CN107762513A - Based on the method dug up mine in exploitation of mineral resources to large diameter, deep borehole open stope afterwards filling - Google Patents
Based on the method dug up mine in exploitation of mineral resources to large diameter, deep borehole open stope afterwards filling Download PDFInfo
- Publication number
- CN107762513A CN107762513A CN201610678715.1A CN201610678715A CN107762513A CN 107762513 A CN107762513 A CN 107762513A CN 201610678715 A CN201610678715 A CN 201610678715A CN 107762513 A CN107762513 A CN 107762513A
- Authority
- CN
- China
- Prior art keywords
- ore
- mineral building
- mineral
- back production
- drilling chamber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 229910052500 inorganic mineral Inorganic materials 0.000 title claims abstract description 58
- 239000011707 mineral Substances 0.000 title claims abstract description 58
- 238000000034 method Methods 0.000 title claims abstract description 23
- 238000005065 mining Methods 0.000 claims abstract description 23
- 238000005553 drilling Methods 0.000 claims abstract description 21
- 238000004519 manufacturing process Methods 0.000 claims abstract description 20
- 210000001367 artery Anatomy 0.000 claims abstract description 11
- 210000003462 vein Anatomy 0.000 claims abstract description 11
- 238000005266 casting Methods 0.000 claims abstract description 8
- 239000011347 resin Substances 0.000 claims abstract description 8
- 229920005989 resin Polymers 0.000 claims abstract description 8
- 238000005096 rolling process Methods 0.000 claims abstract description 4
- 239000002002 slurry Substances 0.000 claims abstract description 4
- 238000004880 explosion Methods 0.000 claims description 12
- 238000005520 cutting process Methods 0.000 claims description 6
- 239000002360 explosive Substances 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 claims description 3
- 239000000843 powder Substances 0.000 claims description 3
- 239000004576 sand Substances 0.000 claims description 3
- 239000012895 dilution Substances 0.000 abstract description 4
- 238000010790 dilution Methods 0.000 abstract description 4
- 238000011084 recovery Methods 0.000 abstract description 4
- -1 after both sides Substances 0.000 abstract description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 12
- 238000011161 development Methods 0.000 description 8
- 229910052742 iron Inorganic materials 0.000 description 6
- 230000000694 effects Effects 0.000 description 4
- 239000011435 rock Substances 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 241000894007 species Species 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 229910000906 Bronze Inorganic materials 0.000 description 1
- ZOKXTWBITQBERF-UHFFFAOYSA-N Molybdenum Chemical compound [Mo] ZOKXTWBITQBERF-UHFFFAOYSA-N 0.000 description 1
- 239000008896 Opium Substances 0.000 description 1
- RTAQQCXQSZGOHL-UHFFFAOYSA-N Titanium Chemical compound [Ti] RTAQQCXQSZGOHL-UHFFFAOYSA-N 0.000 description 1
- 229910052787 antimony Inorganic materials 0.000 description 1
- WATWJIUSRGPENY-UHFFFAOYSA-N antimony atom Chemical compound [Sb] WATWJIUSRGPENY-UHFFFAOYSA-N 0.000 description 1
- 239000010974 bronze Substances 0.000 description 1
- KUNSUQLRTQLHQQ-UHFFFAOYSA-N copper tin Chemical compound [Cu].[Sn] KUNSUQLRTQLHQQ-UHFFFAOYSA-N 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000008021 deposition Effects 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 229910052750 molybdenum Inorganic materials 0.000 description 1
- 239000011733 molybdenum Substances 0.000 description 1
- 229960001027 opium Drugs 0.000 description 1
- 229910052761 rare earth metal Inorganic materials 0.000 description 1
- 150000002910 rare earth metals Chemical class 0.000 description 1
- 238000007634 remodeling Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 229910052719 titanium Inorganic materials 0.000 description 1
- 239000010936 titanium Substances 0.000 description 1
- WFKWXMTUELFFGS-UHFFFAOYSA-N tungsten Chemical compound [W] WFKWXMTUELFFGS-UHFFFAOYSA-N 0.000 description 1
- 229910052721 tungsten Inorganic materials 0.000 description 1
- 239000010937 tungsten Substances 0.000 description 1
- 229910052720 vanadium Inorganic materials 0.000 description 1
- LEONUFNNVUYDNQ-UHFFFAOYSA-N vanadium atom Chemical compound [V] LEONUFNNVUYDNQ-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/22—Methods of underground mining; Layouts therefor for ores, e.g. mining placers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D3/00—Particular applications of blasting techniques
- F42D3/04—Particular applications of blasting techniques for rock blasting
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Remote Sensing (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The invention discloses a kind of based on, to the method for large diameter, deep borehole open stope afterwards filling mining, the vertical ore body arrangement of nugget, mineral building and the wide 15m of ore pillar, length are orebody thickness, and fore-set and foundation thickness are 5m in exploitation of mineral resources;In mineral building bottom, driving ore removal wears arteries and veins, and worn in ore removal in arteries and veins to the tunnelling dress ore deposit route that undercuts, drilling chamber is dug on mineral building top, drilling chamber connection roadway and return aircourse are tunneled respectively along orebody trend in drilling chamber both sides, the tunnel that undercuts is tunneled in mineral building bottom;Actual mining is divided into rooming and stooping pillaring;In mineral building ore all after rolling, with consolidated fill of casting resin, after both sides, mineral building has been adopted and with filling slurry consolidated fill and after having conserved obturation, the mode back production of ore pillar mineral building back production, filled afterwards with casting resin.This method can improve ore recovery rate, reduce ore dilution rate, make full use of existing resource, effectively control ground pressure and subsidence, the purpose for optimizing mining area surrounding environment.
Description
Technical field
The present invention relates to a kind of mining methods, are based on more particularly, to one kind in exploitation of mineral resources to large diameter, deep borehole barnyard
The method of afterwards filling mining.
Background technology
Mineral products, which refer to all and are imbedded in underground (or being distributed in earth's surface or rock decay or rock deposition), to be available for
The natural minerals or rock resource of human use.Mining industry is that the mankind are engaged in one of ancient field of productive labor.The development of mining industry
Utilization with expanding mineral resources, the development to civilization of human society generate rush that is huge, can not be substituted with progress
Enter effect.The ancestors of the Chinese nation from from them being born, begin to be engaged in mineral exploration and exploitation as many nationalitys in the world
Utilize activity.Human history is divided into the Old Stone Age, the Neolithic Age, the Bronze Age, the Iron Age by historian, all
It is characterized by the Prospecting Target of The Main Minerals species of the utilization of people at that time.Exactly our ancestors reform of nature, the knowledge of natural environment and
During nature remodeling, during finding mineral products, understanding mineral products with utilization mineral products, social productive forces are promoted
Development and the progress of human civilization, certain basis is laid for large-scale Mining Development today.Therefore, in research China's ore deposit
During industry present situation, China's Mining Development history of roughly analyzing and researching first is beneficial.We are at the vast territory of great motherland
The world mankind are born, the vital area of procreation and development.Just lived from the ancestors away from the modern 2,000,000 Nian Qi Chinese nation, work and
Procreation is on this vast soil.To stopping during the Opium War (1840-1842) in 1840 from time immemorial, be Ancient Times in China geological cause and
The rudiment of mining industry, formative year.In this period, ancients are engaged in the exploitation profit of mineral resources under conditions of extremely arduous
With activity, indelible contribution is made that, and is modern age and modern ore deposit for Ancient Times in China civilization, social progress, economic development
Certain basis has been laid in the development of industry.At present, the mineral products about more than 150 for having industrial value in the world are planted, wherein more than 80 kind applications
It is extremely wide.Developed country is the key consumer of world ore resource.Russia, China, Brazil, Australia, India, Canada
The %90 in the world is accounted for U.S.'s iron ore storage capacity.The U.S., Japan, West Europe steel and iron industry are more flourishing, and Japanese iron ore is completely dependent on
Import, Australia, Brazil, Canada are iron ore big export country, and China's output of steel is at the forefront in the world.Mineral Resources in China
Feature is:Species is more, and reserves are big, and the amount of verifying such as tungsten, antimony, rare earth, vanadium and titanium, molybdenum occupies first place in the world, and other ore reserves also occupy
Forefront;Though Iron Ore Reserve is abundant, lean ore is than great;Associated minerals add sorting, the difficulty smelted than great;Skewness,
The more coals in the north, oil, the more non-ferrous metals in south.In exploitation of mineral resources, existing mining methods process is cumbersome, and the effect dug up mine
Rate is low, and collapsing for ore deposit hole easily occurs, and security incident is caused to people.
The content of the invention
It is an object of the invention to overcome above-mentioned existing mining methods process cumbersome, and the efficiency dug up mine is low, and holds
Easily there is collapsing for ore deposit hole, the problem of causing security incident to people, devise a kind of be based in exploitation of mineral resources to major diameter
The method of deep hole open stope afterwards filling mining, this method can improve ore recovery rate, reduce ore dilution rate, make full use of existing
There is resource, effectively control ground pressure and subsidence, the purpose for optimizing mining area surrounding environment, it is numerous to solve existing mining methods process
It is trivial, and the efficiency dug up mine is low, and collapsing for ore deposit hole easily occurs, the problem of causing security incident to people.
The purpose of the present invention is achieved through the following technical solutions:Based in exploitation of mineral resources to large diameter, deep borehole barnyard afterwards
The method of mining with stowing, comprises the following steps:
(1)Nugget is arranged:The vertical ore body arrangement of nugget, mineral building and the wide 15m of ore pillar, length is orebody thickness, fore-set and foundation
Thickness is 5m;
(2)Adopt quasi- cutting engineering:Adopt cut journey mainly undercut tunnel, ore removal wear arteries and veins, drilling chamber, drilling chamber connection roadway,
Return aircourse, dress ore deposit route etc., in mineral building bottom, driving ore removal wears arteries and veins, and wears in arteries and veins to enter to the tunnelling dress ore deposit that undercuts in ore removal
Road, drilling chamber is dug on mineral building top, drilling chamber connection roadway and return air are tunneled respectively along orebody trend in drilling chamber both sides
Tunnel, the tunnel that undercuts is tunneled in mineral building bottom, high 6m is dug on the mineral building mediad of tunnel undercuting, is cut on wide 2m to sector
Groove, fan shaped medium length hole is then beaten upwards from the tunnel that undercuts, along cutting groove explosion by row, ore forms moat ditch formula and undercuted sky after transporting
Between, provide the scope of freedom for ore back production;
(3)Back production and ore removal:Actual mining is divided into rooming and stooping pillaring, during rooming, from drilling chamber in mineral building
The vertical parallel deep hole of major diameter is beaten downwards on top, the ㎜ of blasthole diameter 165, is carried out using the explosive of high density, high explosion velocity, high-power
Explosion, using Uncoincided charge, bore diameter 165mm, coil diameter of getting it filled is 150mm, long 900mm, is implemented by powder charge suitable
Sequence, carries out explosion, the ore of avalanche in bottom by 63 m scrapers through filling ore deposit route, ore removal wears lane and stage transportation roadway directly fills
Main chute is transported to, being then transported to crude ore bin through belt conveyer after crushing cave is broken loads skip bucket, and the back production of ore pillar is in ore deposit
Room back production terminates and filled after maintenance work terminates to carry out;
(4)Filling:It is whole after rolling in mineral building ore, with consolidated fill of casting resin, treat that both sides mineral building has been adopted and used filling
Slurry consolidated fill and after having conserved obturation, the mode back production of ore pillar mineral building back production, is filled, mineral building fills with casting resin afterwards
Fill out and choose Gobi aggregate consolidated fill, Gobi aggregate tailing sand slush is chosen in ore pillar filling.
In summary, the beneficial effects of the invention are as follows:This method can improve ore recovery rate, reduce ore dilution rate,
Existing resource is made full use of, effectively control ground pressure and subsidence, the purpose for optimizing mining area surrounding environment, solve existing mining
Procedure is cumbersome, and the efficiency dug up mine is low, and collapsing for ore deposit hole easily occurs, and asking for security incident is caused to people
Topic.
Embodiment
With reference to embodiment, the present invention is described in further detail, but embodiments of the present invention are not limited only to
This.
Embodiment:
Based on the method dug up mine in exploitation of mineral resources to large diameter, deep borehole open stope afterwards filling, comprise the following steps:
(1)Nugget is arranged:The vertical ore body arrangement of nugget, mineral building and the wide 15m of ore pillar, length is orebody thickness, fore-set and foundation
Thickness is 5m;
(2)Adopt quasi- cutting engineering:Adopt cut journey mainly undercut tunnel, ore removal wear arteries and veins, drilling chamber, drilling chamber connection roadway,
Return aircourse, dress ore deposit route etc., in mineral building bottom, driving ore removal wears arteries and veins, and wears in arteries and veins to enter to the tunnelling dress ore deposit that undercuts in ore removal
Road, drilling chamber is dug on mineral building top, drilling chamber connection roadway and return air are tunneled respectively along orebody trend in drilling chamber both sides
Tunnel, the tunnel that undercuts is tunneled in mineral building bottom, high 6m is dug on the mineral building mediad of tunnel undercuting, is cut on wide 2m to sector
Groove, fan shaped medium length hole is then beaten upwards from the tunnel that undercuts, along cutting groove explosion by row, ore forms moat ditch formula and undercuted sky after transporting
Between, provide the scope of freedom for ore back production;
(3)Back production and ore removal:Actual mining is divided into rooming and stooping pillaring, during rooming, from drilling chamber in mineral building
The vertical parallel deep hole of major diameter is beaten downwards on top, the ㎜ of blasthole diameter 165, is carried out using the explosive of high density, high explosion velocity, high-power
Explosion, using Uncoincided charge, bore diameter 165mm, coil diameter of getting it filled is 150mm, long 900mm, is implemented by powder charge suitable
Sequence, carries out explosion, the ore of avalanche in bottom by 63 m scrapers through filling ore deposit route, ore removal wears lane and stage transportation roadway directly fills
Main chute is transported to, being then transported to crude ore bin through belt conveyer after crushing cave is broken loads skip bucket, and the back production of ore pillar is in ore deposit
Room back production terminates and filled after maintenance work terminates to carry out;
(4)Filling:It is whole after rolling in mineral building ore, with consolidated fill of casting resin, treat that both sides mineral building has been adopted and used filling
Slurry consolidated fill and after having conserved obturation, the mode back production of ore pillar mineral building back production, is filled, mineral building fills with casting resin afterwards
Fill out and choose Gobi aggregate consolidated fill, Gobi aggregate tailing sand slush is chosen in ore pillar filling.
This method can improve ore recovery rate, reduce ore dilution rate, make full use of existing resource, effectively control ground pressure
With subsidence, optimize the purpose of mining area surrounding environment, solve that existing mining methods process is cumbersome, and the efficiency dug up mine
It is low, and collapsing for ore deposit hole easily occur, the problem of causing security incident to people.
It is described above, be only presently preferred embodiments of the present invention, any formal limitation not done to the present invention, it is every according to
Any simply modification, the equivalent variations substantially made according to the technology of the present invention, method to above example, each fall within the present invention
Protection domain within.
Claims (1)
1. based on the method dug up mine in exploitation of mineral resources to large diameter, deep borehole open stope afterwards filling, it is characterised in that including following
Step:
(1)Nugget is arranged:The vertical ore body arrangement of nugget, mineral building and the wide 15m of ore pillar, length is orebody thickness, fore-set and foundation
Thickness is 5m;
(2)Adopt quasi- cutting engineering:Adopt cut journey mainly undercut tunnel, ore removal wear arteries and veins, drilling chamber, drilling chamber connection roadway,
Return aircourse, dress ore deposit route etc., in mineral building bottom, driving ore removal wears arteries and veins, and wears in arteries and veins to enter to the tunnelling dress ore deposit that undercuts in ore removal
Road, drilling chamber is dug on mineral building top, drilling chamber connection roadway and return air are tunneled respectively along orebody trend in drilling chamber both sides
Tunnel, the tunnel that undercuts is tunneled in mineral building bottom, high 6m is dug on the mineral building mediad of tunnel undercuting, is cut on wide 2m to sector
Groove, fan shaped medium length hole is then beaten upwards from the tunnel that undercuts, along cutting groove explosion by row, ore forms moat ditch formula and undercuted sky after transporting
Between, provide the scope of freedom for ore back production;
(3)Back production and ore removal:Actual mining is divided into rooming and stooping pillaring, during rooming, from drilling chamber in mineral building
The vertical parallel deep hole of major diameter is beaten downwards on top, the ㎜ of blasthole diameter 165, is carried out using the explosive of high density, high explosion velocity, high-power
Explosion, using Uncoincided charge, bore diameter 165mm, coil diameter of getting it filled is 150mm, long 900mm, is implemented by powder charge suitable
Sequence, carries out explosion, the ore of avalanche in bottom by 63 m scrapers through filling ore deposit route, ore removal wears lane and stage transportation roadway directly fills
Main chute is transported to, being then transported to crude ore bin through belt conveyer after crushing cave is broken loads skip bucket, and the back production of ore pillar is in ore deposit
Room back production terminates and filled after maintenance work terminates to carry out;
(4)Filling:It is whole after rolling in mineral building ore, with consolidated fill of casting resin, treat that both sides mineral building has been adopted and used filling
Slurry consolidated fill and after having conserved obturation, the mode back production of ore pillar mineral building back production, is filled, mineral building fills with casting resin afterwards
Fill out and choose Gobi aggregate consolidated fill, Gobi aggregate tailing sand slush is chosen in ore pillar filling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610678715.1A CN107762513A (en) | 2016-08-17 | 2016-08-17 | Based on the method dug up mine in exploitation of mineral resources to large diameter, deep borehole open stope afterwards filling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610678715.1A CN107762513A (en) | 2016-08-17 | 2016-08-17 | Based on the method dug up mine in exploitation of mineral resources to large diameter, deep borehole open stope afterwards filling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107762513A true CN107762513A (en) | 2018-03-06 |
Family
ID=61260085
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610678715.1A Withdrawn CN107762513A (en) | 2016-08-17 | 2016-08-17 | Based on the method dug up mine in exploitation of mineral resources to large diameter, deep borehole open stope afterwards filling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107762513A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108590651A (en) * | 2018-05-09 | 2018-09-28 | 中冶北方(大连)工程技术有限公司 | A kind of method of more drilling chamber recycling ore pillars |
CN109236295A (en) * | 2018-11-14 | 2019-01-18 | 中南大学 | A kind of three step stoping methods suitable for Deep Thick large ore deposit |
CN113202453A (en) * | 2021-04-30 | 2021-08-03 | 四川省洪雅青衣江元明粉有限公司 | Process for mining glauberite ore by combining chamber water-dissolving method with room-and-column method |
CN114233295A (en) * | 2021-12-23 | 2022-03-25 | 临沂会宝岭铁矿有限公司 | One-lane multipurpose mining method |
-
2016
- 2016-08-17 CN CN201610678715.1A patent/CN107762513A/en not_active Withdrawn
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108590651A (en) * | 2018-05-09 | 2018-09-28 | 中冶北方(大连)工程技术有限公司 | A kind of method of more drilling chamber recycling ore pillars |
CN109236295A (en) * | 2018-11-14 | 2019-01-18 | 中南大学 | A kind of three step stoping methods suitable for Deep Thick large ore deposit |
CN113202453A (en) * | 2021-04-30 | 2021-08-03 | 四川省洪雅青衣江元明粉有限公司 | Process for mining glauberite ore by combining chamber water-dissolving method with room-and-column method |
CN114233295A (en) * | 2021-12-23 | 2022-03-25 | 临沂会宝岭铁矿有限公司 | One-lane multipurpose mining method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101338674B (en) | Pillarless sub-level caving mining method for direct shipment of ore | |
CN106761912B (en) | It is a kind of be suitable for unstable formation efficiently on to route slicing and filling mining methods | |
HUANG et al. | Non-explosive mining and waste utilization for achieving green mining in underground hard rock mine in China | |
CN104481539B (en) | From kerve tight-face blasting caved stopes | |
CN102155228A (en) | Fully-segmented presplitting squeezing primary-blasting mining method | |
CN102086765B (en) | High-sublevel multi-layer mining method of ultrathin copper ore body | |
CA2986062C (en) | Fully mechanized mining-filling mixed mining working face filling section length determination method | |
CN104533416A (en) | Large-scale mechanized non-sill-pillar sub-level caving mining method for extremely thick ore body | |
CN104532818A (en) | Treatment method for strip mine goaf | |
CN103967494A (en) | Mining method for filling after shallow hole shrinkage | |
CN103437766B (en) | In-situ fragmentation mining method | |
CN107762513A (en) | Based on the method dug up mine in exploitation of mineral resources to large diameter, deep borehole open stope afterwards filling | |
CN109869150A (en) | A kind of mine resources are segmented the full office of adopting and fill recovery method | |
CN104989408A (en) | Safe and high-efficiency mining method for metal mine in mountainous area | |
CN107829740A (en) | Mining method of extremely-thin steeply-inclined ore body | |
CN101725348A (en) | Pre-control roof open stoping spallation subsequent filling mining method | |
CN107780937A (en) | Based on the filling mining method in exploitation of mineral resources | |
CN101158285A (en) | A kind of underground mining method of copper ore | |
CN105626074A (en) | Thick ore body mining method | |
CN109630116B (en) | Mining method for inclined medium-thickness blind ore body | |
CN107762506A (en) | Based on falling ore deposit stage mineral building afterwards filling mining method | |
CN107762509A (en) | A kind of method for improving mining efficiency | |
CN107762508A (en) | Filling mining method in exploitation of mineral resources | |
CN107829743B (en) | Improved mining method for steeply inclined thin veins | |
CN117514177A (en) | A separate mining method for double-layered ore bodies containing weak interlayers |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180306 |