CN107575033A - Prefabrication and construction method of prefabricated steel structure prefabricated exterior wall panels - Google Patents

Prefabrication and construction method of prefabricated steel structure prefabricated exterior wall panels Download PDF

Info

Publication number
CN107575033A
CN107575033A CN201710808518.1A CN201710808518A CN107575033A CN 107575033 A CN107575033 A CN 107575033A CN 201710808518 A CN201710808518 A CN 201710808518A CN 107575033 A CN107575033 A CN 107575033A
Authority
CN
China
Prior art keywords
concrete
prefabricated
wall panel
insulation board
prefabricated wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710808518.1A
Other languages
Chinese (zh)
Inventor
张晓峰
孙志昕
李晓亮
索屹楠
刘通
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201710808518.1A priority Critical patent/CN107575033A/en
Publication of CN107575033A publication Critical patent/CN107575033A/en
Pending legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention relates to a prefabricated external wall panel prefabrication and construction method of an assembled steel structure, wherein a heat insulation board is prefabricated in a concrete prefabricated wall panel; the outer side of the heat insulation plate is provided with a concrete outer leaf; the inner side of the heat insulation board is provided with a concrete inner leaf; paving cement mortar on a floor slab for mounting the concrete prefabricated wall panel, and welding the embedded part at the top of the concrete prefabricated wall panel and the steel beam into a whole by using angle steel; binding the left and right reinforcements and the top reinforcements of the concrete prefabricated wall board with the reinforcements of the post-pouring area, and pouring concrete to form a whole; the outer leaf of the concrete prefabricated wall board is constructed and waterproof at the joint part. The invention discloses a prefabricated external wall panel with an assembled steel structure and a construction method, wherein a post-bonded heat insulation board is prefabricated in a concrete prefabricated wall panel, connecting reinforcing steel bars extend out of the left and right sides and the top of an inner leaf of a component, and the bottom of the component is blocked by cement mortar; after the member is installed and fixed, the reinforcing steel bars at the left and right sides of the member and the top of the member are bound with the reinforcing steel bars in the post-pouring area, and the member is integrated after concrete is poured, so that the construction is simple and convenient, the maintenance cost is low, and the hidden danger of water leakage is avoided.

Description

装配式钢结构预制外墙板预制及施工方法Prefabrication and construction method of prefabricated steel structure prefabricated exterior wall panels

技术领域technical field

本发明涉及一种建筑施工方法,具体的说,是涉及一种装配式钢结构预制外墙板预制及施工方法。The invention relates to a building construction method, in particular to a prefabrication and construction method of prefabricated steel structure prefabricated exterior wall panels.

背景技术Background technique

在钢结构建筑中,围护外墙传统的做法为加气块砌筑后粘保温板和轻质板材安装后粘保温板的连接技术,这些施工技术工序繁琐,湿作业较多,并且由于材料的收缩特性较大,随着使用时间的延长,材料与钢梁间容易出现裂缝,特别容易出现漏水现象。近几年,随着装配式混凝土结构推广应用,外墙一般采用预制混凝土外墙,但是这种外墙间缝隙多采用干式连接,板间缝隙仅填充止水条和防水密封胶,在使用过程中围护成本较高,且存在漏水隐患。In steel structure buildings, the traditional method of enclosing the external wall is the connection technology of sticking insulation boards after aerated block masonry and light-weight boards are installed. The shrinkage characteristic of the material is relatively large. With the prolongation of the service time, cracks are prone to appear between the material and the steel beam, and water leakage is particularly prone to occur. In recent years, with the popularization and application of prefabricated concrete structures, the external walls generally adopt prefabricated concrete external walls, but the gaps between the external walls are mostly dry-connected, and the gaps between the panels are only filled with water-stop strips and waterproof sealants. The cost of enclosure during the process is high, and there are hidden dangers of water leakage.

发明内容Contents of the invention

针对上述现有技术中的不足,本发明提供一种施工简便,维护成本低,杜绝了漏水隐患的装配式钢结构预制外墙板预制及施工方法。Aiming at the deficiencies in the above-mentioned prior art, the present invention provides a prefabrication and construction method of prefabricated steel structure prefabricated exterior wall panels that is simple in construction, low in maintenance cost, and eliminates hidden dangers of water leakage.

本发明所采取的技术方案是:The technical scheme that the present invention takes is:

一种装配式钢结构预制外墙板预制及施工方法,包括如下步骤:A prefabrication and construction method of prefabricated steel structure prefabricated exterior wall panels, comprising the following steps:

将后粘保温板预制在混凝土预制墙板中;Post-bonded insulation panels are prefabricated in concrete prefabricated wall panels;

保温板外侧设置有用于外装饰和保护保温板的混凝土外叶;The outer side of the insulation board is provided with concrete outer leaves for exterior decoration and protection of the insulation board;

保温板内侧设置有用于承载外力的混凝土内叶;内叶为混凝土预制墙板的承力层;The inner side of the insulation board is provided with a concrete inner leaf for bearing external force; the inner leaf is the load-bearing layer of the concrete prefabricated wall panel;

混凝土内叶左右及顶面伸出连接钢筋;The left and right sides and the top surface of the concrete inner leaf protrude from the connecting steel bar;

混凝土内叶四周做水洗粗糙面;Wash the rough surface around the concrete inner leaf;

保温层内外的混凝土通过特殊的连接件连成整体。The concrete inside and outside the insulation layer is connected as a whole through special connectors.

混凝土预制墙板安装时,先在安装混凝土预制墙板的楼板上铺水泥砂浆,用角钢把混凝土预制墙板顶部埋件与钢梁焊接成整体;When the concrete prefabricated wall panel is installed, first spread cement mortar on the floor where the concrete prefabricated wall panel is installed, and use angle steel to weld the top embedded part of the concrete prefabricated wall panel and the steel beam into a whole;

混凝土预制墙板左右及顶部钢筋与后浇区域的钢筋绑扎,浇筑混凝土后形成整体。The left, right and top steel bars of the prefabricated concrete wall panels are bound to the steel bars in the post-casting area, and the whole is formed after pouring concrete.

混凝土预制墙板外叶在接缝部位做构造防水,缝隙处填塞聚苯乙烯棒,最外侧打密封胶。The outer leaves of the prefabricated concrete wall panels are constructed to be waterproof at the joints, the joints are filled with polystyrene rods, and the outermost side is sealed with sealant.

本发明相对现有技术的有益效果:The beneficial effect of the present invention relative to prior art:

本发明装配式钢结构预制外墙板预制及施工方法,将后粘保温板预制在混凝土预制墙板中,构件内叶左右及顶部伸出连接钢筋,底部用水泥砂浆封堵;构件安装固定后,构件左右及顶部钢筋与后浇区域的钢筋绑扎,浇筑混凝土后形成整体,施工简便,维护成本低,杜绝了漏水隐患。The prefabrication and construction method of the prefabricated steel structure prefabricated outer wall panel of the present invention includes prefabricating the post-bonding insulation board in the concrete prefabricated wall panel, connecting steel bars protruding from the left, right and top of the inner leaf of the component, and sealing the bottom with cement mortar; after the component is installed and fixed , The steel bars on the left, right and top of the component are bound to the steel bars in the post-casting area, and form a whole after pouring concrete. The construction is simple, the maintenance cost is low, and the hidden danger of water leakage is eliminated.

附图说明Description of drawings

图1是本发明装配式钢结构预制外墙板预制及施工方法的施工示意图;Fig. 1 is the construction schematic diagram of prefabrication and construction method of prefabricated steel structure prefabricated exterior wall panel of the present invention;

图2是本发明装配式钢结构预制外墙板预制及施工方法的预制墙板的水平连接示意图;Fig. 2 is the horizontal connection schematic diagram of the prefabricated wallboard of the prefabricated steel structure prefabricated exterior wallboard prefabrication and construction method of the present invention;

图3是本发明装配式钢结构预制外墙板预制及施工方法的预制墙板的墙板转角水平连接示意图。Fig. 3 is a schematic diagram of the corner horizontal connection of the prefabricated wall panels of the prefabricated steel structure prefabricated exterior wall panels and the construction method of the present invention.

附图中主要部件符号说明:Explanation of symbols of main components in the accompanying drawings:

图中:In the picture:

1、混凝土外叶 2、保温板1. Concrete outer leaf 2. Insulation board

3、混凝土内叶 4、连接钢筋3. Concrete inner leaf 4. Connecting steel bar

5、连接件 6、楼板5. Connector 6. Floor

7、水泥砂浆 8、角钢7. Cement mortar 8. Angle steel

9、埋件 10、钢梁9. Embedded parts 10. Steel beams

11、后浇区域钢筋 12、聚苯乙烯棒11. Reinforcement bars in the post-pouring area 12. Polystyrene rods

13、密封胶。13. Sealant.

具体实施方式detailed description

以下参照附图及实施例对本发明进行详细的说明:The present invention is described in detail below with reference to accompanying drawing and embodiment:

附图1-3可知,一种装配式钢结构预制外墙板预制及施工方法,包括如下步骤:As can be seen from accompanying drawings 1-3, a prefabrication and construction method of prefabricated steel structure prefabricated exterior wall panels includes the following steps:

将后粘保温板2预制在混凝土预制墙板中;Prefabricate the back-bonded insulation board 2 in the concrete prefabricated wallboard;

保温板2外侧设置有用于外装饰和保护保温板的混凝土外叶1;The outer side of the insulation board 2 is provided with a concrete outer leaf 1 for exterior decoration and protection of the insulation board;

保温板2内侧设置有用于承载外力的混凝土内叶3;内叶3为混凝土预制墙板的承力层;The inner side of the insulation board 2 is provided with a concrete inner leaf 3 for bearing external force; the inner leaf 3 is the load-bearing layer of the concrete prefabricated wall panel;

混凝土内叶3左右及顶面伸出连接钢筋4;Concrete inner leaves 3 left and right and the top surface protrude from the connecting steel bar 4;

混凝土内叶3四周做水洗粗糙面;Wash the rough surface around the concrete inner leaf 3;

保温板2内外的混凝土通过特殊的连接件连5连成整体。The concrete inside and outside the insulation board 2 is connected into a whole by special connectors.

混凝土预制墙板安装时,先在安装混凝土预制墙板的楼板6上铺水泥砂浆7,用角钢8把混凝土预制墙板顶部埋件9与钢梁10焊接成整体;When the concrete prefabricated wallboard is installed, cement mortar 7 is first spread on the floor 6 where the concrete prefabricated wallboard is installed, and the embedded part 9 on the top of the concrete prefabricated wallboard is welded to the steel beam 10 with angle steel 8 to form a whole;

混凝土预制墙板左右及顶部钢筋4与后浇区域的钢筋11绑扎,浇筑混凝土后形成整体。The left, right and top steel bars 4 of the prefabricated concrete wall panels are bound to the steel bars 11 in the post-casting area, and the concrete is poured to form a whole.

混凝土预制墙板外叶在接缝部位做构造防水,缝隙处填塞聚苯乙烯棒12,最外侧打密封胶13。The outer leaves of the concrete prefabricated wall panels are constructed to be waterproof at the joints, polystyrene rods 12 are filled in the joints, and sealant 13 is applied on the outermost side.

本发明相对现有技术的有益效果:The beneficial effect of the present invention relative to prior art:

本发明装配式钢结构预制外墙板预制及施工方法,将后粘保温板预制在混凝土预制墙板中,构件内叶左右及顶部伸出连接钢筋,底部用水泥砂浆封堵;构件安装固定后,构件左右及顶部钢筋与后浇区域的钢筋绑扎,浇筑混凝土后形成整体,施工简便,维护成本低,杜绝了漏水隐患。The prefabrication and construction method of the prefabricated steel structure prefabricated outer wall panel of the present invention includes prefabricating the post-bonding insulation board in the concrete prefabricated wall panel, connecting steel bars protruding from the left, right and top of the inner leaf of the component, and sealing the bottom with cement mortar; after the component is installed and fixed , The steel bars on the left, right and top of the component are bound to the steel bars in the post-casting area, and form a whole after pouring concrete. The construction is simple, the maintenance cost is low, and the hidden danger of water leakage is eliminated.

以上所述,仅是本发明的较佳实施例而已,并非对本发明的结构作任何形式上的限制。凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均属于本发明的技术方案范围内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the structure of the present invention in any form. All simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention belong to the scope of the technical solution of the present invention.

Claims (1)

1.一种装配式钢结构预制外墙板预制及施工方法,其特征在于,包括如下步骤:1. A prefabrication and construction method of prefabricated steel structure prefabricated exterior wall panels, characterized in that it comprises the following steps: 将后粘保温板预制在混凝土预制墙板中;Post-bonded insulation panels are prefabricated in concrete prefabricated wall panels; 保温板外侧设置有用于外装饰和保护保温板的混凝土外叶;The outer side of the insulation board is provided with concrete outer leaves for exterior decoration and protection of the insulation board; 保温板内侧设置有用于承载外力的混凝土内叶;内叶为混凝土预制墙板的承力层;The inner side of the insulation board is provided with a concrete inner leaf for bearing external force; the inner leaf is the load-bearing layer of the concrete prefabricated wall panel; 混凝土内叶左右及顶面伸出连接钢筋;The left and right sides and the top surface of the concrete inner leaf protrude from the connecting steel bars; 混凝土内叶四周做水洗粗糙面;Wash the rough surface around the concrete inner leaf; 保温层内外的混凝土通过特殊的连接件连成整体;The concrete inside and outside the insulation layer is connected as a whole through special connectors; 混凝土预制墙板安装时,先在安装混凝土预制墙板的楼板上铺水泥砂浆,用角钢把混凝土预制墙板顶部埋件与钢梁焊接成整体;When the concrete prefabricated wall panel is installed, first spread cement mortar on the floor where the concrete prefabricated wall panel is installed, and use angle steel to weld the top embedded part of the concrete prefabricated wall panel and the steel beam into a whole; 混凝土预制墙板左右及顶部钢筋与后浇区域的钢筋绑扎,浇筑混凝土后形成整体;The left, right and top steel bars of the prefabricated concrete wall panels are bound to the steel bars in the post-casting area, and the whole is formed after pouring concrete; 混凝土预制墙板外叶在接缝部位做构造防水,缝隙处填塞聚苯乙烯棒,最外侧打密封胶。The outer leaves of the prefabricated concrete wall panels are constructed to be waterproof at the joints, the joints are filled with polystyrene rods, and the outermost side is sealed with sealant.
CN201710808518.1A 2017-09-09 2017-09-09 Prefabrication and construction method of prefabricated steel structure prefabricated exterior wall panels Pending CN107575033A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710808518.1A CN107575033A (en) 2017-09-09 2017-09-09 Prefabrication and construction method of prefabricated steel structure prefabricated exterior wall panels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710808518.1A CN107575033A (en) 2017-09-09 2017-09-09 Prefabrication and construction method of prefabricated steel structure prefabricated exterior wall panels

Publications (1)

Publication Number Publication Date
CN107575033A true CN107575033A (en) 2018-01-12

Family

ID=61032687

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710808518.1A Pending CN107575033A (en) 2017-09-09 2017-09-09 Prefabrication and construction method of prefabricated steel structure prefabricated exterior wall panels

Country Status (1)

Country Link
CN (1) CN107575033A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108556133A (en) * 2018-05-29 2018-09-21 中国二十二冶集团有限公司 Method for prefabricating of the assembling type steel structure with corner Side fascia
CN109723141A (en) * 2019-03-06 2019-05-07 北京建工四建工程建设有限公司 Support construction and its construction method at a kind of fabricated construction conversion layer
CN112252514A (en) * 2020-10-23 2021-01-22 成都市建筑设计研究院 Connection structure of assembled outer wall body and cast-in-place wall body
CN113356582A (en) * 2021-06-21 2021-09-07 中建科工集团有限公司 Mould for pouring steel beam concrete-wrapped outside and construction method
CN115075423A (en) * 2022-06-08 2022-09-20 秦皇岛和信基业建筑科技有限公司 WdW heat insulation structure integrated plate for prefabricated building and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1590665A (en) * 2003-09-04 2005-03-09 张英保 Connecting structure of building external wall board and on site pouring concrete floor board and its connecting method
CN103669905A (en) * 2013-12-31 2014-03-26 吕燕 Lightweight composite prefabricated panel combined type house and building method thereof
CN203924472U (en) * 2014-05-07 2014-11-05 杜景云 A kind of reinforced concrete prefabricated compound external wall panel for load-bearing shear wall structure
CN105839818A (en) * 2016-05-18 2016-08-10 戴旭谦 Integral concrete prefabricated wallboard free of lateral die assembly as well as assembling structure and assembling method thereof
CN205577244U (en) * 2016-05-05 2016-09-14 戴旭谦 Structure is assembled to precast concrete wallboard and precast concrete wallboard thereof
CN106499051A (en) * 2016-11-21 2017-03-15 中国建筑股份有限公司 A column-through assembled prestressed concrete frame system and its construction method
CN106836468A (en) * 2016-12-22 2017-06-13 清华大学建筑设计研究院有限公司 A kind of low multilayer assembled heat insulation energy saving building

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1590665A (en) * 2003-09-04 2005-03-09 张英保 Connecting structure of building external wall board and on site pouring concrete floor board and its connecting method
CN103669905A (en) * 2013-12-31 2014-03-26 吕燕 Lightweight composite prefabricated panel combined type house and building method thereof
CN203924472U (en) * 2014-05-07 2014-11-05 杜景云 A kind of reinforced concrete prefabricated compound external wall panel for load-bearing shear wall structure
CN205577244U (en) * 2016-05-05 2016-09-14 戴旭谦 Structure is assembled to precast concrete wallboard and precast concrete wallboard thereof
CN105839818A (en) * 2016-05-18 2016-08-10 戴旭谦 Integral concrete prefabricated wallboard free of lateral die assembly as well as assembling structure and assembling method thereof
CN106499051A (en) * 2016-11-21 2017-03-15 中国建筑股份有限公司 A column-through assembled prestressed concrete frame system and its construction method
CN106836468A (en) * 2016-12-22 2017-06-13 清华大学建筑设计研究院有限公司 A kind of low multilayer assembled heat insulation energy saving building

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108556133A (en) * 2018-05-29 2018-09-21 中国二十二冶集团有限公司 Method for prefabricating of the assembling type steel structure with corner Side fascia
CN109723141A (en) * 2019-03-06 2019-05-07 北京建工四建工程建设有限公司 Support construction and its construction method at a kind of fabricated construction conversion layer
CN112252514A (en) * 2020-10-23 2021-01-22 成都市建筑设计研究院 Connection structure of assembled outer wall body and cast-in-place wall body
CN113356582A (en) * 2021-06-21 2021-09-07 中建科工集团有限公司 Mould for pouring steel beam concrete-wrapped outside and construction method
CN113356582B (en) * 2021-06-21 2022-04-01 中建科工集团有限公司 Mould for pouring steel beam concrete-wrapped outside and construction method
CN115075423A (en) * 2022-06-08 2022-09-20 秦皇岛和信基业建筑科技有限公司 WdW heat insulation structure integrated plate for prefabricated building and construction method

Similar Documents

Publication Publication Date Title
CN107575033A (en) Prefabrication and construction method of prefabricated steel structure prefabricated exterior wall panels
CN106436893A (en) Fully-prefabricated structure and construction method thereof
CN103866885B (en) Construction method of energy-saving heat-insulating structure of lighting window
CN215253698U (en) Ceramsite foam concrete exterior wall hanging plate in assembly type building
CN110206134B (en) A prefabricated balcony of no thermal bridge for assembled sandwich wallboard building
CN106223529B (en) A kind of out-hung panel and preparation method thereof of the compound wood wool board of lightgage steel joist
CN108316525B (en) Integral combined heat-insulating outer wall and construction method thereof
CN111255148A (en) A square column structure and house
CN107119901A (en) The cast-in-place system of formwork structure and shear wall and construction method of shear wall angle node
CN103938767B (en) Trough type energy-saving bearing wall externally wrapped by steel wire mesh mortar plates and foamed concrete
CN106049717A (en) Cast-in-situ integral type steel frame filler wall system connected through springs and construction method thereof
CN206337678U (en) The assembled steel frame wall filled with masonry system of door shape steel disc connection
CN108277895A (en) A kind of composite heat preserving external wall system and construction method
CN204475529U (en) The syndeton of a kind of assembling type outer wall and beam
CN205475877U (en) Compound outer thermal insulation walling system of assembled self preservation temperature wallboard
CN105937279B (en) The cast-in-place Integral Steel frame wall filled with masonry system and construction method of steel disc limit connection
CN107916727A (en) A kind of prefabricated composite wallboard in underground and the waterproofing node structure of cast in place frame column seam crossing
CN203462576U (en) Steel structure concrete building house
CN201162305Y (en) Component type exterior wall interior and exterior insulation decorative panels
CN110374224A (en) A kind of walling system being made of assembly concrete wallboard and cast-in-situ thermal-insulated slurry
CN108560585A (en) The full assembling structure of outer wall of basement and its construction method
CN206157944U (en) Integration superimposed shear wall board L type horizontally connect node
CN115075423A (en) WdW heat insulation structure integrated plate for prefabricated building and construction method
CN2911049Y (en) In-situ light-weight composite wall
CN208152323U (en) A kind of monoblock type composite thermal insulation exterior wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180112