CN108086535A - A kind of assembled square steel tube steel plate concrete combined shear wall - Google Patents
A kind of assembled square steel tube steel plate concrete combined shear wall Download PDFInfo
- Publication number
- CN108086535A CN108086535A CN201711348731.5A CN201711348731A CN108086535A CN 108086535 A CN108086535 A CN 108086535A CN 201711348731 A CN201711348731 A CN 201711348731A CN 108086535 A CN108086535 A CN 108086535A
- Authority
- CN
- China
- Prior art keywords
- shaped
- steel pipe
- square steel
- steel
- shear wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/58—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
本发明公开了一种装配式方钢管与钢板混凝土组合剪力墙,包括竖梁与横梁组成框架结构;所述的竖梁包括异形方钢管组(1)与单体方钢管(2);横梁包括H型钢梁(3);所述的H型钢梁(3)分别与异形方钢管组(1)或单体方钢管(2)焊接作为层间横梁;H型钢梁(3)上方双向连通件(4)连通上下两层;所述的上层的H型钢梁(3)、下层的双向连通件(4)与两侧的异形方钢管组(1)或单体方钢管(2)构成的方形空间两侧面焊接钢板(5);两块钢板(5)间浇注填充混凝土(8);布置灵活、受力明确,显著提高了结构体系的抗侧能力,钢板混凝土组合结构和框架结构协同工作、协调变形,构成了抗震的两道防线,抗震性能得到可靠保证。
The invention discloses an assembled square steel pipe and steel plate concrete combined shear wall, which comprises a vertical beam and a cross beam to form a frame structure; the vertical beam includes a special-shaped square steel pipe group (1) and a single square steel pipe (2); the cross beam Including H-shaped steel beams (3); said H-shaped steel beams (3) are respectively welded with special-shaped square steel pipe groups (1) or single square steel pipes (2) as interlayer beams; above the H-shaped steel beams (3) The two-way connecting piece (4) connects the upper and lower floors; the H-shaped steel beam (3) on the upper floor, the two-way connecting piece (4) on the lower floor and the special-shaped square steel pipe group (1) or single square steel pipe (2) on both sides ) welded steel plates (5) on both sides of the square space formed by two steel plates (5); filling concrete (8) is poured between the two steel plates (5); the layout is flexible and the stress is clear, which significantly improves the lateral resistance of the structural system. The steel plate concrete composite structure and frame The structures work together and coordinate deformation, forming two anti-seismic defense lines, and the anti-seismic performance is reliably guaranteed.
Description
技术领域technical field
本发明涉及建筑结构技术领域,尤其涉及一种装配式方钢管钢板混凝土组合剪力墙。The invention relates to the technical field of building structures, in particular to an assembled square steel tube steel plate concrete composite shear wall.
背景技术Background technique
目前,高层住宅建筑经常采用的结构体系有剪力墙结构、框架-剪力墙结构、框支-剪力墙结构等,这主要是由于纯框架结构的抗侧能力不强,往往需要在高层或超高层结构中引入抗侧刚度更强的剪力墙体系。钢筋混凝土剪力墙是目前结构中最常用的剪力墙形式之一,它以整体性好、刚度大、侧向变形小以及抵抗风荷载及中小级别地震效果好的优点受到广大设计人员的青睐,但是其自身的缺点也比较突出,比如刚度过大、延性较小、裂缝产生较早、受力后期以剪切破坏为主、震后很难修复等,另外,钢筋混凝土剪力墙的尺寸和自重都比较大,这样不但增加了结构基础的负担而且浪费了室内面积。现场施工过程需要支模板、绑钢筋等工序,效率比较低。At present, the structural systems often used in high-rise residential buildings include shear wall structure, frame-shear wall structure, frame support-shear wall structure, etc. Or introduce a shear wall system with stronger lateral stiffness into the super high-rise structure. Reinforced concrete shear wall is one of the most commonly used shear wall forms in structures at present. It is favored by the majority of designers for its advantages of good integrity, high rigidity, small lateral deformation, and good resistance to wind load and small and medium-level earthquakes. , but its own shortcomings are also prominent, such as excessive stiffness, low ductility, early cracks, shear damage in the later stage of stress, and difficult repair after earthquakes. In addition, the size of reinforced concrete shear walls The weight and self-weight are relatively large, which not only increases the burden of the structural foundation but also wastes the indoor area. The on-site construction process needs to support formwork, tie steel bars and other processes, and the efficiency is relatively low.
而另一种双钢板混凝土组合剪力墙,多为上下贯通构造,在楼层位置通过穿筋孔与楼板相连,墙与楼板的连接节点强度较弱,抗震性能较差。The other type of double-steel plate concrete composite shear wall is mostly a vertical through-hole structure, and is connected to the floor through reinforcement holes at the floor position. The joint strength between the wall and the floor is weak, and the seismic performance is poor.
发明内容Contents of the invention
本发明的目的是提供一种装配式方钢管钢板混凝土组合剪力墙,布置灵活、受力明确,显著提高了结构体系的抗侧能力,钢板混凝土组合结构和框架结构协同工作、协调变形,构成了抗震的两道防线,抗震性能得到可靠保证。The purpose of the present invention is to provide an assembled square steel-steel-concrete-concrete composite shear wall, which has flexible layout and clear stress, and significantly improves the lateral resistance of the structural system. The two lines of defense for earthquake resistance are established, and the earthquake resistance performance is reliably guaranteed.
本发明的目的是通过以下技术方案实现的:The purpose of the present invention is achieved through the following technical solutions:
一种装配式方钢管与钢板混凝土组合剪力墙,包括竖梁与横梁组成框架结构;所述的竖梁包括异形方钢管组1与单体方钢管2;横梁包括H型钢梁3;An assembled square steel pipe and steel plate concrete composite shear wall, comprising a vertical beam and a cross beam to form a frame structure; the vertical beam includes a special-shaped square steel pipe group 1 and a single square steel pipe 2; the cross beam includes an H-shaped steel beam 3;
所述的H型钢梁3分别与异形方钢管组1或单体方钢管2焊接作为层间横梁;H型钢梁3上方双向连通件4连通上下两层;The H-shaped steel beam 3 is respectively welded with the special-shaped square steel pipe group 1 or the single square steel pipe 2 as an interlayer beam; the two-way connecting piece 4 above the H-shaped steel beam 3 connects the upper and lower floors;
所述的上层的H型钢梁3、下层的双向连通件4与两侧的异形方钢管组1或单体方钢管2构成的方形空间两侧面焊接钢板5;两块钢板5间浇注填充混凝土8;The H-shaped steel beam 3 on the upper floor, the two-way connecting piece 4 on the lower floor and the special-shaped square steel pipe group 1 or the single square steel pipe 2 on both sides form a square space with welded steel plates 5 on both sides; the two steel plates 5 are filled with concrete 8;
所述的双侧的钢板5通过焊接于上层的H型钢梁3、下层的双向连通件4与两侧的异形方钢管组1或单体方钢管2上的鱼尾板6进行焊接。The steel plate 5 on both sides is welded to the H-shaped steel beam 3 on the upper layer, the two-way connecting piece 4 on the lower layer, and the fishplate 6 on the special-shaped square steel pipe group 1 or the single square steel pipe 2 on both sides.
所述的双侧的钢板5间设有多个均布的支撑钉7。A plurality of evenly distributed support nails 7 are arranged between the steel plates 5 on both sides.
所述的异形方钢管组1包括一字型、L型、T型和十字型。The special-shaped square steel pipe group 1 includes straight, L-shaped, T-shaped and cross-shaped.
所述的双向连通件4包括横通板41,横通板41上方焊接多个均布间断排列的竖栓钉42,与混凝土8浇注连接;The two-way connecting member 4 includes a cross-pass plate 41, and a plurality of evenly distributed and intermittently arranged vertical studs 42 are welded above the cross-pass plate 41, and are poured and connected with the concrete 8;
横通板41下方焊接有多个均布间断排列的竖向钢板43,楼板9的钢筋和混凝土通过竖向钢板43的间隙与相邻空间的楼板9的钢筋和混凝土连接。A plurality of evenly distributed and discontinuously arranged vertical steel plates 43 are welded below the horizontal plate 41, and the steel bars and concrete of the floor 9 are connected with the steel bars and concrete of the floor 9 in the adjacent space through the gaps of the vertical steel plates 43.
所述的楼板9包括叠合楼板、钢筋桁架板和压型钢板。The floor slab 9 includes a laminated floor slab, a reinforced truss slab and a profiled steel plate.
由上述本发明提供的技术方案可以看出,本发明实施例提供的一种装配式方钢管与钢板混凝土组合剪力墙,布置灵活、受力明确,显著提高了结构体系的抗侧能力,钢板混凝土组合结构和框架结构协同工作、协调变形,构成了抗震的两道防线,抗震性能得到可靠保证。It can be seen from the above-mentioned technical solution provided by the present invention that the assembled square steel pipe and steel plate concrete composite shear wall provided by the embodiment of the present invention has flexible layout and clear force, and significantly improves the lateral resistance of the structural system. The concrete composite structure and the frame structure work together and coordinate deformation, forming two lines of defense against earthquakes, and the seismic performance is reliably guaranteed.
附图说明Description of drawings
为了更清楚地说明本发明实施例的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域的普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他附图。In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For Those of ordinary skill in the art can also obtain other drawings based on these drawings on the premise of not paying creative work.
图1为本发明实施例提供的装配式方钢管与钢板混凝土组合剪力墙示意图一;Fig. 1 is the first schematic diagram of the assembled square steel pipe and steel plate concrete composite shear wall provided by the embodiment of the present invention;
图2为本发明实施例提供的装配式方钢管与钢板混凝土组合剪力墙示意图二;Fig. 2 is the second schematic diagram of the assembled square steel pipe and steel plate concrete composite shear wall provided by the embodiment of the present invention;
图3为本发明实施例提供的装配式方钢管与钢板混凝土组合剪力墙异形方钢管组四种结构示意图;Figure 3 is a schematic diagram of four structures of the assembled square steel pipe and steel plate concrete composite shear wall special-shaped square steel pipe group provided by the embodiment of the present invention;
图4为本发明实施例提供的装配式方钢管与钢板混凝土组合剪力墙双向连通件结构示意图一;Fig. 4 is a structural schematic diagram 1 of the two-way connecting member of the assembled square steel pipe and steel plate concrete composite shear wall provided by the embodiment of the present invention;
图5为本发明实施例提供的装配式方钢管与钢板混凝土组合剪力墙双向连通件结构示意图二;Fig. 5 is a structural schematic diagram II of the two-way connecting member of the assembled square steel pipe and steel plate concrete composite shear wall provided by the embodiment of the present invention;
图6为本发明实施例提供的装配式方钢管与钢板混凝土组合剪力墙楼板连接结构示意图。Fig. 6 is a schematic diagram of the connection structure of the assembled square steel pipe and steel plate concrete combined shear wall floor provided by the embodiment of the present invention.
具体实施方式Detailed ways
下面结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明的保护范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
下面将结合附图对本发明实施例作进一步地详细描述。Embodiments of the present invention will be further described in detail below in conjunction with the accompanying drawings.
如图1至图2所示,一种装配式方钢管与钢板混凝土组合剪力墙,包括竖梁与横梁组成框架结构;所述的竖梁包括异形方钢管组1与单体方钢管2;横梁包括H型钢梁3;如图3所示,所述的异形方钢管组1包括一字型、L型、T型和十字型。一字型用于墙面间竖梁,L型用于墙角竖梁,T型用于两个相邻房间的墙角竖梁,十字型用于四个相邻房间的墙角竖梁。As shown in Figures 1 to 2, an assembled square steel pipe and steel plate concrete composite shear wall includes a vertical beam and a beam to form a frame structure; the vertical beam includes a special-shaped square steel pipe group 1 and a single square steel pipe 2; The beams include H-shaped steel beams 3; as shown in Figure 3, the special-shaped square steel pipe group 1 includes straight, L-shaped, T-shaped and cross-shaped. One type is used for vertical beams between walls, L type is used for corner vertical beams, T type is used for corner vertical beams of two adjacent rooms, and cross type is used for corner vertical beams of four adjacent rooms.
所述的H型钢梁3分别与异形方钢管组1或单体方钢管2焊接作为层间横梁;H型钢梁3上方双向连通件4连通上下两层;所述的上层的型钢梁3、下层的双向连通件4与两侧的异形方钢管组1或单体方钢管2构成的方形空间两侧面焊接钢板5;具体的,所述的上层的H型钢梁3内侧焊接两个鱼尾板6、下层的双向连通件4上方焊接两个鱼尾板6,两侧的异形方钢管组1或单体方钢管2内侧均分别焊接两个鱼尾板6,所述的双侧的钢板5通过焊接于上层的型钢梁3、下层的双向连通件4与两侧的异形方钢管组1或单体方钢管2上的鱼尾板6进行焊接。这样两块钢板5就组成了一个空腔,在两块钢板5间浇注填充混凝土8;同时,所述的双侧的钢板5间设有多个均布的支撑钉7。支撑钉7采用横栓钉和对拉螺杆,连接双侧的钢板5。可以增强钢板5和混凝土之间的相互作用。The H-shaped steel beam 3 is welded with the special-shaped square steel pipe group 1 or the single square steel pipe 2 respectively as an interlayer beam; the two-way connecting piece 4 above the H-shaped steel beam 3 connects the upper and lower floors; 3. The two-way connecting piece 4 of the lower layer and the special-shaped square steel pipe group 1 or the single square steel pipe 2 on both sides are welded with steel plates 5 on both sides of the square space; specifically, two of the inner sides of the H-shaped steel beam 3 of the upper layer are welded Two fishplates 6 are welded above the fishplate 6 and the two-way connecting piece 4 of the lower layer, and two fishplates 6 are respectively welded on the inner sides of the special-shaped square steel pipe group 1 or the single square steel pipe 2 on both sides. The steel plate 5 is welded to the profiled steel beam 3 on the upper layer, the two-way connecting piece 4 on the lower layer, and the fishplate 6 on the special-shaped square steel pipe group 1 or the single square steel pipe 2 on both sides. In this way, the two steel plates 5 form a cavity, and concrete 8 is poured between the two steel plates 5; at the same time, a plurality of evenly distributed supporting nails 7 are arranged between the two steel plates 5. The support nail 7 adopts a horizontal bolt and a pull screw to connect the steel plates 5 on both sides. The interaction between the steel plate 5 and concrete can be enhanced.
如图4与图5所示,所述的双向连通件4包括横通板41,横通板41上方焊接多个均布间断排列的竖栓钉42,与混凝土8浇注连接;如图4竖栓钉42可以是双排的,也可以是如图5竖栓钉42是单排的。横通板41下方焊接有多个均布间断排列的竖向钢板43,如图4竖向钢板43可以是横向排列,也可以是如图54竖向钢板43是竖向排列。如图6所示,楼板9的钢筋和混凝土通过竖向钢板43的间隙与相邻空间的楼板9的钢筋和混凝土连接。所述的楼板9包括叠合楼板、钢筋桁架板和压型钢板。As shown in Figures 4 and 5, the two-way connecting member 4 includes a horizontal plate 41, and a plurality of evenly distributed and intermittently arranged vertical studs 42 are welded above the horizontal plate 41 to be connected with the concrete 8 by pouring; The pegs 42 can be in double rows, or in a single row as shown in Fig. 5 . A plurality of evenly distributed vertical steel plates 43 arranged discontinuously are welded below the cross-through plate 41, as shown in Figure 4, the vertical steel plates 43 can be arranged horizontally, or as shown in Figure 54, the vertical steel plates 43 are arranged vertically. As shown in FIG. 6 , the steel bars and concrete of the floor 9 are connected with the steel bars and concrete of the floor 9 in the adjacent space through the gaps of the vertical steel plates 43 . The floor slab 9 includes a laminated floor slab, a reinforced truss slab and a profiled steel plate.
本发明的优点:Advantages of the present invention:
1、剪力墙上下两层间采用墙板双向连通件4,可实现墙体竖直方向的连续和楼板水平方向的连续,结构更加安全;1. Between the upper and lower floors of the shear wall, two-way connecting parts 4 of the wall panel are used, which can realize the continuity of the vertical direction of the wall and the continuity of the horizontal direction of the floor, and the structure is safer;
2、剪力墙在边缘位置采用异形方钢管组1或单体方钢管2的竖梁,对建筑户型的适应能力比较强,可以做到室内不凸角;2. The vertical beams of special-shaped square steel pipe group 1 or single square steel pipe 2 are used at the edge of the shear wall, which has a relatively strong adaptability to the building type and can make indoors without convex corners;
3、剪力墙内嵌H型钢梁3,可将剪力墙的施工与框架结构施工彼此独立,施工效率更高;3. The H-shaped steel beam 3 is embedded in the shear wall, which can separate the construction of the shear wall and the construction of the frame structure, and the construction efficiency is higher;
4、方管柱和钢梁的框架和双钢板5之间内灌混凝土,施工过程中方钢管和双钢板作为模板,免支模,结构施工完成后钢板5和混凝土协同作用,形成组合结构,共同受力;4. Concrete is poured between the frame of the square pipe column and the steel beam and the double steel plate 5. During the construction process, the square steel pipe and the double steel plate are used as a formwork, and formwork is not required. After the structure construction is completed, the steel plate 5 and the concrete cooperate to form a combined structure, Force;
5、方管柱和钢梁的框架内侧焊接鱼尾板6,双侧钢板5直接焊接在鱼尾板6上,施工方便快捷,并且可有效减小薄板焊接造成的残余应力;5. The fishplate 6 is welded on the inner side of the frame of the square pipe column and the steel beam, and the double-sided steel plate 5 is directly welded on the fishplate 6, which is convenient and quick to construct, and can effectively reduce the residual stress caused by the thin plate welding;
6、双钢板5之间通过对拉螺栓和栓钉间隔布置,既防止了混凝土浇筑过程中钢5板的平面外变形又减少了钢板上开孔的数量,更加经济实用。6. The double steel plates 5 are arranged at intervals by tension bolts and studs, which not only prevents the out-of-plane deformation of the steel 5 plates during the concrete pouring process, but also reduces the number of holes on the steel plates, which is more economical and practical.
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明披露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应该以权利要求书的保护范围为准。The above is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any person familiar with the technical field can easily conceive of changes or changes within the technical scope disclosed in the present invention. Replacement should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention should be determined by the protection scope of the claims.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711348731.5A CN108086535B (en) | 2017-12-15 | 2017-12-15 | An Assembled Square Steel Tube Steel Plate Concrete Composite Shear Wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711348731.5A CN108086535B (en) | 2017-12-15 | 2017-12-15 | An Assembled Square Steel Tube Steel Plate Concrete Composite Shear Wall |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108086535A true CN108086535A (en) | 2018-05-29 |
CN108086535B CN108086535B (en) | 2019-10-25 |
Family
ID=62176641
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711348731.5A Active CN108086535B (en) | 2017-12-15 | 2017-12-15 | An Assembled Square Steel Tube Steel Plate Concrete Composite Shear Wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108086535B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109235702A (en) * | 2018-10-19 | 2019-01-18 | 刘凯 | A kind of assembled double steel plate combined shear wall construction and its construction method with ribbing |
CN111636562A (en) * | 2020-05-27 | 2020-09-08 | 安徽富煌钢构股份有限公司 | Assembled high-rise steel structure house double steel plate concrete combined shear wall frame structure |
CN112376692A (en) * | 2020-11-04 | 2021-02-19 | 重庆大学 | Splicing node and splicing method between box type modular steel structure building boxes |
CN114232843A (en) * | 2021-12-16 | 2022-03-25 | 中建五局第三建设有限公司 | A fully assembled building and its construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103883031A (en) * | 2014-03-23 | 2014-06-25 | 北京工业大学 | I-shaped multi-cavity double-steel-plate shear wall with built-in steel mesh reinforcement and manufacturing method |
CN106088400A (en) * | 2016-06-24 | 2016-11-09 | 北京工业大学 | A kind of modular assembly formula light gauge cold-formed steel shape combined wall |
CN205976086U (en) * | 2016-08-11 | 2017-02-22 | 云南建工钢结构股份有限公司 | Compound slat wall body of assembled |
CN106988484A (en) * | 2017-05-12 | 2017-07-28 | 杭萧钢构股份有限公司 | Buckling-restrained steel coupling beam and its steel plate concrete combined shear wall structural system |
CN206570996U (en) * | 2016-12-22 | 2017-10-20 | 山东科技大学 | A kind of novel fabricated shear wall with foundation reinforcer |
CN206607710U (en) * | 2017-03-10 | 2017-11-03 | 西安建筑科技大学 | Steel plate wall construction built in a kind of assembled Self-resetting Concrete Filled Square Steel Tubular Frame |
-
2017
- 2017-12-15 CN CN201711348731.5A patent/CN108086535B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103883031A (en) * | 2014-03-23 | 2014-06-25 | 北京工业大学 | I-shaped multi-cavity double-steel-plate shear wall with built-in steel mesh reinforcement and manufacturing method |
CN106088400A (en) * | 2016-06-24 | 2016-11-09 | 北京工业大学 | A kind of modular assembly formula light gauge cold-formed steel shape combined wall |
CN205976086U (en) * | 2016-08-11 | 2017-02-22 | 云南建工钢结构股份有限公司 | Compound slat wall body of assembled |
CN206570996U (en) * | 2016-12-22 | 2017-10-20 | 山东科技大学 | A kind of novel fabricated shear wall with foundation reinforcer |
CN206607710U (en) * | 2017-03-10 | 2017-11-03 | 西安建筑科技大学 | Steel plate wall construction built in a kind of assembled Self-resetting Concrete Filled Square Steel Tubular Frame |
CN106988484A (en) * | 2017-05-12 | 2017-07-28 | 杭萧钢构股份有限公司 | Buckling-restrained steel coupling beam and its steel plate concrete combined shear wall structural system |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109235702A (en) * | 2018-10-19 | 2019-01-18 | 刘凯 | A kind of assembled double steel plate combined shear wall construction and its construction method with ribbing |
CN109235702B (en) * | 2018-10-19 | 2024-02-02 | 刘凯 | Assembled double-steel-plate combined shear wall structure with ribs and construction method thereof |
CN111636562A (en) * | 2020-05-27 | 2020-09-08 | 安徽富煌钢构股份有限公司 | Assembled high-rise steel structure house double steel plate concrete combined shear wall frame structure |
CN112376692A (en) * | 2020-11-04 | 2021-02-19 | 重庆大学 | Splicing node and splicing method between box type modular steel structure building boxes |
CN114232843A (en) * | 2021-12-16 | 2022-03-25 | 中建五局第三建设有限公司 | A fully assembled building and its construction method |
CN114232843B (en) * | 2021-12-16 | 2023-08-08 | 中建五局第三建设有限公司 | A fully assembled building and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN108086535B (en) | 2019-10-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105544801A (en) | Bolted connection technique for prefabricated large plate shear wall provided with concealed bracing and construction method | |
CN104929281A (en) | Steel bar truss stiffened steel concrete composite shear wall | |
CN209397709U (en) | Light steel keel steel frame composite structure | |
CN105926764B (en) | A kind of industrialization preprocessing regenerative structural system and its construction method | |
CN205954921U (en) | Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area | |
CN106703184A (en) | Connection node construction of concrete-filled square steel tube column and rectangular section steel beam | |
CN108086535B (en) | An Assembled Square Steel Tube Steel Plate Concrete Composite Shear Wall | |
CN207553289U (en) | A kind of assembled steel and concrete frame space modular structure and system | |
CN108005304A (en) | An assembled prestressed concrete frame system and its construction method | |
CN106638957B (en) | Cold formed steel structure external wall of house structural system | |
CN105064529A (en) | Prefabricated and assembled large-board shear wall structure with concealed bracings | |
CN107190884A (en) | A kind of new many high-rise hot-rolled steel section composite light-weight steel shear wall combined structure systems | |
CN205669255U (en) | A kind of industrialization preprocessing regenerative structural system | |
CN102587538A (en) | Dog-bone type coupled shear wall with end plates, bolts and steel coupling beams | |
CN105544865A (en) | Prestress assembly type combined special-shaped column | |
CN106368348A (en) | Overlapped combined shear wall with double-phase stress characteristic | |
CN108755955A (en) | Reinforcement structure between light gauge cold-formed steel shape house longitudinal cross wall | |
CN107268839A (en) | Assembly type semi-embedded semi-hung external wall panel heat insulation structure | |
CN202125104U (en) | Residential building system formed by cast-in-place beam columns and prefabricated sandwich concrete wall slabs | |
CN107882179A (en) | Modular prefabricated steel-concrete combined frame structure | |
CN108775084B (en) | Steel-concrete composite prefabricated beam and prefabricated column connection structure and construction method | |
CN107859403B (en) | Assembled building structure | |
CN202202412U (en) | Rectangular steel pipe concrete special-shaped column-steel beam framework middle node | |
CN102140850B (en) | Frame with floors of composite grid structure and construction method thereof | |
CN108166612A (en) | A kind of multilayer light gauge cold-formed steel shape-concrete composite structure building construction system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |