CN107737788A CN201711032093.6A CN201711032093A CN107737788A CN 107737788 A CN107737788 A CN 107737788A CN 201711032093 A CN201711032093 A CN 201711032093A CN 107737788 A CN107737788 A CN 107737788A
Authority
CN
China
Prior art keywords
gas
landfill
airway tube
processing system
skirt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711032093.6A
Other languages
Chinese (zh)
Other versions
CN107737788B (en
Inventor
吴明桦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou mountain ridge Power Generation Co., Ltd.
Original Assignee
Zhejiang Xin Xin Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Xin Xin Construction Co Ltd filed Critical Zhejiang Xin Xin Construction Co Ltd
Priority to CN201711032093.6A priority Critical patent/CN107737788B/en
Publication of CN107737788A publication Critical patent/CN107737788A/en
Application granted granted Critical
Publication of CN107737788B publication Critical patent/CN107737788B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
    • B09B1/00Dumping solid waste
    • B09B1/004Covering of dumping sites
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/26Drying gases or vapours
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B15/00Preventing escape of dirt or fumes from the area where they are produced; Collecting or removing dirt or fumes from that area
    • B08B15/02Preventing escape of dirt or fumes from the area where they are produced; Collecting or removing dirt or fumes from that area using chambers or hoods covering the area
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G7/00Incinerators or other apparatus for consuming industrial waste, e.g. chemicals
    • F23G7/06Incinerators or other apparatus for consuming industrial waste, e.g. chemicals of waste gases or noxious gases, e.g. exhaust gases
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/30Landfill technologies aiming to mitigate methane emissions

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Analytical Chemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The invention discloses a kind of sanitary filling field landfill gas collection processing system implementing, including gas skirt, assist shroud and dispensing device, gas skirt is uniformly arranged on the top surface of landfill yard, assist shroud is provided between adjacent four gas skirts, assist shroud connects gas skirt by the first airway tube, is provided with gas operated device in gas skirt, isocon is provided with gas operated device, isocon connects discharge, discharge connection dispensing device by turning on collection air valve.Its method includes:1) refuse landfill is constructed, 2) garbage loading embeading is compacted, 3) gas collection component is laid, 4) dispensing device is installed, 5) pipeline is laid and 6) landfill gas collection processing system implementing trial operation.The present invention is simple in construction, practical, not only gas caused by the rubbish in landfill yard can all be carried out into recycling utilization, and can reduce the content of moisture in gas, and the pollution to environment is reduced while Gas recovery rate is improved.

Description

A kind of sanitary filling field landfill gas collection processing system implementing and method
Technical field
The present invention relates to a kind of sanitary filling field landfill gas collection processing system implementing and method.
Background technology
Sanitary landfills is widely used as the final disposal mode of domestic waste all over the world, this method With small investment, processing cost is low, treating capacity is big, simple operation and other advantages.But this method is gone back except causing conventional pollution Produce the largely rubbish landfill gas using methane and carbon dioxide as main component.
Rubbish landfill gas is a kind of greenhouse gases for having larger harm to health and natural environment, but it is one again The reproducible energy of kind, it, which is recycled, to produce larger economy, society and environmental benefit.
After rubbish enters sanitary filling field, after overcompaction covers, extraneous oxygen cannot be entered in rubbish body.When During landfill operation into rubbish body oxygen exhausted by the aerobic metabolism of microorganism after, rubbish body is gradually transitions anaerobism point The stage of solution.Meanwhile as the decrease of aerobic metabolic process, initial a large amount of caused carbon dioxide ratios gradually reduce; With the progress of anaerobic fermentation process, the ratio of methane gradually steps up.In transition stage, mainly there is hydrogen generation.Handling After the initial unstable stage, the concentration of methane and carbon dioxide can keep basicly stable in a very long time.
It is relatively simple to the processing unit of rubbish landfill gas in the prior art, by inserting the device into rubbish, to difference Rubbish landfill gas caused by the rubbish of depth is recycled, although can be reclaimed to part rubbish landfill gas, Can also some rubbish landfill gas be directly entered air, pollute environment.
The content of the invention
Present invention aims at provide a kind of sanitary filling field landfill gas for the deficiency present in prior art to receive Collect the technical scheme of processing system and method, not only gas caused by the rubbish in landfill yard can all be recycled Utilize, and the content of moisture in gas can be reduced, the dirt to environment is reduced while Gas recovery rate is improved Dye.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme that:
A kind of sanitary filling field landfill gas collection processing system implementing, it is characterised in that:Including gas skirt, assist shroud and divide gas Device, gas skirt are uniformly arranged on the top surface of landfill yard, are provided with assist shroud between adjacent four gas skirts, assist shroud passes through First airway tube connects gas skirt, is provided with gas operated device in gas skirt, isocon is provided with gas operated device, isocon leads to Cross conducting collection air valve connection discharge, discharge connection dispensing device;By the design of gas skirt and assist shroud, will can fill Gas caused by rubbish is all collected in, is prevented gas is unprocessed to be directly discharged in air, is not only polluted environment, and In the presence of certain potential safety hazard, while the gas after processing is easy to recycle, and reduces the waste of resource.
Further, sleeve is vertically arranged with the center of gas skirt, the first through hole is evenly arranged with the side of sleeve, Spaced set has the first demarcation strip and the second demarcation strip between sleeve and the inwall of gas skirt, and the first demarcation strip and second separate The inside of gas skirt is divided into three air collecting chambers by plate, can shunt the gas in rubbish by three air collecting chambers, is easy to The recovery of second airway tube.
Further, support is provided with each air collecting chamber, drying layer is installed on support, the air collecting chamber positioned at outside Via hole is evenly arranged with side, via hole matches with the first airway tube, and via hole is located at the lower section of support, passes through drying The design of layer, the gas in gas skirt and assist shroud can be dried to processing, reduce the moisture in gas, improve gas The utilization rate of body.
Further, be filled with sponge in drying layer, sponge is to the good absorbing effect of moisture, and manufacturing cost is low, use Long lifespan.
Further, gas operated device includes the second airway tube, connection cover and pilot pin, and fixation connects respectively for connection cover and pilot pin The top and bottom of the second airway tube are connected on, the second through hole, the second through hole are evenly arranged with the side of the second airway tube Match with the first through hole, compared with of the prior art, the second airway tube is not inserted directly into landfill yard the second airway tube Bottom, effectively gas caused by rubbish and percolate can be separated, prevent that percolate is tubular by the second air guide Into suck-back, and then influence the collection treatment effect of gas, pilot pin improve connected between the second airway tube and rubbish heap it is steady It is qualitative.
Further, blower fan is provided with discharge, the gas in gas skirt can be passed through by isocon and collection by blower fan Tracheae is delivered in dispensing device, and power is provided for the recycling of gas.
Further, biogas burner is provided with isocon, when biogas burner can be by gas unnecessary in isocon Carry out burning processing, reduce the pressure in isocon and discharge, improve landfill gas collection processing system implementing stability and can By property, extend its service life.
Further, dispensing device includes casing, and gas-distributing pipe is symmetrically arranged with left and right sides of casing, pressure is provided with casing Contracting chamber and branch chamber, compression chamber are located at the lower section of branch chamber, and compression chamber connects branch chamber by appendix, on the side of branch chamber Transfer port is evenly arranged with, transfer port is connected with gas-distributing pipe, and gas, which enters after compression by appendix to enter in compression chamber, to be shunted Chamber, it is easy to the use needs of distinct device.
Further, gasing pump is provided with appendix, gasing pump can make the stable conveying of the compressed gas in compression chamber To branch chamber.
Using a kind of method of sanitary filling field landfill gas collection processing system implementing processing landfill gas described above, it is special Sign is to comprise the following steps:
1) refuse landfill is constructed
A, first according to the design requirement of drawing, the construction area of refuse landfill is selected, and on corresponding construction area The excavation of refuse landfill is carried out, until the requirement for excavating the foundation ditch formed and layout design matches;
B, and then to the bottom surface of foundation ditch and side compacting processing is carried out, and concrete is carried out along the bottom surface of foundation ditch and side Pour, after concrete reaches setting intensity, filter layer construction is carried out on the bottom surface of foundation ditch, and at the both sides of filter layer or bottom Portion is connected by conduit with the continuous filter of outside;
2) garbage loading embeading is compacted
After refuse landfill construction terminates, by dumping to landfill yard, and with rammer compacter by garbage truck, then Rubbish is recharged, rammer compacter continues to be compacted, until the distance between the rubbish height after compacting and top surface of landfill yard are less than 50cm, then remove rammer compacter;
3) gas collection component is laid
A, gas operated device is equidistantly laid by design requirement on the rubbish first in landfill yard, and by gas operated device Gas operated device is fixed in pilot pin insertion rubbish, ensures that the depth of the bottom insertion rubbish of the second airway tube is no more than the The position of the second through hole of row is most descended on two airway tubes, until gas operated device all in landfill yard installs;
B, and then on each gas operated device gas skirt is installed, first connection cover is pulled down, gas skirt is transferred, make second to lead Tracheae is inserted vertically into the sleeve of gas skirt, until the bottom of gas skirt is bonded completely with the upper surface of rubbish, then by connection cover Installed in the top of the second airway tube, in order until all gas skirts are installed;
C, assist shroud then is installed between four rectangular gas skirts of adjacent sets, makes bottom surface and the rubbish of assist shroud Upper surface is bonded, and the side of assist shroud is bonded with the lateral surface of four gas skirts, by between assist shroud and gas skirt after fixing Gap carries out encapsulation process with fluid sealant, until space all in landfill yard fills up complete;
D, will finally be connected on the top surface of each assist shroud by the first airway tube and the via hole on adjacent gas skirt Connect, and carry out encapsulation process.
4) dispensing device is installed
The pit that size and dispensing device match is being opened up apart from 100~200m of refuse landfill position, after leveling With concreting, after concrete reaches setting intensity, dispensing device is fixed in pit, and in the side of dispensing device It is upper to be attached by gas-distributing pipe and external equipment;
5) pipeline is laid
Isocon is drawn on the top of the second airway tube on each gas operated device, will pass through conducting between each isocon Collection air valve is attached with discharge, and discharge is ultimately connected to the interface end of dispensing device, blower fan is provided with discharge, together When biogas burner is installed on each isocon;
6) landfill gas collection processing system implementing trial operation
After treating all devices installation connection, gas, a part of gas warp are discharged by the rubbish in refuse landfill Enter the second airway tube after air collecting chamber shunting in gas skirt, while place is dried in the gas of moistening by the drying layer in air collecting chamber Reason, another part gas is entered in the air collecting chamber of gas skirt through assist shroud by the first airway tube, unified to enter the second airway tube, Gas in second airway tube is flow in discharge through diverter, and discharge uniformly delivers the gas to dispensing device, through pressure Corresponding equipment is delivered to after contracting pressurization by gas-distributing pipe to use, unnecessary gas is then carried out by biogas burner in isocon Burning is handled.
The present invention is by adopting the above-described technical solution, have the advantages that:
1st, by the design of gas skirt and assist shroud, gas caused by rubbish in landfill yard can all be collected, prevented Gas is unprocessed to be directly discharged in air, not only pollutes environment, and certain potential safety hazard be present, while after processing Gas is easy to recycle, and reduces the waste of resource.
2nd, the air collecting chamber in gas skirt can be shunted the gas in rubbish, be easy to the recovery of the second airway tube, together When drying layer the gas in gas skirt and assist shroud can be dried to processing, reduce the moisture in gas, improve gas The utilization rate of body.
3rd, compared with of the prior art, the second airway tube is not inserted directly into the bottom of landfill yard the second airway tube, can Effectively to be separated gas caused by rubbish and percolate, prevent percolate from forming suck-back by the second airway tube, enter And the collection treatment effect of gas is influenceed, pilot pin improves the stability connected between the second airway tube and rubbish heap.
The present invention is simple in construction, practical, not only can all be returned gas caused by the rubbish in landfill yard Receive processing to utilize, and the content of moisture in gas can be reduced, reduce while Gas recovery rate is improved to ring The pollution in border.
Brief description of the drawings
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is handled for landfill gas collection in a kind of sanitary filling field landfill gas collection processing system implementing of the present invention and method The structural representation of system;
Fig. 2 is the design sketch of gas skirt in the present invention;
Fig. 3 is the structural representation of gas skirt in the present invention;
Fig. 4 is the connection diagram between gas skirt and assist shroud in the present invention;
Fig. 5 is the structural representation of gas operated device in the present invention;
Fig. 6 is the structural representation of dispensing device in the present invention.
In figure:1- landfill yards;2- gas skirts;3- dispensing devices;4- gas operated devices;5- isocons;6- assist shrouds;7- biogas Burner;8- conducting collection air valves;9- discharges;10- blower fans;11- gas-distributing pipes;12- via holes;13- sleeves;14- first separates Plate;The demarcation strips of 15- second;The through holes of 16- first;17- air collecting chambers;18- supports;19- drying layers;The airway tubes of 20- first;21- Second airway tube;The through holes of 22- second;23- connection covers;24- pilot pins;25- casings;26- compression chambers;27- branch chambers;28- Appendix;29- gasing pumps.
Embodiment
As shown in Figures 1 to 6, it is a kind of sanitary filling field landfill gas collection processing system implementing of the present invention, including gas skirt 2nd, assist shroud 6 and dispensing device 3, gas skirt 2 are uniformly arranged on the top surface of landfill yard 1, are vertically arranged at the center of gas skirt 2 There is sleeve 13, the first through hole 16 is evenly arranged with the side of sleeve 13, between sleeve 13 and the inwall of gas skirt 2 equidistantly It is provided with the first demarcation strip 14 and the second demarcation strip 15, the first demarcation strip 14 and the second demarcation strip 15 are by the inside points of gas skirt 2 Into three air collecting chambers 17, the gas in rubbish can be shunted by three air collecting chambers 17, be easy to the second airway tube 21 Recovery, support 18 is provided with each air collecting chamber 17, drying layer 19 is installed on support 18, the air collecting chamber 17 positioned at outside Via hole 12 is evenly arranged with side, via hole 12 matches with the first airway tube 20, and via hole 12 is located under support 18 Side, by the design of drying layer 19, the gas in gas skirt 2 and assist shroud 6 can be dried to processing, reduced in gas Moisture, improves the utilization rate of gas, be filled with sponge in drying layer 19, and sponge is to the good absorbing effect of moisture, and system Cause low, a service life length.
Assist shroud 6 is provided between adjacent four gas skirts 2, by the design of gas skirt 2 and assist shroud 6, will can be filled out Bury gas caused by rubbish in field 1 all to collect, prevent gas is unprocessed to be directly discharged in air, not only pollute environment, And certain potential safety hazard be present, while the gas after processing is easy to recycle, and reduces the waste of resource, assist shroud 6 Gas skirt 2 is connected by the first airway tube 20, is provided with gas operated device 4 in gas skirt 2, gas operated device 4 includes the second airway tube 21st, connection cover 23 and pilot pin 24, connection cover 23 and pilot pin 24 are respectively fixedly connected with the top and bottom of the second airway tube 21 Hold, the second through hole 22, the second through hole 22 and the phase of the first through hole 16 are evenly arranged with the side of the second airway tube 21 Match somebody with somebody, compared with of the prior art, the second airway tube 21 is not inserted directly into the bottom of landfill yard 1 the second airway tube 21, can be with Effectively gas caused by rubbish and percolate are separated, prevents percolate from forming suck-back by the second airway tube 21, enters And the collection treatment effect of gas is influenceed, pilot pin 24 improves the stability connected between the second airway tube 21 and rubbish heap.
Isocon 5 is provided with gas operated device 4, biogas burner 7 is provided with isocon 5, when biogas burner 7 can So that gas unnecessary in isocon 5 is carried out into burning processing, reduce the pressure in isocon 5 and discharge 9, improve landfill gas The stability and reliability of collection processing system implementing, extend its service life, and isocon 5 connects discharge by turning on collection air valve 8 9, blower fan 10 is provided with discharge 9, can be defeated by isocon 5 and discharge 9 by the gas in gas skirt 2 by blower fan 10 Deliver in dispensing device 3, provide power for the recycling of gas, discharge 9 connects dispensing device 3, and dispensing device 3 includes case Body 25, the left and right sides of casing 25 are symmetrically arranged with gas-distributing pipe 11, compression chamber 26 and branch chamber 27 are provided with casing 25, compression Chamber 26 is located at the lower section of branch chamber 27, and compression chamber 26 connects branch chamber 27 by appendix 28, gas transmission is provided with appendix 28 Pump 29, gasing pump 29 can make compressed gas in compression chamber 26 it is stable be delivered to branch chamber 27, on the side of branch chamber 27 Transfer port is evenly arranged with, transfer port connects with gas-distributing pipe 11, and gas enters in compression chamber 26 by appendix 28 to enter after compression Enter branch chamber 27, be easy to the use needs of distinct device.
Using a kind of method of sanitary filling field landfill gas collection processing system implementing processing landfill gas described above, including Following steps:
1) refuse landfill is constructed
A, first according to the design requirement of drawing, the construction area of refuse landfill 1 is selected, and on corresponding construction area The excavation of refuse landfill 1 is carried out, until the requirement for excavating the foundation ditch formed and layout design matches;
B, and then to the bottom surface of foundation ditch and side compacting processing is carried out, and concrete is carried out along the bottom surface of foundation ditch and side Pour, after concrete reaches setting intensity, filter layer construction is carried out on the bottom surface of foundation ditch, and at the both sides of filter layer or bottom Portion is connected by conduit with the continuous filter of outside;
2) garbage loading embeading is compacted
After the construction of refuse landfill 1 terminates, by dumping to landfill yard 1, and with rammer compacter by garbage truck, so After recharge rubbish, rammer compacter continues to be compacted, until the rubbish height after compacting is less than with the distance between the top surface of landfill yard 1 50cm, then remove rammer compacter;
3) gas collection component is laid
A, gas operated device 4 is equidistantly laid on the rubbish first in landfill yard 1 by design requirement, and by gas operated device 4 On pilot pin 24 insert rubbish in gas operated device 4 is fixed, ensure the second airway tube 21 bottom insertion rubbish depth Degree is no more than the position that the second through hole 22 of row is most descended on the second airway tube 21, until gas operated device 4 all in landfill yard 1 Install;
Gas skirt 2 is installed, first connection cover 23 is pulled down, gas skirt 2 is transferred, made b, and then on each gas operated device 4 Second airway tube 21 is inserted vertically into the sleeve 13 of gas skirt 2, until the bottom of gas skirt 2 and the upper surface of rubbish are pasted completely Close, then connection cover 23 is arranged on to the top of the second airway tube 21, in order until all gas skirts 2 are installed;
Assist shroud 6 is then installed between four rectangular gas skirts 2 of adjacent sets, make bottom surface and the rubbish of assist shroud 6 c, The upper surface fitting of rubbish, the side of assist shroud 6 is bonded with the lateral surface of four gas skirts 2, by assist shroud 6 and gas skirt after fixing Gap between 2 carries out encapsulation process with fluid sealant, until space all in landfill yard 1 fills up complete;
D, finally the first airway tube 20 and the via hole 12 on adjacent gas skirt 2 will be passed through on the top surface of each assist shroud 6 It is attached, and carries out encapsulation process.
4) dispensing device 3 is installed
The pit that size and dispensing device 3 match, leveling are being opened up apart from 1100~200m of refuse landfill position Concreting is used afterwards, and after concrete reaches setting intensity, dispensing device 3 is fixed in pit, and in dispensing device 3 It is attached on side by gas-distributing pipe 11 with external equipment;
5) pipeline is laid
Isocon 5 is drawn on the top of the second airway tube 21 on each gas operated device 4, will be led between each isocon 5 Cross conducting collection air valve 8 to be attached with discharge 9, discharge 9 is ultimately connected to the interface end of dispensing device 3, on discharge 9 pacifies Equipped with blower fan 10, while biogas burner 7 is installed on each isocon 5;
6) landfill gas collection processing system implementing trial operation
After treating all devices installation connection, gas, a part of gas warp are discharged by the rubbish in refuse landfill 1 Air collecting chamber 17 enters the second airway tube 21 after shunting in gas skirt 2, while the drying layer 19 in air collecting chamber 17 is by the gas of moistening Processing is dried, another part gas is entered in the air collecting chamber 17 of gas skirt 2 through assist shroud 6 by the first airway tube 20, system One enters the second airway tube 21, and the gas in the second airway tube 21 is converged into discharge 9 through isocon 5, and discharge 9 is unified will Gas is delivered to dispensing device 3, and being delivered to corresponding equipment by gas-distributing pipe 11 after compressed pressurization uses, more in isocon 5 Remaining gas then carries out burning processing by biogas burner 7.
The specific embodiment of the present invention is these are only, but the technical characteristic of the present invention is not limited thereto.It is any with this hair Based on bright, to realize essentially identical technique effect, made ground simple change, equivalent substitution or modification etc., all cover Among protection scope of the present invention.

Claims (10)

  1. A kind of 1. sanitary filling field landfill gas collection processing system implementing, it is characterised in that:Including gas skirt, assist shroud and gas is divided to fill To put, the gas skirt is uniformly arranged on the top surface of landfill yard, and the assist shroud is provided between adjacent four gas skirts, The assist shroud connects the gas skirt by the first airway tube, and gas operated device, the air guide dress are provided with the gas skirt Put and be provided with isocon, the isocon connects discharge by turning on collection air valve, divides gas described in the discharge connection Device.
  2. A kind of 2. sanitary filling field landfill gas collection processing system implementing according to claim 1, it is characterised in that:The collection Sleeve is vertically arranged with the center of gas hood, the first through hole, the sleeve and institute are evenly arranged with the side of the sleeve Spaced set has the first demarcation strip and the second demarcation strip, first demarcation strip and described second between stating the inwall of gas skirt The inside of the gas skirt is divided into three air collecting chambers by demarcation strip.
  3. A kind of 3. sanitary filling field landfill gas collection processing system implementing according to claim 2, it is characterised in that:Each institute State and support is provided with air collecting chamber, drying layer is installed on the support, on the side of the air collecting chamber in outside Even to be provided with via hole, the via hole matches with first airway tube, and the via hole is located at the lower section of the support.
  4. A kind of 4. sanitary filling field landfill gas collection processing system implementing according to claim 3, it is characterised in that:It is described dry Sponge is filled with dry layer.
  5. A kind of 5. sanitary filling field landfill gas collection processing system implementing according to claim 2, it is characterised in that:It is described to lead Device of air includes the second airway tube, connection cover and pilot pin, and the connection cover and the pilot pin are respectively fixedly connected with described The top and bottom of second airway tube, the second through hole are evenly arranged with the side of second airway tube, described second passes through Through hole matches with first through hole.
  6. A kind of 6. sanitary filling field landfill gas collection processing system implementing according to claim 1, it is characterised in that:The collection Blower fan is provided with tracheae.
  7. A kind of 7. sanitary filling field landfill gas collection processing system implementing according to claim 1, it is characterised in that:Described point Biogas burner is provided with flow tube.
  8. A kind of 8. sanitary filling field landfill gas collection processing system implementing according to claim 1, it is characterised in that:Described point Device of air includes casing, and gas-distributing pipe is symmetrically arranged with left and right sides of the casing, and compression chamber is provided with the casing and is divided Chamber is flowed, the compression chamber is located at the lower section of the branch chamber, and the compression chamber connects the branch chamber by appendix, described point Flow and be evenly arranged with transfer port on the side of chamber, the transfer port connects with the gas-distributing pipe.
  9. A kind of 9. sanitary filling field landfill gas collection processing system implementing according to claim 7, it is characterised in that:It is described defeated Gasing pump is provided with tracheae.
  10. 10. use a kind of sanitary filling field landfill gas collection processing system implementing processing landfill gas as claimed in claim 1 Method, it is characterised in that comprise the following steps:
    1) refuse landfill is constructed
    A, the construction area of refuse landfill is selected according to the design requirement of drawing first, and carried out on corresponding construction area The excavation of refuse landfill, until the requirement for excavating the foundation ditch formed and layout design matches;
    B, and then to the bottom surface of foundation ditch and side compacting processing is carried out, and carries out concrete along the bottom surface of foundation ditch and side and pours Build, after concrete reaches setting intensity, filter layer construction is carried out on the bottom surface of foundation ditch, and in the both sides of filter layer or bottom Connected by conduit with the continuous filter of outside;
    2) garbage loading embeading is compacted
    After refuse landfill construction terminates, by dumping to landfill yard, and with rammer compacter then garbage truck is refilled Rubbish is filled out, rammer compacter continues to be compacted, until the rubbish height after compacting is less than 50cm with the distance between the top surface of landfill yard, connects Removal rammer compacter;
    3) gas collection component is laid
    A, gas operated device is equidistantly laid by design requirement on the rubbish first in landfill yard, and by the positioning on gas operated device Gas operated device is fixed in pin insertion rubbish, ensures that the depth of the bottom insertion rubbish of the second airway tube is led no more than second The position of the second through hole of row is most descended on tracheae, until gas operated device all in landfill yard installs;
    B, and then on each gas operated device gas skirt is installed, first connection cover is pulled down, gas skirt is transferred, make the second airway tube It is inserted vertically into the sleeve of gas skirt, until the bottom of gas skirt is bonded completely with the upper surface of rubbish, then connection cover is installed On the top of the second airway tube, in order until all gas skirts are installed;
    C, assist shroud then is installed between four rectangular gas skirts of adjacent sets, makes the bottom surface of assist shroud and the upper table of rubbish Face is bonded, and the side of assist shroud is bonded with the lateral surface of four gas skirts, by the gap between assist shroud and gas skirt after fixing Encapsulation process is carried out with fluid sealant, until space all in landfill yard fills up complete;
    D, will be finally attached on the top surface of each assist shroud by the first airway tube and the via hole on adjacent gas skirt, and Carry out encapsulation process.
    4) dispensing device is installed
    The pit that size and dispensing device match is being opened up apart from 100~200m of refuse landfill position, with mixed after leveling Solidifying soil is poured, and after concrete reaches setting intensity, dispensing device is fixed in pit, and leads on the side of dispensing device Gas-distributing pipe is crossed to be attached with external equipment;
    5) pipeline is laid
    Isocon is drawn on the top of the second airway tube on each gas operated device, by between each isocon by turning on gas collection Valve is attached with discharge, and discharge is ultimately connected to the interface end of dispensing device, is provided with blower fan on discharge, while Biogas burner is installed on each isocon;
    6) landfill gas collection processing system implementing trial operation
    After treating all devices installation connection, gas is discharged by the rubbish in refuse landfill, a part of gas is through gas collection Enter the second airway tube after air collecting chamber shunting in cover, while processing is dried in the gas of moistening by the drying layer in air collecting chamber, Another part gas is entered in the air collecting chamber of gas skirt through assist shroud by the first airway tube, unified to enter the second airway tube, the Gas in two airway tubes is flow in discharge through diverter, and discharge uniformly delivers the gas to dispensing device, compressed Corresponding equipment is delivered to after pressurization by gas-distributing pipe to use, unnecessary gas is then fired by biogas burner in isocon Burning processing.
CN201711032093.6A 2017-10-30 2017-10-30 A kind of sanitary filling field landfill gas collection processing system implementing and method Active CN107737788B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711032093.6A CN107737788B (en) 2017-10-30 2017-10-30 A kind of sanitary filling field landfill gas collection processing system implementing and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711032093.6A CN107737788B (en) 2017-10-30 2017-10-30 A kind of sanitary filling field landfill gas collection processing system implementing and method

Publications (2)

Publication Number Publication Date
CN107737788A true CN107737788A (en) 2018-02-27
CN107737788B CN107737788B (en) 2019-10-25

Family

ID=61233067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711032093.6A Active CN107737788B (en) 2017-10-30 2017-10-30 A kind of sanitary filling field landfill gas collection processing system implementing and method

Country Status (1)

Country Link
CN (1) CN107737788B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108636976A (en) * 2018-07-17 2018-10-12 深圳市宜和勤环保科技有限公司 A kind of wind turbine exhausting system
CN109482044A (en) * 2018-11-02 2019-03-19 重庆众誉材工科技有限公司 A kind of well head collection device for garbage loading embeading gas well
CN110068017A (en) * 2019-05-20 2019-07-30 台玻成都玻璃有限公司 A kind of exhaust treatment system on silver mirror production line
CN112296052A (en) * 2020-09-27 2021-02-02 鞍钢集团矿业有限公司 Dust suppression floating ball and dust suppression method for tailing pond
CN115007592A (en) * 2022-06-20 2022-09-06 重庆三鑫环保标志有限公司 Be applied to domestic waste landfill gas collection device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100036457A (en) * 2008-09-30 2010-04-08 (주)극동이엔씨 Leachate reinfuse-pipe control system
CN101890420A (en) * 2010-06-25 2010-11-24 南京大学 Landfill gas collection method and system thereof
CN101912864A (en) * 2010-07-16 2010-12-15 湖南省一鼎环保有限公司 Air collecting hood of refuse landfill
CN102896132A (en) * 2012-11-08 2013-01-30 城市建设研究院 Method for determining acting range of biogas gas guiding well of municipal solid waste landfill
EP2705909A1 (en) * 2012-09-05 2014-03-12 Joachim Lehner Method for the degradation of the organic reaction potential by controlled extraction of landfill gas
CN102580975B (en) * 2011-01-17 2015-01-07 深圳市利赛实业发展有限公司 Refuse landfill gas-well hoisting method and gas-well device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100036457A (en) * 2008-09-30 2010-04-08 (주)극동이엔씨 Leachate reinfuse-pipe control system
CN101890420A (en) * 2010-06-25 2010-11-24 南京大学 Landfill gas collection method and system thereof
CN101912864A (en) * 2010-07-16 2010-12-15 湖南省一鼎环保有限公司 Air collecting hood of refuse landfill
CN102580975B (en) * 2011-01-17 2015-01-07 深圳市利赛实业发展有限公司 Refuse landfill gas-well hoisting method and gas-well device
EP2705909A1 (en) * 2012-09-05 2014-03-12 Joachim Lehner Method for the degradation of the organic reaction potential by controlled extraction of landfill gas
CN102896132A (en) * 2012-11-08 2013-01-30 城市建设研究院 Method for determining acting range of biogas gas guiding well of municipal solid waste landfill

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108636976A (en) * 2018-07-17 2018-10-12 深圳市宜和勤环保科技有限公司 A kind of wind turbine exhausting system
CN109482044A (en) * 2018-11-02 2019-03-19 重庆众誉材工科技有限公司 A kind of well head collection device for garbage loading embeading gas well
CN109482044B (en) * 2018-11-02 2024-08-23 上饶花乐童牛科技有限公司 Wellhead collecting device for refuse landfill gas well
CN110068017A (en) * 2019-05-20 2019-07-30 台玻成都玻璃有限公司 A kind of exhaust treatment system on silver mirror production line
CN112296052A (en) * 2020-09-27 2021-02-02 鞍钢集团矿业有限公司 Dust suppression floating ball and dust suppression method for tailing pond
CN112296052B (en) * 2020-09-27 2022-08-19 鞍钢集团矿业有限公司 Dust suppression floating ball and dust suppression method for tailing pond
CN115007592A (en) * 2022-06-20 2022-09-06 重庆三鑫环保标志有限公司 Be applied to domestic waste landfill gas collection device
CN115007592B (en) * 2022-06-20 2023-12-15 重庆三鑫环保标志有限公司 Be applied to domestic waste landfill gas collection device

Also Published As

Publication number Publication date
CN107737788B (en) 2019-10-25

Similar Documents

Publication Publication Date Title
CN107737788A (en) A kind of sanitary filling field landfill gas collection processing system implementing and method
CN100554596C (en) Vacuum preloading method for non-water discharge sand cushion
CN100526571C (en) Biogas and leachate integrated pumping and drainage system for garbage landfill
CN209873824U (en) Landfill district slope drainage gas recovery system
CN201010984Y (en) Integrated drainage device for biogas and leachate in landfill
CN107326891B (en) A kind of soft soil foundation drainage consolidation system and method
CN105064383B (en) Pipe-inserting negative pressure air jet deep-well dewatering device
CN104475419B (en) The multilamellar Leachate site recharge pipe network of refuse landfill and gas-liquid guide exchange system
CN207996882U (en) An in-situ and ex-situ treatment device for leachate from landfills with high water content
CN102441552A (en) Efficient biogas production type domestic garbage landfill
CN110314925A (en) A kind of refuse landfill original position aerobic stabilization processing unit and processing method
CN109779820A (en) A comprehensive utilization system and utilization method of abandoned open pit mine
CN101082211A (en) Large-area dredging dredger fill foundation treatment method and water seepage pipe thereof
CN205966724U (en) Domestic waste handles high -efficient drainage device of a landfill gas
CN205917685U (en) Integral type well dotted arranges vacuum system
CN205917709U (en) Integral type well dotted arranges house steward vacuum system
CN208787174U (en) A kind of percolate and biogas joint guide system
CN202824070U (en) Landfill gas collection well based on gas guide stone cage
CN105970910B (en) Well point plastic strip overlay film vacuum pre-pressed joint precipitating, pre-pressing dynamic consolidation method
CN105862714B (en) Soft soil foundation covers water type integral type well point plastic strip vacuum system
CN215630534U (en) Multifunctional well for quasi-aerobic landfill
CN206064980U (en) A kind of city landfill yard of two-way gas gathering system
CN105862719B (en) Reinforced foundation
CN106013046B (en) Varying stress path well point plastic strip vacuum preloading seepage consolidation hierarchical loading method
CN105926577B (en) Vacuum preloading seepage consolidation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190919

Address after: 310014 Room 102, No. 138-1 Linbian Road, Gongshu District, Hangzhou City, Zhejiang Province

Applicant after: Hangzhou mountain ridge Power Generation Co., Ltd.

Address before: 323800 Songyuan New Road, Qingyuan County, Lishui City, Zhejiang Province, 17

Applicant before: Zhejiang Xin Xin Construction Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant