CN107761763A - A kind of pipe gallery and its application method - Google Patents

A kind of pipe gallery and its application method Download PDF

Info

Publication number
CN107761763A
CN107761763A CN201710972326.4A CN201710972326A CN107761763A CN 107761763 A CN107761763 A CN 107761763A CN 201710972326 A CN201710972326 A CN 201710972326A CN 107761763 A CN107761763 A CN 107761763A
Authority
CN
China
Prior art keywords
drainage
pipe gallery
pipe
water tank
cabin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710972326.4A
Other languages
Chinese (zh)
Inventor
马鸿敏
马建勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Jiaotong University
Original Assignee
Xian Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Jiaotong University filed Critical Xian Jiaotong University
Priority to CN201710972326.4A priority Critical patent/CN107761763A/en
Publication of CN107761763A publication Critical patent/CN107761763A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/02Arrangement of sewer pipe-lines or pipe-line systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Health & Medical Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Abstract

本发明公开一种综合管廊及其使用方法。综合管廊包括管廊本体以及单侧或者双侧设置的附属舱室;附属舱室包括由上到下依次布置的集水舱和排水舱;排水舱内架设有排水管道;集水舱上方设置有排水盖板,底面沿纵向间隔设置有与排水管道相连通的连接管道。在路面下部建造上述综合管廊,当路面降水量小时,积水通过排水盖板汇聚到集水舱中,然后通过连接管道流入排水管道;在路面降水量过大时,积水通过排水盖板汇聚到集水舱中,然后通过连接管道流入排水管道,当排水管道处于满载状态,雨水直接收集在集水舱中。本发明通过在综合管廊本体侧部设置集水舱与排水舱实现了雨水的收集、排放、短期储存功能。

The invention discloses a comprehensive pipe gallery and a using method thereof. The comprehensive pipe gallery includes the main body of the pipe gallery and the auxiliary cabins arranged on one or both sides; the auxiliary cabins include the water collection tank and the drainage cabin arranged in sequence from top to bottom; drainage pipes are erected in the drainage cabin; drainage pipes are installed above the water collection cabin. The bottom surface of the cover plate is longitudinally spaced with connecting pipes communicating with the drainage pipes. The above-mentioned comprehensive pipe gallery is built at the lower part of the road surface. When the precipitation on the road surface is small, the accumulated water will gather into the water collection tank through the drainage cover plate, and then flow into the drainage pipe through the connecting pipe; when the precipitation on the road surface is too large, the accumulated water will pass through the drainage cover plate. The rainwater is collected in the water collection chamber, and then flows into the drainage pipe through the connecting pipe. When the drainage pipe is fully loaded, the rainwater is directly collected in the water collection chamber. The present invention realizes the collection, discharge and short-term storage functions of rainwater by arranging a water collection compartment and a drainage compartment on the side of the main body of the comprehensive pipe gallery.

Description

一种综合管廊及其使用方法A kind of integrated pipe corridor and its using method

技术领域technical field

本发明涉及市政基础设施建设的技术领域,具体为一种综合管廊及其使用方法。The invention relates to the technical field of municipal infrastructure construction, in particular to a comprehensive pipe gallery and its use method.

背景技术Background technique

综合管廊是建造于城市地下用于容纳给水、排水、天然气、电力和通信等城市管线之中的两种及其以上的箱涵隧道。通过综合管廊的建设可以实现市政管网的统一规划与管理。The comprehensive pipe gallery is two or more box culvert tunnels built underground in the city to accommodate urban pipelines such as water supply, drainage, natural gas, electricity, and communications. The unified planning and management of the municipal pipe network can be realized through the construction of the comprehensive pipe gallery.

住建部《关于提高城市排水防涝能力推进城市地下综合管廊建设的通知》中指出将城市排水防涝与城市地下综合管廊、海绵城市建设协同推进,坚持自然与人工相结合,发挥“渗、滞、蓄、净、用、排”的作用,构建以“源头减排系统、排水管渠系统、排涝除险系统、超标应急系统”为主要内容的城市排水防涝工程体系,并与城市防洪规划做好衔接。The Ministry of Housing and Urban-Rural Development's "Notice on Improving Urban Drainage and Waterlogging Prevention Capability and Promoting the Construction of Urban Underground Comprehensive Pipe Gallery" pointed out that urban drainage and waterlogging prevention should be promoted in coordination with urban underground comprehensive pipe gallery and sponge city construction. The role of waterlogging, stagnation, storage, purification, utilization, and drainage is to build an urban drainage and waterlogging prevention engineering system with the main content of "source emission reduction system, drainage pipe and channel system, waterlogging and risk relief system, and emergency response system for exceeding standards", and cooperate with the city Flood control planning is well connected.

现有的雨水排水设计大体分为两种:一种是传统的采用明挖方式将雨水管道铺设在道路两侧地下。另一种是将雨水直接排入设置在综合管廊舱室之中的生活排水管道。以上的第一种布设方式为传统的明挖直排方式,该种方式需要开挖路面,造成城市“马路拉链”,同时不能做到市政管线的统一入廊,这种方式应该被淘汰。上面提到的第二种方式虽然可以理解为雨水与生活污水共用一条管线,同时也符合管线入廊的要求,但是由于生活污水净化处理工序相比于雨水的净化处理复杂很多,生活污水净化需要大型的设备仪器,而雨水只需简单的处理甚至不用处理便就可以进行农田浇灌等用途。如果采用将雨水直接排入生活污水管线会造成需要处理的生活污水量大大增加,增加了污水净化处理的成本。The existing rainwater drainage design is roughly divided into two types: one is the traditional method of laying rainwater pipes underground on both sides of the road by using open and cut methods. The other is to drain rainwater directly into the domestic drainage pipes set in the cabins of the integrated pipe gallery. The first layout method above is the traditional open cut and straight row method. This method needs to excavate the road surface, resulting in a "zipper of the road" in the city. At the same time, it cannot achieve the unified entrance of municipal pipelines. This method should be eliminated. Although the second method mentioned above can be understood as rainwater and domestic sewage sharing a pipeline, it also meets the requirements of the pipeline entering the corridor. However, since the domestic sewage purification process is much more complicated than the rainwater purification treatment, domestic sewage purification needs Large-scale equipment and instruments, and rainwater can be used for farmland irrigation and other purposes with simple or even no treatment. If the rainwater is directly discharged into the domestic sewage pipeline, the amount of domestic sewage to be treated will be greatly increased, and the cost of sewage purification and treatment will be increased.

发明内容Contents of the invention

针对现有技术中存在的问题,本发明提供一种综合管廊及其使用方法,能够将雨水管线入廊,而且不与其他管线相互干扰,结构简单,施工方便。Aiming at the problems existing in the prior art, the present invention provides a comprehensive pipe gallery and its use method, which can put rainwater pipelines into the gallery without interfering with other pipelines, has a simple structure and is convenient for construction.

本发明是通过以下技术方案来实现:The present invention is achieved through the following technical solutions:

一种综合管廊,包括管廊本体以及单侧或者双侧设置的附属舱室;所述的附属舱室包括由上到下依次布置的集水舱和排水舱;所述排水舱内架设有排水管道;所述集水舱上方设置有排水盖板,底面沿纵向间隔设置有与排水管道相连通的连接管道。A comprehensive pipe gallery, including the main body of the pipe gallery and auxiliary cabins arranged on one or both sides; the auxiliary cabins include a water collection compartment and a drainage compartment arranged in sequence from top to bottom; drainage pipes are erected in the drainage compartment ; A drainage cover is provided above the water collecting tank, and connecting pipes communicating with the drainage pipes are provided on the bottom surface at intervals along the longitudinal direction.

优选的,所述排水舱底面纵向间隔设置有排水管墩,所述排水管道架设在排水管墩之上。Preferably, drainage pipe piers are longitudinally spaced apart on the bottom surface of the drainage tank, and the drainage pipes are erected on the drainage pipe piers.

优选的,所述排水盖板上设置有若干泄水孔,且与管廊本体的顶部平齐设置。Preferably, several drain holes are provided on the drainage cover plate, and are arranged flush with the top of the main body of the pipe gallery.

优选的,连接管道竖直设置,上端连接于集水舱底面的最低点,下端连接于连接管道的最高点。Preferably, the connecting pipe is arranged vertically, the upper end is connected to the lowest point of the bottom surface of the water collecting tank, and the lower end is connected to the highest point of the connecting pipe.

优选的,集水舱底面为两侧高中间低的斜坡,坡度2%~5%;连接管道与中间连通。Preferably, the bottom surface of the water collecting tank is a slope with high sides and low middle, with a slope of 2% to 5%; the connecting pipe communicates with the middle.

优选的,集水舱底面横截面呈凹字形设置,连接管道与凹字形的凹陷处连通。Preferably, the cross-section of the bottom surface of the water collecting tank is arranged in a concave shape, and the connecting pipe communicates with the concave-shaped depression.

优选的,连接管道与排水盖板交错设置。Preferably, the connecting pipes and the drainage cover plates are arranged alternately.

优选的,管廊本体及集水舱和排水舱为钢筋混凝土结构或者纤维增强混凝土结构。Preferably, the main body of the pipe gallery, the water collection tank and the drainage tank are reinforced concrete structures or fiber reinforced concrete structures.

优选的,所述集水舱内部铺设有用于密封防渗漏水的防水层。Preferably, a waterproof layer for sealing against water leakage is laid inside the water collecting compartment.

一种综合管廊的使用方法,在道路路面下部的两侧及中间分别建造设置上述任意一综合管廊,在路面上形成三条降水的排放路径;A method for using a comprehensive pipe gallery, in which any one of the above-mentioned comprehensive pipe galleries is respectively constructed and arranged on both sides and in the middle of the lower part of the road surface, forming three drainage paths for precipitation on the road surface;

当路面降水量小时,综合管廊上方路面的积水通过排水盖板汇聚到集水舱中,由集水舱进行初步的收集,然后雨水通过集水舱底面设置的连接管道流入排水舱中的排水管道,由排水管道承担雨水的收集与运输功能;When the precipitation on the road surface is small, the accumulated water on the road above the comprehensive pipe gallery will be collected into the water collection tank through the drainage cover plate, and the water collection tank will be initially collected, and then the rainwater will flow into the drainage tank through the connecting pipes set on the bottom of the water collection tank. Drainage pipes are responsible for the collection and transportation of rainwater;

在路面降水量过大,路面的积水通过排水盖板汇聚到集水舱中,然后雨水通过集水舱底面设置的连接管道流入排水舱中的排水管道,当排水管道处于满载状态,雨水直接收集在集水舱中,此时由排水舱与集水舱共同承担雨水的收集与运输功能。When the precipitation on the road is too large, the accumulated water on the road is collected into the water collection tank through the drainage cover, and then the rainwater flows into the drainage pipe in the drainage cabin through the connecting pipe set on the bottom of the water collection tank. When the drainage pipe is full, the rainwater directly Collected in the water collection tank, at this time, the drainage tank and the water collection tank jointly undertake the functions of collecting and transporting rainwater.

与现有技术相比,本发明具有以下有益的技术效果:Compared with the prior art, the present invention has the following beneficial technical effects:

本发明结构简单,技术要求较少,施工方便,通过在综合管廊本体侧部设置集水舱与排水舱实现了雨水的收集、排放、短期储存功能,同时由于两侧舱室为综合管廊本体的附属舱室,实现了雨水收集设施以及排水设施均入廊的要求。在建设时两侧舱室与综合管廊本体一同施工,施工完成后进行统一管理做到了雨水收集管线以及排水管线与其他的电力、通讯等市政管线统一管理,便于后期的管理与运营维护。该种综合管廊开创性的设计了专用于路面降水收集的集水舱,通过集水舱与下部排水舱的相互协同实现了降水的收集与排放功能。该种综合管廊的雨、污水收集、排放分为两种情况:在路面降水量小时,雨、污水经过集水舱后直接排入排水舱中的排水管线,此时只由排水管线承担集水与排水功能,上部的集水舱室只起隔砂、隔泥以及中间通道作用;在路面降水量大,当下部的排水管线满载时,上部集水舱室参与集水、排水,此时其与下部排水舱共同承担集水、排水功能。该种综合管廊具有两道集水、排水防线,保证大雨时不会出现城市“看海”现象,同时由于该种设计将路面的降水收集在路面地下空间,以待后期利用,符合海绵城市的建设理念。The present invention has simple structure, fewer technical requirements, and convenient construction. By arranging a water collection tank and a drainage tank on the side of the integrated pipe gallery body, the functions of rainwater collection, discharge, and short-term storage are realized. The attached cabin realizes the requirement that both rainwater collection facilities and drainage facilities enter the corridor. During the construction, the cabins on both sides are constructed together with the main body of the comprehensive pipe gallery. After the construction is completed, unified management is carried out to achieve unified management of rainwater collection pipelines and drainage pipelines and other municipal pipelines such as power and communication, which is convenient for later management and operation and maintenance. This kind of comprehensive pipe gallery pioneered the design of a water collection chamber dedicated to collecting road surface precipitation, and realized the collection and discharge functions of precipitation through the mutual cooperation of the water collection chamber and the lower drainage chamber. The rain and sewage collection and discharge of this kind of comprehensive pipe gallery are divided into two situations: when the precipitation on the road surface is small, the rain and sewage pass through the water collection tank and are directly discharged into the drainage pipeline in the drainage cabin. At this time, only the drainage pipeline is responsible for collecting Water and drainage functions, the upper water collection chamber only plays the role of sand separation, mud separation and middle channel; when the precipitation on the road surface is heavy, when the lower drainage pipeline is fully loaded, the upper water collection chamber participates in water collection and drainage. The lower drainage compartment jointly undertakes the functions of water collection and drainage. This kind of comprehensive pipe gallery has two water collection and drainage defense lines to ensure that the city will not "look at the sea" phenomenon during heavy rain. At the same time, because of this design, the precipitation on the road surface is collected in the underground space of the road surface for later use, which is in line with the sponge city construction concept.

附图说明Description of drawings

图1为本发明中只含有左侧集水舱和排水舱的单层双舱综合管廊横截面示意图。Fig. 1 is a cross-sectional schematic diagram of a single-layer double-cabin integrated pipe gallery that only contains the left water collection tank and drainage tank in the present invention.

图2为本发明中只含有右侧集水舱和排水舱的单层双舱综合管廊横截面示意图。Fig. 2 is a schematic cross-sectional view of a single-layer double-cabin comprehensive pipe gallery that only contains the right water collection tank and drainage tank in the present invention.

图3为本发明中两侧均含有集水舱和排水舱的单层双舱综合管廊横截面示意图。Fig. 3 is a cross-sectional schematic diagram of a single-layer double-cabin comprehensive pipe gallery with water collecting tanks and drainage tanks on both sides of the present invention.

图4为本发明中两侧均含有集水舱和排水舱的双层双舱综合管廊横截面示意图。Fig. 4 is a schematic cross-sectional view of a double-deck double-cabin integrated pipe gallery with water collecting tanks and drainage tanks on both sides of the present invention.

图5为本发明中综合管廊在道路下的布置示意图一。Fig. 5 is a first schematic diagram of the layout of the comprehensive utility gallery under the road in the present invention.

图6为本发明中综合管廊在道路下的布置示意图二。Fig. 6 is a second schematic diagram of the layout of the comprehensive utility gallery under the road in the present invention.

图中:1、管廊本体;2、集水舱;3、排水舱;4、排水管墩;5、排水管道;6、连接管道;7、排水盖板。In the figure: 1. Pipe gallery body; 2. Water collection tank; 3. Drainage tank; 4. Drainage pier; 5. Drainage pipe; 6. Connecting pipe; 7. Drainage cover.

具体实施方式Detailed ways

下面结合具体的实施例对本发明做进一步的详细说明,所述是对本发明的解释而不是限定。The present invention will be further described in detail below in conjunction with specific embodiments, which are explanations of the present invention rather than limitations.

本发明为了描述清晰,其描述中所有的关于综合管廊舱数的描述与常用的不同。本发明中的综合管廊舱数是指综合管廊本体的舱数,而非整个综合管廊中本体以及附属集水舱以及排水舱数的总和。In order to describe the present invention clearly, all the descriptions about the number of integrated pipe gallery cabins in its description are different from the commonly used ones. The number of cabins of the integrated pipe gallery in the present invention refers to the number of cabins of the integrated pipe gallery body, rather than the sum of the number of the main body and the auxiliary water collection tanks and drainage cabins in the entire integrated pipe gallery.

本发明一种综合管廊,包括管廊本体1以及单侧或者双侧设置的附属舱室,该附属舱室上下分为两舱,其中上部为集水舱2,所述集水舱2上方设置有排水盖板7,所述排水盖板7上设置有若干泄水孔,所述集水舱2底面为凹形设置且沿纵向每隔一段距离通过连接管道6与下部排水舱3中的排水管道5相连,所述排水舱3为集水舱2下部舱室,所述排水舱3底面纵向每隔一段距离设置有排水管墩4,所述排水管道5架设在排水管墩4之上,所述排水管道5纵向每隔一段距离通过连接管道6与上部集水舱2连接。该种综合管廊的雨、污水收集、排放分为两种情况:在路面降水量小时,雨、污水经过集水舱2直接排入排水舱3中的排水管道5,此时只由排水管道5承担集水与排水功能;在路面降水量大,当下部的排水管道5满载时,上部集水舱2参与集水、排水功能。该种综合管廊具有两道集水、排水防线,保证大雨时不会出现城市“看海”现象,同时由于该种设计将路面的降水可以收集,以待后期利用,符合海绵城市的建设理念。A comprehensive pipe gallery according to the present invention includes a pipe gallery body 1 and an auxiliary cabin arranged on one or both sides. The drain cover 7 is provided with a number of drain holes, and the bottom surface of the water collection tank 2 is concavely arranged and passes through the drain pipes in the connecting pipe 6 and the lower drain tank 3 at intervals along the longitudinal direction. 5 connected, the drainage cabin 3 is the lower cabin of the water collection cabin 2, and the bottom surface of the drainage cabin 3 is provided with drainage pipe piers 4 at intervals in the longitudinal direction, and the drainage pipes 5 are erected on the drainage pipe piers 4. The drainage pipe 5 is connected to the upper water collecting tank 2 through the connection pipe 6 at intervals in the longitudinal direction. The rain and sewage collection and discharge of this kind of integrated pipe gallery are divided into two situations: when the precipitation on the road surface is small, the rain and sewage are directly discharged into the drainage pipe 5 in the drainage chamber 3 through the water collection chamber 2. At this time, only the drainage pipe 5 undertakes the functions of water collection and drainage; when the precipitation on the road surface is large, when the lower drainage pipe 5 is fully loaded, the upper water collection chamber 2 participates in the functions of water collection and drainage. This kind of comprehensive pipe gallery has two water collection and drainage defense lines to ensure that the city will not "look at the sea" phenomenon during heavy rain. At the same time, because of this design, the precipitation on the road surface can be collected for later use, which is in line with the construction concept of sponge city .

其中,管廊本体1内部设置有中隔墙,所述中隔墙将管廊主体空间分隔为左、右两个主舱室,所述管廊本体1的侧部设置有一个上、下布置的两舱舱室,所述两舱舱室上部舱室为集水舱2,所述集水舱2上方设置有排水盖板7,所述排水盖板7上设置有若干泄水孔,所述集水舱2底面两侧高中间低横截面呈“凹”形,且沿纵向每隔一段距离通过连接管道6与下部排水舱中的排水管道5相连,所述排水舱3为集水舱2下部舱室,所述排水舱3底面纵向每隔一段距离设置有排水管墩4,用于支撑排水管道,所述排水管道5架设在排水管墩4之上,所述排水管道5纵向每隔一段距离通过连接管道6与上部集水舱2连接。Among them, the interior of the pipe gallery body 1 is provided with a middle partition wall, which divides the main space of the pipe gallery into left and right two main cabins, and the side of the pipe gallery body 1 is provided with an upper and a lower arrangement. Two cabins, the upper cabin of the two cabins is a water collection cabin 2, a drainage cover 7 is arranged above the water collection cabin 2, and a number of drain holes are arranged on the drainage cover 7, and the water collection cabin 2. The high middle and low cross section on both sides of the bottom surface is "concave" shape, and is connected to the drainage pipe 5 in the lower drainage compartment through the connecting pipeline 6 at intervals along the longitudinal direction. The drainage compartment 3 is the lower compartment of the water collection compartment 2, The bottom surface of the drainage compartment 3 is longitudinally provided with drainage pipe piers 4 at intervals for supporting the drainage pipes. The drainage pipes 5 are erected on the drainage pipe piers 4. The pipeline 6 is connected with the upper sump tank 2 .

管廊本体1为矩形、圆形或马蹄形断面中的任意一种。管廊本体1横截面可以是单舱、双舱以及多层多舱。The main body 1 of the pipe gallery is any one of rectangular, circular or horseshoe-shaped sections. The cross section of the pipe gallery body 1 can be single cabin, double cabin or multi-layer multi-cabin.

管廊本体1及两侧集水舱2、排水舱3为钢筋混凝土结构或者纤维增强混凝土结构。The main body 1 of the pipe gallery, the water collecting tank 2 and the drainage tank 3 on both sides are reinforced concrete structures or fiber reinforced concrete structures.

管廊本体1两侧的集水2舱以及排水舱3可以根据需要设置为只有左侧、只有右侧以及两侧均有的形式。The water collecting compartments 2 and drainage compartments 3 on both sides of the pipe gallery body 1 can be arranged in the form of only the left side, only the right side, or both sides as required.

具体布置和使用时如以下所述。The specific layout and use are as follows.

如图1所示,本发明实施例提供一种综合管廊,所述综合管廊包括右侧的双舱管廊本体1、左侧的集水舱2以及排水舱3。如图5、6所示,该种综合管廊常布置在道路左侧人行道下。As shown in FIG. 1 , the embodiment of the present invention provides a comprehensive pipe gallery, which includes a double-cabin pipe gallery body 1 on the right, a water collection compartment 2 and a drainage compartment 3 on the left. As shown in Figures 5 and 6, this kind of comprehensive pipe gallery is often arranged under the sidewalk on the left side of the road.

其中所述综合管廊本体1横截面为单层双舱。所述集水舱2与排水舱3上下布置。Wherein, the cross-section of the integrated pipe gallery body 1 is a single-layer double-cabin. The water collecting compartment 2 and the drainage compartment 3 are arranged up and down.

所述集水舱2的上部设置排水盖板7,底部底面为两侧向中间的斜坡,坡度2%~5%,呈“凹”字形,并且在底面纵向每隔2m~5m通过连接管道6与下部的排水舱3中的排水管道5连通。The upper part of the water collecting tank 2 is provided with a drainage cover 7, and the bottom surface of the bottom is a slope from both sides to the middle, with a slope of 2% to 5%, which is in the shape of "concave", and the connecting pipe 6 is passed through the bottom surface at intervals of 2m to 5m in the longitudinal direction. It communicates with the drainage pipe 5 in the drainage compartment 3 of the lower part.

所述集水舱2的内部铺设防水卷材进行密封防渗漏水处理。The interior of the water collecting compartment 2 is covered with waterproof coiled material for sealing and anti-leakage water treatment.

所述排水舱3的底部每隔0.5m~1m设置排水管墩,排水管墩为混凝土结构或者钢结构。排水管道顶部每隔2m~5m通过管道与上部的集水舱2连通。The bottom of the drainage chamber 3 is provided with drainage pipe piers every 0.5m-1m, and the drainage pipe piers are concrete structures or steel structures. The top of the drainage pipe is communicated with the upper water collecting compartment 2 through the pipe at intervals of 2m to 5m.

如图1所示,在路面降水量小时,综合管廊上方路面的积水通过排水盖板7汇聚到集水舱2中,由集水舱2进行初步的收集,然后雨水通过集水舱2底面设置的连接管道6流入排水舱3中的排水管道5,然后进行雨水的进一步收集和利用。在路面降水量过大,路面的积水通过排水盖板7汇聚到集水舱2中,然后雨水通过集水舱2底面设置的连接管道6流入排水舱3中的排水管道5,当排水管道5处于满载状态,雨水直接收集在集水舱2中,此时由排水舱3与集水舱2共同承担雨水的收集与运输功能。As shown in Figure 1, when the amount of precipitation on the road surface is small, the accumulated water on the road above the integrated pipe gallery is collected into the water collection chamber 2 through the drainage cover plate 7, and the water collection chamber 2 is used for preliminary collection, and then the rainwater passes through the water collection chamber 2 The connection pipe 6 provided on the bottom surface flows into the drainage pipe 5 in the drainage compartment 3, and then the rainwater is further collected and utilized. When the amount of precipitation on the road surface is too large, the accumulated water on the road surface is collected into the water collection compartment 2 through the drainage cover plate 7, and then the rainwater flows into the drainage pipe 5 in the drainage chamber 3 through the connecting pipe 6 provided on the bottom surface of the water collection chamber 2. When the drainage pipe 5 is in a fully loaded state, and the rainwater is directly collected in the water collection compartment 2, and at this time, the discharge compartment 3 and the water collection compartment 2 jointly undertake the functions of collecting and transporting rainwater.

在本实施例中根据综合管廊所处的位置以及综合管廊本体舱数差异其实现方式还可以有以下几种:如图2所示的只含有右侧集水舱和排水舱的单层双舱综合管廊,该种综合管廊常布置在道路右侧人行道下,如图5、6;如图3所示的两侧均含有集水舱和排水舱的单层双舱综合管廊,该种综合管廊常布置在道路中间隔离带或者绿化带下,如图5;如图4所示的两侧均含有集水舱和排水舱的双层双舱综合管廊,该种综合管廊常布置在道路中间隔离带或者绿化带下,如图6。In this embodiment, according to the location of the integrated pipe gallery and the difference in the number of cabins of the integrated pipe gallery, there are also the following implementation methods: as shown in Figure 2, a single layer containing only the right water collection tank and drainage tank Double-cabin comprehensive pipe gallery, this kind of comprehensive pipe gallery is often arranged under the sidewalk on the right side of the road, as shown in Figure 5 and 6; as shown in Figure 3, the single-layer double-cabin comprehensive pipe gallery contains water collection tanks and drainage tanks on both sides , this kind of comprehensive pipe gallery is often arranged in the middle isolation belt or under the green belt of the road, as shown in Figure 5; The pipe gallery is often arranged in the middle isolation belt or under the green belt of the road, as shown in Figure 6.

由于在道路路面下部的两侧及中间都建造了该种综合管廊,使路面降水的排放具有3条排放路径,实现了路面降水、污水的全断面收集、排放,效率很高。Since this kind of comprehensive pipe gallery is built on both sides and in the middle of the lower part of the road surface, there are three discharge paths for the discharge of road surface precipitation, which realizes the full-section collection and discharge of road surface precipitation and sewage, with high efficiency.

Claims (10)

  1. A kind of 1. pipe gallery, it is characterised in that the attached cabin set including piping lane body (1) and unilateral or bilateral; Described attached cabin includes collection water tank (2) and draining cabin (3) being sequentially arranged from top to bottom;Set up in the draining cabin (3) There is drainage pipeline (5);It is provided with water drainage cover board (7) above collection water tank (2), bottom surface is longitudinally spaced to be provided with and drainpipe The connecting pipe (6) that road (5) is connected.
  2. 2. a kind of pipe gallery according to claim 1, it is characterised in that draining cabin (3) bottom surface is longitudinally spaced to be set Draining pipe pier (4) is equipped with, the drainage pipeline (5) is erected on draining pipe pier (4).
  3. 3. a kind of pipe gallery according to claim 1, it is characterised in that be provided with the water drainage cover board (7) some Spilled water hole, and concordant with the top of piping lane body (1) set.
  4. 4. a kind of pipe gallery according to claim 1, it is characterised in that connecting pipe (6) is vertically arranged, upper end connection Minimum point in collection water tank (2) bottom surface, lower end is connected to the peak of connecting pipe (6).
  5. 5. a kind of pipe gallery according to claim 1, it is characterised in that it is low between the senior middle school of both sides to integrate water tank (2) bottom surface Slope, the gradient 2%~5%;Connecting pipe (6) and intermediate connection.
  6. 6. a kind of pipe gallery according to claim 1, it is characterised in that collection water tank (2) bottom surface cross section is in concave shape Set, connecting pipe (6) connects with the recess of concave shape.
  7. 7. a kind of pipe gallery according to claim 1, it is characterised in that connecting pipe (6) interlocks with water drainage cover board (7) Set.
  8. 8. a kind of pipe gallery according to claim 1, it is characterised in that piping lane body (1) and collection water tank (2) and draining Cabin (3) is reinforced concrete structure or fibre reinforced concrete structure.
  9. 9. a kind of pipe gallery according to claim 1, it is characterised in that described collection water tank (2) laid inside, which has, to be used for Seal the waterproof layer of anti-seep water.
  10. 10. a kind of application method of pipe gallery, it is characterised in that set in the both sides of pavement of road bottom and middle build respectively The pipe gallery as described in any one in claim 1-9 is put, the emission path of three precipitation is formed on road surface;
    When road surface precipitation is small, the ponding on road surface is converged in collection water tank (2) by water drainage cover board (7) above pipe gallery, Preliminary collection is carried out by collection water tank (2), then rainwater flows into draining by collecting the connecting pipe (6) that water tank (2) bottom surface is set Drainage pipeline (5) in cabin (3), collection and the transportation function of rainwater are undertaken by drainage pipeline (5);
    On road surface, precipitation is excessive, and the ponding on road surface is converged in collection water tank (2) by water drainage cover board (7), and then rainwater passes through Collect the drainage pipeline (5) that the connecting pipe (6) that water tank (2) bottom surface is set is flowed into draining cabin (3), when drainage pipeline (5) is in Full load condition, rainwater are directly collected in collection water tank (2), now by draining cabin (3) and the receipts of collection water tank (2) shared rainwater Collection and transportation function.
CN201710972326.4A 2017-10-18 2017-10-18 A kind of pipe gallery and its application method Pending CN107761763A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710972326.4A CN107761763A (en) 2017-10-18 2017-10-18 A kind of pipe gallery and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710972326.4A CN107761763A (en) 2017-10-18 2017-10-18 A kind of pipe gallery and its application method

Publications (1)

Publication Number Publication Date
CN107761763A true CN107761763A (en) 2018-03-06

Family

ID=61269296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710972326.4A Pending CN107761763A (en) 2017-10-18 2017-10-18 A kind of pipe gallery and its application method

Country Status (1)

Country Link
CN (1) CN107761763A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842818A (en) * 2018-07-27 2018-11-20 中铁第四勘察设计院集团有限公司 Integrated synthesis pipe trench and construction method based on energy storage type tramcar engineering
CN109024673A (en) * 2018-07-05 2018-12-18 沈阳工业大学 A kind of sponge road surface-underground pipe gallery system and construction technology
CN109208733A (en) * 2018-10-30 2019-01-15 中冶京诚工程技术有限公司 Rainwater cabin and have utility tunnel in rainwater cabin
CN113089722A (en) * 2021-04-06 2021-07-09 惠州市金雄城建筑科技有限公司 Piping lane building integrated configuration who utilizes function is collected to rainwater based on BIM
CN118065428A (en) * 2024-04-24 2024-05-24 福州市规划设计研究院集团有限公司 L-shaped prefabricated composite drainage pipe gallery

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064312A (en) * 1998-08-26 2000-02-29 Kumagai Gumi Co Ltd Underground tank
CN204238243U (en) * 2014-10-29 2015-04-01 沈晓铃 A kind of city integrated piping lane
CN105926676A (en) * 2016-06-23 2016-09-07 上海市城市建设设计研究总院 Comprehensive pipe rack system with sponge urban function
CN205688461U (en) * 2016-06-23 2016-11-16 上海市城市建设设计研究总院 Pipe gallery section structure
CN106480902A (en) * 2016-11-25 2017-03-08 沈阳建筑大学 There is water-retention and the underground pipe gallery of preliminary filtering function
CN106638681A (en) * 2016-12-19 2017-05-10 北京建筑大学 Integrated pipe gallery
CN206396790U (en) * 2016-12-16 2017-08-11 江西同济设计集团股份有限公司 A kind of comprehensive pipe gallery structure for being easy to rainwater to discharge
CN206418520U (en) * 2016-12-17 2017-08-18 江西同济设计集团股份有限公司 A kind of comprehensive pipe gallery structure for accessing storm sewer

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064312A (en) * 1998-08-26 2000-02-29 Kumagai Gumi Co Ltd Underground tank
CN204238243U (en) * 2014-10-29 2015-04-01 沈晓铃 A kind of city integrated piping lane
CN105926676A (en) * 2016-06-23 2016-09-07 上海市城市建设设计研究总院 Comprehensive pipe rack system with sponge urban function
CN205688461U (en) * 2016-06-23 2016-11-16 上海市城市建设设计研究总院 Pipe gallery section structure
CN106480902A (en) * 2016-11-25 2017-03-08 沈阳建筑大学 There is water-retention and the underground pipe gallery of preliminary filtering function
CN206396790U (en) * 2016-12-16 2017-08-11 江西同济设计集团股份有限公司 A kind of comprehensive pipe gallery structure for being easy to rainwater to discharge
CN206418520U (en) * 2016-12-17 2017-08-18 江西同济设计集团股份有限公司 A kind of comprehensive pipe gallery structure for accessing storm sewer
CN106638681A (en) * 2016-12-19 2017-05-10 北京建筑大学 Integrated pipe gallery

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024673A (en) * 2018-07-05 2018-12-18 沈阳工业大学 A kind of sponge road surface-underground pipe gallery system and construction technology
CN108842818A (en) * 2018-07-27 2018-11-20 中铁第四勘察设计院集团有限公司 Integrated synthesis pipe trench and construction method based on energy storage type tramcar engineering
CN109208733A (en) * 2018-10-30 2019-01-15 中冶京诚工程技术有限公司 Rainwater cabin and have utility tunnel in rainwater cabin
CN109208733B (en) * 2018-10-30 2023-12-01 中冶京诚工程技术有限公司 Rainwater tanks and comprehensive pipe corridors with rainwater tanks
CN113089722A (en) * 2021-04-06 2021-07-09 惠州市金雄城建筑科技有限公司 Piping lane building integrated configuration who utilizes function is collected to rainwater based on BIM
CN113089722B (en) * 2021-04-06 2022-01-28 惠州市金雄城建筑科技有限公司 Piping lane building integrated configuration who utilizes function is collected to rainwater based on BIM
CN118065428A (en) * 2024-04-24 2024-05-24 福州市规划设计研究院集团有限公司 L-shaped prefabricated composite drainage pipe gallery

Similar Documents

Publication Publication Date Title
CN106638681B (en) A kind of comprehensive pipe gallery
CN107761763A (en) A kind of pipe gallery and its application method
CN107131001B (en) High-speed railway tunnel with water delivery and traffic functions
CN206090784U (en) Sewage inspection well group of comprehensive pipe rack
CN106906846B (en) Prefabricated comprehensive pipe gallery
CN105926676A (en) Comprehensive pipe rack system with sponge urban function
CN106351254A (en) Multilayer urban underground comprehensive pipe gallery
CN107326926A (en) A kind of city emergency drainage system with rapid transit and underground pipe gallery function
CN107630464A (en) Rainwater-collecting is regulated and stored and the pipe gallery of preliminary purification function
CN205688460U (en) Pipe gallery system with sponge city function
CN107542153A (en) A kind of method and pipe gallery for solving urban waterlogging
CN109024673B (en) Sponge pavement-underground comprehensive pipe gallery system and construction process
CN107162238A (en) Gravity stream sewage enters corridor system
CN207211190U (en) A kind of pipe gallery
CN214574059U (en) Outdoor transformer substation cable trench
CN206319337U (en) Large-scale square tube type Urban Underground comprehensive tunnel
CN108571013A (en) A kind of underground pipe gallery structure that band rain sewage becomes a mandarin
CN205296347U (en) Arrangement structure that utility tunnel internal drain pipe said
CN208266612U (en) A kind of town road structure
CN208472770U (en) A kind of underground pipe gallery structure suitable for mountain area riverfront landform
CN116677452A (en) A method for cleaning, separating and draining sewage at the bifurcation of an overpass tunnel
CN114164893B (en) A kind of underground mine water dispatching system and its control method
CN212001258U (en) Mountain tunnel utility tunnel structure suitable for new Austrian's method construction
CN215442013U (en) Cross joint structure of comprehensive pipe gallery and drain pipe
CN210066387U (en) Space utilization system based on three-dimensional traffic and utility tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180306