CN108500185A - A kind of railway anticreeper manufacturing process - Google Patents

A kind of railway anticreeper manufacturing process Download PDF

Info

Publication number
CN108500185A
CN108500185A CN201810175018.3A CN201810175018A CN108500185A CN 108500185 A CN108500185 A CN 108500185A CN 201810175018 A CN201810175018 A CN 201810175018A CN 108500185 A CN108500185 A CN 108500185A
Authority
CN
China
Prior art keywords
bending
forging
anticreeper
railway
manufacturing process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810175018.3A
Other languages
Chinese (zh)
Inventor
王孝文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tai'an Ruilang Technology Co Ltd
Original Assignee
Tai'an Ruilang Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tai'an Ruilang Technology Co Ltd filed Critical Tai'an Ruilang Technology Co Ltd
Priority to CN201810175018.3A priority Critical patent/CN108500185A/en
Publication of CN108500185A publication Critical patent/CN108500185A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/002Hybrid process, e.g. forging following casting

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forging (AREA)

Abstract

The present invention provides a kind of railway anticreeper manufacturing process, that is, will warm up malleable temperature rectangular section plate and carry out bending three times and complete the final manufacture of anticreeper after forging and stamping by finishing.The advantage of the invention is that:The continuity of manufacturing process is good, and bending or forging and stamping three times are arranged in order progress, and ensure that product is conformity of production, shortens the production time, and all operations can be completed in one, reduce personnel and use;Conducive to automated production;Stock utilization is high, saves Master Cost, is had a very important significance in railway casting production field.

Description

A kind of railway anticreeper manufacturing process
Technical field
The invention discloses a kind of railway anticreeper manufacturing process, belong to hardware manufacturing field.
Background technology
Creeprail often causes rail gap uneven, and sleeper is crooked to wait circuit questions, very big to the destructiveness of track, when serious Also entail dangers to traffic safety, it is therefore necessary to take effective measure to prevent from creeping.Anticreeper is fastening in rail foot, with to prevent Only rail is with respect to a kind of important railway casting that sleeper is longitudinally creeped.
Railway anticreeper is mainly made of a kind of non-closed ring, currently, non-being closed for forming this of railway anticreeper The production method of cyclization part is mainly:Casting, welding and forging.1, for casting, cast-internal dense structure degree phase For forge it is poor, and often will appear sand holes, stomata, misrun, deformation the defects of problem, need secondary operation, in addition, casting It makes and is also easy to produce more gaseous contamination, water pollution etc..2, for welding, it usually will appear undercut, overlap, recess and weldering Deformation etc. is connect, sometimes also surface pores and face crack, the incomplete root penetration etc. of single welding.This will make certain of anticreeper A little performances fall flat.3, for forging, processing method is excessively simple and crude at present, causes the anticreeper of production consistent Property it is too poor, such anticreeper does not have to effective solution slide creeping problem on guide rail;It is flat and every time can only single-piece life Production, operation number is more, low production efficiency, waste of manpower resource, and is directly forged using plate, and stock utilization is low, Material cost increases.
Therefore, from the point of view of being currently used for the manufacturing technology of anticreeper, being badly in need of one kind can save labor and can guarantee The manufacturing process of the consistency of product improves stock utilization to reduce production cost, improves production efficiency, simultaneously also Make product that there is stable comprehensive performance.This will bring good economic benefit in railway casting production.
Invention content
The object of the invention aims to solve the problem that the manufacturing issue of railway anticreeper, realizes that the technical solution of foregoing invention is:
A kind of railway anticreeper manufacturing process is heated to the blank of malleable temperature by forging and pressing and being carried out again after bending three times Finishing, final molding.
Further, forging and stamping for the first time are completed and enter next impression after bending, new base is sent into again in the first bending impression Material, and so on, follow-up blank enters successively, and the part of bending is then caught up with to advance toward next impression, and bending three times is closely connected, Complete all bending steps.
Further, include the following steps:
(1) take satisfactory plate by good blank under defined size and weight sawing machine;
(2) plate is heated by heating furnace, heating temperature section is 950-1200 DEG C, heating time 0.5- 3min;
(3) plate that step (2) is heated to malleable temperature is transported to the 63t punchings equipped with Bending Mould by transfer device Forging and stamping are carried out in bed and bending, the forging and stamping are carried out at the same time with bending, are carried out altogether three times;
(4) blank after bending three times is put under 800t forcing presses and carries out final finishing, wherein mold temperature is preferred Preheating, temperature range are 180-300 DEG C.
So far, railway anticreeper manufacturing process terminates.The present invention is not related to subsequent heat treatment process.
Further, bending or forging and stamping are completed in same progressive die three times.
Further, in step (3), the first time press forging after first time bending has to be bent at 6.
Further, in step (3), second of press forging after second of bending has to be bent at 7.
Further, in step (3), the third time press forging after third time bending has to be bent at 8.
Further, in step (3), mold temperature should be preheated first, and temperature range is 180-300 DEG C.
Further, further include following steps:
(1) forging and stamping for the first time are completed in the first bending impression with after bending, first time press forging enters the second bender Thorax is sent into new blank in the first bending impression at this time;
(2) second of forging and stamping is completed in the second bending impression with after bending, second of press forging enters third bender Thorax is sent into new blank, first time press forging is sent into the second bending impression at this time in the first bending impression;
(3) completed in third bending impression third time forging and stamping with after bending, complete a third time press forging, one the Secondary press forging and a first time press forging.
Further, bending or forging and stamping are completed in same progressive die three times.
The invention further relates to a kind of railway anticreeper, the railway anticreeper made of manufacturing process as described above.
Compared with prior art, the beneficial effects of the invention are as follows:
1) this manufacturing process is manufactured using the method for forging and stamping, and is continuous during manufacture, therefore phase For the non-closed ring that traditional casting and welding manufacture come out, the advantage for thering are forging and stamping to bring, toughness, tensile strength, There is incomparable advantage in compression strength, manufacturing environment.
2) this manufacturing process is more automated compared to traditional forging technology in disposed of in its entirety using progressive die, The manpower needed is less, and Continuous maching is more efficient.
3) this manufacturing process not only allows continuous production, and it is former easily can also to change manufacture according to actual conditions Material, to adapt to the operation of the railway system under Different climate, can also easily dock follow-up process, improve the reliable of transmission of electricity Property and economy, meet railway system's demand, can be used for the production of the non-closed ring of similar shape.
Description of the drawings
Fig. 1 is first time press forging schematic diagram,
Fig. 2 is second of press forging schematic diagram,
Fig. 3 is third time press forging schematic diagram,
Fig. 4 is that this manufacturing process is molded flow chart.
In figure, 4-1, the first bending section, 4-2, the second bending section, 4-3, third bending section, 4-4, the 4th bending section, 4-5, 5th bending section, 4-6, the 6th bending section, 4-7, straight portion, 4-7-1, the 7th bending section, 4-7-2, the 8th bending section.
Specific implementation mode
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific implementation mode, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or combination thereof.
The invention will be further described with embodiment below in conjunction with the accompanying drawings:
Embodiment one:The making step of railway anticreeper
(1) take satisfactory plate by good blank under defined size and weight sawing machine.
(2) plate is heated by heating furnace, 950-1200 DEG C of heating temperature, heating time 0.5-3min;
(3) as shown in Figure 1, the plate that step (2) is heated to malleable temperature is transported to by transfer device equipped with bending Bending and forging and stamping are carried out in the 63t punching machines of mold, the blank plate of rectangular section becomes as shown in fig. 1 in first time bending Shape, in this process, straight blank as shown in Figure 1 possesses the of 6 bending sections into crossing forging and stamping and can be formed originally Press forging, in 6 bending sections, 4-1,4-6 are symmetrical relative to the central axes of 4-3 and 4-4, and 4-2,4-5 are relative to 4-3 and 4- 4 central axes are symmetrical, and 4-3,4-4 are symmetrical relative to the central axes of 4-3 and 4-4, but are to ensure that the length of straight portion 4-7 is more than 4- 8, in order to subsequent operation;
It forges and presses into second, as shown in Fig. 2, in second is forged and pressed, the parts 4-7 of forging can be carried out second Bending, bending go out the 7th bending section 4-7-1, and second of press forging of formation has to be bent at 7;
It is forged and pressed into third time, as shown in figure 3, in third time forges and presses, the third time press forging of formation has to be bent at 8.
After bending three times, a product, a bending blank of blank and a bending twice are completed.Wherein, mould Tool temperature should first be preheated to 180-300 DEG C;
(4) blank after bending three times is put under 800t forcing presses and carries out final finishing, wherein mold temperature is preferred It is preheated to 180-300 DEG C.
So far, railway anticreeper manufacturing process terminates.The present invention is not related to subsequent heat treatment process.
(1) in the first bending impression, rectangular section blank is admitted to, and is become for the first time after completing forging and stamping for the first time and bending Press forging, first time press forging enter the second bending impression, are sent into new blank in the first bending impression at this time;
(2) in the second bending impression, the first time press forging in step (1) is completed second of forging and stamping and is become after bending Second of press forging, second of press forging enter third bending impression, are sent into new blank, the second folding in the first bending impression at this time First time press forging is sent into curved impression;
(3) in third bending impression, second of press forging in step (2) is completed third time forging and stamping and is become after bending Third time press forging completes third time forging and stamping with after bending, amounts to and complete a third time press forging, second of press forging With a first time press forging.
It should be pointed out that in manufacturing process, bending or forging and stamping three times are completed in same progressive die, about progressive die Tool, belongs to the technology of likewise known in the art, repeats no more.
Above-mentioned, although the foregoing specific embodiments of the present invention is described with reference to the accompanying drawings, not protects model to the present invention The limitation enclosed, those skilled in the art should understand that, based on the technical solutions of the present invention, those skilled in the art are not Need to make the creative labor the various modifications or changes that can be made still within protection scope of the present invention.

Claims (10)

1. a kind of railway anticreeper manufacturing process, it is characterised in that:The blank of malleable temperature is heated to by forging and stamping three times and folding Finishing, final molding are carried out after curved again.
2. railway anticreeper manufacturing process as described in claim 1, which is characterized in that complete first in the first bending impression Enter the second bending impression after secondary forging and stamping and bending, enters third after second of forging and stamping and bending are completed in the second bending impression Bending impression, three times bending are closely connected, and complete all bending steps..
3. railway anticreeper manufacturing process as described in claim 1, which is characterized in that include the following steps:
(1) plate is fabricated to blank with sawing machine;
(2) blank is heated by heating furnace, heating temperature section is 950-1200 DEG C, and heating time section is 0.5- 3min;
(3) blank that step (2) is heated to malleable temperature is transported to by transfer device in the 63t punching machines equipped with Bending Mould It carries out forging and stamping and bending, the forging and stamping is carried out at the same time with bending, carry out altogether three times;
(4) blank after bending three times is put under 800t forcing presses and carries out final finishing, wherein mold temperature needs pre- Heat, temperature range are 180-300 DEG C.
4. railway anticreeper manufacturing process as claimed in claim 1 or 2, which is characterized in that forge and press three times with bending same It is completed in progressive die.
5. railway anticreeper manufacturing process as claimed in claim 3, which is characterized in that in step (3), after first time bending First time press forging have at 6 be bent.
6. railway anticreeper manufacturing process as claimed in claim 3, which is characterized in that in step (3), after second of bending Second of press forging have at 7 be bent.
7. railway anticreeper manufacturing process as claimed in claim 3, which is characterized in that in step (3), after third time bending Third time press forging have at 8 be bent.
8. railway anticreeper manufacturing process as claimed in claim 3, which is characterized in that in step (3), mold temperature should be first Preheating, temperature range are 180-300 DEG C.
9. railway anticreeper manufacturing process as claimed in claim 2 or claim 3, which is characterized in that further include following steps:
(1) forging and stamping for the first time are completed in the first bending impression with after bending, first time press forging enters the second bending impression, this When the first bending impression in be sent into new blank;
(2) second of forging and stamping is completed in the second bending impression with after bending, second of press forging enters third bending impression, this When the first bending impression in be sent into new blank, first time press forging is sent into the second bending impression;
(3) in third bending impression complete third time forging and stamping with bending after, complete a third time press forging, one second Press forging and a first time press forging.
10. a kind of railway anticreeper, which is characterized in that including railway anticreeper system as described in any one of claims 1-9 Make the railway anticreeper of technique manufacture.
CN201810175018.3A 2018-03-02 2018-03-02 A kind of railway anticreeper manufacturing process Pending CN108500185A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810175018.3A CN108500185A (en) 2018-03-02 2018-03-02 A kind of railway anticreeper manufacturing process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810175018.3A CN108500185A (en) 2018-03-02 2018-03-02 A kind of railway anticreeper manufacturing process

Publications (1)

Publication Number Publication Date
CN108500185A true CN108500185A (en) 2018-09-07

Family

ID=63376182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810175018.3A Pending CN108500185A (en) 2018-03-02 2018-03-02 A kind of railway anticreeper manufacturing process

Country Status (1)

Country Link
CN (1) CN108500185A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB697571A (en) * 1950-10-17 1953-09-23 P & M Co England Ltd Improvements in rail anchors
US2771670A (en) * 1950-03-31 1956-11-27 Poor & Co Method for forming a rail anchor with a positive applying stop
US3290419A (en) * 1963-11-14 1966-12-06 Poor & Co Method of making rail anchor
CN2307812Y (en) * 1997-07-04 1999-02-17 济南铁路局科学技术研究所 Anti-creep apparatus made of spring steel
US20160130676A1 (en) * 2010-05-26 2016-05-12 Lewis Bolt & Nut Company Rail anchor

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2771670A (en) * 1950-03-31 1956-11-27 Poor & Co Method for forming a rail anchor with a positive applying stop
GB697571A (en) * 1950-10-17 1953-09-23 P & M Co England Ltd Improvements in rail anchors
US3290419A (en) * 1963-11-14 1966-12-06 Poor & Co Method of making rail anchor
CN2307812Y (en) * 1997-07-04 1999-02-17 济南铁路局科学技术研究所 Anti-creep apparatus made of spring steel
US20160130676A1 (en) * 2010-05-26 2016-05-12 Lewis Bolt & Nut Company Rail anchor

Similar Documents

Publication Publication Date Title
CN104550593B (en) Forging and pressing method of steel rail heel and three-position molding die used thereby
CN201768866U (en) AT steel rail heel end forging and pressing forming die
CN103121075B (en) Hot forging method for transmission shaft yoke with horizontal yoke part
CN111112467B (en) Non-drift-diameter rib pressing plate forming die and rib pressing curved plate machining method
CN108080547A (en) A kind of long-axis forging prefabricated blank method and device
CN104259376B (en) The paired hot-forging forming process of AT rail heel end die mould section
CN101134278A (en) Manufacturing method of the coupler yoke for railway wagon
CN105537487A (en) Manufacturing method for special-shaped fishplate and dies
CN108500185A (en) A kind of railway anticreeper manufacturing process
CN101579710A (en) Bending forming method of railway van coupler yoke forge piece
CN201997666U (en) Production line for forging and moulding three bearing ring blanks at a time
CN205464131U (en) Abnormal shape fish plate punches a hole to cut edge and smooths compound mould
CN102284672A (en) Production process method for rail spike
CN117696804A (en) A method for manufacturing ultra-wide and ultra-long molded plate forgings
CN203076507U (en) Universal joint one-mould three-station mould
CN107225150B (en) A kind of processing method of variable cross-section track connecting plate
CN107186149B (en) One-die two-piece forging die and method for drill pipe joint
CN1785550A (en) Forging method of soliding fork
CN207272071U (en) A kind of first mould two pieces forging mold of drilling rod connecting
CN203817264U (en) Modified novel steel rail heeling skewing forging die
CN113953433A (en) A universal special-shaped rail forging die and its application
CN107214283A (en) The H profile steel manufacture mould of nuclear fusion stack magnet support
CN109807281B (en) K3 brake beam end forging process
CN206445166U (en) A kind of track aftermarket product warm forging and shaping mold group
CN206882580U (en) Cover plate shaping die

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180907