[go: up one dir, main page]

CN107675674A - The flexible earth anchor gabion positioner of crevasse quick blocking - Google Patents

The flexible earth anchor gabion positioner of crevasse quick blocking Download PDF

Info

Publication number
CN107675674A
CN107675674A CN201710788186.5A CN201710788186A CN107675674A CN 107675674 A CN107675674 A CN 107675674A CN 201710788186 A CN201710788186 A CN 201710788186A CN 107675674 A CN107675674 A CN 107675674A
Authority
CN
China
Prior art keywords
anchor
rod
gabion
ground anchor
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710788186.5A
Other languages
Chinese (zh)
Other versions
CN107675674B (en
Inventor
张先起
宋超
武小炎
徐存东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China University of Water Resources and Electric Power
Original Assignee
North China University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China University of Water Resources and Electric Power filed Critical North China University of Water Resources and Electric Power
Priority to CN201710788186.5A priority Critical patent/CN107675674B/en
Publication of CN107675674A publication Critical patent/CN107675674A/en
Application granted granted Critical
Publication of CN107675674B publication Critical patent/CN107675674B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/122Flexible prefabricated covering elements, e.g. mats, strips
    • E02B3/123Flexible prefabricated covering elements, e.g. mats, strips mainly consisting of stone, concrete or similar stony material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)

Abstract

本发明公开了一种溃口快速封堵的柔性地锚石笼定位装置,包括锚杆和石笼,锚杆包括杆部和插地锚头,其中杆部为中空结构,在其轴心孔内套装有钢丝绳,钢丝绳的端部固定在插地锚头的末端;在河道堤岸固定锚杆枪机,利用锚杆枪机将锚杆沿不同角度倾斜插入河道内部,再利用退杆机构将各锚杆的杆部退出,保持钢丝绳与插地锚头连接,将一系列石笼挂套在钢丝绳上端使石笼沿倾斜的钢丝绳滑入河道内。在锚杆的支撑作用下,各石笼不会被冲走,而且多个石笼分别到达指定区域后堆积并相互挤压,形成牢固的挡水主体。本发明操作非常方便,效果非常好,适合在汛期和溃堤等紧急时刻使用,适合推广应用。

The invention discloses a flexible ground anchor gabion positioning device for quick sealing of the breach, which comprises an anchor rod and a gabion. The anchor rod includes a rod part and a ground anchor head. The set is equipped with a wire rope, and the end of the wire rope is fixed at the end of the ground anchor head; the anchor bolt is fixed on the river embankment, and the anchor bolt is inserted into the river channel at different angles by using the anchor bolt bolt, and then the anchor is pulled out by the retracting rod mechanism. The rod part of the pole is withdrawn, and the steel wire rope is connected with the ground anchor head, and a series of gabions are hung on the upper end of the steel wire rope to make the gabion slide into the river along the inclined steel wire rope. Under the support of anchor rods, each gabion will not be washed away, and multiple gabions will accumulate and squeeze each other after arriving at the designated area, forming a firm water-retaining body. The invention is very convenient to operate and very good in effect, suitable for use in flood seasons and emergency times such as bank breaks, and suitable for popularization and application.

Description

溃口快速封堵的柔性地锚石笼定位装置Flexible ground anchor gabion positioning device for quick closure of breach

技术领域technical field

本发明属于水利工程施工围堰设备技术领域,具体涉及一种以地锚插入河床配合石笼进行溃口快速封堵的装置。The invention belongs to the technical field of cofferdam equipment for water conservancy engineering construction, and in particular relates to a device for quickly sealing a breach by inserting a ground anchor into a river bed and matching with a gabion.

背景技术Background technique

水利工程的建设是国民经济和社会发展的先决条件,近些年频繁的暴雨天气和异常偏多的降雨,降雨量的不断加大,导致堤防遭遇超标准洪水次数增加。河道堤防出现溃口事故频发,导致大片农田与村庄被淹,造成当地农作物遭受重大损害与多人死亡事件,且对当地环境造成严重破坏,严重危及当地居民的生存与发展。当堤防出现溃口时,河道洪水不断涌向溃口,此时需要有关部门高效快速封堵溃口。传统的做法是将沙袋、石块或石笼抛掷到溃口来进行封堵溃口,但由于溃口的单宽流量大、流速高,沙袋、石块、石笼等封堵材料极易被洪水冲走,造成封堵缓慢或封堵失败,无法有效保护人民生命财产安全。The construction of water conservancy projects is a prerequisite for the development of the national economy and society. In recent years, frequent rainstorms and abnormally high rainfall, and the increasing rainfall have led to an increase in the number of floods that exceed the standard for embankments. Frequent breaches of river embankments have caused large areas of farmland and villages to be flooded, causing major damage to local crops and many deaths, and causing serious damage to the local environment, seriously jeopardizing the survival and development of local residents. When the embankment breaches, the river flood will continue to flow towards the breach. At this time, it is necessary for relevant departments to effectively and quickly seal the breach. The traditional method is to throw sandbags, stones or gabions into the breach to seal the breach. However, due to the large single-width flow rate and high velocity of the breach, sandbags, stones, gabions and other sealing materials are easily washed away by floods. , resulting in slow blockage or blockage failure, unable to effectively protect the safety of people's lives and property.

当堤坝溃口时,需要及时将溃口处封堵,但是目前没有很好的方法能够有效堵住,通常的办法是将公交车、卡车推入溃口处,再倒入沙袋,这种方式成本高、效果差。当水流较大时,放入水中的卡车和沙袋很快就会被冲走,无法起到堵漏的效果。还有的方法是采用人工的方式,解放军战士手拉手练成一排跳入水中,然后在后面放沙袋,这种方式不仅效果差,而且非常危险。When the dam breaks, it is necessary to seal the breach in time, but there is currently no good way to effectively block it. The usual method is to push buses and trucks into the breach and then pour sandbags into it. This method is costly and expensive. poor effect. When the water flow is large, the trucks and sandbags put into the water will be washed away soon, and the effect of plugging cannot be achieved. Another method is to use artificial methods. People's Liberation Army soldiers join hands and jump into the water in a row, and then put sandbags behind them. This method is not only ineffective, but also very dangerous.

发明内容Contents of the invention

本发明针对目前防洪堵水所采用的方法和材料存在堵水效果差的问题,提供一种能够快速对洪口不同位置进行固定和快速串连式填料堵水的溃口快速封堵的柔性地锚石笼定位装置。The present invention aims at the problem of poor water blocking effect in the methods and materials used for flood control and water blocking at present, and provides a flexible ground anchor capable of quickly fixing different positions of the flood mouth and fast series-type packing water blocking to quickly block the breach Gabion positioning device.

为实现上述目的,本发明采用如下技术方案:一种溃口快速封堵的柔性地锚石笼定位装置,包括锚杆和石笼,所述锚杆包括杆部和插地锚头,两者通过螺纹连接,其中杆部为中空结构,在其轴心孔内套装有钢丝绳,钢丝绳的端部固定在插地锚头的末端;在河道堤岸固定锚杆枪机,利用锚杆枪机将锚杆沿不同角度倾斜插入河道内部,再利用退杆机构将各锚杆的杆部退出,保持钢丝绳与插地锚头连接,将一系列石笼挂套在钢丝绳上端使石笼沿倾斜的钢丝绳滑入河道内;所述锚杆枪机包括车架,在车架上侧设置有可以翻转的枪机主体,在车架下侧设置有皮带输送机构;所述枪机主体包括轨道,轨道下端通过销轴铰接在车架前端的转动座上,轨道的底部与车架之间连接有角度调节液压缸;所述轨道上安装有能够沿轨道滑动的重锤,重锤的上端通过拉绳及导向轮与卷扬机传动连接;重锤的轴心位置设置有轴孔,锚杆的杆部贯穿于重锤的轴孔内,并在重锤的一端或两端设置有锁杆机构。In order to achieve the above object, the present invention adopts the following technical solution: a flexible ground anchor gabion positioning device for rapid closure of the breach, including an anchor rod and a gabion, the anchor rod includes a rod part and a ground anchor head, and the two pass through Threaded connection, wherein the rod part is a hollow structure, and a steel wire rope is set in the shaft center hole, and the end of the wire rope is fixed at the end of the ground anchor head; the anchor bolt is fixed on the river embankment, and the anchor bolt is fixed by the anchor bolt. Insert it into the river channel at different angles, and then withdraw the rods of each anchor rod by using the retracting rod mechanism, keep the wire rope connected to the ground anchor head, and put a series of gabions on the upper end of the wire rope to slide the gabion along the inclined wire rope. In the river; the bolt bolt includes a frame, on which a flippable bolt body is arranged on the upper side of the frame, and a belt conveying mechanism is arranged on the lower side of the frame; the bolt body includes a track, and the lower end of the track passes through a pin The shaft is hinged on the rotating seat at the front end of the frame, and an angle adjustment hydraulic cylinder is connected between the bottom of the track and the frame; a weight that can slide along the track is installed on the track, and the upper end of the weight passes through the rope and the guide wheel It is connected with the transmission of the hoist; the shaft center of the weight is provided with a shaft hole, the rod of the anchor rod runs through the shaft hole of the weight, and a locking rod mechanism is provided at one or both ends of the weight.

所述皮带输送机构是在车架下侧设置有支座并在支座上安装有转轴,皮带轮输送机构外架通过转轴安装在支座上,并在皮带轮输送机构的底部与车架之间连接有皮带轮输送机构翻转液压缸,从而皮带轮输送机构变为能够上下转动。The belt conveying mechanism is provided with a bearing on the lower side of the vehicle frame and a rotating shaft is installed on the bearing. The outer frame of the pulley conveying mechanism is installed on the bearing through the rotating shaft, and is connected between the bottom of the belt conveying mechanism and the vehicle frame. There is a pulley conveying mechanism to turn over the hydraulic cylinder, so that the pulley conveying mechanism becomes able to rotate up and down.

所述锁杆机构为自动缩杆机构,或者为手动缩杆机构。所述手动缩杆机构包括一个开口的圆环钢圈,该钢圈远离开口一侧通过螺栓固定在重锤的轴孔端部,钢圈的开口处的两侧通过连接有锁紧螺栓。The locking rod mechanism is an automatic retracting rod mechanism, or a manual retracting rod mechanism. The manual retracting rod mechanism includes an open circular steel ring, the steel ring is fixed on the end of the shaft hole of the weight by bolts on the side away from the opening, and the two sides of the opening of the steel ring are connected with locking bolts.

在所述车架上设置有辅助支撑腿,并在辅助支撑腿的下端连接有地固插杆。所述锚杆的插地锚头区域设置有倒刺。An auxiliary supporting leg is arranged on the vehicle frame, and a ground fixing rod is connected to the lower end of the auxiliary supporting leg. Barbs are provided in the area of the ground anchor head of the anchor rod.

所述退杆机构包括支架和电机,电机转轴安装主动齿轮,从动齿轮的轴孔套装在锚杆的杆部,从动齿轮与主动齿轮啮合,从动齿轮的一侧或两侧设置有自动锁杆装置。所述自动缩杆装置包括固定卡片和平移卡片,固定卡片的两侧对称设置有导向孔,平移卡片的两侧对称设置有导向拉杆,两侧导向拉杆与对应导向孔匹配套装在一起,在所述固定卡片的两侧分别设置有能够吸引导向拉杆及平移卡片的电磁铁。The rod retracting mechanism includes a bracket and a motor, the motor shaft is equipped with a driving gear, the shaft hole of the driven gear is sleeved on the rod of the anchor rod, the driven gear is meshed with the driving gear, and one or both sides of the driven gear are provided with automatic Lock lever device. The automatic rod shrinking device includes a fixed card and a translation card. Guide holes are symmetrically provided on both sides of the fixed card, and guide rods are symmetrically provided on both sides of the translation card. The guide rods on both sides are matched with the corresponding guide holes. The two sides of the fixed card are respectively provided with electromagnets capable of attracting the guide rod and translating the card.

所述锚杆的杆部为多段螺纹对接组成,在各杆部之间的螺纹连接处设置有锁紧销。The rod part of the anchor rod is composed of multi-segment threaded butt joints, and locking pins are arranged at the threaded joints between the rod parts.

有益效果:本发明在洪水来临时一旦堤防出现溃口,洪水通过溃口涌出,威胁堤后人民财产安全,利用本方法,可以有效封堵溃口,降低危险系数、提高封堵效果。Beneficial effects: the present invention, once the embankment breaches when the flood comes, the flood will gushes out through the breach, threatening the safety of people's property behind the embankment. By using the method, the breach can be effectively blocked, the risk factor is reduced, and the plugging effect is improved.

本发明利用锚杆枪机将多根锚杆沿不同倾角插入河道的不同位置,然后再利用退杆机构将各锚杆的杆部退掉,留下钢丝绳。钢丝绳的端部通过插地锚头固定在洪口的不同区域。在每根钢丝绳上分布套装多个石笼,多个石笼沿钢丝绳滑落到指定位置并不断堆积,钢丝绳作为串联各石笼的钢索,其端部固定在河堤上,在钢丝绳的牵引作用下,各石笼不会被冲走,而且多个石笼分别到达指定区域后堆积并相互挤压,形成牢固的挡水主体。本发明操作非常方便,效果非常好,适合在汛期和溃堤等紧急时刻使用,适合推广应用。In the present invention, a plurality of bolts are inserted into different positions of the river channel along different inclination angles by using a bolt gun, and then the rods of each bolt are withdrawn by a retracting mechanism, leaving steel wire ropes. The ends of the wire ropes are fixed in different areas of the flood mouth by inserting ground anchor heads. Multiple gabions are distributed on each wire rope, and multiple gabions slide down to the designated position along the wire rope and pile up continuously. Under this condition, each gabion will not be washed away, and multiple gabions will accumulate and squeeze each other after arriving at the designated area respectively, forming a firm water-retaining body. The invention is very convenient to operate and very good in effect, suitable for use in flood seasons and emergency times such as bank breaks, and suitable for popularization and application.

本发明中的锚杆枪机是通过重锤反复锤击锚杆,由于本发明锚杆枪机在重锤的端部采用了能够自动缩杆的缩杆机构,所以能够自动反复对锚杆进行冲击。使各锚杆以不同角度牢固地插入洪水区域底面。The anchor bolt in the present invention hammers the bolt repeatedly by a heavy hammer. Since the anchor bolt of the present invention adopts a retractable rod mechanism that can automatically retract the rod at the end of the heavy hammer, it can automatically and repeatedly carry out the bolt retraction on the anchor bolt. shock. Make each anchor rod firmly inserted into the bottom surface of the flood zone at different angles.

附图说明Description of drawings

图1是本发明的安装状态示意图。Fig. 1 is a schematic diagram of the installation state of the present invention.

图2是本发明的使用状态示意图。Fig. 2 is a schematic diagram of the use state of the present invention.

图3是图1中A部放大结构示意图。Fig. 3 is a schematic diagram of the enlarged structure of part A in Fig. 1 .

图4是图2中B部放大结构示意图。Fig. 4 is a schematic diagram of the enlarged structure of part B in Fig. 2 .

图5是本发明使用的锚杆枪机结构示意图。Fig. 5 is a structural schematic diagram of the bolt bolt used in the present invention.

图6是图5中D向结构示意图。Fig. 6 is a schematic diagram of the structure in the direction D in Fig. 5 .

图7是图5中锁杆机构的示意图。Fig. 7 is a schematic diagram of the lock bar mechanism in Fig. 5 .

图8是图5中退杆机构的示意图。Fig. 8 is a schematic diagram of the retracting rod mechanism in Fig. 5 .

图9是图8中C-C剖面结构示意图。Fig. 9 is a schematic diagram of the C-C section structure in Fig. 8 .

图中标号1为杆部,2为插地锚头,3为倒刺,4为石笼,5为锚杆枪机,6为退杆机构,7为锁紧销,8为钢丝绳,9为螺纹连接头,10为河道。501为车架,502为辅助支撑腿,503为地固插杆,504为皮带输送机构支座,505为转轴,506为皮带输送机构外架,507为皮带输送机构,508为行走轮,509为皮带输送机构翻转液压缸,510为转动座,511为轨道,512为角度调节液压缸,513为重锤,514为锁杆机构,515为拉绳,516为导向轮,517为卷扬机,518为支架,519为锁紧螺栓。601为电机,602为主动齿轮,603为从动齿轮,604为自动锁杆装置,605为固定卡片,606为平移卡片,607为支撑座,608为电磁铁,609为导向拉杆。In the figure, the number 1 is the rod, 2 is the ground anchor head, 3 is the barb, 4 is the gabion, 5 is the anchor bolt, 6 is the rod retracting mechanism, 7 is the locking pin, 8 is the wire rope, 9 is the Threaded connector, 10 is a river course. 501 is the vehicle frame, 502 is the auxiliary support leg, 503 is the ground solid insertion rod, 504 is the support of the belt conveying mechanism, 505 is the rotating shaft, 506 is the outer frame of the belt conveying mechanism, 507 is the belt conveying mechanism, 508 is the traveling wheel, 509 510 is the rotating seat, 511 is the track, 512 is the angle adjustment hydraulic cylinder, 513 is the weight, 514 is the locking rod mechanism, 515 is the pull rope, 516 is the guide wheel, 517 is the hoist, 518 For a support, 519 is a locking bolt. 601 is a motor, 602 is a driving gear, 603 is a driven gear, 604 is an automatic locking bar device, 605 is a fixed card, 606 is a translation card, 607 is a support seat, 608 is an electromagnet, and 609 is a guide rod.

具体实施方式detailed description

如图1和图2所述的溃口快速封堵的柔性地锚石笼定位装置,使用了锚杆和石笼4,以及锚杆枪机5。在河道堤岸固定锚杆枪机5,利用锚杆枪机5将锚杆沿不同角度倾斜插入河道内部,再利用退杆机构6将各锚杆的杆部1退出,保持钢丝绳8与插地锚头2连接,将一系列石笼4挂套在钢丝绳8上端使石笼4沿倾斜的钢丝绳8滑入河道内。在车架上设置有辅助支撑腿,并在辅助支撑腿的下端连接有地固插杆。The flexible ground anchor gabion positioning device for rapid closure of breaches as shown in Figures 1 and 2 uses anchor rods and gabion 4, and anchor bolt bolt 5. Fix the bolt bolt 5 on the embankment of the river, use the bolt bolt 5 to insert the bolts into the river channel at different angles, and then use the retracting mechanism 6 to withdraw the rods 1 of each bolt, and keep the wire rope 8 and the ground anchor The head 2 is connected, and a series of gabions 4 are hung on the upper end of the steel wire rope 8 so that the gabion 4 slides into the river channel along the inclined steel wire rope 8. Auxiliary support legs are arranged on the vehicle frame, and ground fixing rods are connected to the lower ends of the auxiliary support legs.

其中,参见图3和图4,锚杆包括杆部1和插地锚头2,两者通过螺纹连接,其中杆部1为中空结构,在其轴心孔内套装有钢丝绳8,钢丝绳8的端部固定在插地锚头2的末端。锚杆的插地锚头2区域设置有倒刺3。Wherein, referring to Fig. 3 and Fig. 4, the anchor rod includes a rod part 1 and a ground anchor head 2, both of which are connected by threads, wherein the rod part 1 is a hollow structure, and a steel wire rope 8 is set in its axial hole, and the wire rope 8 The end is fixed on the end of the ground anchor head 2. The ground anchor head 2 area of the anchor rod is provided with barbs 3 .

参见图5和图6的锚杆枪机5,在车架上侧设置有可以翻转的枪机主体,在车架下侧设置有皮带输送机构。Referring to Fig. 5 and the bolt bolt 5 of Fig. 6, a reversible bolt body is arranged on the upper side of the vehicle frame, and a belt conveying mechanism is arranged on the lower side of the vehicle frame.

其中,枪机主体包括轨道,轨道下端通过销轴铰接在车架前端的转动座上,轨道的底部与车架之间连接有角度调节液压缸;所述轨道上安装有能够沿轨道滑动的重锤,重锤的上端通过拉绳及导向轮与卷扬机传动连接;重锤的轴心位置设置有轴孔,锚杆的杆部1贯穿于重锤的轴孔内,并在重锤的一端或两端设置有锁杆机构。Wherein, the bolt body includes a track, the lower end of the track is hinged on the rotating seat at the front end of the frame through a pin shaft, and an angle adjustment hydraulic cylinder is connected between the bottom of the track and the frame; a heavy weight capable of sliding along the track is installed on the track. Hammer, the upper end of the heavy hammer is connected to the winch through the pull rope and the guide wheel; the shaft center of the heavy hammer is provided with a shaft hole, and the rod part 1 of the anchor rod runs through the shaft hole of the heavy hammer, and is connected at one end of the heavy hammer or Both ends are provided with locking lever mechanism.

其中,皮带输送机构是在车架下侧设置有支座并在支座上安装有转轴,皮带轮输送机构外架通过转轴安装在支座上,并在皮带轮输送机构的底部与车架之间连接有皮带轮输送机构翻转液压缸,从而皮带轮输送机构变为能够上下转动。Among them, the belt conveying mechanism is provided with a support on the lower side of the frame and a rotating shaft is installed on the support, and the outer frame of the pulley conveying mechanism is installed on the support through the rotating shaft, and is connected between the bottom of the pulley conveying mechanism and the vehicle frame There is a pulley conveying mechanism to turn over the hydraulic cylinder, so that the pulley conveying mechanism becomes able to rotate up and down.

锁杆机构为自动缩杆机构,或者为手动缩杆机构。参见图7所示的手动缩杆机构包括一个开口的圆环钢圈,该钢圈远离开口一侧通过螺栓固定在重锤的轴孔端部,钢圈的开口处的两侧通过连接有锁紧螺栓。The locking rod mechanism is an automatic retracting rod mechanism, or a manual retracting rod mechanism. The manual retracting rod mechanism shown in Figure 7 includes an open circular steel ring, the steel ring is fixed on the end of the shaft hole of the weight by bolts on the side away from the opening, and the two sides of the opening of the steel ring are connected with locks. Tighten the bolts.

参见图8和图9,退杆机构6包括支架和电机,电机转轴安装主动齿轮,从动齿轮的轴孔套装在锚杆的杆部1,从动齿轮与主动齿轮啮合,从动齿轮的一侧或两侧设置有自动锁杆装置。所述自动缩杆装置包括固定卡片和平移卡片,固定卡片的两侧对称设置有导向孔,平移卡片的两侧对称设置有导向拉杆,两侧导向拉杆与对应导向孔匹配套装在一起,在所述固定卡片的两侧分别设置有能够吸引导向拉杆及平移卡片的电磁铁。Referring to Fig. 8 and Fig. 9, the retracting rod mechanism 6 includes a bracket and a motor, the motor shaft is equipped with a driving gear, the shaft hole of the driven gear is sleeved on the rod part 1 of the anchor rod, the driven gear meshes with the driving gear, and one part of the driven gear An automatic locking lever device is provided on one or both sides. The automatic rod shrinking device includes a fixed card and a translation card. Guide holes are symmetrically provided on both sides of the fixed card, and guide rods are symmetrically provided on both sides of the translation card. The guide rods on both sides are matched with the corresponding guide holes. The two sides of the fixed card are respectively provided with electromagnets capable of attracting the guide rod and translating the card.

另外,本发明所使用的锚杆,其杆部1可以为多段螺纹对接组成,在各杆部1之间的螺纹连接处设置有锁紧销7。In addition, the rod part 1 of the anchor rod used in the present invention may be composed of multi-segment threaded butt joints, and locking pins 7 are provided at the threaded joints between the rod parts 1 .

Claims (9)

1.一种溃口快速封堵的柔性地锚石笼定位装置,包括锚杆和石笼,其特征是:所述锚杆包括杆部和插地锚头,两者通过螺纹连接,其中杆部为中空结构,在其轴心孔内套装有钢丝绳,钢丝绳的端部固定在插地锚头的末端;在河道堤岸固定锚杆枪机,利用锚杆枪机将锚杆沿不同角度倾斜插入河道内部,再利用退杆机构将各锚杆的杆部退出,保持钢丝绳与插地锚头连接,将一系列石笼挂套在钢丝绳上端使石笼沿倾斜的钢丝绳滑入河道内;所述锚杆枪机包括车架,在车架上侧设置有可以翻转的枪机主体,在车架下侧设置有皮带输送机构;所述枪机主体包括轨道,轨道下端通过销轴铰接在车架前端的转动座上,轨道的底部与车架之间连接有角度调节液压缸;所述轨道上安装有能够沿轨道滑动的重锤,重锤的上端通过拉绳及导向轮与卷扬机传动连接;重锤的轴心位置设置有轴孔,锚杆的杆部贯穿于重锤的轴孔内,并在重锤的一端或两端设置有锁杆机构。1. A flexible ground anchor gabion positioning device for fast sealing of breaches, comprising anchor rods and gabion, characterized in that: said anchor rods include a rod part and a ground anchor head, both of which are connected by threads, wherein the rod part It is a hollow structure, and a steel wire rope is set in its axis hole, and the end of the wire rope is fixed at the end of the ground anchor head; the anchor bolt is fixed on the river embankment, and the anchor bolt is inserted into the river at different angles by using the anchor bolt. Inside, use the rod retracting mechanism to withdraw the rods of each anchor rod, keep the wire rope connected to the ground anchor head, and hang a series of gabions on the upper end of the wire rope to make the gabion slide into the river along the inclined wire rope; the anchor The bolt action includes a frame, on which a flippable bolt body is arranged on the upper side of the frame, and a belt conveying mechanism is arranged on the lower side of the frame; the bolt body includes a track, and the lower end of the track is hinged to the front end of the frame through a pin There is an angle adjustment hydraulic cylinder connected between the bottom of the track and the frame on the rotating seat; a heavy hammer that can slide along the track is installed on the track, and the upper end of the heavy hammer is connected to the hoist through a pull rope and a guide wheel; A shaft hole is provided at the center of the hammer, the rod of the anchor rod passes through the shaft hole of the weight, and a locking rod mechanism is provided at one or both ends of the weight. 2.根据权利要求1所述的溃口快速封堵的柔性地锚石笼定位装置,其特征是:所述皮带输送机构是在车架下侧设置有支座并在支座上安装有转轴,皮带轮输送机构外架通过转轴安装在支座上,并在皮带轮输送机构的底部与车架之间连接有皮带轮输送机构翻转液压缸,从而皮带轮输送机构变为能够上下转动。2. The flexible ground anchor gabion positioning device for quickly blocking the breach according to claim 1, characterized in that: the belt conveying mechanism is provided with a support on the underside of the vehicle frame and a rotating shaft is installed on the support, The outer frame of the pulley conveying mechanism is installed on the support through the rotating shaft, and a pulley conveying mechanism overturning hydraulic cylinder is connected between the bottom of the pulley conveying mechanism and the vehicle frame, so that the pulley conveying mechanism becomes able to rotate up and down. 3.根据权利要求1所述的溃口快速封堵的柔性地锚石笼定位装置,其特征是:所述锁杆机构为自动缩杆机构,或者为手动缩杆机构。3 . The flexible ground anchor gabion positioning device for rapid closure of breaches according to claim 1 , wherein the locking rod mechanism is an automatic rod retracting mechanism or a manual rod retracting mechanism. 4 . 4.根据权利要求3所述的溃口快速封堵的柔性地锚石笼定位装置,其特征是:所述手动缩杆机构包括一个开口的圆环钢圈,该钢圈远离开口一侧通过螺栓固定在重锤的轴孔端部,钢圈的开口处的两侧通过连接有锁紧螺栓。4. The flexible ground anchor gabion positioning device for quickly blocking the breach according to claim 3, characterized in that: the manual retracting rod mechanism includes an open circular steel ring, and the steel ring is passed through a bolt on the side away from the opening. It is fixed at the end of the shaft hole of the weight, and the two sides of the opening of the steel ring are connected with locking bolts. 5.根据权利要求1所述的溃口快速封堵的柔性地锚石笼定位装置,其特征是:在所述车架上设置有辅助支撑腿,并在辅助支撑腿的下端连接有地固插杆。5. The flexible ground anchor gabion positioning device for rapid closure of breaches according to claim 1, characterized in that: auxiliary support legs are provided on the vehicle frame, and ground anchors are connected to the lower ends of the auxiliary support legs pole. 6.根据权利要求1所述的溃口快速封堵的柔性地锚石笼定位装置,其特征是:所述锚杆的插地锚头区域设置有倒刺。6 . The flexible ground anchor gabion positioning device for rapid closure of breaches according to claim 1 , characterized in that barbs are provided in the area of the ground anchor head of the anchor rod. 7.根据权利要求1所述的溃口快速封堵的柔性地锚石笼定位装置,其特征是:所述退杆机构包括支架和电机,电机转轴安装主动齿轮,从动齿轮的轴孔套装在锚杆的杆部,从动齿轮与主动齿轮啮合,从动齿轮的一侧或两侧设置有自动锁杆装置。7. The flexible ground anchor gabion positioning device for fast sealing of breaches according to claim 1, characterized in that: the retracting rod mechanism includes a bracket and a motor, the motor shaft is equipped with a driving gear, and the shaft hole of the driven gear is sleeved on the On the rod part of the anchor rod, the driven gear meshes with the driving gear, and one side or both sides of the driven gear is provided with an automatic locking rod device. 8.根据权利要求7所述的溃口快速封堵的柔性地锚石笼定位装置,其特征是:所述自动缩杆装置包括固定卡片和平移卡片,固定卡片的两侧对称设置有导向孔,平移卡片的两侧对称设置有导向拉杆,两侧导向拉杆与对应导向孔匹配套装在一起,在所述固定卡片的两侧分别设置有能够吸引导向拉杆及平移卡片的电磁铁。8. The flexible ground anchor gabion positioning device for quick sealing of breaches according to claim 7, characterized in that: the automatic rod shrinking device includes a fixed card and a translation card, and guide holes are symmetrically arranged on both sides of the fixed card, The two sides of the translation card are symmetrically provided with guide rods, and the guide rods on both sides are matched with the corresponding guide holes, and the two sides of the fixed card are respectively provided with electromagnets capable of attracting the guide rods and the translation card. 9.根据权利要求1所述的溃口快速封堵的柔性地锚石笼定位装置,其特征是:所述锚杆的杆部为多段螺纹对接组成,在各杆部之间的螺纹连接处设置有锁紧销。9. The flexible ground anchor gabion positioning device for quick sealing of breaches according to claim 1, characterized in that: the rods of the anchor rods are composed of multi-section thread butt joints, and are arranged at the threaded joints between the rods With locking pin.
CN201710788186.5A 2017-09-05 2017-09-05 The flexible earth anchor gabion positioning device of crevasse quick blocking Expired - Fee Related CN107675674B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710788186.5A CN107675674B (en) 2017-09-05 2017-09-05 The flexible earth anchor gabion positioning device of crevasse quick blocking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710788186.5A CN107675674B (en) 2017-09-05 2017-09-05 The flexible earth anchor gabion positioning device of crevasse quick blocking

Publications (2)

Publication Number Publication Date
CN107675674A true CN107675674A (en) 2018-02-09
CN107675674B CN107675674B (en) 2019-10-29

Family

ID=61135080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710788186.5A Expired - Fee Related CN107675674B (en) 2017-09-05 2017-09-05 The flexible earth anchor gabion positioning device of crevasse quick blocking

Country Status (1)

Country Link
CN (1) CN107675674B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505523A (en) * 2018-04-23 2018-09-07 苏州千层茧农业科技有限公司 A kind of chute-type dam break sand hill grenade instrumentation
CN111624028A (en) * 2020-06-18 2020-09-04 辽宁省公路勘测设计公司 Riverbed information acquisition and detection device capable of being automatically fixed and construction method
CN111911778A (en) * 2020-08-19 2020-11-10 方晓霞 Camera support with self-protection function
CN115075194A (en) * 2022-07-07 2022-09-20 新疆金水工程检测有限公司 Gabion for hydraulic engineering embankment rescue, gabion throwing vehicle and breach rescue method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4953638A (en) * 1988-06-27 1990-09-04 The Charles Machine Works, Inc. Method of and apparatus for drilling a horizontal controlled borehole in the earth
CN1274786A (en) * 1999-05-20 2000-11-29 周良勇 Burst stopping umbrella and burst-stopping method thereof
CN201520761U (en) * 2009-09-17 2010-07-07 杨春和 A connection hoop for the inlet and outlet of a biogas bag
CN201582254U (en) * 2009-12-22 2010-09-15 桐乡辰宇机械有限公司 Anti-disassembly hoop
CN201943578U (en) * 2011-01-20 2011-08-24 天津市辰龙工程机械有限公司 All hydraulic self-propelled jumbolter
CN202706022U (en) * 2012-08-13 2013-01-30 杭州南联地基基础工程有限公司 Recycled post-tensioned prestressing anchor cable pile

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4953638A (en) * 1988-06-27 1990-09-04 The Charles Machine Works, Inc. Method of and apparatus for drilling a horizontal controlled borehole in the earth
CN1274786A (en) * 1999-05-20 2000-11-29 周良勇 Burst stopping umbrella and burst-stopping method thereof
CN201520761U (en) * 2009-09-17 2010-07-07 杨春和 A connection hoop for the inlet and outlet of a biogas bag
CN201582254U (en) * 2009-12-22 2010-09-15 桐乡辰宇机械有限公司 Anti-disassembly hoop
CN201943578U (en) * 2011-01-20 2011-08-24 天津市辰龙工程机械有限公司 All hydraulic self-propelled jumbolter
CN202706022U (en) * 2012-08-13 2013-01-30 杭州南联地基基础工程有限公司 Recycled post-tensioned prestressing anchor cable pile

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
蒋伯杰等: "《洪水危机应急预案编制和处理技术》", 31 August 2009, 中国水利水电出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505523A (en) * 2018-04-23 2018-09-07 苏州千层茧农业科技有限公司 A kind of chute-type dam break sand hill grenade instrumentation
CN111624028A (en) * 2020-06-18 2020-09-04 辽宁省公路勘测设计公司 Riverbed information acquisition and detection device capable of being automatically fixed and construction method
CN111911778A (en) * 2020-08-19 2020-11-10 方晓霞 Camera support with self-protection function
CN115075194A (en) * 2022-07-07 2022-09-20 新疆金水工程检测有限公司 Gabion for hydraulic engineering embankment rescue, gabion throwing vehicle and breach rescue method
CN115075194B (en) * 2022-07-07 2024-03-08 王海朋 Gabion for hydraulic engineering embankment rescue, gabion throwing vehicle and breach rescue method

Also Published As

Publication number Publication date
CN107675674B (en) 2019-10-29

Similar Documents

Publication Publication Date Title
CN107675674A (en) The flexible earth anchor gabion positioner of crevasse quick blocking
CN209703496U (en) A kind of self-opening type machinery anchor pole
CN106948349B (en) Rapid plugging assembly type structure system, installation device and method
CN109778851A (en) Construction method of multi-stage expandable carrier bag grouting prestressed anchor rod
CN103835262B (en) Energy dissipating gravity anchor automatic falling type floating foundation is overhead blocks ship's repairs & maintenance facilities
CN107620289B (en) Dot matrix earth anchor gabion crevasse quick blocking construction system
CN104532859A (en) Slope support system with umbrella-type fixing assemblies
DE102009057794A1 (en) Floatable offshore-wind turbine comprises a floating body, masts and rotors arranged on the floating body as construction, two handle bars that are mounted in different height on the construction and are coupled with an anchoring device
CN107761738B (en) The mask gabion string bag is without throwing construction method of colliding with
CN107653835B (en) The dot matrix screw anchor flexibility transmission device that crevasse blocks
DE2452161A1 (en) ARTIFICIAL ISLAND
CN108104058A (en) A kind of dykes and dams flood crevasse plugging device and its method for blocking
CN206784389U (en) Quick block up fabricated construction system and erecting device
CN101545261B (en) Device for improving degree of security of foundation ditch construction and method thereof
CN107620287B (en) Drilled Hard Anchor Breakout Sealing System
CN116374083B (en) Bottom-sitting anti-platform anchoring method for fishery cultivation platform
CN107054572A (en) A kind of flood disaster prevention and reduction ship
CN206736934U (en) A kind of side slope of embankment safeguard structure
CN206173968U (en) Automatically unhook ware under water
DE102010025227B4 (en) Device that can close a defective oil well
CN212612293U (en) A kind of skeleton detachable anti-floating water blocking and seepage intercepting blanket
CN211849242U (en) Dyke piping emergency device
CN114438965A (en) Breach plugging device and rapid plugging method
CN106436649A (en) Flow control technology and series equipment thereof
CN207714256U (en) A kind of dykes and dams flood crevasse plugging device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Xianqi

Inventor after: Chen Zhiqiang

Inventor after: Wu Xiaoyan

Inventor after: Song Chao

Inventor after: Liang Shikui

Inventor after: Xu Cundong

Inventor before: Zhang Xianqi

Inventor before: Song Chao

Inventor before: Wu Xiaoyan

Inventor before: Xu Cundong

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191029