CN108500185A - A kind of railway anticreeper manufacturing process - Google Patents
A kind of railway anticreeper manufacturing process Download PDFInfo
- Publication number
- CN108500185A CN108500185A CN201810175018.3A CN201810175018A CN108500185A CN 108500185 A CN108500185 A CN 108500185A CN 201810175018 A CN201810175018 A CN 201810175018A CN 108500185 A CN108500185 A CN 108500185A
- Authority
- CN
- China
- Prior art keywords
- bending
- forging
- anticreeper
- railway
- manufacturing process
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 45
- 238000005452 bending Methods 0.000 claims abstract description 85
- 238000005242 forging Methods 0.000 claims abstract description 32
- 238000009497 press forging Methods 0.000 claims description 35
- 238000010438 heat treatment Methods 0.000 claims description 11
- 238000000034 method Methods 0.000 claims description 6
- 230000000750 progressive effect Effects 0.000 claims description 6
- 238000004080 punching Methods 0.000 claims description 3
- 238000000465 moulding Methods 0.000 claims description 2
- 238000005266 casting Methods 0.000 abstract description 7
- 230000008901 benefit Effects 0.000 abstract description 4
- 238000005516 engineering process Methods 0.000 description 4
- 238000003466 welding Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 241001669679 Eleotris Species 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 210000000038 chest Anatomy 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 238000010924 continuous production Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 238000007363 ring formation reaction Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000003911 water pollution Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21J—FORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
- B21J5/00—Methods for forging, hammering, or pressing; Special equipment or accessories therefor
- B21J5/002—Hybrid process, e.g. forging following casting
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Forging (AREA)
Abstract
The present invention provides a kind of railway anticreeper manufacturing process, that is, will warm up malleable temperature rectangular section plate and carry out bending three times and complete the final manufacture of anticreeper after forging and stamping by finishing.The advantage of the invention is that:The continuity of manufacturing process is good, and bending or forging and stamping three times are arranged in order progress, and ensure that product is conformity of production, shortens the production time, and all operations can be completed in one, reduce personnel and use;Conducive to automated production;Stock utilization is high, saves Master Cost, is had a very important significance in railway casting production field.
Description
Technical field
The invention discloses a kind of railway anticreeper manufacturing process, belong to hardware manufacturing field.
Background technology
Creeprail often causes rail gap uneven, and sleeper is crooked to wait circuit questions, very big to the destructiveness of track, when serious
Also entail dangers to traffic safety, it is therefore necessary to take effective measure to prevent from creeping.Anticreeper is fastening in rail foot, with to prevent
Only rail is with respect to a kind of important railway casting that sleeper is longitudinally creeped.
Railway anticreeper is mainly made of a kind of non-closed ring, currently, non-being closed for forming this of railway anticreeper
The production method of cyclization part is mainly:Casting, welding and forging.1, for casting, cast-internal dense structure degree phase
For forge it is poor, and often will appear sand holes, stomata, misrun, deformation the defects of problem, need secondary operation, in addition, casting
It makes and is also easy to produce more gaseous contamination, water pollution etc..2, for welding, it usually will appear undercut, overlap, recess and weldering
Deformation etc. is connect, sometimes also surface pores and face crack, the incomplete root penetration etc. of single welding.This will make certain of anticreeper
A little performances fall flat.3, for forging, processing method is excessively simple and crude at present, causes the anticreeper of production consistent
Property it is too poor, such anticreeper does not have to effective solution slide creeping problem on guide rail;It is flat and every time can only single-piece life
Production, operation number is more, low production efficiency, waste of manpower resource, and is directly forged using plate, and stock utilization is low,
Material cost increases.
Therefore, from the point of view of being currently used for the manufacturing technology of anticreeper, being badly in need of one kind can save labor and can guarantee
The manufacturing process of the consistency of product improves stock utilization to reduce production cost, improves production efficiency, simultaneously also
Make product that there is stable comprehensive performance.This will bring good economic benefit in railway casting production.
Invention content
The object of the invention aims to solve the problem that the manufacturing issue of railway anticreeper, realizes that the technical solution of foregoing invention is:
A kind of railway anticreeper manufacturing process is heated to the blank of malleable temperature by forging and pressing and being carried out again after bending three times
Finishing, final molding.
Further, forging and stamping for the first time are completed and enter next impression after bending, new base is sent into again in the first bending impression
Material, and so on, follow-up blank enters successively, and the part of bending is then caught up with to advance toward next impression, and bending three times is closely connected,
Complete all bending steps.
Further, include the following steps:
(1) take satisfactory plate by good blank under defined size and weight sawing machine;
(2) plate is heated by heating furnace, heating temperature section is 950-1200 DEG C, heating time 0.5-
3min;
(3) plate that step (2) is heated to malleable temperature is transported to the 63t punchings equipped with Bending Mould by transfer device
Forging and stamping are carried out in bed and bending, the forging and stamping are carried out at the same time with bending, are carried out altogether three times;
(4) blank after bending three times is put under 800t forcing presses and carries out final finishing, wherein mold temperature is preferred
Preheating, temperature range are 180-300 DEG C.
So far, railway anticreeper manufacturing process terminates.The present invention is not related to subsequent heat treatment process.
Further, bending or forging and stamping are completed in same progressive die three times.
Further, in step (3), the first time press forging after first time bending has to be bent at 6.
Further, in step (3), second of press forging after second of bending has to be bent at 7.
Further, in step (3), the third time press forging after third time bending has to be bent at 8.
Further, in step (3), mold temperature should be preheated first, and temperature range is 180-300 DEG C.
Further, further include following steps:
(1) forging and stamping for the first time are completed in the first bending impression with after bending, first time press forging enters the second bender
Thorax is sent into new blank in the first bending impression at this time;
(2) second of forging and stamping is completed in the second bending impression with after bending, second of press forging enters third bender
Thorax is sent into new blank, first time press forging is sent into the second bending impression at this time in the first bending impression;
(3) completed in third bending impression third time forging and stamping with after bending, complete a third time press forging, one the
Secondary press forging and a first time press forging.
Further, bending or forging and stamping are completed in same progressive die three times.
The invention further relates to a kind of railway anticreeper, the railway anticreeper made of manufacturing process as described above.
Compared with prior art, the beneficial effects of the invention are as follows:
1) this manufacturing process is manufactured using the method for forging and stamping, and is continuous during manufacture, therefore phase
For the non-closed ring that traditional casting and welding manufacture come out, the advantage for thering are forging and stamping to bring, toughness, tensile strength,
There is incomparable advantage in compression strength, manufacturing environment.
2) this manufacturing process is more automated compared to traditional forging technology in disposed of in its entirety using progressive die,
The manpower needed is less, and Continuous maching is more efficient.
3) this manufacturing process not only allows continuous production, and it is former easily can also to change manufacture according to actual conditions
Material, to adapt to the operation of the railway system under Different climate, can also easily dock follow-up process, improve the reliable of transmission of electricity
Property and economy, meet railway system's demand, can be used for the production of the non-closed ring of similar shape.
Description of the drawings
Fig. 1 is first time press forging schematic diagram,
Fig. 2 is second of press forging schematic diagram,
Fig. 3 is third time press forging schematic diagram,
Fig. 4 is that this manufacturing process is molded flow chart.
In figure, 4-1, the first bending section, 4-2, the second bending section, 4-3, third bending section, 4-4, the 4th bending section, 4-5,
5th bending section, 4-6, the 6th bending section, 4-7, straight portion, 4-7-1, the 7th bending section, 4-7-2, the 8th bending section.
Specific implementation mode
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another
It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field
The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific implementation mode, and be not intended to restricted root
According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative
It is also intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet
Include " when, indicate existing characteristics, step, operation, device, component and/or combination thereof.
The invention will be further described with embodiment below in conjunction with the accompanying drawings:
Embodiment one:The making step of railway anticreeper
(1) take satisfactory plate by good blank under defined size and weight sawing machine.
(2) plate is heated by heating furnace, 950-1200 DEG C of heating temperature, heating time 0.5-3min;
(3) as shown in Figure 1, the plate that step (2) is heated to malleable temperature is transported to by transfer device equipped with bending
Bending and forging and stamping are carried out in the 63t punching machines of mold, the blank plate of rectangular section becomes as shown in fig. 1 in first time bending
Shape, in this process, straight blank as shown in Figure 1 possesses the of 6 bending sections into crossing forging and stamping and can be formed originally
Press forging, in 6 bending sections, 4-1,4-6 are symmetrical relative to the central axes of 4-3 and 4-4, and 4-2,4-5 are relative to 4-3 and 4-
4 central axes are symmetrical, and 4-3,4-4 are symmetrical relative to the central axes of 4-3 and 4-4, but are to ensure that the length of straight portion 4-7 is more than 4-
8, in order to subsequent operation;
It forges and presses into second, as shown in Fig. 2, in second is forged and pressed, the parts 4-7 of forging can be carried out second
Bending, bending go out the 7th bending section 4-7-1, and second of press forging of formation has to be bent at 7;
It is forged and pressed into third time, as shown in figure 3, in third time forges and presses, the third time press forging of formation has to be bent at 8.
After bending three times, a product, a bending blank of blank and a bending twice are completed.Wherein, mould
Tool temperature should first be preheated to 180-300 DEG C;
(4) blank after bending three times is put under 800t forcing presses and carries out final finishing, wherein mold temperature is preferred
It is preheated to 180-300 DEG C.
So far, railway anticreeper manufacturing process terminates.The present invention is not related to subsequent heat treatment process.
(1) in the first bending impression, rectangular section blank is admitted to, and is become for the first time after completing forging and stamping for the first time and bending
Press forging, first time press forging enter the second bending impression, are sent into new blank in the first bending impression at this time;
(2) in the second bending impression, the first time press forging in step (1) is completed second of forging and stamping and is become after bending
Second of press forging, second of press forging enter third bending impression, are sent into new blank, the second folding in the first bending impression at this time
First time press forging is sent into curved impression;
(3) in third bending impression, second of press forging in step (2) is completed third time forging and stamping and is become after bending
Third time press forging completes third time forging and stamping with after bending, amounts to and complete a third time press forging, second of press forging
With a first time press forging.
It should be pointed out that in manufacturing process, bending or forging and stamping three times are completed in same progressive die, about progressive die
Tool, belongs to the technology of likewise known in the art, repeats no more.
Above-mentioned, although the foregoing specific embodiments of the present invention is described with reference to the accompanying drawings, not protects model to the present invention
The limitation enclosed, those skilled in the art should understand that, based on the technical solutions of the present invention, those skilled in the art are not
Need to make the creative labor the various modifications or changes that can be made still within protection scope of the present invention.
Claims (10)
1. a kind of railway anticreeper manufacturing process, it is characterised in that:The blank of malleable temperature is heated to by forging and stamping three times and folding
Finishing, final molding are carried out after curved again.
2. railway anticreeper manufacturing process as described in claim 1, which is characterized in that complete first in the first bending impression
Enter the second bending impression after secondary forging and stamping and bending, enters third after second of forging and stamping and bending are completed in the second bending impression
Bending impression, three times bending are closely connected, and complete all bending steps..
3. railway anticreeper manufacturing process as described in claim 1, which is characterized in that include the following steps:
(1) plate is fabricated to blank with sawing machine;
(2) blank is heated by heating furnace, heating temperature section is 950-1200 DEG C, and heating time section is 0.5-
3min;
(3) blank that step (2) is heated to malleable temperature is transported to by transfer device in the 63t punching machines equipped with Bending Mould
It carries out forging and stamping and bending, the forging and stamping is carried out at the same time with bending, carry out altogether three times;
(4) blank after bending three times is put under 800t forcing presses and carries out final finishing, wherein mold temperature needs pre-
Heat, temperature range are 180-300 DEG C.
4. railway anticreeper manufacturing process as claimed in claim 1 or 2, which is characterized in that forge and press three times with bending same
It is completed in progressive die.
5. railway anticreeper manufacturing process as claimed in claim 3, which is characterized in that in step (3), after first time bending
First time press forging have at 6 be bent.
6. railway anticreeper manufacturing process as claimed in claim 3, which is characterized in that in step (3), after second of bending
Second of press forging have at 7 be bent.
7. railway anticreeper manufacturing process as claimed in claim 3, which is characterized in that in step (3), after third time bending
Third time press forging have at 8 be bent.
8. railway anticreeper manufacturing process as claimed in claim 3, which is characterized in that in step (3), mold temperature should be first
Preheating, temperature range are 180-300 DEG C.
9. railway anticreeper manufacturing process as claimed in claim 2 or claim 3, which is characterized in that further include following steps:
(1) forging and stamping for the first time are completed in the first bending impression with after bending, first time press forging enters the second bending impression, this
When the first bending impression in be sent into new blank;
(2) second of forging and stamping is completed in the second bending impression with after bending, second of press forging enters third bending impression, this
When the first bending impression in be sent into new blank, first time press forging is sent into the second bending impression;
(3) in third bending impression complete third time forging and stamping with bending after, complete a third time press forging, one second
Press forging and a first time press forging.
10. a kind of railway anticreeper, which is characterized in that including railway anticreeper system as described in any one of claims 1-9
Make the railway anticreeper of technique manufacture.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810175018.3A CN108500185A (en) | 2018-03-02 | 2018-03-02 | A kind of railway anticreeper manufacturing process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810175018.3A CN108500185A (en) | 2018-03-02 | 2018-03-02 | A kind of railway anticreeper manufacturing process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108500185A true CN108500185A (en) | 2018-09-07 |
Family
ID=63376182
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810175018.3A Pending CN108500185A (en) | 2018-03-02 | 2018-03-02 | A kind of railway anticreeper manufacturing process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108500185A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB697571A (en) * | 1950-10-17 | 1953-09-23 | P & M Co England Ltd | Improvements in rail anchors |
US2771670A (en) * | 1950-03-31 | 1956-11-27 | Poor & Co | Method for forming a rail anchor with a positive applying stop |
US3290419A (en) * | 1963-11-14 | 1966-12-06 | Poor & Co | Method of making rail anchor |
CN2307812Y (en) * | 1997-07-04 | 1999-02-17 | 济南铁路局科学技术研究所 | Anti-creep apparatus made of spring steel |
US20160130676A1 (en) * | 2010-05-26 | 2016-05-12 | Lewis Bolt & Nut Company | Rail anchor |
-
2018
- 2018-03-02 CN CN201810175018.3A patent/CN108500185A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2771670A (en) * | 1950-03-31 | 1956-11-27 | Poor & Co | Method for forming a rail anchor with a positive applying stop |
GB697571A (en) * | 1950-10-17 | 1953-09-23 | P & M Co England Ltd | Improvements in rail anchors |
US3290419A (en) * | 1963-11-14 | 1966-12-06 | Poor & Co | Method of making rail anchor |
CN2307812Y (en) * | 1997-07-04 | 1999-02-17 | 济南铁路局科学技术研究所 | Anti-creep apparatus made of spring steel |
US20160130676A1 (en) * | 2010-05-26 | 2016-05-12 | Lewis Bolt & Nut Company | Rail anchor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104550593B (en) | Forging and pressing method of steel rail heel and three-position molding die used thereby | |
CN201768866U (en) | AT steel rail heel end forging and pressing forming die | |
CN103121075B (en) | Hot forging method for transmission shaft yoke with horizontal yoke part | |
CN111112467B (en) | Non-drift-diameter rib pressing plate forming die and rib pressing curved plate machining method | |
CN108080547A (en) | A kind of long-axis forging prefabricated blank method and device | |
CN104259376B (en) | The paired hot-forging forming process of AT rail heel end die mould section | |
CN101134278A (en) | Manufacturing method of the coupler yoke for railway wagon | |
CN105537487A (en) | Manufacturing method for special-shaped fishplate and dies | |
CN108500185A (en) | A kind of railway anticreeper manufacturing process | |
CN101579710A (en) | Bending forming method of railway van coupler yoke forge piece | |
CN201997666U (en) | Production line for forging and moulding three bearing ring blanks at a time | |
CN205464131U (en) | Abnormal shape fish plate punches a hole to cut edge and smooths compound mould | |
CN102284672A (en) | Production process method for rail spike | |
CN117696804A (en) | A method for manufacturing ultra-wide and ultra-long molded plate forgings | |
CN203076507U (en) | Universal joint one-mould three-station mould | |
CN107225150B (en) | A kind of processing method of variable cross-section track connecting plate | |
CN107186149B (en) | One-die two-piece forging die and method for drill pipe joint | |
CN1785550A (en) | Forging method of soliding fork | |
CN207272071U (en) | A kind of first mould two pieces forging mold of drilling rod connecting | |
CN203817264U (en) | Modified novel steel rail heeling skewing forging die | |
CN113953433A (en) | A universal special-shaped rail forging die and its application | |
CN107214283A (en) | The H profile steel manufacture mould of nuclear fusion stack magnet support | |
CN109807281B (en) | K3 brake beam end forging process | |
CN206445166U (en) | A kind of track aftermarket product warm forging and shaping mold group | |
CN206882580U (en) | Cover plate shaping die |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180907 |