[go: up one dir, main page]

CN107685125A - A kind of Fast Installation reinforcing bar cage assembly - Google Patents

A kind of Fast Installation reinforcing bar cage assembly Download PDF

Info

Publication number
CN107685125A
CN107685125A CN201710746723.XA CN201710746723A CN107685125A CN 107685125 A CN107685125 A CN 107685125A CN 201710746723 A CN201710746723 A CN 201710746723A CN 107685125 A CN107685125 A CN 107685125A
Authority
CN
China
Prior art keywords
longitudinal reinforcement
stirrup
reinforcing bar
helical teeth
fast installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710746723.XA
Other languages
Chinese (zh)
Other versions
CN107685125B (en
Inventor
陈贵全
文远松
唐虹靖
何锋
蔡灿
徐贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Xinlian Blasting Engineering Group Co Ltd
Original Assignee
Guizhou Xinlian Blasting Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Xinlian Blasting Engineering Group Co Ltd filed Critical Guizhou Xinlian Blasting Engineering Group Co Ltd
Priority to CN201710746723.XA priority Critical patent/CN107685125B/en
Publication of CN107685125A publication Critical patent/CN107685125A/en
Application granted granted Critical
Publication of CN107685125B publication Critical patent/CN107685125B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F27/00Making wire network, i.e. wire nets
    • B21F27/12Making special types or portions of network by methods or means specially adapted therefor
    • B21F27/20Making special types or portions of network by methods or means specially adapted therefor of plaster-carrying network

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Wire Processing (AREA)

Abstract

The invention discloses a kind of Fast Installation reinforcing bar cage assembly, longitudinal reinforcement fixing groove is offered on the longitudinal reinforcement fixator, longitudinal reinforcement is plugged with the longitudinal reinforcement fixing groove, several tie hoops are socketed with the longitudinal reinforcement, are connected between two tie hoops by two stirrup connectors.The present invention is simple in construction, until complete steel reinforcement cage colligation, wherein to promoting rack inside stirrup connector, half gear and semi-disc is driven to rotate, head rod is headed into sleeve inner by the first helical teeth, when rotating stopping, first helical teeth and the engagement of the second helical teeth, half gear and semi-disc is prevented to turn round, further fix tie hoop, prevent tie hoop from coming off, this device can not only Fast Installation pile foundation reinforcement cage, and for longitudinal reinforcement and tie hoop accurate positioning, it ensure that reinforcing bar and stirrup design attitude, it ensure that construction quality, structure installation is simple, it is easy to operate.

Description

A kind of Fast Installation reinforcing bar cage assembly
Technical field
The present invention relates to steel reinforcement cage field, more particularly to a kind of Fast Installation reinforcing bar cage assembly.
Background technology
Pile foundation reinforcement cage construction at present is carried out in reinforcement yard, is then transported to job site by carrier, is transported Cause because steel reinforcement cage is long to transport to job site not convenient, especially easily deform steel reinforcement cage in transportation, in order to Ensure steel reinforcement cage quality, it is necessary to which developing a kind of equipment ensures that steel reinforcement cage quality in making and transportation is significant.
The content of the invention
The invention aims to solve shortcoming present in prior art, and a kind of Fast Installation steel reinforcement cage proposed Device.
To achieve these goals, present invention employs following technical scheme:
A kind of Fast Installation reinforcing bar cage assembly, including longitudinal reinforcement, longitudinal reinforcement fixator, longitudinal reinforcement fixing groove, spiral shell Stirrup and stirrup connector are revolved, offers longitudinal reinforcement fixing groove on the longitudinal reinforcement fixator, the longitudinal reinforcement is fixed Longitudinal reinforcement is plugged with groove, several tie hoops are socketed with the longitudinal reinforcement, pass through two between two tie hoops The connection of individual stirrup connector, the outer ring of the stirrup connector are connected with two fixed blocks, the fixation on two stirrup connectors Block is threaded with same bolt, and the bolt thread is connected with nut.
Preferably, the stirrup connector includes the first arc clamp, and the inside of the first arc clamp is provided with second Arc clamp, the second arc clamp lower surface are connected with rack, and the rack engages half gear, half gear and first The side wall rotation connection of the mounting groove opened up on arc clamp, the indentation, there of half gear are connected with semi-disc, and semi-disc Outer ring be connected with the first helical teeth, first helical teeth engages the second helical teeth, and the second helical teeth is connected with head rod, described One end movable sleeve of the head rod away from the second helical teeth is connected to sleeve, and the side wall of sleeve and mounting groove connects, and described first One end that connecting rod is located at sleeve inner is connected with limiting plate, in the first through hole opened up on the limiting plate activity be plugged with Two connecting rods, and the both ends of the second connecting rod are connected with the madial wall of sleeve, the side wall of the limiting plate and the interior bottom of sleeve It is connected with spring, and the connecting rod of grafting second in spring between wall, what the lower end of the rack opened up through the bottom wall of mounting groove Second through hole.
Preferably, the second arc clamp upper surface is connected with teeth.
Preferably, second connecting rod and spring have two, and are symmetrical arranged on head rod.
Preferably, the combining structure of half gear shares two, and is symmetrical arranged on rack.
Compared with prior art, the beneficial effects of the invention are as follows:The present invention it is simple in construction, by add rack, half gear, The structures such as semi-disc, the first helical teeth and the second helical teeth, every longitudinal reinforcement is attached in longitudinal reinforcement fixing groove, now longitudinal direction Adjacent segment tie hoop ending, to being fixed, is then placed in stirrup by reinforcing bar by tie hoop and longitudinal reinforcement fixator In connector, give stirrup connector by bolt and nut and fix, the integrality of tie hoop is ensure that, on steel reinforcement cage top By tie hoop colligation on longitudinal reinforcement, successively by tie hoop colligation on longitudinal reinforcement, until steel reinforcement cage colligation is completed, Wherein to rack is promoted inside stirrup connector, half gear and semi-disc is driven to rotate, the first helical teeth heads into head rod Sleeve inner, when rotating stopping, the first helical teeth and the engagement of the second helical teeth, half gear and semi-disc revolution are prevented, it is further solid Determine tie hoop, prevent tie hoop from coming off, this device can not only Fast Installation pile foundation reinforcement cage, and for longitudinal steel Muscle and tie hoop accurate positioning, reinforcing bar and stirrup design attitude are ensure that, ensure that construction quality, structure installation is simple, behaviour Facilitate.
Brief description of the drawings
Fig. 1 is structural representation proposed by the present invention;
Fig. 2 is the side view of longitudinal reinforcement fixator of the present invention;
Fig. 3 is the front view of stirrup connector of the present invention;
Fig. 4 is the side view of stirrup connector of the present invention;
Fig. 5 is A structure enlargement diagrams of the present invention.
In figure:Longitudinal reinforcement 1, longitudinal reinforcement fixator 2, longitudinal reinforcement fixing groove 3, tie hoop 4, stirrup connector 5, First arc clamp 51, the second arc clamp 52, rack 53, half gear 54, semi-disc 55, the first helical teeth 56, the second helical teeth 57, Head rod 58, sleeve 59, limiting plate 510, the second connecting rod 511, spring 512, mounting groove 513, fixed block 6, bolt 7, Nut 8.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.
Reference picture 1-5, a kind of Fast Installation reinforcing bar cage assembly, including longitudinal reinforcement 1, longitudinal reinforcement fixator 2, longitudinal steel Muscle fixing groove 3, tie hoop 4 and stirrup connector 5, longitudinal reinforcement fixing groove 3 is offered on longitudinal reinforcement fixator 2, longitudinal direction Longitudinal reinforcement 1 is plugged with reinforcing bar fixing groove 3, is socketed with several tie hoops 4 on longitudinal reinforcement 1, two tie hoops 4 it Between connected by two stirrup connectors 5, the outer ring of stirrup connector 5 is connected with two fixed blocks 6, two stirrup connectors 5 On fixed block 6 be threaded with same bolt 7, bolt 7 is threaded with nut 8.
Stirrup connector 5 includes the first arc clamp 51, and the inside of the first arc clamp 51 is provided with the second arc clamp 52, The lower surface of second arc clamp 52 is connected with rack 53, and rack 53 engages half gear 54, half gear 54 and the first arc clamp 51 On the side wall rotation connection of mounting groove 513 that opens up, the indentation, there of half gear 54 is connected with semi-disc 55, and semi-disc 55 is outer Circle is connected with the first helical teeth 56, and the first helical teeth 56 engages the second helical teeth 57, and the second helical teeth 57 is connected with head rod 58, the One end movable sleeve of one connecting rod 58 away from the second helical teeth 57 is connected to sleeve 59, and sleeve 59 is connected with the side wall of mounting groove 513, One end that head rod 58 is located inside sleeve 59 is connected with limiting plate 510, is lived in the first through hole opened up on limiting plate 510 It is dynamic to be plugged with the second connecting rod 511, and madial wall of the both ends of the second connecting rod 511 with sleeve 59 is connected, limiting plate 510 Spring 512, and the second connecting rod of grafting 511 in spring 512 are connected between side wall and the inner bottom wall of sleeve 59, under rack 53 End opened up through the bottom wall of mounting groove 513 the, the upper surface of the second arc clamp 52 is connected with teeth, the He of the second connecting rod 511 Spring 512 has two, and is symmetrical arranged on head rod 58, and the combining structure of half gear 54 shares two, and closes It is symmetrical arranged in rack 53.
Operation principle:The smooth location before steel reinforcement cage is installed, longitudinal reinforcement 1 is penetrated into tie hoop 4 and longitudinal reinforcement is consolidated Between determining device 2, a longitudinal reinforcement fixator 2 is filled according to every three meter ampere, every longitudinal reinforcement 1 is attached to longitudinal reinforcement fixing groove In 3, now longitudinal reinforcement 1 is fixed by tie hoop 4 and longitudinal reinforcement fixator 2, then by adjacent segment spiral hoop The ending of muscle 4 is placed in stirrup connector 5, is given stirrup connector 5 by bolt 7 and nut 8 and is fixed, ensure that tie hoop 4 integrality, steel reinforcement cage top by the colligation of tie hoop 4 on longitudinal reinforcement 1, successively by the colligation of tie hoop 4 in longitudinal direction On reinforcing bar 1, until completing steel reinforcement cage colligation, wherein to promotion rack 53 inside stirrup connector 5, half gear 54 and semicircle are driven Disk 55 rotates, and the first helical teeth 56 heads into head rod 58 inside sleeve 59, when rotating stopping, the first helical teeth 56 and second Helical teeth 57 engages, and prevents half gear 54 and semi-disc 55 from turning round, and further fixed tie hoop 4, prevents tie hoop 4 from coming off, This device can not only Fast Installation pile foundation reinforcement cage, and for longitudinal reinforcement 1 and the accurate positioning of tie hoop 4, ensure Reinforcing bar and stirrup design attitude, construction quality is ensure that, structure installation is simple, easy to operate.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.

Claims (5)

1. a kind of Fast Installation reinforcing bar cage assembly, including longitudinal reinforcement (1), longitudinal reinforcement fixator (2), longitudinal reinforcement fixing groove (3), tie hoop (4) and stirrup connector (5), longitudinal reinforcement fixing groove is offered on the longitudinal reinforcement fixator (2) (3) longitudinal reinforcement (1), is plugged with the longitudinal reinforcement fixing groove (3), several spiral shells are socketed with the longitudinal reinforcement (1) Stirrup (4) is revolved, is connected between two tie hoops (4) by two stirrup connectors (5), it is characterised in that:The stirrup connects The outer ring for connecing device (5) is connected with two fixed blocks (6), and the fixed block (6) on two stirrup connectors (5) is threaded with same Individual bolt (7), the bolt (7) are threaded with nut (8).
A kind of 2. Fast Installation reinforcing bar cage assembly according to claim 1, it is characterised in that:The stirrup connector (5) Including the first arc clamp (51), the inside of the first arc clamp (51) is provided with the second arc clamp (52), and described second Arc clamp (52) lower surface is connected with rack (53), and the rack (53) engages half gear (54), half gear (54) with The side wall rotation connection of the mounting groove (513) opened up on first arc clamp (51), the indentation, there connection of half gear (54) There is semi-disc (55), and the outer ring of semi-disc (55) is connected with the first helical teeth (56), the first helical teeth (56) engagement second is oblique Tooth (57), and the second helical teeth (57) is connected with head rod (58), the head rod (58) is away from the second helical teeth (57) One end movable sleeve be connected to sleeve (59), and sleeve (59) is connected with the side wall of mounting groove (513), the head rod (58) One end internal positioned at sleeve (59) is connected with limiting plate (510), activity in the first through hole opened up on the limiting plate (510) The second connecting rod (511) is plugged with, and madial wall of the both ends of the second connecting rod (511) with sleeve (59) is connected, the limit Spring (512) is connected between the side wall of position plate (510) and the inner bottom wall of sleeve (59), and spring (512) interior grafting second connects The second through hole that the bottom wall of mounting groove (513) opens up is run through in extension bar (511), the lower end of the rack (53).
A kind of 3. Fast Installation reinforcing bar cage assembly according to claim 2, it is characterised in that:The second arc clamp (52) upper surface is connected with teeth.
A kind of 4. Fast Installation reinforcing bar cage assembly according to claim 2, it is characterised in that:Second connecting rod (511) and spring (512) has two, and is symmetrical arranged on head rod (58).
A kind of 5. Fast Installation reinforcing bar cage assembly according to claim 2, it is characterised in that:The group of half gear (54) Close structure and share two, and be symmetrical arranged on rack (53).
CN201710746723.XA 2017-08-27 2017-08-27 Device for quickly installing reinforcement cage Active CN107685125B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710746723.XA CN107685125B (en) 2017-08-27 2017-08-27 Device for quickly installing reinforcement cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710746723.XA CN107685125B (en) 2017-08-27 2017-08-27 Device for quickly installing reinforcement cage

Publications (2)

Publication Number Publication Date
CN107685125A true CN107685125A (en) 2018-02-13
CN107685125B CN107685125B (en) 2023-08-18

Family

ID=61155423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710746723.XA Active CN107685125B (en) 2017-08-27 2017-08-27 Device for quickly installing reinforcement cage

Country Status (1)

Country Link
CN (1) CN107685125B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108581351A (en) * 2018-07-11 2018-09-28 广州鑫桥建筑工程有限公司 Rotary positioning device and automatic welding equipment for underground continuous wall reinforcement cage
CN112454647A (en) * 2020-11-18 2021-03-09 南京俏美骏科技有限公司 Prefabricated reinforced concrete tubular pile forming and processing system
CN112854205A (en) * 2021-01-08 2021-05-28 赵学洪 Steel reinforcement cage fixed mounting structure

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08311867A (en) * 1995-05-18 1996-11-26 Kensetsu Kiso Eng Co Ltd Construction method for high stress-proof pile
JPH1136288A (en) * 1997-07-16 1999-02-09 East Japan Railway Co How to fix hoop streaks
JPH11152745A (en) * 1997-11-19 1999-06-08 Taisei Corp Construction of on-site development pile
CN102877465A (en) * 2012-10-19 2013-01-16 天津宝丰混凝土桩杆有限公司 Tubular pile reinforcement cage with stranded steel wire
CN104096786A (en) * 2014-07-05 2014-10-15 武汉嗨拓科技有限公司 Rebar cage former
CN105150132A (en) * 2015-08-07 2015-12-16 重庆市福顺动力配件厂 Clamp for cylindrical parts
CN105569277A (en) * 2015-12-16 2016-05-11 天津银龙高科新材料研究院有限公司 Reinforcing bar connecter
CN106087870A (en) * 2016-08-16 2016-11-09 重庆市晟庄建材有限责任公司 A kind of flood-fighting special reinforcing steel cage
CN205722575U (en) * 2016-03-10 2016-11-23 云南经济管理学院 Reassembling type pile foundation and cylinder steel reinforcement cage model
CN206170243U (en) * 2016-11-15 2017-05-17 连云港宫良木业有限公司 Work piece clamping device of stuff groove cutting machine
CN106903521A (en) * 2017-03-09 2017-06-30 刘艳平 A kind of cylindric workpiece punching frock clamp
CN106988301A (en) * 2017-05-21 2017-07-28 荆门创佳机械科技有限公司 A kind of intermediate strutting device for processing circular steel reinforcement cage
CN207086806U (en) * 2017-08-27 2018-03-13 贵州新联爆破工程集团有限公司 A kind of Fast Installation reinforcing bar cage assembly

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08311867A (en) * 1995-05-18 1996-11-26 Kensetsu Kiso Eng Co Ltd Construction method for high stress-proof pile
JPH1136288A (en) * 1997-07-16 1999-02-09 East Japan Railway Co How to fix hoop streaks
JPH11152745A (en) * 1997-11-19 1999-06-08 Taisei Corp Construction of on-site development pile
CN102877465A (en) * 2012-10-19 2013-01-16 天津宝丰混凝土桩杆有限公司 Tubular pile reinforcement cage with stranded steel wire
CN104096786A (en) * 2014-07-05 2014-10-15 武汉嗨拓科技有限公司 Rebar cage former
CN105150132A (en) * 2015-08-07 2015-12-16 重庆市福顺动力配件厂 Clamp for cylindrical parts
CN105569277A (en) * 2015-12-16 2016-05-11 天津银龙高科新材料研究院有限公司 Reinforcing bar connecter
CN205722575U (en) * 2016-03-10 2016-11-23 云南经济管理学院 Reassembling type pile foundation and cylinder steel reinforcement cage model
CN106087870A (en) * 2016-08-16 2016-11-09 重庆市晟庄建材有限责任公司 A kind of flood-fighting special reinforcing steel cage
CN206170243U (en) * 2016-11-15 2017-05-17 连云港宫良木业有限公司 Work piece clamping device of stuff groove cutting machine
CN106903521A (en) * 2017-03-09 2017-06-30 刘艳平 A kind of cylindric workpiece punching frock clamp
CN106988301A (en) * 2017-05-21 2017-07-28 荆门创佳机械科技有限公司 A kind of intermediate strutting device for processing circular steel reinforcement cage
CN207086806U (en) * 2017-08-27 2018-03-13 贵州新联爆破工程集团有限公司 A kind of Fast Installation reinforcing bar cage assembly

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李江;: "柱体箍筋卷动器制作桩柱钢筋笼施工工法", 青海交通科技, no. 04, pages 63 - 67 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108581351A (en) * 2018-07-11 2018-09-28 广州鑫桥建筑工程有限公司 Rotary positioning device and automatic welding equipment for underground continuous wall reinforcement cage
CN108581351B (en) * 2018-07-11 2023-11-21 广州鑫桥建筑工程有限公司 Automatic welding equipment for rotating positioning device and underground diaphragm wall reinforcement cage
CN112454647A (en) * 2020-11-18 2021-03-09 南京俏美骏科技有限公司 Prefabricated reinforced concrete tubular pile forming and processing system
CN112854205A (en) * 2021-01-08 2021-05-28 赵学洪 Steel reinforcement cage fixed mounting structure

Also Published As

Publication number Publication date
CN107685125B (en) 2023-08-18

Similar Documents

Publication Publication Date Title
CN107685125A (en) A kind of Fast Installation reinforcing bar cage assembly
CN207437522U (en) A kind of support frame for building connector
CN108136244A (en) Trampoline
CN207086806U (en) A kind of Fast Installation reinforcing bar cage assembly
CN207480430U (en) A kind of laboratory reinforcing bar detects positioning device
CN110130923B (en) A shaped steel supporting bow member structure for tunnel
CN208965546U (en) Bored concrete pile for soft soil property
CN105480859B (en) Tow strap anchor for carriage before a kind of ship unloaders
CN108161681A (en) A kind of pre-buried exposed steel bar derusting device of architectural engineering
US2522165A (en) Reinforced concrete structure
CN105569038B (en) The built-in more plush copper eccentric lock compact form mechanical splice devices of prestressed concrete pipe pile
WO2020262393A1 (en) Dust suppression system
CN205134314U (en) Staple bolt device is connected to tubular pile
AT201812B (en) Mobile turntable derrick crane
KR102019233B1 (en) Reinforced Connection device
DE2200963A1 (en) MULTI-PART AUDITORY
CN107989198A (en) The connection component of closed loop pipe fitting and plate
CN209457946U (en) Wholecircle inclined shaft reinforcing bar quickly positions binding trolley
CN205973539U (en) Simple and easy sustaining wall
CN209180501U (en) Ground pump pipeline fixer
CN209585026U (en) A kind of pile for prestressed pipe plugging device
CN208019324U (en) Bending device for rebars
CN219033170U (en) Locking mechanism of prefabricated underground diaphragm wall
CN204592796U (en) Based on the image collecting device of Expressway Information
CN207672982U (en) Contact network construction job platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 550002, 14 floor, Fu Zhong commercial building, No. 102 Xinhua Road, Nanming District, Guiyang, Guizhou.

Applicant after: POLY XINLIAN BLASTING ENGINEERING GROUP Co.,Ltd.

Address before: 550002, 14 floor, Fu Zhong commercial building, No. 102 Xinhua Road, Nanming District, Guiyang, Guizhou.

Applicant before: GUIZHOU XINLIAN BLASTING ENGINEERING GROUP Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant