CN107964973A - 锚锭基坑排水系统及其施工方法 - Google Patents
锚锭基坑排水系统及其施工方法 Download PDFInfo
- Publication number
- CN107964973A CN107964973A CN201711446156.2A CN201711446156A CN107964973A CN 107964973 A CN107964973 A CN 107964973A CN 201711446156 A CN201711446156 A CN 201711446156A CN 107964973 A CN107964973 A CN 107964973A
- Authority
- CN
- China
- Prior art keywords
- foundation pit
- drainage
- ditch
- gutter
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/12—Restraining of underground water by damming or interrupting the passage of underground water
- E02D19/20—Restraining of underground water by damming or interrupting the passage of underground water by displacing the water, e.g. by compressed air
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Retaining Walls (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Description
Claims (10)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210016516.XA CN114319401A (zh) | 2017-12-27 | 2017-12-27 | 基坑边坡排水系统 |
CN201711446156.2A CN107964973A (zh) | 2017-12-27 | 2017-12-27 | 锚锭基坑排水系统及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711446156.2A CN107964973A (zh) | 2017-12-27 | 2017-12-27 | 锚锭基坑排水系统及其施工方法 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210016516.XA Division CN114319401A (zh) | 2017-12-27 | 2017-12-27 | 基坑边坡排水系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107964973A true CN107964973A (zh) | 2018-04-27 |
Family
ID=61995319
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711446156.2A Pending CN107964973A (zh) | 2017-12-27 | 2017-12-27 | 锚锭基坑排水系统及其施工方法 |
CN202210016516.XA Pending CN114319401A (zh) | 2017-12-27 | 2017-12-27 | 基坑边坡排水系统 |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210016516.XA Pending CN114319401A (zh) | 2017-12-27 | 2017-12-27 | 基坑边坡排水系统 |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN107964973A (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108755696A (zh) * | 2018-06-19 | 2018-11-06 | 江苏东珠景观股份有限公司 | 一种雨季基坑土方快速施工方法 |
CN108755697A (zh) * | 2018-06-19 | 2018-11-06 | 江苏东珠景观股份有限公司 | 一种多雨天气下狭长深基坑土方开挖方法 |
CN109403332A (zh) * | 2018-09-25 | 2019-03-01 | 中建五局土木工程有限公司 | 砂卵石厚覆盖层宽浅河谷深基坑分层梯段组合开挖方法 |
CN109763552A (zh) * | 2018-12-27 | 2019-05-17 | 中建三局集团有限公司 | 一种基础暗敷重力式排水再生利用系统及其施工方法 |
CN109898533A (zh) * | 2019-03-27 | 2019-06-18 | 中建一局集团第二建筑有限公司 | 筏板内置式降水结构、降水井的封井结构及封井方法 |
CN110185051A (zh) * | 2019-05-14 | 2019-08-30 | 中国葛洲坝集团第一工程有限公司 | 深窄基坑开挖施工排水方法 |
CN111305218A (zh) * | 2018-12-11 | 2020-06-19 | 宏润建设集团股份有限公司 | 一种基坑开挖的施工方法 |
CN114457895A (zh) * | 2022-02-24 | 2022-05-10 | 中国煤炭地质总局勘查研究总院 | 一种高寒修复矿区的集排水系统 |
CN117787923A (zh) * | 2024-02-27 | 2024-03-29 | 中交第一航务工程局有限公司 | 一种基于bim的基坑开挖施工管理方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203429651U (zh) * | 2013-08-27 | 2014-02-12 | 中铁十八局集团有限公司 | 一种用于滨海相地质层区超大型深基坑排水系统 |
CN105696612A (zh) * | 2016-04-12 | 2016-06-22 | 山东大学 | 适用于工业化生产的装配式基坑排水及防护体系 |
CN206581278U (zh) * | 2017-02-21 | 2017-10-24 | 浙江绿建建筑设计有限公司 | 基坑降水结构 |
CN208072431U (zh) * | 2017-12-27 | 2018-11-09 | 中交路桥华南工程有限公司 | 锚锭基坑排水系统 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203808215U (zh) * | 2014-03-28 | 2014-09-03 | 中国水电顾问集团贵阳勘测设计研究院有限公司 | 一种边坡排水及防护结构 |
-
2017
- 2017-12-27 CN CN201711446156.2A patent/CN107964973A/zh active Pending
- 2017-12-27 CN CN202210016516.XA patent/CN114319401A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203429651U (zh) * | 2013-08-27 | 2014-02-12 | 中铁十八局集团有限公司 | 一种用于滨海相地质层区超大型深基坑排水系统 |
CN105696612A (zh) * | 2016-04-12 | 2016-06-22 | 山东大学 | 适用于工业化生产的装配式基坑排水及防护体系 |
CN206581278U (zh) * | 2017-02-21 | 2017-10-24 | 浙江绿建建筑设计有限公司 | 基坑降水结构 |
CN208072431U (zh) * | 2017-12-27 | 2018-11-09 | 中交路桥华南工程有限公司 | 锚锭基坑排水系统 |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108755696A (zh) * | 2018-06-19 | 2018-11-06 | 江苏东珠景观股份有限公司 | 一种雨季基坑土方快速施工方法 |
CN108755697A (zh) * | 2018-06-19 | 2018-11-06 | 江苏东珠景观股份有限公司 | 一种多雨天气下狭长深基坑土方开挖方法 |
CN109403332A (zh) * | 2018-09-25 | 2019-03-01 | 中建五局土木工程有限公司 | 砂卵石厚覆盖层宽浅河谷深基坑分层梯段组合开挖方法 |
CN111305218A (zh) * | 2018-12-11 | 2020-06-19 | 宏润建设集团股份有限公司 | 一种基坑开挖的施工方法 |
CN109763552A (zh) * | 2018-12-27 | 2019-05-17 | 中建三局集团有限公司 | 一种基础暗敷重力式排水再生利用系统及其施工方法 |
CN109898533A (zh) * | 2019-03-27 | 2019-06-18 | 中建一局集团第二建筑有限公司 | 筏板内置式降水结构、降水井的封井结构及封井方法 |
CN109898533B (zh) * | 2019-03-27 | 2024-01-23 | 中建一局集团第二建筑有限公司 | 筏板内置式降水结构、降水井的封井结构及封井方法 |
CN110185051A (zh) * | 2019-05-14 | 2019-08-30 | 中国葛洲坝集团第一工程有限公司 | 深窄基坑开挖施工排水方法 |
CN114457895A (zh) * | 2022-02-24 | 2022-05-10 | 中国煤炭地质总局勘查研究总院 | 一种高寒修复矿区的集排水系统 |
CN114457895B (zh) * | 2022-02-24 | 2023-10-27 | 中国煤炭地质总局勘查研究总院 | 一种高寒修复矿区的集排水系统 |
CN117787923A (zh) * | 2024-02-27 | 2024-03-29 | 中交第一航务工程局有限公司 | 一种基于bim的基坑开挖施工管理方法 |
Also Published As
Publication number | Publication date |
---|---|
CN114319401A (zh) | 2022-04-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107964973A (zh) | 锚锭基坑排水系统及其施工方法 | |
Hanson et al. | Ground‐water dams for rural‐water supplies in developing countries | |
CN103882880B (zh) | 一种地埋式边坡排水系统及其施工方法 | |
CN109137940A (zh) | 一种适用于松散堆填边坡的新型立体排水系统 | |
CN104818721A (zh) | 一种适用于陡壁深坑型废弃矿山地质环境治理方法 | |
CN110847197B (zh) | 黄土隧道进洞口段穿越滑坡体综合治理方法 | |
CN113718711B (zh) | 一种抗冲刷的水土保持护坡结构及其施工方法 | |
CN106087953B (zh) | 一种防治山区大型弃土场泥石流的排水施工方法 | |
CN109930613A (zh) | 一种渗水路基边坡排水系统的施工方法及结构 | |
CN108385701A (zh) | 道路膨胀土边坡防护结构及其施工方法 | |
CN110438999A (zh) | 一种地下水丰富的深基坑放坡开挖施工方法 | |
CN105064380B (zh) | 富含潜水高边坡治水防滑结构 | |
CN208072431U (zh) | 锚锭基坑排水系统 | |
CN106761771A (zh) | 一种横穿山谷地段下岩上土浅埋隧道的施工方法 | |
CN210002425U (zh) | 一种渗水路基边坡排水系统的结构 | |
KR20080099937A (ko) | 계단식 화단 옹벽용 배수구조 및 계단식 화단 옹벽시공방법 | |
CN106638633A (zh) | 一种坡积土路堑边坡的原位稳定系统 | |
CN116537221A (zh) | 一种公路隧道洞口段塌滑体边坡防护加强结构和施工方法 | |
CN109610486A (zh) | 一种高边坡透水夹层疏水方法 | |
CN211143522U (zh) | 一种便于排水和灌溉的种植屋面 | |
CN104818734B (zh) | 防治全风化花岗岩边坡水毁破坏防排水系统及其施工方法 | |
CN106801427B (zh) | 基坑水平降水装置及其使用方法 | |
CN216920384U (zh) | 一种公路隧道洞口段塌滑体边坡防护加强结构 | |
CN204899930U (zh) | 暗挖地铁洞内超前疏干井 | |
CN106149736B (zh) | 基于截排水保持坡地软粘土基坑边坡稳定的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20181115 Address after: 528400 19, 3, Central Plaza, 1 Xing Zheng Road, East District, Zhongshan, Guangdong. Applicant after: ROAD & BRIDGE SOUTH CHINA ENGINEERING Co.,Ltd. Applicant after: ROAD & BRIDGE INTERNATIONAL Co.,Ltd. Address before: 528400 19, 3, Central Plaza, 1 Xing Zheng Road, East District, Zhongshan, Guangdong. Applicant before: ROAD & BRIDGE SOUTH CHINA ENGINEERING Co.,Ltd. |
|
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Xiao Xiangrong Inventor after: Xie Ming Inventor after: Gao Shiqiang Inventor after: Fei Yongzhong Inventor after: Liu Huaigang Inventor after: Yang Weiping Inventor after: Yang Jie Inventor after: Zhao Shenghui Inventor after: Lu Hong Inventor before: Liu Huaigang Inventor before: Xie Ming Inventor before: Gao Shiqiang Inventor before: Xiao Xiangrong Inventor before: Fei Yongzhong Inventor before: Yang Weiping Inventor before: Yang Jie Inventor before: Zhao Shenghui Inventor before: Lu Hong |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180427 |