[go: up one dir, main page]

CN107939358A - Carbonate rock hydrocarbon reservoir open hole completion tubing string and post-processing method - Google Patents

Carbonate rock hydrocarbon reservoir open hole completion tubing string and post-processing method Download PDF

Info

Publication number
CN107939358A
CN107939358A CN201711213287.6A CN201711213287A CN107939358A CN 107939358 A CN107939358 A CN 107939358A CN 201711213287 A CN201711213287 A CN 201711213287A CN 107939358 A CN107939358 A CN 107939358A
Authority
CN
China
Prior art keywords
tubing string
screen casing
open hole
carbonate rock
hydrocarbon reservoir
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711213287.6A
Other languages
Chinese (zh)
Inventor
张炜
张义刚
吴文明
张保贵
方建波
邹国君
王玎珂
张佳
田疆
周祥勇
苟斌
唐照星
靳永红
张婷婷
徐宝怀
王涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Original Assignee
China Petroleum and Chemical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp filed Critical China Petroleum and Chemical Corp
Priority to CN201711213287.6A priority Critical patent/CN107939358A/en
Publication of CN107939358A publication Critical patent/CN107939358A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/08Screens or liners
    • E21B43/086Screens with preformed openings, e.g. slotted liners

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Chemical & Material Sciences (AREA)
  • Dispersion Chemistry (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of carbonate rock hydrocarbon reservoir open hole completion tubing string, including axially sequentially connected packer, safety joint, screen casing and blind plugging, the blind plugging is in the bottom of the tubing string, for carrying out closure sand control to the screen casing, the screen casing is used for stabilizing borehole and sand control, when the safety joint is used for the post processing of the tubing string, the screen casing that plays the role of giving up connected with blind plugging to be formed it is integrally-built.The carbonate rock hydrocarbon reservoir open hole completion tubing string tripping in Open-Hole Section can effectively support the reservoir borehole wall, avoid burying payzone because of reservoir cave-in, cause the oil well underproduction stop production the problem of;It also avoid sand washing at the same time, drag for the accident of the bit freezing that collapses, cause secondary caused by sand.On the other hand, effective underground sand-prevention can be carried out, avoids sand grains from causing holddown, stifled pump problem into oil well pump with crude oil, extends pump detection period, saved operating expenses.The present invention also provides a kind of post-processing method of carbonate rock hydrocarbon reservoir open hole completion tubing string.

Description

Carbonate rock hydrocarbon reservoir open hole completion tubing string and post-processing method
Technical field
The present invention relates to oil production equipment and DP technology technical field, more particularly to a kind of carbonate rock hydrocarbon reservoir bore hole Well completion tubular column and post-processing method.
Background technology
In the explored oil and gas reserves in the whole world, 60% is Marine Facies Carbonate Reservoir.Carbonate reservoir becomes oil The key areas of gas exploration exploitation.The carbonate rock hydrocarbon reservoir distribution in China is also very extensive, and exploration-development potential is huge.Carbonic acid Rock salt reservoir generally uses barefoot completion.Strata pressure can occur after drilling well, acid fracturing, completion, water filling, oil recovery and measure operation Large change, it will destroy the pressure balance in well, can undoubtedly cause the redistribution of wellbore rock stress, when it is made a concerted effort When having exceeded rock strength, the borehole wall will unstability, in turn result in the borehole wall and shake out and cave in.Mainly cause asking for following three aspects Topic:1st, oil-well wall caves in, buries payzone, big to yield effect, and operating cost is high;2nd, sand washing, to drag for sand risk big, be easy to cause It is secondary to collapse, cause lock of tool drilling;3rd, the easy sand card of rod-pumped well, electric pump well, pump detection period are short.
The oil well to shake out in cave-in or well, if stratum primary energy deficiency or flow production for a period of time after ground , it is necessary to when turning to take out exploitation, the sand grains in crude oil will block up card oil well pump for layer energy attenuation, cause the inspection pump that takes place frequently, increase exploitation Cost and exploitation yield.In order to solve the problems, such as this, often using suspension sand control of giving up, i.e., using the lower side for hanging sand control screen of pump Formula controls the sand content into pump, and perforation is set on sand-proof pipe, can only allow oil gas by the way that and solid gravel cannot be introduced into, so In casing under pump after mounting sand-proof pipe, oil gas can be mined to ground by sand-proof pipe, and by the sand of sand-proof pipe barrier Then sink to shaft bottom.When being overhauled to pump, then carry out sand removal operation.Although this technology extends the pump overhaul period, but sink to well The sand at bottom easily buries reservoir.
For suspension sand control produced problem of giving up, existing means are that an anti-sand-catching apparatus is set below oil well pump, To be filtered to the sandy crude in oil well, when crude oil be pumped to by device in oil well pump, and the gravel included in crude oil It is blocked and falls into bottom of device.So as to play the role of sand control and sand setting.The technology can sand control again can sand setting, when operation, can Withdrawing device, avoids the long construction period for dragging for abrasive band and coming, the problems such as operating cost is high.But method is in the barefoot interval borehole wall without branch Support, for the cave-in phenomenon caused by shaking out seriously, it is impossible to play the role of stabilizing borehole.
In order to solve the problems, such as to appear above, develop payzone suspension sand control technique again in the prior art, that is, hang slot Screen casing stops bulky grain reservoir sand using screen casing, accumulates to form sand block barrier in the borehole wall and screen casing annular space, play to artificial bottom of a well Prevent the effect of formation sand production, while play the role of stabilizing borehole.But once tubing string sand buries, lower part tubing string is not easily taken out, And then influence later stage operation, such as sidetracking, deepen and on return and change layer.
In addition, it is generally the case that carbonate reservoir is required for being acidified or acidfracturing treatment can be only achieved and be produced in increasing the storage Purpose.For reservoir well section length, the carbonate rock open hole well that layer position is more, permeability contrast is big, it is necessary to carry out separate zone stimulation, The potential of its interlayer reserves can maximally be developed.But current open hole packer technology, it is also immature, especially for deep-well and ultra-deep Well, after completing transformation operation, open hole packer is difficult to take out in Open-Hole Section, causes the inconvenience of oil recovery and later stage operation, because This transformation for deep-well, ultradeep well carbonate rock hydrocarbon reservoir reservoir can only often select generally to transform, and can so make permeability Big layer position is fully transformed, and the small layer position of permeability can not effectively be transformed, so as to be further exacerbated by layer interdigit The difference of permeability.
The content of the invention
Have in view of that, the present invention provides one kind and sand washing can be avoided while cave-in is prevented, is dragged for two caused by sand The secondary accident to collapse and cause bit freezing, and carbonate rock hydrocarbon reservoir open hole completion tubing string and the later stage of pump overhaul period can be extended Processing method, to solve problems of the prior art.
According to the first aspect of the invention, there is provided a kind of carbonate rock hydrocarbon reservoir open hole completion tubing string, including along axis To sequentially connected packer, safety joint, screen casing and blind plugging,
The blind plugging is in the bottom of the tubing string, and for carrying out closure sand control to the screen casing, the screen casing is used to stablize The borehole wall and sand control, when the safety joint is used for the post processing of the tubing string, plays the screen casing of giving up and connect what is formed with blind plugging Integrally-built effect.
Preferably, the packer for can give up can desealed packer, which is in the top of tubing string.
Preferably, ball sealer is further included, the ball sealer is used to put into the tubing string and is completed after suppressing to the envelope Every setting for device.
Preferably, after the ball sealer puts into the tubing string and is suppressed into tubing string, the packer setting in casing, For hanging completion tubular column and being sealed with set annular space.
Preferably, shear pin in the safety joint, for recover the oil later stage operation when, complete to the screen casing and blind plugging Integrally-built the giving up of connection formation.
Preferably, the blind plugging and screen casing are made by easily boring mill material respectively.
Preferably, after the tubing string G.I.H, the screen casing covers whole Open-Hole Section, and packer is in the casing of oil well It is interior.
According to the second aspect of the invention, there is provided a kind of post-processing side of carbonate rock hydrocarbon reservoir open hole completion tubing string Method, it is characterised in that including:
Tripping in is used for the recycling instrument for recycling packer, carries removing seal for packer and above;
The pin that safety joint is connected with screen casing is cut;
The packer is taken out out of well, the screen casing and blind plugging connect the overall structure indwelling to be formed in well.
Preferably, which further includes:
By indwelling in the screen casing in well connected with blind plugging the overall structure tripping in drill bit to be formed carry out bore milling it is broken.
The carbonate rock hydrocarbon reservoir open hole completion tubing string that the invention provides, has the advantages that:
1st, with the carbonate rock hydrocarbon reservoir open hole completion tubing string, effective underground sand-prevention can be carried out, avoid sand grains with Crude oil causes holddown, stifled pump problem into oil well pump, extends pump detection period, has saved operating expenses;
2nd, the carbonate rock hydrocarbon reservoir open hole completion tubing string tripping in Open-Hole Section can effectively support the reservoir borehole wall, avoid because Reservoir cave-in and bury payzone, cause the oil well underproduction stop production the problem of;It also avoid sand washing at the same time, drag for two caused by sand The accident of the secondary bit freezing that collapses, causes;
3rd, the blind plugging in the embodiment is connected to the tubing string columnar part formed on screen casing, by easy brill mill material manufacture Into during, later stage operation, brill can be very easy to and ground off.So as to avoid since steel tubing string is not easy brill mill and brings process cycle Long, the problem of processing cost is big;
4th, the completion tubular column, can be used as transformation and flow string, due to the throttling action of screen slot, it is achieved thereby that reservoir The uniform purpose transformed and uniformly produced.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution of the prior art Embodiment or attached drawing needed to be used in the description of the prior art are briefly described.In all of the figs, similar element Or part is generally identified by similar reference numeral.In attached drawing, each element or part might not be drawn according to actual ratio.
Fig. 1 shows the structure diagram of carbonate rock hydrocarbon reservoir open hole completion tubing string according to embodiments of the present invention.
What Fig. 2 showed carbonate rock hydrocarbon reservoir open hole completion tubing string according to embodiments of the present invention enters well schematic diagram.
What Fig. 3 showed carbonate rock hydrocarbon reservoir open hole completion tubing string according to embodiments of the present invention sets schematic diagram.
Fig. 4 shows the production status signal of carbonate rock hydrocarbon reservoir open hole completion tubing string according to embodiments of the present invention Figure.
Fig. 5 shows showing for the acidifying transformation of carbonate rock hydrocarbon reservoir open hole completion tubing string according to embodiments of the present invention It is intended to.
Fig. 6 shows that carbonate rock hydrocarbon reservoir open hole completion tubing string according to embodiments of the present invention need to bore mill operation and stay well When schematic diagram.
In figure:Carbonate rock hydrocarbon reservoir open hole completion tubing string 100, packer 11, safety joint 12, screen casing 13, blind plugging 14th, casing 2, Open-Hole Section 3, feeding tubing string 5, acidifying tubing string 6.
Embodiment
The embodiment of technical solution of the present invention is described in detail below in conjunction with attached drawing.Following embodiments are only used for Clearly illustrate technical scheme, therefore be only used as example, and the protection model of the present invention cannot be limited with this Enclose.
As shown in Figures 1 to 6, the present invention provides a kind of carbonate rock hydrocarbon reservoir open hole completion tubing string 100, it includes edge Axial sequentially connected packer 11, safety joint 12, screen casing 13 and blind plugging 14.The blind plugging 14 is in the bottom of the tubing string Portion, for carrying out closure sand control to the screen casing 13, the screen casing 13 is used for stabilizing borehole and sand control, and the safety joint 12 is used When the post processing of the tubing string, play the role of giving up the screen casing 13 and the connection of blind plugging 14 formed it is integrally-built.
The packer 11 can desealed packer 11 for that can give up.The completion tubular column vertically in tripping in oil/gas well, can enter After well, which is in the top of tubing string, and blind plugging 14 is in the bottom of the completion tubular column.
The carbonate rock hydrocarbon reservoir open hole completion tubing string 100 further includes ball sealer (not shown), and the ball sealer is used In put into the tubing string in and after suppressing complete setting to the packer 11.The ball sealer puts into the tubing string and to pipe After being suppressed in column, the packer 11 is set in casing 2, for hanging completion tubular column and being sealed with set annular space.
Further, shear pin (not shown) in the safety joint 12, for recover the oil later stage operation when, complete pair The screen casing 13 and integrally-built the giving up of the connection formation of blind plugging 14.
Screen casing 13 is the columnar part of the completion tubular column, is cutting seam sieve tube 13 in the embodiment, for the whole bore hole of tripping in Well section.Cut the screen slot of 0.2-0.4mm width on the screen casing 13, the width of screen slot elects 0.3mm as in the embodiment.Oil gas is from sieve Seam enters tubing string, and the sand grains more than 0.3mm is blocked in outside screen casing 13, plays the role of sand control.With the growth of time, gear Cumulative in the sand grains of o exterior, these sand grains form sand bridge, can stop that the sand grains of smaller enters the completion tubular column, from And play the role of with sand sand block.The screen casing 13 plays the support borehole wall, prevents cave-in from burying production in Open-Hole Section 3 at the same time The effect of layer.
For the completion tubular column in acidizing treatment, the screen slot on screen casing 13 plays the role of throttling.When acid solution is by permeating The larger layer position of rate, due to the throttling action of corresponding screen slot, acid solution inlet can be effectively controlled, and such reservoir reconstruction is just It is relatively uniform;The completion tubular column when recovering the oil, the screen slot on screen casing 13 equally plays throttling action.The larger layer of yield Position, due to the throttling action of corresponding screen slot, crude oil admission velocity can be effectively controlled, so as to avoid due to reservoir part Fluid velocity is excessive and causes a series of problems, such as shaking out.
The blind plugging 14 and screen casing 13 are made by easily boring mill material respectively, and brill milling is broken after being easy to tripping in drilling machine.
It is situated between in detail with reference to uses of the Fig. 2 to Fig. 6 to the carbonate rock hydrocarbon reservoir open hole completion tubing string 100 Continue.
As shown in Fig. 2, when carrying out into well construction, packer 11, safety joint 12, screen casing 13 and blind plugging 14 are connected first Connect, so that completes tubing string assembles work.Then, will be fed into tubing string 5 to be connected on packer 11, with feeding tubing string 5 The tubing string assembled is caused into blind plugging 14 towards slow G.I.H, completes the lower well operations of the tubing string.When completing into well operations, Ensure that screen casing 13 covers whole Open-Hole Section 3, packer 11 is in casing 2, so as to complete the tripping in construction of completion tubular column.
As shown in figure 3, carry out setting operation of giving up in the step.First to being sent into pitching in tubing string 5 and suppressing, envelope is completed Set every device 11.
As shown in figure 4, suppressed to annular space, on submit into tubing string 5 and dextrorotation, or complete recyclable packing using other modes Device 11 is given up.Rise to be sent into tubing string 5, completion tubular column, which is stayed, to be placed in well.The tubing string played from oil recovery process sand control and The effect of anti-cave-in.
As shown in figure 5, when needing to carry out oil/gas well acidifying transformation, acidifying tubing string 6 is inserted into packer 11, with its shape Into interior sealing, implement the well stimulations such as Large Scale Acidizing operation.If flow production, flow string is used as using acidifying tubing string 6, Carry out blowing production;When needing machine to adopt, acidifying tubing string 6 is taken out, tripping in oil well pump or electric pump carry out machine and adopt.
As shown in fig. 6, when oil gas well mining is after a certain period of time if necessary to intensification, sidetracking when underground work, can be to carbon Hydrochlorate oil gas pool open hole completion tubing string 100 is post-processed with the following method:
Tripping in is used for the recycling instrument for recycling packer 11, and packer 11 is unsealed and is above carried;By safety joint 12 and sieve The pin that pipe 13 connects is cut;The packer 11 is taken out out of well, the screen casing 13 and blind plugging 14 connect the whole of formation Body structure indwelling is in well.
Specifically, tripping in packer 11 recycles instrument, can deblocking packer 11 unsealed, and above carry recycling tool pipe Column, the pin of the safety joint 12 of recyclable 11 lower part of packer are cut, by recyclable packer 11 and safety joint 12 from Taken out in well, screen casing 13 is connected the overall structure indwelling formed with blind plugging 14 in well.Since screen casing 13 and blind plugging 14 are easy Mill material is bored, crusher drill is bored in tripping in, easily can bore screen casing 13 and blind plugging 14 and grind off, so as to not influence the well in later stage Lower operation.
Carbonate rock hydrocarbon reservoir open hole completion tubing string 100 in the embodiment when in use, first by involved by the present invention And completion tubular column tripping in design position, pitching sets recyclable packer 11, given up out and be sent into tubing string 5, will be acidified tubing string 6 Return the recyclable packer 11 of insertion and carry out acidifying transformation, carry out blowing production with acidifying tubing string 6 or take out acidifying tubing string 6 to carry out machine Production is adopted, it is necessary to during post-processing, tripping in packer 11 recycles instrument and unseals recyclable packer 11, and upper lifting pipe post, cuts peace The pin of full connector 12, takes out recyclable packer 11 and safety joint 12, and tripping in bores mill tubing string and bores mill screen casing 13 and blind plugging 14, Then later stage job execution can smoothly be implemented.
Carbonate rock hydrocarbon reservoir open hole completion tubing string 100 in the embodiment, has the advantages that:
1st, with the carbonate rock hydrocarbon reservoir open hole completion tubing string 100, effective underground sand-prevention can be carried out, avoids sand grains Holddown, stifled pump problem are caused into oil well pump with crude oil, pump detection period is extended, has saved operating expenses;
2nd, the 100 tripping in Open-Hole Section 3 of carbonate rock hydrocarbon reservoir open hole completion tubing string can effectively support the reservoir borehole wall, keep away The problem of exempting to bury payzone because of reservoir cave-in, causing the oil well underproduction to stop production;Sand washing is also avoid, sand is dragged for and causes at the same time The secondary accident for collapsing, causing bit freezing;
3rd, the blind plugging 14 in the embodiment is connected to the tubing string columnar part formed on screen casing, and material manufacture is ground by easy bore Form, during later stage operation, brill can be very easy to and ground off.So as to avoid since steel tubing string is not easy brill mill and brings processing week The problem of phase is long, processing cost is big;
4th, the completion tubular column, can be used as transformation and flow string, due to the throttling action of screen slot, it is achieved thereby that reservoir The uniform purpose transformed and uniformly produced.
It should be noted that unless otherwise indicated, technical term or scientific terminology used in this application should be this hair The ordinary meaning that bright one of ordinary skill in the art are understood.
In addition, term " first ", " second " etc. are only used for description purpose, and it is not intended that indicating or implying relatively important Property or the implicit quantity for indicating indicated technical characteristic.In the description of the present invention, " multiple " are meant that two or more, Unless otherwise specifically defined.
In this application, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection ", " fixation " etc. Term should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integrally;Can be that machinery connects Connect or be electrically connected;It can be directly connected, can also be indirectly connected by intermediary, can be in two elements The connection in portion or the interaction relationship of two elements.For the ordinary skill in the art, can be according to specific feelings Condition understands the concrete meaning of above-mentioned term in the present invention.
Finally it should be noted that:The above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe is described in detail the present invention with reference to foregoing embodiments, it will be understood by those of ordinary skill in the art that:Its according to Can so modify to the technical solution described in foregoing embodiments, either to which part or all technical characteristic into Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology The scope of scheme, it should all cover among the claim of the present invention and the scope of specification.Especially, as long as there is no knot Structure conflict, items technical characteristic mentioned in the various embodiments can be combined in any way.The present invention does not limit to In specific embodiment disclosed herein, but all technical solutions including falling within the scope of the appended claims.

Claims (9)

1. a kind of carbonate rock hydrocarbon reservoir open hole completion tubing string, it is characterised in that including axially sequentially connected packing Device, safety joint, screen casing and blind plugging,
The blind plugging is in the bottom of the tubing string, and for carrying out closure sand control to the screen casing, the screen casing is used for stabilizing borehole And sand control, when the safety joint is used for the post processing of the completion tubular column, plays the screen casing of giving up and connect what is formed with blind plugging Integrally-built effect.
2. carbonate rock hydrocarbon reservoir open hole completion tubing string according to claim 1, it is characterised in that the packer is Can give up can desealed packer, which is in the top of tubing string.
3. carbonate rock hydrocarbon reservoir open hole completion tubing string according to claim 2, it is characterised in that further include sealing Ball, the ball sealer are used to put into the tubing string and complete to set the packer after suppressing.
4. carbonate rock hydrocarbon reservoir open hole completion tubing string according to claim 3, it is characterised in that the ball sealer is thrown After entering in the tubing string and being suppressed into tubing string, the packer setting is in casing, for hanging completion tubular column and being sealed with Cover annular space.
5. carbonate rock hydrocarbon reservoir open hole completion tubing string according to claim 1, it is characterised in that the safety joint Upper shear pin, for recover the oil later stage operation when, complete to connect the screen casing with blind plugging to be formed integrally-built and give up.
6. carbonate rock hydrocarbon reservoir open hole completion tubing string according to claim 1, it is characterised in that the blind plugging and sieve Pipe is made by easily boring mill material respectively.
7. carbonate rock hydrocarbon reservoir open hole completion tubing string according to claim 1, it is characterised in that the tubing string lower going-into-well After interior, the screen casing covers whole Open-Hole Section, and packer is in the casing of oil well.
A kind of 8. post-processing side according to claim 1-7 any one of them carbonate rock hydrocarbon reservoir open hole completion tubing strings Method, it is characterised in that including:
Tripping in is used for the recycling instrument for recycling packer, carries removing seal for packer and above;
The pin that safety joint is connected with screen casing is cut;
The packer is taken out out of well, the screen casing and blind plugging connect the overall structure indwelling to be formed in well.
9. the post-processing method of carbonate rock hydrocarbon reservoir open hole completion tubing string according to claim 8, its feature exist In further including:
By indwelling in the screen casing in well connected with blind plugging the overall structure tripping in drill bit to be formed carry out bore milling it is broken.
CN201711213287.6A 2017-11-28 2017-11-28 Carbonate rock hydrocarbon reservoir open hole completion tubing string and post-processing method Pending CN107939358A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711213287.6A CN107939358A (en) 2017-11-28 2017-11-28 Carbonate rock hydrocarbon reservoir open hole completion tubing string and post-processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711213287.6A CN107939358A (en) 2017-11-28 2017-11-28 Carbonate rock hydrocarbon reservoir open hole completion tubing string and post-processing method

Publications (1)

Publication Number Publication Date
CN107939358A true CN107939358A (en) 2018-04-20

Family

ID=61950187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711213287.6A Pending CN107939358A (en) 2017-11-28 2017-11-28 Carbonate rock hydrocarbon reservoir open hole completion tubing string and post-processing method

Country Status (1)

Country Link
CN (1) CN107939358A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109854213A (en) * 2019-03-18 2019-06-07 中国石油化工股份有限公司 Set damage repairs the sand control pipe of well
CN110513072A (en) * 2019-10-20 2019-11-29 达坦能源科技(上海)有限公司 A kind of ultradeep well open hole packer
CN110821449A (en) * 2019-11-28 2020-02-21 新疆恒智伟业石油工程技术开发有限公司 A kind of carbonate oil well screen completion pipe string and method for unblocking
CN110984924A (en) * 2019-12-20 2020-04-10 新疆恒智伟业石油工程技术开发有限公司 Easy-drilling-and-grinding open hole well completion pipe string construction method
CN111042767A (en) * 2018-10-11 2020-04-21 中国石油化工股份有限公司 Horizontal well segmented acidizing, filling and sand prevention integrated pipe column and method
CN112112608A (en) * 2019-06-21 2020-12-22 中国石油天然气股份有限公司 Comprehensive treatment method for collapse well of carbonate reservoir
CN113756778A (en) * 2020-06-03 2021-12-07 中国石油化工股份有限公司 Composite completion string and method of use
CN113914814A (en) * 2020-07-09 2022-01-11 中国石油化工股份有限公司 Anti-collapse sand consolidation drilling and grinding treatment method for ultra-deep open hole well
CN115110922A (en) * 2021-03-22 2022-09-27 中国石油化工股份有限公司 Compound sand control pipe for natural gas hydrate exploitation well completion

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201165866Y (en) * 2008-03-04 2008-12-17 北京华油油气技术开发有限公司 Horizontal well separate mining and combined mining pipe column
US20100051287A1 (en) * 2008-08-29 2010-03-04 Petroleo Brasileiro S.A. - Petrobras Depressurization system of annuli between casings in producing wells
CN201714364U (en) * 2010-07-02 2011-01-19 中国石油集团川庆钻探工程有限公司 Staged fracturing acidizing tool string for open hole completion of horizontal well
CN102102503A (en) * 2010-12-22 2011-06-22 中国石油天然气集团公司 Sand prevention method for four-inch small hole
WO2014011546A1 (en) * 2012-07-09 2014-01-16 M-I L.L.C. Wellbore fluid used with oil-swellable elements
CN104695915A (en) * 2015-03-16 2015-06-10 山东普瑞思德石油技术有限公司 Sand washing and prevention integrated completion pipe string and control method thereof
CN106089158A (en) * 2016-08-29 2016-11-09 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of horizontal well is every adopting tubing string and every mining method
CN106089161A (en) * 2016-08-21 2016-11-09 中国石油化工股份有限公司 A kind of layering section sand control production integration control valve and completion tubular column

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201165866Y (en) * 2008-03-04 2008-12-17 北京华油油气技术开发有限公司 Horizontal well separate mining and combined mining pipe column
US20100051287A1 (en) * 2008-08-29 2010-03-04 Petroleo Brasileiro S.A. - Petrobras Depressurization system of annuli between casings in producing wells
CN201714364U (en) * 2010-07-02 2011-01-19 中国石油集团川庆钻探工程有限公司 Staged fracturing acidizing tool string for open hole completion of horizontal well
CN102102503A (en) * 2010-12-22 2011-06-22 中国石油天然气集团公司 Sand prevention method for four-inch small hole
WO2014011546A1 (en) * 2012-07-09 2014-01-16 M-I L.L.C. Wellbore fluid used with oil-swellable elements
CN104695915A (en) * 2015-03-16 2015-06-10 山东普瑞思德石油技术有限公司 Sand washing and prevention integrated completion pipe string and control method thereof
CN106089161A (en) * 2016-08-21 2016-11-09 中国石油化工股份有限公司 A kind of layering section sand control production integration control valve and completion tubular column
CN106089158A (en) * 2016-08-29 2016-11-09 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of horizontal well is every adopting tubing string and every mining method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042767A (en) * 2018-10-11 2020-04-21 中国石油化工股份有限公司 Horizontal well segmented acidizing, filling and sand prevention integrated pipe column and method
CN111042767B (en) * 2018-10-11 2023-08-04 中国石油化工股份有限公司 Horizontal well segmented acidizing filling sand prevention integrated tubular column and method
CN109854213A (en) * 2019-03-18 2019-06-07 中国石油化工股份有限公司 Set damage repairs the sand control pipe of well
CN112112608A (en) * 2019-06-21 2020-12-22 中国石油天然气股份有限公司 Comprehensive treatment method for collapse well of carbonate reservoir
CN110513072A (en) * 2019-10-20 2019-11-29 达坦能源科技(上海)有限公司 A kind of ultradeep well open hole packer
CN110821449A (en) * 2019-11-28 2020-02-21 新疆恒智伟业石油工程技术开发有限公司 A kind of carbonate oil well screen completion pipe string and method for unblocking
CN110984924A (en) * 2019-12-20 2020-04-10 新疆恒智伟业石油工程技术开发有限公司 Easy-drilling-and-grinding open hole well completion pipe string construction method
CN113756778A (en) * 2020-06-03 2021-12-07 中国石油化工股份有限公司 Composite completion string and method of use
CN113756778B (en) * 2020-06-03 2023-09-26 中国石油化工股份有限公司 Composite completion string and how to use it
CN113914814A (en) * 2020-07-09 2022-01-11 中国石油化工股份有限公司 Anti-collapse sand consolidation drilling and grinding treatment method for ultra-deep open hole well
CN115110922A (en) * 2021-03-22 2022-09-27 中国石油化工股份有限公司 Compound sand control pipe for natural gas hydrate exploitation well completion

Similar Documents

Publication Publication Date Title
CN107939358A (en) Carbonate rock hydrocarbon reservoir open hole completion tubing string and post-processing method
EP2235321B1 (en) Stimulation through fracturing while drilling
CA1270188A (en) Process for selectively treating a subterranean formation using coiled tubing without affecting or being affected by the two adjacent zones
CA2614569C (en) Method of increasing reservoir permeability
CN101835953B (en) Well construction using small laterals
US20030075326A1 (en) Well completion method
US20140117739A1 (en) Mining Method for Gassy and Low Permeability Coal Seams
CN111535791A (en) High-efficiency gas drainage method in fractured and soft low-permeability coal seam in the area of combined upper and lower well fracturing
CN112855087A (en) Coal bed gas horizontal well system transformation method
JP2007527493A (en) Geothermal exchanger configuration method
NO314054B1 (en) Device for sealing a lateral borehole in a well
CN112253070B (en) Method for sectional seam making, coal washing and outburst elimination of thick coal seam top-bottom linkage horizontal well
CN112302715B (en) Soft sandstone aquifer dredging and lowering method
RU2410514C1 (en) Method for well construction
CN114607318A (en) Fracturing cooperative construction method for combined production and drilling of multi-layer horizontal well for deep coal bed methane
RU2320849C2 (en) Well construction and operation method
US20140251621A1 (en) Through tubing perpendicular boring
CN214576923U (en) Coal bed gas horizontal well system
US5199766A (en) Cavity induced stimulation of coal degasification wells using solvents
WO2012015528A1 (en) Enhanced hydrocarbon fluid recovery via formation collapse
RU2379492C2 (en) Development method at wells re-entry and oil field in general
RU2386776C1 (en) Method of opening of waterbearing stratum in unstable rocks by upward borehole and device for its implementation
Eide et al. Further advances in coiled-tubing drilling
CN104481494A (en) Method for repairing rock brine wells
RU2474668C1 (en) Well construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180420

RJ01 Rejection of invention patent application after publication