CN108166342A - The vehicle shunting linking traffic system and control method of city road crossing - Google Patents

The vehicle shunting linking traffic system and control method of city road crossing Download PDF

Info

Publication number
CN108166342A
CN108166342A CN201711442436.6A CN201711442436A CN108166342A CN 108166342 A CN108166342 A CN 108166342A CN 201711442436 A CN201711442436 A CN 201711442436A CN 108166342 A CN108166342 A CN 108166342A
Authority
CN
China
Prior art keywords
north
south
orientation
lane
east
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711442436.6A
Other languages
Chinese (zh)
Inventor
蔡建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711442436.6A priority Critical patent/CN108166342A/en
Publication of CN108166342A publication Critical patent/CN108166342A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C1/00Design or layout of roads, e.g. for noise abatement, for gas absorption
    • E01C1/002Design or lay-out of roads, e.g. street systems, cross-sections ; Design for noise abatement, e.g. sunken road
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C1/00Design or layout of roads, e.g. for noise abatement, for gas absorption
    • E01C1/02Crossings, junctions or interconnections between roads on the same level
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/07Controlling traffic signals

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Traffic Control Systems (AREA)

Abstract

Vehicle shunting the invention discloses city road crossing is connected traffic system and control method, by the way that crossroad is set rational vehicle pass-through road and by the way that the spacing of each crossroad and speed limit is rationally controlled to set, the influencing each other property between track can be made smaller, and can guarantee that fast passing improves the current efficiency of vehicle and urban road utilization rate simultaneously in North and South direction, east-west direction multiple tracks.

Description

The vehicle shunting linking traffic system and control method of city road crossing
Technical field
The present invention relates to the vehicles of a kind of vehicle pass-through system and control method, more specifically city road crossing Shunting linking traffic system and control method.
Background technology
Current major urban automobile quantity is continuously increased, and urban road traffic congestion phenomenon is increasingly severe, each big city City all administers traffic congestions exploring various schemes, for example, the granting of limiting vehicle number plate, the restricted driving of strange land vehicle, odd-and-even license plate rule, Tide track is built the schemes such as overpass, subterranean tunnel, but is handed over there is no good actual effect without thoroughly solving urban road Logical congestion.
Existing urban highway traffic facility also existing defects, for example, urban highway traffic crossroad autobus turns left The drawbacks of curved, existing urban road traffic congestion are mainly that crossroad autobus turns left to occupy vast resources, traffic signals The straight trip motor vehicle that is set as of lamp passes through with the same time green light of left-hand bend motor vehicle combination, other three direction traffic lights It exercises to traffic during the crossroad of front and believes for the red light limiting vehicle waiting current two-way straight trip motor vehicle green light current period Signal lamp can not be connected current, and two-way straight trip motor vehicle green light switchs to Dual Left Turn bender motor-car and turns left with the time after passing through, double Turning generally has 30 seconds to the left, the mode that combination is passed through in this way constrain urban highway traffic motor vehicle flow, Urban road resource is consumed, constrains the utilization ratio of urban road resource.
Urban highway traffic crossroad access blocks, due to setting for crossroad access signal lamp cycle overlong time It puts, a large amount of motor vehicle is caused to overstock on urban road, crossroad green light, which opens current period motor vehicle, to be led to rapidly It crosses, a large amount of motor vehicles stops are interior at the parting of the ways, have aggravated urban road traffic congestion.In addition, also turn around there are motor vehicle Drawback, the motor vehicle traffic lights that turn around are mostly that motor vehicle and left-hand bend motor vehicle green light the period permission motor vehicle that passes through of keeping straight on falls Head, such setting hinder the travel speed and flow of straight trip motor vehicle, consume urban road resource.
Invention content
It is an object of the invention to overcome the deficiencies of the prior art and provide the vehicle shunting linkings of city road crossing Traffic system and control method.
To achieve the above object, the present invention uses following technical scheme:The vehicle shunting linking of city road crossing Traffic system, the opposing traffic road of opposing traffic road and North and South direction including east-west direction, pair of the North and South direction Include a plurality of north orientation south runway and a plurality of south orientation north runway to passing road, it is left that north orientation south runway includes north orientation south Turn turn lane, north orientation south Through Lane, north orientation south straight trip right-turn lane, the front end of the north orientation south left-hand rotation turn lane is north Left turn waiting zone domain to the south, rear end are turned around region for north orientation south;It is right that north orientation south is equipped on the right side of the north orientation south straight trip right-turn lane It changes trains or buses to export;South orientation north runway includes south orientation north left-hand rotation turn lane, south orientation north Through Lane, the south orientation north straight trip right side It changes trains or buses;The front end of the south orientation north left-hand rotation turn lane is south orientation north left turn waiting zone domain, and rear end is turned around region for south orientation north; South orientation north right-turn lane is equipped on the right side of the south orientation north straight trip right-turn lane to export;The opposing traffic road packet of the east-west direction Include a plurality of east orientation head west track and it is a plurality of west to eastbound carriageway, the east orientation head west track include east orientation west left-hand rotation turn lane, The western Through Lane of east orientation, east orientation west straight trip right-turn lane;Turn left to treat for east orientation west in the front end of the east orientation west left-hand rotation turn lane Turn region, rear end is turned around region for east orientation west;The western right-turn lane outlet of east orientation is equipped on the right side of the east orientation west straight trip right-turn lane; The west includes the western turn lane that turns left eastwards, western Through Lane eastwards, western right-turn lane of keeping straight on eastwards to eastbound carriageway;It is described For west, left turn waiting zone domain, rear end are western region of turning around eastwards eastwards for the front end of western left-hand rotation turn lane eastwards;The west is eastwards Keeping straight on, equipped with west, right-turn lane exports eastwards on right-turn lane right side.
Its further technical solution is:It is southern and northern that the east crossing of the opposing traffic road of the east-west direction is equipped with the east To pavement, the western end crossing of the opposing traffic road of the east-west direction is equipped with western end North and South direction pavement, the north and south The south crossing of the opposing traffic road in direction is equipped with south east-west direction pavement, the opposing traffic road of the North and South direction The North crossing be equipped with the North east-west direction pavement.
Its further technical solution is:The opposing traffic road of the east-west direction and the opposing traffic road of North and South direction Both sides be equipped with major trunk roads entrance.
Its further technical solution is:North orientation south right-turn lane outlet, the outlet of south orientation north right-turn lane, east orientation west are right The middle part for changing trains or buses to export, western right-turn lane eastwards exports is all provided with someone's row passageway.
Its further technical solution is:The opposing traffic road of the east-west direction and the opposing traffic road of North and South direction The F-Zero for limiting vehicle pass-through is 60km/h.
The control method that the vehicle shunting linking of city road crossing is passed through, the method includes:
Control south orientation north Through Lane, north orientation south Through Lane, east orientation west turn around region, the western right-turn lane outlet of east orientation, The right-turn lane outlet eastwards of western region of turning around eastwards, west, the traffic on the east North and South direction pavement, western end North and South direction pavement The green light of signal lamp is opened, while south orientation north is controlled to turn around region, the outlet of south orientation north right-turn lane, south orientation north left turn waiting zone Domain, north orientation south turn around region, the outlet of north orientation south right-turn lane, north orientation south left turn waiting zone domain, the western Through Lane of east orientation, east orientation west Left turn waiting zone domain, western Through Lane eastwards, left turn waiting zone domain, south east-west direction pavement, the North are between east and west eastwards in west It is opened to the red light of the traffic lights on pavement;
Control south orientation north left turn waiting zone domain, north orientation south left turn waiting zone domain traffic lights green light open, simultaneously Control south orientation north Through Lane, north orientation south Through Lane, the east North and South direction pavement, western end North and South direction pavement, east orientation It turns around eastwards the traffic lights of the western right-turn lane outlet of region, east orientation, west right-turn lane outlet eastwards in turn around region, west of west Red light is opened;
Turn around region, north orientation south turning basin for control south east-west direction pavement, the North east-west direction pavement, south orientation north Domain, the outlet of south orientation north right-turn lane, the outlet of north orientation south right-turn lane, the traffic of the western Through Lane of east orientation, western Through Lane eastwards The green light of signal lamp opens, while controls the traffic lights in south orientation north left turn waiting zone domain, north orientation south left turn waiting zone domain Red light is opened;
The green light of the western left turn waiting zone domain of east orientation, the western lamp of the traffic signals in left turn waiting zone domain eastwards is controlled to open, together When control south east-west direction pavement, the North east-west direction pavement, south orientation north turn around region, south orientation north right-turn lane go out Mouthful, north orientation south turn around region, the outlet of north orientation south right-turn lane, the western Through Lane of east orientation, western Through Lane eastwards traffic signals The red light of lamp is opened.
And so on, above-mentioned rate-determining steps are recycled, to control the current of vehicle and pedestrian.
Its further technical solution is:Turn around region, south orientation north right-turn lane of south orientation north Through Lane, south orientation north goes out It turns around in turn around region, the outlet of north orientation south right-turn lane, the western Through Lane of east orientation, east orientation west of mouth, north orientation south Through Lane, north orientation south Region, the western right-turn lane outlet of east orientation, western Through Lane eastwards, western region of turning around eastwards, west right-turn lane outlet eastwards, the south East-west direction pavement, the traffic on the North east-west direction pavement, the east North and South direction pavement, western end North and South direction pavement The green light opening time of signal lamp is 50 seconds, and the red light opening time is 78 seconds.
Its further technical solution is:South orientation north left turn waiting zone domain, north orientation south left turn waiting zone domain, east orientation west are left Turn area to be transferred domain, the green light opening time from west to the traffic lights in dynamic left turn waiting zone domain for 14 seconds, the red light opening time is 114 seconds.
Its further technical solution is:South orientation north Through Lane, north orientation south Through Lane, the western Through Lane of east orientation, During the western green unlatching of traffic lights of Through Lane eastwards, current vehicle is travelled according to the speed of regulation to next four crossway Mouthful when, the crossroad south orientation north Through Lane, north orientation south Through Lane, the western Through Lane of east orientation, west Through Lane eastwards The green light of traffic lights is just turned on, current to form green light linking.
Compared with the prior art, the invention has the advantages that:The vehicle shunting linking of city road crossing of the present invention Traffic system and control method by crossroad by setting rational vehicle pass-through road and by rationally controlling each ten Spacing and the speed limit setting at word crossing, make Traffic signal control vehicle fast passing, improve the current efficiency of vehicle And urban road utilization rate.
Above description is only the general introduction of technical solution of the present invention, can in order to better understand technical measure It is implemented in accordance with the contents of the specification, and in order to make above and other objects of the present invention, feature and advantage brighter Aobvious understandable, special below to lift preferred embodiment, detailed description are as follows.
Description of the drawings
Fig. 1 is that the vehicle shunting of city road crossing of the present invention is connected traffic system and control method specific embodiment Structure diagram;
Fig. 2 is the partial enlarged view of Fig. 1.
Reference numeral
11 south orientation north left turn waiting zone domain, 12 south orientation north is turned around region
13 south orientation north Through Lane, 14 south orientation north straight trip right-turn lane
15 south orientation north right-turn lanes export 16 south east-west direction pavements
21 north orientation south left turn waiting zone domain, 22 north orientation south is turned around region
23 north orientation south Through Lane, 24 north orientation south straight trip right-turn lane
25 north orientation south right-turn lanes export 26 the North east-west direction pavements
The western 32 east orientation west of left turn waiting zone domain of 31 east orientations is turned around region
Western 34 east orientation west of the Through Lane straight trip right-turn lane of 33 east orientations
The western right-turn lane of 35 east orientations exports 36 the east North and South direction pavements
The 41 western western regions of turning around eastwards in left turn waiting zone domain eastwards 42
The 43 western western right-turn lanes of keeping straight on eastwards of Through Lane eastwards 44
Right-turn lane exports 46 western end North and South direction pavements eastwards in 45 west
5 major trunk roads entrance, 6 people's row passageway
Specific embodiment
In order to more fully understand the present invention technology contents, with reference to specific embodiment to technical scheme of the present invention into One step introduction and explanation, but not limited to this.
- 2 are please referred to Fig.1, this implementation provides a kind of vehicle shunting linking traffic system of city road crossing, should System includes the opposing traffic road of east-west direction and the opposing traffic road of North and South direction, the opposing traffic road of North and South direction Including four north orientation south runways and four south orientation north runways, north orientation south runway includes north orientation south left-hand rotation turn lane, north Through Lane 23 to the south, north orientation south straight trip right-turn lane 24, the front end of north orientation south left-hand rotation turn lane turns left to wait to turn for north orientation south Region 21, rear end are turned around region 22 for north orientation south;24 right side of north orientation south straight trip right-turn lane is equipped with north orientation south right-turn lane and exports 25;South orientation north runway includes south orientation north left-hand rotation turn lane, south orientation north Through Lane 13, south orientation north straight trip right-turn lane 14; The front end of south orientation north left-hand rotation turn lane is south orientation north left turn waiting zone domain 11, and rear end is turned around region 12 for south orientation north;South orientation north 14 right side of right-turn lane keep straight on equipped with south orientation north right-turn lane outlet 15;The opposing traffic road of east-west direction includes four east orientations Track and four west head west to eastbound carriageway, the east orientation track that heads west includes east orientation west left-hand rotation turn lane, the western Through Lane of east orientation 33, east orientation west straight trip right-turn lane 34;The front end of east orientation west left-hand rotation turn lane is the western left turn waiting zone domain 31 of east orientation, and rear end is East orientation west is turned around region 32;34 right side of east orientation west straight trip right-turn lane is equipped with the western right-turn lane outlet 35 of east orientation;It drives a vehicle eastwards in west Road includes the western turn lane that turns left eastwards, western Through Lane 43 eastwards, western right-turn lane 44 of keeping straight on eastwards;Turn left to turn around eastwards in west For west, left turn waiting zone domain 41, rear end are western region 42 of turning around eastwards eastwards for the front end in track;Western right-turn lane 44 of keeping straight on eastwards Right side is equipped with west right-turn lane outlet eastwards 45.Specifically, the spacing of two crossroads can be depending on actual conditions.Thing The F-Zero of the opposing traffic road in direction and the opposing traffic road limitation vehicle pass-through of North and South direction is 60km/h.
Preferably, by south orientation north Through Lane, north orientation south Through Lane, the western Through Lane of east orientation, west to dynamic Through Lane In by left side a track as city cable release track, in addition, south orientation north left turn waiting zone domain, north orientation south left turn waiting zone Domain, the western left turn waiting zone domain of east orientation, west can be used as integrated buffer to dynamic left turn waiting zone domain.City cable release track due to Hypervelocity is exercised, low speed fleet vehicles can not be connected with traffic lights, and therefore, red signal interval vehicle enters integrated buffer, separately Outer integrated buffer, which also allows for city bus, overlength, can not turn around vehicle.
Further, the east crossing of the opposing traffic road of east-west direction is equipped with the east North and South direction pavement 36, east West to opposing traffic road western end crossing be equipped with western end North and South direction pavement 46, the opposing traffic road of North and South direction South crossing be equipped with south east-west direction pavement 16, the North crossing of the opposing traffic road of North and South direction is equipped with the North east West is to pavement 26.
Further, the both sides of the opposing traffic road of the opposing traffic road and North and South direction of east-west direction are equipped with master Arterial highway entrance 5 (for example, for quarter, commercial circle).
Further, north orientation south right-turn lane outlet 25, south orientation north right-turn lane outlet 15, the western right-turn lane outlet of east orientation 35th, the middle part of west right-turn lane outlet eastwards 45 is all provided with someone's row passageway.
In other embodiments, the quantity in track can be depending on actual conditions.
- 2 are please referred to Fig.1, the present embodiment additionally provides a kind of vehicle shunting for above-mentioned city road crossing and holds in the mouth The control method of traffic system is connect, this method includes:
S10, control south orientation north Through Lane 13, north orientation south Through Lane 23, east orientation west turn right at turn around region 32, east orientation west Track outlet 35, west are turned around eastwards, and right-turn lane exports 45, the east North and South direction pavement 36, western end south eastwards for region 42, west The north is opened to the green light of the traffic lights on pavement 46, while south orientation north is controlled to turn around region 12, south orientation north right-turn lane Turn left in turn around region 22, north orientation south right-turn lane outlet 25, north orientation south of outlet 15, south orientation north left turn waiting zone domain 11, north orientation south Through Lane 43, west are turned left eastwards eastwards for area to be transferred domain 21, the western Through Lane 33 of east orientation, the western left turn waiting zone domain 31 of east orientation, west Area to be transferred domain 41, south east-west direction pavement 16, the North east-west direction pavement 26 traffic lights red light open;
S20, control south orientation north left turn waiting zone domain 11, north orientation south left turn waiting zone domain 21 the green lights of traffic lights open It opens, while controls south orientation north Through Lane 13, north orientation south Through Lane 23, the east North and South direction pavement 36, western end southern and northern It turns right eastwards to pavement 46, east orientation west the turn around eastwards western right-turn lane outlet 35 of region 42, east orientation, west of region 32, west of turning around The red light of the traffic lights of track outlet 45 is opened;
S30, control south east-west direction pavement 16, the North east-west direction pavement 26, south orientation north turn around region 12, north To the south region 22 of turning around, south orientation north right-turn lane outlet 15, north orientation south right-turn lane outlet 25, the western Through Lane 33 of east orientation, west The green light of the traffic lights of Through Lane 43 is opened eastwards, while south orientation north left turn waiting zone domain 11, north orientation south is controlled to turn left The red light of the traffic lights in area to be transferred domain 21 is opened;
The green light of S40, the western left turn waiting zone domain 31 of control east orientation, the west lamp of the traffic signals in left turn waiting zone domain 41 eastwards It opens, while south east-west direction pavement 16, the North east-west direction pavement 26, south orientation north is controlled to turn around region 12, south orientation Northern right-turn lane outlet 15, north orientation south turn around region 22, north orientation south right-turn lane outlet 25, the western Through Lane 33 of east orientation, west to The red light of the traffic lights of eastern Through Lane 43 is opened.
S50, and so on, above-mentioned rate-determining steps are recycled, to control the current of vehicle and pedestrian.
Region 12, south orientation north right-turn lane outlet 15, north orientation south specifically, south orientation north Through Lane 13, south orientation north turn around It turns around in turn around region 22, north orientation south right-turn lane outlet 25, the western Through Lane 33 of east orientation, east orientation west of Through Lane 23, north orientation south Region 32, the western right-turn lane outlet 35 of east orientation, western Through Lane 43 eastwards, western region 42 of turning around eastwards, western right-turn lane eastwards Outlet 45, south east-west direction pavement 16, the North east-west direction pavement 26, the east North and South direction pavement 36, western end south The green light opening time from the north to the traffic lights on pavement 46 for 50 seconds, the red light opening time is 78 seconds.Turn left in south orientation north Area to be transferred domain 11, the friendship in north orientation south left turn waiting zone domain 21, the western left turn waiting zone domain 31 of east orientation, western left turn waiting zone domain 11 eastwards The green light opening time of ventilating signal lamp is 14 seconds, and the red light opening time is 114 seconds.
Further, south orientation north Through Lane, north orientation south Through Lane, the western Through Lane of east orientation, western Through Lane eastwards The green unlatching of traffic lights during, when current vehicle is travelled according to the speed of regulation to next crossroad, the four crossway Mouthful south orientation north Through Lane, north orientation south Through Lane, the western Through Lane of east orientation, west traffic lights of Through Lane eastwards it is green Lamp is just turned on, current to form green light linking.
Specifically, the controlling cycle timetable in each traffic lights in the one of crossroad of urban road is as follows:
Above table reflects each Traffic signal control period of one of crossroad, wherein, 00:05:00 with 00:05:What is represented between 50 be time interval is 50 seconds.If in routine duties, because of signal lamp more exchange device, repair, power failure Situations such as need to restart or adjust the traffic lights at each crossing, then can refer to the data in table and go to adjust.
In order to ensure the efficiency of vehicle pass-through, the adjusting of each traffic lights of two or more crossroad Mode is as follows:
Assuming that the distance of first crossroad and second crossroad is 1 km, it is specified that the travel speed of vehicle is 60km/h is calculated, then vehicle needs 1 minute from first crossroad to second crossroad, then, two can be set The interval time that the green light of a crossroad is opened is one minute, specifically, for example, first crossroad south orientation north straight traffic The green light start-up time in road is 00:05:00, then the green light start-up time of second crossroad south orientation north Through Lane is 00:06:00, and so on, the opening time of the traffic lights green light in other tracks of second crossroad is required for comparing One minute evening of opening time of the traffic lights green light in the correspondence track of the first crossroad.This ensure that according to 60km/h The vehicle of travel speed, without waiting for red light, improves traffic efficiency from first crossroad to second crossroad.
Further, the traffic lights of major trunk roads entrance can be set according to actual conditions that red light and green light open when Between length.
The traffic lights of major trunk roads entrance can be according to the rear crossroad Through Lane green light opening time with coming in and going out Mouth spacing, speed per hour setting traffic lights are connected current cycle time, for example, the opening time of setting red light and green light is respectively 50 seconds and 78 seconds.If major trunk roads entrance is with north and south, 500 meters of east-west direction crossroad spacing, it is specified that the traveling speed of vehicle It spends and is calculated for 60km/h, then vehicle drives to major trunk roads entrance from crossroad needs 30 seconds, then, master can be set The green light of arterial highway entrance opens the green light opening time interval 30 seconds with north and south, east-west direction crossroad, and so on Through Lane is connected.
In other embodiments, the red light and green light of each crossroad traffic signal lamp can also be adjusted according to road actual conditions The time length of unlatching.
In other embodiments, the last 3 seconds signals for adding in amber light of red light can be become in green light.
It is above-mentioned only with embodiment come the technology contents that further illustrate the present invention, in order to which reader is easier to understand, but not It represents embodiments of the present invention and is only limitted to this, any technology done according to the present invention extends or recreation, by the present invention's Protection.Protection scope of the present invention is subject to claims.

Claims (9)

1. the vehicle shunting linking traffic system of city road crossing, which is characterized in that the two-way including east-west direction Trade road and the opposing traffic road of North and South direction, the opposing traffic road of the North and South direction include a plurality of north orientation south runway With a plurality of south orientation north runway, north orientation south runway includes north orientation south left-hand rotation turn lane, north orientation south Through Lane, north orientation South straight trip right-turn lane, the front end of the north orientation south left-hand rotation turn lane is north orientation south left turn waiting zone domain, and rear end is north orientation south It turns around region;North orientation south right-turn lane is equipped on the right side of the north orientation south straight trip right-turn lane to export;The south orientation Bei Hangchedaobao Include south orientation north left-hand rotation turn lane, south orientation north Through Lane, south orientation north straight trip right-turn lane;The south orientation north left-hand rotation turn lane Front end for south orientation north left turn waiting zone domain, rear end is turned around region for south orientation north;It is set on the right side of the south orientation north straight trip right-turn lane There is the right-turn lane outlet of south orientation north;The opposing traffic road of the east-west direction including a plurality of east orientation head west track and it is a plurality of west to Eastbound carriageway, the east orientation head west track include east orientation west left-hand rotation turn lane, the western Through Lane of east orientation, east orientation west straight trip turn right Track;The front end of the east orientation west left-hand rotation turn lane is the western left turn waiting zone domain of east orientation, and rear end is turned around region for east orientation west;Institute It states and the western right-turn lane outlet of east orientation is equipped on the right side of east orientation west straight trip right-turn lane;The west includes west to eastbound carriageway and turns left eastwards Turn lane, western Through Lane eastwards, western right-turn lane of keeping straight on eastwards;It is described west eastwards left-hand rotation turn lane front end for west to Eastern left turn waiting zone domain, rear end are western region of turning around eastwards;Straight trip right-turn lane right side is turned right eastwards equipped with west eastwards in the west Track exports.
2. the vehicle shunting linking traffic system of city road crossing according to claim 1, which is characterized in that institute The east crossing for stating the opposing traffic road of east-west direction is equipped with the east North and South direction pavement, the two-way of the east-west direction The western end crossing on trade road is equipped with western end North and South direction pavement, and the south crossing of the opposing traffic road of the North and South direction is set There is south east-west direction pavement, the North crossing of the opposing traffic road of the North and South direction is equipped with the North east-west direction people's row Road.
3. the vehicle shunting linking traffic system of city road crossing according to claim 1, which is characterized in that institute The both sides for stating the opposing traffic road of east-west direction and the opposing traffic road of North and South direction are equipped with major trunk roads entrance.
4. the vehicle shunting linking traffic system of city road crossing according to claim 1, which is characterized in that institute State the right-turn lane outlet of north orientation south, the outlet of south orientation north right-turn lane, the western right-turn lane outlet of east orientation, west right-turn lane outlet eastwards Middle part be all provided with someone's row passageway.
5. the vehicle shunting linking traffic system of city road crossing according to claim 1, which is characterized in that institute The F-Zero for stating the opposing traffic road of east-west direction and the opposing traffic road limitation vehicle pass-through of North and South direction is 60km/ h。
6. the current control method of the vehicle shunting linking of city road crossing, which is characterized in that the method includes:
Control south orientation north Through Lane, north orientation south Through Lane, east orientation west turn around region, the western right-turn lane outlet of east orientation, west to Turn around the traffic signals on region, western right-turn lane outlet eastwards, the east North and South direction pavement, western end North and South direction pavement in east The green light of lamp is opened, while south orientation north is controlled to turn around region, the outlet of south orientation north right-turn lane, south orientation north left turn waiting zone domain, north To the south region of turning around, the outlet of north orientation south right-turn lane, north orientation south left turn waiting zone domain, the western Through Lane of east orientation, the left-hand rotation of east orientation west Area to be transferred domain, western Through Lane eastwards, western left turn waiting zone domain, south east-west direction pavement, the North east-west direction people eastwards The red light of the traffic lights on trade is opened;
Control south orientation north left turn waiting zone domain, north orientation south left turn waiting zone domain traffic lights green light open, control simultaneously South orientation north Through Lane, north orientation south Through Lane, the east North and South direction pavement, western end North and South direction pavement, east orientation west are fallen The red light of traffic lights that head region, western region of turning around eastwards, the western right-turn lane outlet of east orientation, western right-turn lane eastwards export It opens;
Control south east-west direction pavement, the North east-west direction pavement, south orientation north turn around region, north orientation south turn around region, The right-turn lane outlet of south orientation north, the outlet of north orientation south right-turn lane, the western Through Lane of east orientation, west Through Lane eastwards traffic signals The green light of lamp is opened, at the same control south orientation north left turn waiting zone domain, north orientation south left turn waiting zone domain traffic lights red light It opens;
The green light of the western left turn waiting zone domain of east orientation, the western lamp of the traffic signals in left turn waiting zone domain eastwards is controlled to open, same to time control East-west direction pavement in the south processed, the North east-west direction pavement, south orientation north are turned around region, the outlet of south orientation north right-turn lane, north To the south region of turning around, the outlet of north orientation south right-turn lane, the western Through Lane of east orientation, the western traffic lights of Through Lane eastwards it is red Lamp is opened.
And so on, above-mentioned rate-determining steps are recycled, to control the current of vehicle and pedestrian.
7. the current control method of the vehicle shunting linking of city road crossing according to claim 6, feature It is, south orientation north Through Lane, south orientation north turn around region, the outlet of south orientation north right-turn lane, north orientation south Through Lane, north orientation South turn around region, the western right-turn lane of east orientation of region, the outlet of north orientation south right-turn lane, the western Through Lane of east orientation, east orientation west that turn around goes out Through Lane, western region of turning around eastwards, western right-turn lane outlet eastwards, south east-west direction pavement, the North are eastern eastwards for mouth, west West to pavement, the east North and South direction pavement, western end North and South direction pavement traffic lights the green light opening time It it is 50 seconds, the red light opening time is 78 seconds.
8. the current control method of the vehicle shunting linking of city road crossing according to claim 6, feature It is, south orientation north left turn waiting zone domain, north orientation south left turn waiting zone domain, the western left turn waiting zone domain of east orientation, west are to dynamic left-hand rotation The green light opening time of the traffic lights in area to be transferred domain is 14 seconds, and the red light opening time is 114 seconds.
9. the current control method of the vehicle shunting linking of city road crossing according to claim 6, feature It is, the traffic of south orientation north Through Lane, north orientation south Through Lane, the western Through Lane of east orientation, western Through Lane eastwards is believed During the green unlatching of signal lamp, when current vehicle is travelled according to the speed of regulation to next crossroad, the crossroad south orientation north Through Lane, north orientation south Through Lane, the western Through Lane of east orientation, west traffic lights of Through Lane eastwards green light just open It opens, it is current to form green light linking.
CN201711442436.6A 2017-12-27 2017-12-27 The vehicle shunting linking traffic system and control method of city road crossing Pending CN108166342A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711442436.6A CN108166342A (en) 2017-12-27 2017-12-27 The vehicle shunting linking traffic system and control method of city road crossing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711442436.6A CN108166342A (en) 2017-12-27 2017-12-27 The vehicle shunting linking traffic system and control method of city road crossing

Publications (1)

Publication Number Publication Date
CN108166342A true CN108166342A (en) 2018-06-15

Family

ID=62521892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711442436.6A Pending CN108166342A (en) 2017-12-27 2017-12-27 The vehicle shunting linking traffic system and control method of city road crossing

Country Status (1)

Country Link
CN (1) CN108166342A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978382A (en) * 2018-06-22 2018-12-11 王梁 A kind of multidirectional collaboration traffic method of single-pass
CN109272758A (en) * 2018-09-20 2019-01-25 蓝静怡 It is a kind of to can be used for controlling system of traffic light of the Y-shaped road without cross system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR546268A (en) * 1922-01-24 1922-11-04 Signaling methods and devices to facilitate the movement of vehicles and pedestrians on busy urban roads
CN101033598A (en) * 2006-03-07 2007-09-12 程祖本 Road equipment, signal lamp control and passing method for full circulation method crossroad
CN101256716A (en) * 2008-04-11 2008-09-03 张南 Road grade crossing non-conflict traffic mode arrangement and control method
CN104195907A (en) * 2014-09-28 2014-12-10 丁乃祥 Road junction capable of realizing simultaneous left turning of vehicles in multiple directions and traffic method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR546268A (en) * 1922-01-24 1922-11-04 Signaling methods and devices to facilitate the movement of vehicles and pedestrians on busy urban roads
CN101033598A (en) * 2006-03-07 2007-09-12 程祖本 Road equipment, signal lamp control and passing method for full circulation method crossroad
CN101256716A (en) * 2008-04-11 2008-09-03 张南 Road grade crossing non-conflict traffic mode arrangement and control method
CN104195907A (en) * 2014-09-28 2014-12-10 丁乃祥 Road junction capable of realizing simultaneous left turning of vehicles in multiple directions and traffic method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978382A (en) * 2018-06-22 2018-12-11 王梁 A kind of multidirectional collaboration traffic method of single-pass
CN108978382B (en) * 2018-06-22 2021-06-04 王梁 Single-pass multi-directional cooperative traffic method
CN109272758A (en) * 2018-09-20 2019-01-25 蓝静怡 It is a kind of to can be used for controlling system of traffic light of the Y-shaped road without cross system

Similar Documents

Publication Publication Date Title
CN103198680B (en) Green wave coordination control method for multiline
CN102542817B (en) Cooperative control method of dedicated phase setting and social traffic flow of left-opening bus
CN103452020B (en) City road crossing
CN108755308A (en) A kind of intersection traffic organization method and system used based on track dynamic
CN105070080A (en) Plane road intersection dispersion system without left turn conflict
CN102024329A (en) Coordination control method for crossroad left-turning pre-signal and straight-going successive signal
CN101256716A (en) Road grade crossing non-conflict traffic mode arrangement and control method
CN110097751B (en) Two-phase signal control intersection pedestrian special phase dynamic setting method
CN105696821B (en) A kind of public transport passing method
CN113362623B (en) A left-turn non-motor vehicle traffic organization system and signal control method at a continuous flow intersection
CN105957375A (en) Traffic signal system and road intersection vehicle pass management method
CN102231237A (en) Novel method for controlling traffic at signalized crossing
CN103116992B (en) Four-road annular intersection design method based on single entrance release
CN104408949A (en) Method of controlling bus priority signal based on right-turning vehicle and bus shared lane
CN108797246A (en) A kind of traffic circle vehicle pass-through system and passing control method
CN106522053B (en) Road intersection diversion device with bus stops
CN202705838U (en) Three-bridge combined crossroad achieving complete interchange
CN103498394B (en) A kind of automobile-use planar road net system
CN103469708A (en) Signal controlling and transiting scheme of crossroad
CN108166342A (en) The vehicle shunting linking traffic system and control method of city road crossing
CN105672074A (en) Urban road crossroad diversion system
KR100768751B1 (en) Signal Control Method for Three-Tier Intersection and Three-Tier Intersection
CN105654738B (en) A kind of composed structure and its left control method of change of intersection
CN113136753A (en) Urban non-motor vehicle lane design method for slow traffic
CN107808531A (en) It is a kind of based on pre-signal close to stagger intersection wagon flow passing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180615

RJ01 Rejection of invention patent application after publication