[go: up one dir, main page]

CN107738652A - A kind of intelligence nothing stops on-board and off-board system - Google Patents

A kind of intelligence nothing stops on-board and off-board system Download PDF

Info

Publication number
CN107738652A
CN107738652A CN201711124242.1A CN201711124242A CN107738652A CN 107738652 A CN107738652 A CN 107738652A CN 201711124242 A CN201711124242 A CN 201711124242A CN 107738652 A CN107738652 A CN 107738652A
Authority
CN
China
Prior art keywords
carriage
board
train
station
compartment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711124242.1A
Other languages
Chinese (zh)
Inventor
宋东宝
彭良清
宋东金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711124242.1A priority Critical patent/CN107738652A/en
Publication of CN107738652A publication Critical patent/CN107738652A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B1/00General arrangement of stations, platforms, or sidings; Railway networks; Rail vehicle marshalling systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61KAUXILIARY EQUIPMENT SPECIALLY ADAPTED FOR RAILWAYS, NOT OTHERWISE PROVIDED FOR
    • B61K1/00Transferring passengers, articles, or freight to and from moving trains; Slipping or coupling vehicles from or to moving trains

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Transportation (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

本发明涉及一种智能无停上下客系统,包括列车、车站、上客车厢和下客车厢,列车中部的两节车厢沿列车行进方向从前往后依次作为上客升降车厢和下客升降车厢,上客升降车厢和下客升降车厢采用相同的升降车厢结构,上客升降车厢和下客升降车厢之间的车厢顶面上沿列车行进方向从前往后依次设有第一车钩和第二车钩;车站的列车通道上方架设有两条平行的外侧车站轨道,两条外侧车站轨道外侧分别设有一下客车厢拦截机构;上客车厢和下客车厢采用相同的上下客车厢结构。与现有技术相比,本发明可实现列车无停上下客的目的,不仅能够使乘坐高速列车的旅客上下车的站点大量增加,并且还能够实现随时随地的上下车,大大的节省整段旅途的耗时。

The invention relates to an intelligent non-stop passenger loading and unloading system, which comprises a train, a station, a boarding carriage and a disembarking carriage. The passenger elevator car and the passenger elevator car adopt the same elevator car structure, and the car top surface between the passenger elevator car and the passenger elevator car is provided with a first coupler and a second coupler in sequence along the direction of train travel from front to back; Two parallel outer station rails are erected above the train channel of the station, and the outer sides of the two outer station rails are respectively equipped with an intercepting mechanism for passenger cars; the upper and lower passenger cars adopt the same upper and lower passenger car structure. Compared with the prior art, the present invention can realize the purpose of non-stop loading and unloading of trains, not only can increase the number of stations for passengers taking high-speed trains to get on and off, but also can realize getting on and off anytime and anywhere, greatly saving the entire journey time-consuming.

Description

一种智能无停上下客系统An intelligent non-stop passenger loading and unloading system

技术领域technical field

本发明涉及轨道交通工具,尤其是涉及一种智能无停上下客系统。The invention relates to a rail vehicle, in particular to an intelligent non-stop passenger loading and unloading system.

背景技术Background technique

轨道交通工具包括:火车、有轨电车、地铁、高铁及未来城市虚拟轨道电车或云轨电车等,随着交通技术的发展,轨道交通工具给人们带来更多的便利,同时铁路提速,也为企业带来明显的经济效益,显然“提速”这两个字意味着交通、运输、旅游等经济事业的进一步发展,但是由于需要停靠站,否则让旅客无法上下车,在停车时必须先要减速,特别是高铁,从车速二三百公里时速慢慢减到几公里的车速,然后才可以再停车,当开动时,车速又要从零起步不断的再加速,这样一减一停再一加一快,仅仅停车的程序无形中就占用了许多宝贵的时间,使得经过努力提高的速度无形当中又大大打了折扣,如此,这种线路上多次停车的车程也大大增加了整段线路的用时,同时由于铁路提速的限制,不仅停车的站点间距明显的加大,并且还使得停靠的站点也在减少,造成线路资源的浪费,上下车的旅客还需再分散乘车到达车站和各自的目的地,无形之中,给旅客不仅造成了不便,同时也浪费了社会交通的资源,对此目前也没有很好的解决办法。Rail transportation tools include: trains, trams, subways, high-speed rails, and future city virtual rail cars or cloud rail cars. With the development of transportation technology, rail transportation tools bring more convenience to people. Bring obvious economic benefits to the enterprise. Obviously, the word "speed up" means the further development of economic undertakings such as traffic, transportation, and tourism. However, due to the need for stops, otherwise passengers will not be able to get on and off the bus. Slow down, especially for high-speed trains. Slowly reduce the speed from 200 to 300 kilometers per hour to a speed of several kilometers, and then stop again. When driving, the speed must start from zero and continue to accelerate again. Speeding up, just the parking procedure takes up a lot of precious time virtually, which greatly reduces the speed that has been improved through hard work. In this way, the driving time of multiple stops on this line also greatly increases the length of the entire line. At the same time, due to the limitation of railway speed increase, not only the distance between the parking stations is significantly increased, but also the number of stopping stations is also reduced, resulting in a waste of line resources. Invisibly, it not only causes inconvenience to passengers, but also wastes social transportation resources, and there is no good solution to this at present.

发明内容Contents of the invention

本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种智能无停上下客系统,能够完成从站台到目的地中间进行不间断的运行,始终不需要停靠任何站点,就能够不需要停车快速到达目的地,其结构简单可行,它不仅能够使乘坐高速列车的旅客上下车的站点大量增加,并且还能够实现随时随地的上下车,大大的节省整段旅途的耗时。The purpose of the present invention is to provide an intelligent non-stop passenger boarding and disembarking system in order to overcome the above-mentioned defects in the prior art, which can complete uninterrupted operation from the platform to the destination without stopping at any station. Parking quickly reaches the destination, and its structure is simple and feasible. It can not only greatly increase the number of stations for passengers taking high-speed trains to get on and off, but also can realize getting on and off anytime and anywhere, greatly saving the time-consuming of the entire journey.

本发明的目的可以通过以下技术方案来实现:The purpose of the present invention can be achieved through the following technical solutions:

一种智能无停上下客系统,包括列车、车站、上客车厢和下客车厢,所述列车中部的两节车厢沿列车行进方向从前往后依次作为上客升降车厢和下客升降车厢,所述上客升降车厢和下客升降车厢采用相同的升降车厢结构,所述升降车厢结构的顶面开口,升降车厢结构内设有升降机构,所述升降机构上设有载车厢板,所述载车厢板上设有两条平行的内侧车顶轨道,上客升降车厢和下客升降车厢之间的车厢顶面上沿列车行进方向从前往后依次设有第一车钩和第二车钩;An intelligent non-stop passenger loading and unloading system, including a train, a station, a boarding carriage and a disembarking carriage. The passenger lift car and the passenger lift car adopt the same lift car structure, the top surface of the lift car structure is open, the lift car structure is provided with a lifting mechanism, and the lifting mechanism is provided with a car-carrying plate. There are two parallel inner roof rails on the car board, and the first coupler and the second coupler are arranged in sequence from front to back along the direction of train travel on the top surface of the car between the passenger lift car and the drop passenger lift car;

所述车站的列车通道上方架设有两条平行的外侧车站轨道,所述外侧车站轨道的架设高度大于列车高度,两条外侧车站轨道之间的距离大于两条内侧车顶轨道之间的距离,两条外侧车站轨道外侧分别设有一下客车厢拦截机构;Two parallel outer station rails are erected above the train passage of the station, the erection height of the outer station rails is greater than the height of the train, and the distance between the two outer station rails is greater than the distance between the two inner roof rails, Interception mechanisms for passenger compartments are respectively installed on the outer sides of the two outer station tracks;

上客车厢和下客车厢采用相同的上下客车厢结构,该上下客车厢结构的尾部设有与第一车钩配合的第一车钩咬合部,上下客车厢结构的头部设有与第二车钩配合的第二车钩咬合部,上下客车厢结构的左右侧面设有与下客车厢拦截机构配合的第三车钩咬合部,上下客车厢结构的底面设有可切换轨道的双车轮驱动机构;The upper and lower passenger compartments adopt the same upper and lower passenger compartment structure, the tail of the upper and lower passenger compartment structure is provided with a first coupler engaging part that cooperates with the first coupler, and the head of the upper and lower passenger compartment structure is provided with a second coupler. The second coupler occlusal part of the upper and lower passenger compartment structures is provided with a third coupler occlusal part that cooperates with the interception mechanism of the lower passenger compartment, and the bottom surface of the upper and lower passenger compartment structure is provided with a double-wheel drive mechanism that can switch tracks;

列车进站前,上客车厢停驻在外侧车站轨道上并在列车行进方向上位于第一车钩之前,下客车厢停驻在列车的下客升降车厢内的内侧车顶轨道上;下客升降车厢通过升降机构抬升载车厢板至自身的车厢顶面,第二车钩与抬升后的下客车厢的第二车钩咬合部咬合;Before the train enters the station, the boarding carriage is parked on the outer station rail and is located before the first coupler in the direction of train travel, and the disembarking carriage is parked on the inner roof rail in the disembarking elevator compartment of the train; The carriage lifts the carriage plate to the top surface of its own carriage through the lifting mechanism, and the second coupler engages with the second coupler engaging part of the lifted passenger carriage;

无停上下客时,第一车钩与上客车厢的第一车钩咬合部对接咬合,上客车厢的双车轮驱动机构由外侧车站轨道切换到上客升降车厢的内侧车顶轨道上,使上客车厢留驻在列车顶部;与此同时,第二车钩与下客车厢的第二车钩咬合部脱钩,下客车厢拦截机构与下客车厢的第三车钩咬合部对接咬合,下客车厢的双车轮驱动机构由第一内侧车顶轨道切换到外侧车站轨道上,使下客车厢留驻在车站内;最后,上客车厢由升降机构下降至上客升降车厢内,待上客车厢内乘客进入列车内,上客车厢由双车轮驱动机构主动驱动至下客升降车厢内的内侧车顶轨道上,作为下一次的下客车厢。When there is no stop for loading and unloading, the first coupler and the first coupler occlusal part of the boarding car are docked and engaged, and the double-wheel drive mechanism of the boarding car is switched from the outer station track to the inner roof rail of the boarding elevator car, so that the boarding car The car stays on the top of the train; at the same time, the second coupler is decoupled from the second coupler engagement part of the lower passenger car, the lower passenger car interception mechanism is docked and engaged with the third coupler engagement part of the lower passenger car, and the double wheel drive of the lower passenger car The mechanism is switched from the first inner roof track to the outer station track, so that the passenger compartment stays in the station; finally, the passenger compartment is lowered into the passenger elevator compartment by the lifting mechanism, and the passenger in the passenger compartment enters the train and boards. The passenger compartment is actively driven to the inner roof rail in the passenger lift compartment by the double-wheel drive mechanism as the next passenger compartment.

所述外侧车站轨道的架设高度大于列车高度18~22cm。The erection height of the outer station track is 18-22cm greater than the train height.

所述载车厢板上设有可升降的卡钳,所述上下客车厢结构的底面还设有与卡钳相配合的卡槽,卡钳卡入上下客车厢结构的卡槽后将上下客车厢结构固定在升降车厢结构内。The upper and lower passenger car structure is provided with a liftable caliper, and the bottom surface of the upper and lower passenger car structure is also provided with a card slot that matches the caliper. After the caliper is inserted into the card slot of the upper and lower passenger car structure, the upper and lower passenger car structure is fixed. Inside the lift car structure.

所述第一车钩咬合部和第三车钩咬合部上均设有一用于缓冲咬合对接时冲击力的缓冲块。A buffer block is provided on the first coupler engaging portion and the third coupler engaging portion to buffer the impact force during the engagement and docking.

所述双车轮驱动机构包括内侧车轮和外侧车轮,所述内侧车轮和外侧车轮分别设于上下客车厢结构的底面上,且外侧车轮位于内侧车轮的外侧,内侧车轮为主动驱动车轮,双车轮驱动机构由内侧车顶轨道切换到外侧车站轨道上时,内侧车轮悬空,外侧车轮与外侧车站轨道相接触,双车轮驱动机构由外侧车站轨道切换到内侧车顶轨道上时,外侧车轮悬空,内侧车轮与内侧车顶轨道相接触。The dual-wheel drive mechanism includes an inner wheel and an outer wheel. The inner wheel and the outer wheel are respectively arranged on the bottom surface of the upper and lower passenger compartment structures, and the outer wheel is located outside the inner wheel. The inner wheel is an active drive wheel, and the double wheel drives When the mechanism is switched from the inner roof track to the outer station track, the inner wheels are suspended in the air, and the outer wheels are in contact with the outer station track. Contact with inner roof rail.

所述载车厢板上设有可折叠的安全护栏,在载车厢板升降过程中,安全护栏在载车厢板尾部沿竖直方向展开升起。A foldable safety guardrail is provided on the vehicle-carrying board, and during the lifting process of the car-carrying board, the safety guardrail is deployed and raised vertically at the tail of the car-carrying board.

所述升降车厢的顶面开口处设有可自动开合的车顶盖。A roof cover that can be opened and closed automatically is provided at the opening of the top surface of the lift car.

该系统还包括客量定员控制模块,用于实时监测列车内空余座位的数量,并根据列车内空余座位的数量控制上客车厢的容纳人员数量。The system also includes a passenger quota control module, which is used to monitor the number of vacant seats in the train in real time, and control the number of people accommodated in the boarding compartment according to the number of vacant seats in the train.

与现有技术相比,本发明具有以下优点:Compared with the prior art, the present invention has the following advantages:

1、适用于火车、有轨电车、地铁、高铁等轨道交通领域,利用双车轮驱动机构与外侧车站轨道、内侧车顶轨道的紧密配合以及车钩、拦截机构与车钩咬合部的紧密配合可实现列车无停上下客的目的,能够完成从站台到目的地中间进行不间断的运行,始终不需要停靠任何站点,就能够不需要停车快速到达目的地,其结构简单可行,它不仅能够使乘坐高速列车的旅客上下车的站点大量增加,并且还能够实现随时随地的上下车,大大的节省整段旅途的耗时。1. It is suitable for rail transit fields such as trains, trams, subways, and high-speed rails. The tight fit between the double-wheel drive mechanism and the outer station rail and inner roof rail as well as the tight fit between the coupler, the intercepting mechanism and the coupler occlusion can realize the train The purpose of non-stop loading and unloading, it can complete the uninterrupted operation from the platform to the destination, and it can reach the destination quickly without stopping at any station. Its structure is simple and feasible. It can not only make the high-speed train The number of stations for passengers getting on and off has greatly increased, and it is also possible to get on and off anytime and anywhere, which greatly saves the time-consuming of the entire journey.

2、在第一车钩咬合部和第二车钩咬合部上设置缓冲块,例如:弹簧或橡皮块,以缓冲咬合对接时冲击力。2. A cushioning block, such as a spring or a rubber block, is provided on the first coupler engagement portion and the second coupler engagement portion to buffer the impact force during engagement and docking.

3、设置第二车钩与第二车钩咬合部,配合双车轮驱动机构的刹车实现将下客车厢稳定固定在下客升降车厢顶面上,提高结构的稳定性。3. Set the second coupler and the second coupler occlusal part, and coordinate with the brakes of the double-wheel drive mechanism to stably fix the passenger compartment on the top surface of the passenger elevator compartment, improving the stability of the structure.

4、双车轮驱动机构结构简单,实现上下客车厢结构在内侧车顶轨道与外侧车站轨道之间切换,为列车不停车上下客提供基本保障。4. The structure of the double-wheel driving mechanism is simple, which realizes the switch between the inner roof track and the outer station track of the upper and lower passenger car structure, and provides a basic guarantee for the train to board and unload passengers without stopping.

5、设置安全防护栏,在载车厢板升降过程中,安全护栏在载车厢板尾部沿竖直方向展开升起,可防止上下客车厢结构在载车厢板升降过程中不会向后滑行。5. Set up a safety guardrail. During the lifting process of the carriage plate, the safety guardrail is deployed and raised at the tail of the carriage plate along the vertical direction, which can prevent the structure of the upper and lower passenger compartments from sliding backward during the lifting process of the carriage plate.

6、结构合理,使用便捷,占用空间小,对列车以及车站的改造小,建设成本低。6. The structure is reasonable, the use is convenient, the space occupied is small, the transformation of the train and the station is small, and the construction cost is low.

附图说明Description of drawings

图1为本发明系统中内侧车顶轨道和外侧车站轨道布设示意图;Fig. 1 is a schematic layout diagram of the inner roof track and the outer station track in the system of the present invention;

图2为从上客车厢头部往后看时上下客车厢结构的内侧车轮和外侧车轮安装示意图;Figure 2 is a schematic view of the installation of the inner wheels and the outer wheels of the upper and lower passenger compartment structures when looking back from the head of the upper passenger compartment;

图3为从上客车厢尾部往前看时上下客车厢结构的第一车钩与第一车钩咬合部配合的示意图;Fig. 3 is a schematic diagram of cooperation between the first coupler and the first coupler occlusal part of the upper and lower passenger compartment structure when looking forward from the rear of the upper passenger compartment;

图4为从车厢侧面看时上下客车厢结构的第一车钩与第一车钩咬合部配合、第二车钩与第二车钩咬合部配合、下客车厢拦截机构与第三车钩咬合部配合的示意图;Fig. 4 is a schematic diagram of the cooperation between the first coupler and the first coupler joint, the second coupler and the second coupler joint, and the cooperation between the passenger compartment intercepting mechanism and the third coupler joint of the upper and lower passenger compartment structure when viewed from the side of the carriage;

图5为进站前下客车厢抬升至下客升降车厢顶面的示意图;Fig. 5 is a schematic diagram of lifting the passenger car to the top surface of the passenger lift car before entering the station;

图6为第一车钩拦截上客车厢、下客车厢拦截机构拦截下客车厢的示意图;Fig. 6 is a schematic diagram of the first coupler intercepting the upper passenger compartment and the lower passenger compartment interception mechanism intercepting the lower passenger compartment;

图7为无停上下客结束后上客车厢进入上客升降车厢、下客车厢留在车站的示意图。Fig. 7 is the schematic diagram that the boarding carriage enters the boarding lift carriage and the disembarking carriage stays at the station after the end of the non-stop loading and unloading.

图中,A、上客车厢,B、下客车厢,C、上客升降车厢,D、下客升降车厢,1、升降车厢结构,2、升降机构,3、载车厢板,4、内侧车顶轨道,5、列车车厢,6、第一车钩,7、第二车钩,8、外侧车站轨道,9、下客车厢拦截机构,10、卡钳,11、电动折叠台阶,12、内侧车轮,13、外侧车轮,14、第一车钩咬合部,15、第二车钩咬合部,16、第三车钩咬合部,17、中间连接板。In the figure, A, passenger compartment, B, passenger compartment, C, passenger lift compartment, D, passenger lift compartment, 1, lift compartment structure, 2, lifting mechanism, 3, compartment board, 4, inner side car Top rail, 5. Train carriage, 6. First coupler, 7. Second coupler, 8. Outer station rail, 9. Interception mechanism for lower passenger compartment, 10. Caliper, 11. Electric folding steps, 12. Inner wheel, 13 , the outer wheel, 14, the first coupler joint, 15, the second coupler joint, 16, the third coupler joint, 17, the middle connecting plate.

具体实施方式detailed description

下面结合附图和具体实施例对本发明进行详细说明。本实施例以本发明技术方案为前提进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is carried out on the premise of the technical solution of the present invention, and detailed implementation and specific operation process are given, but the protection scope of the present invention is not limited to the following embodiments.

一种智能无停上下客系统包括列车、车站、上客车厢A和下客车厢B,在列车和车站上分别设置用于上下客车厢结构切换的轨道以及将使得下客车厢B留驻在车站内、使上客车厢A留驻在列车顶部的配合结构,从而实现列车无停上下客的目的,适用于火车、有轨电车、地铁、高铁等轨道交通领域,下面对各部分结构具体说明:An intelligent non-stop passenger loading and unloading system includes a train, a station, a passenger compartment A and a passenger compartment B, and tracks for switching the structure of the passenger compartments for the upper and lower compartments are respectively set on the train and the station, and the passenger compartment B will stay in the station 1. The matching structure that makes the boarding compartment A stay on the top of the train, so as to realize the purpose of non-stop loading and unloading of the train. It is suitable for rail transportation fields such as trains, trams, subways, high-speed rails, etc. The structure of each part is described in detail below:

列车中部的两节车厢沿列车行进方向从前往后依次作为上客升降车厢C和下客升降车厢D,其余车厢为普通的列车车厢5,上客升降车厢C和下客升降车厢D采用相同的升降车厢结构1,升降车厢结构1的顶面开口,升降车厢结构1内设有升降机构2,升降机构2上设有载车厢板3,载车厢板3上设有两条平行的内侧车顶轨道4,升降车厢结构1内设有两端分别与内侧车顶轨道4对接的中间连接板17,上客升降车厢C和下客升降车厢D之间的车厢顶面上沿列车行进方向从前往后依次设有第一车钩6和第二车钩7。载车厢板3上设有可升降的卡钳10,上下客车厢结构的底面还设有与卡钳10相配合的卡槽,卡钳10卡入上下客车厢结构的卡槽后将上下客车厢结构固定在升降车厢结构1内,在内侧车轮12刹住在内侧车顶轨道4的基础上,进一步保证列车高速行驶过程中的稳定性,本实施例中升降机构2采用液压升降装置。The two carriages in the middle of the train are used as the passenger elevator car C and the passenger elevator car D from front to back along the train travel direction, and the rest of the cars are ordinary train cars 5, and the passenger elevator car C and the passenger elevator car D use the same The lift car structure 1, the top surface of the lift car structure 1 is open, the lift car structure 1 is provided with a lifting mechanism 2, the lifting mechanism 2 is provided with a carriage plate 3, and the carriage plate 3 is provided with two parallel inner roofs Rail 4, lift car structure 1 is provided with the middle connecting plate 17 that two ends are respectively docked with inner side roof rail 4, and the car top surface between the passenger lift car C and the passenger lift car D is along the traveling direction of the train from going to After that, the first coupler 6 and the second coupler 7 are arranged successively. The carriage plate 3 is provided with a liftable caliper 10, and the bottom surface of the upper and lower passenger compartment structure is also provided with a draw-in groove matched with the caliper 10. After the caliper 10 snaps into the draw-in groove of the upper and lower passenger compartment structure, the upper and lower passenger compartment structure is fixed on the In the lifting car structure 1, the inner wheels 12 are braked on the inner roof rail 4 to further ensure the stability of the train during high-speed running. In this embodiment, the lifting mechanism 2 adopts a hydraulic lifting device.

车站的列车通道上方架设有两条平行的外侧车站轨道8,外侧车站轨道8的架设高度大于列车高度18~22cm,本实施例中采用20cm,两条外侧车站轨道8之间的距离大于两条内侧车顶轨道4之间的距离,则当列车行至外侧车站轨道8下方时内侧车顶轨道4位于内侧而外侧车站轨道8位于外侧,如图1所示,两条外侧车站轨道8外侧分别设有一下客车厢拦截机构9。Two parallel outer station rails 8 are erected above the train passage of the station, and the erection height of the outer station rails 8 is greater than the height of the train by 18-22cm. In the present embodiment, 20cm is adopted, and the distance between the two outer station rails 8 is greater than two The distance between the inner roof rails 4 is that when the train travels below the outer station rails 8, the inner roof rails 4 are on the inside and the outer station rails 8 are on the outer sides. As shown in Figure 1, the two outer station rails 8 are respectively There is an intercepting mechanism 9 for passenger compartments.

上客车厢A和下客车厢B采用相同的上下客车厢结构,如图3、4所示,该上下客车厢结构的尾部设有与第一车钩6配合的第一车钩咬合部14,上下客车厢结构的头部设有与第二车钩7配合的第二车钩咬合部15,上下客车厢结构的左右侧面设有与下客车厢拦截机构9配合的第三车钩咬合部16,该下客车厢拦截机构9与第三车钩咬合部16的配合位置位于上下客车厢结构的后部1/3处较好,此处附近受力最为合理,上下客车厢结构的底面设有可切换轨道的双车轮驱动机构,上下客车厢结构的前后两端上可以根据需要设有供人上下的电动折叠台阶11。本实施例中,第一车钩6、第二车钩7和下客车厢拦截机构9均可采用带钩子的侧面挡板的结构,第一车钩咬合部14、第二车钩咬合部15和第三车钩咬合部16可采用钩子结构,分别对应与第一车钩6、第二车钩7和下客车厢拦截机构9上的钩子咬合对接,第二车钩7与第二车钩咬合部15还可以替换为带有磁性的电磁铁结构。The passenger compartment A and the passenger compartment B adopt the same upper and lower passenger compartment structure, as shown in Figures 3 and 4, the rear portion of the upper and lower passenger compartment structure is provided with a first coupler engagement portion 14 that cooperates with the first coupler 6, and the upper and lower passengers The head of the compartment structure is provided with a second coupler engaging portion 15 that cooperates with the second coupler 7, and the left and right sides of the upper and lower passenger compartment structures are provided with a third coupler engaging portion 16 that cooperates with the intercepting mechanism 9 of the lower passenger compartment. The matching position between the intercepting mechanism 9 and the third coupler engagement part 16 is preferably located at the rear 1/3 of the upper and lower passenger compartment structure, where the force is most reasonable, and the bottom surface of the upper and lower passenger compartment structure is provided with double wheels that can switch tracks Driving mechanism, the front and rear ends of the upper and lower passenger compartment structures can be provided with electric folding steps 11 for people to go up and down as required. In this embodiment, the first coupler 6, the second coupler 7 and the intercepting mechanism 9 for the passenger compartment can all adopt the structure of a side baffle with a hook, and the first coupler engagement portion 14, the second coupler engagement portion 15 and the third coupler engagement portion The engaging portion 16 can adopt a hook structure, corresponding to the first coupler 6, the second coupler 7 and the hook engagement on the intercepting mechanism 9 of the passenger compartment 9, respectively, and the second coupler 7 and the second coupler engaging portion 15 can also be replaced with Magnetic electromagnet structure.

如图5-7所示,本发明系统工作过程为:As shown in Figure 5-7, the working process of the system of the present invention is:

1)列车进站前,上客车厢A停驻在外侧车站轨道8上并在列车行进方向上位于第一车钩6之前,下客车厢B停驻在列车的下客升降车厢D内的内侧车顶轨道4上。1) Before the train enters the station, the boarding carriage A is parked on the outer station track 8 and is located in front of the first coupler 6 in the direction of train travel, and the disembarking carriage B is parked on the inner side of the train's disembarking elevator carriage D Top track 4.

2)无停上下客过程:列车即将进站前,如图5所示,下客车厢拦截机构9和第一车钩6分别处于工作就位状态,上客升降车厢C和下客升降车厢D分别通过升降机构2抬升载车厢板3至自身的车厢顶面,第二车钩7与抬升后的下客车厢B的第二车钩咬合部15咬合,抬升后的下客车厢B稳定固定在下客升降车厢D顶面上,以增加停车稳定性;2) The process of loading and unloading passengers without stopping: before the train enters the station, as shown in Figure 5, the intercepting mechanism 9 of the passenger compartment and the first coupler 6 are in the working position respectively, and the lift car C and the lift car D respectively The lifting mechanism 2 lifts the carriage board 3 to the top surface of its own carriage, the second coupler 7 engages with the second coupler engaging portion 15 of the lifted passenger carriage B, and the lifted passenger carriage B is stably fixed on the passenger lift carriage D top surface to increase parking stability;

上客车厢A与下客车厢B同时分别在内侧车顶轨道4与外侧车站轨道8之间进行切换轨道,具体为:The passenger compartment A and the passenger compartment B switch tracks between the inner roof track 4 and the outer station track 8 at the same time, specifically:

一方面,第一车钩6与上客车厢A的第一车钩咬合部14对接咬合,如图3、4、6所示,将上客车厢A本体拦下,且上客车厢A的双车轮驱动机构由外侧车站轨道8切换到上客升降车厢C的内侧车顶轨道4上,则上客车厢A负重由外侧的外侧车站轨道8转移至内侧的内侧车顶轨道4上,使上客车厢A留驻在列车顶部,第一车钩6与上客车厢A的第一车钩咬合部14脱离,上客车厢A准备下降至上客升降车厢C内;On the one hand, the first coupler 6 is docked and engaged with the first coupler engaging portion 14 of the passenger compartment A, as shown in Figures 3, 4 and 6, the main body of the passenger compartment A is blocked, and the dual wheels of the passenger compartment A are driven The mechanism is switched from the outer station rail 8 to the inner roof rail 4 of the passenger lift car C, then the load of the upper passenger compartment A is transferred from the outer outer station rail 8 to the inner inner roof rail 4 of the inner side, so that the upper passenger compartment A Staying on the top of the train, the first coupler 6 is disengaged from the first coupler engagement portion 14 of the passenger compartment A, and the passenger compartment A is ready to descend into the passenger lift compartment C;

与此同时,第二车钩7与下客车厢B的第二车钩咬合部15脱钩,下客车厢B的内侧车轮12松开刹车,下客车厢拦截机构9与下客车厢B的第三车钩咬合部16对接咬合,脱钩、松刹与对接咬合同步进行,如图4、6所示,将下客车厢B本体拦下,下客车厢B的双车轮驱动机构由第一内侧车顶轨道4切换到外侧车站轨道8上,则下客车厢B负重由内侧的内侧车顶轨道4转移至外侧的外侧车站轨道8,使下客车厢B留驻在车站内;At the same time, the second coupler 7 is decoupled from the second coupler engagement portion 15 of the passenger compartment B, the inner wheel 12 of the passenger compartment B is released from the brake, and the intercepting mechanism 9 of the passenger compartment 9 is engaged with the third coupler of the passenger compartment B. Part 16 is docked and engaged, uncoupling, brake loosening and butted engaging are carried out synchronously, as shown in Figures 4 and 6, the main body of the passenger compartment B is stopped, and the double-wheel drive mechanism of the passenger compartment B is switched by the first inner roof rail 4 On the outer station track 8, the load of the lower passenger compartment B is transferred from the inner inner roof track 4 of the inner side to the outer outer station track 8 of the outer side, so that the lower passenger compartment B stays in the station;

最后,如图7所示,上客车厢A由升降机构2下降至上客升降车厢C内,同时下客升降车厢D内的载车厢板3也下降,下降复位的两个载车厢板3之间由中间连接板17对接,上客车厢A前后门打开,上车乘客利用电动折叠台阶11分别进入自己车厢对应座位,待上客车厢A内乘客进入列车内,上客车厢A由双车轮驱动机构主动驱动至下客升降车厢D内的内侧车顶轨道4上,作为下一次的下客车厢B,载车厢板3上的卡钳10上升并固定下客车厢B位置。Finally, as shown in Figure 7, the passenger compartment A is lowered into the passenger lift compartment C by the lifting mechanism 2, and at the same time, the car-loading compartment plate 3 in the passenger lift compartment D also descends. Butted by the middle connecting plate 17, the front and rear doors of the boarding compartment A are opened, and the boarding passengers enter the corresponding seats in their own compartments by using the electric folding steps 11. After the passengers in the boarding compartment A enter the train, the boarding compartment A is driven by a double-wheel drive mechanism. Actively drive to the inside roof rail 4 in the passenger lift compartment D, as the next passenger compartment B, the caliper 10 on the compartment plate 3 rises and fixes the position of the passenger compartment B.

对于留驻在车站内的下客车厢B,下客后,该下客车厢B转换为下一次的上客车厢A准备车站的上客。对于进入到上客升降车厢C内的上客车厢A,下客后移动至下客升降车厢D内,该上客车厢A转换为下一次的下客车厢B准备列车的下客。For the drop-off car B staying in the station, after getting off the passengers, the drop-off car B is converted into the next pick-up car A to prepare for boarding at the station. For the boarding compartment A entering the boarding elevator car C, it moves to the disembarking elevator car D after getting off the passengers, and the boarding compartment A is converted into the next disembarkation compartment B to prepare for the disembarkation of the train.

第一车钩咬合部14和第三车钩咬合部16上均设有一用于缓冲咬合对接时冲击力的缓冲块,缓冲块可采用弹簧或橡皮块。Both the first coupler engaging portion 14 and the third coupler engaging portion 16 are provided with a buffer block for buffering the impact force when engaging butt joint, and the buffer block can be a spring or a rubber block.

整个上下客过程中,列车处于行驶状态,考虑到安全因素等可以令列车低速经过车站,在低速行驶或滑行状态下进行上客车厢A与下客车厢B的切换。During the whole process of loading and unloading, the train is in the running state. Considering safety factors, the train can pass through the station at a low speed, and switch between the boarding carriage A and the disembarking carriage B under low speed running or sliding state.

该系统的列车的运行由地面供电网进行供电,地面供电网(例如第三轨)在列车下方进行接触供电,以适应高铁、有轨电车等由接触网供电的轨道交通领域。The operation of the train in this system is powered by the ground power supply network, and the ground power supply network (such as the third rail) provides contact power supply under the train to adapt to high-speed rail, trams and other rail transit fields powered by catenary.

如图2所示,双车轮驱动机构包括内侧车轮12和外侧车轮13,内侧车轮12通过第一车轮升降装置设于上下客车厢结构的底面,外侧车轮13通过第二车轮升降装置设于上下客车厢结构的底面,且外侧车轮13位于内侧车轮12的外侧,内侧车轮12为主动驱动车轮,双车轮驱动机构由内侧车顶轨道4切换到外侧车站轨道8上时,第一车轮升降装置带动内侧车轮12上升与内侧车顶轨道4相脱离,即内侧车轮12悬空,第二车轮升降装置带动外侧车轮13下降与外侧车站轨道8相接触,双车轮驱动机构由外侧车站轨道8切换到内侧车顶轨道4上时,第二车轮升降装置带动外侧车轮13上升与外侧车站轨道8相脱离,即外侧车轮13悬空,第一车轮升降装置带动内侧车轮12下降与内侧车顶轨道4相接触,双车轮驱动机构结构简单,实现上下客车厢结构在内侧车顶轨道4与外侧车站轨道8之间切换,为列车不停车上下客提供基本保障。As shown in Figure 2, the dual-wheel drive mechanism includes an inner wheel 12 and an outer wheel 13. The inner wheel 12 is arranged on the bottom surface of the upper and lower passenger compartment structure through the first wheel lifting device, and the outer wheel 13 is arranged on the upper and lower passenger compartment structure through the second wheel lifting device. The bottom surface of the carriage structure, and the outer wheels 13 are located on the outer side of the inner wheels 12, the inner wheels 12 are actively driven wheels, when the double wheel drive mechanism is switched from the inner roof rail 4 to the outer station rail 8, the first wheel lifting device drives the inner The wheels 12 rise and separate from the inner roof rail 4, that is, the inner wheels 12 are suspended in the air, and the second wheel lifting device drives the outer wheels 13 to descend to contact the outer station rail 8, and the double-wheel drive mechanism is switched from the outer station rail 8 to the inner roof. When the track 4 is on, the second wheel elevating device drives the outer wheel 13 to rise and separate from the outer station rail 8, that is, the outer wheel 13 is suspended in the air, and the first wheel elevating device drives the inner wheel 12 to descend to contact the inner roof rail 4. The structure of the driving mechanism is simple, which realizes the switch between the inner roof rail 4 and the outer station rail 8 for the upper and lower passenger car structures, and provides a basic guarantee for the train to board and unload passengers without stopping.

升降车厢结构1的顶面开口处设有可自动开合的车顶盖,在列车高速行驶过程中车顶盖为合闭状态,以保证升降车厢结构1的密闭性与安全性,在无停上下客时,为配合载车厢板3的升降,车顶盖才为打开状态,即在载车厢板3抬升下客车厢B至下客升降车厢D顶面,以及载车厢板3将上客车厢A下降至上客升降车厢C内的时刻,车顶盖打开。The roof opening of the lift car structure 1 is provided with a roof cover that can be opened and closed automatically. The roof cover is closed during the high-speed running of the train to ensure the airtightness and safety of the lift car structure 1. When getting on and off the passengers, in order to cooperate with the lifting of the carriage board 3, the roof cover is in an open state, that is, the carriage board 3 lifts the passenger compartment B to the top surface of the passenger elevator compartment D, and the carriage board 3 lifts the passenger compartment When A descends to the moment in passenger elevator compartment C, the roof cover is opened.

同时,载车厢板3上设有可折叠的安全护栏,在载车厢板3升降过程中,安全护栏在载车厢板3尾部沿竖直方向展开升起,在载车厢板3抬升下客车厢B至下客升降车厢D顶面,以及载车厢板33将上客车厢A下降至上客升降车厢C内的时刻,防止下客车厢B或上客车厢A向后滑行。Simultaneously, a foldable safety guardrail is provided on the carriage board 3. During the lifting process of the carriage board 3, the safety guardrail expands and rises vertically at the rear of the carriage board 3, and lifts the lower passenger compartment B at the carriage board 3. To the top surface of the passenger lift car D, and the moment when the passenger car A is lowered into the passenger lift car C by the car plate 33, the passenger car B or the passenger car A are prevented from sliding backward.

该系统还包括客量定员控制模块,用于实时监测列车内空余座位的数量,并根据列车内空余座位的数量控制上客车厢A的容纳人员数量,以保证列车上不会出现过度拥挤的情况,提高列车安全性。本发明系统还可以在上下客车厢结构上设置刹车机构等安全装置。The system also includes a passenger capacity control module, which is used to monitor the number of vacant seats in the train in real time, and control the number of people in the passenger car A according to the number of vacant seats in the train, so as to ensure that there will be no overcrowding on the train , Improve train safety. The system of the present invention can also be equipped with safety devices such as braking mechanisms on the structure of the upper and lower passenger compartments.

Claims (8)

1. a kind of intelligence nothing stops on-board and off-board system, including train, station, upper carriage and lower carriage, it is characterised in that described Two section compartments of mid-train lift compartment and lower visitor's lifting compartment, institute as upper visitor successively from front to back along train direct of travel Visitor lifting compartment and lower visitor lifting compartment is stated to open using identical lifting carriage body construction, the top surface of the lifting carriage body construction Mouthful, elevating mechanism is provided with lifting carriage body construction, the elevating mechanism is provided with carrier vehicle carriage, and the carrier vehicle carriage is provided with two Along train direct of travel on the parallel inner side roof track of bar, upper visitor lifting compartment and the lower objective compartment top surface lifted between compartment The first hitch and the second hitch are sequentially provided with from front to back;
Being set up above the passage of train at the station has two parallel outside station tracks, the erection of outside station track Highly it is more than train highly, the distance between more than two inner side roof tracks of the distance between two outsides station track, two On the outside of bar carriage interceptor structure is respectively equipped with the outside of the track of station;
Upper carriage and lower carriage use identical on-board and off-board carriage body construction, and the afterbody of the on-board and off-board carriage body construction is provided with and the The first hitch bite that one hitch coordinates, the head of on-board and off-board carriage body construction are provided with the second hitch coordinated with the second hitch and stung Conjunction portion, the left and right side of on-board and off-board carriage body construction are provided with the 3rd hitch bite coordinated with lower carriage interceptor structure, up and down The bottom surface of car end structure is provided with the dual wheels drive mechanism of switching tracks;
Before train enters the station, upper carriage be parked on the station track of outside and on train direct of travel positioned at the first hitch it Before, lower carriage is parked on the inner side roof track in lower visitor's lifting compartment of train;Lower visitor's lifting compartment passes through lift Structure lifting carrier vehicle carriage to the compartment top surface of itself, the second hitch bite of the second hitch and the lower carriage after lifting is stung Close;
Without when stopping on-board and off-board, the first hitch is engaged with the first hitch bite docking of upper carriage, the dual wheels of upper carriage Drive mechanism is switched to upper visitor by outside station track and lifted on the inner side roof track in compartment, carriage is stationed in train Top;At the same time, the second hitch bite of the second hitch and lower carriage breaks off relations, lower carriage interceptor structure and lower car The 3rd hitch bite docking occlusion in railway carriage or compartment, the dual wheels drive mechanism of lower carriage are switched to outside by the first inner side roof track On the track of side station, station lower carriage interior AT STATION;Finally, upper carriage drops to upper visitor's lifting compartment by elevating mechanism It is interior, treat that passenger enters in train in carriage, upper carriage is by dual wheels drive mechanism active drive to lower visitor's lifting compartment On interior inner side roof track, as lower carriage next time.
2. a kind of intelligence nothing according to claim 1 stops on-board and off-board system, it is characterised in that outside station track Antenna height is more than 18 ~ 22cm of train height.
3. a kind of intelligence nothing according to claim 1 stops on-board and off-board system, it is characterised in that the carrier vehicle carriage is provided with Liftable clamp, the bottom surface of the on-board and off-board carriage body construction are additionally provided with the neck being engaged with clamp, and clamp are caught in on-board and off-board On-board and off-board carriage body construction is fixed in lifting carriage body construction after the neck of carriage body construction.
4. a kind of intelligence nothing according to claim 1 stops on-board and off-board system, it is characterised in that the first hitch bite Be equipped with the 3rd hitch bite one be used for buffer occlusion dock when impulsive force buffer stopper.
5. a kind of intelligence nothing according to claim 1 stops on-board and off-board system, it is characterised in that the dual wheels drive mechanism Including inboard wheel and outboard wheels, the inboard wheel and outboard wheels are respectively arranged on the bottom surface of on-board and off-board carriage body construction, And outboard wheels are located at the outside of inboard wheel, inboard wheel is active driving moment, and dual wheels drive mechanism is by inner side roof When track is switched on the track of outside station, inboard wheel is hanging, and outboard wheels are in contact with outside station track, and dual wheels drive When motivation structure is switched on the roof track of inner side by outside station track, outboard wheels are hanging, inboard wheel and inner side roof rail Road is in contact.
6. a kind of intelligence nothing according to claim 1 stops on-board and off-board system, it is characterised in that the carrier vehicle carriage is provided with Folding safety barrier, in carrier vehicle carriage lifting process, safety barrier vertically deploys to rise in carrier vehicle carriage afterbody Rise.
7. a kind of intelligence nothing according to claim 1 stops on-board and off-board system, it is characterised in that the top surface in the lifting compartment Opening be provided with can automatic open-close covering for roofs.
8. a kind of intelligence nothing according to claim 1 stops on-board and off-board system, it is characterised in that the system is also determined including volume of passenger traffic Member's control module, for monitoring the quantity at vacant seat in train in real time, and in the quantity control according to vacant seat in train The receiving personnel amount of carriage.
CN201711124242.1A 2017-11-14 2017-11-14 A kind of intelligence nothing stops on-board and off-board system Pending CN107738652A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711124242.1A CN107738652A (en) 2017-11-14 2017-11-14 A kind of intelligence nothing stops on-board and off-board system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711124242.1A CN107738652A (en) 2017-11-14 2017-11-14 A kind of intelligence nothing stops on-board and off-board system

Publications (1)

Publication Number Publication Date
CN107738652A true CN107738652A (en) 2018-02-27

Family

ID=61233318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711124242.1A Pending CN107738652A (en) 2017-11-14 2017-11-14 A kind of intelligence nothing stops on-board and off-board system

Country Status (1)

Country Link
CN (1) CN107738652A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108725499A (en) * 2018-06-08 2018-11-02 荆门创佳机械科技有限公司 A kind of rail clamp device of high ferro means of transportation
CN110406545A (en) * 2019-08-29 2019-11-05 郑发通 A kind of train enters the station not parking transfer device
CN113264080A (en) * 2021-05-27 2021-08-17 黄秉和 Train passenger getting-on and getting-off device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050039629A1 (en) * 2003-06-20 2005-02-24 Yaron Mayer System and method for boarding and letting off passengers in trains efficiently so that the train does not have to stop at the stations
CN101439718A (en) * 2008-10-01 2009-05-27 王学军 Railway passenger transport integrative operating system capable of realizing getting off and getting on without stopping at intermediate station
CN205059593U (en) * 2015-09-30 2016-03-02 陈景辉 System for train does not stop and realizes that passenger gets on or off bus
CN207972626U (en) * 2017-11-14 2018-10-16 宋东宝 It is a kind of can be without the intelligent track traffic system for stopping on-board and off-board

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050039629A1 (en) * 2003-06-20 2005-02-24 Yaron Mayer System and method for boarding and letting off passengers in trains efficiently so that the train does not have to stop at the stations
CN101439718A (en) * 2008-10-01 2009-05-27 王学军 Railway passenger transport integrative operating system capable of realizing getting off and getting on without stopping at intermediate station
CN205059593U (en) * 2015-09-30 2016-03-02 陈景辉 System for train does not stop and realizes that passenger gets on or off bus
CN207972626U (en) * 2017-11-14 2018-10-16 宋东宝 It is a kind of can be without the intelligent track traffic system for stopping on-board and off-board

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108725499A (en) * 2018-06-08 2018-11-02 荆门创佳机械科技有限公司 A kind of rail clamp device of high ferro means of transportation
CN108725499B (en) * 2018-06-08 2019-06-07 荆门创佳机械科技有限公司 A kind of rail clamp device of high-speed rail means of transportation
CN110406545A (en) * 2019-08-29 2019-11-05 郑发通 A kind of train enters the station not parking transfer device
CN113264080A (en) * 2021-05-27 2021-08-17 黄秉和 Train passenger getting-on and getting-off device

Similar Documents

Publication Publication Date Title
US11801875B2 (en) Hybrid cable/rail transportation system, transportation unit for such a transportation system and method for operating such a transportation system
CN104908753B (en) The big through rail of capacity hands over system
CN205344878U (en) Rail vehicle does not stop to receive or discharge passengers
WO2009043203A1 (en) Multi-station nonstop railway passenger transport system
CN105292132A (en) Docking type rail transit system and operation method thereof
RU2758921C1 (en) Train system with self-propelled single car
CN110406387A (en) A maglev tourist rail transit train system
CN107738652A (en) A kind of intelligence nothing stops on-board and off-board system
CN108609022B (en) Combined transportation system and method of use
CN113085912A (en) Ultra-high-speed wheel-rail train unit battery replacement railway system
CN109649412A (en) A kind of light-duty empty rail traffic delivery system
US8616135B2 (en) Transit vehicle for ferrying roadway vehicles, passengers, cargo and commuters
CN110589524A (en) Platform loading and unloading system and method for high-speed rail express trains
CN112810632A (en) Station outbound method based on transfer island
CN104599491B (en) Tramcar system for shortening transfer distances from tramcars to buses and control method thereof
CN101152870A (en) A method for getting on and off passengers without stopping a train
CN211254507U (en) Platform loading and unloading handling system for high-speed rail express train unit
CN104260728A (en) Passenger and car integrated transportation method based on railway passenger transportation mode
CN105015553A (en) Continuous running method of railway train, railway train and railway facility
CN101722955A (en) Multiple related equipment of train station-passing non-stop system
CN207972626U (en) It is a kind of can be without the intelligent track traffic system for stopping on-board and off-board
WO2022000439A1 (en) Multi-track track changing system and track changing method therefor, and vehicle cpable of changing track
KR20090128676A (en) Nonstop train operation system and method
US20020134277A1 (en) Bullet train which permits passenger loading and unloading without stopping
CN108407820B (en) Train

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180227