CN108331161A - A kind of new steel structure holder - Google Patents
A kind of new steel structure holder Download PDFInfo
- Publication number
- CN108331161A CN108331161A CN201810121073.4A CN201810121073A CN108331161A CN 108331161 A CN108331161 A CN 108331161A CN 201810121073 A CN201810121073 A CN 201810121073A CN 108331161 A CN108331161 A CN 108331161A
- Authority
- CN
- China
- Prior art keywords
- steel structure
- new steel
- structure holder
- rack body
- connecting seat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 32
- 239000010959 steel Substances 0.000 title claims abstract description 32
- 230000007246 mechanism Effects 0.000 claims abstract description 10
- 238000000034 method Methods 0.000 claims description 9
- 230000008569 process Effects 0.000 claims description 9
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 3
- 230000005611 electricity Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 3
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 210000003739 neck Anatomy 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2463—Connections to foundations
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a kind of new steel structure holder, including rack body, multiple adjustment bases and the controller that is arranged on rack body side in rack body bottom are set;Each adjustment base includes connecting seat, support base and the telescoping mechanism being arranged between connecting seat and support base, which includes three electric pushrods for being arranged in parallel and being electrically connected with the controller.Structure of the invention connection and reasonable arrangement disclosure satisfy that the use demand under different places, the especially place of ground out-of-flatness, and using simplicity, flattening effect is good.
Description
Technical field
The present invention relates to Steel structure equipment fields, more particularly to a kind of new steel structure holder.
Background technology
Steel construction is mainly made of steel material, is one of main building structure equipment.General steel construction is main
The components such as the girder steel made of shaped steel and steel plate etc., steel column, steelframe form, generally use weld seam between each component or component,
Bolt or rivet interlacement.
Since steel construction dead weight is lighter, and easy construction, therefore it is widely used in the necks such as large-sized workshop, venue, Super High
Domain.And steel structure base is the equipment for load steel structure, common steel construction be typically due to pedestal there are security performances it is low,
The disadvantage of stability difference causes it to cannot be satisfied the use demand of different scenes, such as in the place of ground out-of-flatness, Zhi Nengtong
It crosses below steel structure base and pads upper object to ensure the steady secured but so not only time-consuming and laborious of steel construction, but also
Flattening effect is also bad.
Invention content
Based on this, it is an object of the invention to overcome the deficiencies of the prior art and provide a kind of new steel structure holder, knots
Structure connection and reasonable arrangement disclosure satisfy that the use demand under different places, the especially place of ground out-of-flatness, and use letter
Just, flattening effect is good.
To achieve the goals above, the technical solution adopted by the present invention is:
A kind of new steel structure holder, including rack body, be arranged rack body bottom multiple adjustment bases and
Controller on rack body side is set;Each adjustment base includes connecting seat, support base and is arranged in connecting seat
Telescoping mechanism between support base, the telescoping mechanism include three electric pushrods for being arranged in parallel and being electrically connected with the controller.
New steel structure holder of the present invention can by the way that the adjustment base in rack body bottom is arranged as a result,
Its height is adjusted according to different situations, so that rack body is more steady secured, meeting makes under different places
It with demand, and is operated by controller, uses simplicity.
In order to achieve better technical results, further technical improvements include between the connecting seat and support base
The space of formation is filled with high intensity buffer layer.
In order to achieve better technical results, further technical improvements include the upper surface of the connecting seat is to incline
Inclined-plane.
In order to achieve better technical results, further technical improvements include the controller includes human-computer exchange
Interface, control process unit and power supply, alternating interface between man and computer are connect with the input terminal of control process unit, control process unit
Output end respectively with telescoping mechanism, power electric connection.
In order to achieve better technical results, further technical improvements include the rack body includes parallel sets
Four pillars setting, the support plate for being covered in four pillar upper ends and the connecting rod being arranged between four pillars.
In order to achieve better technical results, further technical improvements include four support columns and connecting rods
Between by being welded and fixed.
In order to achieve better technical results, further technical improvements include four pillars are cylinder branch
Column.
Description of the drawings
Fig. 1 is the structural schematic diagram of the new steel structure holder of the present invention;
Fig. 2 is the structural schematic diagram of the adjustment base of the present invention.
Specific implementation mode
To further illustrate that each embodiment, the present invention are provided with attached drawing.These attached drawings are that the invention discloses one of content
Point, mainly to illustrate embodiment, and the associated description of specification can be coordinated to explain the operation principles of embodiment.Cooperation ginseng
These contents are examined, those skilled in the art will be understood that other may obtain embodiment and advantages of the present invention.
Referring to Fig. 1, it is the structural schematic diagram of the new steel structure building platform device for high-altitude operation of the present invention.
A kind of new steel structure holder, including rack body 10, multiple adjustment bases in 10 bottom of rack body are set
20 and the controller 30 that is arranged on 10 side of rack body;Each adjustment base 20 include connecting seat 21, support base 22,
And the telescoping mechanism 23 being arranged between connecting seat 21 and support base 22, the telescoping mechanism 23 be arranged in parallel including three and with
The electric pushrod that controller 30 is electrically connected.
Specifically, the rack body 10 includes four pillars 11 disposed in parallel, is covered in four 11 upper ends of pillar
Support plate 12 and the connecting rod 13 being arranged between four pillars 11.Wherein, four support columns 11 and connecting rod 13 it
Between by being welded and fixed.In addition, as a kind of more preferably technical solution, four pillars 11 are cylinder pillar body.
As shown in Fig. 2, the space formed between the connecting seat 21 and support base 22 is filled with high intensity buffer layer 24.And
And the upper surface of the connecting seat 21 is inclined surface.
In addition, the controller 30 include alternating interface between man and computer, control process unit and power supply, alternating interface between man and computer with
The input terminal of control process unit connects, the output end of control process unit respectively with telescoping mechanism 23, power electric connection.
The operation principle of the present invention described further below:
After rack body 10 is placed in the position for needing work, according to the flatness on ground come operation and control device 30, from
And the dilatability of each adjustment base 20 is adjusted, finally so that rack body 10 reaches steady firm state.
Compared with prior art, new steel structure holder of the present invention, by the way that the tune in rack body bottom is arranged
Pedestal is saved, its height can be adjusted according to different situations, so that rack body is more steady secured, meets difference
Use demand under place, and operated by controller, use simplicity.
Several embodiments of the invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art
It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention
Range.
Claims (7)
1. a kind of new steel structure holder, it is characterised in that:Including rack body, multiple adjustings in rack body bottom are set
Pedestal and the controller being arranged on rack body side;Each adjustment base includes connecting seat, support base and setting
Telescoping mechanism between connecting seat and support base, the telescoping mechanism include three electricity for being arranged in parallel and being electrically connected with the controller
Dynamic push rod.
2. new steel structure holder according to claim 1, it is characterised in that:It is formed between the connecting seat and support base
Space be filled with high intensity buffer layer.
3. new steel structure holder according to claim 2, it is characterised in that:The upper surface of the connecting seat is to tilt
Face.
4. new steel structure holder according to claim 3, it is characterised in that:The controller includes human-computer exchange circle
Face, control process unit and power supply, alternating interface between man and computer are connect with the input terminal of control process unit, control process unit
Output end respectively with telescoping mechanism, power electric connection.
5. new steel structure holder according to any one of claims 1 to 4, it is characterised in that:The rack body includes
Four pillars disposed in parallel, the support plate for being covered in four pillar upper ends and the connecting rod being arranged between four pillars.
6. new steel structure holder according to claim 5, it is characterised in that:Described four between support column and connecting rod
By being welded and fixed.
7. new steel structure holder according to claim 6, it is characterised in that:Four pillars are cylinder pillar body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810121073.4A CN108331161A (en) | 2018-02-07 | 2018-02-07 | A kind of new steel structure holder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810121073.4A CN108331161A (en) | 2018-02-07 | 2018-02-07 | A kind of new steel structure holder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108331161A true CN108331161A (en) | 2018-07-27 |
Family
ID=62927120
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810121073.4A Pending CN108331161A (en) | 2018-02-07 | 2018-02-07 | A kind of new steel structure holder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108331161A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH674867A5 (en) * | 1986-12-16 | 1990-07-31 | Wolfgang Baumann | Height adjustable platform trestle with vertical posts |
CN101208485A (en) * | 2005-07-15 | 2008-06-25 | 积水化学工业株式会社 | Junction joint |
CN202164808U (en) * | 2011-07-19 | 2012-03-14 | 山东新巨龙能源有限责任公司 | Adjustable pipe support type work platform |
CN204853379U (en) * | 2015-08-27 | 2015-12-09 | 中山市康盟照明科技有限公司 | A height-adjustable fixed support frame applied to lighting equipment |
CN105888221A (en) * | 2016-04-25 | 2016-08-24 | 文登蓝岛建筑工程有限公司 | Lifting operation platform of steel-structure wall |
CN206530030U (en) * | 2017-02-22 | 2017-09-29 | 贵州惠水人春钢结构工程有限公司 | Steel construction operation frame |
CN206667806U (en) * | 2017-03-01 | 2017-11-24 | 衢州市联橙环保科技有限公司 | A kind of building support |
-
2018
- 2018-02-07 CN CN201810121073.4A patent/CN108331161A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH674867A5 (en) * | 1986-12-16 | 1990-07-31 | Wolfgang Baumann | Height adjustable platform trestle with vertical posts |
CN101208485A (en) * | 2005-07-15 | 2008-06-25 | 积水化学工业株式会社 | Junction joint |
CN202164808U (en) * | 2011-07-19 | 2012-03-14 | 山东新巨龙能源有限责任公司 | Adjustable pipe support type work platform |
CN204853379U (en) * | 2015-08-27 | 2015-12-09 | 中山市康盟照明科技有限公司 | A height-adjustable fixed support frame applied to lighting equipment |
CN105888221A (en) * | 2016-04-25 | 2016-08-24 | 文登蓝岛建筑工程有限公司 | Lifting operation platform of steel-structure wall |
CN206530030U (en) * | 2017-02-22 | 2017-09-29 | 贵州惠水人春钢结构工程有限公司 | Steel construction operation frame |
CN206667806U (en) * | 2017-03-01 | 2017-11-24 | 衢州市联橙环保科技有限公司 | A kind of building support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208202597U (en) | Support jig is used in the installation of large span belfast truss | |
CN203845689U (en) | Indoor assembled large-scale equipment hoisting device | |
CN109555313A (en) | A kind of adjustable gib truss for assembled floor | |
CN108331161A (en) | A kind of new steel structure holder | |
CN106836773A (en) | The support meanss and construction method of a kind of builder's jack | |
CN107939059A (en) | A kind of installation method of aluminum veneer wallboard | |
CN207749839U (en) | Detachable five-leg supporting jig frame | |
CN106368322B (en) | A kind of installation method for the bi-directional symmetrical inclination steel column between super high-rise building conversion layer | |
CN206616470U (en) | A kind of highway bridge support meanss | |
CN106641461A (en) | Bracket provided with three petroleum pipelines capable of being laid thereon | |
CN206467579U (en) | A kind of support meanss of bridge coping | |
CN206784591U (en) | A kind of steel construction box column | |
CN205531441U (en) | Tooling jig frame | |
CN108149798A (en) | A kind of new steel structure device | |
CN201052950Y (en) | Crane | |
CN103362315A (en) | Hanger for integral hoisting of pipeline and construction method thereof | |
CN209742221U (en) | An easy-to-install high-strength box column | |
CN114923698A (en) | Equivalent load for large system load test verification | |
CN204057695U (en) | A kind of gantry crane's supporting legs | |
CN107695961A (en) | A kind of integrated form adjusting detection platform of side wall skeleton | |
CN202384693U (en) | Multifunctional member formed on-pole live-line operation platform | |
CN204694464U (en) | A kind of supporting frame loaded for slow test | |
CN206952814U (en) | A kind of tail boom frock | |
CN207296179U (en) | A kind of c-type support column of steel building | |
CN206888189U (en) | A kind of structure of new bracing members |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180727 |