[go: up one dir, main page]

CN107906263A - Pipeline fixing device and air conditioner with same - Google Patents

Pipeline fixing device and air conditioner with same Download PDF

Info

Publication number
CN107906263A
CN107906263A CN201711171422.5A CN201711171422A CN107906263A CN 107906263 A CN107906263 A CN 107906263A CN 201711171422 A CN201711171422 A CN 201711171422A CN 107906263 A CN107906263 A CN 107906263A
Authority
CN
China
Prior art keywords
section
pipeline
fixing device
locking
pipeline fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711171422.5A
Other languages
Chinese (zh)
Inventor
张兴钰
陈志伟
陈英强
黎优霞
高智强
向新贤
刘鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201711171422.5A priority Critical patent/CN107906263A/en
Publication of CN107906263A publication Critical patent/CN107906263A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/22Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals
    • F16L3/237Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals for two pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The invention provides a pipeline fixing device and an air conditioner with the same, wherein the pipeline fixing device comprises: the mounting mechanism is provided with a containing hole for containing a pipeline; a locking assembly at least partially wrapped around a circumferential outer edge of the mounting mechanism; the locking assembly comprises a free end and a fixed end, and the free end is connected with the fixed end in a clamping mode. The pipeline fixing device solves the problem of low pipeline fixing efficiency in the prior art.

Description

管路固定装置及具有其的空调器Pipeline fixing device and air conditioner with same

技术领域technical field

本发明涉及空调器领域,具体而言,涉及一种管路固定装置及具有其的空调器。The invention relates to the field of air conditioners, in particular to a pipeline fixing device and an air conditioner having the same.

背景技术Background technique

空调在运行时,管路由于振动较大,需采用固定结构增加其运行时的稳定性。现阶段管路固定方式有两种:When the air conditioner is running, the pipelines vibrate greatly, so a fixed structure is required to increase the stability of the pipeline during operation. There are two ways to fix the pipeline at this stage:

1、采用橡胶块加线扎的组合方式,将橡胶块与管路固定后,采用线扎捆绑固定,固定完后还需将线扎剪掉,生产效率低下。1. The combination of rubber blocks and wire ties is adopted. After fixing the rubber blocks and pipelines, they are bound and fixed with wire ties. After fixing, the wire ties need to be cut off, which leads to low production efficiency.

2、采用管夹的形式,这种方式由于管夹是塑料件,管路一直在振动,这样塑料件与管路接触的过程中,存在磨管的问题,会引起管路的磨损甚至破裂。2. Adopt the form of pipe clamp. In this way, since the pipe clamp is a plastic part, the pipeline is always vibrating. In the process of contacting the plastic part with the pipeline, there is a problem of grinding the pipe, which will cause wear or even rupture of the pipeline.

发明内容Contents of the invention

本发明的主要目的在于提供一种管路固定装置及具有其的空调器,以解决现有技术中的管路固定效率较低的问题。The main purpose of the present invention is to provide a pipeline fixing device and an air conditioner having the same, so as to solve the problem of low pipeline fixing efficiency in the prior art.

为了实现上述目的,根据本发明的一个方面,提供了一种管路固定装置,包括:安装机构,安装机构上设置有用于容纳管路的容纳孔;锁紧组件,锁紧组件的至少部分包裹在安装机构的周向外边缘;其中,锁紧组件包括自由端和固定端,自由端与固定端卡接。In order to achieve the above object, according to one aspect of the present invention, a pipeline fixing device is provided, including: a mounting mechanism, which is provided with an accommodating hole for accommodating the pipeline; a locking component, at least partially wrapped by the locking component On the peripheral outer edge of the installation mechanism; wherein, the locking component includes a free end and a fixed end, and the free end is engaged with the fixed end.

进一步地,自由端为卡钩,固定端为卡扣;或自由端为卡扣,固定端为卡钩。Further, the free end is a hook and the fixed end is a buckle; or the free end is a buckle and the fixed end is a hook.

进一步地,锁紧组件还包括:锁紧本体,锁紧本体包裹至少部分的安装机构的外边缘,固定端位于锁紧本体的第一端;卡接本体,卡接本体的第一端与锁紧本体的第二端相连接,自由端位于卡接本体的第二端。Further, the locking assembly also includes: a locking body, the locking body wraps at least part of the outer edge of the installation mechanism, and the fixed end is located at the first end of the locking body; a clamping body, the first end of the clamping body and the lock The second ends of the tightening body are connected, and the free end is located at the second end of the clamping body.

进一步地,卡接本体可转动地设置在锁紧本体上。Further, the locking body is rotatably arranged on the locking body.

进一步地,卡接本体与锁紧本体一体成型。Further, the clamping body and the locking body are integrally formed.

进一步地,安装机构上设置有避让孔,避让孔与容纳孔相连通,避让孔用于供管路通过。Further, the mounting mechanism is provided with an avoidance hole, which communicates with the receiving hole, and the avoidance hole is used for passage of pipelines.

进一步地,容纳孔为圆形孔,避让孔为锥形孔,避让孔沿安装机构的径向方向逐渐扩大。Further, the receiving hole is a circular hole, the escape hole is a tapered hole, and the escape hole gradually expands along the radial direction of the installation mechanism.

进一步地,卡接本体具有遮挡避让孔的第一位置,和打开避让孔供管路通过的第二位置。Further, the clamping body has a first position for blocking the avoidance hole, and a second position for opening the avoidance hole for pipelines to pass through.

进一步地,卡接本体上设置有第一连接部,安装机构上设置有第二连接部,第一连接部与第二连接部可拆卸地相连接。Further, a first connection part is provided on the clamping body, a second connection part is provided on the installation mechanism, and the first connection part and the second connection part are detachably connected.

进一步地,第一连接部为凸起,第二连接部为凹槽;或,第一连接部为凹槽,第二连接部为凸起。Further, the first connecting part is a protrusion, and the second connecting part is a groove; or, the first connecting part is a groove, and the second connecting part is a protrusion.

进一步地,锁紧本体和卡接本体均为多个,各个锁紧本体与相应的卡接本体相连接,锁紧组件还包括:连接本体,连接本体的两端均连接有锁紧本体和相应的卡接本体。Further, there are multiple locking bodies and clamping bodies, and each locking body is connected to a corresponding clamping body, and the locking assembly also includes: a connecting body, and both ends of the connecting body are connected with locking bodies and corresponding locking bodies. snap-in body.

进一步地,锁紧组件还包括:固定部,固定部的第一端与锁紧本体相连接,固定部的第二端与用于固定管路的隔板相连接。Further, the locking assembly further includes: a fixing part, a first end of the fixing part is connected to the locking body, and a second end of the fixing part is connected to a partition for fixing the pipeline.

进一步地,固定部包括:连接段,连接段的第一端与锁紧本体相连接;固定段,固定段与连接段的第二端相连接,固定段与隔板相卡接。Further, the fixing part includes: a connecting section, the first end of which is connected to the locking body;

进一步地,连接段包括:第一连接段,第一连接段的第一端与锁紧本体相连接,第一连接段为圆柱段;第二连接段,第二连接段的第一端与第一连接段的第二端相连接,第二连接段为圆柱段;第三连接段,第三连接段的第一端与第二连接段的第二端相连接,第三连接段的第二端与隔板相抵接,第三连接段为圆锥段。Further, the connection section includes: a first connection section, the first end of the first connection section is connected to the locking body, and the first connection section is a cylindrical section; the second connection section, the first end of the second connection section is connected to the first The second end of a connection section is connected, and the second connection section is a cylindrical section; the third connection section, the first end of the third connection section is connected with the second end of the second connection section, and the second end of the third connection section is connected to the second end of the second connection section. The end is in contact with the partition, and the third connecting section is a conical section.

进一步地,固定段包括:第一固定段的第一端与连接段相连接;第二固定段,第二固定段与第一固定段的第二端相连接,第二固定段的至少部分与隔板相抵接,其中,第二固定段为V形结构或为U形结构。Further, the fixed section includes: the first end of the first fixed section is connected to the connecting section; the second fixed section is connected to the second end of the first fixed section, and at least part of the second fixed section is connected to the connecting section. The partitions are abutted against each other, wherein the second fixing section is a V-shaped structure or a U-shaped structure.

进一步地,第二固定段的至少部分可压缩地设置,以使第二固定段具有穿过隔板的安装孔的第三位置,和穿过安装孔后与隔板相抵接的第四位置。Further, at least part of the second fixing section is configured to be compressible, so that the second fixing section has a third position passing through the installation hole of the partition, and a fourth position abutting against the partition after passing through the installation hole.

进一步地,安装机构与锁紧组件一体成型。Further, the mounting mechanism is integrally formed with the locking assembly.

根据本发明的另一方面,提供了一种空调器,包括管路固定装置、管路和隔板,管路固定装置为上述的管路固定装置。According to another aspect of the present invention, an air conditioner is provided, including a pipeline fixing device, a pipeline and a partition, and the pipeline fixing device is the above pipeline fixing device.

本发明的管路固定装置通过安装机构与锁紧组件能够实现对管路的快速固定。其中,安装机构上设置有用于容纳管路的容纳孔,锁紧组件的至少部分包裹在安装机构的周向外边缘,锁紧组件包括自由端和固定端。在具体固定时,将管路放置在容纳孔内,将锁紧组件的自由端和固定端卡接,以此将管路固定在容纳孔内,完成了对管路的固定,从而解决了现有技术中的管路固定效率较低的问题。The pipeline fixing device of the present invention can quickly fix the pipeline through the installation mechanism and the locking assembly. Wherein, the installation mechanism is provided with accommodating holes for accommodating pipelines, at least part of the locking assembly wraps around the peripheral outer edge of the installation mechanism, and the locking assembly includes a free end and a fixed end. When fixing, the pipeline is placed in the receiving hole, and the free end and the fixed end of the locking assembly are snapped together, so that the pipeline is fixed in the receiving hole, and the fixing of the pipeline is completed, thus solving the current problem. There is a problem that the pipe fixing efficiency in the technique is low.

附图说明Description of drawings

构成本申请的一部分的说明书附图用来提供对本发明的进一步理解,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定。在附图中:The accompanying drawings constituting a part of the present application are used to provide a further understanding of the present invention, and the schematic embodiments and descriptions of the present invention are used to explain the present invention, and do not constitute an improper limitation of the present invention. In the attached picture:

图1示出了根据本发明的管路固定装置的第一种实施例的结构示意图;FIG. 1 shows a schematic structural view of a first embodiment of a pipeline fixing device according to the present invention;

图2示出了图1中的管路固定装置的纵向剖面结构示意图;Fig. 2 shows a schematic diagram of a longitudinal sectional structure of the pipeline fixing device in Fig. 1;

图3示出了图1中的管路固定装置的横向剖面结构示意图;Fig. 3 shows a schematic diagram of a transverse cross-sectional structure of the pipeline fixing device in Fig. 1;

图4示出了根据本发明的管路固定装置的安装机构的结构示意图;Fig. 4 shows a schematic structural view of the installation mechanism of the pipeline fixing device according to the present invention;

图5示出了根据本发明的管路固定装置的第二种实施例的结构示意图;Fig. 5 shows a schematic structural view of a second embodiment of the pipeline fixing device according to the present invention;

图6示出了图5中的管路固定装置的纵向剖面结构示意图。Fig. 6 shows a schematic view of the longitudinal section structure of the pipeline fixing device in Fig. 5 .

其中,上述附图包括以下附图标记:Wherein, the above-mentioned accompanying drawings include the following reference signs:

10、安装机构;11、容纳孔;12、避让孔;13、第二连接部;20、锁紧组件;21、自由端;22、固定端;23、锁紧本体;24、卡接本体;241、第一连接部;25、连接本体;26、固定部;261、连接段;2611、第一连接段;2612、第二连接段;2613、第三连接段;262、固定段;2621、第一固定段;2622、第二固定段;30、管路;40、隔板;41、安装孔。10. Installation mechanism; 11. Accommodating hole; 12. Avoidance hole; 13. Second connecting part; 20. Locking component; 21. Free end; 22. Fixed end; 23. Locking body; 24. Clamping body; 241. The first connection part; 25. The connection body; 26. The fixed part; 261. The connection section; 2611. The first connection section; 2612. The second connection section; 2613. The third connection section; 262. The fixed section; The first fixed section; 2622, the second fixed section; 30, the pipeline; 40, the clapboard; 41, the installation hole.

具体实施方式Detailed ways

需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。下面将参考附图并结合实施例来详细说明本发明。It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and examples.

本发明提供了一种管路固定装置,请参考图1至图3,管路固定装置包括:安装机构10,安装机构10上设置有用于容纳管路30的容纳孔11;锁紧组件20,锁紧组件20的至少部分包裹在安装机构10的周向外边缘;其中,锁紧组件20包括自由端21和固定端22,自由端21与固定端22卡接。The present invention provides a pipeline fixing device, please refer to FIG. 1 to FIG. 3 , the pipeline fixing device includes: a mounting mechanism 10, which is provided with an accommodating hole 11 for accommodating a pipeline 30; a locking assembly 20, At least a part of the locking component 20 wraps around the peripheral outer edge of the installation mechanism 10 ; wherein, the locking component 20 includes a free end 21 and a fixed end 22 , and the free end 21 is engaged with the fixed end 22 .

本发明的管路固定装置通过安装机构10与锁紧组件20能够实现对管路30的快速固定。其中,安装机构10上设置有用于容纳管路30的容纳孔11,锁紧组件20的至少部分包裹在安装机构10的周向外边缘,锁紧组件20包括自由端21和固定端22。在具体固定时,将管路30放置在容纳孔11内,将锁紧组件20的自由端21和固定端22卡接,以此将管路30固定在容纳孔11内,完成了对管路30的固定,从而解决了现有技术中的管路固定效率较低的问题。The pipeline fixing device of the present invention can quickly fix the pipeline 30 through the installation mechanism 10 and the locking assembly 20 . Wherein, the installation mechanism 10 is provided with a receiving hole 11 for accommodating the pipeline 30 , at least part of the locking assembly 20 wraps around the peripheral outer edge of the installation mechanism 10 , and the locking assembly 20 includes a free end 21 and a fixed end 22 . During specific fixing, the pipeline 30 is placed in the receiving hole 11, and the free end 21 and the fixed end 22 of the locking assembly 20 are snapped together, so that the pipeline 30 is fixed in the receiving hole 11, and the alignment of the pipeline is completed. 30, thereby solving the problem of low pipeline fixing efficiency in the prior art.

为了实现自由端21与固定端22的卡接,自由端21为卡钩,固定端22为卡扣;或自由端21为卡扣,固定端22为卡钩。In order to realize the clip connection between the free end 21 and the fixed end 22, the free end 21 is a hook and the fixed end 22 is a buckle; or the free end 21 is a buckle and the fixed end 22 is a hook.

在本实施例中,可选地,自由端21为卡钩,固定端22为卡扣。In this embodiment, optionally, the free end 21 is a hook, and the fixed end 22 is a buckle.

可选地,自由端21为卡扣,固定端22为卡钩。Optionally, the free end 21 is a buckle, and the fixed end 22 is a hook.

针对锁紧组件20的具体结构,如图2所所示,锁紧组件20还包括:锁紧本体23,锁紧本体23包裹至少部分的安装机构10的外边缘,固定端22位于锁紧本体23的第一端;卡接本体24,卡接本体24的第一端与锁紧本体23的第二端相连接,自由端21位于卡接本体24的第二端。Regarding the specific structure of the locking assembly 20, as shown in Figure 2, the locking assembly 20 also includes: a locking body 23, the locking body 23 wraps at least part of the outer edge of the installation mechanism 10, and the fixed end 22 is located on the locking body The first end of 23; the clamping body 24, the first end of the clamping body 24 is connected with the second end of the locking body 23, and the free end 21 is located at the second end of the clamping body 24.

在本实施例中,锁紧组件20由锁紧本体23和卡接本体24组成,其中,锁紧本体23包裹至少部分的安装机构10的外边缘,固定端22位于锁紧本体23的第一端,卡接本体24的第一端与锁紧本体23的第二端相连接,自由端21位于卡接本体24的第二端。在具体安装过程中,通过自由端21和固定端22卡接实现了锁紧本体23和卡接本体24的锁紧。In this embodiment, the locking assembly 20 is composed of a locking body 23 and a clamping body 24, wherein the locking body 23 wraps at least part of the outer edge of the installation mechanism 10, and the fixed end 22 is located on the first side of the locking body 23. The first end of the locking body 24 is connected to the second end of the locking body 23 , and the free end 21 is located at the second end of the locking body 24 . During the specific installation process, the locking of the locking body 23 and the snapping body 24 is realized by snapping the free end 21 and the fixed end 22 .

为了能够保证管路30穿设在容纳孔11内,卡接本体24可转动地设置在锁紧本体23上。In order to ensure that the pipeline 30 passes through the receiving hole 11 , the locking body 24 is rotatably disposed on the locking body 23 .

为了方便加工,卡接本体24与锁紧本体23一体成型。In order to facilitate processing, the clamping body 24 and the locking body 23 are integrally formed.

为了方便管路30穿设在容纳孔11内,如图4所示,安装机构10上设置有避让孔12,避让孔12与容纳孔11相连通,避让孔12用于供管路30通过。In order to facilitate the passage of the pipeline 30 in the receiving hole 11, as shown in FIG.

在本实施例中,通过在安装机构10上设置有避让孔12,其中,避让孔12与容纳孔11相连通,在安装管路30时,管路通过避让孔12然后安装在容纳孔11内。In this embodiment, by setting the avoidance hole 12 on the installation mechanism 10, wherein the avoidance hole 12 communicates with the accommodation hole 11, when the pipeline 30 is installed, the pipeline passes through the avoidance hole 12 and is then installed in the accommodation hole 11 .

优选地,容纳孔11为圆形孔,避让孔12为锥形孔,避让孔12沿安装机构10的径向方向逐渐扩大。Preferably, the receiving hole 11 is a circular hole, the escape hole 12 is a tapered hole, and the escape hole 12 gradually expands along the radial direction of the installation mechanism 10 .

在本实施例中,避让孔12为锥形孔,避让孔12的小孔端与容纳孔11相连通,避让孔12的大孔端朝向卡接本体24。In this embodiment, the escape hole 12 is a tapered hole, the small hole end of the avoidance hole 12 communicates with the receiving hole 11 , and the large hole end of the avoidance hole 12 faces the clamping body 24 .

针对避让孔12的打开与闭合方式,卡接本体24具有遮挡避让孔12的第一位置,和打开避让孔12供管路30通过的第二位置。With regard to the opening and closing modes of the avoidance hole 12 , the clamping body 24 has a first position for blocking the avoidance hole 12 and a second position for opening the escape hole 12 for the pipeline 30 to pass through.

在本实施例中,卡接本体24可转动地设置在锁紧本体23上,从而使得卡接本体24具有遮挡避让孔12的第一位置,和打开避让孔12供管路30通过的第二位置。In this embodiment, the clamping body 24 is rotatably arranged on the locking body 23, so that the clamping body 24 has a first position for blocking the escape hole 12, and a second position for opening the avoidance hole 12 for the pipeline 30 to pass through. Location.

针对卡接本体24和安装机构10的连接方式,如图2所示,卡接本体24上设置有第一连接部241,安装机构10上设置有第二连接部13,第一连接部241与第二连接部13可拆卸地相连接。Regarding the connection mode between the clamping body 24 and the mounting mechanism 10, as shown in FIG. The second connecting part 13 is detachably connected.

在本实施例中,通过在卡接本体24上设置有第一连接部241,安装机构10上设置有第二连接部13,通过将第一连接部241与第二连接部13可拆卸地相连接,从而能够使得卡接本体24具有遮挡避让孔12的第一位置,和打开避让孔12供管路30通过的第二位置。In this embodiment, the first connection part 241 is provided on the clamping body 24, and the second connection part 13 is provided on the installation mechanism 10, and the first connection part 241 is detachably connected to the second connection part 13. connected, so that the clamping body 24 can have a first position that blocks the escape hole 12, and a second position that opens the escape hole 12 for the pipeline 30 to pass through.

优选地,第一连接部241为凸起,第二连接部13为凹槽;或,第一连接部241为凹槽,第二连接部13为凸起。Preferably, the first connecting portion 241 is a protrusion, and the second connecting portion 13 is a groove; or, the first connecting portion 241 is a groove, and the second connecting portion 13 is a protrusion.

为了方便加工,安装机构10与锁紧组件20一体成型。In order to facilitate processing, the mounting mechanism 10 and the locking assembly 20 are integrally formed.

可选地,卡接本体24与锁紧本体23铰接。Optionally, the locking body 24 is hinged to the locking body 23 .

针对管路固定装置的第一种实施例:For the first embodiment of the pipeline fixing device:

考虑到管路固定装置可以同时固定多个管路30,如图1和图2所示,锁紧本体23和卡接本体24均为多个,各个锁紧本体23与相应的卡接本体24相连接,锁紧组件20还包括:连接本体25,连接本体25的两端均连接有锁紧本体23和相应的卡接本体24。Considering that the pipeline fixing device can fix multiple pipelines 30 at the same time, as shown in FIG. 1 and FIG. In connection with each other, the locking assembly 20 further includes: a connecting body 25 , and both ends of the connecting body 25 are connected with a locking body 23 and a corresponding locking body 24 .

在本实施例中,通过将锁紧本体23和卡接本体24均设置为多个,其中,各个锁紧本体23与相应的卡接本体24相连接。通过在锁紧组件20上设置有连接本体25,连接本体25的两端均连接有锁紧本体23和相应的卡接本体24,从而能够通过一个连接本体25连接两个锁紧本体23。In this embodiment, multiple locking bodies 23 and snapping bodies 24 are provided, wherein each locking body 23 is connected to a corresponding snapping body 24 . By providing a connecting body 25 on the locking assembly 20 , both ends of the connecting body 25 are connected with a locking body 23 and a corresponding locking body 24 , so that two locking bodies 23 can be connected through one connecting body 25 .

优选地,锁紧本体23和卡接本体24均为两个。Preferably, there are two locking bodies 23 and snapping bodies 24 .

具体地,安装机构10为圆形橡胶护套,前后位置设置有大于圆形基体的两个挡片,用于橡胶护套的前后限位。第一连接部241用于橡胶护套的止转。避让孔12的尺寸小于管路30的管径,可以将管路卡紧。Specifically, the mounting mechanism 10 is a circular rubber sheath, and two baffles larger than the circular base are provided at the front and rear positions for the front and rear positioning of the rubber sheath. The first connecting portion 241 is used for the anti-rotation of the rubber sheath. The size of the avoidance hole 12 is smaller than the pipe diameter of the pipeline 30, which can clamp the pipeline.

锁紧组件20为塑料夹,包括卡接本体24,卡接本体24为波浪纹锁紧带和薄壁韧带组成,连接本体25为连接肋片。The locking component 20 is a plastic clip, including a clamping body 24, the clamping body 24 is composed of a corrugated locking belt and a thin-walled ligament, and the connecting body 25 is a connecting rib.

装配时,由于橡胶护套具有弹性,捏紧第二连接部13,将安装机构10放入锁紧组件20的圆孔中,管路30沿橡胶护套的避让孔12进入容纳孔11,待管路30进入容纳孔11后,用手按压波浪纹锁紧带,依靠薄壁韧带的变形,使得卡钩与卡扣配合锁紧橡胶护套。此时,塑料夹的止转筋与橡胶护套的第二连接部13贴合,橡胶护套的转动便被限制。When assembling, due to the elasticity of the rubber sheath, pinch the second connecting part 13 tightly, put the installation mechanism 10 into the round hole of the locking assembly 20, and the pipeline 30 enters the accommodation hole 11 along the avoidance hole 12 of the rubber sheath, and waits After the pipeline 30 enters the receiving hole 11, the wave pattern locking belt is pressed by hand, relying on the deformation of the thin-walled ligament, so that the hook and the buckle cooperate to lock the rubber sheath. At this time, the anti-rotation ribs of the plastic clip are attached to the second connecting portion 13 of the rubber sheath, and the rotation of the rubber sheath is restricted.

针对管路固定装置的第二种实施例:For the second embodiment of the pipeline fixing device:

为了实现对管路固定装置的固定,如图5和图6所示,锁紧组件20还包括:固定部26,固定部26的第一端与锁紧本体23相连接,固定部26的第二端与用于固定管路30的隔板40相连接。In order to realize the fixing of the pipeline fixing device, as shown in Figure 5 and Figure 6, the locking assembly 20 further includes: a fixing part 26, the first end of the fixing part 26 is connected with the locking body 23, and the first end of the fixing part 26 The two ends are connected with the partition plate 40 for fixing the pipeline 30 .

优选地,固定部26包括:连接段261,连接段261的第一端与锁紧本体23相连接;固定段262,固定段262与连接段261的第二端相连接,固定段262与隔板40相卡接。Preferably, the fixing part 26 includes: a connecting section 261, the first end of which is connected to the locking body 23; a fixing section 262, which is connected to the second end of the connecting section 261, and which is connected to the partition The plates 40 are snapped together.

优选地,连接段261包括:第一连接段2611,第一连接段2611的第一端与锁紧本体23相连接,第一连接段2611为圆柱段;第二连接段2612,第二连接段2612的第一端与第一连接段2611的第二端相连接,第二连接段2612为圆柱段;第三连接段2613,第三连接段2613的第一端与第二连接段2612的第二端相连接,第三连接段2613的第二端与隔板40相抵接,第三连接段2613为圆锥段。Preferably, the connection section 261 includes: a first connection section 2611, the first end of the first connection section 2611 is connected to the locking body 23, the first connection section 2611 is a cylinder section; the second connection section 2612, the second connection section The first end of 2612 is connected with the second end of the first connection section 2611, and the second connection section 2612 is a cylindrical section; the third connection section 2613, the first end of the third connection section 2613 is connected with the second end of the second connection section 2612 The two ends are connected, the second end of the third connecting section 2613 abuts against the partition plate 40 , and the third connecting section 2613 is a conical section.

优选地,固定段262包括:第一固定段2621的第一端与连接段261相连接;第二固定段2622,第二固定段2622与第一固定段2621的第二端相连接,第二固定段2622的至少部分与隔板40相抵接,其中,第二固定段2622为V形结构或为U形结构。Preferably, the fixing section 262 includes: the first end of the first fixing section 2621 is connected to the connecting section 261; the second fixing section 2622 is connected to the second end of the first fixing section 2621, and the second At least part of the fixing section 2622 abuts against the partition 40 , wherein the second fixing section 2622 is a V-shaped structure or a U-shaped structure.

优选地,第二固定段2622的至少部分可压缩地设置,以使第二固定段2622具有穿过隔板40的安装孔41的第三位置,和穿过安装孔41后与隔板40相抵接的第四位置。Preferably, at least part of the second fixing section 2622 is configured to be compressible, so that the second fixing section 2622 has a third position passing through the installation hole 41 of the partition 40 , and abuts against the partition 40 after passing through the installation hole 41 Take the fourth position.

具体的,管路固定装置用于固定单个管路30时,隔板40上设有安装孔41,管路30通过管路固定装置与隔板40连接。Specifically, when the pipeline fixing device is used to fix a single pipeline 30 , the partition 40 is provided with a mounting hole 41 , and the pipeline 30 is connected to the partition 40 through the pipeline fixing device.

本发明还提供了一种空调器,包括管路固定装置、管路30和隔板40,管路固定装置为上述的管路固定装置。The present invention also provides an air conditioner, including a pipeline fixing device, a pipeline 30 and a partition 40, and the pipeline fixing device is the above-mentioned pipeline fixing device.

从以上的描述中,可以看出,本发明上述的实施例实现了如下技术效果:From the above description, it can be seen that the above-mentioned embodiments of the present invention have achieved the following technical effects:

本发明的管路固定装置通过安装机构10与锁紧组件20能够实现对管路30的快速固定。其中,安装机构10上设置有用于容纳管路30的容纳孔11,锁紧组件20的至少部分包裹在安装机构10的周向外边缘,锁紧组件20包括自由端21和固定端22。在具体固定时,将管路30放置在容纳孔11内,将锁紧组件20的自由端21和固定端22卡接,以此将管路30固定在容纳孔11内,完成了对管路30的固定,从而解决了现有技术中的管路固定效率较低的问题。The pipeline fixing device of the present invention can quickly fix the pipeline 30 through the installation mechanism 10 and the locking assembly 20 . Wherein, the installation mechanism 10 is provided with a receiving hole 11 for accommodating the pipeline 30 , at least part of the locking assembly 20 wraps around the peripheral outer edge of the installation mechanism 10 , and the locking assembly 20 includes a free end 21 and a fixed end 22 . During specific fixing, the pipeline 30 is placed in the receiving hole 11, and the free end 21 and the fixed end 22 of the locking assembly 20 are snapped together, so that the pipeline 30 is fixed in the receiving hole 11, and the alignment of the pipeline is completed. 30, thereby solving the problem of low pipeline fixing efficiency in the prior art.

以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.

Claims (18)

1.一种管路固定装置,其特征在于,包括:1. A pipeline fixing device, characterized in that, comprising: 安装机构(10),所述安装机构(10)上设置有用于容纳管路(30)的容纳孔(11);An installation mechanism (10), the installation mechanism (10) is provided with accommodating holes (11) for accommodating pipelines (30); 锁紧组件(20),所述锁紧组件(20)的至少部分包裹在所述安装机构(10)的周向外边缘;a locking component (20), at least part of the locking component (20) is wrapped around the peripheral outer edge of the installation mechanism (10); 其中,所述锁紧组件(20)包括自由端(21)和固定端(22),所述自由端(21)与所述固定端(22)卡接。Wherein, the locking assembly (20) includes a free end (21) and a fixed end (22), and the free end (21) is engaged with the fixed end (22). 2.根据权利要求1所述的管路固定装置,其特征在于,所述自由端(21)为卡钩,所述固定端(22)为卡扣;或所述自由端(21)为卡扣,所述固定端(22)为卡钩。2. The pipeline fixing device according to claim 1, characterized in that, the free end (21) is a hook, and the fixed end (22) is a buckle; or the free end (21) is a snap Buckle, the fixed end (22) is a hook. 3.根据权利要求1所述的管路固定装置,其特征在于,所述锁紧组件(20)还包括:3. The pipeline fixing device according to claim 1, characterized in that, the locking assembly (20) further comprises: 锁紧本体(23),所述锁紧本体(23)包裹至少部分的所述安装机构(10)的外边缘,所述固定端(22)位于所述锁紧本体(23)的第一端;A locking body (23), the locking body (23) wraps at least part of the outer edge of the installation mechanism (10), the fixed end (22) is located at the first end of the locking body (23) ; 卡接本体(24),所述卡接本体(24)的第一端与所述锁紧本体(23)的第二端相连接,所述自由端(21)位于所述卡接本体(24)的第二端。A clamping body (24), the first end of the clamping body (24) is connected to the second end of the locking body (23), and the free end (21) is located at the clamping body (24 ) at the second end. 4.根据权利要求3所述的管路固定装置,其特征在于,所述卡接本体(24)可转动地设置在所述锁紧本体(23)上。4. The pipeline fixing device according to claim 3, characterized in that, the clamping body (24) is rotatably arranged on the locking body (23). 5.根据权利要求3所述的管路固定装置,其特征在于,所述卡接本体(24)与所述锁紧本体(23)一体成型。5. The pipeline fixing device according to claim 3, characterized in that, the clamping body (24) and the locking body (23) are integrally formed. 6.根据权利要求3所述的管路固定装置,其特征在于,所述安装机构(10)上设置有避让孔(12),所述避让孔(12)与所述容纳孔(11)相连通,所述避让孔(12)用于供所述管路(30)通过。6. The pipeline fixing device according to claim 3, characterized in that, the installation mechanism (10) is provided with an avoidance hole (12), and the avoidance hole (12) is connected with the accommodation hole (11) The avoidance hole (12) is used for passing the pipeline (30). 7.根据权利要求6所述的管路固定装置,其特征在于,所述容纳孔(11)为圆形孔,所述避让孔(12)为锥形孔,所述避让孔(12)沿所述安装机构(10)的径向方向逐渐扩大。7. The pipeline fixing device according to claim 6, characterized in that, the accommodating hole (11) is a circular hole, the avoidance hole (12) is a tapered hole, and the avoidance hole (12) is along the The radial direction of the mounting mechanism (10) gradually expands. 8.根据权利要求6所述的管路固定装置,其特征在于,所述卡接本体(24)具有遮挡所述避让孔(12)的第一位置,和打开所述避让孔(12)供所述管路(30)通过的第二位置。8. The pipeline fixing device according to claim 6, characterized in that, the clamping body (24) has a first position for blocking the avoidance hole (12), and opens the avoidance hole (12) for The second location through which the conduit (30) passes. 9.根据权利要求3所述的管路固定装置,其特征在于,所述卡接本体(24)上设置有第一连接部(241),所述安装机构(10)上设置有第二连接部(13),所述第一连接部(241)与所述第二连接部(13)可拆卸地相连接。9. The pipeline fixing device according to claim 3, characterized in that a first connection part (241) is provided on the clamping body (24), and a second connection part (241) is provided on the installation mechanism (10) part (13), the first connecting part (241) is detachably connected to the second connecting part (13). 10.根据权利要求9所述的管路固定装置,其特征在于,所述第一连接部(241)为凸起,所述第二连接部(13)为凹槽;或,所述第一连接部(241)为凹槽,所述第二连接部(13)为凸起。10. The pipeline fixing device according to claim 9, characterized in that, the first connecting part (241) is a protrusion, and the second connecting part (13) is a groove; or, the first connecting part (241) is a groove; The connecting part (241) is a groove, and the second connecting part (13) is a protrusion. 11.根据权利要求3至10中任一项所述的管路固定装置,其特征在于,所述锁紧本体(23)和所述卡接本体(24)均为多个,各个所述锁紧本体(23)与相应的所述卡接本体(24)相连接,所述锁紧组件(20)还包括:11. The pipeline fixing device according to any one of claims 3 to 10, characterized in that there are multiple locking bodies (23) and snapping bodies (24), each of which locks The tight body (23) is connected with the corresponding snap-in body (24), and the locking assembly (20) also includes: 连接本体(25),所述连接本体(25)的两端均连接有所述锁紧本体(23)和相应的所述卡接本体(24)。A connecting body (25), both ends of the connecting body (25) are connected with the locking body (23) and the corresponding clamping body (24). 12.根据权利要求3至10中任一项所述的管路固定装置,其特征在于,所述锁紧组件(20)还包括:12. The pipeline fixing device according to any one of claims 3 to 10, characterized in that the locking assembly (20) further comprises: 固定部(26),所述固定部(26)的第一端与所述锁紧本体(23)相连接,所述固定部(26)的第二端与用于固定所述管路(30)的隔板(40)相连接。A fixing part (26), the first end of the fixing part (26) is connected with the locking body (23), and the second end of the fixing part (26) is used for fixing the pipeline (30 ) The partition (40) is connected. 13.根据权利要求12所述的管路固定装置,其特征在于,所述固定部(26)包括:13. The pipeline fixing device according to claim 12, characterized in that, the fixing part (26) comprises: 连接段(261),所述连接段(261)的第一端与所述锁紧本体(23)相连接;A connection section (261), the first end of the connection section (261) is connected to the locking body (23); 固定段(262),所述固定段(262)与所述连接段(261)的第二端相连接,所述固定段(262)与所述隔板(40)相卡接。A fixing section (262), the fixing section (262) is connected to the second end of the connecting section (261), and the fixing section (262) is clamped with the partition plate (40). 14.根据权利要求13所述的管路固定装置,其特征在于,所述连接段(261)包括:14. The pipeline fixing device according to claim 13, characterized in that, the connecting section (261) comprises: 第一连接段(2611),所述第一连接段(2611)的第一端与所述锁紧本体(23)相连接,所述第一连接段(2611)为圆柱段;A first connecting section (2611), the first end of the first connecting section (2611) is connected to the locking body (23), and the first connecting section (2611) is a cylindrical section; 第二连接段(2612),所述第二连接段(2612)的第一端与所述第一连接段(2611)的第二端相连接,所述第二连接段(2612)为圆柱段;The second connection section (2612), the first end of the second connection section (2612) is connected to the second end of the first connection section (2611), and the second connection section (2612) is a cylindrical section ; 第三连接段(2613),所述第三连接段(2613)的第一端与所述第二连接段(2612)的第二端相连接,所述第三连接段(2613)的第二端与所述隔板(40)相抵接,所述第三连接段(2613)为圆锥段。The third connection section (2613), the first end of the third connection section (2613) is connected to the second end of the second connection section (2612), and the second end of the third connection section (2613) The end abuts against the partition (40), and the third connecting section (2613) is a conical section. 15.根据权利要求13所述的管路固定装置,其特征在于,所述固定段(262)包括:15. The pipeline fixing device according to claim 13, characterized in that, the fixing section (262) comprises: 第一固定段(2621)的第一端与所述连接段(261)相连接;The first end of the first fixing section (2621) is connected to the connecting section (261); 第二固定段(2622),所述第二固定段(2622)与所述第一固定段(2621)的第二端相连接,所述第二固定段(2622)的至少部分与所述隔板(40)相抵接,其中,所述第二固定段(2622)为V形结构或为U形结构。The second fixing section (2622), the second fixing section (2622) is connected to the second end of the first fixing section (2621), at least part of the second fixing section (2622) is connected to the partition The plates (40) are in contact with each other, wherein the second fixing section (2622) is a V-shaped structure or a U-shaped structure. 16.根据权利要求15所述的管路固定装置,其特征在于,所述第二固定段(2622)的至少部分可压缩地设置,以使所述第二固定段(2622)具有穿过所述隔板(40)的安装孔(41)的第三位置,和穿过所述安装孔(41)后与所述隔板(40)相抵接的第四位置。16. The pipeline fixing device according to claim 15, characterized in that at least part of the second fixing section (2622) is configured to be compressible, so that the second fixing section (2622) has a The third position of the mounting hole (41) of the partition (40), and the fourth position of abutting against the partition (40) after passing through the mounting hole (41). 17.根据权利要求1所述的管路固定装置,其特征在于,所述安装机构(10)与所述锁紧组件(20)一体成型。17. The pipeline fixing device according to claim 1, characterized in that, the installation mechanism (10) is integrally formed with the locking assembly (20). 18.一种空调器,包括管路固定装置、管路(30)和隔板(40),其特征在于,所述管路固定装置为权利要求1至17中任一项所述的管路固定装置。18. An air conditioner, comprising a pipeline fixing device, a pipeline (30) and a partition (40), characterized in that the pipeline fixing device is the pipeline according to any one of claims 1 to 17 Fixtures.
CN201711171422.5A 2017-11-20 2017-11-20 Pipeline fixing device and air conditioner with same Pending CN107906263A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711171422.5A CN107906263A (en) 2017-11-20 2017-11-20 Pipeline fixing device and air conditioner with same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711171422.5A CN107906263A (en) 2017-11-20 2017-11-20 Pipeline fixing device and air conditioner with same

Publications (1)

Publication Number Publication Date
CN107906263A true CN107906263A (en) 2018-04-13

Family

ID=61847026

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711171422.5A Pending CN107906263A (en) 2017-11-20 2017-11-20 Pipeline fixing device and air conditioner with same

Country Status (1)

Country Link
CN (1) CN107906263A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111623171A (en) * 2019-02-27 2020-09-04 苏州三星电子有限公司 Pipeline support piece and air conditioner
EP3988768A1 (en) * 2020-10-13 2022-04-27 Illinois Tool Works Inc. Mounting member

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8912855D0 (en) * 1988-06-06 1989-07-26 Phillips Plastics Corp Releasable clip for retaining elongated members
US6164604A (en) * 1998-02-03 2000-12-26 Oatey Co. Pipe clamps
CN1516786A (en) * 2001-06-22 2004-07-28 纽弗雷公司 Capped clip for pipe, electric cable or the like
US20070018057A1 (en) * 2005-07-20 2007-01-25 Zdravko Kovac Hinged clip having a retainer
US20070215757A1 (en) * 2006-02-28 2007-09-20 Kiyoteru Yuta Vibration-Insulation Fasteners for Elongated Components
CN103339429A (en) * 2011-01-27 2013-10-02 A·雷蒙德公司 Device for fastening elongate objects
CN203309363U (en) * 2013-05-30 2013-11-27 上海弥富精密塑胶模具有限公司 Pipe clamp with cover
CN204403581U (en) * 2015-01-23 2015-06-17 安徽江淮汽车股份有限公司 Pipeline support
CN204910442U (en) * 2015-07-28 2015-12-30 四川南格尔生物科技有限公司 Medical consumables pipeline anchor clamps
CN205026219U (en) * 2015-10-14 2016-02-10 中国重汽集团济南动力有限公司 A pipe clamp for pipeline is fixed among power steering system
CN105697884A (en) * 2016-04-08 2016-06-22 上海易扣精密件制造有限公司 Multi-pipe-diameter automobile air conditioner pipeline clamp
US20160254656A1 (en) * 2013-10-28 2016-09-01 Fi.Mo.Tec. S.P.A. Perfected device for fixing elongated bodies, in particular coaxial wires, to a supporting cable
CN205781399U (en) * 2016-05-16 2016-12-07 豫新汽车空调股份有限公司 A kind of motorcar air conditioner pipeline fixing structure
CN206031262U (en) * 2016-08-19 2017-03-22 北京汽车股份有限公司 Pipeline fixing device and have its vehicle
CN206081224U (en) * 2016-07-07 2017-04-12 山东威高集团医用高分子制品股份有限公司 Medical liquid that ends presss from both sides
CN206145268U (en) * 2016-11-04 2017-05-03 南通华腾通信器材有限责任公司 Cable cramp
CN107112738A (en) * 2014-12-19 2017-08-29 Fi.Mo.技术股份公司 The improved device of wall fixation is carried out for the slender bodies to especially radiating coaxial cable
CN206592645U (en) * 2017-02-27 2017-10-27 上海易扣精密件制造有限公司 Easy assembling type automotive air-conditioning system noise-proofing clip
CN207500640U (en) * 2017-11-20 2018-06-15 珠海格力电器股份有限公司 Pipeline fixing device and air conditioner with same

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8912855D0 (en) * 1988-06-06 1989-07-26 Phillips Plastics Corp Releasable clip for retaining elongated members
US6164604A (en) * 1998-02-03 2000-12-26 Oatey Co. Pipe clamps
CN1516786A (en) * 2001-06-22 2004-07-28 纽弗雷公司 Capped clip for pipe, electric cable or the like
US20070018057A1 (en) * 2005-07-20 2007-01-25 Zdravko Kovac Hinged clip having a retainer
US20070215757A1 (en) * 2006-02-28 2007-09-20 Kiyoteru Yuta Vibration-Insulation Fasteners for Elongated Components
CN103339429A (en) * 2011-01-27 2013-10-02 A·雷蒙德公司 Device for fastening elongate objects
CN203309363U (en) * 2013-05-30 2013-11-27 上海弥富精密塑胶模具有限公司 Pipe clamp with cover
US20160254656A1 (en) * 2013-10-28 2016-09-01 Fi.Mo.Tec. S.P.A. Perfected device for fixing elongated bodies, in particular coaxial wires, to a supporting cable
CN107112738A (en) * 2014-12-19 2017-08-29 Fi.Mo.技术股份公司 The improved device of wall fixation is carried out for the slender bodies to especially radiating coaxial cable
US20170353024A1 (en) * 2014-12-19 2017-12-07 Fi.Mo.Tec. S.P.A. Perfected Device for the Wall-Fixing of Elongated Bodies, in Particular Radiating Coaxial Cables
CN204403581U (en) * 2015-01-23 2015-06-17 安徽江淮汽车股份有限公司 Pipeline support
CN204910442U (en) * 2015-07-28 2015-12-30 四川南格尔生物科技有限公司 Medical consumables pipeline anchor clamps
CN205026219U (en) * 2015-10-14 2016-02-10 中国重汽集团济南动力有限公司 A pipe clamp for pipeline is fixed among power steering system
CN105697884A (en) * 2016-04-08 2016-06-22 上海易扣精密件制造有限公司 Multi-pipe-diameter automobile air conditioner pipeline clamp
CN205781399U (en) * 2016-05-16 2016-12-07 豫新汽车空调股份有限公司 A kind of motorcar air conditioner pipeline fixing structure
CN206081224U (en) * 2016-07-07 2017-04-12 山东威高集团医用高分子制品股份有限公司 Medical liquid that ends presss from both sides
CN206031262U (en) * 2016-08-19 2017-03-22 北京汽车股份有限公司 Pipeline fixing device and have its vehicle
CN206145268U (en) * 2016-11-04 2017-05-03 南通华腾通信器材有限责任公司 Cable cramp
CN206592645U (en) * 2017-02-27 2017-10-27 上海易扣精密件制造有限公司 Easy assembling type automotive air-conditioning system noise-proofing clip
CN207500640U (en) * 2017-11-20 2018-06-15 珠海格力电器股份有限公司 Pipeline fixing device and air conditioner with same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111623171A (en) * 2019-02-27 2020-09-04 苏州三星电子有限公司 Pipeline support piece and air conditioner
EP3988768A1 (en) * 2020-10-13 2022-04-27 Illinois Tool Works Inc. Mounting member

Similar Documents

Publication Publication Date Title
CN112310911B (en) Multi-channel flexible holding mechanism
US7896400B2 (en) System for pre-positioning a hose clamp on a hose end
US20130001373A1 (en) Clamp
CN107906263A (en) Pipeline fixing device and air conditioner with same
US20120267166A1 (en) Clip and wire harness equipped with clip
WO2017202054A1 (en) Air duct assembly and air conditioner having same
CN102853170A (en) Hose clamp
JP2012225476A (en) Vibration control protector
JP2008059815A (en) Fixing structure of embedded apparatus
CN211502021U (en) Pipeline clamping and fixing device and air conditioner
JP7324138B2 (en) Holder for long members
CN112393096B (en) Suspension clamping mechanism
KR20150020890A (en) pipe fixing device
JP2017209018A (en) Nesting prevention device for cross arm
CN107830253A (en) A kind of tubing clamp and vehicle
KR100906731B1 (en) Pipe fixing device with band clamp and pipe fixing method using the same
CA2584541A1 (en) Gasket package
CN209839334U (en) Pipeline fixing structure, pipeline mechanism and air conditioner
WO2015098684A1 (en) Joint cover
KR101622961B1 (en) Clamp for mounting hose
CN105020475A (en) Pipeline clamp, vehicle pipeline fixing device and vehicle
CN219164101U (en) Pipe line fixing clamp
CN203927067U (en) Pipeline clip, vehicle pipeline fixing device and vehicle
KR200374240Y1 (en) Device for connecting sewer pipe
CN211525776U (en) Connection pipe, pipe assembling structure of household electrical appliance and household electrical appliance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180413

RJ01 Rejection of invention patent application after publication