[go: up one dir, main page]

CN108049897A - Construction technology is withdrawn from the fully-mechanized mining working for moving crossbeam and move certainly crossbeam using this - Google Patents

Construction technology is withdrawn from the fully-mechanized mining working for moving crossbeam and move certainly crossbeam using this Download PDF

Info

Publication number
CN108049897A
CN108049897A CN201711269475.0A CN201711269475A CN108049897A CN 108049897 A CN108049897 A CN 108049897A CN 201711269475 A CN201711269475 A CN 201711269475A CN 108049897 A CN108049897 A CN 108049897A
Authority
CN
China
Prior art keywords
frame
cover
stent
crossbeam
cover frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711269475.0A
Other languages
Chinese (zh)
Inventor
汪文芳
王虎
倪义海
李金兵
马学团
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huainan Mining Group Co Ltd
Original Assignee
Huainan Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huainan Mining Group Co Ltd filed Critical Huainan Mining Group Co Ltd
Priority to CN201711269475.0A priority Critical patent/CN108049897A/en
Publication of CN108049897A publication Critical patent/CN108049897A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/60Devices for withdrawing props or chocks
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/04Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
    • E21D23/06Special mine caps or special tops of pit-props for permitting step-by-step movement

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention belongs to underground coal mine working faces to withdraw technical field of construction, construction technology is withdrawn more particularly to a kind of fully-mechanized mining working for moving crossbeam certainly and moving crossbeam certainly using this, including cross-beam body, at least three hinged-supports are arranged at intervals on the cross-beam body along its length, the homonymy of each hinged-support towards cross-beam body is set.The present invention aids in three shield supports to push ahead using crossbeam is moved certainly, eliminates most pulling winch, improves propulsive efficiency, simplifies working face construction environment, improve security;In addition, construction technology provided by the invention reduces the use of mine timber, the cost of construction is reduced.

Description

Construction technology is withdrawn from the fully-mechanized mining working for moving crossbeam and move certainly crossbeam using this
Technical field
The invention belongs to underground coal mine working faces to withdraw technical field of construction, and in particular to a kind of to be somebody's turn to do from shifting crossbeam and application Construction technology is withdrawn from the fully-mechanized mining working for moving crossbeam.
Background technology
The dismounting of fully-mechanized mining working equipment, it is most crucial most dangerous in and projects particularly important to the supporting of top plate Engineering, not only support material amount is using big, and construct threaten it is big.By improvement and innovation for many years, having formd makes With one or two cover frame auxiliary shoring top plates, the technique of striking.But either one or two cover frames Using all mine timber supporting is used without solving the problems, such as to reduce, so as to just be carried without reducing worker, use the process of mine timber, duty Work labor intensity is still very big, and supporting mine timber security threat is still very big.In addition, of the prior art withdraw young of construction technology Winch can be relied on to move cover frame, winch layout difficulty is larger, and there are many security risks, and construction efficiency is low.
The content of the invention
The object of the present invention is to provide it is a kind of can improve working face withdraw construction efficiency and security from move crossbeam and The fully-mechanized mining working that mine timber uses can be reduced and withdraw construction technology.
To achieve the above object, the present invention provides following technical schemes:
It is a kind of to move crossbeam certainly for what underground hydraulic support frame was removed, including cross-beam body, along length on the cross-beam body Direction is arranged at intervals at least three hinged-supports, and the homonymy of each hinged-support towards cross-beam body is set.
Preferably, each hinged-support forms adjustable be fixedly connected along cross-beam body length direction with cross-beam body.
Preferably, each hinged-support is corresponded on the cross-beam body equipped with multiple bolts hole, each bolt hole is along cross-beam body Length direction uniform intervals set, the hinged-support include a connecting portion, the connecting portion be equipped at least two bolts hole It is engaged with the bolt hole on cross-beam body.
Preferably, one end of the cross-beam body is additionally provided with a hydraulic cylinder, the cylinder body of the hydraulic cylinder and cross-beam body It is hinged between end by cross hinged-support.
The present invention also provides construction technology is withdrawn from the fully-mechanized mining working for moving crossbeam described in a kind of application, including walking as follows Suddenly:
Step 1:The formation of cover frame, each hydraulic support in working face are named successively from one end of working face to the other end For No. 1 frame, No. 2 frame ... n framves, mode is removed by after No. 1-No. 3 framves dismounting of working face according to conventional stent, timely entrucking is beaten It transports, tear frame winch open using working face removes frame nest by No. 6 framves, monomer is coordinated to be adjusted to No. 6 framves parallel with coal wall, uses monomer One end, which is supported on, does not tear open on stent, and one end is supported on No. 6 frame front end pedestals, and No. 6 framves are supported to frame head and No. 7 frame side guard plates and are put down Neat position is used as the coal side cover frame of side 1, and cover frame frame head is towards holder orientation to be removed, in time by No. 1 cover frame liter It rises and is pushed against with top plate;No. 5 framves, No. 4 framves are removed successively according to the method described above, are adjusted to, stent frame head and No. 7 framves parallel with coal wall Side guard plate is concordant, is used respectively as No. 2, No. 3 cover frames;
Step 2:It, in time will be from moving crossbeam installation after three cover frames are all in place, and be linked with three cover frames passage Head is connected;
Step 3:Remove remaining stent successively using frame winch is torn open, often remove a stent No. 3 cover frames and old man it Between move towards marguise using road plate in passage, two column of a beam, No. 1, after No. 2 cover frames passage using no mine timber supporting;Often remove One stent, three cover frames, which are drawn forward, moves a step pitch;According to the order of No. 3, No. 2, No. 1 cover frames, drawing shifting is carried out successively, Specifically displacement process is:Environment before cleaning cover frame by 3 cover frame feed flow, passage head is stretched out, is pushed away using two cover frames Head is moved as fulcrum, after frame drops in the 3rd cover frame column, the 3rd cover frame passage hydraulic cylinder is received, is allowed to move certainly forward, three After platform cover frame moves forward a step pitch, frame is risen in time and connects strength with top plate;As procedure described above, cover frame is drawn and moves 2 steps Width away from i.e. two stents;
Step 4:After last three support removings of working face, lift canopy mouth beats grillage branch in stent frame nest and on working face Protect top plate;
Step 5:Cover frame is removed, will be removed first from crossbeam is moved, three are carried out according to No. 3, No. 2, the order of No. 1 after dismounting The dismounting of platform cover frame;A cover frame is often removed, crib protection is played in the cover frame frame nest.
Preferably, in step 1, if the use of working face channel side is set up on stent frame head moves towards H-shaped steel supporting, 2 Number, No. 3 cover frame frame heads against stent to be torn open, No. 1 cover frame is No. 2 advanced, the width of No. 3 cover frames i.e. one stent of one step pitch Degree.
Preferably, in step 1, after three cover frames are in place, cover frame side guard plate is opened, and abuts against three cover frames Together.
Preferably, with the dismounting of No. 1-No. 3 stents, grillage is beaten with lift canopy mouth under channel side in stent frame nest in time and added Strong roof timbering;During three cover frame formation, old man side often removes a frame cover frame and plays crib protection in frame nest in time, until Three cover frames are completely formed;Channel side takes off cladding along mountain marguise, four column of a beam, no less than two rows, until three are covered using 3m Retaining frame is completely formed.
Preferably, in step 1, No. 1, after No. 2 cover frames are formed, before No. 3 cover frames are not formed, get column ready and strengthen top Slab supporting.
Preferably, if working face passage is I-steel marguise supporting in steps of 5, before removing last cover frame Must by marguise supporting it is secured after just last dismountable cover frame.
The technical effects of the invention are that:The present invention aids in three shield supports to push ahead using crossbeam is moved certainly, saves Most pulling winch has been removed, has improved propulsive efficiency, working face construction environment has been simplified, improves security.In addition, this The construction technology that invention provides reduces the use of mine timber, reduces the cost of construction.
Description of the drawings
The structure diagram from shifting crossbeam that Fig. 1 is provided by the embodiment of the present invention;
Fig. 2,3,4 are each station schematic diagrames that the fully-mechanized mining working that the embodiment of the present invention is provided withdraws construction technology.
Specific embodiment
The present invention is described in detail below in conjunction with attached drawing.
Embodiment 1
As shown in Figure 1, a kind of move crossbeam certainly for what underground hydraulic support frame was removed, it is characterised in that:Including cross-beam body 10, it is arranged at intervals at least three hinged-supports 11 on the cross-beam body 10 along its length, each hinged-support 11 is towards crossbeam sheet The homonymy of body 10 is set.Each hinged-support 11 forms adjustable fixation even along 10 length direction of cross-beam body and cross-beam body 10 It connects.Each hinged-support 11 is corresponded on the cross-beam body 10 equipped with multiple bolts hole, length of each bolt hole along cross-beam body 10 Direction uniform intervals are set, and the hinged-support 11 includes a connecting portion, and the connecting portion is equipped at least two bolts hole and horizontal stroke Bolt hole on beam body 10 is engaged.One end of the cross-beam body 10 is additionally provided with a hydraulic cylinder 12, the hydraulic cylinder 12 It is hinged by cross hinged-support 13 between the end of cylinder body and cross-beam body 10.The piston rod of hydraulic cylinder 12 can be connected in it is other not It tears open and Auxiliary support is used as on stent.
Embodiment 2
Construction technology is withdrawn from the fully-mechanized mining working for moving crossbeam described in a kind of application, is included the following steps:
Step 1:The formation of cover frame, each hydraulic support in working face are named successively from one end of working face to the other end For No. 1 frame, No. 2 frame ... n framves, mode is removed by after No. 1-No. 3 framves dismounting of working face according to conventional stent, timely entrucking is beaten It transports, tear frame winch open using working face removes frame nest by No. 6 framves, monomer is coordinated to be adjusted to No. 6 framves parallel with coal wall, uses monomer One end, which is supported on, does not tear open on stent, and one end is supported on No. 6 frame front end pedestals, and No. 6 framves are supported to frame head and No. 7 frame side guard plates and are put down Neat position is used as the coal side cover frame of side 1, and cover frame frame head is towards holder orientation to be removed, in time by No. 1 cover frame liter It rising and is pushed against with top plate, when No. 6 framves are removed, frame is torn open using working face winch cooperation leading block, pulley is hung on No. 7 frame frame heads, As shown in Figure 2;No. 5 framves, No. 4 framves are removed successively according to the method described above, are adjusted to, stent frame head and No. 7 frame sides parallel with coal wall Backplate is concordant, is used respectively as No. 2, No. 3 cover frames, as shown in Figure 3;
Step 2:It, in time will be from moving crossbeam installation after three cover frames are all in place, and connected with three cover frames passage Head is connected;
Step 3:Remove remaining stent successively using frame winch is torn open, often remove a stent No. 3 cover frames and old man it Between move towards marguise using road plate in passage, two column of a beam, No. 1, after No. 2 cover frames passage using no mine timber supporting;Often remove One stent, three cover frames, which are drawn forward, moves a step pitch;According to the order of No. 3, No. 2, No. 1 cover frames, drawing shifting is carried out successively, Specifically displacement process is:Environment before cleaning cover frame by 3 cover frame feed flow, passage head is stretched out, is pushed away using two cover frames Head is moved as fulcrum, after frame drops in the 3rd cover frame column, the 3rd cover frame passage hydraulic cylinder is received, is allowed to move certainly forward, three After platform cover frame moves forward a step pitch, frame is risen in time and connects strength with top plate;As procedure described above, cover frame is drawn and moves 2 steps Width away from i.e. two stents;
Step 4:After last three support removings of working face, lift canopy mouth beats grillage branch in stent frame nest and on working face Protect top plate;
Step 5:Cover frame is removed, will be removed first from crossbeam is moved, three are carried out according to No. 3, No. 2, the order of No. 1 after dismounting The dismounting of platform cover frame;A cover frame is often removed, crib protection is played in the cover frame frame nest.
Preferably, in step 1, if the use of working face channel side is set up on stent frame head moves towards H-shaped steel supporting, 2 Number, No. 3 cover frame frame heads against stent to be torn open, No. 1 cover frame is No. 2 advanced, the width of No. 3 cover frames i.e. one stent of one step pitch Degree, as shown in Figure 4.
Preferably, in step 1, after three cover frames are in place, cover frame side guard plate is opened, and abuts against three cover frames Together.
Preferably, with the dismounting of No. 1-No. 3 stents, grillage is beaten with lift canopy mouth under channel side in stent frame nest in time and added Strong roof timbering;During three cover frame formation, old man side often removes a frame cover frame and plays crib protection in frame nest in time, until Three cover frames are completely formed;Channel side takes off cladding along mountain marguise, four column of a beam, no less than two rows, until three are covered using 3m Retaining frame is completely formed.
Preferably, in step 1, No. 1, after No. 2 cover frames are formed, before No. 3 cover frames are not formed, get column ready and strengthen top Slab supporting.
Preferably, if working face passage is I-steel marguise supporting in steps of 5, before removing last cover frame Must by marguise supporting it is secured after just last dismountable cover frame.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement made within refreshing and principle etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of move crossbeam certainly for what underground hydraulic support frame was removed, it is characterised in that:Including cross-beam body, the cross-beam body On be arranged at intervals at least three hinged-supports along its length, the homonymy of each hinged-support towards cross-beam body is set.
2. according to claim 1 move crossbeam certainly for what underground hydraulic support frame was removed, it is characterised in that:It is described each hinged Seat forms adjustable be fixedly connected along cross-beam body length direction with cross-beam body.
3. according to claim 2 move crossbeam certainly for what underground hydraulic support frame was removed, it is characterised in that:The crossbeam sheet Each hinged-support is corresponded on body equipped with multiple bolts hole, each bolt hole is set along the length direction uniform intervals of cross-beam body, institute Stating hinged-support includes a connecting portion, and the connecting portion is equipped at least two bolts hole and matches with the bolt hole on cross-beam body It closes.
4. according to claim 1 move crossbeam certainly for what underground hydraulic support frame was removed, it is characterised in that:The crossbeam sheet One end of body is additionally provided with a hydraulic cylinder, is cut with scissors between the cylinder body of the hydraulic cylinder and the end of cross-beam body by cross hinged-support It connects.
5. a kind of withdraw construction technology, feature using described in claim 1-4 any one from the fully-mechanized mining working for moving crossbeam It is to include the following steps:
Step 1:The formation of cover frame, each hydraulic support in working face are named as 1 successively from one end of working face to the other end Number frame, No. 2 frame ... n framves are removed according to conventional stent after mode removes No. 1-No. 3 frame of working face, and fortune is beaten in timely entrucking It walks, tear frame winch open using working face removes frame nest by No. 6 framves, monomer is coordinated to be adjusted to No. 6 framves parallel with coal wall, uses monomer one End, which is supported on, does not tear open on stent, and one end is supported on No. 6 frame front end pedestals, No. 6 framves is supported concordant with No. 7 frame side guard plates to frame head Position is used as the coal side cover frame of side 1, and cover frame frame head in time rises No. 1 cover frame towards holder orientation to be removed It is pushed against with top plate;No. 5 framves, No. 4 framves are removed successively according to the method described above, are adjusted to, stent frame head and No. 7 frame sides parallel with coal wall Backplate is concordant, is used respectively as No. 2, No. 3 cover frames;
Step 2:It, in time will be from moving crossbeam installation after three cover frames are all in place, and elapse connector phases with three cover frames Even;
Step 3:Remaining stent is removed successively using frame winch is torn open, is often removed a stent and is led at No. 3 between cover frame and old man Move towards marguise using road plate in road, two column of a beam, No. 1, after No. 2 cover frames passage using no mine timber supporting;Often remove one Stent, three cover frames, which are drawn forward, moves a step pitch;According to the order of No. 3, No. 2, No. 1 cover frames, drawing shifting is carried out successively, specifically Displacement process is:Environment before cleaning cover frame by 3 cover frame feed flow, passage head is stretched out, two cover frames is utilized to elapse heads As fulcrum, after frame drops in the 3rd cover frame column, the 3rd cover frame passage hydraulic cylinder is received, is allowed to forward from moving, three are covered After retaining frame moves forward a step pitch, frame is risen in time and connects strength with top plate;As procedure described above, cover frame drawing is moved 2 step pitches is The width of two stents;
Step 4:After last three support removings of working face, lift canopy mouth beats crib protection top in stent frame nest and on working face Plate;
Step 5:Cover frame is removed, will be removed first from crossbeam is moved, carrying out three according to No. 3, No. 2, the order of No. 1 after dismounting covers The dismounting of retaining frame;A cover frame is often removed, crib protection is played in the cover frame frame nest.
6. fully-mechanized mining working according to claim 5 withdraws construction technology, it is characterised in that:In step 1, if working face Channel side use sets up on stent frame head and moves towards H-shaped steel supporting, then No. 2, No. 3 cover frame frame heads against stent to be torn open, No. 1 Cover frame is No. 2 advanced, the width of No. 3 cover frames i.e. one stent of one step pitch.
7. fully-mechanized mining working according to claim 5 withdraws construction technology, it is characterised in that:In step 1, three shielding After frame is in place, cover frame side guard plate is opened, and is closely packed together three cover frames.
8. fully-mechanized mining working according to claim 5 withdraws construction technology, it is characterised in that:With No. 1-No. 3 stent It removes, lift canopy mouth beats grillage reinforcement roof timbering in stent frame nest and under channel side in time;During three cover frame formation, old man Side often removes a frame cover frame and plays crib protection in frame nest in time, until three cover frames are completely formed;Channel side uses 3m Cladding is taken off along mountain marguise, four column of a beam, no less than two rows, until three cover frames are completely formed.
9. fully-mechanized mining working according to claim 5 withdraws construction technology, it is characterised in that:In step 1, No. 1, No. 2 After cover frame is formed, before No. 3 cover frames are not formed, get column ready and strengthen roof timbering.
10. fully-mechanized mining working according to claim 5 withdraws construction technology, it is characterised in that:If working face in steps of 5 When passage is I-steel marguise supporting, remove before last cover frame must by marguise supporting it is secured after it is just dismountable last One cover frame.
CN201711269475.0A 2017-12-05 2017-12-05 Construction technology is withdrawn from the fully-mechanized mining working for moving crossbeam and move certainly crossbeam using this Pending CN108049897A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711269475.0A CN108049897A (en) 2017-12-05 2017-12-05 Construction technology is withdrawn from the fully-mechanized mining working for moving crossbeam and move certainly crossbeam using this

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711269475.0A CN108049897A (en) 2017-12-05 2017-12-05 Construction technology is withdrawn from the fully-mechanized mining working for moving crossbeam and move certainly crossbeam using this

Publications (1)

Publication Number Publication Date
CN108049897A true CN108049897A (en) 2018-05-18

Family

ID=62122020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711269475.0A Pending CN108049897A (en) 2017-12-05 2017-12-05 Construction technology is withdrawn from the fully-mechanized mining working for moving crossbeam and move certainly crossbeam using this

Country Status (1)

Country Link
CN (1) CN108049897A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112412515A (en) * 2020-11-23 2021-02-26 中国矿业大学 A kind of self-moving full-screen broken roof support method
CN112412514A (en) * 2020-11-11 2021-02-26 天地科技股份有限公司 Support withdrawing device
CN112412513A (en) * 2020-11-11 2021-02-26 天地科技股份有限公司 Support withdrawing device
CN116201582A (en) * 2023-03-07 2023-06-02 天地科技股份有限公司北京技术研究分公司 Fully-mechanized hydraulic support retracting system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2934574Y (en) * 2006-07-21 2007-08-15 兖州煤业股份有限公司 Comprehensive mechanical work face hydraulic prop retreating device
CN101463730A (en) * 2008-12-31 2009-06-24 山东唐口煤业有限公司 Self-moving device of protection stand
CN105019927A (en) * 2015-07-31 2015-11-04 山东能源重装集团鲁南装备制造有限公司 Hydraulic support withdrawing system and method
CN105401966A (en) * 2015-12-08 2016-03-16 永城煤电控股集团有限公司 E-shaped pushing and grinding rack device for dismounting coal mine hydraulic bracket
CN105863691A (en) * 2016-05-04 2016-08-17 淮南矿业(集团)有限责任公司 Fully mechanized coal mining face support retracting roof supporting construction method
CN105971653A (en) * 2016-06-21 2016-09-28 淮南矿业(集团)有限责任公司 Multi-shielding support long-step pitch hydraulic self-moving cross beam and retreating method of multiple shielding supports

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2934574Y (en) * 2006-07-21 2007-08-15 兖州煤业股份有限公司 Comprehensive mechanical work face hydraulic prop retreating device
CN101463730A (en) * 2008-12-31 2009-06-24 山东唐口煤业有限公司 Self-moving device of protection stand
CN105019927A (en) * 2015-07-31 2015-11-04 山东能源重装集团鲁南装备制造有限公司 Hydraulic support withdrawing system and method
CN105401966A (en) * 2015-12-08 2016-03-16 永城煤电控股集团有限公司 E-shaped pushing and grinding rack device for dismounting coal mine hydraulic bracket
CN105863691A (en) * 2016-05-04 2016-08-17 淮南矿业(集团)有限责任公司 Fully mechanized coal mining face support retracting roof supporting construction method
CN105971653A (en) * 2016-06-21 2016-09-28 淮南矿业(集团)有限责任公司 Multi-shielding support long-step pitch hydraulic self-moving cross beam and retreating method of multiple shielding supports

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112412514A (en) * 2020-11-11 2021-02-26 天地科技股份有限公司 Support withdrawing device
CN112412513A (en) * 2020-11-11 2021-02-26 天地科技股份有限公司 Support withdrawing device
CN112412515A (en) * 2020-11-23 2021-02-26 中国矿业大学 A kind of self-moving full-screen broken roof support method
CN116201582A (en) * 2023-03-07 2023-06-02 天地科技股份有限公司北京技术研究分公司 Fully-mechanized hydraulic support retracting system

Similar Documents

Publication Publication Date Title
CN108049897A (en) Construction technology is withdrawn from the fully-mechanized mining working for moving crossbeam and move certainly crossbeam using this
CN104963301B (en) The dilatory translation downward putting device and method removed for pier top beam section and bridge pier
CN101775991B (en) Large-shrinkage support method for gob-side retaining roadway in fully mechanized mining face
CN105421453B (en) Pile block movable platform steel pipe pile driving construction method
CN107476815A (en) Carry the laneway temporary support support and application method of handling track
CN109113772B (en) Large-circulation roadway tunneling temporary support device and method thereof
CN103061765A (en) Z type horizontal stratification top coal caving coal mining method in half-edge thick coal seam
CN102121390B (en) Telescopic tunneling immediate support device
CN108222953B (en) Construction method for U-shaped open shield tunneling machine to pass through nonstandard section of pipe gallery
CN107387139B (en) Downward dismantling process for large-inclination-angle retracting working surface support
CN108930548A (en) A kind of coal mine fully-mechanized mining working rack restoring method
CN200964858Y (en) Dredging, protection, anchoring integral tunneling apparatus
CN107013030B (en) Hoisting type elevator shaft construction platform device and elevator shaft construction method
CN109404009A (en) The negative endless tube piece overall pulling down structure of shield method service channel pin-connected panel
CN207161127U (en) Adopt and fill joint hydraulic bracket system
CN211007705U (en) Discharging platform
CN205532650U (en) Roof support structure and well worker colliery withdrawing working face that has this structure
CN214498337U (en) Working platform for elevator shaft construction
CN2839562Y (en) Movable tunnel hydraulic support
CN201193525Y (en) Vehicle-mounted temporary support device for development machine
CN209457139U (en) Cantilever steel girder balcony slab rest configuration
CN205822193U (en) Static pile drawer
CN1066229C (en) Construction method of jacking and pushing bridge box and beam rear part
CN107130990A (en) A kind of large-mining-height working surface tears frame method open
CN104453966B (en) Large mining height end is adopted fully-mechanized digging machine and is removed frame passage passing sunk pillars on full frame acnemia canopy construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180518