CN107626868A - Manufacturing process is constructed in the classification of hourglass shape metal - Google Patents

Manufacturing process is constructed in the classification of hourglass shape metal Download PDF

Info

Publication number
CN107626868A
CN107626868A CN201711067504.5A CN201711067504A CN107626868A CN 107626868 A CN107626868 A CN 107626868A CN 201711067504 A CN201711067504 A CN 201711067504A CN 107626868 A CN107626868 A CN 107626868A
Authority
CN
China
Prior art keywords
blank
hourglass
construction
preform
level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711067504.5A
Other languages
Chinese (zh)
Other versions
CN107626868B (en
Inventor
徐斌
孙明月
陈响军
刘朝晖
李殿中
李依依
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Metal Research of CAS
Original Assignee
Institute of Metal Research of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Metal Research of CAS filed Critical Institute of Metal Research of CAS
Priority to CN201711067504.5A priority Critical patent/CN107626868B/en
Publication of CN107626868A publication Critical patent/CN107626868A/en
Application granted granted Critical
Publication of CN107626868B publication Critical patent/CN107626868B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forging (AREA)

Abstract

本发明公开一种沙漏形金属分级构筑成形方法,其特征在于,首先使用常规构筑方法进行一级构筑,获得毛坯,将毛坯进一步锻造成圆台或方台形,作为下一级构筑的毛坯基元;之后进行N级构筑,将两个毛坯基元堆垛在一起以在整体上形成沙漏形;将堆垛成沙漏形的两个毛坯基元封装成沙漏形预制坯;通过锻焊使两个毛坯基元之间的界面焊合以将沙漏形预制坯制成毛坯;将毛坯进一步锻造成圆台或方台形,作为N+1级构筑的毛坯基元;重复以上步骤以实现多级构筑,制备更大型的毛坯。由于沙漏形中间尺寸小,上下两端尺寸大,变形过程中小尺寸的中间段优先变形,因此在较小压力下即可实现中间界面处的大变形。

The invention discloses a step-by-step construction method for hourglass-shaped metals, which is characterized in that firstly, a conventional construction method is used to carry out one-stage construction to obtain a blank, and the blank is further forged into a circular frustum or a square frustum, which is used as a basic element of the next-stage construction; After that, N-level construction is carried out, and the two blank primitives are stacked together to form an hourglass shape as a whole; the two blank primitives stacked in an hourglass shape are packaged into an hourglass-shaped preform; The interface between the primitives is welded to make the hourglass-shaped preform into a blank; the blank is further forged into a circular or square platform, which is used as a rough primitive for N+1-level construction; repeat the above steps to achieve multi-level construction and prepare more Large rough. Due to the small middle size of the hourglass shape and the large upper and lower ends, the small middle section deforms preferentially during the deformation process, so a large deformation at the middle interface can be achieved under relatively small pressure.

Description

沙漏形金属分级构筑成形方法Forming method of hourglass-shaped metal graded construction

技术领域technical field

本发明涉及一种金属材料制造方法,具体来说是通过沙漏形分级构筑方式实现金属或金属基材料成形的加工方法。该方法不但适用于同质材料的均质化制造,而且还适用于异质材料的复合制造。The invention relates to a metal material manufacturing method, in particular to a processing method for realizing metal or metal-based material forming through an hourglass-shaped hierarchical construction method. This method is not only suitable for homogeneous manufacturing of homogeneous materials, but also suitable for composite manufacturing of heterogeneous materials.

背景技术Background technique

金属材料是人类历史发展中最不可或缺的材料,基于其得天独厚的廉价性、强韧性、耐久性等特点,金属在当代材料工业中始终占据主导地位。经过数千年的积累,人类已掌握一整套相当成熟的金属材料生产技术,例如传统的钢铁生产历经冶炼、浇铸、压力加工和热处理工序,产品质量稳定,价格低廉。近年来出现的金属基复合材料结合了金属材料与非金属材料的优点,具有比重小、比强度高等特点,进一步拓宽了金属材料的应用范围。Metal materials are the most indispensable materials in the development of human history. Based on their unique characteristics of cheapness, strength, toughness, and durability, metals have always occupied a dominant position in the contemporary material industry. After thousands of years of accumulation, human beings have mastered a set of quite mature metal material production technologies. For example, traditional steel production has gone through smelting, casting, pressure processing and heat treatment processes, and the product quality is stable and the price is low. Metal matrix composites that have emerged in recent years combine the advantages of metal materials and non-metal materials, and have the characteristics of small specific gravity and high specific strength, which further broadens the application range of metal materials.

一些关键领域对复合界面的结合强度要求较高,传统的爆炸复合方式由于在常温下压力复合,界面上存在显微缺陷,已难以满足要求,需要开发更加可靠、更加安全的新的金属复合方法。Some key areas have high requirements for the bonding strength of the composite interface. The traditional explosive composite method is difficult to meet the requirements due to the pressure composite at room temperature and the presence of microscopic defects on the interface. It is necessary to develop a more reliable and safer new metal composite method. .

金属构筑成形方法,是一种采用多块体积更小的金属坯作为构筑基元制成大型金属坯的增材制造方法。该方法通过制备多个基元、将多个基元堆垛成预定形状、将堆垛成预定形状的多个基元封装成预制坯、通过锻焊使得多个基元之间的界面焊合以将预制坯制成毛坯等步骤实现使用较小的铸坯、锻坯或轧坯制造大型锻件的目的。然而,在构筑坯料制造过程中,由于偶然因素如界面污染或焊缝失效造成基元之间的界面破真空而导致报废的可能性很大。对于100t以上的超大型锻件,单一界面的失效导致锻件整体报废的损失巨大,亟需通过有效的方法规避风险。且由于坯料总重量过大,亟需通过有效手段降低锻造所需压力。The metal building forming method is an additive manufacturing method that uses multiple smaller metal blanks as building blocks to make large metal blanks. The method prepares multiple primitives, stacks multiple primitives into a predetermined shape, packages the multiple primitives stacked into a predetermined shape into a preform, and welds the interfaces between multiple primitives by forging welding. The purpose of using smaller cast billets, forged billets or rolled billets to manufacture large forgings is achieved by making preforms into blanks. However, during the fabrication of building blocks, there is a high possibility of scrapping due to accidental factors such as interface contamination or failure of welds that break the vacuum at the interface between primitives. For super-large forgings over 100t, the failure of a single interface leads to huge losses in the scrapping of the entire forging, and effective methods are urgently needed to avoid risks. And because the total weight of the billet is too large, it is urgent to reduce the pressure required for forging by effective means.

发明内容Contents of the invention

本发明的目的在于提供一种制备大型金属材料或复合金属材料的沙漏形分级构筑成形方法,首先采用常规的构筑方法进行多层铸坯、锻坯或轧坯的构筑,将构筑坯料锻焊后获得毛坯。其中锻焊是指在高温锻造过程中,通过不同基元间的原子扩散使界面充分焊合而实现冶金连接的过程。在完成常规构筑过程后,将坯料锻造成圆台或方台形,获得毛坯基元。将毛坯基元进行表面加工和清洁后,将两个毛坯基元封装在一起,成为沙漏形预制坯,并使界面内部保持高真空状态,然后施加以镦粗大变形为特点的锻焊工艺,使两个毛坯基元结合在一起成为毛坯。可以将毛坯再次锻造成圆台或方台形毛坯基元,多次重复将两件圆台或方台形毛坯基元锻焊成一件更大的毛坯的过程,每一次构筑称为一级。进行多级构筑后,可以实现超大型锻件的制造。The object of the present invention is to provide a kind of hourglass-shaped hierarchical construction forming method for preparing large-scale metal materials or composite metal materials. Get the blank. Among them, forging welding refers to the process of realizing metallurgical connection through the atomic diffusion between different elements to fully weld the interface during the high temperature forging process. After the conventional construction process is completed, the blank is forged into a circular or square frustum to obtain a blank element. After the surface processing and cleaning of the blank primitives, the two blank primitives are packaged together to form an hourglass-shaped preform, and the inside of the interface is kept in a high vacuum state, and then a forging welding process characterized by upsetting and large deformation is applied, so that Two blank primitives are joined together to form a blank. The blank can be forged again into a round or square base, and the process of forging and welding two round or square bases into a larger blank can be repeated many times. Each construction is called a first level. After multi-level construction, the manufacture of super-large forgings can be realized.

本发明的一种沙漏形金属分级构筑成形方法,其特征在于,包括:An hourglass-shaped metal graded construction forming method according to the present invention is characterized in that it includes:

一级构筑和N级构筑,其中N≥2,First-level construction and N-level construction, where N≥2,

所述一级构筑包括如下步骤:Described primary construction comprises the steps:

制备多个基元;Prepare multiple primitives;

将多个基元堆垛成圆柱体或长方体形;Stack multiple primitives into a cylinder or cuboid;

将堆垛成圆柱体或长方体形的多个基元封装成预制坯;Pack multiple primitives stacked into cylinders or cuboids into preforms;

通过锻焊使得多个毛坯基元之间的界面焊合以将预制坯制成毛坯,将毛坯进一步锻造成圆台或方台形,作为下一级构筑的毛坯基元,所述圆台或方台形的毛坯的大平面一端的横截面面积大于小平面一端的横截面面积;By forging and welding, the interface between multiple blank primitives is welded to make the preform into a blank, and the blank is further forged into a circular frustum or a square frustum, which is used as the blank primitive for the next stage of construction. The circular frustum or square frustum is The cross-sectional area of one end of the large plane of the blank is larger than the cross-sectional area of one end of the small plane;

所述N级构筑包括:The N-level architecture includes:

将两个通过N-1级构筑形成的圆台或方台形的毛坯基元堆垛在一起,使得具有较小横截面面积的小平面一端相互接触以在整体上形成沙漏形;将堆垛成沙漏形的两个毛坯基元封装成沙漏形预制坯;Stack two conical or square frustum-shaped blank primitives formed by N-1 level construction, so that one end of the facet with a smaller cross-sectional area contacts each other to form an hourglass shape as a whole; stacking into an hourglass The two blank primitives of the shape are packaged into an hourglass-shaped preform;

通过锻焊使两个毛坯基元之间的界面焊合以将沙漏形预制坯制成毛坯;Welding the interface between the two blank primitives by forging to form the hourglass shaped preform into a blank;

将锻焊获得的毛坯进一步锻造成圆台或方台形,作为N+1级构筑的毛坯基元;The blank obtained by forging and welding is further forged into a circular or square platform, which is used as the blank basic element of the N+1 level construction;

重复所述N级构筑的步骤,以制备更大型的毛坯,重复构筑过程直至坯料重量达到目标重量后将坯料锻造至最终锻件尺寸。Repeat the steps of N-level construction to prepare larger blanks, repeat the construction process until the weight of the blank reaches the target weight, and then forge the blank to the final forging size.

本发明的技术方案为:Technical scheme of the present invention is:

一种沙漏形金属分级构筑成形方法,包括如下步骤:A method for forming an hourglass-shaped metal hierarchical structure, comprising the steps of:

首先使用常规构筑方法制备毛坯基元:将多块小规格金属坯(可为铸坯、锻坯或轧坯)堆垛后进行真空封装,之后对其施加以镦粗大变形为特点的锻焊工艺,使多块小规格金属坯结合在一起成为毛坯。将毛坯进一步锻造成圆台或方台形,获得毛坯基元。所述圆台或方台形的毛坯的大平面一端的横截面面积大于小平面一端的横截面面积;Firstly, the blank element is prepared by the conventional construction method: multiple small-sized metal billets (which can be cast billets, forged billets or rolled billets) are stacked and then vacuum-packaged, and then a forging welding process characterized by upsetting and large deformation is applied to them , so that multiple pieces of small-sized metal blanks are combined to form a blank. The blank is further forged into a circular frustum or a square frustum to obtain the blank primitive. The cross-sectional area of one end of the large plane of the frustum-shaped or square-shaped blank is greater than the cross-sectional area of one end of the small plane;

然后将毛坯基元构筑、封焊成预制坯:将两块圆台或方台形毛坯基元具有较小横截面面积的小平面一端相互接触,堆垛成大规格长方体或圆柱体沙漏形,采用廉价金属板将构筑后的坯料整体封装成箱,并对箱内抽真空处理;或采用真空焊接方式将两基元间的界面封装;封装后的坯料称之为沙漏形预制坯;Then the rough base unit is constructed, sealed and welded into a preform: the facet ends of two round or square base units with a smaller cross-sectional area are contacted with each other, and stacked into a large-sized rectangular parallelepiped or cylindrical hourglass shape. The metal plate encapsulates the constructed blank as a whole into a box, and vacuumizes the inside of the box; or uses vacuum welding to encapsulate the interface between the two primitives; the packaged blank is called an hourglass-shaped preform;

然后将沙漏形预制坯锻焊成毛坯:将封装后的沙漏形预制坯加热到指定温度出炉,在液压机上进行锻造,实施镦粗大变形的措施,使界面充分焊合,实现冶金连接,成为一体化的毛坯;Then the hourglass-shaped preform is forged and welded into a blank: the packaged hourglass-shaped preform is heated to a specified temperature and released from the furnace, forged on a hydraulic press, and the measures of upsetting and large deformation are implemented to fully weld the interface and realize metallurgical connection. the blank;

将毛坯进一步锻造后制成毛坯基元重复构筑过程:将锻焊后成为一体的毛坯进一步锻造成圆台或方台形。将圆台或方台形毛坯作为毛坯基元,重复以上将毛坯基元制造成毛坯的构筑过程,每次重复构筑过程称为一级,直至毛坯重量达到目标重量。After the blank is further forged, the blank is made into a blank basic unit and the construction process is repeated: the blank that is integrated after forging and welding is further forged into a circular or square platform. Use the circular frustum or square frustum-shaped blank as the blank basic unit, repeat the above construction process of making the blank basic unit into a blank, and each repetition of the construction process is called one level, until the weight of the blank reaches the target weight.

最后成形为器件:将毛坯采用锻造、轧制等压力加工方式进一步成形,采用机加工方式精确成形为最终规格尺寸。Final forming into devices: the blank is further formed by forging, rolling and other pressure processing methods, and precisely formed into the final specification size by machining.

该方法的具体步骤如下:The concrete steps of this method are as follows:

第一步,使用常规构筑方法制造圆台或方台形毛坯基元;The first step is to use conventional construction methods to manufacture round or square base blanks;

第二步,加工、清洗毛坯基元表面;The second step is to process and clean the surface of the blank primitive;

第三步,将两块毛坯基元堆垛成沙漏形;The third step is to stack two blank primitives into an hourglass shape;

第四步,将堆垛后的毛坯基元封装,使各接触界面处于真空状态;The fourth step is to package the stacked blank elements so that each contact interface is in a vacuum state;

第五步,对封装后的沙漏形预制坯实施锻前加热;The fifth step is to heat the packaged hourglass-shaped preform before forging;

第六步,对沙漏形预制坯实施镦粗大变形,获得毛坯;The sixth step is to perform upsetting and large deformation on the hourglass-shaped preform to obtain the blank;

第七步,将毛坯锻造成圆台或方台形,获得毛坯基元,重复第二步至第六步的过程,直到毛坯重量达到目标重量;The seventh step is to forge the blank into a circular or square platform to obtain the basic element of the blank, and repeat the process from the second step to the sixth step until the weight of the blank reaches the target weight;

第八步,将毛坯加工成形至最终规格尺寸。The eighth step is to shape the blank to the final size.

在沙漏形金属分级构筑成形方法的第一步中,使用常规构筑工艺,将金属坯裁切制备成多个基元、表面加工清洗、堆垛成圆柱体或长方体形、封装成预制坯、锻焊后制成毛坯,此过程称为第一级构筑。将毛坯进一步锻造成圆台或方台形,获得毛坯基元。所述圆台或方台形的毛坯的大平面一端的横截面面积大于小平面一端的横截面面积。圆台或方台侧面相对于轴线的倾斜角度为0°~30°,侧面倾斜角度可以始终保持一致,也可以不断变化,如圆台或方台侧面倾斜角度为由大平面一端至小平面一端逐渐减小,并最终减小至0°,使两块毛坯基元小平面相对堆垛后接触界面处平滑过渡。每块毛坯基元的高度与最大宽度/长度/直径的比例不超过1.5∶1,便于实施镦粗变形。In the first step of the hourglass-shaped metal hierarchical construction forming method, the conventional construction process is used to cut and prepare the metal billet into multiple primitives, surface processing and cleaning, stacking into a cylinder or a cuboid, packaging into a preform, forging After welding, it is made into a blank. This process is called the first level of construction. The blank is further forged into a circular frustum or a square frustum to obtain the blank primitive. The cross-sectional area of one end of the large plane of the frustum-shaped or square-shaped blank is larger than the cross-sectional area of one end of the small plane. The inclination angle of the side of the round or square platform relative to the axis is 0°~30°, and the side inclination angle can be kept consistent all the time, or it can be changed continuously. Small, and finally reduced to 0°, so that the facets of the two blank primitives are relatively stacked and the contact interface is smoothly transitioned. The ratio of the height of each blank primitive to the maximum width/length/diameter does not exceed 1.5:1, which is convenient for upsetting deformation.

在沙漏形金属分级构筑成形方法的第二步中,采用角磨、钢刷打磨毛坯基元表面,去除氧化皮,必要时采用铣床加工表面。然后采用丙酮、酒精等有机溶剂清洗表面,保障表面高度清洁,露出新鲜金属。In the second step of the hourglass-shaped metal graded construction forming method, the surface of the blank element is polished with an angle grinder and a steel brush to remove scale, and a milling machine is used to process the surface if necessary. Then use organic solvents such as acetone and alcohol to clean the surface to ensure a high degree of cleanliness and expose fresh metal.

在沙漏形金属分级构筑成形方法的第三步中,将两块圆台或方台形毛坯基元具有较小横截面面积的小平面一端相互接触,堆垛成大规格长方体或圆柱体沙漏形,使边缘对齐,堆垛后总高度与最大宽度/长度/直径的比例不超过3∶1。In the third step of the hourglass-shaped metal hierarchical construction forming method, the facet ends of two circular or square-shaped blanks with a smaller cross-sectional area are contacted with each other, and stacked into a large-scale rectangular parallelepiped or cylindrical hourglass shape, so that The edges are aligned, and the ratio of the total height to the maximum width/length/diameter after stacking does not exceed 3:1.

在沙漏形金属分级构筑成形方法的第四步中,采用廉价金属板将堆垛后的毛坯基元整体封装成箱,箱体预留抽真空接口,对箱内抽真空处理后再封堵接口;或将堆垛后的毛坯基元整体放入真空室内,再采用真空焊接方式将两基元间的界面封装,封装界面的焊接深度为10~50mm。封装完成后获得沙漏形预制坯。In the fourth step of the hourglass-shaped metal hierarchical construction method, cheap metal plates are used to package the stacked blank elements into a box, and the box body is reserved for vacuuming the interface, and then the interface is sealed after vacuuming the box ; or put the stacked blank elements into a vacuum chamber as a whole, and then seal the interface between the two elements by vacuum welding, and the welding depth of the packaging interface is 10-50mm. After the encapsulation is completed, an hourglass-shaped preform is obtained.

在沙漏形金属分级构筑成形方法的第五步中,将焊接完成的预制坯送入加热炉加热,加热温度为0.8至0.9Tm,Tm为材料的熔点,单位为℃。优选温度为0.85Tm。In the fifth step of the hourglass-shaped metal hierarchical construction forming method, the welded preform is sent to a heating furnace for heating at a heating temperature of 0.8 to 0.9 Tm, where Tm is the melting point of the material in °C. A preferred temperature is 0.85Tm.

在沙漏形金属分级构筑成形方法的第六步中,将加热后的沙漏形预制坯水平放置于锻压机操作平台上,采用镦粗板对坯料沿高度方向(即垂直于界面方向)进行镦粗;压下坯料总高度的10-50%,此过程称为锻焊,锻焊结束后获得毛坯,此过程称为第二级构筑。在锻造过程中,如果两个毛坯基元之间的界面没能够完全焊合,则将两个毛坯基元分离并锻造回到第一步中毛坯基元的尺寸,以重新进行第二级构筑。In the sixth step of the hourglass-shaped metal hierarchical construction forming method, the heated hourglass-shaped preform is placed horizontally on the operating platform of the forging press, and the blank is upset along the height direction (that is, perpendicular to the interface direction) with an upsetting plate ;Depress 10-50% of the total height of the blank. This process is called forging welding. After forging and welding, the blank is obtained. This process is called the second-level construction. During the forging process, if the interface between the two blank primitives is not fully welded, the two blank primitives are separated and forged back to the size of the blank primitives in the first step to re-build the second stage .

在沙漏形金属分级构筑成形方法的第七步中,将第六步获得的毛坯进一步锻造成圆台或方台形,获得毛坯基元。将两块相同尺寸的毛坯基元再次进行表面加工、清洗、堆垛、封装、锻焊,即重复第二步至第六步的过程,此过程称为第三级构筑。可多次重复此过程,每次重复进行构筑称为一级。每次构筑后毛坯重量为该次构筑前毛坯基元重量的2倍,进行多级构筑直到毛坯重量达到目标重量为止。In the seventh step of the hourglass-shaped metal hierarchical construction forming method, the blank obtained in the sixth step is further forged into a circular frustum or a square frustum to obtain a blank basic element. Surface processing, cleaning, stacking, packaging, and forging welding are carried out on two blank primitives of the same size again, that is, the process from the second step to the sixth step is repeated. This process is called the third-level construction. This process can be repeated many times, each repetition of the construction is called a level. The weight of the blank after each construction is twice the weight of the blank primitive before the construction, and multi-stage construction is carried out until the weight of the blank reaches the target weight.

在沙漏形金属分级构筑成形方法的第八步中,将多级构筑后的毛坯通过锻造、轧制等压力加工方式进一步成形,采用机加工方式精确成形为最终规格尺寸。In the eighth step of the hourglass-shaped metal hierarchical construction forming method, the multi-stage construction blank is further formed by forging, rolling and other pressure processing methods, and is accurately formed into the final specification size by machining.

本发明突破了金属器件的母材只能比其更大的传统思维,使用品质更优、成本更低的小型金属坯构筑成形,具有如下的优点和有益效果:The present invention breaks through the traditional thinking that the base material of a metal device can only be larger than it, and uses a small metal billet with better quality and lower cost to construct and form it, which has the following advantages and beneficial effects:

1、实现大尺寸金属器件的均质化制造。采用多块体积更小的金属坯作为构筑基元,由于凝固速度快,因此其成分均匀性远远好于传统整体铸造的大型金属坯,在此基础上构筑而成的大尺寸金属器件不存在显著的宏观偏析。1. Realize the homogeneous manufacturing of large-scale metal devices. Multiple metal billets with smaller volumes are used as building blocks. Due to the fast solidification speed, the composition uniformity is far better than that of traditional integrally cast large metal billets. Large-scale metal devices constructed on this basis do not exist. Significant macrosegregation.

2、实现大尺寸金属器件的致密化制造。采用多块体积更小的金属坯作为构筑基元,由于凝固速度快,几乎可以实现同时凝固,因此坯料内部集中的缩孔疏松少。焊合界面经变形、保温和多向锻造后,致密性高于传统整体铸坯制成的锻件。2. Realize the densification of large-scale metal devices. Using multiple metal billets with smaller volumes as the building blocks, due to the fast solidification speed, almost simultaneous solidification can be achieved, so there are fewer shrinkage cavities and porosity concentrated inside the billet. After deformation, heat preservation and multi-directional forging at the welding interface, the compactness is higher than that of forgings made of traditional integral billets.

3、实现大尺寸金属器件的纯净化制造。采用多块体积更小的金属坯作为构筑基元,由于制备成本、难度低,因此可采用各种灵活的精炼方法实现基元的纯净化,在此基础上构筑而成的大尺寸金属器件纯净度高于传统整体铸坯制成的锻件。3. Realize the purified manufacturing of large-scale metal devices. Multiple metal billets with smaller volumes are used as the building blocks. Due to the low preparation cost and difficulty, various flexible refining methods can be used to realize the purification of the primitives. The large-scale metal devices constructed on this basis are pure Higher than forgings made of traditional solid billets.

4、实现大尺寸金属器件的低成本制造。由于制备体积较小的金属坯可采用连铸等大生产手段,其制造成本远低于制备体积较大的金属坯必须采用的模铸手段,因此可大幅降低制造成本。此外,使用连铸坯作为构筑基元,没有传统钢锭的冒口、水口损耗,可提升材料利用率15%以上。4. Realize low-cost manufacturing of large-scale metal devices. Since large-scale production methods such as continuous casting can be used to prepare smaller metal billets, its manufacturing cost is much lower than the die casting method that must be used to prepare larger metal billets, so the manufacturing cost can be greatly reduced. In addition, using continuous casting slabs as building blocks, there is no riser and nozzle loss of traditional steel ingots, and the material utilization rate can be increased by more than 15%.

5、实现大尺寸金属器件的清洁化、稳定化制造。传统模铸方法制备金属坯需人工准备模具、浇道、保温材料,同时浇注后冒口发热剂和覆盖剂存在较大的环境污染。采用沙漏形金属分级构筑成形方法,过程可实现完全自动化,不但可以改善劳动环境,而且减少了人为因素影响,产品质量将更加稳定。5. Realize the clean and stable manufacturing of large-scale metal devices. The preparation of metal billets by traditional die casting methods requires manual preparation of molds, runners, and insulation materials. At the same time, there is a large environmental pollution in the riser heating agent and covering agent after pouring. By adopting the hourglass-shaped metal grading construction method, the process can be fully automated, which not only improves the working environment, but also reduces the influence of human factors, and the product quality will be more stable.

6、实现超大型构件的高可靠性分级制造。传统的构筑方法是将多块金属坯直接进行构筑,在构筑坯料制造过程中,由于偶然因素如界面污染或焊缝失效造成界面破真空而导致报废的可能性很大。例如,对于100t以上的超大型锻件,采用传统构筑方法使用连铸坯进行构筑,连铸坯堆垛的层数超过10层,任何两层之间单一界面的失效将导致锻件整体报废,损失巨大。通过分级构筑成形方法可以实现逐步以小制大,只有第一级构筑过程中坯料中存在多个界面,后续的多级构筑过程中每次仅存在一个界面,可以有效降低界面破真空导致锻件整体报废的风险。6. Realize high-reliability graded manufacturing of super-large components. The traditional construction method is to directly construct multiple metal blanks. During the manufacturing process of the construction blanks, there is a high possibility of scrapping due to accidental factors such as interface pollution or weld failure causing the interface to break the vacuum. For example, for super-large forgings over 100t, traditional construction methods are used to construct continuous casting slabs, and the number of continuous casting slabs stacked exceeds 10 layers. The failure of a single interface between any two layers will lead to the scrapping of the forging as a whole, resulting in huge losses. . Through the step-by-step forming method, it is possible to gradually reduce the size from the small to the large. Only in the first-stage construction process, there are multiple interfaces in the blank, and in the subsequent multi-stage construction process, there is only one interface at a time, which can effectively reduce the vacuum caused by the interface breaking the overall forging. risk of obsolescence.

7、实现超大型构件的小压力制造。传统的构筑方法是将多块金属坯直接进行构筑,构筑后预制坯为圆柱体或长方体形,变形所需压机压力较大。采用沙漏形金属分级构筑方法,由于沙漏形中间尺寸小,上下两端尺寸大,变形过程中小尺寸的中间段优先变形,因此在较小压力下即可实现中间界面处的大变形,从而实现金属基元之间界面冶金结合,降低了超大型构件构筑成形所需的压力。7. Realize the small pressure manufacturing of super large components. The traditional construction method is to directly construct a plurality of metal blanks. After construction, the preform is in the shape of a cylinder or a cuboid, and the deformation requires a large press pressure. The hourglass-shaped metal graded construction method is adopted. Since the hourglass-shaped middle size is small and the upper and lower ends are large, the middle section of the small size is preferentially deformed during the deformation process, so the large deformation at the middle interface can be realized under a small pressure, thereby realizing metal The metallurgical bonding of the interface between the basic elements reduces the pressure required for the construction of super-large components.

附图说明Description of drawings

图1a至图1h为本发明工艺流程图,其中,图1a显示采用常规构筑工艺获得的预制坯;图1b将预制坯锻焊成毛坯,并进一步锻造成圆台或方台形,获得毛坯基元;图1c显示将毛坯基元表面加工平整,露出新鲜金属,并进行清洗;图1d显示在真空坏境下对毛坯基元之间的界面四周进行封焊,以获得沙漏形预制坯;图1e显示将沙漏形预制坯放入高温炉中加热;图1f显示在锻压机上采用镦粗板沿沙漏形预制坯的高度方向镦粗;图1g显示镦粗变形到位,使缺陷充分焊合以获得毛坯;图1h显示将毛坯进一步锻造、加工成最终零件形状和尺寸。Fig. 1a to Fig. 1h are process flow charts of the present invention, wherein, Fig. 1a shows the preform obtained by conventional construction process; Fig. 1b forges and welds the preform into a blank, and further forges it into a circular frustum or square frustum to obtain the blank element; Figure 1c shows that the surface of the blank element is flattened to expose fresh metal, and then cleaned; Figure 1d shows that the interface between the blank elements is sealed and welded in a vacuum environment to obtain an hourglass-shaped preform; Figure 1e shows Put the hourglass-shaped preform into a high-temperature furnace for heating; Figure 1f shows that an upsetting plate is used on the forging press to upset along the height direction of the hourglass-shaped preform; Figure 1g shows that the upsetting deformation is in place, and the defects are fully welded to obtain a blank; Figure 1h shows the blank being further forged and machined into the final part shape and dimensions.

图2为本发明实施例1的构筑工艺示意图,第一级构筑采用常规构筑工艺制备第二级构筑使用的方台形毛坯基元,第二级构筑采用本发明的方法将第一级构筑获得的两件方台形毛坯基元制成作为第三级构筑使用的方台形毛坯基元,第三级构筑采用本发明的方法将第二级构筑获得的两件方台形毛坯基元制备成更大型的毛坯。Fig. 2 is the schematic diagram of the construction process of Example 1 of the present invention, the first-level construction adopts the conventional construction process to prepare the square platform-shaped blank primitive used in the second-level construction, and the second-level construction adopts the method of the present invention to obtain the first-level construction Two pieces of square truss-shaped rough base elements are made into square truss-shaped rough base elements used as the third-level construction, and the third-level construction adopts the method of the present invention to prepare the two pieces of square-shaped blank base elements obtained by the second-level construction into a larger blank.

图3为本发明实施例2的构筑工艺示意图,第一级构筑采用常规构筑工艺制备第二级构筑使用的圆台形毛坯基元,第二级构筑采用本发明的方法将第一级构筑获得的两件圆台形毛坯基元制成作为第三级构筑使用的圆台形毛坯基元,第三级构筑采用本发明的方法将第二级构筑获得的两件圆台形毛坯基元制备成更大型的毛坯。Fig. 3 is a schematic diagram of the construction process of Example 2 of the present invention, the first-level construction adopts the conventional construction process to prepare the frustum-shaped blank primitive used in the second-level construction, and the second-level construction adopts the method of the present invention to obtain the first-level construction Two truncated conical blanks are made into a truncated conical blank used as a third-level construction, and the third-level construction adopts the method of the present invention to prepare the two truncated conical blanks obtained by the second-level construction into a larger blank.

具体实施方式detailed description

图1a至图1h为本发明工艺流程图,其中,图1a显示采用常规构筑工艺获得的预制坯;图1b将预制坯锻焊成毛坯,并进一步锻造成圆台或方台形,获得毛坯基元;图1c显示将毛坯基元表面加工平整,露出新鲜金属,并进行清洗;图1d显示在真空坏境下对毛坯基元之间的界面四周进行封焊,以获得沙漏形预制坯;图1e显示将沙漏形预制坯放入高温炉中加热;图1f显示在锻压机上采用镦粗板沿沙漏形预制坯的高度方向镦粗;图1g显示镦粗变形到位,使缺陷充分焊合以获得毛坯;图1h显示将毛坯进一步锻造、加工成最终零件形状和尺寸。Fig. 1a to Fig. 1h are process flow charts of the present invention, wherein, Fig. 1a shows the preform obtained by conventional construction process; Fig. 1b forges and welds the preform into a blank, and further forges it into a circular frustum or square frustum to obtain the blank element; Figure 1c shows that the surface of the blank element is flattened to expose fresh metal, and then cleaned; Figure 1d shows that the interface between the blank elements is sealed and welded in a vacuum environment to obtain an hourglass-shaped preform; Figure 1e shows Put the hourglass-shaped preform into a high-temperature furnace for heating; Figure 1f shows that an upsetting plate is used on the forging press to upset along the height direction of the hourglass-shaped preform; Figure 1g shows that the upsetting deformation is in place, and the defects are fully welded to obtain a blank; Figure 1h shows the blank being further forged and machined into the final part shape and dimensions.

图2为本发明实施例1的构筑工艺示意图,第一级构筑采用常规构筑工艺制备第二级构筑使用的方台形毛坯基元,第二级构筑采用本发明的方法将第一级构筑获得的两件方台形毛坯基元制成作为第三级构筑使用的方台形毛坯基元,第三级构筑采用本发明的方法将第二级构筑获得的两件方台形毛坯基元制备成更大型的毛坯。Fig. 2 is the schematic diagram of the construction process of Example 1 of the present invention, the first-level construction adopts the conventional construction process to prepare the square platform-shaped blank primitive used in the second-level construction, and the second-level construction adopts the method of the present invention to obtain the first-level construction Two pieces of square truss-shaped rough base elements are made into square truss-shaped rough base elements used as the third-level construction, and the third-level construction adopts the method of the present invention to prepare the two pieces of square-shaped blank base elements obtained by the second-level construction into a larger blank.

实施例1Example 1

本实施例的目标产品为316不锈钢环形件。首先采用连铸方式,浇注宽度1000mm、厚度300mm的连铸板坯,其钢种为316H。然后切取长度为1000mm的连铸坯基元,加工、清洗后在真空室内封焊成预制坯。将预制坯进行锻焊和进一步锻造后获得10t级毛坯基元。将4件10t级毛坯基元进行表面加工、清洗、堆垛、封装、锻焊和进一步锻造后获得2件20t级毛坯基元。将2件20t级毛坯基元进行表面加工、清洗、堆垛、封装、锻焊后获得1件40t级毛坯。最后将毛坯锻造成环形件。具体步骤如下:The target product of this embodiment is a 316 stainless steel ring. Firstly, the continuous casting method is adopted, and the continuous casting slab with a width of 1000mm and a thickness of 300mm is poured, and its steel type is 316H. Then cut out the continuous casting slab element with a length of 1000mm, process and clean it, seal and weld it into a preform in a vacuum chamber. After the preform is forged and welded and further forged, a 10t-level blank element is obtained. After surface processing, cleaning, stacking, encapsulation, forging and welding, and further forging, 4 pieces of 10t-level rough base units were used to obtain 2 pieces of 20t-level rough base units. After surface processing, cleaning, stacking, packaging, and forging welding of two 20t-level blank elements, a 40t-level blank was obtained. Finally the blank is forged into a ring. Specific steps are as follows:

第一步,使用常规构筑方法制造毛坯基元。切取规格为1000×1000×300mm连铸坯16块,连铸坯经加工、清洗后在真空室内每4块堆垛封焊成1000×1000×1200mm的预制坯。将预制坯进行锻焊后获得10t级毛坯,将毛坯锻造为大平面为1240×1240mm,小平面为870×870mm,高度为1050mm的,侧面倾斜角度不变的方台形,该坯料为10t级毛坯基元。共获得4块10t级毛坯基元。In the first step, blank primitives are fabricated using conventional construction methods. Cut out 16 continuous casting slabs with specifications of 1000×1000×300mm. After processing and cleaning, each 4 pieces of continuous casting slabs are stacked and welded into 1000×1000×1200mm preforms in a vacuum chamber. After the preform is forged and welded, a 10t-level blank is obtained. The blank is forged into a square platform with a large plane of 1240×1240mm, a small plane of 870×870mm, a height of 1050mm, and a constant side inclination angle. This blank is a 10t-level blank primitive. A total of 4 pieces of 10t-level rough primitives were obtained.

第二步,加工、清洗待焊接表面。采用龙门铣床加工10t级毛坯基元表面,然后采用丙酮清洗,保障表面高度清洁,露出新鲜金属。The second step is to process and clean the surface to be welded. A gantry milling machine is used to process the surface of the 10t-level blank element, and then cleaned with acetone to ensure a high degree of cleanliness of the surface and expose fresh metal.

第三步,对10t级毛坯基元进行堆垛。将两块10t级毛坯基元进行堆垛,堆垛后成为顶面和底面1240×1240mm,中间最细部分870×g70mm,高度2100mm的沙漏形,重量约为20t。The third step is to stack the 10t-level rough primitives. Stack two 10t-level blank primitives, and after stacking, it becomes an hourglass shape with a top and bottom surface of 1240×1240mm, the smallest part in the middle of 870×g70mm, a height of 2100mm, and a weight of about 20t.

第四步,对10t级毛坯基元进行真空电子束焊接。将堆垛后的10t级毛坯基元四周进行真空电子束焊接,焊接深度为50mm,焊接完成后得到20t级预制坯。The fourth step is to carry out vacuum electron beam welding on the 10t-level blank primitive. Vacuum electron beam welding is carried out around the stacked 10t-level blank element with a welding depth of 50mm. After welding, a 20t-level preform is obtained.

第五步,对20t级预制坯实施锻前加热。将焊接完成的预制坯送入加热炉加热,加热温度为1200℃。The fifth step is to heat the 20t preform before forging. The welded preform is sent into a heating furnace for heating, and the heating temperature is 1200°C.

第六步,对20t级预制坯实施镦粗。将加热后的20t级预制坯放置于锻压机操作平台上,使20t级预制坯高度方向沿竖直方向。采用镦粗板沿高度方向对预制坯进行镦粗,压下预制坯总高度的50%。变形完成后得到20t级毛坯。将毛坯锻造至大平面为1550×1550mm,小平面为1085×1085mm,高度为1320mm的方台形,成为20t级毛坯基元。共获得2块20t级毛坯基元。The sixth step is to upsetting the 20t level preform. Place the heated 20t level preform on the operating platform of the forging press so that the height direction of the 20t level preform is along the vertical direction. The upsetting plate is used to upset the preform along the height direction, and press down 50% of the total height of the preform. After the deformation is completed, a 20t level blank is obtained. The blank is forged to a square platform shape with a large plane of 1550×1550mm, a small plane of 1085×1085mm, and a height of 1320mm to become a 20t-level blank basic unit. A total of 2 pieces of 20t-level rough primitives were obtained.

第七步,进行40t级毛坯的制造。将2块20t级毛坯基元进行表面加工、清洗、堆垛、封装后得到40t级预制坯。将预制坯锻焊后成为40t级毛坯,即重复第二步至第六步的过程。The seventh step is to manufacture 40t-level blanks. Surface processing, cleaning, stacking, and packaging of two 20t-level blank elements were performed to obtain a 40t-level preform. After the preform is forged and welded to become a 40t level blank, the process from the second step to the sixth step is repeated.

第八步,将40t级毛坯锻造成形至最终锻件尺寸,锻件为环形,内径为1030mm,外径为2630mm,高度为1000mm。The eighth step is to forge the 40t-level blank to the final forging size. The forging is ring-shaped, with an inner diameter of 1030mm, an outer diameter of 2630mm, and a height of 1000mm.

图3为本发明实施例2的构筑工艺示意图,第一级构筑采用常规构筑工艺制备第二级构筑使用的圆台形毛坯基元,第二级构筑采用本发明的方法将第一级构筑获得的两件圆台形毛坯基元制成作为第三级构筑使用的圆台形毛坯基元,第三级构筑采用本发明的方法将第二级构筑获得的两件圆台形毛坯基元制备成更大型的毛坯。Fig. 3 is a schematic diagram of the construction process of Example 2 of the present invention, the first-level construction adopts the conventional construction process to prepare the frustum-shaped blank primitive used in the second-level construction, and the second-level construction adopts the method of the present invention to obtain the first-level construction Two truncated conical blanks are made into a truncated conical blank used as a third-level construction, and the third-level construction adopts the method of the present invention to prepare the two truncated conical blanks obtained by the second-level construction into a larger blank.

实施例2Example 2

本实施例的目标产品为转子锻件。首先采用连铸方式,浇注宽度1600mm、厚度300mm的连铸板坯,其钢种为16Mn。然后切取长度为1600mm的连铸坯基元,加工、清洗后在真空室内封焊成预制坯。将预制坯进行锻焊和进一步锻造后获得40t级毛坯基元。将4件40t级毛坯基元进行表面加工、清洗、堆垛、封装、锻焊和进一步锻造后获得2件80t级毛坯基元。将2件80t级毛坯基元进行表面加工、清洗、堆垛、封装、锻焊后获得1件160t级毛坯。最后将毛坯锻造成转子。具体步骤如下:The target product of this embodiment is the rotor forging. Firstly, the continuous casting method is used to cast a continuous casting slab with a width of 1600mm and a thickness of 300mm, and its steel type is 16Mn. Then cut out the continuous casting slab element with a length of 1600mm, process and clean it, seal and weld it into a preform in a vacuum chamber. After the preform is forged and welded and further forged, a 40t-level blank element is obtained. After surface processing, cleaning, stacking, encapsulation, forging and welding and further forging, 4 pieces of 40t-level rough base units were used to obtain 2 pieces of 80t-level rough base units. After surface processing, cleaning, stacking, packaging, and forging welding, two 80t-level blank elements were used to obtain one 160t-level blank. Finally the blank is forged into a rotor. Specific steps are as follows:

第一步,使用常规构筑方法制造毛坯基元。切取规格为1600×1600×300mm连铸坯28块,连铸坯经加工、清洗后在真空室内每7块堆垛封焊成1600×1600×2100mm的预制坯。将预制坯进行锻焊后获得40t级毛坯,将毛坯锻造为大平面为φ2250mm,小平面为φ1650mm,高度为1750mm的圆台形,在接近小平面位置的毛坯侧面为圆弧过渡,圆弧半径为1000mm。该坯料为40t级毛坯基元。共获得4块40t级毛坯基元。第二步,加工、清洗待焊接表面。采用龙门铣床加工40t级毛坯基元表面,然后采用丙酮清洗,保障表面高度清洁,露出新鲜金属。In the first step, blank primitives are fabricated using conventional construction methods. Cut out 28 pieces of continuous casting slabs with specifications of 1600×1600×300mm. After the continuous casting slabs are processed and cleaned, they are stacked and welded into 1600×1600×2100mm preforms in a vacuum chamber by stacking every 7 pieces. After the preform is forged and welded, a 40t-level blank is obtained. The blank is forged into a frustum of conical shape with a large plane of φ2250mm, a small plane of φ1650mm, and a height of 1750mm. The side of the blank close to the small plane has a circular arc transition with a radius of 1000mm. The blank is a 40t-level blank primitive. A total of 4 pieces of 40t-level blank primitives were obtained. The second step is to process and clean the surface to be welded. A gantry milling machine is used to process the surface of the 40t-level blank element, and then cleaned with acetone to ensure a high degree of cleanliness of the surface and expose fresh metal.

第三步,对40t级毛坯基元进行堆垛。将两块40t级毛坯基元进行堆垛,堆垛后成为顶面和底面φ2250mm,中间最细部分φ1650mm,高度3500mm的沙漏形,沙漏中间最细部分存在半径为1000mm的圆弧过渡,重量约为80t。The third step is to stack the 40t-level blank primitives. Two pieces of 40t-level blank primitives are stacked, and after stacking, the top and bottom surfaces are φ2250mm, the thinnest part in the middle is φ1650mm, and the hourglass shape is 3500mm in height. It is 80t.

第四部,对40t级毛坯基元进行真空电子束焊接。将堆垛后的40t级毛坯基元四周进行真空电子束焊接,焊接深度为50mm,焊接完成后得到80t级预制坯。The fourth part is to carry out vacuum electron beam welding on the 40t-level blank element. Vacuum electron beam welding is carried out around the stacked 40t-level blank element with a welding depth of 50mm, and an 80t-level preform is obtained after welding.

第五步,对80t级预制坯实施锻前加热。将焊接完成的预制坯送入加热炉加热,加热温度为1200℃。The fifth step is to heat the 80t preform before forging. The welded preform is sent into a heating furnace for heating, and the heating temperature is 1200°C.

第六步,对80t级预制坯实施镦粗。将加热后的80t级预制坯放置于锻压机操作平台上,使80t级预制坯高度方向沿竖直方向。采用镦粗板沿高度方向对预制坯进行镦粗,压下预制坯总高度的50%。变形完成后得到80t级毛坯。将毛坯锻造至大平面为φ2900mm,小平面为φ2250mm,高度为2000mm的圆台形,接近小平面位置侧面为圆弧过渡,圆弧半径为1500mm,获得80t级毛坯基元。共获得2块80t级毛坯基元。The sixth step is to upsetting the 80t preform. Place the heated 80t level preform on the operating platform of the forging press so that the height direction of the 80t level preform is along the vertical direction. The upsetting plate is used to upset the preform along the height direction, and press down 50% of the total height of the preform. After the deformation is completed, an 80t grade blank is obtained. The blank is forged to a truncated conical shape with a large plane of φ2900mm, a small plane of φ2250mm, and a height of 2000mm. The side near the small plane is a circular arc transition with a radius of 1500mm to obtain an 80t-level blank primitive. A total of 2 pieces of 80t-level rough primitives were obtained.

第七步,进行160t级毛坯的制造。将2块80t级毛坯基元进行表面加工、清洗、堆垛、封装后得到160t级预制坯。将预制坯锻焊后成为160t级毛坯,即重复第二步至第六步的过程。The seventh step is to manufacture 160t-level blanks. After surface processing, cleaning, stacking and packaging of two 80t-level blank primitives, a 160t-level preform was obtained. After the preform is forged and welded to become a 160t level blank, the process from the second step to the sixth step is repeated.

第八步,将160t级毛坯锻造成形至最终锻件尺寸,锻件为转子锻件,总长度9000mm,最大直径3000mm,最小直径700mm。The eighth step is to forge the 160t-level blank to the final forging size. The forging is a rotor forging with a total length of 9000mm, a maximum diameter of 3000mm, and a minimum diameter of 700mm.

Claims (11)

1.一种沙漏形金属分级构筑成形方法,其特征在于,包括:1. A step-by-step forming method for hourglass-shaped metal, characterized in that it comprises: 一级构筑和N级构筑,其中N≥2,First-level construction and N-level construction, where N≥2, 所述一级构筑包括如下步骤:Described primary construction comprises the steps: 制备多个基元;Prepare multiple primitives; 将多个基元堆垛成圆柱体或长方体形;Stack multiple primitives into a cylinder or cuboid; 将堆垛成圆柱体或长方体形的多个基元封装成预制坯;Pack multiple primitives stacked into cylinders or cuboids into preforms; 通过锻焊使得多个毛坯基元之间的界面焊合以将预制坯制成毛坯,将毛坯进一步锻造成圆台或方台形,作为下一级构筑的毛坯基元,所述圆台或方台形的毛坯的大平面一端的横截面面积大于小平面一端的横截面面积;By forging and welding, the interface between multiple blank primitives is welded to make the preform into a blank, and the blank is further forged into a circular frustum or a square frustum, which is used as the blank primitive for the next stage of construction. The circular frustum or square frustum is The cross-sectional area of one end of the large plane of the blank is larger than the cross-sectional area of one end of the small plane; 所述N级构筑包括:The N-level architecture includes: 将两个通过N-1级构筑形成的圆台或方台形的毛坯基元堆垛在一起,使得具有较小横截面面积的小平面一端相互接触以在整体上形成沙漏形;Stacking two frustum-shaped or frustum-shaped blanks formed by N-1 level construction together, so that one end of the facet with a smaller cross-sectional area contacts each other to form an hourglass shape as a whole; 将堆垛成沙漏形的两个毛坯基元封装成沙漏形预制坯;Pack the two blank primitives stacked in an hourglass shape into an hourglass-shaped preform; 通过锻焊使两个毛坯基元之间的界面焊合以将沙漏形预制坯制成毛坯;Welding the interface between the two blank primitives by forging to form the hourglass shaped preform into a blank; 将锻焊获得的毛坯进一步锻造成圆台或方台形,作为N+1级构筑的毛坯基元;The blank obtained by forging and welding is further forged into a circular or square platform, which is used as the blank basic element of the N+1 level construction; 重复所述N级构筑的步骤,以制备更大型的毛坯,重复构筑过程直至坯料重量达到目标重量后将坯料锻造至最终锻件尺寸。Repeat the steps of N-level construction to prepare larger blanks, repeat the construction process until the weight of the blank reaches the target weight, and then forge the blank to the final forging size. 2.根据权利要求1所述的沙漏形金属分级构筑成形方法,其特征在于,圆台或方台形侧面相对于轴线的倾斜角度为0°~30°。2. The hourglass-shaped metal step-by-step construction forming method according to claim 1, characterized in that the inclination angle of the side of the circular frustum or square frustum relative to the axis is 0°-30°. 3.根据权利要求2所述的沙漏形金属分级构筑成形方法,其特征在于,圆台或方台形侧面倾斜角度始终保持一致。3. The hourglass-shaped metal step-by-step construction forming method according to claim 2, characterized in that the angle of inclination of the side of the circular frustum or square frustum is always consistent. 4.根据权利要求2所述的沙漏形金属分级构筑成形方法,其特征在于,圆台或方台形侧面倾斜角度由大平面一端至小平面一端逐渐减小,最终减小至0°。4. The step-by-step forming method of hourglass-shaped metal according to claim 2, characterized in that the inclination angle of the side of the circular or square frustum gradually decreases from one end of the large plane to one end of the small plane, and finally decreases to 0°. 5.根据权利要求1所述的沙漏形金属分级构筑成形方法,其特征在于,两个毛坯基元堆垛成的沙漏形的高与最大宽度/长度/直径的比例不超过3∶1。5. The hourglass-shaped metal hierarchical construction forming method according to claim 1, characterized in that the ratio of the height to the maximum width/length/diameter of the hourglass shape formed by stacking two blank primitives does not exceed 3:1. 6.根据权利要求1所述的沙漏形金属分级构筑成形方法,其特征在于,所述沙漏形为长方体或圆柱体沙漏形。6 . The hourglass-shaped metal hierarchical construction forming method according to claim 1 , wherein the hourglass shape is a rectangular parallelepiped or a cylindrical hourglass shape. 7 . 7.根据权利要求1所述的沙漏形金属分级构筑成形方法,其特征在于,通过锻焊使两个毛坯基元之间的界面焊合以将沙漏形预制坯制成毛坯的步骤包括加热预制坯,加热温度范围在0.8-0.9Tm之间,Tm为材料的熔点,单位为℃,优选地,加热温度为0.85Tm,并且然后将加热后的沙漏形预制坯放置于锻压机操作平台上锻压,使得沙漏形预制坯变形。7. The hourglass-shaped metal hierarchical construction forming method according to claim 1, characterized in that, the step of making the hourglass-shaped preform into a blank by forging and welding the interface between the two blank elements includes heating the preform Billet, the heating temperature range is between 0.8-0.9Tm, Tm is the melting point of the material, the unit is °C, preferably, the heating temperature is 0.85Tm, and then the heated hourglass-shaped preform is placed on the operating platform of the forging press for forging , deforming the hourglass-shaped preform. 8.根据权利要求7所述的沙漏形金属分级构筑成形方法,其特征在于,变形量为沙漏形预制坯在变形方向上总长度的10%-50%。8 . The step-by-step forming method for hourglass-shaped metal according to claim 7 , wherein the amount of deformation is 10%-50% of the total length of the hourglass-shaped preform in the deformation direction. 9.根据权利要求8所述的沙漏形金属分级构筑成形方法,其特征在于,变形方向为沙漏形预制坯高度方向,即垂直于两个毛坯基元之间界面的方向。9. The hourglass-shaped metal hierarchical construction forming method according to claim 8, characterized in that the deformation direction is the height direction of the hourglass-shaped preform, that is, the direction perpendicular to the interface between two blank elements. 10.根据权利要求9所述的沙漏形金属分级构筑成形方法,在锻压预制坯使得预制坯变形过程中,在预制坯的横截面面积从两端至中间基本上相等时,停止变形。10. The step-by-step forming method of hourglass-shaped metal according to claim 9, during the process of forging and pressing the preform to deform the preform, the deformation is stopped when the cross-sectional area of the preform is substantially equal from both ends to the middle. 11.根据权利要求1所述的金属分级构筑成形方法,其特征在于,在执行所述N级构筑步骤时,如果在通过锻焊使得两个毛坯基元之间的界面焊合以将预制坯制成毛坯的过程中,两个毛坯基元之间的界面没能够完全焊合,能够将两个毛坯基元分离并锻造回到N-1级构筑结束时的毛坯基元的圆台或方台形尺寸,以进行再一次的N级构筑。11. The metal hierarchical building forming method according to claim 1, characterized in that, when performing the N-level building step, if the interface between the two blank primitives is welded by forging welding to weld the preform In the process of making the blank, the interface between the two blank primitives cannot be completely welded, and the two blank primitives can be separated and forged back to the circular or square shape of the blank primitive at the end of the N-1 level construction Dimensions for another N-level build.
CN201711067504.5A 2017-11-02 2017-11-02 Hourglass-shaped metal graded construction forming method Active CN107626868B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711067504.5A CN107626868B (en) 2017-11-02 2017-11-02 Hourglass-shaped metal graded construction forming method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711067504.5A CN107626868B (en) 2017-11-02 2017-11-02 Hourglass-shaped metal graded construction forming method

Publications (2)

Publication Number Publication Date
CN107626868A true CN107626868A (en) 2018-01-26
CN107626868B CN107626868B (en) 2020-05-05

Family

ID=61106794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711067504.5A Active CN107626868B (en) 2017-11-02 2017-11-02 Hourglass-shaped metal graded construction forming method

Country Status (1)

Country Link
CN (1) CN107626868B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019051979A1 (en) * 2017-09-15 2019-03-21 中国原子能科学研究院 Forming method for modular metal construction
WO2019051981A1 (en) * 2017-09-15 2019-03-21 中国原子能科学研究院 Profiled metal construction forming method
CN109807269A (en) * 2019-01-02 2019-05-28 中国原子能科学研究院 A kind of design method of special-shaped construction blank
CN111055036A (en) * 2019-11-28 2020-04-24 上海微电子装备(集团)股份有限公司 A metal additive manufacturing method
CN115255093A (en) * 2022-07-29 2022-11-01 山东大学 A method for constructing forging and extrusion forming of large billets or components

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3858428A (en) * 1972-08-21 1975-01-07 Osborn Steels Limited Rolling of metal
CN104259357A (en) * 2014-10-16 2015-01-07 二重集团(德阳)重型装备股份有限公司 Large-sized steel ingot production method
CN105522349A (en) * 2015-03-26 2016-04-27 中国科学院金属研究所 Homogeneous metal constructing and forming method
CN105856727A (en) * 2016-04-19 2016-08-17 东北大学 Multilayer copper/titanium composite board and preparation method thereof
CN106312454A (en) * 2016-08-29 2017-01-11 辽宁北祥重工机械制造有限公司 Method for producing main shaft forging through stacked forging of multi-element homogeneous metal
CN107282634A (en) * 2017-06-14 2017-10-24 中南大学 A kind of method that utilization scale effect prepares foam stratiform foil
CN107626880A (en) * 2017-09-15 2018-01-26 中国原子能科学研究院 A kind of manufacturing process of large-sized annular forging
CN107717341A (en) * 2017-09-15 2018-02-23 中国原子能科学研究院 Modular metal constructs manufacturing process

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3858428A (en) * 1972-08-21 1975-01-07 Osborn Steels Limited Rolling of metal
CN104259357A (en) * 2014-10-16 2015-01-07 二重集团(德阳)重型装备股份有限公司 Large-sized steel ingot production method
CN105522349A (en) * 2015-03-26 2016-04-27 中国科学院金属研究所 Homogeneous metal constructing and forming method
CN105598599A (en) * 2015-03-26 2016-05-25 中国科学院金属研究所 Cylindrical metal construction method
CN105618506A (en) * 2015-03-26 2016-06-01 中国科学院金属研究所 Metal construction forming method
CN105856727A (en) * 2016-04-19 2016-08-17 东北大学 Multilayer copper/titanium composite board and preparation method thereof
CN106312454A (en) * 2016-08-29 2017-01-11 辽宁北祥重工机械制造有限公司 Method for producing main shaft forging through stacked forging of multi-element homogeneous metal
CN107282634A (en) * 2017-06-14 2017-10-24 中南大学 A kind of method that utilization scale effect prepares foam stratiform foil
CN107626880A (en) * 2017-09-15 2018-01-26 中国原子能科学研究院 A kind of manufacturing process of large-sized annular forging
CN107717341A (en) * 2017-09-15 2018-02-23 中国原子能科学研究院 Modular metal constructs manufacturing process

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胡亚民 等: "《锻造工艺过程及模具设计》", 31 August 2006 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019051979A1 (en) * 2017-09-15 2019-03-21 中国原子能科学研究院 Forming method for modular metal construction
WO2019051981A1 (en) * 2017-09-15 2019-03-21 中国原子能科学研究院 Profiled metal construction forming method
CN109807269A (en) * 2019-01-02 2019-05-28 中国原子能科学研究院 A kind of design method of special-shaped construction blank
CN109807269B (en) * 2019-01-02 2020-06-23 中国原子能科学研究院 Design method of special-shaped building blank
CN111055036A (en) * 2019-11-28 2020-04-24 上海微电子装备(集团)股份有限公司 A metal additive manufacturing method
CN111055036B (en) * 2019-11-28 2021-04-30 上海微电子装备(集团)股份有限公司 Metal additive manufacturing method
CN115255093A (en) * 2022-07-29 2022-11-01 山东大学 A method for constructing forging and extrusion forming of large billets or components

Also Published As

Publication number Publication date
CN107626868B (en) 2020-05-05

Similar Documents

Publication Publication Date Title
CN107626868A (en) Manufacturing process is constructed in the classification of hourglass shape metal
CN105499459A (en) Dissimilar metal structure forming method
CN107671216A (en) Hourglass shape metal constructs manufacturing process
CN107626880B (en) Manufacturing process of large annular forging
EP3683006B1 (en) Forming method for modular metal construction
CN107876674A (en) Manufacturing process is constructed in metal classification
KR102372970B1 (en) How to build a deformable metal
CN106944715A (en) A kind of method of highly efficient multi-position electric arc increasing material manufacturing aluminum alloy junction component
CN104624900B (en) Forging method for efficiently recovering internal defects of thin plate forged pieces
JP2005238334A (en) Manufacturing method for part or semi-finished good containing intermetallic titanium aluminide alloy, and part capable of being manufactured by this method
CN103639235A (en) Ti-Al intermetallic compound laminated composite material tube and preparation method thereof
CN109822026B (en) Method for manufacturing special-shaped blank and die used in method
CN106141054B (en) A kind of post multi-robot hydraulic forging press group of three beam three
CN104259233B (en) A kind of heavy caliber thick wall heat-resisting alloy pipe remaining pressing method with no pressure
CN115255093B (en) Forging and extruding forming method for construction of large blank or member
CN114570926B (en) Integrated sheathing method for powder metallurgy plate
JPH04143037A (en) Method for working whisker reinforced al alloy

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant