[go: up one dir, main page]

CN107489450A - A kind of electricity-generating method that water potential energy is reclaimed using underground mine water supply system - Google Patents

A kind of electricity-generating method that water potential energy is reclaimed using underground mine water supply system Download PDF

Info

Publication number
CN107489450A
CN107489450A CN201710810377.7A CN201710810377A CN107489450A CN 107489450 A CN107489450 A CN 107489450A CN 201710810377 A CN201710810377 A CN 201710810377A CN 107489450 A CN107489450 A CN 107489450A
Authority
CN
China
Prior art keywords
turbine
generator units
main
switch valve
supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710810377.7A
Other languages
Chinese (zh)
Inventor
倪先杰
朱若军
袁媛
丁锋
赵子龙
年福田
李雪
叶元辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Xinji Energy Co Ltd
Original Assignee
China Coal Xinji Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal Xinji Energy Co Ltd filed Critical China Coal Xinji Energy Co Ltd
Priority to CN201710810377.7A priority Critical patent/CN107489450A/en
Publication of CN107489450A publication Critical patent/CN107489450A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03BMACHINES OR ENGINES FOR LIQUIDS
    • F03B13/00Adaptations of machines or engines for special use; Combinations of machines or engines with driving or driven apparatus; Power stations or aggregates
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/04Distributing means for power supply in mines
    • E21F17/08Distributing hydraulic power; Pipe networks for hydraulic liquid

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

A kind of electricity-generating method that water potential energy is reclaimed using underground mine water supply system, is comprised the following steps:One static pressure cistern is set on the ground;Main-supply is made, one end of the main-supply is connected with static pressure cistern and communicated, the other end is laid to shaft bottom along pit shaft;After the bottom of main-supply reaches shaft bottom, it is divided into first, second main line;It is divided into two tie points in the first main line end, is divided into two the second branch roads in the second main line end;Two turbine-generator units are arranged in the chamber of underground, and are attached separately in two tie points, there is first switch valve the rear and front end of turbine-generator units;The first switch valve tail end pipeline at two turbine-generator units rear portions is merged, first is formed and collects branch road;One proportional pressure-reducing valve is respectively installed on two the second branch roads, there is second switch valve the rear and front end of proportional pressure-reducing valve.The present invention is easy to operate, can reach the purpose for saving the energy and cost while reduction hydraulic pressure meets requirement.

Description

A kind of electricity-generating method that water potential energy is reclaimed using underground mine water supply system
Technical field
The present invention relates to underground mine water supply system, is especially a kind of generating side that water potential energy is reclaimed using underground mine water supply system Method.
Background technology
According to the rules, underground coal mine water supply maximum pressure must not exceed 4.0MPa.At present, (buried for ocurrence of coal seam is shallower Deep 300m~400m) colliery, mostly using ground static pressure pond directly to underground supply water.And exceed 400m coal for depth Ore deposit cannot directly supply water, it is necessary to take measures just supply water after decompression.Most collieries typically fill on underground main-supply road If proportional pressure-reducing valve, reduction processing is carried out to hydraulic pressure, hydraulic pressure is met requirement, although this way has reached reduction hydraulic pressure Requirement, but because the pressure loss that pressure-reducing valve is brought is a kind of waste of resource to water potential energy.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of generating side that water potential energy is reclaimed using underground mine water supply system Method, its is easy to operate, can reach the purpose for saving the energy and cost while reduction hydraulic pressure meets requirement.
The technical solution of the present invention is to provide a kind of electricity-generating method that water potential energy is reclaimed using underground mine water supply system, Comprise the following steps:
(1) a static pressure cistern is set on the ground;
(2) main-supply is made, one end of the main-supply is connected with static pressure cistern and communicated, the other end is along pit shaft Lay to shaft bottom;
(3) after the bottom of main-supply reaches shaft bottom, it is divided into the first main line and the second main line;
(4) it is divided into two tie points in the end of the first main line, is divided into two second in the end of the second main line Branch road;
(5) two turbine-generator units are arranged, this two turbine-generator units are respectively positioned in the chamber of underground, and respectively by it In two tie points, the rear and front end of turbine-generator units is equipped with first switch valve, and first switch valve is arranged on In tie point;
(6) the first switch valve tail end pipeline at two turbine-generator units rear portions is merged, forms first and collect branch road;
(7) proportional pressure-reducing valve is respectively installed on two second branch roads, the rear and front end of proportional pressure-reducing valve is all provided with There is second switch valve, second switch valve is arranged on the second branch road.
A kind of electricity-generating method that water potential energy is reclaimed using underground mine water supply system of the present invention, wherein, by by constant pressure Water pump reversion is used as turbine-generator units.
After above structure, compared with prior art, the present invention is a kind of to reclaim water potential energy using underground mine water supply system Electricity-generating method has advantages below:When underground water, the water in the static pressure cistern of ground flow to hydraulic generator through main-supply Unit, current rotate the impeller of turbine-generator units, so as to drive what turbine-generator units were generated electricity using water potential energy Meanwhile effectively the water in supply channel is depressurized, and reach comparatively ideal effect of easing stress;What turbine-generator units were sent Electricity can be that the electric locomotive battery in the chamber of underground is charged, it can also be used to the illumination of underground chamber after mu balanced circuit voltage stabilizing. As can be seen here, two turbine-generator units that the present invention is set are easy to operate while reduction hydraulic pressure meets requirement, and Water potential energy is effectively utilized, is saved specially to underground power supply used trouble, so as to reach the purpose for saving the energy and cost.
The end of second main line is divided into two the second branch roads, and respectively one ratio of installation on this two second branch roads Pressure-reducing valve depressurizes to the water in supply channel, the purpose is to:In turbine-generator units failure or maintenance, it is ensured that feed pipe Road normally can supply water to underground.
Inverted by the use of constant voltage water pump as turbine-generator units, can be while hydraulic pressure be reduced, after will not both making decompression Hydraulic pressure deficiency, will not also make hydraulic pressure excessive.
Brief description of the drawings
Fig. 1 is that main-supply is introduced shaft bottom by the present invention from cistern, and is divided into the first main line and the second main line, so Turbine-generator units and proportional pressure-reducing valve are arranged on to structural representation when on first, second main line afterwards.
Embodiment
The hair that water potential energy is reclaimed using underground mine water supply system a kind of to the present invention with reference to the accompanying drawings and detailed description Method for electrically is described in further detail:
As shown in figure 1, in this embodiment, a kind of hair that water potential energy is reclaimed using underground mine water supply system of the present invention Method for electrically, comprise the following steps:
(1) a static pressure cistern 10 is set on the ground;
(2) main-supply 11 is made, one end of the main-supply 11 is connected with static pressure cistern 10 and communicated, other end edge Pit shaft 12 to lay to shaft bottom;
(3) after the bottom of main-supply 11 reaches shaft bottom, it is divided into the first main line 13 and the second main line 23;
(4) it is divided into two tie points 14 in the end of the first main line 13, is divided into two in the end of the second main line 23 The second branch road of bar 24;
(5) two turbine-generator units 16 are arranged, this two turbine-generator units 16 are respectively positioned in the chamber of underground, water wheels hair The flow and pressure of the parameter of group of motors 16 and supply channel reclaimed water match, and two turbine-generator units 16 are separately mounted to In two tie points 14, the rear and front end of turbine-generator units 16 is equipped with first switch valve 15, and first switch valve 15 is installed In tie point 14;
(6) the tail end pipeline of first switch valve 15 at two rear portions of turbine-generator units 16 is merged, forms first and collect branch Road 17;
(7) one proportional pressure-reducing valve 26 of each installation on two second branch roads 24, front and rear the two of proportional pressure-reducing valve 26 End is equipped with second switch valve 25, and second switch valve 25 is arranged on the second branch road 24, when turbine-generator units 16 break down Or during maintenance, second branch road 24 is able to ensure that regular supply of the water to underground.
By the way that constant voltage water pump reversion is used as into turbine-generator units 16, will not both can make to subtract while hydraulic pressure is reduced Hydraulic pressure deficiency after pressure, will not also make hydraulic pressure excessive.
When underground water, the water in ground static pressure cistern 10 flow to turbine-generator units 16, water through main-supply 11 Stream rotates the impeller of turbine-generator units 16, so that same driving turbine-generator units 16 to be generated electricity using water potential energy When, effectively the water in supply channel is depressurized, and reach comparatively ideal effect of easing stress;What turbine-generator units 16 were sent Electricity can be that the electric locomotive battery in the chamber of underground is charged, it can also be used to the illumination of underground chamber after mu balanced circuit voltage stabilizing. As can be seen here, two turbine-generator units that the present invention is set are effectively utilized while reduction hydraulic pressure meets requirement Water potential energy, save specially to underground power supply used trouble, so as to reach the purpose for saving the energy and cost.
Embodiment described above is only that the preferred embodiment of the present invention is described, not to the model of the present invention Enclose and be defined, on the premise of design spirit of the present invention is not departed from, technical side of the those of ordinary skill in the art to the present invention The various modifications and improvement that case is made, all should fall within the scope of protection of the present invention.

Claims (2)

1. a kind of electricity-generating method that water potential energy is reclaimed using underground mine water supply system, it is characterised in that comprise the following steps:
(1) a static pressure cistern (10) is set on the ground;
(2) main-supply (11) is made, one end of the main-supply (11) is connected with static pressure cistern (10) and communicated, the other end Laid along pit shaft (12) to shaft bottom;
(3) after the bottom of main-supply (11) reaches shaft bottom, it is divided into the first main line (13) and the second main line (23);
(4) it is divided into two tie points (14) in the end of the first main line (13), is divided into the end of the second main line (23) Two the second branch roads (24);
(5) two turbine-generator units (16) are arranged, this two turbine-generator units (16) are respectively positioned in the chamber of underground, and respectively It is installed on two tie points (14), the rear and front end of turbine-generator units (16) is equipped with first switch valve (15), The first switch valve (15) is arranged in tie point (14);
(6) first switch valve (15) the tail end pipeline at two turbine-generator units (16) rear portions is merged, forms first and collect branch Road (17);
(7) one proportional pressure-reducing valve (26) of each installation on two second branch roads (24), the proportional pressure-reducing valve (26) Rear and front end is equipped with second switch valve (25), and the second switch valve (25) is arranged on the second branch road (24).
A kind of 2. electricity-generating method that water potential energy is reclaimed using underground mine water supply system according to claim 1, it is characterised in that: By the way that constant voltage water pump reversion is used as into turbine-generator units (16).
CN201710810377.7A 2017-09-11 2017-09-11 A kind of electricity-generating method that water potential energy is reclaimed using underground mine water supply system Pending CN107489450A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710810377.7A CN107489450A (en) 2017-09-11 2017-09-11 A kind of electricity-generating method that water potential energy is reclaimed using underground mine water supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710810377.7A CN107489450A (en) 2017-09-11 2017-09-11 A kind of electricity-generating method that water potential energy is reclaimed using underground mine water supply system

Publications (1)

Publication Number Publication Date
CN107489450A true CN107489450A (en) 2017-12-19

Family

ID=60651564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710810377.7A Pending CN107489450A (en) 2017-09-11 2017-09-11 A kind of electricity-generating method that water potential energy is reclaimed using underground mine water supply system

Country Status (1)

Country Link
CN (1) CN107489450A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86103849A (en) * 1986-05-30 1987-01-31 沈昇日 Utilize the method for generating of seawater potential energy and extraction Mare Frigoris water
CN1039878A (en) * 1989-03-21 1990-02-21 郑光华 Hydraulic engine
CN1095794A (en) * 1993-03-15 1994-11-30 远藤胜久 The power generation system of suction engine and this suction engine of use
CN2215033Y (en) * 1994-01-09 1995-12-13 管理 Wave generated universal bank-protecting combination power station
US20100003553A1 (en) * 2008-03-20 2010-01-07 Pfefferle William C Method for improved efficiency for producing fuel gas for power generation
CN203892106U (en) * 2014-06-10 2014-10-22 北京中科华誉能源技术发展有限责任公司 Power generating system making use of recycled water feeding pressure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86103849A (en) * 1986-05-30 1987-01-31 沈昇日 Utilize the method for generating of seawater potential energy and extraction Mare Frigoris water
CN1039878A (en) * 1989-03-21 1990-02-21 郑光华 Hydraulic engine
CN1095794A (en) * 1993-03-15 1994-11-30 远藤胜久 The power generation system of suction engine and this suction engine of use
CN2215033Y (en) * 1994-01-09 1995-12-13 管理 Wave generated universal bank-protecting combination power station
US20100003553A1 (en) * 2008-03-20 2010-01-07 Pfefferle William C Method for improved efficiency for producing fuel gas for power generation
CN203892106U (en) * 2014-06-10 2014-10-22 北京中科华誉能源技术发展有限责任公司 Power generating system making use of recycled water feeding pressure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郭季雄: "怎样利用水泵倒转代替水轮机", 《农业机械》 *

Similar Documents

Publication Publication Date Title
CN108867584A (en) Combine the system and method for carrying out water-storage with underground roadway using discarded opencut
CN103556611B (en) The cushion pool filling and drainage system that can generate electricity
CN112065633A (en) An underground pumped-storage energy storage system and method using an abandoned mine shaft as an energy storage container
CN204457860U (en) Mine zero power siphon drainage device
CN207297221U (en) A kind of device to be generated electricity using pit shaft static pressure water potential energy
CN204825816U (en) Multistage hydropower station
CN107489450A (en) A kind of electricity-generating method that water potential energy is reclaimed using underground mine water supply system
CN105756860A (en) Wind power water pumping and energy storage power station system
CN113107740A (en) Underground water supply and drainage dual-purpose energy recovery device and system
CN210509454U (en) Booster-type multi-runner hydraulic turbine set
CN113404634A (en) Pumped storage power station based on underground tunnel group
CN103174416B (en) Multi-point drive electric traction coal mining machine
CN102251796A (en) Water circulation system of gas pump station under mine
CN214787790U (en) A dual-purpose energy recovery device for underground water supply and drainage
CN2789414Y (en) Coal mine gas exhausting and discharging apparatus
CN205823286U (en) In a kind of water, shield machine arrives and receives structure
CN201474720U (en) Mine gas extraction device
CN204163630U (en) The speed control unit of horizontal directional drilling machine mud and running gear
CN203420877U (en) Mining explosion-proof type booster pump with cable protecting device
CN203412625U (en) Underground coal mine drainage facility
CN108194120B (en) Tunnel structure with power generation function
CN101603496A (en) Duct-type hydraulic circulation power station and generator set
CN214170613U (en) Underground water supply and drainage system for mining
CN104213835A (en) Speed control device of slurry and traveling systems of horizontal directional drilling machine
CN201141311Y (en) Down-hole electric sprinkling dustproof vehicle for coal mine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171219