[go: up one dir, main page]

CN107720493A - Architectural engineering cargo lift quick discharging method and car - Google Patents

Architectural engineering cargo lift quick discharging method and car Download PDF

Info

Publication number
CN107720493A
CN107720493A CN201711076898.0A CN201711076898A CN107720493A CN 107720493 A CN107720493 A CN 107720493A CN 201711076898 A CN201711076898 A CN 201711076898A CN 107720493 A CN107720493 A CN 107720493A
Authority
CN
China
Prior art keywords
car
unloading
plate
control cabinet
reversing door
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711076898.0A
Other languages
Chinese (zh)
Inventor
徐敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Industry Polytechnic College
Original Assignee
Chongqing Industry Polytechnic College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Industry Polytechnic College filed Critical Chongqing Industry Polytechnic College
Priority to CN201711076898.0A priority Critical patent/CN107720493A/en
Publication of CN107720493A publication Critical patent/CN107720493A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/0035Arrangement of driving gear, e.g. location or support
    • B66B11/0045Arrangement of driving gear, e.g. location or support in the hoistway
    • B66B11/005Arrangement of driving gear, e.g. location or support in the hoistway on the car
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/006Applications of loading and unloading equipment for lifts associated with buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/02Cages, i.e. cars
    • B66B11/0226Constructional features, e.g. walls assembly, decorative panels, comfort equipment, thermal or sound insulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

本发明涉及建筑施工用快速卸货方法及载货装置,具体是一种建筑工程载货电梯用快速卸货方法及轿厢,建筑工程载货电梯用快速卸货方法是在轿厢的箱体的后侧壁上设置一扇翻转门,在轿厢的箱体的内腔底板上设置有卸货板。建筑工程载货电梯用轿厢包括箱体,位于箱体上的翻转门,所述翻转门位于箱体的后侧壁上,所述翻转门的内面板上部固定有与翻转门的内面板一体的至少一个拉绳固定座,每一个拉绳固定座均与一根拉绳的一端固定,拉绳的另一端与卷扬机连接,在箱体的内腔中设置有卸货支撑板。本发明缩短了卸货时间、提高了运输效率、缩短了施工周期、利于提高建筑周边地面整洁度、提高了安全性、降低了承建成本和提高了环保性。

The invention relates to a fast unloading method and a cargo device for building construction, in particular to a fast unloading method and a car for a freight elevator in a construction project. A flip door is arranged on the wall, and a unloading plate is arranged on the bottom plate of the inner cavity of the car box. The car used for the freight elevator in construction engineering includes a box body, a reversing door located on the box body, the reversing door is located on the rear side wall of the box body, and the upper part of the inner panel of the reversing door is fixed with At least one stay rope fixing seat, each stay rope fixing seat is fixed with one end of a stay rope, the other end of the stay rope is connected with the winch, and a unloading support plate is arranged in the inner cavity of the box body. The invention shortens the unloading time, improves the transportation efficiency, shortens the construction period, is beneficial to improving the cleanliness of the ground around the building, improves the safety, reduces the construction cost and improves the environmental protection.

Description

建筑工程载货电梯用快速卸货方法及轿厢Quick unloading method and car for freight elevator in construction engineering

技术领域technical field

本发明涉及建筑施工用快速卸货方法及载货装置,尤其是一种缩短卸货时间、提高运输效率、缩短施工周期、利于提高建筑周边地面整洁度、提高安全性、降低承建成本和提高环保性的建筑工程载货电梯用快速卸货方法及轿厢。The invention relates to a fast unloading method and a loading device for building construction, especially a method for shortening unloading time, improving transportation efficiency, shortening the construction period, improving the cleanliness of the ground around the building, improving safety, reducing construction costs and improving environmental protection. A fast unloading method and a car for a construction freight elevator.

背景技术Background technique

现有高层房屋建筑修建过程中,一般采用塔吊或升降载货电梯、塔吊与升降载货电梯结合的方法对建筑材料搬运至所需地点。During the construction of existing high-rise buildings, tower cranes or lifting freight elevators, or tower cranes and lifting freight elevators are generally used to transport building materials to desired locations.

现有升降载货电梯一般包括位于地面的防护围栏、随楼层高度逐渐增加的导轨架标准节、轿厢、驱动轿厢上下移动的驱动结构、位于防护围栏和轿厢内的控制箱。驱动结构一般又采用齿轮齿条式或钢丝绳式。轿厢一般又包括箱体,开设在箱体上的对开式电梯门,驱动对开式电梯门启闭的电机。该类轿厢在使用过程中,位于地面的工人先将建材搬运进轿厢中,轿厢在驱动结构作用下上升至指定楼层,再由工人人工卸货。由于对开式电梯门的结构,一般只能容纳两三个工人同时对建材进行搬运,所有建材搬运完后,升降载货电梯再下移至地面,进行下一次建材的装货以及搬运。工人在卸货时,升降载货电梯的轿厢必须位于卸货楼层处的位置,并等工人卸货完后才能进行下一次建材搬运,并且在每层楼的楼板上需要搭建卸料平台,卸料平台实质上是在外墙脚架与每层楼的楼板之间固定竹制跳板或木制跳板,耗材量相当大,使用成本偏高,同时存在安全隐患。基于成本预算以及承建成本控制,现有常规的方法是每间隔3至5层构建一个卸料平台,大都采用每间隔5层构建一个卸料平台,使得建材的转运成本居高不下,建材到位进度慢,影响工程进度。Existing lifting goods elevator generally comprises the protective fence that is positioned at ground, the guide rail frame standard section that increases gradually with floor height, car, the driving structure that drives car to move up and down, is positioned at the control box in protective fence and car. The driving structure generally adopts a rack and pinion type or a wire rope type. The car generally includes a box body, a side-by-side elevator door set on the box body, and a motor for driving the side-by-side elevator door opening and closing. During the use of this type of car, the workers on the ground first carry the building materials into the car, and the car rises to the designated floor under the action of the driving structure, and then the workers unload the goods manually. Due to the structure of the side-opening elevator doors, generally only two or three workers can carry the building materials at the same time. After all the building materials have been moved, the lifting cargo elevator will move down to the ground for the next building material loading and handling. When workers are unloading, the elevator car must be located at the unloading floor, and the next building material handling can only be carried out after the workers have finished unloading, and an unloading platform needs to be built on the floor of each floor. In essence, bamboo springboards or wooden springboards are fixed between the scaffolding of the outer wall and the floor slabs of each floor. The amount of consumables is quite large, the cost of use is high, and there are potential safety hazards. Based on cost budget and construction cost control, the existing conventional method is to build a discharge platform every 3 to 5 floors, most of which use 5 floors to build a discharge platform, so that the transfer cost of building materials remains high and the progress of building materials in place Slow, affecting the progress of the project.

发明内容Contents of the invention

本发明的目的是提供一种缩短卸货时间、提高运输效率、缩短施工周期、利于提高建筑周边地面整洁度、提高安全性、降低承建成本和提高环保性的建筑工程载货电梯用快速卸货方法。The purpose of the present invention is to provide a fast unloading method for construction cargo elevators that shortens unloading time, improves transportation efficiency, shortens construction period, is beneficial to improving the cleanliness of the ground around the building, improves safety, reduces construction costs and improves environmental protection.

为实现上述目的而采用的技术方案是这样的,即建筑工程载货电梯用快速卸货方法,其中:在现有工程施工载货电梯基础上,将现有工程施工载货电梯的轿厢上的对开式电梯门取消,在轿厢的箱体的后侧壁上设置一扇翻转门,该翻转门常态下将轿厢的箱体封闭,所述翻转门外力作用可翻转后放置在高层建筑的楼板上,所述翻转门的翻转是靠钢绳在卷扬机上的收放来实现的;The technical solution adopted for achieving the above-mentioned purpose is such that the fast unloading method for the construction freight elevator is used, wherein: on the basis of the existing engineering construction freight elevator, the car on the existing engineering construction freight elevator is The side-opening elevator door is canceled, and a flip door is set on the rear side wall of the car box. The flip door closes the car box under normal conditions. The flip door can be turned over by external force and placed in a high-rise building. On the floor, the turning of the turning door is realized by retracting and unwinding the steel rope on the winch;

在轿厢的箱体的内腔底板上设置有卸货板,该卸货板常态下与箱体的内腔底板平行;A unloading plate is arranged on the bottom plate of the inner cavity of the box body of the car, and the unloading plate is normally parallel to the bottom plate of the inner cavity of the box body;

所述卸货板通过以紧邻翻转门的边部为支点,外力作用下上下倾斜,卸货板的上下倾斜靠液压缸或气压缸来实现的;The unloading plate is tilted up and down under the action of external force by taking the edge close to the reversing door as the fulcrum, and the up and down tilting of the unloading plate is realized by hydraulic cylinder or pneumatic cylinder;

使用时,位于地面的控制柜管理工人通过控制柜打开翻转门,装货工人装货,装货完后控制柜管理工人关闭翻转门,启动电梯上行至指定楼层;位于楼层上的工人通过对讲机与控制柜管理工人联系并发出开门指令,控制柜管理工人收到信号后通过控制柜打开翻转门,翻转门翻转后搭接在指定楼层的楼板上;位于指定楼层上的工人向控制柜管理工人发出卸货指令,控制柜管理工人收到卸货指令后通过控制柜启动液压缸或气压缸实现卸货板切斜卸货,货物瞬间缓慢的倾倒在指定楼层的楼板上,位于指定楼层的楼板上的卸货工人快速将位于翻转门未散落至楼板上的货物搬离翻转门,接着位于指定楼层的楼板上的工人向控制柜管理工人发出卸货完毕指令,控制柜管理工人通过控制柜控制翻转门复位,翻转门复位后控制柜管理工人通过控制柜控制轿厢下行至地面复位,翻转门复位和轿厢下行至地面复位的过程中,位于指定楼层的楼板上的卸货工人进行货物搬运。When in use, the control cabinet management worker on the ground opens the reversing door through the control cabinet, and the loading worker loads the goods. After loading, the control cabinet management worker closes the reversing door and starts the elevator to go up to the designated floor; the workers on the floor talk to each other through the intercom The control cabinet management workers contact and issue an instruction to open the door. After receiving the signal, the control cabinet management workers open the reversing door through the control cabinet. The reversing door is flipped and then lapped on the floor of the designated floor; Unloading instructions, after receiving the unloading instructions, the management workers of the control cabinet start the hydraulic cylinder or pneumatic cylinder through the control cabinet to realize the unloading of the unloading board. Move the goods that are not scattered on the floor by the reversing door away from the reversing door, and then the workers on the floor on the designated floor send an instruction to the control cabinet management worker to complete the unloading, and the control cabinet management worker controls the reversing door to reset through the control cabinet, and the reversing door resets The rear control cabinet management workers control the car to go down to the ground to reset through the control cabinet. During the process of resetting the flip door and the car going down to the ground, the unloading workers on the floor of the designated floor carry out cargo handling.

本发明的目的还提供一种缩短卸货时间、提高运输效率、缩短施工周期、利于提高建筑周边地面整洁度、提高安全性、降低承建成本和提高环保性的建筑工程载货电梯用轿厢。The object of the present invention is also to provide a construction freight elevator car that shortens unloading time, improves transportation efficiency, shortens construction period, helps to improve the cleanliness of the ground around the building, improves safety, reduces construction costs and improves environmental protection.

为实现上述目的而采用的技术方案是这样的,即建筑工程载货电梯用轿厢,包括长方体状的箱体;其中:位于箱体上的翻转门,所述翻转门位于箱体的后侧壁上,在箱体的后侧壁下部设置有安装板,该安装板与箱体的底板固定为一体;The technical solution adopted in order to achieve the above purpose is that the car used for the freight elevator in construction engineering includes a cuboid box; wherein: the reversing door on the box body, and the reversing door is located on the rear side of the box body On the wall, a mounting plate is arranged at the lower part of the rear side wall of the box body, and the mounting plate is fixed with the bottom plate of the box body;

所述翻转门的下端与安装板的顶端通过合叶铰接为一体,或者所述翻转门的两侧壁下端通过转动轴与安装板的两边部连接为一体;The lower end of the flip door is hinged to the top of the installation plate through a hinge, or the lower ends of the two side walls of the flip door are connected to the two sides of the installation plate through a rotating shaft;

所述翻转门的内面板上部固定有与翻转门的内面板一体的至少一个拉绳固定座,每一个拉绳固定座均与一根拉绳的一端固定,所述拉绳的另一端穿过过线孔后依次绕过导向滑轮和张紧滑轮后固定在卷扬机的卷扬盘上,所述过线孔位于箱体的顶板上;The upper part of the inner panel of the reversing door is fixed with at least one stay cord fixing seat integrated with the inner panel of the reversing door, each stay cord fixing seat is fixed with one end of a stay cord, and the other end of the stay cord passes through After passing through the wire hole, it bypasses the guide pulley and the tensioning pulley in turn and fixes it on the hoisting disc of the winch, and the wire passing hole is located on the top plate of the box body;

所述导向滑轮和张紧滑轮均通过独立的转轴固定在独立的支撑杆上,所述两根支撑杆固定在箱体的顶板上,位于导向滑轮下方的支撑杆的高度高于位于张紧滑轮下方的支撑杆的高度;The guide pulley and the tension pulley are all fixed on independent support rods through independent rotating shafts, and the two support rods are fixed on the top plate of the box body, and the height of the support rod below the guide pulley is higher than that of the tension pulley. the height of the lower support bar;

所述张紧滑轮位于导向滑轮与卷扬机之间,所述导向滑轮位于张紧滑轮与过线孔之间;The tension pulley is located between the guide pulley and the hoist, and the guide pulley is located between the tension pulley and the wire hole;

在箱体的内腔中设置有卸货支撑板,该卸货支撑板的底面板的四角上均各固定有一组安装耳,每一组安装耳上固定有支撑转轴;紧邻翻转门的两根支撑转轴位于支撑柱顶部的旋转孔中,另外两根支撑转轴位于活塞杆顶部的旋转孔中;所述支撑柱的底端固定在箱体的底板上,所述活塞杆的下端与位于液压缸或气缸的内腔中的活塞固定为一体,所述液压缸或气缸的缸体下端固定在箱体的底板上;A unloading support plate is arranged in the inner cavity of the box body, and a set of mounting ears are respectively fixed on the four corners of the bottom panel of the unloading support plate, and a support shaft is fixed on each set of mounting ears; two support shafts adjacent to the flip door It is located in the rotation hole on the top of the support column, and the other two support shafts are located in the rotation hole on the top of the piston rod; the bottom end of the support column is fixed on the bottom plate of the box, and the lower end of the piston rod is connected to the hydraulic cylinder or cylinder. The piston in the inner cavity of the hydraulic cylinder is fixed as a whole, and the lower end of the cylinder body of the hydraulic cylinder or air cylinder is fixed on the bottom plate of the box body;

所述液压缸或气缸通过软管与液压系统或气压系统连接,该液压系统或气压系统通过设置在地面的控制柜控制运行,所述卷扬机和液压系统或气压系统通过线缆与控制柜电性连接。The hydraulic cylinder or air cylinder is connected to the hydraulic system or pneumatic system through hoses, and the hydraulic system or pneumatic system is controlled by the control cabinet installed on the ground, and the hoist and hydraulic system or pneumatic system are electrically connected to the control cabinet through cables. connect.

本发明所述方法及结构具有的优点是:缩短了卸货时间、提高了运输效率、缩短了施工周期、利于提高建筑周边地面整洁度、提高了安全性、降低了承建成本和提高了环保性。The method and structure of the invention have the advantages of shortening unloading time, improving transportation efficiency, shortening the construction period, improving the cleanliness of the ground around the building, improving safety, reducing construction costs and improving environmental protection.

附图说明Description of drawings

本发明可以通过附图给出的非限定性实施例进一步说明。The invention can be further illustrated by the non-limiting examples given in the accompanying drawings.

图1为本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.

图2为本发明的主方向结构示意图。Fig. 2 is a schematic diagram of the main direction structure of the present invention.

图3为本发明的箱体主方向的内部结构示意图。Fig. 3 is a schematic diagram of the internal structure of the main direction of the box body of the present invention.

图4为本发明的翻转门处采用转动轴的结构示意图。Fig. 4 is a structural schematic diagram of a rotating shaft used in the reversing door of the present invention.

图5为本发明的翻转门的侧视结构示意图。Fig. 5 is a side structural schematic view of the reversing door of the present invention.

图6为本发明卸货支撑板的结构示意图。Fig. 6 is a structural schematic diagram of the unloading support plate of the present invention.

图中:1、箱体;2、翻转门;3、安装板;4、合叶;5、转动轴;6、拉绳固定座;7、拉绳;8、过线孔;9、导向滑轮;10、张紧滑轮;11、卷扬机;12、卷扬盘;13、卸货支撑板;14、安装耳;15、支撑转轴;16、支撑柱;17、活塞杆;18、液压缸或气缸;19、液压系统或气压系统;20、倾斜板;21、槽状滑动板;22、升降驱动电机;23、升降变速器;24、驱动齿轮;25、升降驱动电机安装架。In the figure: 1. Box body; 2. Overturn door; 3. Mounting plate; 4. Hinge; 5. Rotating shaft; 10. Tensioning pulley; 11. Hoist; 12. Hoisting disc; 13. Unloading support plate; 14. Mounting ear; 15. Supporting shaft; 16. Supporting column; 17. Piston rod; 19. Hydraulic system or air pressure system; 20. Inclined plate; 21. Grooved sliding plate; 22. Lifting drive motor; 23. Lifting transmission; 24. Driving gear; 25. Mounting frame for lifting drive motor.

具体实施方式detailed description

下面结合附图和实施例对本发明作进一步说明:Below in conjunction with accompanying drawing and embodiment the present invention will be further described:

一种建筑工程载货电梯用快速卸货方法,其中:在现有工程施工载货电梯基础上,将现有工程施工载货电梯的轿厢上的对开式电梯门取消,在轿厢的箱体的后侧壁上设置一扇翻转门,该翻转门常态下将轿厢的箱体封闭,所述翻转门外力作用可翻转后放置在高层建筑的楼板上,所述翻转门的翻转是靠钢绳在卷扬机上的收放来实现的;A fast unloading method for a construction freight elevator, wherein: on the basis of the existing engineering construction freight elevator, the side-opening elevator doors on the car of the existing engineering construction freight elevator are cancelled, and A reversing door is arranged on the rear side wall of the car body, and the reversing door closes the box body of the car under normal conditions. It is realized by retracting and unwinding the steel rope on the winch;

在轿厢的箱体的内腔底板上设置有卸货板,该卸货板常态下与箱体的内腔底板平行;A unloading plate is arranged on the bottom plate of the inner cavity of the box body of the car, and the unloading plate is normally parallel to the bottom plate of the inner cavity of the box body;

所述卸货板通过以紧邻翻转门的边部为支点,外力作用下上下倾斜,卸货板的上下倾斜靠液压缸或气压缸来实现的;The unloading plate is tilted up and down under the action of external force by taking the edge close to the reversing door as the fulcrum, and the up and down tilting of the unloading plate is realized by hydraulic cylinder or pneumatic cylinder;

使用时,位于地面的控制柜管理工人通过控制柜打开翻转门,装货工人装货,装货完后控制柜管理工人关闭翻转门,启动电梯上行至指定楼层;位于楼层上的工人通过对讲机与控制柜管理工人联系并发出开门指令,控制柜管理工人收到信号后通过控制柜打开翻转门,翻转门翻转后搭接在指定楼层的楼板上;位于指定楼层上的工人向控制柜管理工人发出卸货指令,控制柜管理工人收到卸货指令后通过控制柜启动液压缸或气压缸实现卸货板切斜卸货,货物瞬间缓慢的倾倒在指定楼层的楼板上,位于指定楼层的楼板上的卸货工人快速将位于翻转门未散落至楼板上的货物搬离翻转门,接着位于指定楼层的楼板上的工人向控制柜管理工人发出卸货完毕指令,控制柜管理工人通过控制柜控制翻转门复位,翻转门复位后控制柜管理工人通过控制柜控制轿厢下行至地面复位,翻转门复位和轿厢下行至地面复位的过程中,位于指定楼层的楼板上的卸货工人进行货物搬运。通过本方法,可以使得导轨架标准节尽可能近的靠近建筑物,使得轿厢的翻转门尽可能近的靠近建筑物,缩短了卸货时间、提高了运输效率、缩短了施工周期,地面建材能够及时搬运至指定楼层,利于提高建筑周边地面整洁度,不再需要卸货板,提高了安全性、降低了承建成本和提高了环保性。When in use, the control cabinet management worker on the ground opens the reversing door through the control cabinet, and the loading worker loads the goods. After loading, the control cabinet management worker closes the reversing door and starts the elevator to go up to the designated floor; the workers on the floor talk to each other through the intercom The control cabinet management workers contact and issue an instruction to open the door. After receiving the signal, the control cabinet management workers open the reversing door through the control cabinet. The reversing door is flipped and then lapped on the floor of the designated floor; Unloading instructions, after receiving the unloading instructions, the management workers of the control cabinet start the hydraulic cylinder or pneumatic cylinder through the control cabinet to realize the unloading of the unloading board. Move the goods that are not scattered on the floor by the reversing door away from the reversing door, and then the workers on the floor on the designated floor send an instruction to the control cabinet management worker to complete the unloading, and the control cabinet management worker controls the reversing door to reset through the control cabinet, and the reversing door resets The rear control cabinet management workers control the car to go down to the ground to reset through the control cabinet. During the process of resetting the flip door and the car going down to the ground, the unloading workers on the floor of the designated floor carry out cargo handling. Through this method, the standard section of the guide rail frame can be made as close as possible to the building, and the reversing door of the car can be as close as possible to the building, which shortens the unloading time, improves the transportation efficiency, shortens the construction period, and the ground building materials can Timely transport to the designated floor will help improve the cleanliness of the ground around the building, no need for a unloading board, improve safety, reduce construction costs and improve environmental protection.

参见附图1至6,图中的建筑工程载货电梯用轿厢,包括长方体状的箱体1,其中:位于箱体1上的翻转门2,所述翻转门2位于箱体1的后侧壁上,在箱体1的后侧壁下部设置有安装板3,该安装板3与箱体1的底板固定为一体;Referring to accompanying drawings 1 to 6, the elevator car for construction engineering in the figure includes a cuboid box body 1, wherein: a reversing door 2 located on the box body 1, and the reversing door 2 is located at the rear of the box body 1 On the side wall, a mounting plate 3 is provided at the lower part of the rear side wall of the box body 1, and the mounting plate 3 is fixed with the bottom plate of the box body 1 as a whole;

所述翻转门2的下端与安装板3的顶端通过合叶4铰接为一体,或者所述翻转门2的两侧壁下端通过转动轴5与安装板3的两边部连接为一体;The lower end of the flip door 2 is hinged to the top of the mounting plate 3 as a whole through the hinge 4, or the lower ends of the two side walls of the flip door 2 are connected to the two sides of the mounting plate 3 as a whole through the rotating shaft 5;

所述翻转门2的内面板上部固定有与翻转门2的内面板一体的至少一个拉绳固定座6,每一个拉绳固定座6均与一根拉绳7的一端固定,所述拉绳7的另一端穿过过线孔8后依次绕过导向滑轮9和张紧滑轮10后固定在卷扬机11的卷扬盘12上,所述过线孔8位于箱体1的顶板上;The upper part of the inner panel of the flip door 2 is fixed with at least one stay cord fixing seat 6 integrated with the inner panel of the flip door 2, and each stay cord fixing seat 6 is fixed with one end of a stay cord 7, and the stay cord The other end of 7 passes through the wire hole 8 and then goes around the guide pulley 9 and the tension pulley 10 and is fixed on the hoisting disc 12 of the winch 11. The wire hole 8 is located on the top plate of the box body 1;

所述导向滑轮9和张紧滑轮10均通过独立的转轴固定在独立的支撑杆上,所述两根支撑杆固定在箱体1的顶板上,位于导向滑轮9下方的支撑杆的高度高于位于张紧滑轮10下方的支撑杆的高度;The guide pulley 9 and the tension pulley 10 are all fixed on independent support rods through independent rotating shafts, and the two support rods are fixed on the top plate of the casing 1, and the height of the support rod below the guide pulley 9 is higher than the height of the support bar located below the tensioning pulley 10;

所述张紧滑轮10位于导向滑轮9与卷扬机11之间,所述导向滑轮9位于张紧滑轮10与过线孔8之间;The tension pulley 10 is located between the guide pulley 9 and the hoist 11, and the guide pulley 9 is located between the tension pulley 10 and the wire hole 8;

在箱体1的内腔中设置有卸货支撑板13,该卸货支撑板13的底面板的四角上均各固定有一组安装耳14,每一组安装耳14上固定有支撑转轴15;紧邻翻转门2的两根支撑转轴15位于支撑柱16顶部的旋转孔中,另外两根支撑转轴15位于活塞杆17顶部的旋转孔中;所述支撑柱16的底端固定在箱体1的底板上,所述活塞杆17的下端与位于液压缸或气缸18的内腔中的活塞固定为一体,所述液压缸或气缸18的缸体下端固定在箱体1的底板上;An unloading support plate 13 is arranged in the inner cavity of the box body 1, and a set of mounting ears 14 are respectively fixed on the four corners of the bottom panel of the unloading support plate 13, and a support shaft 15 is fixed on each set of mounting ears 14; The two supporting shafts 15 of the door 2 are located in the rotating holes at the top of the supporting column 16, and the other two supporting rotating shafts 15 are located in the rotating holes at the top of the piston rod 17; , the lower end of the piston rod 17 is fixed as a whole with the piston in the inner cavity of the hydraulic cylinder or cylinder 18, and the lower end of the cylinder body of the hydraulic cylinder or cylinder 18 is fixed on the bottom plate of the box body 1;

所述液压缸或气缸18通过软管与液压系统或气压系统19连接,该液压系统或气压系统19通过设置在地面的控制柜控制运行,所述卷扬机11和液压系统或气压系统19通过线缆与控制柜电性连接。该实施例中,所述结构可以使得导轨架标准节尽可能近的靠近建筑物,使得轿厢的翻转门尽可能近的靠近建筑物,工人卸货空间大幅度提升,缩短了卸货时间、提高了运输效率、缩短了施工周期,地面建材能够及时搬运至指定楼层,利于提高建筑周边地面整洁度,不再需要另外修建卸货板,提高了安全性、降低了承建成本和提高了环保性。The hydraulic cylinder or cylinder 18 is connected to the hydraulic system or pneumatic system 19 through a hose, and the hydraulic system or pneumatic system 19 is controlled and operated through a control cabinet arranged on the ground. Electrically connected with the control cabinet. In this embodiment, the structure can make the standard section of the guide rail frame close to the building as close as possible, so that the reversing door of the car can be close to the building as close as possible, and the unloading space of the workers is greatly improved, which shortens the unloading time and improves the construction efficiency. The transportation efficiency shortens the construction period, and the ground building materials can be transported to the designated floor in time, which is conducive to improving the cleanliness of the ground around the building, eliminating the need to build additional unloading boards, improving safety, reducing construction costs and improving environmental protection.

为保证拉绳7在控制翻转门2翻转时的活动空间,提高拉绳7使用安全性,上述实施例中,优选地:所述过线孔8为条形槽孔。In order to ensure the movement space of the pull rope 7 when controlling the flipping of the reversing door 2 and improve the safety of the pull rope 7 in use, in the above embodiment, preferably: the wire passing hole 8 is a strip-shaped slot hole.

为保证拉绳7来回移动不与过线孔8的孔壁接触,进一步提高拉绳7使用安全性,上述实施例中,优选地:所述条形槽孔的孔宽为10-30厘米,该条形槽孔的长度为80-120厘米。In order to ensure that the stay cord 7 moves back and forth without contacting the hole wall of the wire-passing hole 8, and to further improve the safety of the stay cord 7, in the above-mentioned embodiment, preferably: the hole width of the strip-shaped slot hole is 10-30 cm, The length of the strip slot is 80-120 centimeters.

为保证建材快速从翻转门2上散落,上述实施例中,优选地:所述翻转门2的外面板顶部固定有与翻转门2的外面板一体的倾斜架或倾斜板20。In order to ensure that building materials are quickly scattered from the reversing door 2 , in the above embodiment, preferably: the top of the outer panel of the reversing door 2 is fixed with an inclined frame or inclined plate 20 integrated with the outer panel of the reversing door 2 .

为进一步提高卸货安全性,保证翻转门2的承重量,上述实施例中,优选地:所述拉绳固定座6为两个,该两个拉绳固定座6分别位于翻转门2的内面板的顶部两角,每一个拉绳固定座6通过与其独立连接的拉绳7与独立的卷扬机11连接,两台卷扬机11均位于箱体1的顶板中部。In order to further improve the safety of unloading and ensure the bearing capacity of the reversing door 2, in the above-mentioned embodiment, preferably: there are two stay cord fixing seats 6, and the two stay cord fixing seats 6 are respectively located on the inner panel of the reversing door 2 The top two corners of each stay cord holder 6 are connected with independent winches 11 through stay cords 7 independently connected with it, and two winches 11 are all positioned at the top plate middle part of casing 1.

上述实施例中,优选地:所述卷扬机11的输出轴上安装又减速器,所述卷扬盘12的转轴通过联轴器与减速器的输出轴连接为一体。In the above embodiment, preferably, a reducer is installed on the output shaft of the winch 11, and the rotating shaft of the winch disc 12 is connected as a whole with the output shaft of the reducer through a coupling.

为使得翻转门2与卸货支撑板13一体作为卸货板时,它们之间的缝隙尽可能的小,保证建材从卸货支撑板13平稳滑至翻转门2上,上述实施例中,优选地:所述翻转门2的下端和/或卸货支撑板13紧邻翻转门2的端部为圆弧形。In order to make the reversing door 2 and the unloading support plate 13 integrally used as the unloading plate, the gap between them is as small as possible to ensure that the building materials slide smoothly from the unloading support plate 13 to the reversing door 2. In the above embodiment, preferably: The lower end of the reversing door 2 and/or the end of the unloading support plate 13 adjacent to the reversing door 2 is arc-shaped.

为使得本轿厢适用于钢丝绳式驱动结构,上述实施例中,优选地:所述箱体1的顶板上设置有用于升降钢绳和配重钢绳连接的连接座。In order to make the car suitable for the wire rope drive structure, in the above embodiments, preferably: the top plate of the box body 1 is provided with a connecting seat for connecting the lifting steel rope and the counterweight steel rope.

为使得本轿厢适用于齿轮齿条式驱动结构,上述实施例中,优选地:所述箱体1的左侧壁或右侧壁上固定有与箱体1一体的槽状滑动板21,该槽状滑动板21的两槽壁体上设置有与导轨架标准节的导轨匹配的滑动部;In order to make the car suitable for the rack-and-pinion driving structure, in the above-mentioned embodiments, preferably: a groove-shaped sliding plate 21 integrated with the box body 1 is fixed on the left side wall or the right side wall of the box body 1, The two groove walls of the groove-shaped sliding plate 21 are provided with sliding parts matching the guide rails of the standard section of the guide rail frame;

所述箱体1的顶板上设置有至少一台升降驱动电机22,该升降驱动电机22紧邻槽状滑动板21;At least one lifting drive motor 22 is arranged on the top plate of the box body 1, and the lifting drive motor 22 is adjacent to the groove-shaped sliding plate 21;

所述升降驱动电机22的动力输出端安装有升降变速器23,该升降变速器23的输出轴穿过槽状滑动板21的底板,在升降变速器23的输出轴的端部固定有驱动齿轮24;The power output end of the lifting drive motor 22 is equipped with a lifting transmission 23, the output shaft of the lifting transmission 23 passes through the bottom plate of the groove-shaped sliding plate 21, and the end of the output shaft of the lifting transmission 23 is fixed with a drive gear 24;

所述驱动齿轮24用于与导轨架标准节上的磁条啮合;Described driving gear 24 is used for engaging with the magnetic strip on the guide rail frame standard section;

所述升降驱动电机22通过线缆与控制柜电性连接。在该实施例中,所述升降驱动电机22和升降变速器23均固定在升降驱动电机安装架25上,最佳方式是升降驱动电机22采用两台。The lifting drive motor 22 is electrically connected to the control cabinet through a cable. In this embodiment, the lifting drive motor 22 and the lifting transmission 23 are fixed on the lifting drive motor installation frame 25, and the best way is to use two lifting drive motors 22.

上述实施例中所有部件均为市场销售产品。本发明所述技术方案尤其适用于预埋管材、管接头、搭接扣件等建材的运输。All components in the above-mentioned embodiments are commercially available products. The technical solution of the present invention is especially suitable for the transportation of building materials such as pre-embedded pipes, pipe joints, lap fasteners and the like.

显然,上述所有实施例是本发明的一部分实施例,而不是全部的实施例。基于本发明所述实施例,本领域技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范畴。Apparently, all the above-mentioned embodiments are some embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative efforts fall within the scope of protection of the present invention.

综上所述,由于上述方法和结构,本发明缩短了卸货时间、提高了运输效率、缩短了施工周期、利于提高建筑周边地面整洁度、提高了安全性、降低了承建成本和提高了环保性。In summary, due to the above method and structure, the present invention shortens the unloading time, improves the transportation efficiency, shortens the construction period, helps to improve the cleanliness of the ground around the building, improves safety, reduces construction costs and improves environmental protection. .

Claims (10)

1.一种建筑工程载货电梯用快速卸货方法,其特征在于:在现有工程施工载货电梯基础上,将现有工程施工载货电梯的轿厢上的对开式电梯门取消,在轿厢的箱体的后侧壁上设置一扇翻转门,该翻转门常态下将轿厢的箱体封闭,所述翻转门外力作用可翻转后放置在高层建筑的楼板上,所述翻转门的翻转是靠钢绳在卷扬机上的收放来实现的;1. a kind of fast unloading method for building engineering freight elevator, it is characterized in that: on the basis of existing engineering construction freight elevator, the side-opening elevator door on the car of existing engineering construction freight elevator is canceled, in A reversing door is arranged on the rear side wall of the casing of the car, and the reversing door closes the casing of the car under normal conditions. The overturning is realized by retracting and unwinding the steel rope on the hoist; 在轿厢的箱体的内腔底板上设置有卸货板,该卸货板常态下与箱体的内腔底板平行;A unloading plate is arranged on the bottom plate of the inner cavity of the box body of the car, and the unloading plate is normally parallel to the bottom plate of the inner cavity of the box body; 所述卸货板通过以紧邻翻转门的边部为支点,外力作用下上下倾斜,卸货板的上下倾斜靠液压缸或气压缸来实现的;The unloading plate is tilted up and down under the action of external force by taking the edge close to the reversing door as the fulcrum, and the up and down tilting of the unloading plate is realized by hydraulic cylinder or pneumatic cylinder; 使用时,位于地面的控制柜管理工人通过控制柜打开翻转门,装货工人装货,装货完后控制柜管理工人关闭翻转门,启动电梯上行至指定楼层;位于楼层上的工人通过对讲机与控制柜管理工人联系并发出开门指令,控制柜管理工人收到信号后通过控制柜打开翻转门,翻转门翻转后搭接在指定楼层的楼板上;位于指定楼层上的工人向控制柜管理工人发出卸货指令,控制柜管理工人收到卸货指令后通过控制柜启动液压缸或气压缸实现卸货板切斜卸货,货物瞬间缓慢的倾倒在指定楼层的楼板上,位于指定楼层的楼板上的卸货工人快速将位于翻转门未散落至楼板上的货物搬离翻转门,接着位于指定楼层的楼板上的工人向控制柜管理工人发出卸货完毕指令,控制柜管理工人通过控制柜控制翻转门复位,翻转门复位后控制柜管理工人通过控制柜控制轿厢下行至地面复位,翻转门复位和轿厢下行至地面复位的过程中,位于指定楼层的楼板上的卸货工人进行货物搬运。When in use, the control cabinet management worker on the ground opens the reversing door through the control cabinet, and the loading worker loads the goods. After loading, the control cabinet management worker closes the reversing door and starts the elevator to go up to the designated floor; the workers on the floor talk to each other through the intercom The control cabinet management workers contact and issue an instruction to open the door. After receiving the signal, the control cabinet management workers open the reversing door through the control cabinet. The reversing door is flipped and then lapped on the floor of the designated floor; Unloading instructions, after receiving the unloading instructions, the management workers of the control cabinet start the hydraulic cylinder or pneumatic cylinder through the control cabinet to realize the unloading of the unloading board. Move the goods that are not scattered on the floor by the reversing door away from the reversing door, and then the workers on the floor on the designated floor send an instruction to the control cabinet management worker to complete the unloading, and the control cabinet management worker controls the reversing door to reset through the control cabinet, and the reversing door resets The rear control cabinet management workers control the car to go down to the ground to reset through the control cabinet. During the process of resetting the flip door and the car going down to the ground, the unloading workers on the floor of the designated floor carry out cargo handling. 2.一种建筑工程载货电梯用轿厢,包括长方体状的箱体(1),其特征在于:位于箱体(1)上的翻转门(2),所述翻转门(2)位于箱体(1)的后侧壁上,在箱体(1)的后侧壁下部设置有安装板(3),该安装板(3)与箱体(1)的底板固定为一体;2. A car for freight elevators in construction projects, comprising a cuboid box (1), characterized in that: a reversing door (2) located on the box (1), the reversing door (2) is located in the box On the rear side wall of the body (1), a mounting plate (3) is arranged at the lower part of the rear side wall of the box body (1), and the mounting plate (3) is fixed together with the bottom plate of the box body (1); 所述翻转门(2)的下端与安装板(3)的顶端通过合叶(4)铰接为一体,或者所述翻转门(2)的两侧壁下端通过转动轴(5)与安装板(3)的两边部连接为一体;The lower end of the reversing door (2) is hinged to the top of the mounting plate (3) through the hinge (4), or the lower end of the two side walls of the reversing door (2) is connected to the mounting plate ( 3) The two sides of the board are connected as one; 所述翻转门(2)的内面板上部固定有与翻转门(2)的内面板一体的至少一个拉绳固定座(6),每一个拉绳固定座(6)均与一根拉绳(7)的一端固定,所述拉绳(7)的另一端穿过过线孔(8)后依次绕过导向滑轮(9)和张紧滑轮(10)后固定在卷扬机(11)的卷扬盘(12)上,所述过线孔(8)位于箱体(1)的顶板上;The upper part of the inner panel of the reversing door (2) is fixed with at least one drawstring fixing seat (6) integrated with the inner panel of the reversing door (2), and each drawstring fixing seat (6) is connected with a drawstring ( 7) is fixed at one end, and the other end of the stay rope (7) passes through the wire hole (8) and then goes around the guide pulley (9) and the tension pulley (10) in turn and then fixes it on the winch of the hoist (11). On the plate (12), the wire hole (8) is located on the top plate of the box (1); 所述导向滑轮(9)和张紧滑轮(10)均通过独立的转轴固定在独立的支撑杆上,所述两根支撑杆固定在箱体(1)的顶板上,位于导向滑轮(9)下方的支撑杆的高度高于位于张紧滑轮(10)下方的支撑杆的高度;Both the guide pulley (9) and the tension pulley (10) are fixed on independent support rods through independent rotating shafts. The two support rods are fixed on the top plate of the box (1) and are located on the guide pulley (9). The height of the support rod below is higher than the height of the support rod positioned at the tension pulley (10) below; 所述张紧滑轮(10)位于导向滑轮(9)与卷扬机(11)之间,所述导向滑轮(9)位于张紧滑轮(10)与过线孔(8)之间;The tension pulley (10) is located between the guide pulley (9) and the hoist (11), and the guide pulley (9) is located between the tension pulley (10) and the wire hole (8); 在箱体(1)的内腔中设置有卸货支撑板(13),该卸货支撑板(13)的底面板的四角上均各固定有一组安装耳(14),每一组安装耳(14)上固定有支撑转轴(15);紧邻翻转门(2)的两根支撑转轴(15)位于支撑柱(16)顶部的旋转孔中,另外两根支撑转轴(15)位于活塞杆(17)顶部的旋转孔中;所述支撑柱(16)的底端固定在箱体(1)的底板上,所述活塞杆(17)的下端与位于液压缸或气缸(18)的内腔中的活塞固定为一体,所述液压缸或气缸(18)的缸体下端固定在箱体(1)的底板上;A unloading support plate (13) is arranged in the inner cavity of the box body (1), and a set of mounting ears (14) are respectively fixed on the four corners of the bottom panel of the unloading support plate (13), each set of mounting ears (14) ) is fixed with support shafts (15); the two support shafts (15) adjacent to the flip door (2) are located in the rotation holes on the top of the support column (16), and the other two support shafts (15) are located on the piston rod (17) The bottom of the support column (16) is fixed on the bottom plate of the box (1), and the lower end of the piston rod (17) is connected to the inner cavity of the hydraulic cylinder or cylinder (18). The piston is fixed as a whole, and the lower end of the hydraulic cylinder or cylinder (18) is fixed on the bottom plate of the box (1); 所述液压缸或气缸(18)通过软管与液压系统或气压系统(19)连接,该液压系统或气压系统(19)通过设置在地面的控制柜控制运行,所述卷扬机(11)和液压系统或气压系统(19)通过线缆与控制柜电性连接。The hydraulic cylinder or cylinder (18) is connected to the hydraulic system or pneumatic system (19) through a hose, and the hydraulic system or pneumatic system (19) is controlled by a control cabinet on the ground. The hoist (11) and hydraulic pressure The system or air pressure system (19) is electrically connected to the control cabinet through cables. 3.根据权利要求2所述的建筑工程载货电梯用轿厢,其特征在于:所述过线孔(8)为条形槽孔。3. The car for a construction freight elevator according to claim 2, characterized in that: the wire passing hole (8) is a strip-shaped slotted hole. 4.根据权利要求3所述的建筑工程载货电梯用轿厢,其特征在于:所述条形槽孔的孔宽为10-30厘米,该条形槽孔的长度为80-120厘米。4. The car for a construction freight elevator according to claim 3, wherein the width of the strip-shaped slot is 10-30 cm, and the length of the strip-shaped slot is 80-120 cm. 5.根据权利要求2所述的建筑工程载货电梯用轿厢,其特征在于:所述翻转门(2)的外面板顶部固定有与翻转门(2)的外面板一体的倾斜架或倾斜板(20)。5. The car for freight elevators in construction projects according to claim 2, characterized in that: the top of the outer panel of the reversing door (2) is fixed with a tilting frame or a tilting frame integrated with the outer panel of the reversing door (2). board (20). 6.根据权利要求2所述的建筑工程载货电梯用轿厢,其特征在于:所述拉绳固定座(6)为两个,该两个拉绳固定座(6)分别位于翻转门(2)的内面板的顶部两角,每一个拉绳固定座(6)通过与其独立连接的拉绳(7)与独立的卷扬机(11)连接,两台卷扬机(11)均位于箱体(1)的顶板中部。6. The car for freight elevators in construction projects according to claim 2, characterized in that there are two stay rope fixing seats (6), and the two stay rope fixing seats (6) are respectively located on the reversing door ( 2) At the top two corners of the inner panel, each stay rope fixing seat (6) is connected to an independent winch (11) through a stay rope (7) independently connected to it, and the two winches (11) are located in the box body (1 ) in the middle of the top plate. 7.根据权利要求2或6所述的建筑工程载货电梯用轿厢,其特征在于:所述卷扬机(11)的输出轴上安装又减速器,所述卷扬盘(12)的转轴通过联轴器与减速器的输出轴连接为一体。7. The car for a construction freight elevator according to claim 2 or 6, characterized in that: a speed reducer is installed on the output shaft of the hoist (11), and the shaft of the hoist (12) passes through The coupling is connected with the output shaft of the reducer as a whole. 8.根据权利要求2所述的建筑工程载货电梯用轿厢,其特征在于:所述翻转门(2)的下端和/或卸货支撑板(13)紧邻翻转门(2)的端部为圆弧形。8. The car for a construction freight elevator according to claim 2, characterized in that: the lower end of the reversing door (2) and/or the end of the unloading support plate (13) adjacent to the reversing door (2) is circle. 9.根据权利要求2所述的建筑工程载货电梯用轿厢,其特征在于:所述箱体(1)的顶板上设置有用于升降钢绳和配重钢绳连接的连接座。9. The car for a construction freight elevator according to claim 2, characterized in that: the top plate of the box body (1) is provided with a connecting seat for connecting the lifting steel rope and the counterweight steel rope. 10.根据权利要求2所述的建筑工程载货电梯用轿厢,其特征在于:所述箱体(1)的左侧壁或右侧壁上固定有与箱体(1)一体的槽状滑动板(21),该槽状滑动板(21)的两槽壁体上设置有与导轨架标准节的导轨匹配的滑动部;10. The car for freight elevators in construction projects according to claim 2, characterized in that: the left side wall or the right side wall of the box body (1) is fixed with a groove-like groove integrated with the box body (1). Sliding plate (21), the two groove walls of the groove-shaped sliding plate (21) are provided with sliding parts matching the guide rails of the standard section of the guide rail frame; 所述箱体(1)的顶板上设置有至少一台升降驱动电机(22),该升降驱动电机(22)紧邻槽状滑动板(21);At least one lifting drive motor (22) is arranged on the top plate of the box body (1), and the lifting drive motor (22) is adjacent to the groove-shaped sliding plate (21); 所述升降驱动电机(22)的动力输出端安装有升降变速器(23),该升降变速器(23)的输出轴穿过槽状滑动板(21)的底板,在升降变速器(23)的输出轴的端部固定有驱动齿轮(24);The power output end of the lifting drive motor (22) is equipped with a lifting transmission (23), the output shaft of the lifting transmission (23) passes through the bottom plate of the groove-shaped sliding plate (21), and the output shaft of the lifting transmission (23) The end of the drive gear (24) is fixed; 所述驱动齿轮(24)用于与导轨架标准节上的磁条啮合;The drive gear (24) is used to engage with the magnetic strip on the standard section of the rail frame; 所述升降驱动电机(22)通过线缆与控制柜电性连接。The lifting drive motor (22) is electrically connected to the control cabinet through cables.
CN201711076898.0A 2017-11-06 2017-11-06 Architectural engineering cargo lift quick discharging method and car Pending CN107720493A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711076898.0A CN107720493A (en) 2017-11-06 2017-11-06 Architectural engineering cargo lift quick discharging method and car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711076898.0A CN107720493A (en) 2017-11-06 2017-11-06 Architectural engineering cargo lift quick discharging method and car

Publications (1)

Publication Number Publication Date
CN107720493A true CN107720493A (en) 2018-02-23

Family

ID=61221567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711076898.0A Pending CN107720493A (en) 2017-11-06 2017-11-06 Architectural engineering cargo lift quick discharging method and car

Country Status (1)

Country Link
CN (1) CN107720493A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112693993A (en) * 2020-12-31 2021-04-23 南阳中原智能电梯有限公司 Three-dimensional transfer equipment
CN114229244A (en) * 2021-12-21 2022-03-25 重庆四正激光科技有限公司 Telescopic combined bin and control method
CN116199070A (en) * 2023-05-05 2023-06-02 四川长能装配式建筑科技有限公司 Assembled building wallboard lifting conveying device
CN118495301A (en) * 2024-07-16 2024-08-16 晟唐伟业建设集团有限公司 A construction cargo elevator convenient for transporting materials

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201261674Y (en) * 2008-09-08 2009-06-24 长沙科达建设机械制造有限公司 Suspension cage with turning door
CN203474189U (en) * 2013-08-30 2014-03-12 江苏中南建筑产业集团有限责任公司 Passenger-and-freight elevator moving
CN204237411U (en) * 2014-11-24 2015-04-01 台州富士电梯制造有限公司 Baggage elevator
CN204897121U (en) * 2015-08-19 2015-12-23 苏州工业园区建设监理有限责任公司 People's goods elevator with passageway draw bridge
CN205602950U (en) * 2016-04-07 2016-09-28 苏州捷菱快速电梯有限公司 Freight elevator
CN205616397U (en) * 2016-03-10 2016-10-05 中国建筑第五工程局有限公司深圳分公司 Novel rotatory passageway formula elevator car
CN205739937U (en) * 2016-05-17 2016-11-30 康达电梯有限公司 A kind of baggage elevator being easy to handling goods
CN206108672U (en) * 2016-08-31 2017-04-19 天津京龙工程机械有限公司 Safe type lift with stable structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201261674Y (en) * 2008-09-08 2009-06-24 长沙科达建设机械制造有限公司 Suspension cage with turning door
CN203474189U (en) * 2013-08-30 2014-03-12 江苏中南建筑产业集团有限责任公司 Passenger-and-freight elevator moving
CN204237411U (en) * 2014-11-24 2015-04-01 台州富士电梯制造有限公司 Baggage elevator
CN204897121U (en) * 2015-08-19 2015-12-23 苏州工业园区建设监理有限责任公司 People's goods elevator with passageway draw bridge
CN205616397U (en) * 2016-03-10 2016-10-05 中国建筑第五工程局有限公司深圳分公司 Novel rotatory passageway formula elevator car
CN205602950U (en) * 2016-04-07 2016-09-28 苏州捷菱快速电梯有限公司 Freight elevator
CN205739937U (en) * 2016-05-17 2016-11-30 康达电梯有限公司 A kind of baggage elevator being easy to handling goods
CN206108672U (en) * 2016-08-31 2017-04-19 天津京龙工程机械有限公司 Safe type lift with stable structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112693993A (en) * 2020-12-31 2021-04-23 南阳中原智能电梯有限公司 Three-dimensional transfer equipment
CN114229244A (en) * 2021-12-21 2022-03-25 重庆四正激光科技有限公司 Telescopic combined bin and control method
CN116199070A (en) * 2023-05-05 2023-06-02 四川长能装配式建筑科技有限公司 Assembled building wallboard lifting conveying device
CN116199070B (en) * 2023-05-05 2023-07-11 四川长能装配式建筑科技有限公司 Assembled building wallboard lifting conveying device
CN118495301A (en) * 2024-07-16 2024-08-16 晟唐伟业建设集团有限公司 A construction cargo elevator convenient for transporting materials
CN118495301B (en) * 2024-07-16 2024-11-22 晟唐伟业建设集团有限公司 A construction cargo elevator convenient for transporting materials

Similar Documents

Publication Publication Date Title
CN107720493A (en) Architectural engineering cargo lift quick discharging method and car
US12031342B2 (en) Hoist platform system for multi-floor building construction
CN210457317U (en) Vertical transport vechicle is built in room
CN107814299B (en) Rapid construction method of building construction unloading platform and rapid unloading lift car
CN111453585A (en) A prefabricated intelligent single-tower nested double-cage construction elevator
JP3372892B2 (en) Elevator for construction
CN205114772U (en) Perpendicular conveyer of ready -package elevartor shaft material
CN206942256U (en) A kind of Simple double-layer garage
CN105947906A (en) Combined moving machine for improving efficiency and safety
CN207903766U (en) The test specimen for testing loading system becomes rail conveying device
CN111776898B (en) Elevator with adjustable load capacity and running speed
CN212374664U (en) Assembled intelligent single-tower nested double-cage construction elevator
CN108190739A (en) The test specimen for testing loading system becomes rail conveying device and hanging method
KR20220008993A (en) Cargo carrying aids in elevators
JP7595916B2 (en) Traversing device for multi-storey car parks
CN109969991A (en) A non-climbing manual hydraulic truck loading hoist
JP6510212B2 (en) Method for disassembling construction elevator, assembling method, and disassembling and assembling apparatus
CN205419582U (en) Floor hoist
CN219298825U (en) Engineering platform of unloading is built in room
CN219751748U (en) Material lifting device for high-rise building construction
CN219670049U (en) Automatic hoister for turnover materials
CN219411893U (en) Construction discharging platform
CN217780546U (en) Hopper trolley for winery
CN210528304U (en) Material transportation frame of conveniently unloading for building
JPH10167668A (en) Vertical and horizontal transporting device and its operation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180223

WD01 Invention patent application deemed withdrawn after publication