CN107954296A - A kind of fabricated construction elevator shaft and elevator - Google Patents
A kind of fabricated construction elevator shaft and elevator Download PDFInfo
- Publication number
- CN107954296A CN107954296A CN201711236624.3A CN201711236624A CN107954296A CN 107954296 A CN107954296 A CN 107954296A CN 201711236624 A CN201711236624 A CN 201711236624A CN 107954296 A CN107954296 A CN 107954296A
- Authority
- CN
- China
- Prior art keywords
- elevator shaft
- elevator
- piece
- side frame
- columns
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title abstract description 8
- 239000010959 steel Substances 0.000 claims description 18
- 230000003014 reinforcing effect Effects 0.000 claims description 15
- 238000009434 installation Methods 0.000 claims description 11
- 229920000049 Carbon (fiber) Polymers 0.000 claims description 7
- 239000004917 carbon fiber Substances 0.000 claims description 7
- 239000000463 material Substances 0.000 claims description 7
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 claims description 7
- 230000002787 reinforcement Effects 0.000 claims description 3
- 229910000838 Al alloy Inorganic materials 0.000 claims description 2
- 229910000851 Alloy steel Inorganic materials 0.000 claims description 2
- 230000011218 segmentation Effects 0.000 abstract 3
- 229910000831 Steel Inorganic materials 0.000 description 16
- 238000003466 welding Methods 0.000 description 7
- 238000000034 method Methods 0.000 description 2
- 230000001133 acceleration Effects 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 230000000703 anti-shock Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 210000001503 joint Anatomy 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
Description
技术领域technical field
本发明属于电梯设备领域,特别涉及一种装配式结构电梯井道及电梯。The invention belongs to the field of elevator equipment, in particular to an elevator shaft and an elevator with an assembled structure.
背景技术Background technique
随着人口老龄化进程的加快和居民生活水平的日益提高,对已建多层楼房加装电梯的需求也将日趋增大。已建多层楼房加装电梯因事先没有设计井道,通常的办法是增设一个室外井道供电梯安装和运行。但是,现有的钢结构井道采用整体式现场焊接或用预制钢构件现场拼焊而成,对高空焊接工艺要求很高,整个施工过程在室外进行,受气候环境影响较大,工期很长,往往超过60天,长期施工噪音大,扰民事件也时常发生。另一种钢结构井道是完全装配式,全部采用单根预制钢构件,在现场用螺栓连接紧固而成。这种钢构井道虽然省去焊接麻烦,但钢构件数量很多,结构也较复杂,对钢构件装配要求很高,井道立柱、横杆之间的平行度、垂直度等形位公差都将影响井道内电梯的安装质量、运行可靠性和乘坐舒适性,故施工工期依然很长,安装成本也较高。另外,现有的钢结构井道施工与电梯的安装是完全分开的,通常是井道施工后,再进行电梯安装和调试,故室外电梯安装的总时间很长,现场的人工费用也很大,导致加装电梯总成本提高,许多已建多层楼房加装电梯也会因此而无法实现。With the acceleration of population aging process and the improvement of residents' living standards, the demand for installing elevators in multi-storey buildings will also increase day by day. The multi-storey building has been built to install elevators because there is no well design in advance. The usual way is to add an outdoor shaft for elevator installation and operation. However, the existing steel structure wells are formed by integral on-site welding or on-site tailor-welding of prefabricated steel components, which requires high-altitude welding technology. The entire construction process is carried out outdoors, which is greatly affected by the climate and environment, and the construction period is very long. Often more than 60 days, the long-term construction noise is loud, and disturbance incidents often occur. Another kind of steel structure hoistway is a fully assembled type, all of which are made of a single prefabricated steel component, which is fastened with bolts on site. Although this kind of steel structure hoistway saves the trouble of welding, there are many steel components and the structure is relatively complicated, which requires high assembly of steel components. The installation quality, operational reliability and riding comfort of the elevator in the shaft are still very long, so the construction period is still very long and the installation cost is also high. In addition, the construction of the existing steel structure shaft is completely separated from the installation of the elevator. Usually, the elevator is installed and debugged after the construction of the shaft. Therefore, the total time for the installation of the outdoor elevator is very long, and the labor costs on site are also large, resulting in The total cost of installing elevators increases, and many multi-storey buildings have been built with elevators and therefore cannot be realized.
针对目前加装电梯的技术现状和发展障碍,现已研发出模块式钢结构井道一体化电梯(CN 102180395B)。该一体化电梯,包括钢结构井道和井道所有的零部件的制作加工和工艺装配都在工厂的车间内完成,电梯现场只进行模块式吊装和调试。但是该种模块式钢结构的井道在出厂时依然以较大的框体形式进行运输,依旧会占用较大的运输空间,运输极为不便。Aiming at the technical status and development obstacles of adding elevators at present, a modular steel structure hoistway integrated elevator (CN 102180395B) has been developed. The integrated elevator, including the steel structure shaft and all parts of the shaft, are manufactured, processed and assembled in the workshop of the factory, and only modular hoisting and debugging are carried out on the elevator site. However, the hoistway of this kind of modular steel structure is still transported in the form of a larger frame when it leaves the factory, which still takes up a large transport space and is extremely inconvenient to transport.
发明内容Contents of the invention
本发明的目的是提供一种占用高度较少的装配式结构电梯井道,其主要方式是采用片式结构。The object of the present invention is to provide a prefabricated structure elevator shaft with less occupied height, the main way of which is to adopt a sheet structure.
为解决上述技术问题,本发明采用如下技术方案:一种装配式结构电梯井道,所述电梯井道包括多个片式侧框以及用于将各个所述片式侧框固定连接的连接件,多个所述片式侧框依次首尾相接形成电梯井道或者形成电梯井道的分段,多个所述分段依次拼接形成所述电梯井道,所述连接件连接于所述片式侧框之间或所述分段之间。In order to solve the above-mentioned technical problems, the present invention adopts the following technical solution: an elevator shaft with an assembled structure, the elevator shaft includes a plurality of piece-type side frames and connectors for fixing and connecting each of the piece-type side frames. The two piece side frames are connected end to end in sequence to form the elevator shaft or to form segments of the elevator shaft, and a plurality of the segments are sequentially spliced to form the elevator shaft, and the connecting piece is connected between the piece side frames or between the segments.
优化的,所述片式侧框整体呈平板状或L型,所述电梯井道包括至少两片所述片式侧框,所述片式侧框包括两根侧柱、连接于所述侧柱之间的横梁以及连接于所述侧柱之间的加强梁,所述连接件设于所述侧柱上。Optimally, the sheet-type side frame is flat or L-shaped as a whole, and the elevator shaft includes at least two pieces of the sheet-type side frame, and the sheet-type side frame includes two side columns connected to the side columns The beams between them and the reinforcing beams connected between the side columns, the connecting parts are arranged on the side columns.
优化的,所述片式侧框包括至少两个相垂直设置的侧框本体,所述电梯井道包括两片所述片式侧框。Optimally, the piece-type side frame includes at least two side-frame bodies arranged vertically, and the elevator shaft includes two pieces of the piece-type side frame.
进一步地,所述侧框本体包括两根侧柱、连接于所述侧柱之间的横梁以及连接于所述侧柱之间的加强梁,同一所述片式侧框的两个所述侧框本体共用一根侧柱。Further, the side frame body includes two side columns, a cross beam connected between the side columns and a reinforcing beam connected between the side columns, and the two sides of the same piece side frame The frame body shares a side column.
优化的,所述片式侧框和/或连接件采用钢材或铝合金型材或碳纤维材料制成。Optimally, the piece-type side frame and/or the connecting piece are made of steel or aluminum alloy profile or carbon fiber material.
进一步地,所述连接件包括同时与两个相拼接的侧柱相固定连接或同时与侧柱和横梁相固定连接的连接片以及用于固定连接所述连接片和侧柱的螺栓组件;或者所述连接件为固定于处于上下位关系且相拼接的两个所述侧柱的拼接端上的连接法兰或对接定位螺栓。Further, the connecting piece includes a connecting piece that is fixedly connected with two spliced side columns or is fixedly connected with a side column and a beam at the same time, and a bolt assembly for fixedly connecting the connecting piece with the side column; or The connecting piece is a connecting flange or a butt joint positioning bolt fixed on the splicing ends of the two side columns which are in a vertical relationship and spliced together.
进一步地,所述横梁与所述侧柱之间设有固定组件,所述固定组件包括固定套设于所述侧柱上的固定座,所述固定座上具有开口朝向横梁的套管,所述横梁固定插设于所述套管内。Further, a fixing assembly is provided between the crossbeam and the side column, and the fixing assembly includes a fixing seat fixedly sleeved on the side column, and the fixing seat has a sleeve with an opening facing the crossbeam. The beam is fixedly inserted in the casing.
更进一步地,所述螺栓组件包括多个螺栓,其中至少一个螺栓的头部具有向外伸出的用于辅助安装的延伸段。Furthermore, the bolt assembly includes a plurality of bolts, wherein at least one bolt head has an extending section protruding outwards for assisting installation.
更进一步地,相匹配的两个所述连接法兰的连接面上分别设有辅助安装的导向柱以及导向槽,所述导向柱插设于所述导向槽内。Furthermore, guide posts and guide grooves for auxiliary installation are respectively provided on the connecting surfaces of the matching two connecting flanges, and the guide posts are inserted into the guide grooves.
本发明还提供了一种电梯,其包括电梯井道、轿厢组件以及曳引系统,所述电梯井道为上述片式结构电梯井道。The present invention also provides an elevator, which includes an elevator shaft, a car assembly and a traction system, wherein the elevator shaft is the elevator shaft with the above-mentioned sheet structure.
本发明的有益效果在于:本发明将电梯井道拆成多个大体呈平板状或呈L型框架的,可以层层叠放极大地降低了原有的多节模块化井道运输时所占用的空间和难度,极大地提高了井道装车的效率。The beneficial effect of the present invention is that: the present invention disassembles the elevator shaft into a plurality of generally flat or L-shaped frames, which can be stacked layer by layer, greatly reducing the space and space occupied by the original multi-section modular shaft during transportation. Difficulty, greatly improving the efficiency of hoistway loading.
附图说明Description of drawings
图1是实施例一中井道的爆炸视图;Fig. 1 is the exploded view of shaft in embodiment one;
图2是实施例一中井道的立体视图;Fig. 2 is a perspective view of the shaft in Embodiment 1;
图3是实施例二中井道的爆炸视图;Fig. 3 is the exploded view of well way in embodiment two;
图4是实施例二中井道的立体视图;Fig. 4 is the perspective view of well way in embodiment two;
图5是实施例三中井道的立体视图;Fig. 5 is the perspective view of the hoistway in embodiment three;
图6是实施例一中连接件的立体视图;Fig. 6 is a perspective view of the connector in the first embodiment;
图7是实施例二中连接件的立体视图;Fig. 7 is a perspective view of the connector in the second embodiment;
图8是实施例三中连接件的立体视图;Fig. 8 is a perspective view of the connector in the third embodiment;
图9是实施例四中连接件的立体视图;Fig. 9 is a perspective view of the connector in the fourth embodiment;
图10是实施例五中电梯井道的立体视图;Fig. 10 is a perspective view of the elevator shaft in Embodiment 5;
图11是实施例五中连接件的立体视图;Fig. 11 is a perspective view of the connector in the fifth embodiment;
图12是实施例五中连接件的分解视图;Fig. 12 is an exploded view of the connector in the fifth embodiment;
图13是实施例六中片式结构电梯的立体视图。Fig. 13 is a perspective view of the slice structure elevator in the sixth embodiment.
具体实施方式Detailed ways
下面结合附图所示的实施例对本发明作以下详细描述:Below in conjunction with the embodiment shown in the accompanying drawings, the present invention is described in detail as follows:
实施例一Embodiment one
片式结构电梯包括片式结构电梯井道、轿厢组件以及曳引系统。如图1、2、6所示,片式结构电梯井道包括多个片式侧框1、用于将各个所述片式侧框1固定连接的连接件2,所述片式侧框1的依次首尾相接形成电梯井道。The sheet structure elevator includes a sheet structure elevator shaft, a car assembly and a traction system. As shown in Figures 1, 2, and 6, the elevator shaft with a sheet structure includes a plurality of sheet side frames 1, connecting pieces 2 for fixing and connecting each of the sheet type side frames 1, and the sheet type side frames 1 Connect end to end in turn to form an elevator shaft.
所述片式侧框1整体呈平板状,所述电梯井道包括四片所述片式侧框1。所述片式侧框1包括两根侧柱11、连接于所述侧柱11之间的横梁12以及连接于所述侧柱11之间的加强梁13,所述连接件2设于所述侧柱11上。所述片式侧框1和/或连接件2采用钢材或碳纤维材料制成。所述侧柱11可以是方管、矩形管、圆管、三角管等,所述横梁12可以是方管、矩形管、圆管、三角管等,加强梁13可以是方管、矩形管、圆管、三角管等。The piece-type side frame 1 is in the shape of a flat plate as a whole, and the elevator shaft includes four pieces of the piece-type side frame 1 . The sheet-type side frame 1 includes two side columns 11, a beam 12 connected between the side columns 11 and a reinforcing beam 13 connected between the side columns 11, and the connecting member 2 is arranged on the side column 11. on jamb 11. The sheet side frame 1 and/or the connecting piece 2 are made of steel or carbon fiber material. The side columns 11 can be square tubes, rectangular tubes, round tubes, triangular tubes, etc., the crossbeam 12 can be square tubes, rectangular tubes, round tubes, triangular tubes, etc., and the reinforcing beam 13 can be square tubes, rectangular tubes, Round tube, triangular tube, etc.
所述连接件2包括同时与两个相拼接的侧柱11相固定连接或同时与侧柱11和横梁12相固定连接的的连接片21以及用于固定连接所述连接片21和侧柱11的螺栓组件22。所述螺栓组件22包括多个螺栓,其中至少一个螺栓的头部具有向井道外侧伸出的用于辅助安装的延伸段221,所述延伸段221呈柱状,其上具有螺纹状固定槽,在安装井道时,可用作吊装设备的辅助固定件或用作井道辅助定位件也可以用于电缆限位作用。固定组件可以是套接也可以是连接板23以及螺栓组件22,在本实施例中,固定组件包括连接板23和螺栓组件22,连接板23的两端部分别与侧柱11和横梁12通过螺栓组件22相固定连接。The connecting piece 2 includes a connecting piece 21 that is fixedly connected with two spliced side columns 11 at the same time or is fixedly connected with the side column 11 and the beam 12 at the same time, and is used for fixedly connecting the connecting piece 21 and the side column 11 The bolt assembly 22. The bolt assembly 22 includes a plurality of bolts, wherein the head of at least one bolt has an extension 221 protruding out of the shaft for auxiliary installation. The extension 221 is columnar and has a threaded fixing groove on it. When installing the hoistway, it can be used as an auxiliary fixing part for hoisting equipment or as an auxiliary positioning part for the hoistway, and can also be used for cable positioning. The fixing assembly can be a socket or a connecting plate 23 and a bolt assembly 22. In this embodiment, the fixing assembly includes a connecting plate 23 and a bolt assembly 22. The bolt assembly 22 is fixedly connected.
实施例二Embodiment two
片式结构电梯包括片式结构电梯井道、轿厢组件以及曳引系统。如图1、2、7所示,片式结构电梯井道包括多个片式侧框1、连接于所述片式侧框1之间的连接件2,所述片式侧框1的依次首尾相接形成电梯井道。The sheet structure elevator includes a sheet structure elevator shaft, a car assembly and a traction system. As shown in Figures 1, 2, and 7, the elevator shaft with a sheet structure includes a plurality of sheet side frames 1 and connecting pieces 2 connected between the sheet type side frames 1, and the front and rear of the sheet type side frames 1 Connect to form the elevator shaft.
所述片式侧框1整体呈平板状,所述电梯井道包括四片所述片式侧框1。所述片式侧框1包括两根侧柱11、连接于所述侧柱11之间的横梁12以及连接于所述侧柱11之间的加强梁13,所述连接件2设于所述侧柱11上。所述片式侧框1和/或连接件2采用钢材或碳纤维材料制成。所述侧柱11可以是方管、矩形管、圆管、三角管等,所述横梁12可以是方管、矩形管、圆管、三角管等,加强梁13可以是方管、矩形管、圆管、三角管等。The piece-type side frame 1 is in the shape of a flat plate as a whole, and the elevator shaft includes four pieces of the piece-type side frame 1 . The sheet-type side frame 1 includes two side columns 11, a beam 12 connected between the side columns 11 and a reinforcing beam 13 connected between the side columns 11, and the connecting member 2 is arranged on the side column 11. on jamb 11. The sheet side frame 1 and/or the connecting piece 2 are made of steel or carbon fiber material. The side columns 11 can be square tubes, rectangular tubes, round tubes, triangular tubes, etc., the crossbeam 12 can be square tubes, rectangular tubes, round tubes, triangular tubes, etc., and the reinforcing beam 13 can be square tubes, rectangular tubes, Round tube, triangular tube, etc.
所述连接件2包括同时与两个相拼接的侧柱11相固定连接的连接片21以及用于固定连接所述连接片21和侧柱11的螺栓组件22。两个相拼接的侧柱11的拼接面上分别设有相匹配的凹槽和凸条27,所述凸条27嵌设于所述凹槽内。固定组件可以是套接也可以是连接板23以及螺栓组件22,在本实施例中,固定组件包括连接板23和螺栓组件22,连接板23的两端部分别与侧柱11和横梁12通过螺栓组件22相固定连接。The connecting piece 2 includes a connecting piece 21 fixedly connected to two spliced side columns 11 at the same time, and a bolt assembly 22 for fixedly connecting the connecting piece 21 and the side columns 11 . Matching grooves and protruding lines 27 are respectively provided on the splicing surfaces of the two spliced side columns 11 , and the protruding lines 27 are embedded in the grooves. The fixing assembly can be a socket or a connecting plate 23 and a bolt assembly 22. In this embodiment, the fixing assembly includes a connecting plate 23 and a bolt assembly 22. The bolt assembly 22 is fixedly connected.
实施例三Embodiment Three
片式结构电梯包括片式结构电梯井道、轿厢组件以及曳引系统。如图5、8所示,片式结构电梯井道包括多个片式侧框1、连接于所述片式侧框1之间的连接件2,所述片式侧框1的依次首尾相接形成电梯井道。The sheet structure elevator includes a sheet structure elevator shaft, a car assembly and a traction system. As shown in Figures 5 and 8, the elevator hoistway with a sheet structure includes a plurality of sheet side frames 1 and connecting pieces 2 connected between the sheet type side frames 1, and the sheet type side frames 1 are connected end to end in sequence. Form the elevator shaft.
所述片式侧框1整体呈平板状,所述电梯井道包括四片所述片式侧框1。所述片式侧框1包括两根侧柱11、连接于所述侧柱11之间的横梁12以及连接于所述侧柱11之间的加强梁13,所述连接件2设于所述侧柱11上。所述片式侧框1和/或连接件2采用钢材或碳纤维材料制成。两个拼接的所述侧框共用一根侧柱11。所述侧柱11可以是方管、矩形管、圆管、三角管等,所述横梁12可以是方管、矩形管、圆管、三角管等,加强梁13可以是方管、矩形管、圆管、三角管等。The piece-type side frame 1 is in the shape of a flat plate as a whole, and the elevator shaft includes four pieces of the piece-type side frame 1 . The sheet-type side frame 1 includes two side columns 11, a beam 12 connected between the side columns 11 and a reinforcing beam 13 connected between the side columns 11, and the connecting member 2 is arranged on the side column 11. on jamb 11. The sheet side frame 1 and/or the connecting piece 2 are made of steel or carbon fiber material. The two spliced side frames share a side column 11 . The side columns 11 can be square tubes, rectangular tubes, round tubes, triangular tubes, etc., the crossbeam 12 can be square tubes, rectangular tubes, round tubes, triangular tubes, etc., and the reinforcing beam 13 can be square tubes, rectangular tubes, Round tube, triangular tube, etc.
在本实施例中,所述连接件2即固定组件,固定组件包括连接板23和螺栓组件22,连接板23的两端部分别与侧柱11和横梁12通过螺栓组件22相固定连接。In this embodiment, the connecting member 2 is a fixing assembly, and the fixing assembly includes a connecting plate 23 and a bolt assembly 22 .
实施例四Embodiment Four
片式结构电梯包括片式结构电梯井道、轿厢组件以及曳引系统。如图5、9所示,片式结构电梯井道包括多个片式侧框1、连接于所述片式侧框1之间的连接件2,所述片式侧框1的依次首尾相接形成电梯井道。The sheet structure elevator includes a sheet structure elevator shaft, a car assembly and a traction system. As shown in Figures 5 and 9, the elevator hoistway with a sheet structure includes a plurality of sheet side frames 1, connecting pieces 2 connected between the sheet type side frames 1, and the sheet type side frames 1 are connected end to end in sequence. Form the elevator shaft.
所述片式侧框1包括两个相垂直设置的侧框本体14,所述电梯井道包括两片所述片式侧框1。所述侧框本体14包括两根侧柱11、连接于所述侧柱11之间的横梁12以及连接于所述侧柱11之间的加强梁13。同一所述片式侧框1的两个所述侧框本体14共用一根侧柱11,该侧柱11为内侧柱11,另外两根侧柱11为外侧住,所述连接件2设于所述外侧柱11上。所述片式侧框1和/或连接件2采用钢材或碳纤维材料制成。两个拼接的所述片式侧框1共用一根侧柱11。所述侧柱11可以是方管、矩形管、圆管、三角管等,所述横梁12可以是方管、矩形管、圆管、三角管等,加强梁13可以是方管、矩形管、圆管、三角管等。The sheet side frame 1 includes two side frame bodies 14 arranged vertically, and the elevator shaft includes two sheet side frames 1 . The side frame body 14 includes two side columns 11 , a cross beam 12 connected between the side columns 11 and a reinforcement beam 13 connected between the side columns 11 . The two side frame bodies 14 of the same piece side frame 1 share a side column 11, the side column 11 is the inner side column 11, and the other two side columns 11 are the outer side columns, and the connecting piece 2 is arranged on on the outer column 11. The sheet side frame 1 and/or the connecting piece 2 are made of steel or carbon fiber material. The two spliced side frames 1 share a side column 11 . The side columns 11 can be square tubes, rectangular tubes, round tubes, triangular tubes, etc., the crossbeam 12 can be square tubes, rectangular tubes, round tubes, triangular tubes, etc., and the reinforcing beam 13 can be square tubes, rectangular tubes, Round tube, triangular tube, etc.
在本实施例中,所述连接件2即固定组件,固定组件包括固定套设于所述侧柱11上的固定座24,所述固定座24上具有开口朝向横梁12的套管25,所述横梁12固定插设于所述套管25内。In this embodiment, the connector 2 is a fixing assembly, and the fixing assembly includes a fixing seat 24 fixedly sleeved on the side column 11, and the fixing seat 24 has a sleeve 25 with an opening facing the beam 12. The beam 12 is fixedly inserted in the casing 25 .
实施例五Embodiment five
片式结构电梯包括片式结构电梯井道、轿厢组件以及曳引系统。如图10、11、12所示,片式结构电梯井道包括多个片式侧框1以及连接件2,两个所述片式侧框1依次拼接围合形成电梯井道的分段10,多个所述分段10由下至上或由上至下首尾拼接形成所述电梯井道,所述连接件2连接于所述片式侧框1之间以及所述分段10之间。The sheet structure elevator includes a sheet structure elevator shaft, a car assembly and a traction system. As shown in Figures 10, 11, and 12, the elevator shaft with a piece structure includes a plurality of side frames 1 and connectors 2, and the two side frames 1 are sequentially spliced to form a segment 10 of the elevator shaft. Two segments 10 are spliced from bottom to top or from top to bottom to form the elevator shaft, and the connecting piece 2 is connected between the piece side frames 1 and between the segments 10 .
所述片式侧框1包括两个相垂直设置的侧框本体14,所述电梯井道包括两片所述片式侧框1。所述侧框本体14包括两根侧柱11、连接于所述侧柱11之间的横梁12以及连接于所述侧柱11之间的加强梁13。同一所述片式侧框1的两个所述侧框本体14共用一根侧柱11,该侧柱11为内侧柱11,另外两根侧柱11为外侧住,所述连接件2设于所述外侧柱11上。所述片式侧框1和/或连接件2采用钢材或碳纤维材料制成。所述侧柱11可以是方管、矩形管、圆管、三角管等,所述横梁12可以是方管、矩形管、圆管、三角管等,加强梁13可以是方管、矩形管、圆管、三角管等。The sheet side frame 1 includes two side frame bodies 14 arranged vertically, and the elevator shaft includes two sheet side frames 1 . The side frame body 14 includes two side columns 11 , a cross beam 12 connected between the side columns 11 and a reinforcement beam 13 connected between the side columns 11 . The two side frame bodies 14 of the same piece side frame 1 share a side column 11, the side column 11 is the inner side column 11, and the other two side columns 11 are the outer side columns, and the connecting piece 2 is arranged on on the outer column 11. The sheet side frame 1 and/or the connecting piece 2 are made of steel or carbon fiber material. The side columns 11 can be square tubes, rectangular tubes, round tubes, triangular tubes, etc., the crossbeam 12 can be square tubes, rectangular tubes, round tubes, triangular tubes, etc., and the reinforcing beam 13 can be square tubes, rectangular tubes, Round tube, triangular tube, etc.
连接件2为固定于处于上下位关系且相拼接的两个所述侧柱11的拼接端上的连接法兰26。相匹配的两个所述连接法兰26的连接面上分别设有辅助安装的导向柱28以及导向槽,所述导向柱28插设于所述导向槽内,导向柱28上涂覆有防震涂料,连接面上涂覆有一层0.5-1mm厚的弹性膜。The connecting piece 2 is a connecting flange 26 fixed on the splicing ends of the two side columns 11 that are in a vertical relationship and spliced together. The connecting surfaces of the matching two connecting flanges 26 are respectively provided with guide posts 28 and guide grooves for auxiliary installation, the guide posts 28 are inserted in the guide grooves, and the guide posts 28 are coated with anti-shock Coating, the connecting surface is coated with a layer of 0.5-1mm thick elastic film.
上述各实施例中,侧柱11与横梁12、侧柱11与加强梁13之间也可采用焊接或结合上述实施例采用焊接与连接件2组合方式,连接片21或连接板23与侧柱11与横梁12或侧柱11与加强梁13的拼接缝齐平,连接片21或连接板23固定完成后,在加强梁13与侧柱11焊接时能顺带将连接片21或连接板23的其中一个或多个侧边与加强梁13焊固,能极大得提高连接强度,同时连接片21和连接板23固定后焊接,能确保焊接的精度、平整性以及稳定性。In the above-mentioned embodiments, welding can also be used between the side column 11 and the cross beam 12, the side column 11 and the reinforcing beam 13, or in combination with the above-mentioned embodiments, the combination of welding and the connector 2 can be used, and the connecting piece 21 or the connecting plate 23 is connected to the side column. 11 is flush with the joint between the crossbeam 12 or the side column 11 and the reinforcing beam 13. After the connecting piece 21 or the connecting plate 23 is fixed, the connecting piece 21 or the connecting plate 23 can be connected when the reinforcing beam 13 and the side column 11 are welded. One or more of the side edges are welded to the reinforcing beam 13, which can greatly improve the connection strength, and at the same time, the connection piece 21 and the connection plate 23 are fixed and then welded to ensure the accuracy, smoothness and stability of the welding.
实施例六Embodiment six
如图13所示,片式结构电梯包括片式结构电梯井道、轿厢组件31以及曳引系统32。本实施例与实施例五的区别在于:其连接法兰26不伸出于分段10的外侧。As shown in FIG. 13 , the slice structure elevator includes a slice structure elevator shaft, a car assembly 31 and a traction system 32 . The difference between this embodiment and the fifth embodiment is that the connecting flange 26 does not protrude from the outside of the segment 10 .
上述实施例只为说明本发明的技术构思及特点,其目的在于让熟悉此项技术的人士能够了解本发明的内容并据以实施,并不能以此限制本发明的保护范围。凡根据本发明精神所作的等效变化或修饰,都应涵盖在本发明的保护范围之内。The above-mentioned embodiments are only to illustrate the technical concept and characteristics of the present invention, and the purpose is to enable those skilled in the art to understand the content of the present invention and implement it accordingly, and not to limit the protection scope of the present invention. All equivalent changes or modifications made according to the spirit of the present invention shall fall within the protection scope of the present invention.
Claims (10)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2017213549675 | 2017-10-20 | ||
CN201721354967 | 2017-10-20 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107954296A true CN107954296A (en) | 2018-04-24 |
Family
ID=61962703
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711236624.3A Pending CN107954296A (en) | 2017-10-20 | 2017-11-30 | A kind of fabricated construction elevator shaft and elevator |
CN201721644294.7U Active CN207483122U (en) | 2017-10-20 | 2017-11-30 | A kind of fabricated construction elevator shaft and elevator |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721644294.7U Active CN207483122U (en) | 2017-10-20 | 2017-11-30 | A kind of fabricated construction elevator shaft and elevator |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN107954296A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108821058A (en) * | 2018-08-29 | 2018-11-16 | 郑超 | Assembled steel structure elevator shaft |
CN109052109A (en) * | 2018-08-20 | 2018-12-21 | 宁波宏大电梯有限公司 | A kind of steel structure lift shaft component |
CN109138364A (en) * | 2018-09-20 | 2019-01-04 | 上海三菱电梯有限公司 | A kind of installation elevator shaft structure and its building method |
CN110127492A (en) * | 2019-04-30 | 2019-08-16 | 苏州珀威智能科技有限公司 | A kind of elevator frame and its installation method |
CN116477445A (en) * | 2023-03-22 | 2023-07-25 | 广州市机电安装有限公司 | Construction method for integral pre-assembly of steel structure well elevator |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107954296A (en) * | 2017-10-20 | 2018-04-24 | 东南电梯股份有限公司 | A kind of fabricated construction elevator shaft and elevator |
CN115788103A (en) * | 2023-02-08 | 2023-03-14 | 集束智能装配科技有限公司 | Construction method of elevator shaft modular assembly structure system |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040129505A1 (en) * | 2002-12-09 | 2004-07-08 | Rice Kevin M. | Elevator pit set assembly |
JP2004352457A (en) * | 2003-05-29 | 2004-12-16 | Ohbayashi Corp | Junction structure for shaft unit in elevator shaft |
CN102180395A (en) * | 2011-05-30 | 2011-09-14 | 张凡 | Integrated sightseeing lift with steel-structured hoistway and modularized installation method thereof |
CN102583131A (en) * | 2011-01-04 | 2012-07-18 | 张向阳 | Elevator shaft wall assembled by combined shaft frames |
CN103991773A (en) * | 2014-05-28 | 2014-08-20 | 江苏润安电梯工程技术服务有限公司 | Design and installation method of assembly-type modularized steel structure elevator shaft |
CN204096827U (en) * | 2014-10-16 | 2015-01-14 | 广东亚太西奥电梯有限公司 | Stacked steelframe elevator hoistways |
CN104760860A (en) * | 2015-03-25 | 2015-07-08 | 苏州天梭电梯有限公司 | Hoistway frame, elevator with hoistway frame and hoistway frame installation method |
CN205634564U (en) * | 2016-05-31 | 2016-10-12 | 辽宁联盟中资创业投资企业(有限合伙) | Elevator steel construction well |
CN205906864U (en) * | 2016-08-11 | 2017-01-25 | 山东富士制御电梯有限公司 | Fang guangang structure positioner |
CN107089573A (en) * | 2017-05-27 | 2017-08-25 | 山东富士制御电梯有限公司 | A kind of Lao Lou ready-packages steel construction elevator chip hoistway standard knot |
CN207483122U (en) * | 2017-10-20 | 2018-06-12 | 东南电梯股份有限公司 | A kind of fabricated construction elevator shaft and elevator |
-
2017
- 2017-11-30 CN CN201711236624.3A patent/CN107954296A/en active Pending
- 2017-11-30 CN CN201721644294.7U patent/CN207483122U/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040129505A1 (en) * | 2002-12-09 | 2004-07-08 | Rice Kevin M. | Elevator pit set assembly |
JP2004352457A (en) * | 2003-05-29 | 2004-12-16 | Ohbayashi Corp | Junction structure for shaft unit in elevator shaft |
CN102583131A (en) * | 2011-01-04 | 2012-07-18 | 张向阳 | Elevator shaft wall assembled by combined shaft frames |
CN102180395A (en) * | 2011-05-30 | 2011-09-14 | 张凡 | Integrated sightseeing lift with steel-structured hoistway and modularized installation method thereof |
CN103991773A (en) * | 2014-05-28 | 2014-08-20 | 江苏润安电梯工程技术服务有限公司 | Design and installation method of assembly-type modularized steel structure elevator shaft |
CN204096827U (en) * | 2014-10-16 | 2015-01-14 | 广东亚太西奥电梯有限公司 | Stacked steelframe elevator hoistways |
CN104760860A (en) * | 2015-03-25 | 2015-07-08 | 苏州天梭电梯有限公司 | Hoistway frame, elevator with hoistway frame and hoistway frame installation method |
CN205634564U (en) * | 2016-05-31 | 2016-10-12 | 辽宁联盟中资创业投资企业(有限合伙) | Elevator steel construction well |
CN205906864U (en) * | 2016-08-11 | 2017-01-25 | 山东富士制御电梯有限公司 | Fang guangang structure positioner |
CN107089573A (en) * | 2017-05-27 | 2017-08-25 | 山东富士制御电梯有限公司 | A kind of Lao Lou ready-packages steel construction elevator chip hoistway standard knot |
CN207483122U (en) * | 2017-10-20 | 2018-06-12 | 东南电梯股份有限公司 | A kind of fabricated construction elevator shaft and elevator |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109052109A (en) * | 2018-08-20 | 2018-12-21 | 宁波宏大电梯有限公司 | A kind of steel structure lift shaft component |
CN109052109B (en) * | 2018-08-20 | 2024-02-13 | 宁波宏大电梯有限公司 | Steel construction elevator well subassembly |
CN108821058A (en) * | 2018-08-29 | 2018-11-16 | 郑超 | Assembled steel structure elevator shaft |
CN109138364A (en) * | 2018-09-20 | 2019-01-04 | 上海三菱电梯有限公司 | A kind of installation elevator shaft structure and its building method |
CN110127492A (en) * | 2019-04-30 | 2019-08-16 | 苏州珀威智能科技有限公司 | A kind of elevator frame and its installation method |
CN116477445A (en) * | 2023-03-22 | 2023-07-25 | 广州市机电安装有限公司 | Construction method for integral pre-assembly of steel structure well elevator |
CN116477445B (en) * | 2023-03-22 | 2024-03-19 | 广州市机电安装有限公司 | A construction method for overall preassembly of steel structure shaft elevators |
Also Published As
Publication number | Publication date |
---|---|
CN207483122U (en) | 2018-06-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107954296A (en) | A kind of fabricated construction elevator shaft and elevator | |
CN106368315A (en) | Assembly type wood frame structure beam-column joint with sleeve | |
CN113047454A (en) | FRP (fiber reinforced plastic) steel concrete column and steel beam combined node and mounting method | |
CN206110325U (en) | Take telescopic assembled wood frame structure beam column node | |
CN103967133B (en) | Rectangular steel-tube concrete column and H profile steel beam bolted and welded connection node | |
CN107503440A (en) | For 3-dimensional boxlike structure with assembled lightweight steel multi-module structure and its connected mode | |
US20190136504A1 (en) | Apparatus and systems related to modular construction | |
CN106284690A (en) | A kind of reinforced assembled wood frame construction bean column node | |
CN107905577A (en) | Babinet and container data center | |
CN112942571B (en) | Frame column, frame node and all-bolt assembly type frame structure system | |
CN203924753U (en) | For girth member and the ruggedized construction of reinforcing container type house steel structure column | |
CN106760139A (en) | A kind of external labeling type modular architectural structural and its construction method | |
CN110206196A (en) | The connecting joint structure of assembling type partition wall structure and partition wall module and metope | |
CN218894246U (en) | An assembled wall panel connection node structure | |
CN209260924U (en) | A mortise and tenon joint at the corner of a modular building | |
CN107355007A (en) | Connecting structure of beam-column joint of concrete filled steel tube combined column | |
CN112482590B (en) | Prefabricated externally-hung wallboard splicing piece of assembled that T style of calligraphy steel sheet socket joint is fixed | |
US12180696B1 (en) | Systems and methods for resisting soft story collapse | |
CN206110367U (en) | Strenghthened type assembled wood frame structure beam column node | |
JP2016204864A (en) | Combination structure of hybrid frame and plywood or CLT board | |
CN104032975B (en) | A kind of reinforcement means of container type house | |
CN104963469B (en) | A kind of stair installation method | |
CN112482589A (en) | Prefabricated externally-hung wallboard splicing piece of assembled that I shape steel sheet socket joint is fixed | |
CN208056417U (en) | A kind of assembled interlayer floor | |
CN206308883U (en) | A kind of external labeling type modular architectural structural |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180424 |