CN108086931A - Well head dust collector for drilling equipment - Google Patents

Well head dust collector for drilling equipment Download PDF

Info

Publication number
CN108086931A
CN108086931A CN201810114166.4A CN201810114166A CN108086931A CN 108086931 A CN108086931 A CN 108086931A CN 201810114166 A CN201810114166 A CN 201810114166A CN 108086931 A CN108086931 A CN 108086931A
Authority
CN
China
Prior art keywords
dust
guide cylinder
drilling
well head
gathering arrester
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810114166.4A
Other languages
Chinese (zh)
Inventor
邝光升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Geology And Mineral Exploration And Development Bureau 208 Hydrogeology Engineering Geology Team (chongqing Geological Disaster Prevention Engineering Exploration And Design Institute)
Original Assignee
Chongqing Geology And Mineral Exploration And Development Bureau 208 Hydrogeology Engineering Geology Team (chongqing Geological Disaster Prevention Engineering Exploration And Design Institute)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Geology And Mineral Exploration And Development Bureau 208 Hydrogeology Engineering Geology Team (chongqing Geological Disaster Prevention Engineering Exploration And Design Institute) filed Critical Chongqing Geology And Mineral Exploration And Development Bureau 208 Hydrogeology Engineering Geology Team (chongqing Geological Disaster Prevention Engineering Exploration And Design Institute)
Priority to CN201810114166.4A priority Critical patent/CN108086931A/en
Publication of CN108086931A publication Critical patent/CN108086931A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/01Arrangements for handling drilling fluids or cuttings outside the borehole, e.g. mud boxes
    • E21B21/015Means engaging the bore entrance, e.g. hoods for collecting dust

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The invention relates to a wellhead dust removal device for drilling equipment, which comprises a horn-shaped dust collection cover, a guide cylinder, a dust remover and a sealing air bag, wherein the upper end of the guide cylinder is closed, a rubber sealing ring is arranged on a drill rod through hole to realize dynamic sealing, the dust remover is vertically arranged right below the guide cylinder and is communicated with an inner cavity of the guide cylinder, the dust remover is a double-layer coaxial circular short pipe, two ends of an annular interlayer formed by an inner pipe and an outer pipe are closed, a large number of water spray holes are distributed on the inner pipe, a high-pressure water access pipe is arranged on the outer pipe, and when air flow carrying dust in a drill hole passes through the dust remover, the air flow is fully contacted with high-pressure water fed by the high-pressure water access pipe and water mist sprayed inwards through the water spray holes of the inner pipe. The anchor rod and anchor cable drilling machine is simple in structure, low in manufacturing cost, light in weight and small in occupied space, can be flexibly used for anchor rod and anchor cable drilling of scaffold operation such as high slope, deep foundation pit and dangerous rock management, and achieves green drilling.

Description

A kind of drilling equipment well head dust-extraction unit
Technical field
The invention belongs to geological drilling field of engineering technology, are removed suitable for the various dust drillings using air as circulatory mediator Dirt.
Background technology
Traditional large-scale advanced drilling equipment, is sent to cyclone separator dedusting, advantage is to remove after the dust of aperture by pipeline Dirt effect is preferable, but since volume, weight are big, can not be applied on the landing stage of scaffold of anchoring engineering.It is set for small-sized probing It is standby, dust-extraction unit is generally not provided with, proofing dust and protecting measure is only taken worker and combines well head covering plus water spray dust, although It is at low cost, but dust removing effects are bad, pollute environment, influence workers ' health, dust is big to equipment damage.
The content of the invention
For above-mentioned technical problem, the present invention is intended to provide a kind of manufacture drilling equipment at low cost, good dedusting effect is used Well head dust-extraction unit is particularly suitable for some drilling site conditions harshnesses, and the occasion that large scale equipment cannot go up scaffold operation uses, Anchor shaft anchor cable drilling of the scaffolds operation such as high slope, deep basal pit and Unstable Rock Treatment etc., especially small-sized probing can be flexibly used for Facilities air creeps into well head dedusting, effectively solves environmental pollution and protection worker's health.
For this purpose, the technical solution adopted in the present invention is:A kind of drilling equipment well head dust-extraction unit, including tubaeform collection Dust hood, guide cylinder and deduster, the tubaeform dust gathering arrester are co-axially mounted rear enclosure on the drilling rod of drilling equipment with guide cylinder, institute The big opening end for stating tubaeform dust gathering arrester covers in well head, and the pressure bladder by being close to well head prevents dust from leaking, the guiding The upper end closed of cylinder is simultaneously provided with rubber seal on drilling rod via and realizes dynamic sealing, the drilling rod horizontal by angle α, And 0 ° of 90 ° of < α <, deduster are vertically installed at the underface of guide cylinder and are communicated with the inner cavity of guide cylinder, deduster is bilayer Coaxial circular short tube, the annular interlayer that inner and outer pipes are formed is closed at both ends, and substantial amounts of hole for water spraying is distributed in inner tube, is set on outer tube There is high pressure water access tube, when the air stream that dust is carried in drilling passes through deduster, the high pressure with high pressure water access tube feeding The water and water mist inwardly sprayed through deduster inner tube hole for water spraying comes into full contact with, becomes wet bulb or mud, under the effect of gravity, through removing It discharges dirt device bottom.
As the preferred of said program, the osculum end of the tubaeform dust gathering arrester perpendicular to drilling rod, tubaeform dust gathering arrester Big opening end is obliquely installed with respect to drilling rod, the inclined hole drilling well for different angle, it is only necessary to replace tubaeform dust gathering arrester, it is ensured that loudspeaker The big opening end diameter of shape dust gathering arrester is consistent, you can realizes the general of pressure bladder.
Further, the tubaeform dust gathering arrester is welded and fixed with guide cylinder, and deduster is welded and fixed with guide cylinder, welding peace The sealing effect of dress is more preferable.
The beneficial effects of the invention are as follows:It is simple in structure, manufacture it is at low cost, light-weight, occupy little space, can flexibly be used for height The anchor shaft anchor cable drilling of the scaffolds operation such as side slope, deep basal pit and Unstable Rock Treatment;Dust is made using totally enclosed type high pressure water veil Become wet bulb or mud, and be automatically drained out using gravity, it is achieved thereby that green probing, effectively solves environmental pollution and protection work The sky in addition to large scale equipment operation has been filled up in human body health, the well head dedusting being adapted under all devices and execution conditions Pneumatic drill is into dedusting blank.
Description of the drawings
Fig. 1 is the structure diagram of the present invention.
Fig. 2 is the deduster perspective view with high pressure water access tube.
Specific embodiment
By way of example and in conjunction with the accompanying drawings, the invention will be further described:
As shown in Figure 1, a kind of drilling equipment well head dust-extraction unit, mainly by tubaeform dust gathering arrester 1, guide cylinder 2, dedusting Device 3, pressure bladder 4, high pressure water access tube 5 form.
Tubaeform dust gathering arrester 1 is co-axially mounted rear enclosure on the drilling rod 6 of drilling equipment with guide cylinder 2, it is preferable that tubaeform collection Dust hood 1 is welded and fixed with guide cylinder 2.
Tubaeform dust gathering arrester 1 divides big opening end and osculum end, and the big opening end of tubaeform dust gathering arrester 1 covers in well head, and passes through tight The pressure bladder 4 of patch well head prevents dust from leaking, and the osculum end of tubaeform dust gathering arrester 1 is welded with the lower end of guide cylinder 2.
The upper end closed of guide cylinder 2 is simultaneously provided with rubber seal realization dynamic sealing on drilling rod via, and drilling rod 6 was crept into Cheng Zhong, tubaeform dust gathering arrester 1, guide cylinder 2, deduster 3, pressure bladder 4, high pressure water access tube 5 are fixed not as an entirety It is dynamic.
Drilling rod 6 is horizontal by angle α, and 0 ° of 90 ° of < α <, deduster 3 are vertically installed at the underface of guide cylinder 2, and It is communicated with the inner cavity of guide cylinder 2, deduster 3 is welded and fixed with guide cylinder 2.
As shown in Figure 1, Figure 2, deduster 3 is double-layer coaxial circular short tube, two end seal of annular interlayer that inner and outer pipes are formed It closes, substantial amounts of hole for water spraying 3a is distributed in inner tube, high pressure water access tube 5 is provided on outer tube.
When carrying the air stream of dust by deduster 3 in drilling, the high pressure water and warp be sent into high pressure water access tube 5 The water mist that 3 inner tube hole for water spraying 3a of deduster inwardly sprays comes into full contact with, and becomes wet bulb or mud, under the effect of gravity, through dedusting It discharges 3 bottom of device.
The osculum end of tubaeform dust gathering arrester 1 is set perpendicular to drilling rod 6, the big opening end of tubaeform dust gathering arrester 1 with respect to the inclination of drilling rod 6 It puts, the inclined hole drilling well for different angle, it is only necessary to replace tubaeform dust gathering arrester 1, it is ensured that the big opening end of tubaeform dust gathering arrester 1 is straight Footpath is consistent, you can realizes the general of pressure bladder 4.
The dust generated in drilling process along the gap between drilling and hole wall is blown out using gases at high pressure in drilling rod, is led to The big opening end for crossing tubaeform dust gathering arrester 1 covers in well head, can preferably collect dust, and dust is finally blown to guide cylinder 2, deduster 3 connect pressure water by high pressure water access tube 5 forms interior spray high pressure water veil, contacts to form wet bulb or mud with dust, through dedusting It discharges 3 bottom of device.Since deduster 3 is arranged on the underface of guide cylinder 2, dust is once contacted with high-pressure water mist just becomes wet bulb Or mud, dust removing effects are very good.

Claims (3)

1. a kind of drilling equipment well head dust-extraction unit, it is characterised in that:Including tubaeform dust gathering arrester (1), guide cylinder (2) and remove Dirt device (3), the tubaeform dust gathering arrester (1) is co-axially mounted rear enclosure on the drilling rod (6) of drilling equipment with guide cylinder (2), described The big opening end of tubaeform dust gathering arrester (1) covers in well head, and the pressure bladder (4) by being close to well head prevents dust from leaking, described The upper end closed of guide cylinder (2) is simultaneously provided with rubber seal realization dynamic sealing, the drilling rod (6) and level on drilling rod via Face makes an angle alpha, and 0 ° of 90 ° of < α <, and deduster (3) is vertically installed at the underface of guide cylinder (2) and interior with guide cylinder (2) Chamber communicates, and deduster (3) is double-layer coaxial circular short tube, and the annular interlayer that inner and outer pipes are formed is closed at both ends, is distributed in inner tube Substantial amounts of hole for water spraying (3a) is provided with high pressure water access tube (5) on outer tube, when the air stream that dust is carried in drilling passes through dedusting During device (3), the high pressure water being sent into high pressure water access tube (5) and the water inwardly sprayed through deduster (3) inner tube hole for water spraying (3a) Mist comes into full contact with, and becomes wet bulb or mud, under the effect of gravity, is discharged through deduster (3) bottom.
2. drilling equipment according to claim 1 well head dust-extraction unit, it is characterised in that:The tubaeform dust gathering arrester (1) osculum end is obliquely installed perpendicular to drilling rod (6), the big opening end of tubaeform dust gathering arrester (1) with respect to drilling rod (6).
3. drilling equipment according to claim 1 well head dust-extraction unit, it is characterised in that:The tubaeform dust gathering arrester (1) it is welded and fixed with guide cylinder (2), deduster (3) is welded and fixed with guide cylinder (2).
CN201810114166.4A 2018-02-05 2018-02-05 Well head dust collector for drilling equipment Pending CN108086931A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810114166.4A CN108086931A (en) 2018-02-05 2018-02-05 Well head dust collector for drilling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810114166.4A CN108086931A (en) 2018-02-05 2018-02-05 Well head dust collector for drilling equipment

Publications (1)

Publication Number Publication Date
CN108086931A true CN108086931A (en) 2018-05-29

Family

ID=62194296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810114166.4A Pending CN108086931A (en) 2018-02-05 2018-02-05 Well head dust collector for drilling equipment

Country Status (1)

Country Link
CN (1) CN108086931A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057734A (en) * 2018-09-20 2018-12-21 江苏鼎达建筑新技术有限公司 All-in-one machine is anchored for no-dig technique roadbed
CN109057733A (en) * 2018-07-25 2018-12-21 中国十七冶集团有限公司 A kind of side slope armature boring construction device for reducing dust
CN114198028A (en) * 2021-12-10 2022-03-18 山东省路桥集团有限公司 Cyclone anti-floating anchor rod machine and construction method
CN118855387A (en) * 2024-06-21 2024-10-29 玉溪飛亚矿业开发管理有限责任公司 A wet dust suppression system for hole enlarging cutter disc

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4319647A (en) * 1980-04-16 1982-03-16 Browning Engineering Corporation Flame drill channelling method and apparatus for reducing noise and dust levels
CN203879428U (en) * 2014-05-30 2014-10-15 陕西煤业化工技术研究院有限责任公司 Dry-type drilling and dust removing device
CN104499967A (en) * 2014-12-12 2015-04-08 平顶山冠宏矿山技术装备有限公司 Drilling machine with dust-collecting device
CN206608126U (en) * 2017-04-07 2017-11-03 吴雨谦 Pneumatic type down-hole hammer drilling dust-removing apparatus
CN207847557U (en) * 2018-02-05 2018-09-11 重庆市地质矿产勘查开发局208水文地质工程地质队(重庆市地质灾害防治工程勘查设计院) Wellhead dust removal device for drilling equipment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4319647A (en) * 1980-04-16 1982-03-16 Browning Engineering Corporation Flame drill channelling method and apparatus for reducing noise and dust levels
CN203879428U (en) * 2014-05-30 2014-10-15 陕西煤业化工技术研究院有限责任公司 Dry-type drilling and dust removing device
CN104499967A (en) * 2014-12-12 2015-04-08 平顶山冠宏矿山技术装备有限公司 Drilling machine with dust-collecting device
CN206608126U (en) * 2017-04-07 2017-11-03 吴雨谦 Pneumatic type down-hole hammer drilling dust-removing apparatus
CN207847557U (en) * 2018-02-05 2018-09-11 重庆市地质矿产勘查开发局208水文地质工程地质队(重庆市地质灾害防治工程勘查设计院) Wellhead dust removal device for drilling equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057733A (en) * 2018-07-25 2018-12-21 中国十七冶集团有限公司 A kind of side slope armature boring construction device for reducing dust
CN109057734A (en) * 2018-09-20 2018-12-21 江苏鼎达建筑新技术有限公司 All-in-one machine is anchored for no-dig technique roadbed
CN114198028A (en) * 2021-12-10 2022-03-18 山东省路桥集团有限公司 Cyclone anti-floating anchor rod machine and construction method
CN114198028B (en) * 2021-12-10 2023-09-05 山东省路桥集团有限公司 Cyclone type anti-floating roof bolter and construction method
CN118855387A (en) * 2024-06-21 2024-10-29 玉溪飛亚矿业开发管理有限责任公司 A wet dust suppression system for hole enlarging cutter disc

Similar Documents

Publication Publication Date Title
CN108086931A (en) Well head dust collector for drilling equipment
CN203879428U (en) Dry-type drilling and dust removing device
CN206376771U (en) Geophysical drilling machine dust guard
CN207847557U (en) Wellhead dust removal device for drilling equipment
CN211370341U (en) Dust and blowout prevention device for coal mine gas drainage
CN203097768U (en) Dust removal device of dry-type drilling hole
CN107503680B (en) Ground large-diameter rapid drilling equipment and method thereof
CN206608126U (en) Pneumatic type down-hole hammer drilling dust-removing apparatus
CN111535762B (en) Drill bit cooling dust remover
CN218716634U (en) Water-free drilling dustproof device
CN215696558U (en) Clear hole device in big gun hole
CN212642642U (en) A kind of spray dust suppression drill pipe
CN102518404B (en) Coal mine down-hole drill hole water jet negative-pressure dedusting device
CN210105912U (en) Dust settling system for underground gas extraction drill hole orifice
CN213510714U (en) Dust collection and removal device in extremely soft rock tunnel dry drilling environment
CN207951094U (en) Mist of oil exhaust-gas treatment environmental protecting device
CN202348114U (en) Vertical shaft direct-discharging de-dusting noise-reducing integrated umbrella-shaped drilling machine
CN220539595U (en) Orifice dust collecting device
CN203856496U (en) Coal seam pumping and releasing drilling negative pressure dedusting system
CN221002752U (en) Heading machine with monitoring function
CN205858252U (en) A kind of coring boring blowout prevention aperture apparatus
CN218716636U (en) Gas drainage drilling protector
CN221400627U (en) Automatic dust removal protection device
CN221074152U (en) Cover side slope anchor rope pore-forming dust device
CN221299239U (en) Blowout preventer for safe drilling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180529

RJ01 Rejection of invention patent application after publication