CN108005680A - 一种适用于护盾式tbm隧道预制管片衬砌结构的仰拱支撑组件 - Google Patents
一种适用于护盾式tbm隧道预制管片衬砌结构的仰拱支撑组件 Download PDFInfo
- Publication number
- CN108005680A CN108005680A CN201711299405.XA CN201711299405A CN108005680A CN 108005680 A CN108005680 A CN 108005680A CN 201711299405 A CN201711299405 A CN 201711299405A CN 108005680 A CN108005680 A CN 108005680A
- Authority
- CN
- China
- Prior art keywords
- inverted arch
- pipe section
- prefabricated pipe
- arch support
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 abstract description 7
- 238000010586 diagram Methods 0.000 description 3
- 239000004567 concrete Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 238000012407 engineering method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/12—Temporary supports for use during building; Accessories
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
一种适用于护盾式TBM隧道预制管片衬砌结构的仰拱支撑组件,在不削弱管片的结构性能的前提下,能有效解决衬砌管片脱出盾尾自然下沉的问题,大幅提高管片的成环质量,同时还能方便管片安装、保证结构防水性能。它包括:螺纹套筒,根据拼装点位包络设置于预制管片外侧结构内;仰拱支撑构件,在仰拱下部外侧对称安装布置,具有仰拱支撑腿和支撑螺杆,支撑螺杆与螺纹套筒形成可拆卸螺旋连接。
Description
技术领域
本发明涉及隧道工程,特别涉及一种适用于护盾式TBM隧道预制管片衬砌结构的仰拱支撑组件。
背景技术
岩石隧道掘进机(TBM)前期广泛应用于水工、铁路隧道,随着城市轨道交通工程的蓬勃发展,TBM工法在岩质地区城市地铁隧道的使用也越来越多。受制于城市地铁特殊的周边环境和复杂的地质条件,一般选用护盾式TBM施工,例如重庆轨道交通选用单护盾式TBM、青岛轨道交通选用双护盾式TBM;衬砌结构型式一般选用地质适应性强、施工快速的预制钢筋混凝土管片衬砌结构。
由于护盾式TBM掘进施工过程中钢筋混凝土预制管片衬砌结构需在盾体内拼装完成后再推出盾尾,因此TBM开挖直径略大于预制管片衬砌结构的外径。由于护盾式TBM无盾尾密封装置,不能通过同步注浆来充填管片外径与开挖直径间的间隙;因此,当管片脱出盾尾时,仰拱管片会自然下沉占据管片外径与开挖直径间的间隙,造成管片错台及隧道椭圆度超标,同时还可能造成后期隧道管片漏水严重。
发明内容
本发明所要解决的技术问题是提供一种适用于护盾式TBM隧道预制管片衬砌结构的仰拱支撑组件,在不削弱管片的结构性能的前提下,能有效解决衬砌管片脱出盾尾自然下沉的问题,大幅提高管片的成环质量,同时还能方便管片安装、保证结构防水性能。
本发明解决其技术问题所采用的技术方案如下:
本发明的一种适用于护盾式TBM隧道预制管片衬砌结构的仰拱支撑组件,其特征是它包括:螺纹套筒,根据拼装点位包络设置于预制管片外侧结构内;仰拱支撑构件,在仰拱下部外侧对称安装布置,具有仰拱支撑腿和支撑螺杆,支撑螺杆与螺纹套筒形成可拆卸螺旋连接。
本发明的有益效果是,通过对预制管片先期预埋螺纹套筒,根据拼装点位的需要在管片安装前对仰拱管片将支撑构件通过螺杆与预制管片中的螺纹套筒旋拧固定形成仰拱支撑组件,该支撑构件占据管片外径与开挖直径间的间隙,有效解决衬砌管片脱出盾尾自然下沉的问题,不仅能保证管片的成环质量,还能方便管片安装、保证结构防水性能。
附图说明
本说明书包括如下六幅附图:
图1是本发明一种适用于护盾式TBM隧道预制管片衬砌结构的仰拱支撑组件点位一安装剖面示意图
图2是本发明一种适用于护盾式TBM隧道预制管片衬砌结构的仰拱支撑组件点位一安装俯视图
图3是本发明一种适用于护盾式TBM隧道预制管片衬砌结构的仰拱支撑组件点位二安装剖面示意图
图4是本发明一种适用于护盾式TBM隧道预制管片衬砌结构的仰拱支撑组件点位二安装俯视图
图5是本发明一种适用于护盾式TBM隧道预制管片衬砌结构的仰拱支撑组件螺纹套筒预埋示意图
图6是本发明一种适用于护盾式TBM隧道预制管片衬砌结构的仰拱支撑组件螺杆和支撑腿结构示意图
图中示出构件名称及所对应的标记:预制管片11、预制管片分块一11a、预制管片分块二11b、预制管片分块三11c、仰拱支撑构件21、仰拱支撑腿21a、支撑螺杆21b、螺纹套筒22。
具体实施方式
下面结合附图和具体的实施方式对本发明作进一步详细说明。
参照图1、图2、图3、图4,本发明一种适用于护盾式TBM隧道预制管片衬砌结构的仰拱支撑组件包括:螺纹套筒22,根据拼装点位包络设置于预制管片11外侧内;仰拱支撑构件21,在仰拱下部外侧对称安装布置,具有仰拱支撑腿21a和支撑螺杆21b,支撑螺杆21b与螺纹套筒22形成可拆卸螺旋连接。如在图2示出的实施例中,预制管片分块一11a、预制管片分块二11b、预制管片分块三11c中根据预制衬砌管片11拼装点位包络设置4排共计8个螺纹套筒22,使安装上的2排4个仰拱支撑构件21沿管片竖向中心线对称布置。螺纹套筒22应在预制衬砌管片11生产过程中预埋,螺纹套筒22端口部应进行临时封堵以避免管片浇筑过程中被水泥砂浆堵塞,预制管片11完工后将封堵凿除。
参照图6,仰拱支撑构件21由仰拱支撑腿21a和支撑螺杆21b两部分组成,仰拱支撑腿21a的厚度应与管片外径与开挖直径间的间隙匹配。仰拱支撑腿21a应具有一定的强度,能承受全环管片的自重和一定的外荷载作用。
参照图5、图6,支撑螺杆21b的螺杆尺寸应与螺纹套筒22匹配,预制衬砌管片11安装前通过旋拧支撑螺杆21b进入螺纹套筒22形成整体。
以上所述只是用图解说明本发明一种适用于护盾式TBM隧道预制管片衬砌结构的仰拱支撑组件的基本原理,并非是要将本发明局限在所示和所述的具体结构和适用范围内,故凡是所有可能被利用的相应修改以及等同物,均属于本发明所申请的专利范围。
Claims (2)
1.一种适用于护盾式TBM隧道预制管片衬砌结构的仰拱支撑组件,其特征是它包括:螺纹套筒(22),根据拼装点位包络设置于预制管片(11)外侧结构内;仰拱支撑构件(21),在仰拱下部外侧对称安装布置,具有仰拱支撑腿(21a)和支撑螺杆(21b),支撑螺杆(21b)与螺纹套筒(22)形成可拆卸螺旋连接。
2.如权利要求1所述一种适用于护盾式TBM隧道预制管片衬砌结构的仰拱支撑组件,其特征是:所述仰拱支撑腿(21a)的高厚度与管片外径与开挖直径间的间隙相匹配。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711299405.XA CN108005680A (zh) | 2017-12-08 | 2017-12-08 | 一种适用于护盾式tbm隧道预制管片衬砌结构的仰拱支撑组件 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711299405.XA CN108005680A (zh) | 2017-12-08 | 2017-12-08 | 一种适用于护盾式tbm隧道预制管片衬砌结构的仰拱支撑组件 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108005680A true CN108005680A (zh) | 2018-05-08 |
Family
ID=62057743
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711299405.XA Pending CN108005680A (zh) | 2017-12-08 | 2017-12-08 | 一种适用于护盾式tbm隧道预制管片衬砌结构的仰拱支撑组件 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108005680A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108708752A (zh) * | 2018-07-27 | 2018-10-26 | 西南交通大学 | Tbm隧道施作管片的临时支撑装置及豆砾石回填灌浆的方法 |
CN110307007A (zh) * | 2019-06-24 | 2019-10-08 | 中铁二院工程集团有限责任公司 | 掘进机法隧道预制管片衬砌仰拱支撑构件快速安装工具 |
CN111502692A (zh) * | 2020-04-10 | 2020-08-07 | 中铁隧道集团二处有限公司 | 一种tbm首环管片衬砌拼装式箱型锁定装置及应用方法 |
FR3101661A1 (fr) * | 2019-10-08 | 2021-04-09 | Vinci Construction Grands Projets | Voussoir de tunnel en béton armé |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07247794A (ja) * | 1994-03-11 | 1995-09-26 | Nippon Concrete Ind Co Ltd | トンネル覆工工法 |
JP2000045692A (ja) * | 1998-07-30 | 2000-02-15 | Kumagai Gumi Co Ltd | シールドトンネルの二次覆工工法 |
CN103993895A (zh) * | 2014-06-10 | 2014-08-20 | 中铁二院工程集团有限责任公司 | 一种tbm工法预制管片衬砌吊装及吹填压浆预埋组件 |
CN204357447U (zh) * | 2014-11-12 | 2015-05-27 | 中铁二院工程集团有限责任公司 | 一种盾构隧道预制管片衬砌背后地层注浆装置 |
JP2015214853A (ja) * | 2014-05-12 | 2015-12-03 | 大成建設株式会社 | トンネルの覆工方法 |
CN204984441U (zh) * | 2015-09-08 | 2016-01-20 | 中铁隧道股份有限公司 | 改变单护盾tbm管片背后回填质量的新型管片 |
CN204984424U (zh) * | 2015-09-15 | 2016-01-20 | 中铁隧道股份有限公司 | 防止开口盾尾管片下沉的垫块装置 |
CN205297600U (zh) * | 2015-12-18 | 2016-06-08 | 中国建筑土木建设有限公司 | 盾构空推管片支顶注浆两用管及其管片支顶、注浆结构 |
CN208220811U (zh) * | 2017-12-08 | 2018-12-11 | 中铁二院工程集团有限责任公司 | 一种适用于护盾式tbm隧道预制管片衬砌结构的仰拱支撑组件 |
-
2017
- 2017-12-08 CN CN201711299405.XA patent/CN108005680A/zh active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07247794A (ja) * | 1994-03-11 | 1995-09-26 | Nippon Concrete Ind Co Ltd | トンネル覆工工法 |
JP2000045692A (ja) * | 1998-07-30 | 2000-02-15 | Kumagai Gumi Co Ltd | シールドトンネルの二次覆工工法 |
JP2015214853A (ja) * | 2014-05-12 | 2015-12-03 | 大成建設株式会社 | トンネルの覆工方法 |
CN103993895A (zh) * | 2014-06-10 | 2014-08-20 | 中铁二院工程集团有限责任公司 | 一种tbm工法预制管片衬砌吊装及吹填压浆预埋组件 |
CN204357447U (zh) * | 2014-11-12 | 2015-05-27 | 中铁二院工程集团有限责任公司 | 一种盾构隧道预制管片衬砌背后地层注浆装置 |
CN204984441U (zh) * | 2015-09-08 | 2016-01-20 | 中铁隧道股份有限公司 | 改变单护盾tbm管片背后回填质量的新型管片 |
CN204984424U (zh) * | 2015-09-15 | 2016-01-20 | 中铁隧道股份有限公司 | 防止开口盾尾管片下沉的垫块装置 |
CN205297600U (zh) * | 2015-12-18 | 2016-06-08 | 中国建筑土木建设有限公司 | 盾构空推管片支顶注浆两用管及其管片支顶、注浆结构 |
CN208220811U (zh) * | 2017-12-08 | 2018-12-11 | 中铁二院工程集团有限责任公司 | 一种适用于护盾式tbm隧道预制管片衬砌结构的仰拱支撑组件 |
Non-Patent Citations (2)
Title |
---|
李飞宇,胡燕伟,李龙飞: "马蹄形盾构负环管片拼装技术" * |
黄永生;: "改良型双护盾TBM模筑衬砌与管片衬砌两种模式转换技术" * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108708752A (zh) * | 2018-07-27 | 2018-10-26 | 西南交通大学 | Tbm隧道施作管片的临时支撑装置及豆砾石回填灌浆的方法 |
CN108708752B (zh) * | 2018-07-27 | 2023-11-24 | 西南交通大学 | Tbm隧道施作管片的临时支撑装置及豆砾石回填灌浆的方法 |
CN110307007A (zh) * | 2019-06-24 | 2019-10-08 | 中铁二院工程集团有限责任公司 | 掘进机法隧道预制管片衬砌仰拱支撑构件快速安装工具 |
CN110307007B (zh) * | 2019-06-24 | 2024-03-22 | 中铁二院工程集团有限责任公司 | 掘进机法隧道预制管片衬砌仰拱支撑构件快速安装工具 |
FR3101661A1 (fr) * | 2019-10-08 | 2021-04-09 | Vinci Construction Grands Projets | Voussoir de tunnel en béton armé |
CN111502692A (zh) * | 2020-04-10 | 2020-08-07 | 中铁隧道集团二处有限公司 | 一种tbm首环管片衬砌拼装式箱型锁定装置及应用方法 |
CN111502692B (zh) * | 2020-04-10 | 2024-05-17 | 中铁隧道集团二处有限公司 | 一种tbm首环管片衬砌拼装式箱型锁定装置及应用方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106837408B (zh) | 一种煤层采场优势瓦斯运移通道阶梯式构建方法 | |
CN109209392B (zh) | 适用于大断面隧道ⅳ-ⅴ级围岩的全环开挖方法 | |
CN110905530B (zh) | 穿越断层破碎带的富水软岩隧道稳定性控制施工方法 | |
CN108005680A (zh) | 一种适用于护盾式tbm隧道预制管片衬砌结构的仰拱支撑组件 | |
CN110924959B (zh) | 穿越断层破碎带的富水软弱围岩隧道施工方法 | |
CN103306687A (zh) | 软岩隧道长悬臂水平旋喷变形控制施工方法 | |
CN101324072A (zh) | 通透肋式拱梁隧道施工方法 | |
CN104612696B (zh) | 大断面暗挖地铁车站在粉细砂层中穿越高架桥柱洞法施工方法 | |
CN105064397A (zh) | 一种在地铁区间盾构隧道基础上扩挖车站的明挖施工方法 | |
CN203097896U (zh) | 分离式大断面群洞下穿既有构筑物控制沉降结构 | |
CN101709651A (zh) | 海底隧道的注浆堵水方法 | |
CN106014449A (zh) | 双线小净距大断面节理岩体地铁隧道的施工方法 | |
CN211258623U (zh) | 穿越断层破碎带的富水软弱围岩隧道支护体系 | |
CN208220811U (zh) | 一种适用于护盾式tbm隧道预制管片衬砌结构的仰拱支撑组件 | |
CN103628885A (zh) | 一种超浅埋隧道出洞盖挖施工方法 | |
CN105804765A (zh) | 一种通透肋式连拱隧道 | |
CN104653188B (zh) | 一种在暗挖风道内设置大直径盾构接收和始发井的方法 | |
CN103485808A (zh) | 井下膨胀软岩的电渗法原位改性巷道锚固方法 | |
CN107165661A (zh) | 一种高地应力软弱围岩大变形隧道超长扩大头锚索施工方法 | |
CN104074534A (zh) | 一种综采/综放工作面的沿空留巷方法 | |
CN109057801B (zh) | 双侧墙导坑复合台阶式大断面隧道开挖支护的施工方法 | |
CN205260048U (zh) | 一种通透肋式连拱隧道 | |
CN106285775A (zh) | 一种构筑物下覆采空区充填扩充袋及施工方法 | |
CN104863613A (zh) | 岩质地层暗挖地下结构高边墙锚拉初支结构及施工方法 | |
CN109184752B (zh) | 一种煤矿用穿越老窑采空区的支护结构及其支护方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180508 |