[go: up one dir, main page]

CN108037384B - On-site monitoring method and device for electric power facilities - Google Patents

On-site monitoring method and device for electric power facilities Download PDF

Info

Publication number
CN108037384B
CN108037384B CN201711238403.XA CN201711238403A CN108037384B CN 108037384 B CN108037384 B CN 108037384B CN 201711238403 A CN201711238403 A CN 201711238403A CN 108037384 B CN108037384 B CN 108037384B
Authority
CN
China
Prior art keywords
electric power
power facility
parameter information
working parameter
target
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711238403.XA
Other languages
Chinese (zh)
Other versions
CN108037384A (en
Inventor
唐帅
韩光
袁建普
赵丙军
刘雪飞
安佳坤
高立坡
孟繁华
孙鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201711238403.XA priority Critical patent/CN108037384B/en
Publication of CN108037384A publication Critical patent/CN108037384A/en
Application granted granted Critical
Publication of CN108037384B publication Critical patent/CN108037384B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/25Arrangements for measuring currents or voltages or for indicating presence or sign thereof using digital measurement techniques
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R27/00Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
    • G01R27/02Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06VIMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
    • G06V10/00Arrangements for image or video recognition or understanding
    • G06V10/40Extraction of image or video features
    • G06V10/46Descriptors for shape, contour or point-related descriptors, e.g. scale invariant feature transform [SIFT] or bags of words [BoW]; Salient regional features
    • G06V10/462Salient features, e.g. scale invariant feature transforms [SIFT]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06VIMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
    • G06V10/00Arrangements for image or video recognition or understanding
    • G06V10/70Arrangements for image or video recognition or understanding using pattern recognition or machine learning
    • G06V10/74Image or video pattern matching; Proximity measures in feature spaces
    • G06V10/75Organisation of the matching processes, e.g. simultaneous or sequential comparisons of image or video features; Coarse-fine approaches, e.g. multi-scale approaches; using context analysis; Selection of dictionaries
    • G06V10/751Comparing pixel values or logical combinations thereof, or feature values having positional relevance, e.g. template matching
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/40Display of information, e.g. of data or controls

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

本发明适用于电力技术领域,提供了电力设施现场监测方法及装置,该方法包括:通过检测装置对目标区域中的电力设施进行监测,采集各个电力设施的第一工作参数信息,然后对所述第一工作参数信息进行检测,在所述第一工作参数信息超出第一预设范围时,通过图像采集装置采集相应的电力设施的当前画面,将当前画面与预设画面进行比对,并在若所述当前画面与所述预设画面的匹配度小于阈值时,将对应的电力设施作为目标电力设施,并将所述目标电力设施的第一工作参数信息发送给服务器,服务器根据接收到的第一工作参数信息对所述目标电力设施的状态进行监测,从而能够实时监测电力设施的工作状态,提高对电力设施状态的监测效率和准确度。

The present invention is applicable to the field of electric power technology, and provides an on-site monitoring method and device for electric power facilities. The method comprises: monitoring the electric power facilities in the target area by means of a detection device, collecting first working parameter information of each electric power facility, and then detecting the first working parameter information; when the first working parameter information exceeds a first preset range, collecting the current picture of the corresponding electric power facility by means of an image acquisition device, comparing the current picture with the preset picture, and when the matching degree between the current picture and the preset picture is less than a threshold value, taking the corresponding electric power facility as the target electric power facility, and sending the first working parameter information of the target electric power facility to a server; the server monitors the status of the target electric power facility according to the received first working parameter information, thereby being able to monitor the working status of the electric power facility in real time, and improving the monitoring efficiency and accuracy of the status of the electric power facility.

Description

Electric power facility field monitoring method and device
Technical Field
The invention belongs to the technical field of electric power, and particularly relates to an electric power facility field monitoring method and device.
Background
Conventionally, when monitoring an electric power facility, a detecting device is generally used to detect the state of the electric power facility, and then the detected data is sent to a control processing end for processing, so as to monitor the state of the electric power facility. Because the quantity of the detection devices arranged on each electric power facility is more, and the quantity of the electric power facilities is also more, the data quantity received by the control processing end is larger, the corresponding processing speed is slower, and the quick monitoring of the state of the electric power facilities is not facilitated.
Disclosure of Invention
In view of the above, the embodiment of the invention provides a method and a device for on-site monitoring of an electric power facility, so as to solve the problem that hidden danger of the electric power facility cannot be found in time by adopting a manual detection mode for the electric power facility in the prior art.
A first aspect of an embodiment of the present invention provides a method for on-site monitoring of an electric power facility, including:
Monitoring the electric power facilities in the target area through a detection device, and collecting first working parameter information of each electric power facility;
Detecting the first working parameter information, and acquiring a current picture of a corresponding electric power facility through an image acquisition device when the first working parameter information exceeds a first preset range;
Comparing a current picture with a preset picture, and taking a corresponding electric power facility as a target electric power facility and sending first working parameter information of the target electric power facility to a server when the matching degree of the current picture and the preset picture is smaller than a threshold value;
And the server monitors the state of the target electric power facility according to the received first working parameter information.
Optionally, the comparing the current frame with the preset frame, and when the matching degree of the current frame and the preset frame is smaller than a threshold, using the corresponding electric power facility as a target electric power facility, and sending the first working parameter information of the target electric power facility to a server, includes:
Extracting a plurality of first characteristic points of a current picture, and matching each first characteristic point with each second characteristic point of a preset picture, wherein one first characteristic point corresponds to one second characteristic point;
and when the matching degree is smaller than the threshold value, the corresponding electric power facility is taken as a target electric power facility, and the first working parameter information of the target electric power facility is sent to the server.
Optionally, after the first operation parameter information of the target electric power facility is sent to the server, the method further includes:
collecting first working parameter information of a target electric power facility at intervals of preset time until the first working parameter information is located in the first preset range;
the server monitors the state of the target electric power facility according to the first operating parameter information of the target electric power facility acquired again.
Optionally, the method further comprises the step of sending the comparison result of the current picture and the preset picture to a server, and the server stores the received first working parameter information, the identification of the target electric power facility, the time information and the comparison result.
Optionally, the method further comprises the step that the server monitors the electric facilities of the same category according to the stored first working parameter information, the identification of the target electric facilities, the time information and the comparison result.
A second aspect of an embodiment of the present invention provides an electric power facility field monitoring device, including:
The detection module is used for monitoring the electric power facilities in the target area and collecting first working parameter information of each electric power facility;
The processing module is used for detecting the first working parameter information, and acquiring a current picture of a corresponding electric power facility through the image acquisition device when the first working parameter information exceeds a first preset range;
The comparison module is used for comparing the current picture with a preset picture, and taking the corresponding electric power facility as a target electric power facility when the matching degree of the current picture and the preset picture is smaller than a threshold value, wherein the preset picture is a picture when the electric power facility works normally;
the information sending module is used for sending the first working parameter information of the target electric power facility to the control module;
And the control module is used for monitoring the state of the target electric power facility according to the received first working parameter information.
Optionally, the comparison module includes:
The device comprises a feature point extraction unit, a feature point extraction unit and a display unit, wherein the feature point extraction unit is used for extracting a plurality of first feature points of a current picture and matching each first feature point with each second feature point of a preset picture;
And the information processing unit is used for taking the corresponding electric power facility as a target electric power facility when the matching degree is smaller than the threshold value and sending the first working parameter information of the target electric power facility to the control module.
Optionally, after the first operating parameter information of the target electric power facility is sent to the control module, the detection module is further configured to collect the first operating parameter information of the target electric power facility at intervals of a preset time interval until the first operating parameter information is located in the first preset range;
The control module is also used for monitoring the state of the target electric power facility according to the acquired first working parameter information of the target electric power facility.
Optionally, the information sending module is further configured to send a comparison result of the current frame and the preset frame to the control module;
The control module is also used for storing the received first working parameter information, the identification of the target electric power facility, the time information and the comparison result.
Optionally, the control module is further configured to monitor the same type of electric power facilities according to the stored first operating parameter information, the identifier of the target electric power facility, the time information and the comparison result.
Compared with the prior art, the method has the advantages that the detection device is used for monitoring the electric power facilities in the target area, the first working parameter information of each electric power facility is collected, then the first working parameter information is detected, when the first working parameter information exceeds a first preset range, the image collection device is used for collecting the current picture of the corresponding electric power facility, the current picture is compared with the preset picture, when the matching degree of the current picture and the preset picture is smaller than a threshold value, the corresponding electric power facility is used as the target electric power facility, the first working parameter information of the target electric power facility is sent to the server, and the state of the target electric power facility is monitored by the server according to the received first working parameter information, so that the working state of the electric power facility can be monitored in real time, and the monitoring efficiency and accuracy of the state of the electric power facility are improved.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are needed in the embodiments or the description of the prior art will be briefly described below, it being obvious that the drawings in the following description are only some embodiments of the present invention, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
Fig. 1 is a schematic diagram of an implementation flow of a method for on-site monitoring of an electric power facility according to an embodiment of the present invention;
FIG. 2 is a schematic diagram of the implementation flow of step S103 in FIG. 1;
FIG. 3 is a schematic flow chart of another implementation of the method for on-site monitoring of an electric power facility according to an embodiment of the present invention;
fig. 4 is a schematic diagram of an on-site monitoring device for an electric power facility according to an embodiment of the present invention.
Detailed Description
In the following description, for purposes of explanation and not limitation, specific details are set forth such as the particular system architecture, techniques, etc., in order to provide a thorough understanding of the embodiments of the present invention. It will be apparent, however, to one skilled in the art that the present invention may be practiced in other embodiments that depart from these specific details. In other instances, detailed descriptions of well-known systems, devices, circuits, and methods are omitted so as not to obscure the description of the present invention with unnecessary detail.
In order to illustrate the technical scheme of the invention, the following description is made by specific examples.
Example 1
Fig. 1 shows an implementation flow of a power facility field monitoring method according to an embodiment of the present invention, which is described in detail below:
Step S101, monitoring the electric power facilities in the target area by the detection device, and collecting the first operation parameter information of each electric power facility.
In this embodiment, the detection device is a device capable of detecting an operation parameter of the electric power facility, for example, a sensor or the like. The detection devices can be arranged inside and/or outside the electric power facilities, one electric power facility corresponds to at least one detection device, the detection devices corresponding to different electric power facilities are different, and the detection devices are determined according to parameters required to be detected.
For example, the detection means may comprise a resistance detection circuit, a line sequence/voltage detection circuit, an MCU singlechip, a clock/reset circuit and a communication circuit. The MCU singlechip is connected with an electric power facility needing to be monitored through a resistance detection circuit, the line sequence/voltage detection circuit is connected with the electric power facility and the MCU singlechip, the clock/reset circuit is respectively connected with the MCU singlechip, and the MCU singlechip is further connected with the communication circuit.
The resistance detection circuit is formed by sequentially connecting a high-power resistor, a thyristor and an optocoupler isolation circuit, wherein the high-power resistor is connected with an electric power facility, and the optocoupler isolation circuit is connected with an MCU (micro control Unit) singlechip. The line sequence/voltage detection circuit is an A/D sampling circuit and is connected with the electric power facility.
The A/D sampling circuit can detect the effective value, peak value and fluctuation of phase zero voltage and zero ground voltage of the electric power facility, and can also detect whether the phase line and the zero line are connected in a wrong way or are open circuit and whether the ground line is connected. The MCU singlechip controls the optocoupler isolation circuit to further control the thyristor, and controls whether the high-power resistor is connected into the circuit or not through the thyristor. When the high-power resistor is connected into the resistor, the voltage value before and after connection can be obtained through the line sequence/voltage detection circuit, and then the step-down percentage, the phase line impedance and the zero line impedance of the line are obtained.
The detection device can detect the electricity utilization condition of the electric power facility at any time, can transmit detected data in real time through the ZIGBEE network, is not limited by environment and cables, effectively analyzes the detected data, timely finds out line problems such as electric shock, electric fire and abnormal equipment operation of personnel, helps to find out the problems, helps find out and quickly locate fault positions and reasons, eliminates potential safety hazards, can trace back the detected data, helps users to realize management of data electricity utilization safety and quality, can directly take electricity through a detected circuit, does not need external power sources such as batteries, can store a large amount of data, and is convenient to use under the condition without a server.
The first operating parameter information includes, but is not limited to, a voltage, a current, a power, a rotational speed, etc. of the electric power facility, by which an operating state of the electric power facility can be reflected. For example, for a certain electric power facility, the range of the corresponding first operation parameter is substantially fixed during normal operation, so that the collected first operation parameter information may be processed according to the range, which is not described in detail herein.
Step S102, detecting the first working parameter information, and when the first working parameter information exceeds a first preset range, acquiring a current picture of a corresponding electric power facility through an image acquisition device.
Each monitoring device corresponds to one electric power facility identifier, and each electric power facility identifier corresponds to a first preset range. It can be understood that the first operating parameter information corresponding to different electric power facilities is different, so that the corresponding first preset range can be set according to the information such as the electric power facility identifier corresponding to the detection device.
The first preset range includes preset ranges of various information in the first operating parameter information. For example, the first preset range may include a first voltage preset range, a first current preset range, and the like. For different electric power facilities, the corresponding first preset ranges are different. It can be understood that the power information such as the working voltage and the working current corresponding to different power facilities are different. The first preset range may be obtained by counting historical data. For example, voltage information, current information, etc. of the electric power facility at the time of normal operation are counted, and then a first preset range is set.
Through setting up different first preset ranges to different electric power facilities, can make the monitoring to electric power facility state more reasonable, accurate and accord with actual conditions, improve the accuracy to electric power facility state monitoring.
It should be noted that, the various information in the first preset range are related as a whole, and the safety state determination may not be made on the power facility state information for one information alone. For example, the collected voltage/current information corresponding to the electric power facilities is compared with the voltage/current range in the corresponding first preset range, and when the collected voltage/current exceeds the voltage/current range in the corresponding first preset range, the state abnormality of the electric power line is judged, and the monitoring is not in accordance with the actual situation, so that the monitoring is not scientific enough.
For the above reasons, in the first preset range, a separate preset range of partial information and an overall preset range in which various information are combined together may be included. The collected partial information can be compared with the independent preset range of the information in the corresponding first preset range, and the collected various information can be compared with the integral preset range of the various information in the corresponding first preset range when needed.
Specifically, the first operating parameter information exceeding the corresponding first preset range may include the following cases:
Part of the information in the first operating parameter information exceeds the single preset range of the information in the corresponding first preset range. For example, if the voltage information acquired for a certain electric power facility exceeds an individual voltage range in a corresponding first preset range, the current picture of the corresponding electric power facility can be acquired by the image acquisition device, or if the current information acquired for a certain electric power facility exceeds an individual current range in the corresponding first preset range, the current picture of the corresponding electric power facility can be acquired by the image acquisition device.
All information in the first working parameter information exceeds the whole preset range in the corresponding first preset range. For example, when the voltage information and the current amplitude information acquired by a certain electric power facility do not exceed the respective voltage range and the respective current range in the respective first preset range, various information in the first working parameter information can be compared with the whole preset range in the first preset range, and when the preset requirement is met, the current picture of the corresponding electric power facility is acquired by the image acquisition device.
The overall preset range in the first preset range can be set according to actual conditions. For example, the independent preset range of voltage is A1-A2, the independent preset range of current is B1-B2, the overall preset range of voltage in the overall preset range is A3-A4, the overall preset range of current is B3-B4, and the overall preset range of voltage and the overall preset range of current have a correlation relationship, for example, the correlation relationship between the two can be obtained by fitting the two according to historical data.
It should be noted that, each detection device may collect first working parameter information of the electric power facility all the time according to a preset time interval, and detect the collected first working parameter information, and when the first working parameter information exceeds a first preset range, collect a current picture of the corresponding electric power facility through the image collection device.
Step S103, comparing a current picture with a preset picture, taking a corresponding electric power facility as a target electric power facility when the matching degree of the current picture and the preset picture is smaller than a threshold value, and sending first working parameter information of the target electric power facility to a server.
The preset picture is a picture when the electric power facility works normally.
Referring to fig. 2, in one embodiment, the implementation procedure of step S103 is as follows:
Step S201, extracting a plurality of first feature points of a current picture, and matching each first feature point with each second feature point of a preset picture, wherein one first feature point corresponds to one second feature point.
For each feature point of the current picture and each feature point of the preset picture, the feature points may be extracted by the same feature point extraction algorithm, for example, each feature point of the current picture may be extracted by a sift algorithm, and each feature point of the preset picture may be extracted by a sift algorithm, but not limited thereto.
It should be noted that, each feature point of the current frame corresponds to each feature point of the preset frame one by one, so that the comparison in step S202 can be performed.
And step S202, when the matching degree is smaller than the threshold value, the corresponding electric power facility is taken as a target electric power facility, and the first working parameter information of the target electric power facility is sent to the server.
Specifically, taking N first feature points extracted from the current picture, N second feature points extracted from the preset picture, and a threshold value being α (0 < α < 1) as an example, the matching logarithm of the first feature points and the corresponding second feature points is M (i.e., the M first feature points are matched with the corresponding M second feature points, 0.ltoreq.m.ltoreq.n), if M/N is greater than or equal to α, the matching degree is greater than or equal to the threshold value, and if M/N is less than α, the matching degree is less than the threshold value.
Step S104, the server monitors the state of the target electric power facility according to the received first working parameter information.
The server monitors the target electric power facility according to the received first working parameter information and the working parameter information of the normal working of the target electric power facility, so that the abnormality of the electric power facility can be found in time.
Referring to fig. 3, after step S103, the method may further include:
Step S301, collecting first operating parameter information of a target electric power facility at intervals of a preset time interval until the first operating parameter information is located in the first preset range.
In step S302, the server monitors the state of the target electric power facility according to the first operation parameter information of the target electric power facility acquired again.
Optionally, after step S104, the method may further include sending a comparison result of the current frame and the preset frame to a server, where the server stores the received first operating parameter information, the identifier of the target electric power facility, the time information, and the comparison result.
The method can further comprise the step that the server monitors the electric facilities in the same category according to the stored first working parameter information, the identification of the target electric facilities, the time information and the comparison result.
According to the electric power facility field monitoring method, the electric power facilities in the target area are monitored through the detection device, the first working parameter information of each electric power facility is collected, then the first working parameter information is detected, when the first working parameter information exceeds a first preset range, the current picture of the corresponding electric power facility is collected through the image collection device, the current picture is compared with the preset picture, when the matching degree of the current picture and the preset picture is smaller than a threshold value, the corresponding electric power facility is used as the target electric power facility, the first working parameter information of the target electric power facility is sent to the server, and the state of the target electric power facility is monitored according to the received first working parameter information by the server, so that the working state of the electric power facility can be monitored in real time, and the monitoring efficiency and accuracy of the state of the electric power facility are improved.
It should be understood that the sequence number of each step in the foregoing embodiment does not mean that the execution sequence of each process should be determined by the function and the internal logic, and should not limit the implementation process of the embodiment of the present invention.
Example two
Fig. 4 shows an electric power facility field monitoring apparatus in the present embodiment, corresponding to the electric power facility field monitoring method in the first embodiment, including a detection module 401, a processing module 402, a comparison module 403, an information transmission module 404, and a control module 405.
The detection module 401 is configured to monitor the electric power facilities in the target area, and collect first operating parameter information of each electric power facility.
And the processing module 402 is configured to detect the first operating parameter information, and collect, by using the image collecting device, a current picture of the corresponding electric power facility when the first operating parameter information exceeds a first preset range.
The comparison module 403 is configured to compare a current frame with a preset frame, and when the matching degree between the current frame and the preset frame is smaller than a threshold, use a corresponding electric power facility as a target electric power facility, where the preset frame is a frame when the electric power facility works normally.
The information sending module 404 is configured to send the first operation parameter information of the target electric power facility to the control module 405.
And the control module 405 is configured to monitor a state of the target electric power facility according to the received first operating parameter information.
Alternatively, the comparison module 403 includes a feature point extraction unit 501 and an information processing unit 502.
A feature point extracting unit 501, configured to extract a plurality of first feature points of a current picture, and match each of the first feature points with each of second feature points of a preset picture;
and an information processing unit 502, configured to, when the matching degree is smaller than the threshold value, take the corresponding electric power facility as a target electric power facility, and send first operation parameter information of the target electric power facility to the control module 405.
Optionally, after the first operation parameter information of the target electric power facility is sent to the control module 405, the detection module 401 is further configured to collect the first operation parameter information of the target electric power facility at intervals of a preset time interval until the first operation parameter information is within the first preset range.
The control module 405 is further configured to monitor a state of the target electric power facility according to the first operating parameter information of the target electric power facility acquired again.
Optionally, the information sending module 404 is further configured to send a comparison result of the current frame and the preset frame to the control module 405. The control module 405 is further configured to store the received first operating parameter information, the identification of the target electric power facility, the time information, and the comparison result.
Further, the control module 405 is further configured to monitor the same type of electric power facilities according to the stored first operating parameter information, the identification of the target electric power facilities, the time information, and the comparison result.
It will be apparent to those skilled in the art that, for convenience and brevity of description, only the above-described division of the functional units and modules is illustrated, and in practical application, the above-described functional distribution may be performed by different functional units and modules according to needs, i.e. the internal structure of the apparatus is divided into different functional units or modules to perform all or part of the above-described functions. The functional units and modules in the embodiment may be integrated in one processing unit, or each unit may exist alone physically, or two or more units may be integrated in one unit, where the integrated units may be implemented in a form of hardware or a form of a software functional unit. In addition, the specific names of the functional units and modules are only for distinguishing from each other, and are not used for limiting the protection scope of the present application. The specific working process of the units and modules in the above system may refer to the corresponding process in the foregoing method embodiment, which is not described herein again.
In the foregoing embodiments, the descriptions of the embodiments are emphasized, and in part, not described or illustrated in any particular embodiment, reference is made to the related descriptions of other embodiments.
Those of ordinary skill in the art will appreciate that the various illustrative elements and algorithm steps described in connection with the embodiments disclosed herein may be implemented as electronic hardware, or combinations of computer software and electronic hardware. Whether such functionality is implemented as hardware or software depends upon the particular application and design constraints imposed on the solution. Skilled artisans may implement the described functionality in varying ways for each particular application, but such implementation decisions should not be interpreted as causing a departure from the scope of the present invention.
In the embodiments provided in the present invention, it should be understood that the disclosed apparatus/terminal device and method may be implemented in other manners. For example, the apparatus/terminal device embodiments described above are merely illustrative, e.g., the division of the modules or units is merely a logical function division, and there may be additional divisions in actual implementation, e.g., multiple units or components may be combined or integrated into another system, or some features may be omitted or not performed. Alternatively, the coupling or direct coupling or communication connection shown or discussed may be an indirect coupling or communication connection via interfaces, devices or units, which may be in electrical, mechanical or other forms.
The units described as separate units may or may not be physically separate, and units shown as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
In addition, each functional unit in the embodiments of the present invention may be integrated in one processing unit, or each unit may exist alone physically, or two or more units may be integrated in one unit. The integrated units may be implemented in hardware or in software functional units.
The integrated modules/units, if implemented in the form of software functional units and sold or used as stand-alone products, may be stored in a computer readable storage medium. Based on such understanding, the present invention may implement all or part of the flow of the method of the above embodiment, or may be implemented by a computer program to instruct related hardware, where the computer program may be stored in a computer readable storage medium, and when the computer program is executed by a processor, the computer program may implement the steps of each of the method embodiments described above. . Wherein the computer program comprises computer program code which may be in source code form, object code form, executable file or some intermediate form etc. The computer readable medium may include any entity or device capable of carrying the computer program code, a recording medium, a U disk, a removable hard disk, a magnetic disk, an optical disk, a computer Memory, a Read-Only Memory (ROM), a random access Memory (RAM, random Access Memory), an electrical carrier signal, a telecommunications signal, a software distribution medium, and so forth. It should be noted that the computer readable medium contains content that can be appropriately scaled according to the requirements of jurisdictions in which such content is subject to legislation and patent practice, such as in certain jurisdictions in which such content is subject to legislation and patent practice, the computer readable medium does not include electrical carrier signals and telecommunication signals.
The foregoing embodiments are merely illustrative of the technical solutions of the present invention, and not restrictive, and although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that modifications may still be made to the technical solutions described in the foregoing embodiments or equivalent substitutions of some technical features thereof, and that such modifications or substitutions do not depart from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims (4)

1. A method of on-site monitoring of an electrical utility, comprising:
Monitoring the electric power facilities in the target area through a detection device, and collecting first working parameter information of each electric power facility;
Detecting the first working parameter information, and acquiring a current picture of a corresponding electric power facility through an image acquisition device when the first working parameter information exceeds a first preset range;
Comparing a current picture with a preset picture, and taking a corresponding electric power facility as a target electric power facility and sending first working parameter information of the target electric power facility to a server when the matching degree of the current picture and the preset picture is smaller than a threshold value;
the server monitors the state of the target electric power facility according to the received first working parameter information;
the method further comprises the steps of:
The comparison result of the current picture and the preset picture is sent to a server, and the server stores the received first working parameter information, the identification of the target electric power facility, the time information and the comparison result;
The comparing the current picture with a preset picture, and when the matching degree of the current picture and the preset picture is smaller than a threshold value, taking the corresponding electric power facility as a target electric power facility, and sending the first working parameter information of the target electric power facility to a server, wherein the method comprises the following steps:
Extracting a plurality of first characteristic points of a current picture, and matching each first characteristic point with each second characteristic point of a preset picture, wherein one first characteristic point corresponds to one second characteristic point;
and when the matching degree is smaller than the threshold value, the corresponding electric power facility is taken as a target electric power facility, and the first working parameter information of the target electric power facility is sent to the server.
2. The power utility on-site monitoring method of claim 1, further comprising, after the transmitting the first operating parameter information of the target power utility to the server:
collecting first working parameter information of a target electric power facility at intervals of preset time until the first working parameter information is located in the first preset range;
the server monitors the state of the target electric power facility according to the first operating parameter information of the target electric power facility acquired again.
3. An electrical utility field monitoring device, comprising:
The detection module is used for monitoring the electric power facilities in the target area and collecting first working parameter information of each electric power facility;
The processing module is used for detecting the first working parameter information, and acquiring a current picture of a corresponding electric power facility through the image acquisition device when the first working parameter information exceeds a first preset range;
The comparison module is used for comparing the current picture with a preset picture, and taking the corresponding electric power facility as a target electric power facility when the matching degree of the current picture and the preset picture is smaller than a threshold value, wherein the preset picture is a picture when the electric power facility works normally;
the information sending module is used for sending the first working parameter information of the target electric power facility to the control module;
The control module is used for monitoring the state of the target electric power facility according to the received first working parameter information;
the information sending module is also used for sending the comparison result of the current picture and the preset picture to the control module;
The control module is also used for storing the received first working parameter information, the identification of the target electric power facility, the time information and the comparison result;
the control module is also used for monitoring the same-class electric power facilities according to the stored first working parameter information, the identification of the target electric power facilities, the time information and the comparison result;
The comparison module includes:
The device comprises a feature point extraction unit, a feature point extraction unit and a display unit, wherein the feature point extraction unit is used for extracting a plurality of first feature points of a current picture and matching each first feature point with each second feature point of a preset picture;
And the information processing unit is used for taking the corresponding electric power facility as a target electric power facility when the matching degree is smaller than the threshold value and sending the first working parameter information of the target electric power facility to the control module.
4. The power facility on-site monitoring apparatus of claim 3, wherein after the first operating parameter information of the target power facility is sent to the control module, the detection module is further configured to collect the first operating parameter information of the target power facility once at intervals of a preset time until the first operating parameter information is within the first preset range;
The control module is also used for monitoring the state of the target electric power facility according to the acquired first working parameter information of the target electric power facility.
CN201711238403.XA 2017-11-30 2017-11-30 On-site monitoring method and device for electric power facilities Active CN108037384B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711238403.XA CN108037384B (en) 2017-11-30 2017-11-30 On-site monitoring method and device for electric power facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711238403.XA CN108037384B (en) 2017-11-30 2017-11-30 On-site monitoring method and device for electric power facilities

Publications (2)

Publication Number Publication Date
CN108037384A CN108037384A (en) 2018-05-15
CN108037384B true CN108037384B (en) 2024-12-27

Family

ID=62094330

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711238403.XA Active CN108037384B (en) 2017-11-30 2017-11-30 On-site monitoring method and device for electric power facilities

Country Status (1)

Country Link
CN (1) CN108037384B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109375538A (en) * 2018-10-15 2019-02-22 国网河南省电力公司孟州市供电公司 A method and device for on-site monitoring of power facilities
CN115480106A (en) * 2021-01-20 2022-12-16 宁夏中科天际防雷研究院有限公司 Power facility on-site monitoring device and use method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104267319A (en) * 2014-10-29 2015-01-07 杭州凯达电力建设有限公司 Electric power control system and method
CN105119379A (en) * 2015-09-11 2015-12-02 国网天津宝坻供电有限公司 Inspection method based on transformation station intelligent image comparison
CN106790352A (en) * 2016-11-15 2017-05-31 国网江苏省电力公司泰州供电公司 The power transmission and transforming equipment system of trigger-type IMAQ
CN106846304A (en) * 2017-01-03 2017-06-13 中国特种设备检测研究院 Electrical equipment detection method and device based on infrared detection
CN107192920A (en) * 2017-06-27 2017-09-22 国家电网公司 Electric power monitoring method and system based on information transit node
CN207636680U (en) * 2017-11-30 2018-07-20 国网河北省电力公司经济技术研究院 On-site monitoring device and system for power facilities

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103078327B (en) * 2013-02-07 2016-02-10 重庆市电力公司供电服务中心 A kind of electric power load control method and system
MY168883A (en) * 2013-02-20 2018-12-04 Panasonic Ip Corp America Control method for information apparatus and program
CN103487729B (en) * 2013-09-06 2016-04-27 广东电网公司电力科学研究院 Based on the power equipments defect detection method that ultraviolet video and infrared video merge
CN104316782B (en) * 2014-09-26 2017-09-29 苏州华兴致远电子科技有限公司 pantograph monitoring method and system
CN104301690A (en) * 2014-10-29 2015-01-21 杭州凯达电力建设有限公司 Field monitoring method and system
CN104268805A (en) * 2014-10-29 2015-01-07 杭州凯达电力建设有限公司 Line management method and system
CN204789798U (en) * 2015-06-26 2015-11-18 广东电网有限责任公司东莞供电局 Distribution lines running state monitoring device and monitoring system
CN105388414A (en) * 2015-10-23 2016-03-09 国网山西省电力公司大同供电公司 Omnidirectional fault automatic identification method of isolation switch
CN105811578B (en) * 2016-03-09 2018-08-31 国家电网公司 Transmission line of electricity monitor supervision platform and its Power Supply Monitoring algorithm and image warning algorithm
CN107305727A (en) * 2016-04-22 2017-10-31 深圳市爱丰达盛科技有限公司 A kind of method and system remotely monitored
CN106408209A (en) * 2016-10-29 2017-02-15 国家电网公司 Positioning and line inspection detection system and method in electric power field
CN106680633B (en) * 2016-12-30 2020-03-13 国网山东省电力公司鄄城县供电公司 Cable pressure monitoring method and system
CN107247203A (en) * 2017-07-10 2017-10-13 佛山杰致信息科技有限公司 A kind of transformer fault detection method and device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104267319A (en) * 2014-10-29 2015-01-07 杭州凯达电力建设有限公司 Electric power control system and method
CN105119379A (en) * 2015-09-11 2015-12-02 国网天津宝坻供电有限公司 Inspection method based on transformation station intelligent image comparison
CN106790352A (en) * 2016-11-15 2017-05-31 国网江苏省电力公司泰州供电公司 The power transmission and transforming equipment system of trigger-type IMAQ
CN106846304A (en) * 2017-01-03 2017-06-13 中国特种设备检测研究院 Electrical equipment detection method and device based on infrared detection
CN107192920A (en) * 2017-06-27 2017-09-22 国家电网公司 Electric power monitoring method and system based on information transit node
CN207636680U (en) * 2017-11-30 2018-07-20 国网河北省电力公司经济技术研究院 On-site monitoring device and system for power facilities

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
图像智能分析技术在输电线路监控系统中的应用;孙召峰;《自动化技术与应用》;第96-100页 *

Also Published As

Publication number Publication date
CN108037384A (en) 2018-05-15

Similar Documents

Publication Publication Date Title
CN118137682B (en) Active detection system and method for hardware failure of distribution automation master station
CN111452658B (en) Charging pile health state monitoring and diagnosing method and device and terminal equipment
CN116980958B (en) Radio equipment electric fault monitoring method and system based on data identification
CN208459507U (en) Arrester online monitoring system
CN103200395B (en) A kind of intelligent newspapers barrier optical transmitter and receiver and network management client end system thereof
WO2019214231A1 (en) Faulty arc detection method, device and system
CN114743089B (en) Image recognition GIS fault diagnosis device and method based on SSA-SVM
CN108037384B (en) On-site monitoring method and device for electric power facilities
CN111585819A (en) Distribution network communication equipment fault analysis method and system
CN111654405B (en) Method, device, equipment and storage medium for fault node of communication link
CN206313533U (en) Distribution monitor device
CN207636680U (en) On-site monitoring device and system for power facilities
JP2025085667A (en) Battery data management system and related methods
CN209786878U (en) Intelligent power distribution room online monitoring system
CN108663970B (en) Electric power operation safety monitoring system
CN104485991A (en) Optical module fault automatic alarm method and system
CN109544852B (en) Restaurant fire monitoring method and device
CN116298459B (en) Intelligent lightning current on-line monitoring system
CN106940414A (en) Power circuit monitoring method and device
CN111157942A (en) Electricity stealing event monitoring method, electronic monitoring equipment and electricity stealing prevention system
CN106526426A (en) Power distribution network fault analyzing system and method
CN114069865A (en) Converter station operation monitoring system, method and device, computer equipment and medium
CN113783755A (en) Network monitoring method, network monitoring device, storage medium and electronic device
CN115480106A (en) Power facility on-site monitoring device and use method thereof
CN113340347A (en) Intelligent display device of switch cabinet and control method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant