[go: up one dir, main page]

CN107722954A - A kind of sealing agent, leak stopping slurries and leak-blocking construction method for borehole wall fractures leakage - Google Patents

A kind of sealing agent, leak stopping slurries and leak-blocking construction method for borehole wall fractures leakage Download PDF

Info

Publication number
CN107722954A
CN107722954A CN201711058750.4A CN201711058750A CN107722954A CN 107722954 A CN107722954 A CN 107722954A CN 201711058750 A CN201711058750 A CN 201711058750A CN 107722954 A CN107722954 A CN 107722954A
Authority
CN
China
Prior art keywords
leak
leakage
sealing agent
cement
parts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711058750.4A
Other languages
Chinese (zh)
Other versions
CN107722954B (en
Inventor
魏平
蒋新立
张冠军
吴天乾
席银申
李明忠
李德红
刘福
韩婧
李正国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Oilfield Service Corp
Sinopec North China Petroleum Engineering Corp
Original Assignee
Sinopec Oilfield Service Corp
Sinopec North China Petroleum Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Oilfield Service Corp, Sinopec North China Petroleum Engineering Corp filed Critical Sinopec Oilfield Service Corp
Priority to CN201711058750.4A priority Critical patent/CN107722954B/en
Publication of CN107722954A publication Critical patent/CN107722954A/en
Application granted granted Critical
Publication of CN107722954B publication Critical patent/CN107722954B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/42Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells
    • C09K8/46Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement
    • C09K8/467Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement containing additives for specific purposes
    • C09K8/487Fluid loss control additives; Additives for reducing or preventing circulation loss
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/42Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells
    • C09K8/426Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells for plugging
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/42Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells
    • C09K8/46Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement
    • C09K8/467Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement containing additives for specific purposes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K2208/00Aspects relating to compositions of drilling or well treatment fluids
    • C09K2208/08Fiber-containing well treatment fluids
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K2208/00Aspects relating to compositions of drilling or well treatment fluids
    • C09K2208/18Bridging agents, i.e. particles for temporarily filling the pores of a formation; Graded salts

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Inorganic Chemistry (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention relates to a kind of sealing agent, leak stopping slurries and leak-blocking construction method for borehole wall fractures leakage.The sealing agent includes the component of following parts by weight:80~85 parts of cement, 6~10 parts of floating bead, micro- 6~10 parts of silicon, 1~3 part of asbestos fibre.The sealing agent for being used for borehole wall fractures leakage of the present invention, compounded by cement, floating bead, micro- silicon, asbestos fibre and form sealing agent main body, wherein asbestos fibre fracture plays the effect of bridge formation bridging plug, floating bead, micro- silicon fracture play filling plugging action, each component coordinative role makes sealing agent be easily accessible drop ply, bridging plug, bridge formation, the comprehensive function of filling closure are played, the fracture width that is particularly suitable for use in is 5~100m in 3~10mm, leakage speed3Fractured leakage, leak stopping is quick, duty cycle is short, leak stopping success rate is high.

Description

A kind of sealing agent, leak stopping slurries and blocking construction for borehole wall fractures leakage Method
Technical field
The invention belongs to the closure field of drilling well leakage, and in particular to a kind of sealing agent missed for borehole wall fractures, Leak stopping slurries and leak-blocking construction method.
Background technology
The stratigraphic horizon met and the Geologic Structure Features such as tomography, elevation angle connectedness crack or mud stone crushed zone be present is bored in drilling well When, due to the window narrows between leakage pressure and strata pressure, if drilling fluid density control is unreasonable, surge pressure is excessive, easily Drilling well is caused to be missed, or even severe mud losses.Moreover, processing well leakage during, easily induce borehole well instability cave in, blowout, drilling tool Lock of tool drilling, wellbore conditions are complicated.Drilling well is missed or the cave-in caused by leakage, will have a strong impact on drilling progress, Extend drilling period, increase shaft building cost.
According to drop ply property, leakage speed and occur leakage the reason for, leakage can be divided into permeability loss, fractured leakage and Cave leakage.No matter the fractured leakage as caused by geological structure or drilling engineering factor, indulge in geographic area or stratum To being widely present.The areas such as example domestic Ordos Basin in geographic area, Tahe Oilfield In Xinjiang and suitable north;Such as E Er in distribution of strata The YAN ' AN FORMATION of this Hangjin Banner block, extension group, Liu family's ditch group, Shi Qian peaks group etc. more, suitable northern segment length about 400m Permian Systems etc., Fractured leakage is serious.Application publication number is that CN102443382A patent discloses a kind of sealing agent for being adapted to large-scale leakage, Include the component of following mass ratio:Clear water:HSD:HD-1:HD-2:LD-102:DF-A:Barite=100:(12~15):(4~ 5):(7~8):(4~5):30;After the technology is mainly used in large-scale leakage using pons hematoma or gel+bridging plug, wastage phase To smaller, but still can not normally it creep into or cementing effect is not fine, using composite construction cock body leak-stopping technique leak stopping.Change Yan Zhi, the technology need other leak-stopping techniques to pre-process stratum for large-scale leakage situation.
For 3~10mm of fracture width fractured leakage, the bulky grain material of conventional drilling leak stopping is attached to borehole wall hardly possible So that into drop ply, barrier layer is destroyed rapidly after boring again;Though little particle loss circulation material can enter stratum, because cementing with stratum Power and the structural capacity of itself are inadequate, show the characteristics of leak stopping is quick, the leakage cycle is short again.
The content of the invention
It is an object of the invention to provide a kind of sealing agent for borehole wall fractures leakage, so as to solve existing sealing agent The low problem of leak stopping success rate.
Second object of the present invention is to provide the leak stopping slurries using above-mentioned sealing agent.
Third object of the present invention is the supporting leak-blocking construction method for providing above-mentioned leak stopping slurries.
To achieve the above object, the technical scheme of the sealing agent for being used for borehole wall fractures leakage of the invention is:
A kind of sealing agent for borehole wall fractures leakage, include the component of following parts by weight:
80~85 parts of cement, 6~10 parts of floating bead, micro- 6~10 parts of silicon, 1~3 part of asbestos fibre.
The sealing agent for being used for borehole wall fractures leakage of the present invention, is compounded and is formed by cement, floating bead, micro- silicon, asbestos fibre Sealing agent main body, wherein asbestos fibre fracture play the effect of bridge formation bridging plug, and floating bead, micro- silicon fracture play filling closure and made With each component coordinative role makes sealing agent be easily accessible drop ply, plays bridging plug, bridge formation, the comprehensive function of filling closure, especially suitable For fracture width 3~10mm, leakage speed be 5~100m3Fractured leakage, leak stopping is quick, duty cycle is short, leak stopping into Power is high.
Auxiliary agent can further be added to optimize the workability of above-mentioned sealing agent and adaptability.Preferably, above-mentioned sealing agent It is made up of the component of following parts by weight:80~85 parts of cement, 6~10 parts of floating bead, micro- 6~10 parts of silicon, 1~3 part of asbestos fibre, drop 1~2 part of dehydration agent, 0.5~1.5 part of swelling agent, 0.2~0.3 part of retarder, 0.02~0.06 part of polyacrylic acid potassium.
Preferably, the particle diameter of cement is 0.68~63 μm, and the particle diameter of micro- silicon is 0.04~0.68 μm, and the particle diameter of floating bead is 0.063~0.256mm.
Preferably, the length of asbestos fibre is 1~6mm.It is further preferred that asbestos fibre is by 1mm≤length<3mm's Short asbestos fibre and 3mm≤length≤6mm long asbestos fibre compounding form, short asbestos fibre, the mass ratio of long asbestos fibre (1.5~2.5):1.Ratio compounding more than short asbestos fibre, long asbestos fibre is stated, can further optimize bridging plug, bridging action, can To provide more excellent plugging effect.
Further, the sealing agent for being used for borehole wall fractures leakage of the invention, is optimized by further increasing auxiliary agent The filtrate-loss control of sealing agent, improve flow pattern, be adapted to different drop ply depth, temperature and the change of engineering time;Behavior of Hardened Cement Paste is strong Spend moderate, reduce and sweep plug difficulty, avoid the formation of " new well ";Behavior of Hardened Cement Paste also has crack arrest toughness reinforcing performance, when preventing from sweeping plug Behavior of Hardened Cement Paste influences plugging effect because of the broken cracking of stress.
The technical scheme of leak stopping slurries for being used for borehole wall fractures leakage of the present invention is:
A kind of leak stopping slurries using the above-mentioned sealing agent missed for borehole wall fractures, it is made up of water and sealing agent, water Gray scale is 0.8~0.9.
The leak stopping slurries for being used for borehole wall fractures leakage of the present invention, cement, micro- silicon, floating bead according to certain condition blending, Maximum dry-blend stacking volume percentage is realized, acquisition density is 1.40~1.45g/cm3Low-density cement mortar, avoid Leak-stopping cement mortar density is excessive and aggravates leakage degree;Leak stopping slurries have good workability, its pumpable time length, into drop ply after can Rapid thickening;There is certain thixotropy simultaneously, auxiliary slurry is stranded in crack.
The leak stopping slurries have very brief solidifying, poor flow properties and thixotropic performance characteristics, and increase leak stopping slurry is in drop ply stream Dynamic resistance;Early strength development is fast, can solidify drop ply rapidly, improves shut-off capacity.
The technical scheme of leak-blocking construction method of the present invention is:
A kind of leak-blocking construction method using above-mentioned leak stopping slurries, comprise the following steps:Be deep under leak stoppage limb leak source with Upper position, leak stopping slurries are injected, for slurry, pulled out of hole, closing well is pushed, and is waited solidifying.
Preferably, the distance between deep degree and cement plug design block section top=15m+ closing wells are pushed under leak stoppage limb Preceding static leakage segment length;Wherein, the length of cement plug design block section is not less than 150m;Static leakage segment length=VLoss/S2× t1, V in formulaLossFor static leakage speed, m after trip-out3/min;S2For Open-Hole Section well sectional area, m2;t1Pushed away to start slip casting to closing well Engineering time before squeezing, min.
Preferably, the injection rate of leak stopping slurries is cement plug design closure segment length corresponding volume in well, missed between the waiting-on-cement Amount is with pushing to the 10m on stratum3Three's sum;Wherein, wastage is V between the waiting-on-cementLoss×(T2- t), it is T in formula2During thickening Between, min;T is the plugging operations whole process engineering time, min.
Preferably, preflush spacer fluid, rearmounted insulating liquid are injected separately into before and after injection leak stopping slurries;It is preflush spacer fluid, rearmounted Insulating liquid plays a part of separating leak stopping slurry, drilling fluid, and the injection rate of preflush spacer fluid is 2m3, rearmounted flushing liquor injection rate presses It is designed according to balancing method cementing plug principle.The discharge capacity for injecting leak stopping slurries is 400~700L/min.
For starching, in trip-out process, for slurry to more than balanced surface 100~150m;Discharge capacity for slurry is 500~700L/min. Rise and be drilled into leak stopping slurries theory and return more than height at least 100m.Turn on pump rinses drilling rod after trip-out, prevents leak stopping slurry to be detained in drilling rod, protects Card safety;Flushing dose is for drilling rod internal volume corresponding to slurry position to drilling rod bottom segment length.
Preferably, the pushing amount Q that closing well is pushedR=Qt+10-QLoss;Qt=S2×(HLoss-Hd);QtFor deep position under drilling rod To annular space volume, m corresponding to target drop ply bottom segment length3;Wherein, S2For Open-Hole Section well sectional area, m2;HLossFor leak source institute Deep, the m at layer position bottom;HdFor deep under leak stoppage limb, m;QLossThe actual measurement wastage during drilling tool to infusion terminates is starched out for leak stopping, The level change of tank and recycling can be starched by the drilling fluid of isolation, with reference to cementing truck infusion amount, Actual measurement QLoss
Plugging operations whole process engineering time t and pumpable time T1Relation:T1=t+ (20~30min).
Wait after coagulating, drilling tool visits plug pressure-bearing, is tested Lou with normally creeping into discharge capacity circulation 20min, record fills in top, plug bottom;If judge Without leakage, plug is swept using normal drilling discharge capacity.
Further, it can adjust above-mentioned leak-blocking construction method according to leak source or leakage speed change, be specially:
(1) leak source closure or leakage speed are reduced in plugging operations.In this case leak stopping slurries top circle can move up;Drilling rod is short The principle that theoretical short segment length adds 100m will be followed by playing segment length;Closing well pushing amount should reach leak stopping slurry bottom to drop ply bottom Hole capacity and entrance stratum 10m3Total amount;
(2) lose and return completely in plugging operations.In this case leak stopping is starched out drilling rod Hou Di circle and moved down, for short after slurry still State operation so is returned according to complete, drilling rod only rinses drilling tool after in place and do not pushed;
(3) half leakage is partly returned.In this case accurate recording leak stopping starches out drilling tool and misses total amount to infusion ending phase, and drilling rod is short It is actual to push total amount Q after rising in placeR=S2×(HLoss-Hd)+10-QLoss
The leak-blocking construction method of the present invention, depth, leak stopping slurries injection rate, closing well pushing amount under leak stoppage limb are carried out carefully Change, promote most of leak stopping slurries to enter stratum, residue gives over to cement plug on a small quantity;When leak source gets the wrong sow by the ear, push in operation Secondary Automatic-searching bottom leak source, realizes leak stopping.
The leak-blocking construction method of the present invention, the fracture width that is particularly suitable for use in is in 3-10mm, the fast 5-100m of leakage3/ h Fractured Leakage.After drilling well leakage occurs, if leakage speed is more than 5m3, without carrying out drop ply pretreatment, directly pull out of hole and change leak stoppage limb, under To design well depth, injection leak stopping slurry carries out leak stopping;Control can be quantified into the leak stopping slurry amount of drop ply, and avoid leak stopping slurry from squeezing into Lou Interval velocity is too fast to be caused to suppress logical leakage channel deterioration leakage situation;Leak stopping is quick, duty cycle is short, has a wide range of application, construction Mechanization degree is high, and program is simple and direct, easy to operate, and loss circulation material cost is low, and environment is caused in the absence of residual leak stopping slurry discharge Pollution.The technology is applied to the drilling leakage blockage on Ordos Basin fractured leakage stratum, the Hanggin at the Basin of Northern edge Flag block leak stopping 72 times, a leak stopping success rate are effectively ensured downhole safety, significantly improve drilling efficiency, significantly up to 87.5% Reduce drilling cost.
Brief description of the drawings
Fig. 1 is the differential percentage of floating bead particle diameter;
Fig. 2 is the cumulative percentage of floating bead particle diameter;
(a) and broken rear (b) mode of appearance before the Behavior of Hardened Cement Paste of Fig. 3 embodiments 1 is broken;
Fig. 4 is deep design diagram under leak stoppage limb in the leak-blocking construction method of embodiment 1;
Fig. 5 is the slip casting schematic diagram in the leak-blocking construction method of embodiment 1;
Fig. 6 is that schematic diagram is cleaned in the trip-out in the leak-blocking construction method of embodiment 1;
Fig. 7 is that the closing well in the leak-blocking construction method of embodiment 1 pushes schematic diagram.
Embodiment
Embodiments of the present invention are described further with reference to embodiment.The key data that following examples are related to It is with key parameter:
1) layer position bottom depth H where leak sourceLoss, m;
2) design closure well section L, m;
3) the static fast V of leakage after pulling out of holeLoss, m3/min;
4) the actual measurement wastage Q during drilling tool to infusion terminates is starched out in leak stoppingLoss, m3
5) leak stopping drilling tool inner section product S1, m2
6) Open-Hole Section well sectional area S2, m2
7) leak stopping slurry pumpable time T1, min;Thickening time T2, min;
8) plugging operations whole process engineering time t, min;Start engineering time t before slip casting is pushed to closing well1, min;
9) deep H under leak stoppage limbd, m;
10) annular space volume Q corresponding to deep position to target drop ply bottom segment length under drilling rodt, m3
11) actual pushing amount QR, m3
Fluid loss agent is G309 oil-well cement filtrate reducers, purchased from Weihui City Chemical Co., Ltd.;Swelling agent is XJP-1 oil Well cement lattice dilatation agent, purchased from Henan nova building materials Co., Ltd;Retarder is XJH-1 oil well cement retarders, purchased from river Southern nova building materials Co., Ltd.
Embodiment 1
The sealing agent of the present embodiment, it is made up of the component of following parts by weight:84 parts of G class g cements, 8 parts of floating bead, micro- 8 parts of silicon, 2 parts of asbestos fibre, 1.8 parts of fluid loss agent, 1 part of swelling agent, 0.22 part of retarder, 0.05 part of polyacrylic acid potassium (KPAM);Cement Reach 93.8% in the cumulative percentage of 0.68~63 μm of particle size range;Floating bead is power plant's floating bead, in 0.063~0.256mm grains The cumulative percentage of footpath scope reached for 95.21% (as depicted in figs. 1 and 2);Micro- silicon is in the tired of 0.04~0.68 μm of particle size range Meter percentage reaches 97.4%;Asbestos fibre is by 1mm≤length<3mm short asbestos fibre and 3mm≤length≤6mm feldspar Cotton fiber presses 2:1 mass ratio compounding forms, and two types of fibers is that the different lengths in respective length range do not wait mixture.
Plugging action such as table 1 using the asbestos fibre that short asbestos fibre, long asbestos fibre compound to different in width crack It is shown.
The fibre length of table 1 is to different in width crack plugging action
Fracture width 3.00 4.00 5.00 7.00 9.00 10.00
Short asbestos fibre Bridging plug, bridge formation Bridging plug, bridge formation Bridging plug Bridging plug Bridging plug ---
Long asbestos fibre ---- ---- Build bridge Bridging plug, bridge formation Bridging plug, bridge formation Bridging plug
The leak stopping slurries of the present embodiment, mixed by the sealing agent and water of the present embodiment, the ratio of mud 0.85.Cement mortar Shown in the structural representation such as 3 (a) of Behavior of Hardened Cement Paste after liquid solidification, there is preferable compactness extent, the structural representation after crushing As shown in Fig. 3 (b), there is good crack arrest toughness reinforcing performance, Behavior of Hardened Cement Paste ftractures and shadow because stress crushes when effectively can prevent from sweeping plug Ring plugging effect.
The blocking construction design of the present embodiment, including herein below:
1) top leakage drilling:For abundant exposure drop ply, avoid repeating leak stopping to same layer position, drilling well is continued with small displacement to bore Leakage layer;During drilling well, well head observation and measurement liquid level are paid attention to, ensure that underground is stable;
2) tripping in leak stoppage limb (polish drill rod), injection preflush spacer fluid, leak stopping slurries, the leak stopping slurry of rearmounted insulating liquid composition Post;The composition of preflush spacer fluid is " clear water+5%XJCX-1 ", injection rate 2m3, the injection rate of rearmounted insulating liquid is according to balance Method cementing plug principle is designed, consisting of " clear water+2%XJG-1 ";Slip casting discharge capacity is 400~700L/min;XJCX-1 It is composite efficient flushing liquor, XJG-1 is a kind of by macromolecule modified cellulose, and it is new that two kinds of additives are purchased from Henan Star building materials Co., Ltd;
The lower deep degree of leak stoppage limb for cement plug design it is more than block section top with before closing well pushing it is static miss segment length it With;Static leakage segment length=V before closing well is pushedLoss/S2×t1, lower deep design is as shown in Figure 4;
Cement plug design closure segment length corresponding volume, wastage and pushing between the waiting-on-cement in injection rate=well of leak stopping slurries To stratum 10m3Three's sum;Design closure segment length is not less than 150m;Wastage=V between waiting-on-cementLoss×(T2-t);Slip casting Journey schematic diagram is as shown in Figure 5;
3) it is 500~700L/min for slurry discharge capacity for slurry to more than balanced surface 100~150m;
4) short distance is drilled into leak stopping slurries theory and returns more than height at least 100m, and turn on pump rinses drilling rod, and flushing dose is for slurry position Put to drilling rod internal volume corresponding to the segment length of drilling rod bottom, its schematic diagram of constructing is as shown in Figure 6;
5) closing well is pushed after short, pushing amount QR=Qt+10-QLoss;Qt=S2×(HLoss-Hd);QLossSurvey as follows It is fixed:Two slurry tanks are individually insulated, a tank is used as slurry tank, and a tank is as recycling can;According to two slurry tank Volume Changes before pushing, With reference to cementing truck infusion amount, calculate leak stopping and starch out the actual wastage that drilling rod to infusion terminates period;Closing well pushes operation signal Figure is as shown in Figure 7;
Plugging operations whole process engineering time t and pumpable time T1Relation be:T1=t+ (20-30min);
6) wait to coagulate and be not less than 8h, drilling tool visits plug pressure-bearing, is tested Lou with normally creeping into discharge capacity circulation 20min, record fills in top, plug Bottom;If judging no leakage, plug is swept using normal drilling discharge capacity.
Above detail design notes low stifled principle using high, is higher than leak source deeply under drilling tool, when leak source gets the wrong sow by the ear, pushes and makees Secondary Automatic-searching bottom leak source, realizes leak stopping in industry.
It is applied to the JPX-3Y1 wells of Erdos Hangjin Banner block according to above-mentioned detail design, the well is drilled into 2699.6m When, fractured leakage occurs, leakage speed is examined with small displacement 14L/min, drilling fluid loses and returned.Carried out using above-mentioned leak-blocking construction method Construction, detailed process are as follows:
1) using little particle, high concentration routine leak stopping slurry 10m3, blocked paragraph by paragraph from shaft bottom, being in the milk and being pumped by well head becomes Change judges leak source position, and it is Liu family's ditch middle and lower part to determine leak source;Liu family ditch group well depth 2513-2653m;
2) 0 is used:30、1:It is 0m/h that the grouting of 30 two-point methods, which measures static leakage speed,;
3) leak stopping polish drill rod is made up of the common drilling rods of 2136.2m and 348.8m heavy weight drill pipes;2585m is arrived under polish drill rod deeply, Inject leak-stopping cement mortar 13m3, averag density 1.45g/cm3, for slurry 19.19m3;Leak stopping misses 7.4m after starching out drilling tool3
4) rise and be drilled into escape pit section 2182m, close ram preventer, push drilling fluid 5.6m3;Plug face is visited after waiting solidifying 8h, is blocked up Spillage plug top 2593m;Tested Lou within 20 minutes with normally creeping into discharge capacity circulation, no leakage;After sweep plug, sweep plug discharge capacity be 29L/s, sweep plug Circulation is normal in well afterwards, recovers drilling.
Using the leak-blocking construction method of above-described embodiment in Erdos Hangjin Banner block leak stopping 72 times, leak stopping success Rate is effectively ensured downhole safety, significantly improves drilling efficiency, drilling cost is greatly reduced up to 87.5%.In conventional blocking method Compare, the leak-blocking construction method has execute-in-place convenience, the plugging operations time is short, leak stopping is quick, leaks cycle length, leak stopping again The characteristics of cost is low, it can effectively reduce the various down hole problems induced by long-term leak stopping;The leak-blocking construction method can also have Effect is used for the cave leakage after the bridge formations such as stone mud ball, long fibre thing are crammed.
Embodiment 2
The sealing agent of the present embodiment, it is made up of the component of following parts by weight:81 parts of G class g cements, 7 parts of floating bead, micro- 10 parts of silicon, 1 part of asbestos fibre, 1 part of fluid loss agent, 0.8 part of swelling agent, 0.2 part of retarder, 0.03 part of polyacrylic acid potassium (KPAM);Asbestos are fine Dimension is by 1mm≤length<3mm short asbestos fibre and 3mm≤length≤6mm long asbestos fibre press 1.8:1 mass ratio compounding Form.
The leak stopping slurries of the present embodiment, mixed by the sealing agent and water of the present embodiment, the ratio of mud 0.82.
Embodiment 3
The sealing agent of the present embodiment, it is made up of the component of following parts by weight:85 parts of G class g cements, 10 parts of floating bead, micro- 7 parts of silicon, 3 parts of asbestos fibre, 2 parts of fluid loss agent, 1.2 parts of swelling agent, 0.28 part of retarder, 0.06 part of polyacrylic acid potassium (KPAM);Asbestos Fiber is by 1mm≤length<3mm short asbestos fibre and 3mm≤length≤6mm long asbestos fibre press 2.2:1 mass ratio is answered With into.
The leak stopping slurries of the present embodiment, mixed by the sealing agent and water of the present embodiment, the ratio of mud 0.88.
Blocking construction is carried out using the leak stopping slurries of embodiment 2 and embodiment 3, technical process refers to embodiment 1, can obtained Obtain the suitable plugging effect of effect.

Claims (10)

1. a kind of sealing agent for borehole wall fractures leakage, it is characterised in that include the component of following parts by weight:Cement 80~ 85 parts, 6~10 parts of floating bead, micro- 6~10 parts of silicon, 1~3 part of asbestos fibre.
2. the sealing agent for borehole wall fractures leakage as claimed in claim 1, it is characterised in that sealing agent is by following weight The component composition of part:80~85 parts of cement, 6~10 parts of floating bead, micro- 6~10 parts of silicon, 1~3 part of asbestos fibre, fluid loss agent 1~2 Part, 0.5~1.5 part of swelling agent, 0.2~0.3 part of retarder, 0.02~0.06 part of polyacrylic acid potassium.
3. the sealing agent for borehole wall fractures leakage as claimed in claim 1 or 2, it is characterised in that the particle diameter of cement is 0.68~63 μm, the particle diameter of micro- silicon is 0.04~0.68 μm, and the particle diameter of floating bead is 0.063~0.256mm.
4. the sealing agent for borehole wall fractures leakage as claimed in claim 1 or 2, it is characterised in that the length of asbestos fibre Spend for 1~6mm.
5. as claimed in claim 4 for borehole wall fractures leakage sealing agent, it is characterised in that asbestos fibre by 1mm≤ Length<3mm short asbestos fibre and 3mm≤length≤6mm long asbestos fibre compounding form, and short asbestos fibre, long asbestos are fine The mass ratio (1.5~2.5) of dimension:1.
6. a kind of leak stopping slurries using the sealing agent missed as claimed in claim 1 or 2 for borehole wall fractures, its feature It is, is made up of water and the sealing agent, the ratio of mud is 0.8~0.9.
7. a kind of leak-blocking construction method using leak stopping slurries as claimed in claim 6, it is characterised in that including following step Suddenly:Leak source above position is deep under leak stoppage limb, injects leak stopping slurries, for slurry, is pulled out of hole, closing well is pushed, and is waited solidifying.
8. leak-blocking construction method as claimed in claim 7, it is characterised in that deep degree seals with cement plug design under leak stoppage limb Static leakage segment length before the distance between stifled section top=15m+ closing wells are pushed;Wherein, cement plug designs the length of block section not Less than 150m;Static leakage segment length=VLoss/S2×t1, V in formulaLossFor static leakage speed, m after trip-out3/min;S2For Open-Hole Section well Eye sectional area, m2;t1To start before slip casting is pushed to closing well engineering time, min.
9. leak-blocking construction method as claimed in claim 7 or 8, it is characterised in that the injection rate of leak stopping slurries is cement in well Plug design closure segment length corresponding volume, wastage and the 10m of pushing to stratum between the waiting-on-cement3Three's sum;Wherein, between the waiting-on-cement Wastage is VLoss×(T2- t), it is T in formula2Thickening time, min;T is the plugging operations whole process engineering time, min.
10. leak-blocking construction method as claimed in claim 7 or 8, it is characterised in that the pushing amount Q that closing well is pushedR=Qt+10- QLoss;Qt=S2×(HLoss-Hd);Wherein, QtFor annular space volume corresponding to deep position under drilling rod to target drop ply bottom segment length, m3;S2For Open-Hole Section well sectional area, m2;HLossLayer position bottom is deep where leak source, m;HdFor deep under leak stoppage limb, m;QLossIt is stifled Drilling tool to the infusion that spillage goes out terminates the actual measurement wastage of period, can be become by the drilling fluid of isolation for the liquid level of slurry tank and recycling can Change, with reference to cementing truck infusion amount, Actual measurement QLoss
CN201711058750.4A 2017-11-01 2017-11-01 Plugging agent for fractured leakage of drilling well, plugging slurry and plugging construction method Active CN107722954B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711058750.4A CN107722954B (en) 2017-11-01 2017-11-01 Plugging agent for fractured leakage of drilling well, plugging slurry and plugging construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711058750.4A CN107722954B (en) 2017-11-01 2017-11-01 Plugging agent for fractured leakage of drilling well, plugging slurry and plugging construction method

Publications (2)

Publication Number Publication Date
CN107722954A true CN107722954A (en) 2018-02-23
CN107722954B CN107722954B (en) 2020-03-24

Family

ID=61221431

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711058750.4A Active CN107722954B (en) 2017-11-01 2017-11-01 Plugging agent for fractured leakage of drilling well, plugging slurry and plugging construction method

Country Status (1)

Country Link
CN (1) CN107722954B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109021945A (en) * 2018-08-01 2018-12-18 西南石油大学 Bridging materials and preparation method thereof and sealing agent and leakage-stop liquid and its application
CN109294537A (en) * 2018-11-19 2019-02-01 中国石油集团川庆钻探工程有限公司工程技术研究院 A kind of leak stopping slurry and blocking method
CN109538158A (en) * 2018-10-31 2019-03-29 中国石油集团川庆钻探工程有限公司 Method for improving cement paste leaking stoppage construction success rate
CN110359879A (en) * 2018-03-26 2019-10-22 中国石油天然气股份有限公司 Abandoned well plugging method
CN110764541A (en) * 2018-07-26 2020-02-07 中国石油天然气股份有限公司 Method and device for determining particle composition of drilling fluid
CN111087994A (en) * 2020-01-14 2020-05-01 中国石油集团川庆钻探工程有限公司长庆钻井总公司 Multistage particle mesh cementing wall-repairing working solution and preparation and construction method thereof
CN111197469A (en) * 2018-11-16 2020-05-26 中石化石油工程技术服务有限公司 Drilling well plugging device and method
CN111827926A (en) * 2020-06-29 2020-10-27 中石化石油工程技术服务有限公司 Plugging process for micro-fractured and induced fractured stratum
CN111925169A (en) * 2020-08-09 2020-11-13 辽宁昆成实业有限公司 Cement slurry system suitable for blocking water channeling in Xinglong platform stratum petroleum well workover
CN112253042A (en) * 2020-10-28 2021-01-22 北京中海沃邦能源投资有限公司 Leakage stopping method
CN112377144A (en) * 2020-10-10 2021-02-19 中国石油化工股份有限公司 Oil gas drilling concrete bridge plugging process method
CN112412393A (en) * 2020-10-19 2021-02-26 四川盐业地质钻井大队 Bittern natural gas waste well differential pressure segmented plugging process
CN112694871A (en) * 2020-12-25 2021-04-23 中煤地一七三勘探队涿州有限责任公司 Green and environment-friendly drilling plugging agent and use method thereof
CN112760084A (en) * 2019-10-21 2021-05-07 中石化石油工程技术服务有限公司 Plugging agent for oil-based drilling fluid and preparation method and application thereof
CN115142838A (en) * 2022-06-16 2022-10-04 中国石油天然气股份有限公司 Method for determining position of leaking layer
CN115680558A (en) * 2022-10-26 2023-02-03 新疆格瑞迪斯石油技术股份有限公司 Curing and leaking stoppage method suitable for fracture-cavity type malignant leakage
CN116515467A (en) * 2023-04-19 2023-08-01 新疆格瑞迪斯石油技术股份有限公司 Cementing and plugging slurry for well drilling and application method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104632123A (en) * 2013-11-15 2015-05-20 中国石油天然气股份有限公司 Ultralow-pressure well plugging method
US20150292278A1 (en) * 2014-04-09 2015-10-15 Sharp-Rock Technologies, Inc. Method of Stopping Lost Circulation
CN105507848A (en) * 2015-12-17 2016-04-20 成都得道实业有限公司 Fast-dehydrating curable and organic synthetic plugging agent compound plugging construction method
CN105971555A (en) * 2016-05-05 2016-09-28 中国石油集团渤海钻探工程有限公司 Leaking stoppage barrel and leaking stoppage slurry combined leaking stoppage method specific to fractured formation
CN106555565A (en) * 2016-11-30 2017-04-05 中石化石油工程技术服务有限公司 A kind of low pressure and easy leaking loses the cementing method that well positive injection is instead squeezed
CN107056158A (en) * 2017-05-02 2017-08-18 成都西油奥星石油技术有限公司 Closure channeling control cement slurry for easily missing slim-hole or the well cementation of narrow gap annular
CN107156158A (en) * 2017-07-19 2017-09-15 佛山市普尔玛农化有限公司 A kind of seed treatment compositions containing pyraclostrobin, fluopyram and ethiprole

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104632123A (en) * 2013-11-15 2015-05-20 中国石油天然气股份有限公司 Ultralow-pressure well plugging method
US20150292278A1 (en) * 2014-04-09 2015-10-15 Sharp-Rock Technologies, Inc. Method of Stopping Lost Circulation
CN105507848A (en) * 2015-12-17 2016-04-20 成都得道实业有限公司 Fast-dehydrating curable and organic synthetic plugging agent compound plugging construction method
CN105971555A (en) * 2016-05-05 2016-09-28 中国石油集团渤海钻探工程有限公司 Leaking stoppage barrel and leaking stoppage slurry combined leaking stoppage method specific to fractured formation
CN106555565A (en) * 2016-11-30 2017-04-05 中石化石油工程技术服务有限公司 A kind of low pressure and easy leaking loses the cementing method that well positive injection is instead squeezed
CN107056158A (en) * 2017-05-02 2017-08-18 成都西油奥星石油技术有限公司 Closure channeling control cement slurry for easily missing slim-hole or the well cementation of narrow gap annular
CN107156158A (en) * 2017-07-19 2017-09-15 佛山市普尔玛农化有限公司 A kind of seed treatment compositions containing pyraclostrobin, fluopyram and ethiprole

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110359879A (en) * 2018-03-26 2019-10-22 中国石油天然气股份有限公司 Abandoned well plugging method
CN110359879B (en) * 2018-03-26 2021-11-02 中国石油天然气股份有限公司 Abandoned well plugging method
CN110764541A (en) * 2018-07-26 2020-02-07 中国石油天然气股份有限公司 Method and device for determining particle composition of drilling fluid
CN110764541B (en) * 2018-07-26 2023-04-07 中国石油天然气股份有限公司 Method and device for determining particle composition of drilling fluid
CN109021945B (en) * 2018-08-01 2019-04-12 西南石油大学 Bridging materials and preparation method thereof and sealing agent and leakage-stop liquid and its application
CN109021945A (en) * 2018-08-01 2018-12-18 西南石油大学 Bridging materials and preparation method thereof and sealing agent and leakage-stop liquid and its application
CN109538158A (en) * 2018-10-31 2019-03-29 中国石油集团川庆钻探工程有限公司 Method for improving cement paste leaking stoppage construction success rate
CN111197469A (en) * 2018-11-16 2020-05-26 中石化石油工程技术服务有限公司 Drilling well plugging device and method
CN109294537A (en) * 2018-11-19 2019-02-01 中国石油集团川庆钻探工程有限公司工程技术研究院 A kind of leak stopping slurry and blocking method
CN112760084A (en) * 2019-10-21 2021-05-07 中石化石油工程技术服务有限公司 Plugging agent for oil-based drilling fluid and preparation method and application thereof
CN112760084B (en) * 2019-10-21 2022-10-14 中石化石油工程技术服务有限公司 Plugging agent for oil-based drilling fluid and preparation method and application thereof
CN111087994A (en) * 2020-01-14 2020-05-01 中国石油集团川庆钻探工程有限公司长庆钻井总公司 Multistage particle mesh cementing wall-repairing working solution and preparation and construction method thereof
CN111087994B (en) * 2020-01-14 2022-05-13 中国石油天然气集团有限公司 Multistage particle mesh cementing wall-repairing working solution and preparation and construction method thereof
CN111827926B (en) * 2020-06-29 2022-12-23 中石化石油工程技术服务有限公司 Plugging process for micro-fractured and induced fracture stratum
CN111827926A (en) * 2020-06-29 2020-10-27 中石化石油工程技术服务有限公司 Plugging process for micro-fractured and induced fractured stratum
CN111925169A (en) * 2020-08-09 2020-11-13 辽宁昆成实业有限公司 Cement slurry system suitable for blocking water channeling in Xinglong platform stratum petroleum well workover
CN112377144A (en) * 2020-10-10 2021-02-19 中国石油化工股份有限公司 Oil gas drilling concrete bridge plugging process method
CN112412393A (en) * 2020-10-19 2021-02-26 四川盐业地质钻井大队 Bittern natural gas waste well differential pressure segmented plugging process
CN112253042A (en) * 2020-10-28 2021-01-22 北京中海沃邦能源投资有限公司 Leakage stopping method
CN112694871A (en) * 2020-12-25 2021-04-23 中煤地一七三勘探队涿州有限责任公司 Green and environment-friendly drilling plugging agent and use method thereof
CN115142838A (en) * 2022-06-16 2022-10-04 中国石油天然气股份有限公司 Method for determining position of leaking layer
CN115142838B (en) * 2022-06-16 2024-09-17 中国石油天然气股份有限公司 Leakage layer position determining method
CN115680558A (en) * 2022-10-26 2023-02-03 新疆格瑞迪斯石油技术股份有限公司 Curing and leaking stoppage method suitable for fracture-cavity type malignant leakage
CN116515467A (en) * 2023-04-19 2023-08-01 新疆格瑞迪斯石油技术股份有限公司 Cementing and plugging slurry for well drilling and application method thereof

Also Published As

Publication number Publication date
CN107722954B (en) 2020-03-24

Similar Documents

Publication Publication Date Title
CN107722954A (en) A kind of sealing agent, leak stopping slurries and leak-blocking construction method for borehole wall fractures leakage
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN102705005B (en) Technology for plugging water bursting in mine by directional diversion grouting
CN108240234A (en) A kind of Along Railway underlies coal mine gob Grouting method
CN102994059B (en) low-density cement slurry
CN105199685B (en) Induced crack leakage-proof and plugging water-based drilling fluid
CN102808427B (en) Composite grouting reinforcement anti-seepage treatment technology
CN103396774A (en) Plugging agent and preparation method thereof
CN108119143A (en) A kind of vertical shaft working surface cement soluble glass paste combines grouting method with chemical grout double-round curtain
CN101498220B (en) Vertical shaft working surface artesian flow sand layer slurry protecting rotary spraying grouting process
CN103485345A (en) Construction method for covering layer closed porthole high-pressure curtain grouting
CN104726078A (en) Gel plugging agent and preparation method thereof
CN102011591A (en) Grouting process for working surface of deep well
CN102838325A (en) Hole sealing grout stop material and grouting hole sealing process
Gao et al. New Chemical Grouting Materials and Rapid Construction Technology for Inclined Shaft Penetrating Drift‐Sand Layer in Coal Mine
CN102505701B (en) Self-compaction mortar and deep hole curtain pouring construction method
CN103756656B (en) Static gelling leakage-stopping liquid for stopping malignant leakage
CN102817361B (en) Double bushing top cover for broken rock curtain grouting and construction method of double bushing top cover
CN106147732A (en) A kind of compound rapid hardening silicate leak stopping slurry and blocking method thereof
CN110228980A (en) A kind of tunnel subtracts shock insulation grouting filling material and its application
Granata et al. New experience in ground treatment by permeation grouting
CN104529339B (en) A kind of polypropylene cross-linked copolymer fiber concrete plugging slurry
CN112523170A (en) Seepage-proofing treatment method for deep-buried karst seepage channel of reservoir
Gao et al. Cementing technical solutions for long-term isolation of national underground gas storage (UGS) project
CN107882544A (en) A kind of mixing heat release method for removing blockage for carbonate cementation molding sand rock heavy oil wells

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant