[go: up one dir, main page]

CN108071922A - A kind of flow monitoring instrument hanger - Google Patents

A kind of flow monitoring instrument hanger Download PDF

Info

Publication number
CN108071922A
CN108071922A CN201611040796.9A CN201611040796A CN108071922A CN 108071922 A CN108071922 A CN 108071922A CN 201611040796 A CN201611040796 A CN 201611040796A CN 108071922 A CN108071922 A CN 108071922A
Authority
CN
China
Prior art keywords
fixed
plate
monitoring instrument
flow monitoring
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611040796.9A
Other languages
Chinese (zh)
Inventor
曾庆华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Wei Qi Polytron Technologies Inc
Original Assignee
Sichuan Wei Qi Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Wei Qi Polytron Technologies Inc filed Critical Sichuan Wei Qi Polytron Technologies Inc
Priority to CN201611040796.9A priority Critical patent/CN108071922A/en
Publication of CN108071922A publication Critical patent/CN108071922A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M13/00Other supports for positioning apparatus or articles; Means for steadying hand-held apparatus or articles
    • F16M13/02Other supports for positioning apparatus or articles; Means for steadying hand-held apparatus or articles for supporting on, or attaching to, an object, e.g. tree, gate, window-frame, cycle
    • F16M13/027Ceiling supports

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Barrages (AREA)

Abstract

本发明一种流速监测仪用挂架由于在所述行车固定支架的两侧呈对称布置的形式设置所述配重架及承载支架,且配重架重量可调,避免进行水务监测时,流速监测仪因不平衡造成的上下摆动,确保了流速监测仪始终与河道平面呈固定角度的夹角,保证了流速监测数据的准确性。

A hanger for a flow rate monitor in the present invention is provided with the counterweight frame and the load-bearing bracket in a symmetrical arrangement on both sides of the driving fixed bracket, and the weight of the counterweight frame is adjustable, so that the flow rate during water monitoring is avoided. The up and down swing of the monitor due to unbalance ensures that the flow rate monitor always forms a fixed angle with the river plane, ensuring the accuracy of the flow rate monitoring data.

Description

一种流速监测仪用挂架Hanging rack for flow rate monitor

技术领域technical field

本发明涉及水务监测领域用传感器,尤其涉及应用在水务监测领域的流速监测仪用挂架。The invention relates to a sensor used in the field of water monitoring, in particular to a hanger for a flow rate monitor applied in the field of water monitoring.

背景技术Background technique

目前,应用于水务监测领域的流速监测仪,使用时,一般将流速监测仪固定在三角行车并通过电机的拖动而实现将流速监测仪在河道两岸的来回拖动监测,电机拖动过程中,由于流速监测仪仅布置在三角行车的一侧及电机拖动时的振动,极易造成行车两侧受力不平衡,经常容易发生流速监测过程中三角行车的来回摆动,进而造成测试数据的不准确。如何针对此问题设计一个合理可行的流速监测仪挂架成为解决流速监测数据测量准确性的关键。At present, when the flow rate monitor used in the field of water monitoring is used, the flow rate monitor is generally fixed on the triangular vehicle and dragged by the motor to realize the monitoring of the flow rate monitor back and forth on both sides of the river. , because the flow rate monitor is only arranged on one side of the triangular crane and the vibration when the motor is dragged, it is very easy to cause unbalanced forces on both sides of the truck, and it is often easy to swing back and forth during the flow rate monitoring process of the triangular crane, which in turn causes test data. Inaccurate. How to design a reasonable and feasible flow rate monitor hanger to solve this problem becomes the key to solve the measurement accuracy of flow rate monitoring data.

发明内容Contents of the invention

本发明的目的是针对上述背景技术存在的缺陷,提供一种能确保装在流速监测仪用挂架上的流速监测仪始终与河道平面呈固定夹角的流速监测仪用挂架。The object of the present invention is to provide a hanger for a flow rate monitor that can ensure that the flow rate monitor installed on the hanger for a flow rate monitor always forms a fixed angle with the river channel plane in view of the defects in the above-mentioned background technology.

为实现上述目的,本发明一种流速监测仪用挂架,适用于水务监测领域,该流速监测仪用挂架包括一固定于三角行车上的行车固定支架,该行车固定支架进一步包括两呈“H”型的基架及将两基架相互固定的四固定柱,一可调节地固定在行车固定支架顶端的太阳能安装架,倾斜安装固定在所述基架上的配重架,所述配重架通过一第一安装固定板安装固定在所述基架的两相对固定柱上,所述配重架上设置有调节流速监测仪用挂架平衡的配重固定装置,该配重固定装置由一固定在配重架上的配重固定柱、一用于将所述配重固定柱上的配重块锁死的压紧锁死螺母及一套设在所述配重固定柱上的定位片;一相对所述配重架安装固定在所述基架的另两相对固定柱上的承载支架;一套装在所述承载支架上的流速监测仪保护罩及一有间距地套装在所述流速监测仪保护罩外的防热罩。In order to achieve the above object, the present invention provides a hanger for a flow rate monitor, which is suitable for the field of water monitoring. The hanger for a flow rate monitor includes a driving fixing bracket fixed on a triangular driving, and the driving fixing bracket further includes two " H"-shaped base frame and four fixed columns that fix the two base frames to each other, a solar installation frame that can be adjusted and fixed on the top of the driving fixed bracket, and a counterweight frame that is fixed on the base frame by tilting. The heavy frame is installed and fixed on two opposite fixed columns of the base frame through a first installation and fixing plate, and a counterweight fixing device for adjusting the balance of the hanger for the flow rate monitor is arranged on the described counterweight frame, and the counterweight fixing device It consists of a counterweight fixing column fixed on the counterweight frame, a compression locking nut for locking the counterweight on the counterweight fixing column, and a set of counterweight fixing columns arranged on the counterweight fixing column. A positioning piece; a load-bearing bracket installed and fixed on the other two relative fixed columns of the base frame relative to the counterweight frame; a flow rate monitor protective cover set on the load-bearing bracket and a spaced ground set on the A heat shield outside the protective cover of the flow rate monitor described above.

进一步地,所述承载支架进一步包括一通过安装固定在所述基架上的第二安装固定板、一焊接固定在所述第二安装固定板上的设备安装支架及一倾斜向下固定在所述设备安装支架上的流速监测仪安装盒。Further, the bearing bracket further includes a second installation and fixing plate fixed on the base frame through installation, an equipment installation bracket fixed on the second installation and fixing plate by welding, and an equipment installation bracket fixed on the The flow rate monitor installation box on the installation bracket of the above-mentioned equipment.

进一步地,所述流速监测仪保护罩包括一倾斜保护板,该倾斜保护板的一侧缘水平弯折形成有一水平固定板,另一相对的侧缘竖直向下弯折凸伸形成有一挡水板,所述水平固定板与挡水板相对的侧缘倾斜向下弯折凸伸形成有一导水板,所述倾斜保护板的另两相对的侧缘同时竖直向下弯折凸伸形成有两相互平行的保护侧板,所述两保护侧板沿水平固定板方向凸伸形成有两相对的固定侧板,所述两固定侧板的上边缘与所述水平固定板及挡水板的两相对的侧缘平齐所述保护侧板沿所述挡水板与倾斜保护板相对的侧缘处且相对于第二安装固定板方向倾斜裁切形成有一倾斜前缘。Further, the protective cover of the flow rate monitor includes an inclined protective plate, one side edge of the inclined protective plate is bent horizontally to form a horizontal fixing plate, and the other opposite side edge is bent vertically downward to form a stop The water plate, the side edge of the horizontal fixing plate opposite to the water retaining plate is bent downwards and protrudes obliquely to form a water guide plate, and the other two opposite side edges of the inclined protection plate are bent vertically downwards and protruded at the same time Two protective side plates parallel to each other are formed. The two protective side plates protrude along the direction of the horizontal fixed plate to form two opposite fixed side plates. The upper edges of the two fixed side plates are in contact with the horizontal fixed plate and the water retaining plate. The two opposite side edges of the plate are flush with the protective side plate and cut along the opposite side edge of the water baffle plate to the inclined protective plate and obliquely relative to the direction of the second installation and fixing plate to form an inclined front edge.

进一步地,防热罩包括两相互平行的防热侧板、一倾斜防热板、一水平防热板围合而成。Further, the heat shield includes two parallel heat shields, an inclined heat shield and a horizontal heat shield.

进一步地,所述防热侧板、倾斜防热板及水平防热板上开设有若干散热孔。。Further, a number of cooling holes are opened on the heat-resistant side plate, the inclined heat-resistant plate and the horizontal heat-resistant plate. .

进一步地,所述设备安装支架进一步包括一呈框状的固定框,该固定框两侧缘同向水平凸伸形成有两相互平行第一固定臂,所述固定框的另两侧缘同向水平凸伸形成有两相互平行的焊接臂,所述固定框的一上侧缘倾斜向下凸伸形成有一挡水臂,所述焊接臂与所述挡水臂布置在所述固定框的同一侧,所述固定框的一底缘水平凸伸形成有一承载板,该承载板的两相对的侧缘均竖直向上凸伸形成有两相互平行的第二固定臂,所述挡水臂及焊接臂通过焊接的方式焊接在所述第二安装固定板上,且所述挡水臂与所述第二安装固定板之间相互固定后形成有一导水槽,该导水槽可将沿所述基架进入的水向所述焊接臂两侧分流。Further, the equipment installation bracket further includes a frame-shaped fixing frame, two sides of the fixing frame protrude horizontally in the same direction to form two first fixing arms parallel to each other, and the other two sides of the fixing frame are in the same direction There are two welding arms parallel to each other formed on the horizontal protrusion, and a water retaining arm is formed on an upper side edge of the fixed frame obliquely protruding downward, and the welding arm and the water retaining arm are arranged on the same side of the fixed frame. On the side, a bottom edge of the fixed frame protrudes horizontally to form a bearing plate, and two opposite side edges of the bearing plate protrude vertically upward to form two second fixed arms parallel to each other. The water retaining arm and The welding arm is welded on the second installation and fixing plate by welding, and the water retaining arm and the second installation and fixing plate are fixed to each other to form a water guide groove, which can move along the base The water that enters the frame is diverted to both sides of the welding arm.

进一步地,所述第二固定臂、第一固定臂布置在所述固定框的同一侧,且所述第一固定臂长度大于所述第二固定臂的长度。Further, the second fixing arm and the first fixing arm are arranged on the same side of the fixing frame, and the length of the first fixing arm is greater than the length of the second fixing arm.

进一步地,所述流速监测仪安装盒的一端焊接在所述第一固定臂上,另一端焊接在所述第一固定臂上,且所述流速监测仪安装盒的一侧缘向上弯折凸伸形成有一顶持所述倾斜保护板的支撑板。Further, one end of the flow rate monitor installation box is welded on the first fixed arm, and the other end is welded on the first fixation arm, and one side edge of the flow rate monitor installation box is bent upwards to protrude A support plate is formed to support the inclined protection plate.

综上所述,本发明一种流速监测仪用挂架由于在所述行车固定支架的两侧呈对称布置的形式设置所述配重架及承载支架,且配重架重量可调,避免进行水务监测时,流速监测仪因不平衡造成的上下摆动,确保了流速监测仪始终与河道平面呈固定角度的夹角,保证了流速监测数据的准确性。In summary, a hanger for a flow rate monitor in the present invention is provided with the counterweight frame and the load-bearing bracket symmetrically arranged on both sides of the vehicle fixing bracket, and the weight of the counterweight frame is adjustable, avoiding During water monitoring, the flow rate monitor swings up and down due to imbalance, which ensures that the flow rate monitor always forms a fixed angle with the river channel plane, ensuring the accuracy of the flow rate monitoring data.

附图说明Description of drawings

图1为本发明一种流速监测仪用挂架的一侧面示意图。Fig. 1 is a schematic side view of a hanger for a flow rate monitor of the present invention.

图2为本发明一种流速监测仪用挂架的一立体示意图。Fig. 2 is a three-dimensional schematic diagram of a hanger for a flow rate monitor of the present invention.

图3为本发明一种流速监测仪用挂架的承载支架的一立体示意图。FIG. 3 is a three-dimensional schematic diagram of a bearing bracket of a hanger for a flow rate monitor according to the present invention.

图4为本发明一种流速监测仪用挂架的承载支架的不同视角的两立体示意图。Fig. 4 is two perspective schematic diagrams of different viewing angles of a bearing bracket of a hanger for a flow rate monitor according to the present invention.

具体实施方式Detailed ways

为详细说明本发明的技术内容、构造特征、所达成目的及效果,以下兹例举实施例并配合附图详予说明。In order to describe the technical content, structural features, goals and effects of the present invention in detail, the following examples are given and described in detail with accompanying drawings.

请参阅图1至图4,一种流速监测仪用挂架100,适用于水务监测领域,该流速监测仪用挂架100包括一固定于三角行车(图中未示意出)上的行车固定支架1,该行车固定支架1进一步包括两呈“H”型的基架11及将两基架11相互固定的四固定柱12。Please refer to FIG. 1 to FIG. 4 , a hanger 100 for a flow rate monitor, suitable for the field of water monitoring, the hanger 100 for a flow rate monitor includes a driveway fixing bracket fixed on a triangular driveway (not shown in the figure) 1. The driving fixing bracket 1 further includes two "H"-shaped base frames 11 and four fixing columns 12 for fixing the two base frames 11 to each other.

一可调节地固定在行车固定支架1顶端的太阳能安装架2。A solar mounting frame 2 that is adjustablely fixed on the top of the vehicle fixing bracket 1 .

一倾斜安装固定在所述基架11上的配重架3,所述配重架3通过一第一安装固定板31及螺母(图中未标示出)固定在所述基架11的两相对的固定柱12上,所述配重架3上设置有调节流速监测仪用挂架100平衡的配重固定装置32,该配重固定装置32由一固定在配重加上的配重固定柱321、一用于将所述配重固定柱321上的配重块锁死的压紧锁死螺母(图中未示意出)及一套设在所述配重固定柱321上的定位片322。A counterweight frame 3 that is installed and fixed on the base frame 11 obliquely, and the counterweight frame 3 is fixed on two opposite sides of the base frame 11 by a first installation fixing plate 31 and nuts (not shown in the figure). On the fixed column 12 of the counterweight frame 3, a counterweight fixing device 32 for adjusting the balance of the hanger 100 for the flow rate monitor is provided. The counterweight fixing device 32 consists of a counterweight fixing column fixed on the counterweight 321. A compression locking nut (not shown in the figure) for locking the counterweight on the counterweight fixing column 321 and a set of positioning pieces 322 provided on the counterweight fixing column 321 .

一相对所述配重架3安装固定在所述基架11的另两相对固定柱12上的承载支架4。A bearing bracket 4 is installed and fixed on the other two opposite fixed columns 12 of the base frame 11 relative to the counterweight frame 3 .

一套装在所述承载支架4上的流速监测仪保护罩5及一有间距地套装在所述流速监测仪保护罩5外的防热罩6,。A flow rate monitor protective cover 5 set on the supporting bracket 4 and a heat shield 6 set outside the flow rate monitor protective cover 5 at intervals.

所述承载支架4进一步包括一通过螺栓(图中未标示出)固定在所述基架上的第二安装固定板41、一焊接固定在所述第二安装固定板41上的设备安装支架42及一倾斜向下固定在所述设备安装支架42上的流速监测仪安装盒43。The bearing bracket 4 further includes a second installation and fixing plate 41 fixed on the base frame by bolts (not shown in the figure), an equipment installation bracket 42 welded and fixed on the second installation and fixing plate 41 And a flow rate monitor installation box 43 fixed on the equipment installation bracket 42 obliquely downward.

所述流速监测仪保护罩5大致呈“内框”状,其包括一倾斜保护板51,该倾斜保护板51的一侧缘水平弯折形成有一水平固定板52,另一相对的侧缘竖直向下弯折凸伸形成有一挡水板53,所述水平固定板52与挡水板53相对的侧缘倾斜向下弯折凸伸形成有一导水板54,所述倾斜保护板51的另两相对的侧缘同时向下弯折竖直凸伸形成有两相互平行对的保护侧板55,所述两保护侧板55沿水平固定板52方向凸伸形成有两相对的固定侧板56,所述两固定侧板56的上边缘与所述水平固定板52及挡水板53的两相对的侧缘平齐,所述保护侧板55沿所述挡水板53与倾斜保护板51相对的侧缘处且相对于第二安装固定板41方向倾斜裁切形成有一倾斜前缘551。The protective cover 5 of the flow rate monitor is roughly in the shape of an "inner frame", which includes an inclined protective plate 51, one side edge of the inclined protective plate 51 is horizontally bent to form a horizontal fixing plate 52, and the other opposite side edge is vertically bent. A water retaining plate 53 is formed by bending and protruding straight downward. The side edge of the horizontal fixing plate 52 opposite to the water retaining plate 53 is obliquely bent and protruding downward to form a water guide plate 54. The inclined protective plate 51 The other two opposite side edges are bent downwards and protrude vertically to form two parallel protective side plates 55 , and the two protective side plates 55 protrude along the direction of the horizontal fixing plate 52 to form two opposite fixed side plates 56, the upper edges of the two fixed side plates 56 are flush with the two opposite side edges of the horizontal fixed plate 52 and the water retaining plate 53, and the protective side plate 55 is along the water retaining plate 53 and the inclined protection plate An inclined front edge 551 is formed at the opposite side edge of the 51 and obliquely cut relative to the direction of the second mounting plate 41 .

所述防热罩6包括两相互平行的防热侧板61、一倾斜防热板62、一水平防热板(图中未示意出)围合而成,所述防热侧板61的形状与所述保护侧板55大体相同。The heat shield 6 includes two parallel heat shields 61, an inclined heat shield 62, and a horizontal heat shield (not shown in the figure) enclosed by the heat shield. The shape of the heat shield 61 is It is substantially the same as the protective side plate 55 .

所述防热侧板61、倾斜防热板62及水平防热板上开设有若干散热孔(图中未标示出)。由于所述防热罩6有间距地套设在所述流速监测仪保护罩5外,同时,由于所述防热罩6上开设的散热孔的散热作用,籍而能有效地将由所述承载支架4的电气设备散发的热量通过流速监测仪保护罩5快速的散发出去。A number of cooling holes (not shown in the figure) are opened on the heat-proof side plate 61 , the inclined heat-proof plate 62 and the horizontal heat-proof plate. Since the heat shield 6 is set on the outside of the flow rate monitor protective cover 5 with intervals, and at the same time, due to the heat dissipation effect of the heat dissipation holes provided on the heat shield 6, it can effectively dissipate the load carried by the heat shield 6. The heat dissipated by the electrical equipment of the bracket 4 is dissipated quickly through the protective cover 5 of the flow rate monitor.

所述每一固定侧板56及每一防热侧板61上均开设有两通孔。Each fixed side plate 56 and each heat-resistant side plate 61 are provided with two through holes.

所述设备安装支架42进一步包括一呈框状的固定框421,该固定框421两侧缘同向水平凸伸形成有两相互平行第一固定臂422,所述固定框421的另两侧缘同向水平凸伸形成有两相互平行的焊接臂423,所述固定框421的一上侧缘倾斜向下凸伸形成有一挡水臂424,所述焊接臂423与所述挡水臂424布置在所述固定框421的同一侧,所述固定框421的一底缘水平凸伸形成有一承载板425,该承载板425的两相对的侧缘均竖直向上凸伸形成有两相互平行的第二固定臂426。所述挡水臂及焊接臂通过焊接的方式焊接在所述第二安装固定板上,且所述挡水臂424与所述第二安装固定板41之间相互固定后形成有一导水槽428,该导水槽428可有效的将沿所述基架11进入的水向所述焊接臂423两侧分流,以避免水滴入安装在所述承载支架4上的电池、电池充电器、电台等电气设备内。The equipment installation bracket 42 further includes a frame-shaped fixed frame 421, the two sides of the fixed frame 421 protrude horizontally in the same direction to form two first fixed arms 422 parallel to each other, and the other two sides of the fixed frame 421 There are two parallel welding arms 423 protruding horizontally in the same direction, and an upper side edge of the fixed frame 421 protrudes obliquely downward to form a water retaining arm 424, and the welding arm 423 and the water retaining arm 424 are arranged On the same side of the fixed frame 421, a bottom edge of the fixed frame 421 protrudes horizontally to form a bearing plate 425, and two opposite side edges of the bearing plate 425 protrude vertically upward to form two mutually parallel The second fixed arm 426 . The water retaining arm and the welding arm are welded on the second installation and fixing plate by welding, and the water retaining arm 424 and the second installation and fixing plate 41 are fixed to each other to form a water guiding groove 428, The water guide groove 428 can effectively divert the water entering along the base frame 11 to both sides of the welding arm 423, so as to avoid water dripping into the electrical equipment such as batteries, battery chargers, and radio stations installed on the bearing bracket 4. Inside.

所述第二固定臂426、第一固定臂422布置在所述固定框421的同一侧,且所述第一固定臂422长度大于所述第二固定臂426的长度。The second fixing arm 426 and the first fixing arm 422 are arranged on the same side of the fixing frame 421 , and the length of the first fixing arm 422 is greater than the length of the second fixing arm 426 .

所述流速监测仪安装盒43的一端焊接在所述第一固定臂422上,另一端焊接在所述第一固定臂上,且所述流速监测仪安装盒43的一侧缘向上弯折凸伸形成有一顶持所述倾斜保护板51的支撑板431。One end of the flow rate monitor installation box 43 is welded on the first fixed arm 422, the other end is welded on the first fixed arm, and one side edge of the flow rate monitor installation box 43 is bent upward A support plate 431 supporting the inclined protection plate 51 is formed extending therefrom.

所述固定框421的侧框上开设有与所述固定侧板56及防热侧板61上的通孔一一对应的螺纹孔(图中未标示出)。The side frames of the fixing frame 421 are provided with threaded holes (not shown in the figure) corresponding to the through holes on the fixing side plate 56 and the heat-proof side plate 61 one by one.

所述防热罩6的倾斜防热板62上安装有一天线(图中未标示出)。An antenna (not shown in the figure) is installed on the inclined heat shield 62 of the heat shield 6 .

组装时,所述配重架通过一所述第一安装固定板及螺栓固定在所述基架上,所述承载支架4通过所述第二安装固定板41及螺母固定在所述行车固定支架1所述基架上,电池、电池充电器、电台等固定在所述承载支架4上,流速监测仪(图中未标示出)安装在所述流速监测仪安装盒43内,通过螺栓、通孔、螺纹孔的配合将所述流速监测仪保护罩5及所述防热罩6依次套装在所述承载支架4上,且所述支撑板431顶持在所述倾斜保护板51上。When assembling, the counterweight frame is fixed on the base frame by the first installation and fixing plate and bolts, and the bearing bracket 4 is fixed on the driving fixing bracket by the second installation and fixing plate 41 and nuts 1. On the pedestal, batteries, battery chargers, radio stations, etc. are fixed on the bearing bracket 4, and the flow rate monitor (not shown in the figure) is installed in the flow rate monitor installation box 43. Through the cooperation of the hole and the threaded hole, the protective cover 5 of the flow rate monitor and the heat shield 6 are sequentially set on the supporting bracket 4 , and the supporting plate 431 is supported on the inclined protective plate 51 .

本发明一种流速监测仪用挂架100装载的流速监测仪为电波流速监测仪。A flow rate monitor of the present invention is loaded with a hanger 100 and is an electric wave flow rate monitor.

综上所述,本发明一种流速监测仪用挂架100由于在所述行车固定支架1的两侧呈对称布置的形式设置所述配重架3及承载支架4,且配重架3重量可调,避免进行水务监测时,流速监测仪因不平衡造成的上下摆动,确保了流速监测仪始终与河道平面呈固定角度的夹角,保证了流速监测数据的准确性。In summary, the hanger 100 for a flow rate monitor of the present invention is provided with the counterweight frame 3 and the load-bearing bracket 4 in a symmetrical arrangement on both sides of the vehicle fixing bracket 1, and the weight of the counterweight frame 3 is Adjustable, to avoid the up and down swing of the flow rate monitor due to imbalance during water monitoring, to ensure that the flow rate monitor always has a fixed angle with the river plane, and to ensure the accuracy of the flow rate monitoring data.

以上所述的技术方案仅为本发明一种流速监测仪用挂架100的较佳实施例,任何在本发明一种流速监测仪用挂架100基础上所作的等效变换或替换都包含在本专利的保护范围之内。The technical scheme described above is only a preferred embodiment of the hanger 100 for a flow rate monitor of the present invention, and any equivalent transformation or replacement done on the basis of the hanger 100 for a flow rate monitor of the present invention is included in within the scope of protection of this patent.

Claims (8)

1. a kind of flow monitoring instrument hanger monitors field suitable for water utilities, which is fixed on including one Driving fixing bracket in triangle driving, the driving fixing bracket further comprise two in the pedestal of " H " type and by two pedestal phases Mutual fixed four fixed column, one is fixed adjustably to the solar energy mounting bracket on driving fixing bracket top, it is characterised in that:
The counter-balanced carriage being fixed on pedestal is tilted, the counter-balanced carriage is fixed on described by one first mounting plate In two pedestals, two opposite fixed column, adjusting flow monitoring instrument is provided on the counter-balanced carriage and fixes dress with the counterweight that hanger balances Put, the counterweight fixing device by one be fixed on counter-balanced carriage counterweight fixed column, one be used for matching somebody with somebody in the counterweight fixed column Compression locking nut and one that pouring weight locks are set in the locating plate in the counterweight fixed column;
One relatively described counter-balanced carriage is fixed on the bearing support in another two opposite fixed columns of the pedestal;
The one flow monitoring instrument protective cover being sleeved on the bearing support and one it is sleeved on the flow monitoring instrument with having spacing Heat shield outside protective cover.
2. a kind of flow monitoring instrument hanger as described in claim 1, it is characterised in that:The bearing support further comprises One the second mounting plate being fixed on the pedestal, one are weldingly fixed on equipment on second mounting plate Mounting bracket and one flow monitoring instrument mounting box in the equipment mounting bracket is fixed on diagonally downward.
3. a kind of flow monitoring instrument hanger as described in 1 or 2 any one of claim, it is characterised in that:The flow velocity prison Surveying instrument protective cover includes a unequal protection plate, and a lateral margin horizontal buckling of the unequal protection plate is formed with a horizontal fixed plate, separately One opposite lateral margin, which bends to protrude out straight down, is formed with a water fender, and the horizontal fixed plate lateral margin opposite with water fender is inclined Bending protrudes out and is formed with a weather board obliquely, and another two opposite lateral margins of the unequal protection plate bend convex straight down simultaneously Stretch and be formed with two protection side panels being mutually parallel, two protection side panel protruded out along horizontal fixed plate direction be formed with it is two opposite Fixed side panel, the top edge of two fixed side panel is concordant with two opposite lateral margins of the horizontal fixed plate and water fender, institute Protection side panel is stated to tilt along at the water fender lateral margin opposite with unequal protection plate and compared with the second mounting plate direction It cuts and is formed with a bevelled leading edge.
4. a kind of flow monitoring instrument hanger as claimed in claim 2, it is characterised in that:It is mutually flat that the heat shield includes two Capable solar heat protection side plate, an inclination heat shield panel, a horizontal heat shield panel enclose.
5. a kind of flow monitoring instrument hanger as claimed in claim 4, it is characterised in that:The solar heat protection side plate tilts solar heat protection Several heat emission holes are offered on plate and horizontal heat shield panel.
6. a kind of flow monitoring instrument hanger as claimed in claim 2, it is characterised in that:The equipment mounting bracket is further Including a fixed frame in the shape of a frame, which, which protrudes out, is formed with two and is mutually parallel the first fixed arm, institute The another both side edges level in the same direction for stating fixed frame protrudes out and is formed with two welding arms being mutually parallel, the fixed frame one on lateral margin incline It protrudes out obliquely and is formed with a water-retaining arm, the welding arm is arranged in the same side of the fixed frame with the water-retaining arm, described One root edge level of fixed frame, which protrudes out, is formed with a loading plate, and two opposite lateral margins of the loading plate protrude out to be formed straight up There are two the second fixed arms being mutually parallel, it is solid that the water-retaining arm and welding arm are welded on second installation by welding On fixed board, and a guiding gutter is formed with after interfixing between the water-retaining arm and second mounting plate, the guiding gutter It can will be shunted along the water that the pedestal enters to the welding arm both sides.
7. a kind of flow monitoring instrument hanger as claimed in claim 6, it is characterised in that:Second fixed arm, first are consolidated Fixed arm is arranged in the same side of the fixed frame, and described first fixes the length that arm lengths are more than second fixed arm.
8. a kind of flow monitoring instrument hanger as claimed in claim 7, it is characterised in that:The flow monitoring instrument mounting box One end is welded on first fixed arm, and the other end is welded on first fixed arm, and the flow monitoring instrument is installed One lateral margin of box, which is folded upward at protruding out, is formed with a support plate for holding the unequal protection plate.
CN201611040796.9A 2016-11-11 2016-11-11 A kind of flow monitoring instrument hanger Pending CN108071922A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611040796.9A CN108071922A (en) 2016-11-11 2016-11-11 A kind of flow monitoring instrument hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611040796.9A CN108071922A (en) 2016-11-11 2016-11-11 A kind of flow monitoring instrument hanger

Publications (1)

Publication Number Publication Date
CN108071922A true CN108071922A (en) 2018-05-25

Family

ID=62161594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611040796.9A Pending CN108071922A (en) 2016-11-11 2016-11-11 A kind of flow monitoring instrument hanger

Country Status (1)

Country Link
CN (1) CN108071922A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6129319A (en) * 1995-10-12 2000-10-10 Leica Microsystems Ag Automatically adjustable counterbalanced stand
US20050053371A1 (en) * 2001-09-13 2005-03-10 Schaller Curt O. Decoupled weight compensation system for a camera balance-device
CN103239294A (en) * 2012-02-14 2013-08-14 徕卡显微系统(瑞士)股份公司 Adjustable stand
CN204726645U (en) * 2015-06-22 2015-10-28 台州市航天恒通科技有限公司 The mounting structure of water quality monitoring equipment in a kind of water environment on-line checkingi buoy dump
CN206145393U (en) * 2016-11-11 2017-05-03 四川炜麒科技股份有限公司 Flow velocity monitoring is stores pylon for appearance

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6129319A (en) * 1995-10-12 2000-10-10 Leica Microsystems Ag Automatically adjustable counterbalanced stand
US20050053371A1 (en) * 2001-09-13 2005-03-10 Schaller Curt O. Decoupled weight compensation system for a camera balance-device
CN103239294A (en) * 2012-02-14 2013-08-14 徕卡显微系统(瑞士)股份公司 Adjustable stand
CN204726645U (en) * 2015-06-22 2015-10-28 台州市航天恒通科技有限公司 The mounting structure of water quality monitoring equipment in a kind of water environment on-line checkingi buoy dump
CN206145393U (en) * 2016-11-11 2017-05-03 四川炜麒科技股份有限公司 Flow velocity monitoring is stores pylon for appearance

Similar Documents

Publication Publication Date Title
BR102016024303B1 (en) AIRCRAFT AGITATOR SYSTEM AND METHOD FOR TESTING THE EXCITATION OF A STRUCTURE
CN103057836B (en) A kind of transport fixed support of voltage transformer outgoing line device
CN108071922A (en) A kind of flow monitoring instrument hanger
US10633226B2 (en) Flange cover mounting and dismounting device and cooling device
CN206145393U (en) Flow velocity monitoring is stores pylon for appearance
CN207763917U (en) A kind of pendulum stand
CN211249852U (en) An electrical engineering positioning and installation mechanism
JP2014077762A (en) Drop testing device
CN209757158U (en) Effectual conveyer of shock attenuation for communication product
CN210719930U (en) Portable impact experimental equipment for plates
JP6370640B2 (en) Support column for solar cell panel support
CN210243130U (en) Box mechanical collision testing device
CN204136730U (en) A kind of erecting frame of air-conditioning compressor
CN208006745U (en) A kind of foldable electric vehicle alternating current-direct current charging pile
CN216586692U (en) Pile foundation balance detection device for portable civil engineering
CN219318032U (en) Centrifugal machine with leveling and damping functions
CN218444377U (en) Battery package vibration frock
CN103078260B (en) Mechanism case installs special purpose device
CN221572114U (en) Detection device for reverse drawing force of insulation board
KR102781120B1 (en) Mask inspection equipment for display
JP7141550B1 (en) photovoltaic device
CN215825163U (en) Device convenient to heavy steel structure column vertical location
CN211089527U (en) Simple and easy assembled photovoltaic module support
CN212691324U (en) A projection stand with adjustable verticality for multimedia teaching
CN220139107U (en) Cable bridge support structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180525

WD01 Invention patent application deemed withdrawn after publication