instruction is illegal " and is exited the control choosing Interface where.
7. the control system of complete buried prepackage type intelligent green substation as claimed in claim 6, which is characterized in that described to obtain Modulus block is additionally operable to obtain the conditions present of the corresponding execution condition of the control instruction and the substation;
The authentication module is additionally operable to when the execution condition is consistent with the conditions present, judges that the control instruction is closed Method;
When the execution condition and the conditions present are inconsistent, judge that the control instruction is illegal.
8. the control system of complete buried prepackage type intelligent green substation as claimed in claim 6, which is characterized in that described to obtain Modulus block is additionally operable to obtain updated electrical parameter, the electrical parameter include three-phase voltage, three-phase current, active power, Reactive power and power factor (PF);
Whether the authentication module is additionally operable to judge the electrical parameter in values;
If so, when receiving staff and exiting the instruction of the substation operation state diagram, by the substation operation Presently described control interface, release control permission are exited in state diagram;
If it is not, then obtaining the electrical parameter beyond the values, and show corresponding with the electrical parameter Warning message.
9. the control system of complete buried prepackage type intelligent green substation as claimed in claim 8, which is characterized in that described to hold Row module is additionally operable to when the electrical parameter be to be in values, and do not receive staff in preset time and move back When going out the instruction of the substation operation state diagram, presently described control interface is exited into the substation operation state diagram, is released Put control authority.
10. the control system of complete buried prepackage type intelligent green substation as claimed in claim 8, which is characterized in that described Display module is additionally operable to show the corresponding control option of the warning message, and obtains staff and sent out based on the control option The control instruction sent.
CN201810246775.5A 2018-03-23 2018-03-23 The control method and system of complete buried prepackage type intelligent green substation Pending CN108520473A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810246775.5A CN108520473A (en) 2018-03-23 2018-03-23 The control method and system of complete buried prepackage type intelligent green substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810246775.5A CN108520473A (en) 2018-03-23 2018-03-23 The control method and system of complete buried prepackage type intelligent green substation

Publications (1)

Publication Number Publication Date
CN108520473A true CN108520473A (en) 2018-09-11

Family

ID=63434188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810246775.5A Pending CN108520473A (en) 2018-03-23 2018-03-23 The control method and system of complete buried prepackage type intelligent green substation

Country Status (1)

Country Link
CN (1) CN108520473A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110829346A (en) * 2019-11-28 2020-02-21 安徽兴晟电气设备有限公司 Intelligent high tension cable feeder pillar
CN112169996A (en) * 2020-10-09 2021-01-05 北京北矿智能科技有限公司 Method and device for controlling single stone crusher, storage medium and electronic equipment
CN112217125A (en) * 2020-10-23 2021-01-12 华夏恒业变压器有限公司 Thing allies oneself with box-type substation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090299536A1 (en) * 2005-04-29 2009-12-03 Fat Spaniel Technologies, Inc. Computer implemented systems and methods for improving sales and marketing effectiveness
CN102064602A (en) * 2009-11-17 2011-05-18 江苏省电力公司扬州供电公司 Operating method of B/S framework networked electronic simulation drawing board system
CN103944275A (en) * 2014-05-19 2014-07-23 国网河南省电力公司商丘供电公司 Transformer substation intelligent auxiliary monitoring inspection system in regulation and control integration mode
CN105869470A (en) * 2015-05-28 2016-08-17 国家电网公司 Extra-high voltage transformer station operation simulation method and system
CN106157167A (en) * 2016-07-06 2016-11-23 北京四方继保自动化股份有限公司 A kind of secondary device remote manipulation bill system and the implementation method of secondary device remote operation ticket

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090299536A1 (en) * 2005-04-29 2009-12-03 Fat Spaniel Technologies, Inc. Computer implemented systems and methods for improving sales and marketing effectiveness
CN102064602A (en) * 2009-11-17 2011-05-18 江苏省电力公司扬州供电公司 Operating method of B/S framework networked electronic simulation drawing board system
CN103944275A (en) * 2014-05-19 2014-07-23 国网河南省电力公司商丘供电公司 Transformer substation intelligent auxiliary monitoring inspection system in regulation and control integration mode
CN105869470A (en) * 2015-05-28 2016-08-17 国家电网公司 Extra-high voltage transformer station operation simulation method and system
CN106157167A (en) * 2016-07-06 2016-11-23 北京四方继保自动化股份有限公司 A kind of secondary device remote manipulation bill system and the implementation method of secondary device remote operation ticket

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110829346A (en) * 2019-11-28 2020-02-21 安徽兴晟电气设备有限公司 Intelligent high tension cable feeder pillar
CN112169996A (en) * 2020-10-09 2021-01-05 北京北矿智能科技有限公司 Method and device for controlling single stone crusher, storage medium and electronic equipment
CN112169996B (en) * 2020-10-09 2021-10-01 北京北矿智能科技有限公司 Method and device for controlling single stone crusher, storage medium and electronic equipment
CN112217125A (en) * 2020-10-23 2021-01-12 华夏恒业变压器有限公司 Thing allies oneself with box-type substation

Similar Documents

Publication Publication Date Title
CN108520473A (en) The control method and system of complete buried prepackage type intelligent green substation
CA2614396C (en) Apparatus, methods, and system for role-based access in an intelligent electronic device
CN109634243A (en) A kind of scheduler program operating system based on intelligent robot
CN104883355A (en) Charging pile parking spot lock management system based on intelligent terminal and charging pile parking spot lock management method based on intelligent terminal
CN103856632B (en) The control method of a kind of terminal applies and device thereof
CN104935053A (en) A method and an apparatus controlling charging of a charging pile
CN102694910A (en) Mobile communication terminal and communication limiting and monitoring method based on mobile communication terminal
CN105425931B (en) A kind of battery capacity management method, device and intelligent terminal
CN106953840B (en) A kind of water power far controls platform method for preventing misoperation
DE102017003868A1 (en) Charging connector for a motor vehicle
CN109286621A (en) Electric car charging service system and charging service authentication control method
JP2000287387A5 (en)
CN106401930B (en) Air compressor intelligent control system
CN106096383A (en) Automatically mobile terminal and the method thereof of unlocking pin are changed
CN111583464B (en) Method for realizing mode switching function of intelligent access control
CN204989266U (en) Smart electric meter with triple line is inhaled to magnetism
CN107676666A (en) A kind of desk lamp and control method with wireless charging function
CN109521679A (en) A kind of household electric appliance control method
CN107294211A (en) The special power supply management system of Training Room
CN105279403B (en) A kind of method and device for the terminal remote unlock that principle is added based on color
CN108439108A (en) The method and elevator control method of elevator call plate are set
CN113437785A (en) Device, system and method for simulating gun plugging and unplugging of alternating-current charging pile
US12204617B2 (en) Key fobs and menu access level authorization for control panels via Bluetooth pairing with user devices
CN111083146A (en) Operation authorization system of electric primary equipment
CN110336370A (en) A kind of System and method for preventing accidentally division switch

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180911