CN108421623A - A kind of production line of nonmetallic ore green aggregate - Google Patents

A kind of production line of nonmetallic ore green aggregate Download PDF

Info

Publication number
CN108421623A
CN108421623A CN201810455183.4A CN201810455183A CN108421623A CN 108421623 A CN108421623 A CN 108421623A CN 201810455183 A CN201810455183 A CN 201810455183A CN 108421623 A CN108421623 A CN 108421623A
Authority
CN
China
Prior art keywords
crusher
discharge port
batcher
production line
screen banks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810455183.4A
Other languages
Chinese (zh)
Inventor
黄伟强
谯晓燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qiao Xiaoyan
Original Assignee
Deqin County Nine Town Dexin Stone Mine Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Deqin County Nine Town Dexin Stone Mine Co Ltd filed Critical Deqin County Nine Town Dexin Stone Mine Co Ltd
Priority to CN201810455183.4A priority Critical patent/CN108421623A/en
Publication of CN108421623A publication Critical patent/CN108421623A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C21/00Disintegrating plant with or without drying of the material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07BSEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, SIFTING OR BY USING GAS CURRENTS; SEPARATING BY OTHER DRY METHODS APPLICABLE TO BULK MATERIAL, e.g. LOOSE ARTICLES FIT TO BE HANDLED LIKE BULK MATERIAL
    • B07B1/00Sieving, screening, sifting, or sorting solid materials using networks, gratings, grids, or the like
    • B07B1/28Moving screens not otherwise provided for, e.g. swinging, reciprocating, rocking, tilting or wobbling screens
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07BSEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, SIFTING OR BY USING GAS CURRENTS; SEPARATING BY OTHER DRY METHODS APPLICABLE TO BULK MATERIAL, e.g. LOOSE ARTICLES FIT TO BE HANDLED LIKE BULK MATERIAL
    • B07B9/00Combinations of apparatus for screening or sifting or for separating solids from solids using gas currents; General arrangement of plant, e.g. flow sheets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B15/00Preventing escape of dirt or fumes from the area where they are produced; Collecting or removing dirt or fumes from that area
    • B08B15/04Preventing escape of dirt or fumes from the area where they are produced; Collecting or removing dirt or fumes from that area from a small area, e.g. a tool

Landscapes

  • Engineering & Computer Science (AREA)
  • Food Science & Technology (AREA)
  • Disintegrating Or Milling (AREA)
  • Crushing And Grinding (AREA)

Abstract

The present invention relates to mine mechanism technical fields, more particularly to a kind of production line of nonmetallic ore green aggregate, include the feed bin set gradually, jaw crusher, first building station, second building station and third story station, wherein first building station is crushed building stones by jaw crusher and collects soil by the first vibrating screen;After second building station is further crushed building stones by the second crusher, No. 2 aggregates, No. 3 aggregates and No. 4 aggregates are screened out using the second vibration screen banks;Third story station vibrates screen banks by third and screens out No. 5 aggregates, No. 6 aggregates and No. 7 aggregates, and building stones are crushed, are conveyed and are sieved automatically, reduces hand labor intensity, and the material that can be directed to aggregate is equipped with corresponding crusher, ensures the specification quality of aggregate.

Description

A kind of production line of nonmetallic ore green aggregate
Technical field
The present invention relates to mine mechanism technical field, more particularly to a kind of production line of nonmetallic ore green aggregate.
Background technology
Nonmetallic ore green aggregate is the bulk material that skeleton and filling effect are played in concrete and mortar, in nonmetallic ore In the production technology of green aggregate, first step process is exactly broken building stones, screening, in order to reach better packed density, aggregate Size specification have strict requirements, be commonly subdivided into several different brackets of 0-28mm;Currently, domestic surface mine life The technological process of producing line is:In building stones in-site installation jaw crusher, every jaw crusher is furnished with two staff, 2 people It not deactivating spades and send building stones toward jaw crusher, broken rear worker is directly sent to blender batch mixing with trolley, and building stones can not sieve, It can not ensure that technological requirement, the mode of production of such inefficiency obviously cannot be satisfied the social demand of high speed development.
Invention content
Used technical solution is to provide a kind of production of nonmetallic ore green aggregate to the present invention in order to solve the above problem Line, includes the feed bin set gradually, jaw crusher, first building station, second building station and third story station, wherein:Described first Building station includes the second batcher, the first vibrating screen, the first crusher and middle roll-over, the feed inlet and jaw of second batcher Formula crusher connects, and discharge port connects the first crusher, and the discharge port of the first crusher is connected to middle roll-over, the second batcher It is connected to the first vibrating screen at bottom discharging, the thin discharge port of first vibrating screen is connected to No. 1 clay bin, and thick discharge port connects It is connected to middle roll-over;Second building station includes third batcher, the second crusher and the second vibration screen banks, the third feed Machine is connect with middle roll-over, and the second crusher and the second vibrating screen group are connect with third batcher respectively, the discharging of the second crusher Mouth is connected to the second vibration screen banks, and the thin discharge port of the second vibration screen banks is respectively connected to No. 2 aggregate bins, No. 3 aggregate bins and No. 4 Aggregate bin;The third story station includes the impact crusher being connect respectively with the thick discharge port of the second vibration screen banks and third Screen banks is vibrated, the discharge port of the impact crusher is connect with third vibration screen banks, the thin discharging of the third vibration screen banks Mouth is respectively connected to No. 5 aggregate bins, No. 6 aggregate bins and No. 7 aggregate bins, thick discharge port and is connected to the second crusher.
As being further improved for said program, the second vibration screen banks and third vibration screen banks are equipped with three layers of vibration Sieve, the specification of vibrating screen are successively decreased successively from top to bottom.
As being further improved for said program, the second vibration screen banks and third vibration screen banks include different sieves Three vibrating screens of divider lattice, three vibrating screens are sequentially connected from childhood and greatly by specification.
Further include having the first feed being arranged between feed bin and jaw crusher as being further improved for said program Machine is connect with the second batcher at the bottom discharging of first batcher.
As being further improved for said program, first crusher and/or the second crusher are spring cone crusher Machine.
As being further improved for said program, the thin discharge port of the second vibration screen banks is additionally coupled to impact type and is crushed Machine.
As being further improved for said program, the discharge port of second batcher is additionally coupled to middle roll-over, and second gives The first slide valve is provided between material machine and the first crusher.
As being further improved for said program, the thin discharge outlet of the second vibration screen banks is provided with the second flashboard Valve.
Further include having dust pelletizing system as being further improved for said program.
As being further improved for said program, the dust pelletizing system includes the first dust pelletizing system and the second dedusting system System, first dust pelletizing system are separately connected jaw crusher, the first crusher and the first vibrating screen;Second dust pelletizing system It is separately connected the second vibration screen banks and the second crusher.
The beneficial effects of the invention are as follows:
The present invention is processed transport to building stones successively using sequentially connected first building station, second building station, third story station, Wherein first building station is crushed building stones by jaw crusher and collects soil by the first vibrating screen;Second building station is broken by second After broken machine is further crushed building stones, No. 2 aggregates, No. 3 aggregates and No. 4 aggregates are screened out using the second vibration screen banks;Third story It stands and No. 5 aggregates, No. 6 aggregates and No. 7 aggregates is screened out by third vibration screen banks, building stones are crushed, are conveyed and are sieved automatically Point, hand labor intensity is reduced, and the material that can be directed to aggregate is equipped with corresponding crusher, ensures the specification quality of aggregate.
Description of the drawings
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is the process flow chart of the production line of nonmetallic ore green aggregate of the present invention;
Fig. 2 is the structural schematic diagram of the production line of nonmetallic ore green aggregate of the present invention.
Specific implementation mode
Presently in connection with attached drawing and preferred embodiment, the present invention will be further described in detail.
The production line of kind nonmetallic ore green aggregate as shown in Figures 1 and 2, includes the feed bin 4 set gradually, jaw The station 2 of 1, second building, station of 5, first building, crusher and third story station 3, wherein first building station 1 includes the second batcher 12, first Vibrating screen 11, the first crusher 13 and middle roll-over 14, the feed inlet of the second batcher 12 are connect with jaw crusher 5, discharge port Connect the first crusher 13, the discharge port of the first crusher 13 is connected to middle roll-over 14, at the bottom discharging of the second batcher 12 It is connected to the first vibrating screen 11, the thin discharge port of the first vibrating screen 11 is connected to No. 1 clay bin, and thick discharge port is connected to middle roll-over 14;The building stones being stored in feed bin 4 can manually carry or mechanical handing by way of be delivered in jaw crusher 5, The mode of middle mechanical handing may include having vehicle transport or conveyer belt transport or batcher feeding etc., the building stones of bulk to pass through jaw Formula crusher 5 carry out it is broken after middle roll-over 14 is transported to by the second batcher 12, at the bottom discharging of the second batcher 12 with First vibrating screen 11 is connected to, and the building stones fallen when the second batcher 12 is transported screen out No. 1 soil, the first vibrating screen 11 it is thick Discharge port is connected to middle roll-over 14, reduces the waste material that building stones are generated in transport, promotes coefficient of mining;
Second building station 2 includes third batcher 21, the second crusher 22 and second vibration screen banks 23, third batcher 21 It is connect with middle roll-over 14, the second crusher 22 and second vibration screen banks 23 is connect with third batcher 21 respectively, the second crusher 22 discharge port is connected to the second vibration screen banks 23, and the thin discharge port of the second vibration screen banks 23 is respectively connected to No. 2 aggregate bins 4,3 Number aggregate bin 4 and No. 4 aggregate bins 4;The building stones being stored in middle roll-over 14 are delivered to the second crusher 22 by third batcher 21 In be crushed, at the bottom of third batcher 21 discharge material and the discharge port of the second crusher 22 respectively with the second vibration screen banks 23 connections screen out No. 2 aggregates, No. 3 aggregates and No. 4 aggregates by the second vibration screen banks 23, and the second vibration screen banks 23 slightly goes out Material mouth is connected to third story station 3;
Third story station 3 include respectively with the impact crusher 31 that connect of thick discharge port of the second vibration screen banks 23 and the The discharge port of three vibration screen banks 32, impact crusher 31 is connect with third vibration screen banks 32, and third vibrates carefully going out for screen banks 32 Material mouth is respectively connected to 4, No. 6 aggregate bins 4 of No. 5 aggregate bins and No. 7 aggregate bins 4, thick discharge port are connected to the second crusher 22;The The thick discharge port of two vibration screen banks 23 is connected to impact crusher 31, is fed for impact crusher 31, impact crusher 31 by building stones it is broken after be delivered to third and vibrate screen banks 32, third vibration screen banks 32 screens out No. 5 aggregates, No. 6 aggregates and No. 7 bones The thick discharge port of material, third vibration screen banks 32 is connected to the second crusher 22, by the building stones not sifted out again crushing and screening.
As being further improved for said program, the second vibration screen banks 23 and third vibration screen banks 32 are equipped with three layers of vibration Sieve, the specification of vibrating screen are successively decreased successively from top to bottom, and specifically, the second vibration screen banks 23 and third vibrate the non-multilayer of screen banks 32 Sieve structure, the present embodiment are preferably four layers of sieve, and the screening specification of wherein screen layers is successively decreased from top to bottom, that is to say, that top layer's sieve connects Thick discharge port is connect, the big building stones of specification are discharged from thick discharge port, each layer sieve down is separately connected aggregate bin, by different size Aggregate screen out successively.
As being further improved for said program, the second vibration screen banks 23 and third vibration screen banks 32 include not With three vibrating screens of screening specification, three vibrating screens are sequentially connected from childhood and greatly by specification, the second vibration in the present embodiment Screen banks 23, building stones first pass through the vibrating screen of minimum gauge, and the small aggregate screening of specification is gone out, and secondly pass through the vibration of intermediate specification Sieve, then maximum specification vibrating screen, last unsized oversize rock material is delivered to from the thick discharge port of the vibrating screen of maximum specification In impact crusher 31, it should be noted that third vibrates the thick discharge port connection of the vibrating screen of the maximum specification of screen banks 32 To the second crusher 22.
As being further improved for said program, further include have be arranged between feed bin 4 and jaw crusher 5 first to Material machine 6 is connect with the second batcher 12 at the bottom discharging of first batcher 6, and oversize rock material is delivered to by the first batcher 6 It is crushed in jaw crusher 5, tiny building stones can be collected at the bottom discharging of the first batcher 6, and tiny building stones are defeated It send to the second batcher 12, saves production materials in this way, promote the utilization rate of building stones, be conducive to economize on resources.
As being further improved for said program, the first crusher 13 and/or the second crusher 22 can be spring circular cones Crusher, when spring cone crusher works, motor drives the great circle of eccentric bushing bottom by fluid-flywheel clutch, small conical gear Bevel gear makes eccentric bushing rotate, and causes cone to make swing and moves and broken material, with high-power, large reduction ratio, high production rate Effect, higher production capacity and better quality can be obtained, in the present embodiment, the first crusher 13 is broken using spring circular cone Broken machine can in Fast Filling roll-over 14 storing, so that first building station 1 is obtained higher production capacity, ensure enough to second building station 2 Feed;Second crusher 22 is building stones being crushed completely using the purpose of spring cone crusher, makes the second vibration screen banks 23 More chargings are obtained, the production capacity at second building station 2 is promoted.
As being further improved for said program, the thin discharge port of the second vibration screen banks 23 is additionally coupled to impact crusher 31, block valve is arranged in the thin discharge outlet of the second vibration screen banks 23, and block valve can be the second slide valve 24, specifically, second Slide valve 24 is separately positioned on access between the second vibration screen banks 23 and 4, No. 3 aggregate bins 4 of No. 2 aggregate bins and No. 4 aggregate bins 4 On three, can be by block valve respectively by No. 2 aggregates at second building station 2, No. 3 bones when third story station 3 needs big yield Material and No. 4 aggregates block, and are allowed to be crushed again in the impact crusher 31 for flowing into third story station 3, promote building stones The production capacity of quality and third story station 3.
As being further improved for said program, the discharge port of the second batcher 12 is additionally coupled to middle roll-over 14, and second gives The first slide valve 15 is provided between material machine 12 and the first crusher 13, specifically, in normal production, the second batcher 12 is given First crusher 13 is fed, and building stones, which are delivered to after the first crusher 13 is broken again in middle roll-over 14, waits for production stream in next step Journey, when building stones only need to be crushed by jaw crusher 5, it is broken that the first slide valve 15 can block the second batcher 12 and first Channel between broken machine 13 makes building stones flow directly into middle roll-over 14, improving production efficiency.
Further include having dust pelletizing system as being further improved for said program, dust pelletizing system includes the first dust pelletizing system 41 and second dust pelletizing system 42, dust pelletizing system common closed dust pelletizing system in the market may be used, refer to by ventilating fan, Dust laden air in confined space is sent to the mine dust protection device that deduster purifies through air duct, closed dust pelletizing system is by close Close the compositions such as cover, dust discharge air duct, dedusting and ventilating fan.First dust pelletizing system 41 is separately connected jaw crusher 5, the first crusher 13 and first vibrating screen 11;Second dust pelletizing system 42 is separately connected the second vibration screen banks 23 and the second crusher 22, and purpose exists In the production environment of purification production line, the dust pollution of production line is reduced, the industry theory of Green Mine is met.
More than, only presently preferred embodiments of the present invention, the invention is not limited in the above embodiments, as long as its with Identical means reach the technique effect of the present invention, should all belong to the scope of protection of the present invention.

Claims (10)

1. a kind of production line of nonmetallic ore green aggregate, which is characterized in that include that the feed bin (4) set gradually, jaw are broken Broken machine (5), first building station (1), second building station (2) and third story station (3), wherein:
First building station (1) includes the second batcher (12), the first vibrating screen (11), the first crusher (13) and middle roll-over (14), the feed inlet of second batcher (12) is connect with jaw crusher (5), and discharge port connects the first crusher (13), The discharge port of first crusher (13) is connected to middle roll-over (14), at the bottom discharging of the second batcher (12) with the first vibrating screen (11) it is connected to, the thin discharge port of first vibrating screen (11) is connected to No. 1 clay bin, and thick discharge port is connected to middle roll-over (14);
Second building station (2) include third batcher (21), the second crusher (22) and second vibration screen banks (23), it is described Third batcher (21) is connect with middle roll-over (14), and the second crusher (22) and the second vibration screen banks (23) are fed with third respectively Machine (21) connects, and the discharge port of the second crusher (22) is connected to the second vibration screen banks (23), and second vibrates the thin of screen banks (23) Discharge port is respectively connected to No. 2 aggregate bins, No. 3 aggregate bins and No. 4 aggregate bins;
The third story station (3) includes the impact crusher being connect respectively with the thick discharge port of the second vibration screen banks (23) (31) and third vibration screen banks (32), the discharge port of the impact crusher (31) are connect with third vibration screen banks (32), institute The thin discharge port for stating third vibration screen banks (32) is respectively connected to No. 5 aggregate bins, No. 6 aggregate bins and No. 7 aggregate bins, thick discharge port It is connected to the second crusher (22).
2. a kind of production line of nonmetallic ore green aggregate according to claim 1, which is characterized in that second vibration Screen banks (23) and third vibration screen banks (32) are equipped with three-deck vibrating screen, and the specification of vibrating screen is successively decreased successively from top to bottom.
3. a kind of production line of nonmetallic ore green aggregate according to claim 1, which is characterized in that second vibration Screen banks (23) and third vibration screen banks (32) include three vibrating screens of different screening specifications, and three vibrating screens press specification certainly It is small and be sequentially connected greatly.
4. a kind of production line of nonmetallic ore green aggregate according to claim 1, which is characterized in that further include having setting The first batcher (6) between feed bin (4) and jaw crusher (5), with the at the bottom discharging of first batcher (6) Two batchers (12) connect.
5. a kind of production line of nonmetallic ore green aggregate according to any one of claims 1 to 4, which is characterized in that institute It is spring cone crusher to state the first crusher (13) and/or the second crusher (22).
6. a kind of production line of nonmetallic ore green aggregate according to claim 2 or 3, which is characterized in that described second The thin discharge port of vibration screen banks (23) is additionally coupled to impact crusher (31).
7. a kind of production line of nonmetallic ore green aggregate according to claim 1 or 4, which is characterized in that described second The discharge port of batcher (12) is additionally coupled to middle roll-over (14), is provided between the second batcher (12) and the first crusher (13) First slide valve (15).
8. a kind of production line of nonmetallic ore green aggregate according to claim 6, which is characterized in that second vibration The thin discharge outlet of screen banks (23) is provided with the second slide valve (24).
9. a kind of production line of nonmetallic ore green aggregate according to any one of claims 1 to 4, which is characterized in that also It include dust pelletizing system.
10. a kind of production line of nonmetallic ore green aggregate according to claim 9, which is characterized in that the dedusting system System includes the first dust pelletizing system (41) and the second dust pelletizing system (42), and it is broken that first dust pelletizing system (41) is separately connected jaw Broken machine (5), the first crusher (13) and the first vibrating screen (11);Second dust pelletizing system (42) is separately connected the second vibrating screen Group (23) and the second crusher (22).
CN201810455183.4A 2018-05-14 2018-05-14 A kind of production line of nonmetallic ore green aggregate Pending CN108421623A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810455183.4A CN108421623A (en) 2018-05-14 2018-05-14 A kind of production line of nonmetallic ore green aggregate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810455183.4A CN108421623A (en) 2018-05-14 2018-05-14 A kind of production line of nonmetallic ore green aggregate

Publications (1)

Publication Number Publication Date
CN108421623A true CN108421623A (en) 2018-08-21

Family

ID=63162869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810455183.4A Pending CN108421623A (en) 2018-05-14 2018-05-14 A kind of production line of nonmetallic ore green aggregate

Country Status (1)

Country Link
CN (1) CN108421623A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108940540A (en) * 2018-09-27 2018-12-07 华北理工大学 A method of using impact grinding quick obtaining ore

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105195288A (en) * 2014-06-19 2015-12-30 中联重科股份有限公司 Building standing type gravel production system and gravel production method
CN107153410A (en) * 2017-07-12 2017-09-12 上海云统创申智能科技有限公司 A kind of intelligent sandstone aggregate production line
CN107377170A (en) * 2017-09-01 2017-11-24 中国水利水电第十六工程局有限公司 Materials of man-made sand production system
CN207025526U (en) * 2017-07-19 2018-02-23 大连地拓环境科技有限公司 A kind of barren rock Machine-made Sand production system
CN208742775U (en) * 2018-05-14 2019-04-16 德庆县九市镇德鑫石矿有限公司 A kind of production line of nonmetallic ore green aggregate

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105195288A (en) * 2014-06-19 2015-12-30 中联重科股份有限公司 Building standing type gravel production system and gravel production method
CN107153410A (en) * 2017-07-12 2017-09-12 上海云统创申智能科技有限公司 A kind of intelligent sandstone aggregate production line
CN207025526U (en) * 2017-07-19 2018-02-23 大连地拓环境科技有限公司 A kind of barren rock Machine-made Sand production system
CN107377170A (en) * 2017-09-01 2017-11-24 中国水利水电第十六工程局有限公司 Materials of man-made sand production system
CN208742775U (en) * 2018-05-14 2019-04-16 德庆县九市镇德鑫石矿有限公司 A kind of production line of nonmetallic ore green aggregate

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郭立华: "沥青拌和厂生产与管理", 华文出版社, pages: 72 - 75 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108940540A (en) * 2018-09-27 2018-12-07 华北理工大学 A method of using impact grinding quick obtaining ore

Similar Documents

Publication Publication Date Title
CN101549351B (en) Building refuse treatment regeneration system
CN203253517U (en) Sand production system
CN201511034U (en) Construction waste treatment recycling system
CN202621464U (en) Airflow and vibration combination dry sand grading screening system in dry-mixed mortar production line
CN208275561U (en) Half tower type sand production line
CN104384004A (en) Production system and method for machine-made sand
CN105728157B (en) Environment-friendlymodular modular high-quality sandstone work station and its control method
CN105195288A (en) Building standing type gravel production system and gravel production method
CN209317818U (en) A kind of efficient coal picker
CN208661394U (en) A kind of sand device processed
CN108816483A (en) A kind of Machine-made Sand production system
CN108722639A (en) machine-made sand production system
CN109985715A (en) A kind of lime stone system of processing
CN106607170B (en) Aggregate-cement co-production equipment
CN205550503U (en) High -quality grit workstation of environment -friendly modularization
CN215087403U (en) Aggregate crushing and screening production line
CN208742775U (en) A kind of production line of nonmetallic ore green aggregate
CN111940117B (en) A high-efficiency sand making building including a closed-circuit wind screening system
CN108031541B (en) Perlite ore sand semi-wet production line and production process thereof
CN210171639U (en) Dry powder machine system sand apparatus for producing
CN108421623A (en) A kind of production line of nonmetallic ore green aggregate
CN107597376A (en) Machine-made Sand production technology and the production system for implementing the production technology
CN105562188B (en) A kind of kiln tail haydite caking material processing system
CN107096632A (en) Using the building formula sand system of horizontal ellipse screening
CN207954271U (en) A kind of sand production system processed

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190808

Address after: 519000 Zhuhai Public Credit Accounting Firm, 257 Building 102, Huwanli, Xiangzhou District, Zhuhai City, Guangdong Province

Applicant after: Qiao Xiaoyan

Address before: 526639 Bantangkeng, Jiushi Town, Zhaoqing City, Guangdong Province

Applicant before: DEQING JIUSHI DEXIN STONE MINE Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180821