[go: up one dir, main page]

CN107938650A - The method for filling and treating of underground karst cavity - Google Patents

The method for filling and treating of underground karst cavity Download PDF

Info

Publication number
CN107938650A
CN107938650A CN201711405407.2A CN201711405407A CN107938650A CN 107938650 A CN107938650 A CN 107938650A CN 201711405407 A CN201711405407 A CN 201711405407A CN 107938650 A CN107938650 A CN 107938650A
Authority
CN
China
Prior art keywords
solution cavity
drilling
cavity
filling
clay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711405407.2A
Other languages
Chinese (zh)
Inventor
叶中海
胡金雄
袁伟明
张明涛
俞鑫
胡华清
高红燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cccc Third Harbor Engineering Co Ltd Ningbo Branch
Original Assignee
Cccc Third Harbor Engineering Co Ltd Ningbo Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cccc Third Harbor Engineering Co Ltd Ningbo Branch filed Critical Cccc Third Harbor Engineering Co Ltd Ningbo Branch
Priority to CN201711405407.2A priority Critical patent/CN107938650A/en
Publication of CN107938650A publication Critical patent/CN107938650A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention relates to a kind of method for filling and treating of underground karst cavity, during drilling construction, judge the type of the solution cavity, corresponding method is selected according to the type of the solution cavity, method for small-sized solution cavity using backfill clay drilling Gu Bi, hole is blocked up using slabstone clay for medium-sized solution cavity and builds wall approach, slabstone soil cement pulping method is used for large-scale solution cavity.The present invention is different for different types of karst cave treatment method, is not only advantageous to save material, and can fast and effectively handle solution cavity, shortens construction period, improves construction efficiency.

Description

The method for filling and treating of underground karst cavity
Technical field
The present invention relates to the technical field of underground karst cavity processing, a kind of method for filling and treating of underground karst cavity is referred in particular to.
Background technology
Solution cavity is the ground that dissolubility rock stratum is acted on and formed by chemical action and mechanical damage by surface water and groundwater Lower corrosion phenomenon, the geological sites can influence stability and the mechanics distribution of its peripheral rock.Usual solution cavity is located at karst strata In, and the upper strata of karst strata is silty clay, basic unit is weak weathering ash rock stratum, therefore is easily formed erodible arch cave.
During pile foundation construction, it is underground concealed engineering to be excavated due to pile foundation, can not avoid meeting solution cavity sometimes, by Easily there is collapse hole phenomenon in the complexity of Karst Cave Formation and the Unpredictability of underground karst cavity form size, work progress, Cause the dangerous and destabilizing factor of engineering structure to increase, construction technology is become complicated, directly affects whole engineering Uncertain and risk.
In order to overcome the above problem, Chinese invention patent(CN104278667A)Disclose at a kind of filling of underground karst cavity Reason method, its step include:Geological mapping, collapse hole protection, drilling, bore flushing, to prepare bubble composite soil, slip casting operation above-mentioned Raw material of the utilizing works waste soil as bubble composite soil, slip casting operation are by carrying out filling filling to the borderline drilling of solution cavity Slurry, then mider hole grouting is carried out, spill-over rear lift tube, although can be filled to solution cavity, since solution cavity is in the big of stratum There is difference in small, position, if above-mentioned processing method is used to all solution cavities of discovery in drilling process, not only bad for section Timely handle solution cavity, is likely to result in the waste of slurries, extends construction period, surface subsidence can be directly resulted in when serious, The accidents such as landslide.
The content of the invention
For this reason, the technical problems to be solved by the invention are to overcome in the prior art to the method for karst cave treatment not science The problem of so as to provide it is a kind of avoid slurries waste, shorten construction period underground karst cavity method for filling and treating.
In order to solve the above technical problems, a kind of method for filling and treating of underground karst cavity of the present invention, includes the following steps:Step Rapid S1:During drilling construction, the type of the solution cavity is judged, if the height of single solution cavity is less than the first specified altitude assignment or multiple The height of solution cavity is respectively less than first specified altitude assignment and spacing distance is also greater than first specified altitude assignment, then enters step S2;If the height of single solution cavity is between first specified altitude assignment and the second specified altitude assignment or multiple solution cavities add up and reach described More than first specified altitude assignment, then enter step S3;If the height of single solution cavity is more than second specified altitude assignment or multiple solution cavities It is cumulative to reach more than second specified altitude assignment, then enter step S4;Step S2:When drilling through at the top of the solution cavity, first mend Water, then by clay input in the borehole, using the method redrilling of decompression slow-motion, blocks solution cavity by punching and makes again Slurry;If spillage again, according to the method described above, backfill drilling repeatedly;Step S3:When drilling through at the top of the solution cavity, slurry is first mended Moisturizing, then filler that slabstone and clay are mixed to composition in proportion squeeze into the solution cavity inner wall in a manner of pressurizeing, until Mud face in drilling stops declining, and continues pressurization after slowly rising and is crept into, the filler of input is extruded, works as mud After starching leakage phenomena stopping, continuing to creep into;Step S4:When drilling through at the top of the solution cavity, mud is first mended, at the same setting is heavy The cement of amount is thrown into, and thick clay and slabstone mixture are then put into hole, drilling is re-started after the stopping of spillage phenomenon; Step S5:Drilling extremely design stake bottom absolute altitude.
In one embodiment of the invention, in the step S2, when clay is put into the borehole, backfill height is more than First specified altitude assignment.
In one embodiment of the invention, first specified altitude assignment is 2m, and second specified altitude assignment is 4m.
In one embodiment of the invention, in the step S3, when drilling through at the top of the solution cavity, first mend slurry and mend Water, and increase the clay quantity in mud, then by slabstone and clay with 3:The filler of 7 composition of proportions squeezes into the solution cavity Inner wall.
In one embodiment of the invention, it is described when continuing drilling, if collapse hole again after same intake transformation, then put into Bagged cement is launched while clay in batches, and cement amount is no less than regulation bag number to backfill every meter of depth.
In one embodiment of the invention, in the step S4, the input amount of the thickness clay and slabstone mixture More than filling to solution cavity top setpoint distance.
In one embodiment of the invention, when re-starting drilling, using pressuring method, make brill hammer crushing cement, stick Soil and slabstone mixture, and squeeze into the solution cavity inner wall.
In one embodiment of the invention, during the drilling, after Upper Plate of Karst Cave is punctured, mud balance is increased, it is to be drilled To solution cavity bottom plate, into hole, pouring underwater concrete is to more than setpoint distance at the top of the solution cavity.
In one embodiment of the invention, after the intensity of the concrete reaches prescribed strength, creep into again.
In one embodiment of the invention, in the step S1, during drilling construction, the solution cavity is punctured in drilling Before top, using the method for slow-motion drilling, gradually hole is pushed up and is punctured.
The above technical solution of the present invention has the following advantages over the prior art:
The method for filling and treating of underground karst cavity of the present invention, solution cavity is divided into:Small-sized solution cavity, medium-sized solution cavity and large-scale molten Hole, it is different for different types of karst cave treatment method in the construction process, it is not only advantageous to save material, and can be quick Effective processing solution cavity, shortens construction period, improves construction efficiency.
Brief description of the drawings
In order to make the content of the present invention more clearly understood, the specific embodiment below according to the present invention and combination Attached drawing, the present invention is described in further detail, wherein
Fig. 1 is the method for filling and treating flow chart of underground karst cavity of the present invention.
Embodiment
As shown in Figure 1, the present embodiment provides a kind of method for filling and treating of underground karst cavity, include the following steps:Step S1: During drilling construction, the type of the solution cavity is judged, if the height of single solution cavity is less than the first specified altitude assignment or multiple solution cavities Height be respectively less than first specified altitude assignment and spacing distance is also greater than first specified altitude assignment, then enter step S2;If The height of single solution cavity is between first specified altitude assignment and the second specified altitude assignment or multiple solution cavities add up and reach described first More than specified altitude assignment, then enter step S3;If the height of single solution cavity is more than second specified altitude assignment or multiple solution cavities add up Reach more than second specified altitude assignment, then enter step S4;Step S2:When drilling through at the top of the solution cavity, first moisturizing, so Afterwards by clay input in the borehole, using the method redrilling of decompression slow-motion, solution cavity and again pulping are blocked by punching;If Spillage again, according to the method described above, backfill drilling repeatedly;Step S3:When drilling through at the top of the solution cavity, slurry moisturizing is first mended, Then the filler for slabstone and clay being mixed to composition in proportion squeezes into the solution cavity inner wall in a manner of pressurizeing, until in drilling Mud face stop declining, continue pressurization after slowly rising and crept into, the filler of input is extruded, when mud is missed After phenomenon stops, continuing to creep into;Step S4:When drilling through at the top of the solution cavity, mud is first mended, while by the water of setting weight Mud is thrown into, and thick clay and slabstone mixture are then put into hole, drilling is re-started after the stopping of spillage phenomenon;Step S5:Drilling extremely design stake bottom absolute altitude.
The method for filling and treating of underground karst cavity described in the present embodiment, in the step S1, during drilling construction, judges institute The type of solution cavity is stated, if the height of single solution cavity is less than the first specified altitude assignment or the height of multiple solution cavities is respectively less than first finger Determine height and spacing distance is also greater than first specified altitude assignment, it is small-sized solution cavity to judge the solution cavity, then enters step S2;If The height of single solution cavity is between first specified altitude assignment and the second specified altitude assignment or multiple solution cavities add up and reach described first More than specified altitude assignment, judge that the solution cavity for neutral solution cavity, then enters step S3;If the height of single solution cavity is more than described second Specified altitude assignment or multiple solution cavities, which add up, to be reached more than second specified altitude assignment, and it is large-scale solution cavity to judge the solution cavity, then enters Step S4;It is first when mud face declines rapidly when drilling through at the top of the solution cavity for small-sized solution cavity in the step S2 Moisturizing, then by clay input in the borehole, using the method redrilling of decompression slow-motion, solution cavity and again is blocked by punching Pulping, since the solution cavity is smaller, solution cavity, positive effect can be quickly handled by mending slurry;If spillage again, according to above-mentioned side Method, repeatedly backfill drilling;In the step S3, for medium-sized solution cavity, when drilling through at the top of the solution cavity, under mud is rapid Drop, since the solution cavity volume is larger at this time, first mends slurry moisturizing, then slabstone and clay is mixed to the filler of composition in proportion The solution cavity inner wall is squeezed into a manner of pressurization, is conducive to play retaining wall effect, avoids collapse hole, until the mud face in drilling is stopped Only decline, continue pressurization after slowly rising and crept into, the filler of input is extruded, when mud leakage phenomena stops Afterwards, continue to creep into;In the step S4, for large-scale solution cavity, when drilling through at the top of the solution cavity, mud is first mended, at the same time will The cement of setting weight is thrown into, and preliminary treatment is carried out to the solution cavity, and thick clay and slabstone mixture are then put into hole, Drilling is re-started after the stopping of spillage phenomenon;In the step S5, continue drilling to design stake bottom absolute altitude, due to work progress In it is different for different types of karst cave treatment method, be not only advantageous to save material, and can fast and effectively handle molten Hole, shortens construction period, improves construction efficiency.
In the step S2, the processing for small-sized solution cavity, using the solid wall approach of backfill clay drilling.Specifically, by clay When putting into the borehole, backfill height is more than first specified altitude assignment, so as to advantageously ensure that the quality of construction.Drilling Cheng Zhong, occurs fermentation product collapse hole or mud quickly flows away, and the former mud face that drills decrease beyond first specified altitude assignment, then shows The solution cavity that former advance exploration does not disclose is broken up in boring procedure and has formd medium-sized and above solution cavity.
In the step S3, the processing for medium-sized solution cavity, blocks up hole using slabstone clay and builds wall approach.Specifically, drilling To before the top of breakdown hole, drilled using slow-motion, gradually hole is pushed up and is punctured, prevent card hammer or inclined hole, once find that mud face is quick Decline, water level in borehole changes greatly, slip consistency, color change or rate of penetration substantially accelerate again unbiased hole phenomenon when, Show that having passed through solution cavity jacking enters solution cavity.Slurry moisturizing is quickly mended using High-power Mud Pump at this time, while carries tup in time, is prevented Hammer is buried, and increases the clay quantity in mud, improves mud density, and the control of mud viscosity is in 19-28s, then by slabstone With clay with 3:The filler of 7 composition of proportions squeezes into the solution cavity inner wall, is conducive to play retaining wall effect, avoids collapse hole.Together When input amount by the solution cavity to highly adding more than set a distance, repeatedly launched on a small quantity, to ensure construction quality.In addition, By the way of pressurization, allow and bore hammer crushing clay and slabstone and squeeze into the effect that solution cavity inner wall plays retaining wall, when the mud in hole Face stops declining, and when slowly rising, can pressurize drilling, and the filler of input is extruded, it is ensured that the solution cavity is blocked. It is described when continuing drilling, if collapse hole again after same intake transformation, then put into clay while, launch bagged cement, and water in batches Mud amount is no less than regulation bag number to backfill every meter of depth, and specifically, every meter of cement amount backfill depth is thrown no less than 3 bags with whole bag Enter.After mud leakage phenomena all disappears, normal drilling is pierced, so drilling is smoothly passed through solution cavity repeatedly.
In the step S4, the processing for large-scale solution cavity uses slabstone soil cement pulping method.In particular, it was found that spillage Afterwards, show to have perforated, supplement mud into hole to prevent hole wall collapse using slush pump immediately, meanwhile, bag is thrown into hole immediately Fill cement 5t or so;Then, 3-5m thickness clay, slabstone mixture are put into hole(Soil-rock ratio 1:1), with filling to the solution cavity More than top setpoint distance, specifically, 3m is no less than with filling to solution cavity top;Brill is re-started after the stopping of spillage phenomenon Into using pressuring method, making brill hammer crushing cement, clay and slabstone mixture, and squeeze into the solution cavity inner wall and play retaining wall and make With.
For the large-scale solution cavity of emptying aperture, filler to have the large-scale solution cavity such as water burst in stream modeling shape solution cavity, solution cavity, because of its mud Lateral pressure is larger, self-stability is poor, can use the perfusion secondary pore-forming Drilling Method of concrete dado.Specifically, install above-mentioned large-scale molten After the punching of hole, after Upper Plate of Karst Cave is punctured, mud balance is increased, water burst is prevented, gushes slurry dilution mud, cause mud off ability Decline, hole wall collapse occurs;After being drilled into the solution cavity bottom plate, without borehole cleaning, into hole, pouring underwater concrete is to the solution cavity More than bottom setpoint distance, specifically, into hole, pouring underwater concrete is to more than 1m at the top of the solution cavity;Treat the concrete Intensity reach prescribed strength after, specifically, after concrete reaches 70% intensity, creep into again.
In the present embodiment, first specified altitude assignment is set as 2m, and second specified altitude assignment is set as 4m.Constructing Cheng Zhong, hole before drilling punctures the solution cavity top, using the method for slow-motion drilling, gradually pushed up and punctured, prevent card from hammering into shape;And It is with hammer is bored that the stake holes repairing at Upper Plate of Karst Cave, bottom plate is round and smooth after puncturing Upper Plate of Karst Cave, bottom plate, to prevent bit freezing.
Obviously, the above embodiments are merely examples for clarifying the description, not to the restriction of embodiment.For For those of ordinary skill in the art, other multi-form changes can also be made on the basis of the above description or are become It is dynamic.There is no necessity and possibility to exhaust all the enbodiments.And the obvious change or change thus extended out Among moving still in the protection domain of the invention.

Claims (10)

1. a kind of method for filling and treating of underground karst cavity, it is characterised in that include the following steps:
Step S1:During drilling construction, the type of the solution cavity is judged, if the height of single solution cavity is less than the first specified altitude assignment Or the height of multiple solution cavities is respectively less than first specified altitude assignment and spacing distance is also greater than first specified altitude assignment, then enters Step S2;If the height of single solution cavity is between first specified altitude assignment and the second specified altitude assignment or multiple solution cavities add up and reach More than first specified altitude assignment, then enter step S3;If the height of single solution cavity is more than second specified altitude assignment or multiple Solution cavity, which adds up, to be reached more than second specified altitude assignment, then enters step S4;
Step S2:When drilling through at the top of the solution cavity, first moisturizing, then by clay input in the borehole, using decompression slow-motion Method redrilling, solution cavity and again pulping are blocked by punching;If spillage again, according to the method described above, backfill repeatedly is bored Hole;
Step S3:When drilling through at the top of the solution cavity, slurry moisturizing is first mended, slabstone and clay are then mixed into composition in proportion Filler squeezes into the solution cavity inner wall in a manner of pressurizeing, until the mud face in drilling stops declining, continues after slowly rising Pressurization is crept into, and the filler of input is extruded, after mud leakage phenomena stops, continuing to creep into;
Step S4:When drilling through at the top of the solution cavity, mud is first mended, while the cement of setting weight is thrown into, then to hole Middle input thickness clay and slabstone mixture, drilling is re-started after the stopping of spillage phenomenon;
Step S5:Drilling extremely design stake bottom absolute altitude.
2. the method for filling and treating of underground karst cavity according to claim 1, it is characterised in that:In the step S2, by clay When putting into the borehole, backfill height is more than first specified altitude assignment.
3. the method for filling and treating of underground karst cavity according to claim 1 or claim 2, it is characterised in that:First specified altitude assignment It is 2m, second specified altitude assignment is 4m.
4. the method for filling and treating of underground karst cavity according to claim 1, it is characterised in that:In the step S3, drilling is worn When crossing at the top of the solution cavity, slurry moisturizing is first mended, and increases the clay quantity in mud, then by slabstone and clay with 3:7 ratio The filler that example is formed squeezes into the solution cavity inner wall.
5. according to the method for filling and treating of the underground karst cavity of claim 1 or 4, it is characterised in that:It is described continue drilling when, if Collapse hole again after same intake transformation, then put into clay while, launch bagged cement in batches, and cement amount is every to backfill depth Rice is no less than regulation bag number.
6. the method for filling and treating of underground karst cavity according to claim 1, it is characterised in that:In the step S4, the thickness The input amount of clay and slabstone mixture is more than filling to solution cavity top setpoint distance.
7. the method for filling and treating of underground karst cavity according to claim 1, it is characterised in that:When re-starting drilling, use Pressuring method, makes brill hammer crushing cement, clay and slabstone mixture, and squeezes into the solution cavity inner wall.
8. according to the method for filling and treating of the underground karst cavity of claim 1 or 7, it is characterised in that:During the drilling, puncturing After Upper Plate of Karst Cave, mud balance is increased, after solution cavity bottom plate is drilled into, pouring underwater concrete is set to solution cavity top into hole It is more than set a distance.
9. the method for filling and treating of underground karst cavity according to claim 8, it is characterised in that:The intensity of the concrete reaches After prescribed strength, creep into again.
10. the method for filling and treating of underground karst cavity according to claim 1, it is characterised in that:In the step S1, drilling is applied During work, before drilling punctures the solution cavity top, using the method for slow-motion drilling, gradually hole is pushed up and is punctured.
CN201711405407.2A 2017-12-22 2017-12-22 The method for filling and treating of underground karst cavity Pending CN107938650A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711405407.2A CN107938650A (en) 2017-12-22 2017-12-22 The method for filling and treating of underground karst cavity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711405407.2A CN107938650A (en) 2017-12-22 2017-12-22 The method for filling and treating of underground karst cavity

Publications (1)

Publication Number Publication Date
CN107938650A true CN107938650A (en) 2018-04-20

Family

ID=61941755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711405407.2A Pending CN107938650A (en) 2017-12-22 2017-12-22 The method for filling and treating of underground karst cavity

Country Status (1)

Country Link
CN (1) CN107938650A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108772937A (en) * 2018-04-28 2018-11-09 中国矿业大学 A kind of underground cavity intelligence placement method
CN108789769A (en) * 2018-04-28 2018-11-13 中国矿业大学 A kind of underground cavity intelligence filling system
CN109577313A (en) * 2018-12-11 2019-04-05 宝钢集团新疆八钢铁有限公司 A kind of cold region factory built-up areas grouting and reinforcing technology
CN109577197A (en) * 2018-11-05 2019-04-05 中铁二十二局集团轨道工程有限公司 A kind of construction method of thick sand bed Pile In Karst Area
CN110056326A (en) * 2019-04-29 2019-07-26 中铁第四勘察设计院集团有限公司 Hole sealing structure and implementation method for drilling with bead type solution cavity
CN110984120A (en) * 2019-12-31 2020-04-10 桂林电子科技大学 A kind of filling structure of shallow buried non-pressure water-filled karst cave and its construction method
CN111574183A (en) * 2020-06-17 2020-08-25 贵州大学 A kind of backfill material suitable for karst area and its backfill method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469789A (en) * 2013-09-30 2013-12-25 中铁二十局集团有限公司 Karst-area underwater bridge pier drilled pile construction method
CN104278667A (en) * 2013-07-02 2015-01-14 浙江国泰建设集团有限公司 Underground karst cave filling treatment method
CN104818712A (en) * 2015-04-07 2015-08-05 浙江大华建设集团有限公司 Construction method of cast-in-situ bored pile suitable for karst cave geology
CN105653811A (en) * 2016-01-11 2016-06-08 重庆市送变电工程有限公司 Rocked depth determining method for high voltage transformer substation deep back filled region rotary excavation drilling
CN106049467A (en) * 2016-08-02 2016-10-26 中铁六局集团有限公司 Method for treating slurry leakage of bored pile through percussion drill under complex geology
CN106498965A (en) * 2016-12-05 2017-03-15 广西大学 A kind of karst area water sealing consolidation construction method
CN106837353A (en) * 2017-01-22 2017-06-13 中南大学 Filling karst tunnel construction treatment method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104278667A (en) * 2013-07-02 2015-01-14 浙江国泰建设集团有限公司 Underground karst cave filling treatment method
CN103469789A (en) * 2013-09-30 2013-12-25 中铁二十局集团有限公司 Karst-area underwater bridge pier drilled pile construction method
CN104818712A (en) * 2015-04-07 2015-08-05 浙江大华建设集团有限公司 Construction method of cast-in-situ bored pile suitable for karst cave geology
CN105653811A (en) * 2016-01-11 2016-06-08 重庆市送变电工程有限公司 Rocked depth determining method for high voltage transformer substation deep back filled region rotary excavation drilling
CN106049467A (en) * 2016-08-02 2016-10-26 中铁六局集团有限公司 Method for treating slurry leakage of bored pile through percussion drill under complex geology
CN106498965A (en) * 2016-12-05 2017-03-15 广西大学 A kind of karst area water sealing consolidation construction method
CN106837353A (en) * 2017-01-22 2017-06-13 中南大学 Filling karst tunnel construction treatment method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
徐天平主编: "《地基与基础工程施工质量问答》", 30 April 2004 *
汪旵生,赵春生: "《高速铁路(客运专线)工程设计与施工技术论文集》", 31 May 2010 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108772937A (en) * 2018-04-28 2018-11-09 中国矿业大学 A kind of underground cavity intelligence placement method
CN108789769A (en) * 2018-04-28 2018-11-13 中国矿业大学 A kind of underground cavity intelligence filling system
CN109577197A (en) * 2018-11-05 2019-04-05 中铁二十二局集团轨道工程有限公司 A kind of construction method of thick sand bed Pile In Karst Area
CN109577313A (en) * 2018-12-11 2019-04-05 宝钢集团新疆八钢铁有限公司 A kind of cold region factory built-up areas grouting and reinforcing technology
CN110056326A (en) * 2019-04-29 2019-07-26 中铁第四勘察设计院集团有限公司 Hole sealing structure and implementation method for drilling with bead type solution cavity
CN110984120A (en) * 2019-12-31 2020-04-10 桂林电子科技大学 A kind of filling structure of shallow buried non-pressure water-filled karst cave and its construction method
CN110984120B (en) * 2019-12-31 2020-09-25 桂林电子科技大学 Filling structure of shallow-buried non-pressure water-filled karst cave and construction method thereof
CN111574183A (en) * 2020-06-17 2020-08-25 贵州大学 A kind of backfill material suitable for karst area and its backfill method

Similar Documents

Publication Publication Date Title
CN107938650A (en) The method for filling and treating of underground karst cavity
CN110230309B (en) Karst area bridge karst cave pile foundation construction method
CN104674809B (en) Anti-floating anchor rod structure and its construction method
CN101196117A (en) Non-blasting digging method for tunnel and underground project
CN103485336A (en) Drilling pile drilling construction method of bead-type karst area
CN113529721B (en) Combined drilling and grouting pipe for grouting reinforcement of island reef weak stratum and construction method
CN106996105A (en) Down-the-hole impacts jet mixing pile constructing process and equipment
CN101525881A (en) Structure of karst strata pile holes protecting wall and method for constructing pile holes
CN108149672A (en) The processing method of underground karst cavity
CN109881696A (en) A kind of HPPG back cover construction method
CN110424434A (en) For filling out the stirring pile water stopping curtain and construction method in the deep area Kuai Shi in sea
CN102337732A (en) Seawall construction method with top pipes penetrating through block stone
CN101225740A (en) Annular filling method for space between freezing pipe and surrounding rock
CN103556554B (en) Reinforce the construction method of the drilled pile composite foundation structure of the soft base of embankment
CN105484266B (en) The grouting equipment and its construction method of a kind of multifunctional information
CN104711973A (en) Construction method for small-diameter pile composite foundation
CN108797578A (en) Crushed stone grouting pile and its construction method with classification enlarged footing
CN107587502A (en) A kind of spiral-digging pore pressure pour water soil occlusion curtain pile construction method
CN104790982A (en) Enclosed mud for underground excavation tunnel ultra-deep hole grouting
CN113431045B (en) Construction method for rotary drilling pore-forming karst leaking stoppage
CN106223329A (en) A kind of construction method of full-sleeve rotary churning pile
CN106013155A (en) Method for filling up covering layer and processing drilling slurry leakage by grouting consolidation
CN106192987B (en) It is a kind of to be crushed the construction method that geology is reinforced to stake periphery
CN104108919A (en) Environment-friendly water-stop curtain
CN103556555B (en) Reinforce the construction method of the nail shape drilled pile composite foundation structure of embankment widening

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180420

RJ01 Rejection of invention patent application after publication