CN107932055A - A kind of full-automatic ball valve group installs standby and its assemble method - Google Patents
A kind of full-automatic ball valve group installs standby and its assemble method Download PDFInfo
- Publication number
- CN107932055A CN107932055A CN201710951719.7A CN201710951719A CN107932055A CN 107932055 A CN107932055 A CN 107932055A CN 201710951719 A CN201710951719 A CN 201710951719A CN 107932055 A CN107932055 A CN 107932055A
- Authority
- CN
- China
- Prior art keywords
- valve
- cylinder
- bonnet
- valve body
- ball
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 11
- 230000007246 mechanism Effects 0.000 claims abstract description 72
- 239000003292 glue Substances 0.000 claims abstract description 21
- 230000009471 action Effects 0.000 claims description 10
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims 2
- 238000009434 installation Methods 0.000 abstract description 25
- 238000007789 sealing Methods 0.000 abstract description 17
- 238000004519 manufacturing process Methods 0.000 abstract description 7
- 238000012856 packing Methods 0.000 abstract description 5
- 230000006835 compression Effects 0.000 description 6
- 238000007906 compression Methods 0.000 description 6
- 238000013461 design Methods 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000001934 delay Effects 0.000 description 1
- 239000003814 drug Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005504 petroleum refining Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000000047 product Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P21/00—Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control
- B23P21/004—Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control the units passing two or more work-stations whilst being composed
- B23P21/006—Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control the units passing two or more work-stations whilst being composed the conveying means comprising a rotating table
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Automatic Assembly (AREA)
Abstract
本发明涉及球阀制造设备技术领域,公开一种全自动球阀组装设备和其组装方法。该设备包括工作台,工作台上均布若干个阀体夹具和阀帽夹具,工作台的侧边依次设有侧密封圈装填料机构、侧螺盖和阀杆上料机器人、侧螺盖拧紧装置、阀球安装机构、阀帽安装机构、预拧紧和加胶机构、锁紧机构、阀体阀帽上料机器人,其中阀球安装机构远离工作台的一侧设置有阀球上料机器人。本发明采用多工位转盘式工作台,工作台每转过一个工位,所有的装置同时进行组装,即每转过一个工位,就完成一个球阀的组装,装配效率高。
The invention relates to the technical field of ball valve manufacturing equipment, and discloses a fully automatic ball valve assembly equipment and an assembly method thereof. The equipment includes a workbench, on which several valve body fixtures and bonnet fixtures are evenly distributed. The side of the workbench is provided with a side sealing ring packing mechanism, a side screw cap and valve stem feeding robot, and a side screw cap tightening mechanism. Device, valve ball installation mechanism, bonnet installation mechanism, pre-tightening and glue adding mechanism, locking mechanism, valve body and bonnet loading robot, wherein the side of the valve ball installation mechanism away from the workbench is provided with a valve ball feeding robot. The invention adopts a multi-station turntable workbench, and every time the workbench turns a station, all the devices are assembled at the same time, that is, every time a station is turned, the assembly of a ball valve is completed, and the assembly efficiency is high.
Description
技术领域technical field
本发明涉及球阀制造设备技术领域,具体地讲,涉及一种全自动球阀组装设备和其组装方法。The invention relates to the technical field of ball valve manufacturing equipment, in particular to a fully automatic ball valve assembly equipment and an assembly method thereof.
背景技术Background technique
在我国,球阀被广泛的应用在石油炼制、长输管线、化工、造纸、制药、水利、电力、市政、钢铁等行业,在国民经济中占有举足轻重的地位。球阀组装是球阀生产的后置工序,在其生产制造中占有重要的地位。In my country, ball valves are widely used in petroleum refining, long-distance pipelines, chemical industry, papermaking, pharmaceuticals, water conservancy, electric power, municipal, steel and other industries, and occupy a pivotal position in the national economy. Ball valve assembly is the post process of ball valve production and plays an important role in its manufacturing.
目前,国内生产球阀的企业,在生产组装球阀时,基本上都是手工组装。现有的手工组装球阀的方式存在速度慢、装配效率低等缺点,已显然满足不了现代生产制造自动化、高精度的生产要求。此外在一个大的球阀企业中,一年中球阀的产量一般都较大,就需要招收大量的装配工人来组装球阀,大量的劳动力就需要大量的劳动力成本,经济效益不高,而且目前企业都存在招工难的问题,有时候招不到足够多的工人进行组装生产,导致产品加工延期。例如申请号为201620807273.1的中国专利:一种全自动圆盘式球阀组装机,实现了全自动球阀的组装,但是该装置中的阀球上料机构、阀杆装配机构、钢球装配机构、阀盖装配机构等机构存在结构设计复杂、设计不合理的缺点。本发明从解决现有技术中存在的不足出发,设计一种结构简单合理、利用机器人上下料、自动化程度高的全自动球阀组装设备。At present, domestic enterprises that produce ball valves basically assemble them by hand when producing and assembling ball valves. The existing method of manually assembling ball valves has disadvantages such as slow speed and low assembly efficiency, which obviously cannot meet the automation and high-precision production requirements of modern manufacturing. In addition, in a large ball valve enterprise, the output of ball valves is generally large in a year, so it is necessary to recruit a large number of assembly workers to assemble the ball valves. A large amount of labor requires a lot of labor costs, and the economic benefits are not high. There is a problem of difficulty in recruiting workers. Sometimes it is not possible to recruit enough workers for assembly and production, resulting in delays in product processing. For example, the Chinese patent with application number 201620807273.1: a fully automatic disc ball valve assembly machine realizes the assembly of fully automatic ball valves, but the valve ball feeding mechanism, valve stem assembly mechanism, steel ball assembly mechanism, valve Mechanisms such as the cover assembly mechanism have the disadvantages of complicated structural design and unreasonable design. The present invention starts from solving the deficiencies in the prior art, and designs a fully automatic ball valve assembly equipment with simple and reasonable structure, using robots for loading and unloading, and a high degree of automation.
发明内容Contents of the invention
本发明的目的在于克服现有技术中存在的上述不足,而提供一种结构设计合理、系统完善、可全面整体提高球阀的组装效率的全自动球阀组装设备,并给出其组装方法。The purpose of the present invention is to overcome the above-mentioned deficiencies in the prior art, and provide a fully automatic ball valve assembly equipment with reasonable structural design, perfect system, and comprehensively improve the assembly efficiency of ball valves, and provide its assembly method.
本发明解决上述问题所采用的技术方案是:The technical solution adopted by the present invention to solve the above problems is:
一种全自动球阀组装设备,其特征在于: 包括工作台;工作台上均布若干个阀体夹具和阀帽夹具,工作台的侧边依次设有侧密封圈装填料机构、侧螺盖和阀杆上料机器人、侧螺盖拧紧装置、阀球安装机构、阀帽安装机构、预拧紧和加胶机构、锁紧机构、阀体阀帽上料机器人,其中阀球安装机构远离工作台的一侧设置有阀球上料机器人;A fully automatic ball valve assembly equipment, characterized in that it includes a workbench; several valve body fixtures and bonnet fixtures are evenly distributed on the workbench, and the side of the workbench is provided with a side sealing ring packing mechanism, a side screw cover and a Stem feeding robot, side screw cap tightening device, valve ball installation mechanism, bonnet installation mechanism, pre-tightening and glue adding mechanism, locking mechanism, valve body and bonnet feeding robot, wherein the valve ball installation mechanism is far away from the working table One side is equipped with a valve ball feeding robot;
侧密封圈装填料机构包括基座和气缸一,气缸一沿水平方向固定在基座上,气缸一的气缸杆端部设置有推头;The packing mechanism of the side sealing ring includes a base and a cylinder one, the cylinder one is fixed on the base along the horizontal direction, and the end of the cylinder rod of the cylinder one is provided with a push head;
侧螺盖拧紧装置包括第一拧紧机和气缸二;第一拧紧机水平布置在所对应工位的侧边,气缸二通过安装架一沿竖直方向布置在所对应工位的正上方,气缸二的气缸杆端部设置有顶出头;The side screw cap tightening device includes the first tightening machine and the second cylinder; the first tightening machine is horizontally arranged on the side of the corresponding station, and the second cylinder is vertically arranged directly above the corresponding station through the installation frame one. The end of the cylinder rod of the second is provided with an ejection head;
阀球安装机构包括气缸三,气缸三通过安装架二沿竖直方向布置在所对应工位的正上方,气缸三的气缸杆端部设置有压紧头;The valve ball installation mechanism includes a cylinder three, and the cylinder three is vertically arranged directly above the corresponding station through the installation frame two, and the end of the cylinder rod of the cylinder three is provided with a compression head;
阀球上料机器人的夹具部分含有两个相对设置的机械加持手指,在动力驱动下,做张合动作;The clamp part of the valve ball feeding robot contains two oppositely arranged mechanical holding fingers, which are driven by power to perform opening and closing actions;
阀帽安装机构包括驱动模块、夹持部件和气缸四;气缸四沿水平方向连接在驱动模块上,气缸四在驱动模块作用下沿竖直方向做升降运动,夹持部件与气缸四连接;The bonnet installation mechanism includes a drive module, a clamping part and a cylinder four; the cylinder four is connected to the drive module along the horizontal direction, and the cylinder four moves up and down in the vertical direction under the action of the drive module, and the clamping part is connected with the cylinder four;
预拧紧和加胶机构包括支架、第二拧紧机、针筒和气缸五;第二拧紧机设置在支架的上部,且第二拧紧机的旋紧头正对所对应工位上的阀体夹具;针筒和气缸五连接,气缸五水平设置在支架下部,针筒的出胶头正对所对应工位上阀体夹具上装夹的阀体的螺纹处。The pre-tightening and glue adding mechanism includes a bracket, a second tightening machine, a syringe and cylinder five; the second tightening machine is set on the upper part of the bracket, and the tightening head of the second tightening machine is facing the valve body fixture on the corresponding station The syringe is connected to the cylinder five, and the cylinder five is horizontally arranged on the lower part of the support, and the glue outlet of the syringe is facing the thread of the valve body clamped on the valve body fixture on the corresponding station.
本发明所述的全自动球阀组装设备还包括阀杆上料震动缸、侧螺盖上料震动缸和侧密封圈上料震动缸。The automatic ball valve assembly equipment of the present invention also includes a valve stem feeding vibration cylinder, a side screw cap feeding vibration cylinder and a side sealing ring feeding vibration cylinder.
本发明所述的工作台为圆盘式可转动工作台,绕其圆心做间歇式分度转动;工作台的边沿处周向均布八工位,每个工位上设置一个阀体夹具,每个阀体夹具对应设置一个阀帽夹具;所述的侧密封圈装填料机构、侧螺盖和阀杆上料机器人、侧螺盖拧紧装置、阀球安装机构、阀帽安装机构、预拧紧和加胶机构、锁紧机构、阀体阀帽上料机器人沿圆盘式可转动工作台的圆周方向围成一圈,且按先后顺序依次对应一个工位。The workbench described in the present invention is a disc-type rotatable workbench, which performs intermittent indexing rotation around the center of the circle; the edge of the workbench is evenly distributed with eight stations in the circumferential direction, and each station is provided with a valve body fixture, each The valve body fixture is correspondingly provided with a bonnet fixture; the side sealing ring packing mechanism, the side screw cap and valve stem loading robot, the side screw cap tightening device, the valve ball installation mechanism, the bonnet installation mechanism, the pre-tightening and tightening The glue mechanism, locking mechanism, and valve body and bonnet feeding robot form a circle along the circumference of the disc-type rotatable workbench, and correspond to a station in sequence.
一种全自动球阀组装设备的组装方法,其特征在于:包括如下步骤:An assembly method for fully automatic ball valve assembly equipment, characterized in that it includes the following steps:
(1) 侧密封圈上料震动缸将侧密封圈上料到侧密封圈装填料机构的推头上,推头在气缸一的作用下将侧密封圈装进阀体夹具装夹的阀体的侧阀杆孔内,工作台转动一个工位;(1) The side sealing ring feeding vibrating cylinder feeds the side sealing ring onto the push head of the side sealing ring filling mechanism, and the push head puts the side sealing ring into the valve body clamped by the valve body fixture under the action of cylinder one In the side valve stem hole, the workbench rotates one position;
(2) 侧螺盖和阀杆上料机器人从阀杆上料震动缸的出料口处取出阀杆,将阀杆从阀体上部端口装入到阀杆孔内,工作台转动一个工位;(2) The side screw cap and valve stem loading robot takes out the valve stem from the outlet of the valve stem feeding vibration cylinder, loads the valve stem from the upper port of the valve body into the valve stem hole, and the worktable rotates one station ;
(3) 侧螺盖拧紧装置中的气缸二的气缸杆端部的顶出头向下深入阀体,将阀杆安装到位,然后侧螺盖和阀杆上料机器人从侧螺盖上料震动缸的出料口处取出侧螺盖,将侧螺盖放置到阀杆上,此时第一拧紧机对侧螺盖进行拧紧,工作台转动一个工位;(3) In the side screw cap tightening device, the ejector head at the end of the cylinder rod of cylinder 2 goes deep into the valve body downwards, and the valve stem is installed in place, and then the side screw cap and valve stem feeding robot feeds the vibration cylinder from the side screw cap Take out the side screw cap from the discharge port of the valve, and place the side screw cap on the valve stem. At this time, the first tightening machine tightens the side screw cap, and the worktable rotates one station;
(4) 阀球上料机器人将阀球放置到阀体内,阀球安装机构中气缸三的气缸杆端部的压紧头伸入阀体,压紧阀球,使阀球的缺口和阀杆配合,工作台转动一个工位;(4) The valve ball feeding robot places the valve ball into the valve body, and the compression head at the end of the cylinder rod of cylinder three in the valve ball installation mechanism extends into the valve body to compress the valve ball so that the notch of the valve ball and the valve stem Cooperate, the workbench rotates one station;
(5) 阀帽安装机构的夹持部件在气缸四和驱动模块的作用下,夹住阀帽,将阀帽放置到阀体上,工作台转动一个工位;(5) The clamping part of the bonnet installation mechanism clamps the bonnet under the action of cylinder four and the drive module, puts the bonnet on the valve body, and the workbench rotates one station;
(6) 预拧紧和加胶机构对阀帽和阀体进行预拧紧,以及在预拧紧的同时,向阀帽和阀体的螺纹连接处加注入胶水,工作台转动一个工位;(6) The pre-tightening and glue adding mechanism pre-tightens the bonnet and the valve body, and at the same time of pre-tightening, injects glue into the threaded connection between the bonnet and the valve body, and the workbench rotates one station;
(7) 锁紧机构对阀帽和阀体进行拧紧,工作台转动一个工位;(7) The locking mechanism tightens the bonnet and the valve body, and the workbench rotates one position;
(8) 阀体阀帽上料机器人将组装完成的球阀从阀体夹具上取出,随后将阀体和阀帽分别放到阀体夹具和阀帽夹具中。(8) The valve body and bonnet feeding robot takes out the assembled ball valve from the valve body fixture, and then puts the valve body and bonnet into the valve body fixture and bonnet fixture respectively.
本发明与现有技术相比,具有以下优点和效果:Compared with the prior art, the present invention has the following advantages and effects:
(1)全自动球阀组装设备采用多工位转盘式工作台,工作台每转过一个工位,所有的装置同时进行组装,即每转过一个工位,就完成一个球阀的组装,装配效率高;(1) The automatic ball valve assembly equipment adopts a multi-station turntable workbench. Every time the workbench turns a station, all the devices are assembled at the same time, that is, every time a station is turned, the assembly of a ball valve is completed, and the assembly efficiency is high. high;
(2)全自动球阀组装设备中采用了机器人上下料,效率高;(2) The automatic ball valve assembly equipment adopts robot loading and unloading, which has high efficiency;
(3)全自动球阀组装设备通过可编程控制器 PLC 控制,只需界面操作,操作简单,大大节省企业的劳动力成本。(3) The fully automatic ball valve assembly equipment is controlled by a programmable controller PLC, and only needs interface operation, which is easy to operate and greatly saves the labor cost of the enterprise.
附图说明Description of drawings
图1是本发明实施例全自动球阀组装设备结构示意图。Fig. 1 is a schematic structural diagram of a fully automatic ball valve assembly device according to an embodiment of the present invention.
图2是本发明实施例去除侧螺盖、侧密封圈和阀杆上料震动缸的全自动球阀组装设备结构示意图。Fig. 2 is a schematic diagram of the structure of the fully automatic ball valve assembly equipment for removing the side screw cover, the side sealing ring and the valve stem loading vibrating cylinder according to the embodiment of the present invention.
具体实施方式Detailed ways
下面结合附图并通过实施例对本发明作进一步的详细说明,以下实施例是对本发明的解释而本发明并不局限于以下实施例。The present invention will be further described in detail below in conjunction with the accompanying drawings and examples. The following examples are explanations of the present invention and the present invention is not limited to the following examples.
参见图1,本发明实施例一种全自动球阀组装设备包括工作台10、侧密封圈装填料机构11、侧螺盖和阀杆上料机器人12、侧螺盖拧紧装置13、阀球上料机器人14、阀球安装机构15、阀帽安装机构16、预拧紧和加胶机构17、锁紧机构18、阀体阀帽上料机器人19。Referring to Fig. 1, a fully automatic ball valve assembly equipment according to an embodiment of the present invention includes a workbench 10, a side sealing ring packing mechanism 11, a side screw cap and valve stem loading robot 12, a side screw cap tightening device 13, and a valve ball loading mechanism. Robot 14, valve ball installation mechanism 15, bonnet installation mechanism 16, pre-tightening and glue adding mechanism 17, locking mechanism 18, valve body bonnet feeding robot 19.
工作台10为圆盘式可转动工作台,在其工作台下方布置有动力机构,在动力机构带动下,工作台10绕其圆心做间歇式分度转动。工作台10的边沿处周向均布八个工位,每个工位上设置一个阀体夹具101,每个阀体夹具101对应设置一个阀帽夹具102。The workbench 10 is a disc-type rotatable workbench, and a power mechanism is arranged under the workbench. Driven by the power mechanism, the workbench 10 performs intermittent indexing rotation around its center of circle. Eight workstations are evenly distributed around the edge of the workbench 10 , each station is provided with a valve body clamp 101 , and each valve body clamp 101 is correspondingly provided with a bonnet clamp 102 .
侧密封圈装填料机构11、侧螺盖和阀杆上料机器人12、侧螺盖拧紧装置13、阀球安装机构15、阀帽安装机构16、预拧紧和加胶机构17、锁紧机构18、阀体阀帽上料机器人19沿圆盘式可转动工作台10的圆周方向围成一圈,且按先后顺序分别对应一个工位。Side sealing ring filling mechanism 11, side screw cap and valve stem loading robot 12, side screw cap tightening device 13, valve ball installation mechanism 15, valve cap installation mechanism 16, pre-tightening and glue adding mechanism 17, locking mechanism 18 , The valve body and bonnet feeding robot 19 forms a circle along the circumferential direction of the disc-type rotatable workbench 10, and corresponds to a station respectively in sequence.
侧密封圈装填料机构11包括基座111和沿水平方向固定在基座上的气缸一112,气缸一112的气缸杆端部设置有推头,推头正对所对应工位上装夹的阀体一侧的阀杆孔。侧密封圈上料震动缸113将侧密封圈上料到气缸一112的气缸杆端部的推头上,然后推头通过气缸杆的伸缩运动将侧密封圈装入阀体的阀杆孔内。The side sealing ring filling mechanism 11 includes a base 111 and a cylinder one 112 fixed on the base along the horizontal direction. The end of the cylinder rod of the cylinder one 112 is provided with a push head, and the push head is facing the valve clamped on the corresponding station. Stem hole on body side. The side seal ring feeding vibration cylinder 113 feeds the side seal ring onto the push head at the end of the cylinder rod of cylinder one 112, and then the push head puts the side seal ring into the valve stem hole of the valve body through the telescopic movement of the cylinder rod .
侧螺盖和阀杆上料机器人12用来将阀杆装入到阀体的阀杆孔内,以及将侧螺盖装入到阀杆伸出阀杆孔的一端上;侧螺盖和阀杆分别由侧螺盖上料震动缸121和阀杆上料震动缸122实现上料。Side screw cap and valve stem loading robot 12 are used for valve stem is packed in the valve stem hole of valve body, and side screw cap is packed into on the end that valve stem stretches out valve stem hole; Side screw cap and valve The rod is loaded by the side screw cover feeding vibration cylinder 121 and the valve stem feeding vibration cylinder 122 respectively.
侧螺盖拧紧装置13包括第一拧紧机131和气缸二132。第一拧紧机131水平布置在所对应工位的侧边。气缸二132通过安装架一133沿竖直方向布置在所对应工位上的阀体夹具的正上方,且气缸二132的气缸杆的端部装有顶出头,气缸杆伸出从而带动顶出头进入所对应工位上装夹的阀体内,并顶住阀杆,将阀杆安装到位。此时,第一拧紧机131对侧螺盖进行预拧紧和拧紧,关于预拧紧和拧紧可参考现有技术。The side screw cap tightening device 13 includes a first tightening machine 131 and a second cylinder 132 . The first screwing machine 131 is horizontally arranged on the side of the corresponding station. Cylinder 2 132 is vertically arranged directly above the valve body fixture on the corresponding station through mounting frame 1 133, and the end of the cylinder rod of cylinder 2 132 is equipped with an ejector head, and the cylinder rod is stretched out to drive the ejector head Enter the valve body clamped on the corresponding station, and withstand the valve stem, and install the valve stem in place. At this time, the first tightening machine 131 performs pre-tightening and tightening on the side screw cap, and the prior art can be referred to for the pre-tightening and tightening.
阀球上料机器人14和阀球安装机构15位于同一工位,此工位完成阀球的装入和压紧。阀球安装机构15包括气缸三151,气缸三151通过安装架二沿竖直方向布置在所对应工位上的阀体夹具的正上方,并且气缸三151的气缸杆的底部装有压紧头。阀球上料机器人14的夹具部分含有两个相对设置的机械加持手指141,在动力驱动下,做张合动作,从而夹住阀球将其装入到阀体内,然后气缸三151的气缸杆伸出从而带动压紧头进入所对应工位上的阀体夹具装夹的阀体内,并压紧阀球,使阀球的缺口与阀杆配合。The valve ball feeding robot 14 and the valve ball installation mechanism 15 are located at the same station, and this station completes the loading and compression of the valve ball. The valve ball installation mechanism 15 includes a cylinder three 151, and the cylinder three 151 is vertically arranged directly above the valve body fixture on the corresponding station through the installation frame two, and the bottom of the cylinder rod of the cylinder three 151 is equipped with a compression head . The clamp part of the valve ball loading robot 14 contains two oppositely arranged mechanical holding fingers 141, which are driven by power to perform opening and closing actions, thereby clamping the valve ball and loading it into the valve body, and then the cylinder rod of the cylinder three 151 Stretch out so as to drive the compression head to enter the valve body clamped by the valve body fixture on the corresponding station, and compress the valve ball so that the gap of the valve ball fits with the valve stem.
阀帽安装机构16包括驱动模块161、气缸四162和夹持部件163。气缸四162沿水平方向连接在驱动模块161上,夹持部件163与气缸四162的气缸杆连接。气缸四162的气缸杆伸出,带动夹持部件163移动到所对应工位上阀帽夹具的上方;然后在驱动模块161作用下气缸四162沿竖直方向做下降运动,从而带动夹持部件163做下降运动而夹住阀帽;随后气缸四162的气缸杆缩回,带动夹持部件163移动到所对应工位上阀体夹具的上方,从而将阀帽放置到阀体上。The bonnet installation mechanism 16 includes a driving module 161 , a cylinder four 162 and a clamping part 163 . The fourth cylinder 162 is connected to the driving module 161 along the horizontal direction, and the clamping part 163 is connected to the cylinder rod of the fourth cylinder 162 . The cylinder rod of cylinder four 162 is stretched out, driving the clamping part 163 to move to the top of the bonnet fixture on the corresponding station; then under the action of the driving module 161, cylinder four 162 makes a downward movement in the vertical direction, thereby driving the clamping part 163 makes a downward movement to clamp the bonnet; then the cylinder rod of cylinder 4 162 retracts, driving the clamping part 163 to move to the top of the valve body fixture on the corresponding station, thereby placing the bonnet on the valve body.
预拧紧和加胶机构17用于将阀帽和阀体进行预拧紧,以及在预拧紧的同时,向阀帽和阀体的螺纹连接处加注入胶水,从而保证球阀的密封性。预拧紧和加胶机构17包括支架171、第二拧紧机172、针筒和气缸五。第二拧紧机172设置在支架171的上部,且第二拧紧机172的旋紧头正对所对应工位上的阀体夹具。针筒和气缸五连接,气缸五水平设置在支架171下部,针筒的出胶头正对所对应工位上阀体夹具上装夹的阀体的螺纹处,针筒在气缸五的带动下从而将胶水注入到阀帽和阀体的螺纹连接处。The pre-tightening and glue adding mechanism 17 is used for pre-tightening the bonnet and the valve body, and injecting glue into the threaded connection between the bonnet and the valve body while pre-tightening, so as to ensure the tightness of the ball valve. The pre-tightening and glue adding mechanism 17 includes a support 171, a second tightening machine 172, a syringe and a cylinder five. The second tightening machine 172 is arranged on the upper part of the bracket 171 , and the tightening head of the second tightening machine 172 is facing the valve body fixture on the corresponding station. The syringe is connected to the cylinder five, and the cylinder five is horizontally arranged at the lower part of the bracket 171. The glue outlet of the syringe is facing the thread of the valve body clamped on the valve body fixture on the corresponding station, and the needle cylinder is driven by the cylinder five so that Inject glue into the threaded connection of the bonnet and body.
锁紧机构18用于将阀帽在安装后将其旋紧,从而使阀帽与阀体不脱落。锁紧机构19的结构同去除针筒和气缸五的预拧紧和加胶机构17 的结构相同。至于拧紧机如何进行预拧紧和拧紧,可参考现有技术。The locking mechanism 18 is used to tighten the bonnet after installation, so that the bonnet and the valve body will not fall off. The structure of locking mechanism 19 is identical with the pre-tightening of removing needle cylinder and cylinder five and the structure of glue-adding mechanism 17. As for how the tightening machine performs pre-tightening and tightening, reference may be made to the prior art.
阀体阀帽上料机器人19采用四轴机器人,用来将组装完成的球阀从工位上取出,然后再将阀体和阀帽分别放到阀体夹具101和阀帽夹具102中。The valve body and bonnet loading robot 19 adopts a four-axis robot, which is used to take out the assembled ball valve from the station, and then put the valve body and bonnet into the valve body fixture 101 and the bonnet fixture 102 respectively.
本发明实施例一种全自动球阀组装设备的组装方法包括如下步骤:An assembly method of a fully automatic ball valve assembly device in an embodiment of the present invention includes the following steps:
(1) 侧密封圈上料震动缸113将侧密封圈上料到侧密封圈装填料机构11的推头上,推头在气缸一112的作用下将侧密封圈装进阀体夹具101装夹的阀体的侧阀杆孔内,工作台10转动一个工位;(1) The side sealing ring feeding vibration cylinder 113 feeds the side sealing ring to the push head of the side sealing ring filling mechanism 11, and the push head puts the side sealing ring into the valve body fixture 101 under the action of the cylinder one 112. In the side stem hole of the clamped valve body, the workbench 10 rotates one station;
(2) 侧螺盖和阀杆上料机器人12从阀杆上料震动缸122的出料口处取出阀杆,将阀杆从阀体上部端口装入到阀杆孔内,工作台10转动一个工位;(2) The side screw cap and valve stem loading robot 12 takes out the valve stem from the outlet of the valve stem feeding vibration cylinder 122, puts the valve stem into the valve stem hole from the upper port of the valve body, and the workbench 10 rotates a station;
(3) 侧螺盖拧紧装置13中的气缸二132的气缸杆端部的顶出头向下深入阀体,将阀杆安装到位,然后侧螺盖和阀杆上料机器人12从侧螺盖上料震动缸121的出料口处取出侧螺盖,将侧螺盖放置到阀杆上,此时第一拧紧机131对侧螺盖进行拧紧,工作台10转动一个工位;(3) The ejector head of the end of the cylinder rod of cylinder 2 132 in the side screw cap tightening device 13 goes deep into the valve body downwards, installs the valve stem in place, and then the side screw cap and the valve stem loading robot 12 are removed from the side screw cap. The side screw cap is taken out from the discharge port of the material vibrating cylinder 121, and the side screw cap is placed on the valve stem. At this time, the first tightening machine 131 tightens the side screw cap, and the workbench 10 rotates by one station;
(4) 阀球上料机器人14将阀球放置到阀体内,阀球安装机构15中气缸三151的气缸杆端部的压紧头伸入阀体,压紧阀球,使阀球的缺口和阀杆配合,工作台10转动一个工位;(4) The valve ball feeding robot 14 places the valve ball into the valve body, and the compression head at the end of the cylinder rod end of the cylinder three 151 in the valve ball installation mechanism 15 extends into the valve body to compress the valve ball so that the gap of the valve ball Cooperating with the valve stem, the workbench 10 rotates one station;
(5) 阀帽安装机构16的夹持部件163在气缸四162和驱动模块161的作用下,夹住阀帽,将阀帽放置到阀体上,工作台10转动一个工位;(5) The clamping part 163 of the bonnet installation mechanism 16 clamps the bonnet under the action of the cylinder 4 162 and the driving module 161, and places the bonnet on the valve body, and the workbench 10 rotates one station;
(6) 预拧紧和加胶机构17对阀帽和阀体进行预拧紧,以及在预拧紧的同时,向阀帽和阀体的螺纹连接处加注入胶水,工作台10转动一个工位;(6) The pre-tightening and glue adding mechanism 17 pre-tightens the bonnet and the valve body, and at the same time of pre-tightening, injects glue into the threaded connection between the bonnet and the valve body, and the workbench 10 rotates one station;
(7) 锁紧机构18对阀帽和阀体进行拧紧,工作台10转动一个工位;(7) The locking mechanism 18 tightens the bonnet and the valve body, and the workbench 10 rotates by one position;
(8) 阀体阀帽上料机器人19将组装完成的球阀从阀体夹具101上取出,随后将阀体和阀帽分别放到阀体夹具101和阀帽夹具102中。(8) The valve body and bonnet loading robot 19 takes out the assembled ball valve from the valve body fixture 101 , and then puts the valve body and bonnet into the valve body fixture 101 and bonnet fixture 102 respectively.
此外,需要说明的是,本说明书中所描述的具体实施例,其零、部件的形状、所取名称等可以不同,本说明书中所描述的以上内容仅仅是对本发明结构所作的举例说明。凡依据本发明专利构思所述的构造、特征及原理所做的等效变化或者简单变化,均包括于本发明专利的保护范围内。本发明所属技术领域的技术人员可以对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,只要不偏离本发明的结构或者超越本权利要求书所定义的范围,均应属于本发明的保护范围。In addition, it should be noted that the specific embodiments described in this specification may be different in parts, shapes and names of parts, and the above content described in this specification is only an illustration of the structure of the present invention. All equivalent changes or simple changes made according to the structure, features and principles described in the patent concept of the present invention are included in the protection scope of the patent of the present invention. Those skilled in the art to which the present invention belongs can make various modifications or supplements to the described specific embodiments or adopt similar methods to replace them, as long as they do not deviate from the structure of the present invention or exceed the scope defined in the claims. All should belong to the protection scope of the present invention.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710951719.7A CN107932055A (en) | 2017-10-13 | 2017-10-13 | A kind of full-automatic ball valve group installs standby and its assemble method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710951719.7A CN107932055A (en) | 2017-10-13 | 2017-10-13 | A kind of full-automatic ball valve group installs standby and its assemble method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107932055A true CN107932055A (en) | 2018-04-20 |
Family
ID=61935262
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710951719.7A Pending CN107932055A (en) | 2017-10-13 | 2017-10-13 | A kind of full-automatic ball valve group installs standby and its assemble method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107932055A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108437349A (en) * | 2018-05-21 | 2018-08-24 | 深圳市晶鼎包装材料有限公司 | A kind of dispensing needle head and its production equipment and its assemble method |
CN108544227A (en) * | 2018-05-24 | 2018-09-18 | 温州大学激光与光电智能制造研究院 | Ball valve automatic assembling production equipment |
CN109128816A (en) * | 2018-10-16 | 2019-01-04 | 邵玉刚 | A kind of bi-bit bi-pass screw-in cartridge valve automatic assembly equipment |
CN109702444A (en) * | 2018-12-15 | 2019-05-03 | 樊凌风 | A kind of ball valve automatic assembling device |
CN110227941A (en) * | 2019-07-17 | 2019-09-13 | 浙江元邦智能装备有限公司 | A kind of screw hole ball valve assembly machine of robot control |
CN111318880A (en) * | 2020-04-07 | 2020-06-23 | 许昌学院 | Full-automatic equipment of intelligence valve body |
CN112756967A (en) * | 2021-01-04 | 2021-05-07 | 浙江中德自控科技股份有限公司 | Semi-automatic ball valve assembly production line |
CN113829050A (en) * | 2021-10-12 | 2021-12-24 | 嘉兴达鼎自动化科技有限公司 | Automatic ball valve assembling equipment |
CN114851585A (en) * | 2022-07-07 | 2022-08-05 | 江苏信泰化工装备有限公司 | Automatic ball valve assembling mechanism |
CN115302446A (en) * | 2022-08-29 | 2022-11-08 | 芜湖弘度智能科技有限公司 | A kind of refrigerator quick-cooling plate processing device |
CN116852099A (en) * | 2023-07-28 | 2023-10-10 | 玉环伯特利医用模具有限公司 | Assembling equipment for medical three-way valve |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008261417A (en) * | 2007-04-11 | 2008-10-30 | Asahi Breweries Ltd | Valve assembly jig |
CN103753212A (en) * | 2014-01-26 | 2014-04-30 | 嘉兴艾迪西暖通科技有限公司 | Main machine of multi-station rotary ball valve assembly machine |
CN204277443U (en) * | 2014-12-06 | 2015-04-22 | 浙江华龙巨水科技股份有限公司 | The valve ball charging apparatus of ball valve group installation |
CN205950242U (en) * | 2016-07-29 | 2017-02-15 | 成都柯博特自动化科技有限公司 | Full -automatic disc type ball valve kludge |
-
2017
- 2017-10-13 CN CN201710951719.7A patent/CN107932055A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008261417A (en) * | 2007-04-11 | 2008-10-30 | Asahi Breweries Ltd | Valve assembly jig |
CN103753212A (en) * | 2014-01-26 | 2014-04-30 | 嘉兴艾迪西暖通科技有限公司 | Main machine of multi-station rotary ball valve assembly machine |
CN204277443U (en) * | 2014-12-06 | 2015-04-22 | 浙江华龙巨水科技股份有限公司 | The valve ball charging apparatus of ball valve group installation |
CN205950242U (en) * | 2016-07-29 | 2017-02-15 | 成都柯博特自动化科技有限公司 | Full -automatic disc type ball valve kludge |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108437349A (en) * | 2018-05-21 | 2018-08-24 | 深圳市晶鼎包装材料有限公司 | A kind of dispensing needle head and its production equipment and its assemble method |
CN108544227A (en) * | 2018-05-24 | 2018-09-18 | 温州大学激光与光电智能制造研究院 | Ball valve automatic assembling production equipment |
CN109128816A (en) * | 2018-10-16 | 2019-01-04 | 邵玉刚 | A kind of bi-bit bi-pass screw-in cartridge valve automatic assembly equipment |
CN109702444A (en) * | 2018-12-15 | 2019-05-03 | 樊凌风 | A kind of ball valve automatic assembling device |
CN110227941B (en) * | 2019-07-17 | 2024-02-23 | 浙江元邦智能装备有限公司 | Robot-controlled screw hole ball valve assembly machine |
CN110227941A (en) * | 2019-07-17 | 2019-09-13 | 浙江元邦智能装备有限公司 | A kind of screw hole ball valve assembly machine of robot control |
CN111318880A (en) * | 2020-04-07 | 2020-06-23 | 许昌学院 | Full-automatic equipment of intelligence valve body |
CN112756967A (en) * | 2021-01-04 | 2021-05-07 | 浙江中德自控科技股份有限公司 | Semi-automatic ball valve assembly production line |
CN113829050A (en) * | 2021-10-12 | 2021-12-24 | 嘉兴达鼎自动化科技有限公司 | Automatic ball valve assembling equipment |
CN113829050B (en) * | 2021-10-12 | 2025-01-28 | 浙江达鼎智能科技有限公司 | Ball valve automatic assembly equipment |
CN114851585A (en) * | 2022-07-07 | 2022-08-05 | 江苏信泰化工装备有限公司 | Automatic ball valve assembling mechanism |
CN115302446A (en) * | 2022-08-29 | 2022-11-08 | 芜湖弘度智能科技有限公司 | A kind of refrigerator quick-cooling plate processing device |
CN116852099A (en) * | 2023-07-28 | 2023-10-10 | 玉环伯特利医用模具有限公司 | Assembling equipment for medical three-way valve |
CN116852099B (en) * | 2023-07-28 | 2024-05-07 | 玉环伯特利医用模具有限公司 | Assembling equipment for medical three-way valve |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107932055A (en) | A kind of full-automatic ball valve group installs standby and its assemble method | |
CN207333799U (en) | Full-automatic ball valve assembly equipment | |
CN104015089B (en) | Clamp for automatically clamping and positioning flange | |
CN107940010A (en) | Full-automatic ball valve assembly equipment and its assembly method | |
CN103753212B (en) | A kind of multi-station turning formula ball valve assembly machine main frame | |
CN202825189U (en) | A sealing ring automatic assembly machine | |
CN106112529A (en) | Electromagnetic valve assembles equipment | |
CN207326402U (en) | A kind of full-automatic ball valve group installing is standby | |
CN108817910A (en) | High-precision electric toothbrush handle shell automatic assembling detection device | |
CN108817950B (en) | Pressure regulating piston assembling equipment | |
CN105058037A (en) | Nut locking machine for motor impeller and method for locking nut of nut locking machine | |
CN106112463A (en) | Electromagnetic valve assembles the nut feed mechanism of equipment | |
CN209583574U (en) | A kind of screw capping device for abnormal cup | |
CN2600213Y (en) | Elastic clamp for processing thin-wall cylinder | |
CN110625383A (en) | Hydraulic Valve Stem Assembly Machine | |
CN110315338A (en) | A kind of water purifier ball-cock assembly floating ball connector automatic assembly equipment | |
CN115055946B (en) | Automatic assembly line for cup cover sealing ring | |
CN204778730U (en) | Medicine bottle is spiral cover device in batches | |
CN104264122B (en) | Clamp for coating tapered surfaces of valve seats | |
CN209793079U (en) | Automatic ball valve assembling equipment | |
CN206702702U (en) | Camshaft cover clamp for machining | |
CN105414966A (en) | Automatic assembly equipment of water tank | |
CN208729123U (en) | The rotary installation assembly line of extinguisher valve | |
CN205551976U (en) | Carousel device of row's of plugging in kludge | |
CN203062008U (en) | Manual gear hob jig gland |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180420 |
|
RJ01 | Rejection of invention patent application after publication |