[go: up one dir, main page]

CN108277997A - Modular assembly formula elevator-integrated system of balcony with complementary antidetonation/vibration absorption unit - Google Patents

Modular assembly formula elevator-integrated system of balcony with complementary antidetonation/vibration absorption unit Download PDF

Info

Publication number
CN108277997A
CN108277997A CN201810163384.7A CN201810163384A CN108277997A CN 108277997 A CN108277997 A CN 108277997A CN 201810163384 A CN201810163384 A CN 201810163384A CN 108277997 A CN108277997 A CN 108277997A
Authority
CN
China
Prior art keywords
modular
balcony
elevator
shock
integrated system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810163384.7A
Other languages
Chinese (zh)
Inventor
赵宪忠
贾良玖
黄兆祺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201810163384.7A priority Critical patent/CN108277997A/en
Publication of CN108277997A publication Critical patent/CN108277997A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266Enlarging
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/56Screw piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Mechanical Engineering (AREA)
  • Electrochemistry (AREA)
  • Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

本发明公开了一种具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体化集成体系。模块化阳台在工厂预制好后整体运输至现场;模块化阳台自下而上逐层堆叠安装,并采用钢管螺旋地桩作为基础。模块化阳台兼作外加电梯的承重结构,无需为电梯轿厢配备独立的电梯井。模块化装配式电梯—阳台一体化集成体系与原有结构通过抗震/减震连接元件相连。模块化装配式电梯—阳台一体化集成体系可以根据住户需求灵活选择布置在小区楼梯间一侧或楼梯间对侧,或两侧同时布置,住户可以乘坐电梯从新建模块化阳台直接进入家中。本发明不仅可以大大缩短施工周期和改造造价、最大程度减小施工改造为小区居民生活带来的干扰,还可以改善居民居住条件及改善现有住宅抗震性能。

The invention discloses a modular assembly elevator-balcony integrated system with an auxiliary anti-shock/shock-absorbing unit. The modular balconies are prefabricated in the factory and transported to the site as a whole; the modular balconies are stacked and installed layer by layer from bottom to top, and steel pipe spiral piles are used as the foundation. The modular balconies double as load-bearing structures for additional elevators, eliminating the need for a separate elevator shaft for the elevator cabs. The modular prefabricated elevator-balcony integrated system is connected to the original structure through anti-seismic/shock-absorbing connecting elements. The modular prefabricated elevator-balcony integrated system can be flexibly arranged on one side of the stairwell or on the opposite side of the stairwell, or on both sides according to the needs of the residents. Residents can take the elevator to enter the home directly from the newly built modular balcony. The invention can not only greatly shorten the construction period and renovation cost, minimize the interference brought by the construction renovation to the life of residents in the community, but also improve the living conditions of the residents and the anti-seismic performance of existing houses.

Description

具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体 化集成体系Modular assembled elevator with auxiliary anti-vibration/vibration-absorbing unit-balcony integrated integrated system

技术领域technical field

本发明属于原有建筑物修理技术领域,涉及一种用于在老小区外侧加装的具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体化集成体系。The invention belongs to the technical field of original building repairs, and relates to a modular assembly elevator-balcony integrated system with auxiliary anti-shock/shock-absorbing units installed on the outside of an old residential area.

背景技术Background technique

我国大量建设于上世纪的低、多层砖混住宅结构没有加装电梯。目前,随着我国人口老龄化进程加快、东部沿海经济发达地区已经提前进入老龄化社会,老小区缺乏电梯已经成为严重影响老年人生活的巨大不便,同时也给二胎社会当下的年轻人全家出行带来了很大的不便,相关问题已经严重影响到老年人乃至全社会的幸福指数,成为影响老年人和有婴儿家庭的生活品质的一项重大问题。A large number of low and multi-story brick-concrete residential structures built in the last century in my country did not install elevators. At present, as my country's population aging process is accelerating and the economically developed eastern coastal areas have entered the aging society ahead of schedule, the lack of elevators in old communities has become a huge inconvenience that seriously affects the lives of the elderly. It has brought great inconvenience, and related problems have seriously affected the happiness index of the elderly and even the whole society, and become a major issue affecting the quality of life of the elderly and families with babies.

目前,为老小区住宅加装电梯的成功案例极少。一方面,现阶段为老小区加装电梯没有考虑采用模块化建筑作为基本要素、没有采用预制装配的施工方式,使得现场工程量大、施工方案复杂、施工耗时长。当前不采用模块化建筑为基本要素的外加电梯改造方案,需要在已建成老小区周围额外搭建大量脚手架用于高大电梯井框架的安装;由于难以找到原有结构的定位轴线,现场为电梯井框架准确测量、定位放线的难度也极大提升。正因如此,目前为老小区加装电梯的改造工程不仅施工复杂,而且现场施工周期长、对小区居民生活带来极大的不便。另一方面,目前在考虑加装电梯的同时没有充分考虑利用加建的电梯结构为原有结构的其它功能做进一步改善。首先,老小区砖混结构住宅由于建设年代较早,抗震能力普遍低于本地区的设防烈度;其次,加装电梯的同时可以考虑为老旧小区住宅配套加装阳台,在利用加建阳台简化加建电梯施工难度的同时改善居民的居住品质。At present, there are very few successful cases of installing elevators in old residential quarters. On the one hand, at this stage, the installation of elevators in the old community does not consider the use of modular buildings as the basic elements, and does not adopt the construction method of prefabrication and assembly, which leads to a large amount of on-site engineering, complex construction plans, and long construction time. At present, the retrofit scheme of adding elevators without modular buildings as the basic elements requires a large number of additional scaffoldings to be built around the old residential areas for the installation of tall elevator shaft frames; as it is difficult to find the positioning axis of the original structure, the site is an elevator shaft frame The difficulty of accurate measurement, positioning and setting out has also been greatly improved. Because of this, the current renovation project of adding elevators to the old community is not only complicated in construction, but also has a long on-site construction period, which brings great inconvenience to the lives of residents in the community. On the other hand, do not fully consider utilizing the added elevator structure to further improve other functions of the original structure while considering adding an elevator at present. First of all, due to the early construction of brick-concrete structures in the old community, the seismic capacity is generally lower than the fortification intensity of the area; secondly, while installing elevators, it is also possible to consider adding balconies to the old residential buildings. Improve the living quality of residents while increasing the construction difficulty of elevators.

为了克服上述问题,本发明提出一种以模块化阳台为基本要素、大大简化加建电梯施工难度、将加建电梯施工周期缩短到两至三天的模块化装配式电梯—阳台一体化集成体系,实现缩短电梯施工周期、降低改造难度、改善居民通行条件的目标;同时通过在模块化阳台与原有结构之间设置高性能连接元件将二者可靠连接,可以显著提升老旧小区住宅对地震灾害的抵御能力。In order to overcome the above-mentioned problems, the present invention proposes a modular assembly elevator-balcony integrated system that uses modular balconies as the basic elements, greatly simplifies the construction difficulty of adding elevators, and shortens the construction period of adding elevators to two to three days , to achieve the goal of shortening the elevator construction period, reducing the difficulty of renovation, and improving the traffic conditions of residents; at the same time, by setting high-performance connecting elements between the modular balcony and the original structure to connect the two reliably, it can significantly improve the earthquake resistance of old residential buildings. disaster resilience.

发明内容Contents of the invention

本发明为了解决老小区外加电梯施工时间久、安装电梯对小区居民生活影响大的问题,并为了同时改善老旧小区住房的抗震性能及居住舒适性,提供了一种具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体化集成体系。In order to solve the problem that the construction time of the elevator in the old community is long and the installation of the elevator has a great impact on the life of the residents in the community, and in order to improve the anti-seismic performance and living comfort of the houses in the old community, the present invention provides an auxiliary anti-seismic/shock-absorbing The unit's modular assembly elevator-balcony integrated system.

本发明采用的技术方案为:一种具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体化集成体系,包括模块化阳台、钢管螺旋地桩、电梯轿厢,高性能抗震/减震连接元件,其中:The technical solution adopted in the present invention is: a modular assembled elevator-balcony integrated system with auxiliary anti-seismic/shock-absorbing unit, including modular balcony, steel pipe spiral ground pile, elevator car, high-performance anti-seismic/shock-absorbing Shock connection elements, of which:

所述模块化阳台位于电梯两侧,同一楼层每户居民均拥有一个模块化阳台,模块化阳台进深与电梯井进深相同;所述模块化阳台的高度与原有结构的层高相同,模块化阳台从底层开始、通过堆叠的方式逐层向上安装,直至原有结构顶层;The modular balcony is located on both sides of the elevator, and each household on the same floor has a modular balcony. The depth of the modular balcony is the same as that of the elevator shaft; the height of the modular balcony is the same as that of the original structure. The balcony starts from the bottom layer and is installed layer by layer through stacking until it reaches the top layer of the original structure;

所述模块化阳台与原有结构之间通过高性能抗震/减震连接元件连接,高性能连接元件锚固于原有结构纵墙面内构造柱中;高性能连接元件可以沿原有结构高度方向每层设置,或可以根据需求隔层设置;The modular balcony is connected to the original structure through a high-performance anti-seismic/shock-absorbing connection element, and the high-performance connection element is anchored in the structural column in the longitudinal wall of the original structure; the high-performance connection element can be along the height direction of the original structure Each layer can be set, or can be set according to the needs of the compartment;

所述电梯轿厢安装于同层模块化阳台及连接两个模块化阳台的电梯井连梁之间。所述电梯轿厢在平行于原有结构横墙的方向分别在两侧各设置一个厢门,且两个厢门均可以开闭,并供居住在电梯左右两侧的住户乘坐电梯进入家中;The elevator car is installed between the modular balconies on the same floor and the elevator shaft connecting beams connecting the two modular balconies. The elevator car is provided with a door on both sides in the direction parallel to the original structural transverse wall, and both doors can be opened and closed, and the residents living on the left and right sides of the elevator can take the elevator to enter their homes;

所述钢管螺旋地桩的施工无需现场土方开挖作业,钢管螺旋地桩安装于最底层的模块化阳台的模块化阳台加强柱和模块化阳台框架非加强柱上方,仅需微型打桩机便可快速完成;压桩过程无明显挤土效应,对原有结构地基及基础无不利影响。The construction of the steel pipe spiral ground pile does not require on-site earthwork excavation operations, and the steel pipe spiral ground pile is installed above the modular balcony reinforced column and the modular balcony frame non-reinforced column of the lowest modular balcony, and only a miniature pile driver is needed. It is completed quickly; there is no obvious soil squeezing effect during the pile pressing process, and there is no adverse effect on the original structural foundation and foundation.

本发明中,所述模块化阳台为框架结构,由模块化阳台加强柱、模块化阳台框架非加强柱、模块化阳台栏杆、模块化阳台框架梁和模块化阳台扶手组成,模块化阳台框架梁、模块化阳台框架非加强柱和模块化阳台框架加强柱连接组成立方体框架结构,框架结构上设置模块化阳台栏杆和模块化阳台扶手;位于电梯两侧的模块化阳台加强柱之间通过电梯井连梁连接。In the present invention, the modular balcony is a frame structure, which is composed of modular balcony reinforced columns, modular balcony frame non-reinforced columns, modular balcony railings, modular balcony frame beams and modular balcony handrails, and the modular balcony frame beams , The non-reinforced columns of the modular balcony frame and the reinforced columns of the modular balcony frame are connected to form a cubic frame structure, and the modular balcony railings and modular balcony handrails are set on the frame structure; the modular balcony reinforced columns on both sides of the elevator pass through the elevator shaft Even beam connection.

本发明中,所述模块化阳台在靠近电梯一侧设有门,使得住户可从电梯下来后通过阳台上的门直接进入家中,所述门与电梯轿厢出入门对齐,门朝模块化阳台内侧开启。In the present invention, the modular balcony is provided with a door on the side close to the elevator, so that the resident can directly enter the home through the door on the balcony after getting off the elevator. The door is aligned with the door of the elevator car, and the door faces the modular balcony. Inside open.

本发明中,所述模块化阳台在沿原有结构高度方向堆叠安装完成后,靠近电梯井的模块化阳台框架柱尺寸比其它模块化阳台框架柱大,四根加大截面的模块化阳台框架柱通过额外的框架梁相连形成电梯的承重框架,电梯及相关设备无需额外的承重结构。In the present invention, after the modular balcony is stacked and installed along the original structural height direction, the size of the modular balcony frame column near the elevator shaft is larger than that of other modular balcony frame columns, and the four modular balcony frames with enlarged cross-section The columns are connected by additional frame beams to form the load-bearing frame of the elevator, and the elevator and related equipment do not need additional load-bearing structures.

本发明中,所述模块化阳台地面采用100 mm厚玻璃钢纤维混凝土板,也可以为其它形式的预制板;所述模块化阳台采用合理形式的轻质填充墙,在与原有结构纵墙平行方向的外侧设合理形式的窗户。In the present invention, the ground of the modular balcony adopts a 100 mm thick glass fiber reinforced concrete slab, which can also be other forms of prefabricated panels; Windows of reasonable form are provided on the outside of the direction.

本发明中,所述高性能抗震/减震连接元件可以是刚性的连接构件,或可以是各种耗能阻尼器,所述耗能阻尼器为金属阻尼器、粘滞阻尼器或摩擦阻尼器等中任一种。In the present invention, the high-performance anti-vibration/shock-absorbing connection element can be a rigid connection member, or can be various energy dissipation dampers, and the energy dissipation dampers are metal dampers, viscous dampers or friction dampers Either of these.

本发明中,所述阳台为模块化结构,在现场整体安装施工。该模块化阳台的主体结构及内部装饰在工厂预制、组装完成,无需现场制作;该模块化阳台可以整体运输至施工现场,并可以被整体吊装至指定位置。In the present invention, the balcony is a modular structure, which is integrally installed and constructed on site. The main structure and interior decoration of the modular balcony are prefabricated and assembled in the factory without on-site production; the modular balcony can be transported to the construction site as a whole and hoisted to the designated position as a whole.

本发明中,所述相邻两个模块化阳台之间通过螺栓连接节点可靠连接。In the present invention, the two adjacent modular balconies are reliably connected by bolt connection nodes.

本发明中,所述具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体化集成体系布置于原有结构间一侧,或布置于原有结构楼梯间对侧,或布置于原有结构两侧。In the present invention, the modular assembled elevator-balcony integrated system with auxiliary anti-seismic/shock-absorbing unit is arranged on one side of the original structure, or on the opposite side of the stairwell of the original structure, or on the original There are structures on both sides.

本发明中,所述模块化阳台关于电梯所在位置对称同步安装,电梯左右两侧的位于同一层的两个模块化阳台之间通过连梁连接。连梁可以沿结构高度方向每层设置,也可以根据需求按照一定间隔设置。In the present invention, the modular balconies are installed symmetrically and synchronously with respect to the location of the elevator, and the two modular balconies on the same floor on the left and right sides of the elevator are connected by connecting beams. Coupling beams can be set on each floor along the height direction of the structure, or can be set at certain intervals according to requirements.

本发明中,电梯井平行于原有结构纵向的两面墙设置幕墙。幕墙可以采用玻璃幕墙,也可以是其它形式的幕墙。In the present invention, the elevator shaft is parallel to the two longitudinal walls of the original structure to arrange curtain walls. The curtain wall can be glass curtain wall or other forms of curtain wall.

本发明中,所述模块化阳台主体结构为框架,材料可以是钢也可以是混凝土,包括框架柱、框架梁。所述模块化阳台电梯两侧的框架柱之间通过连梁连接。In the present invention, the main structure of the modular balcony is a frame, and the material can be steel or concrete, including frame columns and frame beams. The frame columns on both sides of the modular balcony elevator are connected by connecting beams.

本发明中,所述高性能抗震/减震连接元件与模块化阳台之间连接节点的螺栓孔采用椭圆孔,使得高性能连接元件沿高度方向可以位置微调,以释放由于模块化阳台与原有结构基础不均匀沉降产生的附加应力,同时可以防止由于地震荷载、温度荷载等造成的强制协调变形应力造成原有或新加结构的破坏。In the present invention, the bolt holes of the connecting nodes between the high-performance anti-shock/shock-absorbing connecting elements and the modular balcony adopt elliptical holes, so that the position of the high-performance connecting element can be fine-tuned along the height direction, so as to release the difference between the modular balcony and the original The additional stress generated by the uneven settlement of the structural foundation can also prevent the damage of the original or newly added structure caused by the forced coordinated deformation stress caused by earthquake load and temperature load.

本发明中,所述电梯轿厢安装于同层两个模块化阳台及连接两个模块化阳台的连梁之间。所述电梯轿厢在平行于原有结构横墙的方向分别在两侧各设置一个厢门,且两个厢门均可以开闭并供居住在电梯左右两侧的住户乘坐电梯进出房间。In the present invention, the elevator car is installed between two modular balconies on the same floor and connecting beams connecting the two modular balconies. The elevator car is provided with a door on both sides in a direction parallel to the original structural transverse wall, and both doors can be opened and closed for residents living on the left and right sides of the elevator to take the elevator in and out of the room.

本发明具有以下有益效果:The present invention has the following beneficial effects:

1. 本发明采用在工厂预制的模块化阳台,并利用自下而上堆叠的模块化阳台兼作加装电梯的承重框架,使得加装电梯无需独立的电梯井,从而大大减小加装电梯的现场施工作业量、降低电梯安装成本。1. The present invention adopts modular balconies prefabricated in the factory, and uses the modular balconies stacked from bottom to top as the load-bearing frame for installing elevators, so that the installation of elevators does not require an independent elevator shaft, thereby greatly reducing the cost of installing elevators. Reduce the amount of on-site construction work and reduce the cost of elevator installation.

2. 本发明采用的模块化阳台现场吊装便利,整体加装改造工程施工工序简单,施工周期极短且可以在两至三天时间内完成全部的改造工程,在最大程度上减小了老小区住宅改建对居民生活的影响。2. The modularized balcony adopted by the present invention is convenient to be hoisted on site, and the construction process of the overall installation and renovation project is simple, the construction period is extremely short and all the renovation projects can be completed within two to three days, reducing the old community to the greatest extent. The impact of residential remodeling on the lives of residents.

3. 本发明通过高性能连接元件将模块化装配式电梯—阳台一体化集成体系与原有结构相连,可以有效增强老旧小区住宅对地震灾害的抵御能力,降低原有结构在强震下失效倒塌的风险;高性能连接元件连接螺栓节点采用椭圆孔,可以适应加建结构与原有结构间可能产生的不均匀沉降,并可以释放由不均匀沉降或地震力、温度效应在原有结构中产生的次应力。3. The present invention connects the modular assembled elevator-balcony integrated system with the original structure through high-performance connecting elements, which can effectively enhance the resistance of old residential quarters to earthquake disasters and reduce the failure of the original structure under strong earthquakes The risk of collapse; the high-performance connecting element uses elliptical holes for connecting bolt nodes, which can adapt to the uneven settlement that may occur between the added structure and the original structure, and can release the uneven settlement or seismic force and temperature effects in the original structure. secondary stress.

4. 本发明采用在便于现场快速安装的钢管螺旋微型地桩作为模块化阳台基础,避免现场出现复杂的混凝土基础浇筑施工过程,同时无需大型打桩机械进场施工,仅需微型打桩机即可进行微型地桩的施工,施工效率高,且对原有地基扰动小,能够大幅缩短施工周期,有利于保护小区环境并减小施工过程给小区居民生活带来的影响。4. The present invention adopts steel pipe spiral miniature ground piles that are easy to install quickly on site as the modular balcony foundation, avoiding the complicated concrete foundation pouring construction process on site, and at the same time, there is no need for large-scale piling machines to enter the site for construction, only a miniature piling machine is required. The construction of micro ground piles has high construction efficiency and little disturbance to the original foundation, which can greatly shorten the construction period, help protect the environment of the community and reduce the impact of the construction process on the lives of residents in the community.

附图说明Description of drawings

图1为本发明具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体化集成体系平面示意图;其中:(a)为改装前,(b)为改装方案1,(c)为改装方案2;Figure 1 is a schematic plan view of the modular assembly elevator-balcony integrated system with auxiliary anti-vibration/vibration-absorbing units of the present invention; wherein: (a) is before refitting, (b) is refitting plan 1, and (c) is refitting Scenario 2;

图2为模块化阳台轴测图;Figure 2 is an axonometric view of the modular balcony;

图3为模块化装配式电梯—阳台一体化集成体系装配示意图;Figure 3 is a schematic diagram of the assembly of the modular assembly elevator-balcony integrated system;

图4为钢管螺旋微桩示意图;Fig. 4 is the schematic diagram of steel pipe spiral micropile;

图中标号:1. 模块化阳台;2. 钢管螺旋地桩;3. 电梯轿厢;4. 高性能抗震/减震连接元件;5.紧邻电梯井模块化阳台框架加强柱;6. 模块化阳台框架非加强柱;7. 模块化阳台框架梁;8. 模块化阳台扶手;9. 模块化阳台栏杆;10. 模块化阳台预制楼面;11. 原有结构;12. 电梯井连梁;13. 幕墙;14. 模块化阳台之间螺栓连接节点。Labels in the figure: 1. Modular balcony; 2. Steel pipe spiral ground pile; 3. Elevator car; 4. High-performance anti-seismic/shock-absorbing connection elements; 5. Modular balcony frame reinforcement columns adjacent to the elevator shaft; 6. Modular 7. Modular balcony frame beams; 8. Modular balcony handrails; 9. Modular balcony railings; 10. Modular balcony prefabricated floors; 11. Original structure; 12. Elevator shaft connecting beams; 13. Curtain walls; 14. Bolted joints between modular balconies.

具体实施方式Detailed ways

下面结合附图和具体实施方式对本发明做进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

实施例1:如图1-4所示:一种具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体化集成体系,包括兼作电梯承重框架的模块化阳台1、作为模块化阳台基础的钢管螺旋地桩2、电梯轿厢3,以及将模块化装配式阳台与原有住宅结构相连的具有辅助性高性能抗震/减震连接元件4。Embodiment 1: As shown in Figures 1-4: a modular assembly elevator-balcony integrated system with auxiliary shock-resistant/shock-absorbing units, including a modular balcony that doubles as an elevator load-bearing frame 1, as a modular balcony The basic steel pipe spiral ground pile 2, the elevator car 3, and the auxiliary high-performance anti-seismic/shock-absorbing connection element 4 that connects the modular assembly balcony with the original residential structure.

模块化装配式电梯—阳台一体化结构采用钢管螺旋地桩2作为结构基础。钢管螺旋地桩位于底层模块化阳台的模块化阳台框架加强柱5和模块化阳台框架非加强柱6下方。钢管螺旋地桩2在现场利用配套的打桩机将钢管螺旋地桩安装于模块化阳台框架加强柱5和模块化阳台框架非加强柱6轴线位置。钢管螺旋地桩2的施工应无现场土方开挖作业。The modular assembly elevator-balcony integrated structure adopts the steel pipe spiral ground pile 2 as the structural foundation. The steel pipe spiral ground pile is located under the modular balcony frame reinforced column 5 and the modular balcony frame non-reinforced column 6 of the modular balcony at the bottom. The steel pipe spiral ground pile 2 is installed on the axial position of the reinforced column 5 of the modular balcony frame and the non-reinforced column 6 of the modular balcony frame by using a supporting pile driver on site. There should be no on-site earthwork excavation for the construction of the steel pipe spiral ground pile 2.

模块化阳台1由模块化阳台加强柱5、模块化阳台框架非加强柱6、模块化阳台栏杆9、模块化阳台框架梁7和模块化阳台扶手8组成,模块化阳台1在工厂中预制、组装完成,包括模块化阳台1的主体结构及内部装饰。模块化阳台1被整体运输至现场后,首先通过吊装方式将底层模块化阳台安装至对应位置。底层的模块化阳台框架柱底部焊接柱脚端板,通过螺栓连接方式与钢管螺旋地桩2顶面可靠连接。底层模块化阳台1在与基础连接后,通过高性能抗震/减震连接元件4与原有结构11连接。Modular balcony 1 is composed of modular balcony reinforced columns 5, modular balcony frame non-reinforced columns 6, modular balcony railings 9, modular balcony frame beams 7 and modular balcony handrails 8. Modular balcony 1 is prefabricated in the factory, The assembly is complete, including the main structure and interior decoration of the modular balcony 1. After the modular balcony 1 is transported to the site as a whole, the bottom modular balcony is first installed to the corresponding position by hoisting. The bottom of the modular balcony frame column on the ground floor is welded to the column base end plate, and is reliably connected to the top surface of the steel pipe spiral ground pile 2 through bolt connection. After the ground-floor modular balcony 1 is connected to the foundation, it is connected to the original structure 11 through a high-performance anti-seismic/shock-absorbing connection element 4 .

底层上方各层模块化阳台1通过堆叠的方式逐层向上吊装,每吊装一层阳台,则通过阳台自身模块化框架加强柱5和模块化阳台框架非加强柱6、利用全螺栓节点将上下两层模块化阳台1可靠连接。新吊装阳台应在与下方阳台可靠连接后,应尽快通过高性能抗震/减震连接元件4与原有结构11连接。高性能抗震/减震连接元件4可以沿结构高度方向每层设置,也可以根据需求隔层设置;高性能抗震/减震连接元件4锚固在原有结构11纵墙面内构造柱中。高性能抗震/减震连接元件4与模块化阳台1之间连接节点的螺栓孔采用椭圆孔,使得高性能抗震/减震连接元件4在安装过程中位置可调、且可以适应在正常使用状态下新建模块化阳台1与原有结构11间可能产生的微小竖向错位。The modular balconies 1 of each layer above the bottom layer are hoisted upward layer by layer by stacking, and each layer of balconies is hoisted, and the upper and lower two are connected through the balcony's own modular frame reinforcement column 5 and the modular balcony frame non-reinforcement column 6. Layer modular balcony 1 reliable connection. After the newly hoisted balcony is reliably connected to the balcony below, it should be connected to the original structure 11 through the high-performance anti-seismic/shock-absorbing connecting element 4 as soon as possible. The high-performance anti-seismic/shock-absorbing connecting element 4 can be arranged on each floor along the height direction of the structure, or can be arranged in separate layers according to the requirements; the high-performance anti-shock/shock-absorbing connecting element 4 is anchored in the structural column in the longitudinal wall of the original structure 11. The bolt holes of the connection nodes between the high-performance anti-vibration/shock-absorbing connection element 4 and the modular balcony 1 adopt oval holes, so that the position of the high-performance anti-vibration/shock-absorbing connection element 4 can be adjusted during installation and can be adapted to the normal use state The slight vertical misalignment that may occur between the new modular balcony 1 and the original structure 11.

左右两侧模块化阳台1沿原有结构高度方向全部安装到位后,电梯左右两侧的位于同一层的两个模块化阳台之间通过电梯井连梁12连接。电梯井连梁12可以沿结构高度方向每层设置,也可以根据需求按照一定间隔设置。电梯井连梁12与模块化阳台1靠近电梯一侧的模块化阳台框架加强柱5通过全螺栓方式连接,也可以采用其它可靠的机械连接方式。After the modular balconies 1 on the left and right sides are all installed in place along the original structural height direction, the two modular balconies on the same floor on the left and right sides of the elevator are connected by the elevator shaft connecting beam 12. The elevator shaft connecting beams 12 can be arranged on each floor along the height direction of the structure, and can also be arranged at certain intervals according to requirements. The elevator shaft connecting beam 12 is connected to the modular balcony frame reinforcement column 5 on the side of the modular balcony 1 near the elevator by full bolts, and other reliable mechanical connection methods can also be used.

在左右两侧模块化阳台1及电梯井连梁12之间的空间内安装电梯轿厢3及相关设备。电梯轿厢3具有对开双侧门,并且电梯两侧轿厢门分别与左右两侧住户模块化阳台上户门对齐,住户可以从电梯上通过阳台上户门直接进入家中。Elevator car 3 and related equipment are installed in the space between the left and right sides modular balcony 1 and the elevator shaft connecting beam 12. The elevator car 3 has double-sided doors, and the car doors on both sides of the elevator are respectively aligned with the doors on the modular balconies of the residents on the left and right sides, and the residents can directly enter the home from the elevator through the upper doors on the balcony.

电梯轿厢3及相关设备安装完成后,在连接同一楼层两个模块化阳台1的电梯井连梁12之间设置幕墙13。幕墙13可以采用玻璃幕墙,也可以是其它形式的幕墙。After the elevator car 3 and related equipment are installed, a curtain wall 13 is set between the elevator shaft connecting beams 12 connecting the two modular balconies 1 on the same floor. Curtain wall 13 can adopt glass curtain wall, also can be the curtain wall of other forms.

应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。本实施例中未明确的各组成部分均可以通过现有技术加以实现。It should be pointed out that those skilled in the art can make some improvements and modifications without departing from the principle of the present invention, and these improvements and modifications should also be regarded as the protection scope of the present invention. All components that are not specified in this embodiment can be realized by existing technologies.

Claims (11)

1.一种具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体化集成体系,包括模块化阳台、钢管螺旋地桩、电梯轿厢,高性能抗震/减震连接元件,其特征在于:1. A modular assembled elevator-balcony integrated system with auxiliary anti-seismic/shock-absorbing units, including modular balconies, steel pipe spiral ground piles, elevator cars, high-performance anti-seismic/shock-absorbing connecting elements, its characteristics in: 所述模块化阳台位于电梯两侧,同一楼层每户居民均拥有一个模块化阳台,模块化阳台进深与电梯井进深相同;所述模块化阳台的高度与原有结构的层高相同,模块化阳台从底层开始、通过堆叠的方式逐层向上安装,直至原有结构顶层;The modular balcony is located on both sides of the elevator, and each household on the same floor has a modular balcony. The depth of the modular balcony is the same as that of the elevator shaft; the height of the modular balcony is the same as that of the original structure. The balcony starts from the bottom layer and is installed layer by layer through stacking until it reaches the top layer of the original structure; 所述模块化阳台与原有结构之间通过高性能抗震/减震连接元件连接,高性能连接元件锚固于原有结构纵墙面内构造柱中;高性能连接元件可以沿原有结构高度方向每层设置,或可以根据需求隔层设置;The modular balcony is connected to the original structure through a high-performance anti-seismic/shock-absorbing connection element, and the high-performance connection element is anchored in the structural column in the longitudinal wall of the original structure; the high-performance connection element can be along the height direction of the original structure Each layer can be set, or can be set according to the needs of the compartment; 所述电梯轿厢安装于同层模块化阳台及连接两个模块化阳台的电梯井连梁之间;所述电梯轿厢在平行于原有结构横墙的方向分别在两侧各设置一个厢门,且两个厢门均可以开闭,并供居住在电梯左右两侧的住户乘坐电梯进入家中;The elevator car is installed between the modular balcony on the same floor and the elevator shaft connecting beams connecting the two modular balconies; the elevator car is respectively provided with a car on both sides in a direction parallel to the horizontal wall of the original structure. door, and the two compartment doors can be opened and closed, and the residents living on the left and right sides of the elevator can take the elevator to enter the home; 所述钢管螺旋地桩的施工无需现场土方开挖作业,钢管螺旋地桩安装于最底层的模块化阳台的模块化阳台加强柱和模块化阳台框架非加强柱上方,仅需微型打桩机便可快速完成;压桩过程无明显挤土效应,对原有结构地基及基础无不利影响。The construction of the steel pipe spiral ground pile does not require on-site earthwork excavation operations, and the steel pipe spiral ground pile is installed above the modular balcony reinforced column and the modular balcony frame non-reinforced column of the lowest modular balcony, and only a miniature pile driver is needed. It is completed quickly; there is no obvious soil squeezing effect during the pile pressing process, and there is no adverse effect on the original structural foundation and foundation. 2.根据权利要求1所述的具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体化集成体系,其特征在于所述模块化阳台为框架结构,由模块化阳台加强柱、模块化阳台框架非加强柱、模块化阳台栏杆、模块化阳台框架梁和模块化阳台扶手组成,模块化阳台框架梁、模块化阳台框架非加强柱和模块化阳台框架加强柱连接组成立方体框架结构,框架结构上设置模块化阳台栏杆和模块化阳台扶手;位于电梯两侧的模块化阳台加强柱之间通过电梯井连梁连接。2. The modular assembled elevator-balcony integrated system with auxiliary anti-seismic/shock-absorbing unit according to claim 1, characterized in that the modular balcony is a frame structure, reinforced by modular balcony columns, modules Composed of non-reinforced columns of the balcony frame, modular balcony railings, modular balcony frame beams and modular balcony handrails, modular balcony frame beams, non-reinforced columns of the modular balcony frame and reinforced columns of the modular balcony frame are connected to form a cubic frame structure, The frame structure is equipped with modular balcony railings and modular balcony handrails; the modular balcony reinforcement columns on both sides of the elevator are connected by elevator shaft connecting beams. 3.根据权利要求1所述的具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体化集成体系,其特征在于所述模块化阳台在靠近电梯一侧设有门,使得住户可从电梯下来后通过阳台上的门直接进入家中,所述门与电梯轿厢出入门对齐,门朝模块化阳台内侧开启。3. The modular assembled elevator-balcony integrated system with auxiliary anti-seismic/shock-absorbing unit according to claim 1, characterized in that the modular balcony is provided with a door on the side close to the elevator, so that residents can After getting off from the elevator, the door directly enters the home through the door on the balcony. The door is aligned with the door of the elevator car, and the door opens towards the inside of the modular balcony. 4.根据权利要求1所述的具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体化集成体系,其特征在于所述模块化阳台在沿原有结构高度方向堆叠安装完成后,靠近电梯井的模块化阳台框架柱尺寸比其它模块化阳台框架柱大,四根加大截面的模块化阳台框架柱通过额外的框架梁相连形成电梯的承重框架,电梯及相关设备无需额外的承重结构。4. The modular assembled elevator-balcony integrated system with auxiliary anti-seismic/shock-absorbing units according to claim 1, characterized in that after the modularized balconies are stacked and installed along the original structural height direction, The size of the modular balcony frame columns near the elevator shaft is larger than other modular balcony frame columns. Four modular balcony frame columns with enlarged cross-sections are connected through additional frame beams to form the load-bearing frame of the elevator. The elevator and related equipment do not need additional load-bearing structure. 5.根据权利要求1所述的具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体化集成体系,其特征在于所述模块化阳台地面采用100 mm厚玻璃钢纤维混凝土板,也可以为其它形式的预制板;所述模块化阳台采用合理形式的轻质填充墙,在与原有结构纵墙平行方向的外侧设合理形式的窗户。5. The modular assembled elevator-balcony integrated system with auxiliary anti-seismic/shock-absorbing unit according to claim 1, characterized in that the ground of the modularized balcony adopts a 100 mm thick glass fiber reinforced concrete slab, or It is other forms of prefabricated panels; the modular balcony adopts a reasonable form of lightweight filling wall, and a reasonable form of windows is arranged on the outside in a direction parallel to the original structural longitudinal wall. 6.根据权利要求1所述的具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体化集成体系,其特征在于所述高性能抗震/减震连接元件是刚性的连接构件或耗能阻尼器,所述耗能阻尼器为金属阻尼器、粘滞阻尼器或摩擦阻尼器中任一种。6. The modular assembled elevator-balcony integrated system with auxiliary anti-vibration/vibration-absorbing unit according to claim 1, characterized in that the high-performance anti-vibration/vibration-absorbing connecting element is a rigid connecting member or a consumable An energy damper, and the energy dissipation damper is any one of a metal damper, a viscous damper or a friction damper. 7.根据权利要求1所述的具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体化集成体系,其特征在于所述相邻两个模块化阳台之间通过螺栓连接节点可靠连接。7. The modular assembled elevator-balcony integrated system with auxiliary anti-seismic/shock-absorbing unit according to claim 1, characterized in that the two adjacent modular balconies are reliably connected by bolted joints . 8.根据权利要求1所述的具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体化集成体系,其特征在于所述具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体化集成体系布置于原有结构间一侧,或布置于原有结构楼梯间对侧,或布置于原有结构两侧。8. The modular assembly elevator-balcony integrated system with auxiliary anti-vibration/shock absorption unit according to claim 1, characterized in that said modular assembly elevator with auxiliary anti-vibration/shock absorption unit- The balcony integrated system is arranged on one side of the original structure, or on the opposite side of the stairwell of the original structure, or on both sides of the original structure. 9.根据权利要求1所述的具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体化集成体系,其特征在于所述模块化阳台关于电梯所在位置对称同步安装,电梯左右两侧的位于同一层的两个模块化阳台之间通过连梁连接,连梁可以沿结构高度方向每层设置,也可以根据需求按照一定间隔设置。9. The modular assembly elevator-balcony integrated system with auxiliary anti-seismic/shock-absorbing unit according to claim 1, characterized in that the modular balcony is installed symmetrically and synchronously with respect to the location of the elevator, and the left and right sides of the elevator The two modular balconies on the same floor are connected by connecting beams. The connecting beams can be set on each floor along the height direction of the structure, or can be set at certain intervals according to requirements. 10.根据权利要求1所述的具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体化集成体系,其特征在于电梯井平行于原有结构纵向的两面墙设置幕墙,幕墙采用玻璃幕墙。10. The modular assembly elevator-balcony integrated system with auxiliary anti-seismic/shock-absorbing unit according to claim 1, characterized in that the elevator shaft is parallel to the two vertical walls of the original structure with curtain walls, and the curtain walls are made of glass curtain wall. 11.根据权利要求1所述的具有辅助性抗震/减震单元的模块化装配式电梯—阳台一体化集成体系,其特征在于所述高性能抗震/减震连接元件与模块化阳台之间连接节点的螺栓孔采用椭圆孔。11. The modular assembled elevator-balcony integrated system with auxiliary anti-vibration/shock-absorbing unit according to claim 1, characterized in that the connection between the high-performance anti-vibration/shock-absorbing connecting element and the modular balcony The bolt holes of the joints adopt oval holes.
CN201810163384.7A 2018-02-27 2018-02-27 Modular assembly formula elevator-integrated system of balcony with complementary antidetonation/vibration absorption unit Pending CN108277997A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810163384.7A CN108277997A (en) 2018-02-27 2018-02-27 Modular assembly formula elevator-integrated system of balcony with complementary antidetonation/vibration absorption unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810163384.7A CN108277997A (en) 2018-02-27 2018-02-27 Modular assembly formula elevator-integrated system of balcony with complementary antidetonation/vibration absorption unit

Publications (1)

Publication Number Publication Date
CN108277997A true CN108277997A (en) 2018-07-13

Family

ID=62808786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810163384.7A Pending CN108277997A (en) 2018-02-27 2018-02-27 Modular assembly formula elevator-integrated system of balcony with complementary antidetonation/vibration absorption unit

Country Status (1)

Country Link
CN (1) CN108277997A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184150A (en) * 2018-10-29 2019-01-11 张云天 A kind of existing multi-storey building of cold district installs the prefabricated assembled hoistway of elevator and its construction method additional
CN110026823A (en) * 2019-04-08 2019-07-19 广东凯兴达建筑科技有限公司 A kind of Modular electrical stair shaft pipeline production line

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004183238A (en) * 2002-11-29 2004-07-02 Miracle Three Corporation Antiseismic reinforcing extension method for dwelling house and structure extended by the method
CN201962672U (en) * 2011-02-12 2011-09-07 魏治国 Spiral ground pile
CN204139642U (en) * 2014-07-24 2015-02-04 北京筑福建筑事务有限责任公司 The additional elevator structure of old cell unit reveal
CN104481166A (en) * 2014-12-12 2015-04-01 北京筑福国际工程技术有限责任公司 Additionally assembled type balcony structure for old community and construction method of additionally assembled type balcony structure
CN104755678A (en) * 2012-07-11 2015-07-01 1Space私人有限公司 Modular building
CN205531426U (en) * 2016-01-21 2016-08-31 江苏鼎达建筑新技术有限公司 Device for connecting elevator is add to existing building
CN206245464U (en) * 2016-12-15 2017-06-13 四川省建筑设计研究院 One kind is gone along with sb. to guard him by power integrated prefabricated balcony
CN206267167U (en) * 2016-10-31 2017-06-20 沈阳远大瑞福工程技术有限公司 Wallboard house assembly type basis
CN107355094A (en) * 2017-08-31 2017-11-17 西继迅达(许昌)电梯有限公司 The building of outdoor installation elevator
CN208039890U (en) * 2018-02-27 2018-11-02 同济大学 Modular assembly formula elevator-integrated system of balcony with complementary antidetonation/vibration absorption unit

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004183238A (en) * 2002-11-29 2004-07-02 Miracle Three Corporation Antiseismic reinforcing extension method for dwelling house and structure extended by the method
CN201962672U (en) * 2011-02-12 2011-09-07 魏治国 Spiral ground pile
CN104755678A (en) * 2012-07-11 2015-07-01 1Space私人有限公司 Modular building
CN204139642U (en) * 2014-07-24 2015-02-04 北京筑福建筑事务有限责任公司 The additional elevator structure of old cell unit reveal
CN104481166A (en) * 2014-12-12 2015-04-01 北京筑福国际工程技术有限责任公司 Additionally assembled type balcony structure for old community and construction method of additionally assembled type balcony structure
CN205531426U (en) * 2016-01-21 2016-08-31 江苏鼎达建筑新技术有限公司 Device for connecting elevator is add to existing building
CN206267167U (en) * 2016-10-31 2017-06-20 沈阳远大瑞福工程技术有限公司 Wallboard house assembly type basis
CN206245464U (en) * 2016-12-15 2017-06-13 四川省建筑设计研究院 One kind is gone along with sb. to guard him by power integrated prefabricated balcony
CN107355094A (en) * 2017-08-31 2017-11-17 西继迅达(许昌)电梯有限公司 The building of outdoor installation elevator
CN208039890U (en) * 2018-02-27 2018-11-02 同济大学 Modular assembly formula elevator-integrated system of balcony with complementary antidetonation/vibration absorption unit

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184150A (en) * 2018-10-29 2019-01-11 张云天 A kind of existing multi-storey building of cold district installs the prefabricated assembled hoistway of elevator and its construction method additional
CN110026823A (en) * 2019-04-08 2019-07-19 广东凯兴达建筑科技有限公司 A kind of Modular electrical stair shaft pipeline production line
CN110026823B (en) * 2019-04-08 2024-03-19 广东凯兴达建筑科技有限公司 Modularized elevator shaft production line

Similar Documents

Publication Publication Date Title
JP3218530U (en) Central assembly steel structure
CN208531965U (en) The installation steel structure lift shaft of portable installation and transport
WO2018018913A1 (en) Flexible hanging type module building structure
AU2020217448B2 (en) Integrated steel concrete building and construction method thereof
CN204826308U (en) Structure assembly type structure is pieced together in advance to prefabricated shaped steel concrete shear force wall
CN105089178A (en) Fabricated building of pre-assembling structure of prefabricated section steel concrete shear wall
CN108755940A (en) A kind of steel core concrete column framed bent-Reinforced Concrete Core Walls Structure structural system
CN103061517A (en) Novel sub-structure modular prefabricated assembly node type frame structure assembly method
CN104294963B (en) A kind of bottom punches the precast concrete shear wall plate of band energy-dissipating device
CN108277997A (en) Modular assembly formula elevator-integrated system of balcony with complementary antidetonation/vibration absorption unit
Zanni et al. Application of CLT prefabricated exoskeleton for an integrated renovation of existing buildings and continuous structural monitoring
CN110565987A (en) prefabricated assembled high-rise dwelling cylinder formwork multi-ribbed prestressed floor structure system
CN110306665A (en) Prefabricated steel structure residential system and its node installation method
CN212295078U (en) Steel assembled synthetic concrete building
CN212053617U (en) Prefabricated elevator shaft structure
JP2012140818A (en) Earthquake strengthening structure for existing reinforced concrete apartment house
CN208039890U (en) Modular assembly formula elevator-integrated system of balcony with complementary antidetonation/vibration absorption unit
CN103469892B (en) The primary and secondary modular unit combining structure in high-rise building module space and method of attachment
JP3827472B2 (en) Flat slab structure building
CN206279815U (en) A kind of half indoor substation main transformer sound-deadening and noise-reducing structure
CN215055686U (en) Basic module for building and low and multi-storey modular building structure system
CN205776898U (en) Overall assembled reinforced concrete shear wall structure system
CN212534646U (en) Assembled both sides connection steel grid shear force wall convenient to replacement
CN211172365U (en) Assembled low-rise residential structure system
JP3803951B2 (en) Flat slab structure building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180713

WD01 Invention patent application deemed withdrawn after publication