CN107486535B CN201710902969.1A CN201710902969A CN107486535B CN 107486535 B CN107486535 B CN 107486535B CN 201710902969 A CN201710902969 A CN 201710902969A CN 107486535 B CN107486535 B CN 107486535B
Authority
CN
China
Prior art keywords
spiro nail
long spiro
loading chute
embryo material
formed punch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710902969.1A
Other languages
Chinese (zh)
Other versions
CN107486535A (en
Inventor
陆昱森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Shengda Qianliang Aluminum Co Ltd
Original Assignee
Ningbo Yinzhou Fengming Industrial Product Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Yinzhou Fengming Industrial Product Design Co Ltd filed Critical Ningbo Yinzhou Fengming Industrial Product Design Co Ltd
Priority to CN201710902969.1A priority Critical patent/CN107486535B/en
Publication of CN107486535A publication Critical patent/CN107486535A/en
Application granted granted Critical
Publication of CN107486535B publication Critical patent/CN107486535B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K1/00Making machine elements
    • B21K1/44Making machine elements bolts, studs, or the like
    • B21K1/46Making machine elements bolts, studs, or the like with heads
    • B21K1/50Trimming or shearing formed heads, e.g. working with dies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J13/00Details of machines for forging, pressing, or hammering
    • B21J13/02Dies or mountings therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J13/00Details of machines for forging, pressing, or hammering
    • B21J13/08Accessories for handling work or tools
    • B21J13/10Manipulators
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K27/00Handling devices, e.g. for feeding, aligning, discharging, Cutting-off means; Arrangement thereof
    • B21K27/02Feeding devices for rods, wire, or strips
    • B21K27/04Feeding devices for rods, wire, or strips allowing successive working steps

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Apparatus Associated With Microorganisms And Enzymes (AREA)

Abstract

The present invention discloses a kind of equipment and control method for long spiro nail head formation, including the transport mechanism (1) for transmitting long spiro nail embryo material, the top of the transport mechanism (1) is equipped with for carrying out material to arrange and be accurately in an orderly manner placed into material the feeding distribution mechanism (2) on transport mechanism (1), is additionally provided with above the transport mechanism (1) for long spiro nail to be carried out straightness correction and carries out the builder (3) of head formation.The present invention, which provides one kind, makes long spiro nail carry out straightening in head formation, and is not in a kind of equipment and control method for long spiro nail head formation of equipment downtime occur because processing failure.

Description

A kind of equipment and control method for long spiro nail head formation
Technical field
The present invention relates to fastener manufacture fields, and in particular to a kind of equipment and controlling party for long spiro nail head formation Method.
Background technique
In the prior art, the processing of screw head is often used heading machine and is processed, and the process of heading machine is generally adjusted Directly, inlet wire, cutting, feeding enter main mould, press forging and forming, embryo material and exit, such heading machine is preferentially to carry out to raw material Feeding enters main mould and carries out press forging and forming again for straightening, and this job order is suitable for the shorter screw of length, if screw length compared with It is long, after preferential straightening, screw may can be made to be bent again during inlet wire, cutting, feeding enter main mould, to cause Cannot not only head formation be carried out to screw when press forging and forming, it is also possible to make long spiro nail bending more it is serious it is stuck in a mold, nothing Method exits main mould, and then needs to safeguard heading machine accordingly, leverages the efficiency of processing.
Summary of the invention
Long spiro nail is set to carry out straightening in head formation the technical problems to be solved by the present invention are: providing one kind, and It is not in a kind of equipment and control method for long spiro nail head formation of equipment downtime occur because processing failure.
The technical scheme is that it includes the transport mechanism for transmitting long spiro nail embryo material, the transport mechanism Top is equipped with for arrange by material and material being accurately placed into the feeding distribution mechanism in transport mechanism, the biography in an orderly manner It send and is additionally provided with above mechanism for long spiro nail to be carried out straightness correction and carries out the builder of head formation, the biography Sending mechanism includes conveyer belt, and the conveyer belt is made up of multiple cricoid hinged disks of sealed joint that are hinged to, each described hinged A transmission block is connected on disk, the transmission block is equipped with the first loading chute and second for accepting long spiro nail embryo material and loads Slot, the feeding distribution mechanism include tripper and sub-material push rod, and the tripper, which is equipped with one, can only once pass through a root long screw The first passage of embryo material and the second channel mobile for sub-material push rod, the lower end of the first passage are connected with the second channel, institute The junction for stating first passage and second channel is equipped with isolation board, and the inner wall of the isolation board and second channel is hinged, it is described every It is equipped with torsional spring from the hinged place of plate and second channel, the sub-material push rod is set in second channel and can make one by movement A long spiro nail embryo material from first passage pass through second channel enter the first loading chute in and can be by another long spiro nail embryo material Shift above the second loading chute make another long spiro nail embryo material enter the second loading chute, while close first passage prevent it is other Long spiro nail embryo material enters second channel from first passage, and the builder includes link block, fixed block group and formed punch group, described Link block be equipped with passed through for transport mechanism and opening direction be horizontal direction open slot, the side inner walls of the link block with One end of transmission block fits, and the fixed block group is connected for being matched with transmission block with fixed length with the top surface of link block The bottom surface of screw, the formed punch group and link block is connected for making long spiro nail head formation.
The having the beneficial effect that of the present invention program will carry out preliminary straightening, cuts and is put into feeding distribution mechanism, by the The limitation in one channel makes long spiro nail embryo material enter first passage one by one, completes the orderly arrangement of long spiro nail embryo material, and sub-material push rod is received When contracting, after long spiro nail embryo material enters second channel from first passage, under the limitation of sub-material push rod and isolation board, a long spiral shell Embryo material to be followed closely to enter in the first loading chute across second channel, another long spiro nail embryo material enters second channel from first passage, Sub-material push rod starts movement and another long spiro nail embryo material is pushed through isolation board and shifts one of second channel far from sub-material push rod onto End, then another long spiro nail embryo material enters in the second loading chute from second channel, long by two by the effect of conveyer belt Screw embryo material is sent in builder, and correction is fixed to long spiro nail embryo material using builder, then carries out head formation, Long spiro nail embryo material is separated by these steps, the primary head formation for carrying out two long spiro nail embryo materials is processed and in head Straightening is carried out to long spiro nail embryo material again when portion forms, not only ensure that the success rate of long spiro nail head formation, moreover it is possible to protect Demonstrate,prove the straightness of long spiro nail.It the case where if there is the failure of long spiro nail head formation, can also be to avoid long spiro nail embryo material in mold Interior the phenomenon that being bent, it is stuck in mold to avoid long spiro nail embryo material, during device remains in operation, either head The long spiro nail embryo material for shaping successful long spiro nail embryo material or head formation failure is all easily detached from from loading chute, after will not influence Continuous work is not needed to shut down the corresponding maintenance for carrying out device, be improved work efficiency.
As an improvement of the present invention, the fixed block group includes being fixed on the first cylinder of link block top surface and with The fixed block of the removable connection of the motion bar of one cylinder, the transmission block and the removable connection of hinged disk can by the improvement It, can be with when fixed block and transmission block are combined to control the division of fixed block and transmission block by the first cylinder of control Long spiro nail embryo material is fixed and the straightness of long spiro nail embryo material is corrected, after fixed block is separated with transmission block, Transmission block can send out builder with the long spiro nail completed the process, while pass through the motion bar of the first cylinder and fixed block The removable connection of removable connection and hinged disk and transmission block, convenient for by the disassembly, replacement and dimension of fixed block and transmission block Shield.
As an improvement of the present invention, the cross section of first loading chute and the second loading chute is dome-shaped, described The circular arc of dome-shaped is semicircle, and the fixed block is equipped with the first fixing groove matched with the first loading chute and loads with second The second fixing groove that slot matches, the two sides of first fixing groove, which are equipped with, to be cooperatively formed with the first loading chute for correcting long spiral shell The protrusion of the cylindrical hole of the screw rod straightness of embryo material is followed closely, the two sides of second fixing groove are equipped with to be cooperatively formed with the second loading chute For correcting the protrusion of the cylindrical hole of the screw rod straightness of long spiro nail embryo material, by the improvement, the design of loading chute can be to prevent Only long spiro nail is detached from the first loading chute and second during transportation and loads, and the design of the first fixing groove and the second fixing groove can be with A guiding role from when to fixed block in conjunction with transmission block, avoid fixed block in conjunction with transmission block when contraposition inaccuracy, not only It ensure that the fixation of fixed block rear long spiro nail in conjunction with transmission block, also the circularity of long spiro nail and straightness corrected.
As an improvement of the present invention, the formed punch group includes formed punch pedestal, and the formed punch pedestal is along long spiro nail axial direction It is slidably connected at the bottom surface of link block, the formed punch pedestal is connected with the driving device for moving back and forth formed punch pedestal, the drive Dynamic device includes driving motor and drive rod, and one end of the drive rod and driving motor are rotatablely connected, the drive rod it is another One end is connect with formed punch base rotation, by the improvement, is easily changed and safeguards formed punch, while formed punch pedestal is along long spiro nail axis Formed punch pedestal can be made to avoid rushing when moving back and forth on the slot on the bottom surface of link block to the bottom surface for being slidably connected at link block Head pedestal or so offset avoids eccentric phenomena when long spiro nail head formation, while by driving device, can make formed punch bottom Seat moves reciprocatingly on the bottom surface of link block, quickly completes and carries out head formation to long spiro nail embryo material and be detached from long spiro nail embryo material Work.
As an improvement of the present invention, the formed punch group further includes two formed punches with the removable connection of formed punch pedestal, The junction of the formed punch pedestal and formed punch is equipped with limiting slot, and the junction of the formed punch and formed punch pedestal is equipped with and limiting slot phase The limited block of adaptation, the axis of two formed punches when head formation is processed respectively with the first loading chute and the second loading chute The axis of semi-circular segments coincides, and passes through the improvement, it is ensured that the link position of formed punch pedestal and formed punch avoids formed punch even It is connected to discovery offset in position on formed punch pedestal, occurs the axis of the axis on head and long spiro nail when so as to cause long spiro nail head formation The not conllinear phenomenon of line.
As an improvement of the present invention, the other end of the second channel, which is equipped with, provides the second gas of sub-material push rod power The motion bar of cylinder, second cylinder is connect with sub-material push rod, by the improvement, can effectively control the shifting of sub-material push rod It is dynamic, it enters in the first loading chute and controls so that one long spiro nail embryo material of control smoothly can pass through second channel from first passage Another long spiro nail embryo material is moved to the top of the second loading chute from the junction of first passage and second channel and enters the Two loading chutes.
As an improvement of the present invention, the diameter of the long spiro nail embryo material is equal with the height of second channel, the length Screw embryo material enter the first loading chute after it is tangent with second channel, by the improvement, another long spiro nail embryo material can be made more It is easy to be shifted onto the top of the second loading chute by sub-material push rod, will not both be influenced by previous long spiro nail embryo material, it will not be by rear The influence of one long spiro nail embryo material.
As an improvement of the present invention, the transport mechanism further includes providing servo motor and the steering of transmission drive Driven wheel, the servo motor be located at conveyer belt steering one end and matched with conveyer belt for provide transmission drive and Turn to conveyer belt, the driven wheel that turns to is located at the other end of conveyer belt steering and matches with conveyer belt for making to transmit Band turn to, by the improvement, transport mechanism can with cycle operation and can make by head formation handle long spiro nail from It is fallen on transmission block, does not need artificially to take out.
In addition invention additionally discloses a kind of control methods of equipment for long spiro nail head formation, which is characterized in that packet Include following steps:
S1, the long spiro nail embryo material for cutting length is put into feeding distribution mechanism;
S2, long spiro nail embryo material enter first passage one by one;
S3, through sub-material push rod in the second channel it is mobile make a root long screw embryo material separated with other long spiro nail embryo materials and Into in the first loading chute, separates another root long screw embryo material with other screw embryo materials and enter in the second loading chute;
S4, the transmission block for being loaded with long spiro nail embryo material enter in builder and stop moving in the underface of fixed block;
S5, fixed block are pushed by the first cylinder action, match the first loading chute with the first fixing groove, make the second loading Slot is matched with the second fixing groove, long spiro nail embryo material is fixed and is carried out respectively the correction of straightness;
S6, formed punch group are mobile to long spiro nail embryo material direction under the action of driving device, carry out head to long spiro nail embryo material Forming;
After S7, head formation, formed punch group is detached from long spiro nail under the action of driving device, and the first fixing groove is first It is detached from and cooperates with the first loading chute under cylinder action, the second fixing groove is matched under the first cylinder action with the disengaging of the second loading chute It closes;
S8, the transmission block equipped with the long spiro nail that head formation is completed remove builder, and transmission block arrives at servo motor When place, starts 180 degree and turn to, long spiro nail is fallen from transmission block;
S9, transmission block continue to move to, and when arriving at steering driven wheel, 180 degree is turned to again, and then the first loading chute moves The lower section for moving first passage starts to accept lower a pair of of long spiro nail embryo material.
The invention has the benefit that first by feeding distribution mechanism by the long spiro nail embryo material being put into feeding distribution mechanism originally into The orderly arrangement of row, is then separated one by one, and the long spiro nail embryo material of two separation is placed on a transmission block, is made subsequent Head formation processing becomes orderly, efficient, can also occur the phenomenon that leakage processing or secondary operation to avoid long spiro nail embryo material, When long spiro nail embryo material is processed, two long spiro nail embryo materials can be processed simultaneously, the productivity of raising, first by long spiro nail embryo The correction with straightness is fixed in material, guarantees the accuracy of processing and long spiro nail embryo material is avoided to squeeze in process Be bent the stuck phenomenon on transmission block, long spiro nail embryo material head formation after processing is completed, long spiro nail can be turned in transmission block It after 180 degree, falls off naturally from transmission block, does not need artificially to shut down feeding, manpower and time is greatly saved.
Detailed description of the invention
Fig. 1 is overall structure of the present invention.
Fig. 2 is builder side structure schematic view of the present invention.
Fig. 3 is that feeding distribution mechanism long spiro nail embryo material of the present invention enters the first loading slot structure schematic diagram (I).
Fig. 4 is that feeding distribution mechanism long spiro nail embryo material of the present invention enters the second loading slot structure schematic diagram.
Fig. 5 is II structure enlargement diagram of the invention.
Fig. 6 is structural schematic diagram when the first cylinder of builder of the present invention pushes.
Wherein, appended drawing reference are as follows: 1, transport mechanism, 1.1, conveyer belt, 1.1.1, hinged disk, 1.2, transmission block, 1.2.1, First loading chute, 1.2.2, the second loading chute, 1.3, servo motor, 1.4, steering driven wheel, 2, feeding distribution mechanism, 2.1, sub-material Device, 2.1.1, first passage, 2.1.2, second channel, 2.1.3, isolation board, 2.1.4, torsional spring, 2.2, sub-material push rod, 2.3, Two cylinders, 3, builder, 3.1, link block, 3.1.1, open slot, 3.2, fixed block group, 3.2.1, the first cylinder, 3.2.2, Fixed block, 3.2.2.1, the first fixing groove, 3.2.2.2, the second fixing groove, 3.3, formed punch group, 3.3.1, formed punch pedestal, 3.3.1.1, limiting slot, 3.3.2, formed punch, 3.3.2.1, limited block, 4, driving device, 4.1, driving motor, 4.2, drive rod.
Specific embodiment
Embodiments of the present invention will be further described with reference to the accompanying drawing.
As shown in figures 1 to 6, the working principle of the invention: it includes the transport mechanism 1 for transmitting long spiro nail embryo material, transmission The top of mechanism 1 is equipped with for arrange by material and material being accurately placed into the depiler in transport mechanism 1 in an orderly manner Structure 2, the top of transport mechanism 1 are additionally provided with for long spiro nail to be carried out straightness correction and carries out the builder of head formation 3, transport mechanism 1 includes conveyer belt 1.1, and conveyer belt 1.1 is made up of multiple cricoid hinged disk 1.1.1 of sealed joint that are hinged to, A transmission block 1.2 is connected on each hinged disk 1.1.1, transmission block 1.2 is equipped with first for accepting long spiro nail embryo material The cross section of loading chute 1.2.1 and the second loading chute 1.2.2, the first loading chute 1.2.1 and the second loading chute 1.2.2 are circular arch Shape, the circular arc of dome-shaped are semicircle, and transport mechanism 1 further includes providing the servo motor 1.3 of 1.1 power of conveyer belt and turning to driven Wheel 1.4, servo motor 1.3 are located at one end of the steering of conveyer belt 1.1 and match with conveyer belt 1.1 for providing conveyer belt 1.1 power and make conveyer belt 1.1 turn to, turn to driven wheel 1.4 be located at conveyer belt 1.1 turn to the other end and and conveyer belt 1.1 match for turning to conveyer belt 1.1, and feeding distribution mechanism 2 includes tripper 2.1 and sub-material push rod 2.2, and tripper 2.1 is set Have one once can only be by the first passage 2.1.1 of a root long screw embryo material and the second channel mobile for sub-material push rod 2.2 2.1.2, the lower end of first passage 2.1.1 is connected to second channel 2.1.2, the company of first passage 2.1.1 and second channel 2.1.2 It meets place and is equipped with isolation board 2.1.3, isolation board 2.1.3 and the inner wall of second channel 2.1.2 are hinged, and isolation board 2.1.3 and second is logical The hinged place of road 2.1.2 is equipped with torsional spring 2.1.4, and sub-material push rod 2.2 is set in second channel 2.1.2 and can be made by movement One long spiro nail embryo material enters in the first loading chute 1.2.1 and can incite somebody to action across second channel 2.1.2 from first passage 2.1.1 Another long spiro nail embryo material, which is shifted above the second loading chute 1.2.2, makes another long spiro nail embryo material enter the second loading chute 1.2.2, while closing first passage 2.1.1 prevents other long spiro nail embryo materials from entering second channel from first passage 2.1.1 2.1.2, one end far from the second loading chute 1.2.2 of second channel 2.1.2, which is equipped with, provides the second gas of 2.2 power of sub-material push rod The motion bar of cylinder 2.3, the second cylinder 2.3 is connect with sub-material push rod 2.2, and builder 3 includes link block 3.1, fixed block group 3.2 With formed punch group 3.3, link block 3.1 be equipped with passed through for transport mechanism 1 and opening direction be horizontal direction open slot 3.1.1, The side inner walls of link block 3.1 and one end of transmission block 1.2 fit, and fixed block group 3.2 is connected with the top surface of link block 3.1 For matching with transmission block 1.2 to fix long spiro nail, fixed block group 3.2 includes the first gas for being fixed on 3.1 top surface of link block Cylinder 3.2.1 and fixed block 3.2.2 with the removable connection of motion bar of the first cylinder 3.2.1, fixed block 3.2.2 are equipped with and the The the first fixing groove 3.2.2.1 and the second fixing groove matched with the second loading chute 1.2.2 that one loading chute 1.2.1 is matched 3.2.2.2, the two sides of the first fixing groove 3.2.2.1 are equipped with and cooperatively form with the first loading chute 1.2.1 for correcting long spiro nail embryo Expect the protrusion of the cylindrical hole of screw rod straightness, the two sides of the second fixing groove 3.2.2.2, which are equipped with, cooperates shape with the second loading chute 1.2.2 At the protrusion of the cylindrical hole for correcting long spiro nail embryo material screw rod straightness, transmission block 1.2 and the removable company of hinged disk 1.1.1 It connects, formed punch group 3.3 is connect for making long spiro nail head formation with the bottom surface of link block 3.1, and formed punch group 3.3 includes formed punch pedestal And the two formed punch 3.3.2, formed punch pedestal 3.3.1 and formed punch 3.3.2 that are detachably connected on formed punch pedestal 3.3.1 3.3.1 Junction is equipped with and limiting slot 3.3.1.1 phase equipped with the junction of limiting slot 3.3.1.1, formed punch 3.3.2 and formed punch pedestal 3.3.1 The limiting slot on limited block 3.3.2.1 and formed punch pedestal 3.3.1 on the limited block 3.3.2.1 of adaptation, formed punch 3.3.2 3.3.1.1 after connecting, formed punch 3.3.2 is fixed on formed punch pedestal 3.3.1 with screw, the axis of two formed punch 3.3.2 is in head Axis when portion forms respectively with the semi-circular segments of the first loading chute 1.2.1 and the second loading chute 1.2.2 coincides, formed punch bottom Seat 3.3.1 is in axial sliding connection along long spiro nail in the bottom surface of link block 3.1, and formed punch pedestal 3.3.1, which is connected with, makes formed punch pedestal 3.3.1 the driving device 4 moved back and forth, driving device 4 include driving motor 4.1 and drive rod 4.2, one end of drive rod 4.2 It is rotatablely connected with driving motor 4.1, the other end and formed punch pedestal 3.3.1 of drive rod 4.2 are rotatablely connected.
In device operational process, first the long spiro nail embryo material cut is put into tripper 2.1, long spiro nail embryo material can be suitable First passage 2.1.1 slip down to the junction of first passage 2.1.1 Yu second channel 2.1.2, if sub-material push rod 2.2 is in Contraction state, then long spiro nail embryo material can be fallen in second channel 2.1.2, then passed through second channel 2.1.2 and entered into the In one loading chute 1.2.1, if sub-material push rod 2.2 is in stretched condition, long spiro nail embryo material can be in first passage 2.1.1 It is interior;Start servo motor 1.3, the first loading chute 1.2.1 of each transmission block 1.2 is made to be moved to the lower section of first passage 2.1.1 When will stop;When the first loading chute 1.2.1 is moved to the lower section of first passage 2.1.1, the second cylinder 2.3 can be received first Contracting is arrived at long spiro nail embryo material in second channel 2.1.2 and is entered in the first loading chute 1.2.1, then upholds and sub-material is pushed to push away Bar 2.2 pushes another long spiro nail embryo material in second channel 2.1.2 one of second channel 2.1.2 far from the second cylinder 2.3 to End, this one end can enter the second loading chute 1.2.2 at the end in the top of the second loading chute 1.2.2, another long spiro nail embryo material In, while the sub-material push rod 2.2 upheld can prevent other long spiro nail embryo materials in first passage 2.1.1 from entering second channel 2.1.2 in, which can guarantee that the long spiro nail embryo material fallen on transmission block 1.2 every time only has two, the first loading chute 1.2.1 with each one in the second loading chute 1.2.2, avoid the occurrence of two or more long spiro nail embryo materials and fall together, make device slot Two or more long spiro nail embryo materials can not be accommodated and cause long spiro nail embryo material to fall to outside device and cause waste or long spiro nail Embryo material causes device to run not normal phenomenon between falling to the gap of device, meanwhile, because of the dress of the first loading chute 1.2.1 and second The cross section for carrying slot 1.2.2 is dome-shaped, enters the first loading chute 1.2.1 and the second loading chute 1.2.2 in long spiro nail embryo material Afterwards, it is not easy to fall off from the first loading chute 1.2.1 and the second loading chute 1.2.2;It is transported in the transmission block 1.2 with long spiro nail embryo material When moving below fixed block 3.2.2, the bottom surface of link block 3.1 supports conveyer belt 1.1, and the first cylinder 3.2.1 is pushed, and makes fixed block 3.2.2 decline, the first fixing groove 3.2.2.1 on fixed block 3.2.2 matches to form a cylinder with the first loading chute 1.2.1 Hole, the second fixing groove 3.2.2.2 match to form another cylindrical hole with the second loading chute 1.2.2, this two cylindrical hole can be right The screw rod straightness of two root long screw embryo materials is corrected, and the screw rod straightness after can not only guaranteeing long spiro nail forming may be used also To avoid long spiro nail embryo material because the bending of long spiro nail embryo material causes head formation to fail during head formation, long spiro nail embryo material Head formation unsuccessfully be easy to cause the waste of long spiro nail embryo material, while also resulting in long spiro nail embryo material and being trapped in device slot not Easily take out;After the completion of transmission block 1.2 and fixed block 3.2.2 cooperate, driving device 4 drives formed punch pedestal 3.3.1 to close to long The direction of screw embryo material is mobile, and completes the head formation work of long spiro nail embryo material;Then driving device 4 drives formed punch pedestal 3.3.1 the long spiro nail completed far from head formation, the first cylinder 3.2.1 rise, and make fixed block 3.2.2 far from transmission block 1.2, solution Except the fixation and correction to long spiro nail, conveyer belt 1.1 continues with the movement of transmission block 1.2, until being moved at servo motor 1.3 Start to turn to, when the moving direction of transmission block 1.2 turns over 180 degree, the long spiro nail that has completed the process on transmission block 1.2 can be from It is fallen in first loading chute 1.2.1 and the second loading chute 1.2.2, transmission block 1.2 moves on, and diverted driven wheel 1.4 is again After the 180 degree that commutates, new long spiral shell is accepted in the underface that the first loading chute 1.2.1 on transmission block 1.2 returns to first passage 2.1.1 Embryo material is followed closely, the circulation of a long spiro nail head formation is completed.It, once can be to two long spiro nail embryos by the operation of above-mentioned apparatus Material carries out head formation, substantially increases the efficiency of long spiro nail embryo material head formation.
In this equipment, removable connection, the first cylinder 3.2.1 and the fixed block of transmission block 1.2 and hinged disk 1.1.1 3.2.2 the removable connection of removable connection, formed punch pedestal 3.3.1 and formed punch 3.3.2 can be connected by screw to What mode connected, it is conveniently replaceable the specification of transmission block 1.2, fixed block 3.2.2, formed punch 3.3.2 in this way, is suitable for this equipment more The processing of the long spiro nail of more specifications.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (8)

1. a kind of equipment for long spiro nail head formation, it is characterised in that: it includes the transmission for transmitting long spiro nail embryo material Mechanism (1), the top of the transport mechanism (1) are equipped with for arrange by material and material being accurately placed into biography in an orderly manner The feeding distribution mechanism (2) on mechanism (1) is sent, is additionally provided with above the transport mechanism (1) for rectifying long spiro nail progress straightness Just and the builder (3) of head formation is carried out, the transport mechanism (1) includes conveyer belt (1.1), the conveyer belt (1.1) it is hinged to the cricoid hinged disk of sealed joint (1.1.1) composition by multiple, is connected on each hinged disk (1.1.1) There is a transmission block (1.2), the transmission block (1.2) is equipped with the first loading chute (1.2.1) for accepting long spiro nail embryo material With the second loading chute (1.2.2), the feeding distribution mechanism (2) includes tripper (2.1) and sub-material push rod (2.2), the tripper (2.1) being equipped with one once can only be by the first passage (2.1.1) of a root long screw embryo material and for sub-material push rod (2.2) movement Second channel (2.1.2), the lower end of the first passage (2.1.1) is connected to second channel (2.1.2), the first passage The junction of (2.1.1) and second channel (2.1.2) is equipped with isolation board (2.1.3), the isolation board (2.1.3) and second channel The inner wall of (2.1.2) is hinged, and the hinged place of the isolation board (2.1.3) and second channel (2.1.2) are equipped with torsional spring (2.1.4), The sub-material push rod (2.2) is set in second channel (2.1.2) and a long spiro nail embryo material can be made from first by movement Channel (2.1.1) pass through second channel (2.1.2) enter the first loading chute (1.2.1) in and can be by another long spiro nail embryo Material, which is shifted above the second loading chute (1.2.2), makes another long spiro nail embryo material enter the second loading chute (1.2.2), closes simultaneously First passage (2.1.1) prevent other long spiro nail embryo materials from first passage (2.1.1) enter second channel (2.1.2), it is described at Shape mechanism (3) includes link block (3.1), fixed block group (3.2) and formed punch group (3.3), and the link block (3.1) is equipped with for transmission Mechanism (1) pass through and opening direction be horizontal direction open slot (3.1.1), the side inner walls of the link block (3.1) with One end of transmission block (1.2) fits, the fixed block group (3.2) be connected with the top surface of link block (3.1) for transmission Block (1.2) is matched to fix long spiro nail, and the formed punch group (3.3) connect with the bottom surface of link block (3.1) for making long spiro nail Head formation, the formed punch group (3.3) include formed punch pedestal (3.3.1), and the formed punch pedestal (3.3.1) is axially sliding along long spiro nail The dynamic bottom surface for being connected to link block (3.1), the formed punch pedestal (3.3.1), which is connected with, moves back and forth formed punch pedestal (3.3.1) Driving device (4), the driving device (4) includes driving motor (4.1) and drive rod (4.2), the drive rod (4.2) One end and driving motor (4.1) are rotatablely connected, and the other end and formed punch pedestal (3.3.1) of the drive rod (4.2) are rotatablely connected.
2. a kind of equipment for long spiro nail head formation according to claim 1, it is characterised in that: the fixed block group (3.2) include be fixed on link block (3.1) top surface the first cylinder (3.2.1) and can with the motion bar of the first cylinder (3.2.1) Tear the fixed block (3.2.2) of formula connection, the transmission block (1.2) and hinged disk (1.1.1) removable connection open.
3. a kind of equipment for long spiro nail head formation according to claim 2, it is characterised in that: described first loads The cross section of slot (1.2.1) and the second loading chute (1.2.2) is dome-shaped, and the circular arc of the dome-shaped is semicircle, the fixation Block (3.2.2) be equipped with the first fixing groove (3.2.2.1) for being matched with the first loading chute (1.2.1) and with the second loading chute The second fixing groove (3.2.2.2) that (1.2.2) is matched, the two sides of first fixing groove (3.2.2.1) are equipped with and the first dress The protrusion that slot (1.2.1) cooperatively forms the cylindrical hole of the screw rod straightness for correcting long spiro nail embryo material is carried, described second is fixed The two sides of slot (3.2.2.2) are equipped with the screw rod straight line cooperatively formed with the second loading chute (1.2.2) for correcting long spiro nail embryo material The protrusion of the cylindrical hole of degree.
4. a kind of equipment for long spiro nail head formation according to claim 1, it is characterised in that: the formed punch group (3.3) further include two formed punches (3.3.2) with formed punch pedestal (3.3.1) removable connection, the formed punch pedestal (3.3.1) with The junction of formed punch (3.3.2) is equipped with limiting slot (3.3.1.1), the connection of the formed punch (3.3.2) and formed punch pedestal (3.3.1) Place is equipped with the limited block (3.3.2.1) adaptable with limiting slot (3.3.1.1), and the axis of two formed punches (3.3.2) is in head Axis when portion forms respectively with the semi-circular segments of the first loading chute (1.2.1) and the second loading chute (1.2.2) coincides.
5. a kind of equipment for long spiro nail head formation according to claim 1, it is characterised in that: the second channel Being equipped with far from the end the second loading chute (1.2.2) for (2.1.2) provides second cylinder (2.3) of sub-material push rod (2.2) power, described The motion bar of second cylinder (2.3) is connect with sub-material push rod (2.2).
6. according to claim 1 or a kind of equipment for long spiro nail head formation described in 5, it is characterised in that: the length The diameter of screw embryo material is equal with the height of second channel (2.1.2), and the long spiro nail embryo material enters the first loading chute (1.2.1) It is tangent with second channel (2.1.2) afterwards.
7. a kind of equipment for long spiro nail head formation according to claim 1, it is characterised in that: the transport mechanism It (1) further include that the servo motor (1.3) of conveyer belt (1.1) power is provided and turns to driven wheel (1.4), the servo motor (1.3) it is located at one end that conveyer belt (1.1) turn to and matches with conveyer belt (1.1) for providing conveyer belt (1.1) power With make conveyer belt (1.1) turn to, it is described turn to driven wheel (1.4) be located at conveyer belt (1.1) turn to the other end and with transmission Band (1.1) is matched for turning to conveyer belt (1.1).
8. the control method of any equipment for long spiro nail head formation of claim 1-7, which is characterized in that including with Lower step:
S1, the long spiro nail embryo material for cutting length is put into feeding distribution mechanism (2);
S2, long spiro nail embryo material enter first passage (2.1.1) one by one;
S3, through sub-material push rod (2.2), movement makes a root long screw embryo material and other long spiro nail embryo materials in second channel (2.1.2) It separates and enters in the first loading chute (1.2.1), another root long screw embryo material is made to separate and enter with other screw embryo materials In second loading chute (1.2.2);
S4, be loaded with long spiro nail embryo material transmission block (1.2) enter builder (3) in and fixed block (3.2.2) just under Side stops movement;
S5, fixed block (3.2.2) are acted on by the first cylinder (3.2.1) and being pushed, and make the first loading chute (1.2.1) and the first fixing groove (3.2.2.1) is matched, and matches the second loading chute (1.2.2) with the second fixing groove (3.2.2.2), respectively to long spiro nail embryo Material is fixed and carries out the correction of straightness;
S6, formed punch group (3.3) are mobile to long spiro nail embryo material direction under the action of driving device (4), carry out to long spiro nail embryo material Head formation;
After S7, head formation, formed punch group (3.3) is detached from long spiro nail, the first fixing groove under the action of driving device (4) (3.2.2.1), which is detached under the first cylinder (3.2.1) effect with the first loading chute (1.2.1), to be cooperated, the second fixing groove (3.2.2.2), which is detached under the first cylinder (3.2.1) effect with the second loading chute (1.2.2), to be cooperated;
S8, the transmission block (1.2) equipped with the long spiro nail that head formation is completed remove builder (3), and transmission block (1.2) arrives at When at servo motor (1.3), starts 180 degree and turn to, long spiro nail is fallen from transmission block (1.2);
S9, transmission block (1.2) continue to move to, and when arriving at steering driven wheel (1.4), 180 degree is turned to again, then the first dress The lower section that slot (1.2.1) is moved to first passage (2.1.1) is carried, starts to accept lower a pair of of long spiro nail embryo material.
CN201710902969.1A 2017-09-29 2017-09-29 A kind of equipment and control method for long spiro nail head formation Active CN107486535B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710902969.1A CN107486535B (en) 2017-09-29 2017-09-29 A kind of equipment and control method for long spiro nail head formation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710902969.1A CN107486535B (en) 2017-09-29 2017-09-29 A kind of equipment and control method for long spiro nail head formation

Publications (2)

Publication Number Publication Date
CN107486535A CN107486535A (en) 2017-12-19
CN107486535B true CN107486535B (en) 2019-03-26

Family

ID=60653652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710902969.1A Active CN107486535B (en) 2017-09-29 2017-09-29 A kind of equipment and control method for long spiro nail head formation

Country Status (1)

Country Link
CN (1) CN107486535B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109127977A (en) * 2018-07-17 2019-01-04 无锡双马钻探工具有限公司 A kind of hydraulic efficient double-station drill pipe thickening machine

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1748321A (en) * 1928-02-13 1930-02-25 Waterbury Farrel Foundry Co Means and method for forming blanks
US4168458A (en) * 1976-12-20 1979-09-18 Nedschroef Octrooi Maatschappij N.V. Method and apparatus for detecting, signalling, and sorting inaccurately formed articles produced by a tool machine
KR20080086015A (en) * 2007-03-21 2008-09-25 (주)대웅 Bolt and manufacturing method
CN104400155A (en) * 2014-11-12 2015-03-11 温州中特标准件有限公司 Multi-station screw heading machine
CN104475641A (en) * 2014-11-29 2015-04-01 安徽六方重联机械股份有限公司 Bolt machining all-in-one machine
CN104493064A (en) * 2014-11-28 2015-04-08 芜湖银星汽车零部件有限公司 Hot-forging processing forming system
CN206464652U (en) * 2017-01-21 2017-09-05 深圳市骏强五金制品有限公司 Heading machine

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1748321A (en) * 1928-02-13 1930-02-25 Waterbury Farrel Foundry Co Means and method for forming blanks
US4168458A (en) * 1976-12-20 1979-09-18 Nedschroef Octrooi Maatschappij N.V. Method and apparatus for detecting, signalling, and sorting inaccurately formed articles produced by a tool machine
KR20080086015A (en) * 2007-03-21 2008-09-25 (주)대웅 Bolt and manufacturing method
CN104400155A (en) * 2014-11-12 2015-03-11 温州中特标准件有限公司 Multi-station screw heading machine
CN104493064A (en) * 2014-11-28 2015-04-08 芜湖银星汽车零部件有限公司 Hot-forging processing forming system
CN104475641A (en) * 2014-11-29 2015-04-01 安徽六方重联机械股份有限公司 Bolt machining all-in-one machine
CN206464652U (en) * 2017-01-21 2017-09-05 深圳市骏强五金制品有限公司 Heading machine

Also Published As

Publication number Publication date
CN107486535A (en) 2017-12-19

Similar Documents

Publication Publication Date Title
EP0123361B1 (en) Connecting device for synchronously intercoupling machines mounted in series and destined to handle objects
CN107457342B (en) A kind of device and control method for long spiro nail heating occiput forming
CN107695279B (en) A kind of equipment and control method for long spiro nail heating occiput forming
KR100823136B1 (en) Unprocessed device for outer diameter grinding of round bar
CN107442708B (en) A kind of device and control method of long spiro nail head formation
CN110757025B (en) Composite stirrup welding equipment
CN208880274U (en) A kind of cutter device of stainless steel tube
KR101997576B1 (en) Multi-cutting system for pipe forming machine
CN108455232A (en) Feeding system with weld-ring semi-circular tube
CN107486535B (en) A kind of equipment and control method for long spiro nail head formation
JP2023055700A (en) Conveyance method for conveying work-piece
CN106141290A (en) A kind of steel plate crushes cutting system
CN203568398U (en) Automatic feeding device
CN205733202U (en) A kind of full-automatic wolfram steel pole cutting machine
KR100935126B1 (en) Manufacturing equipment for diffuser up cover
CN107486534B (en) A kind of device and control method for long spiro nail head formation
KR100382413B1 (en) The wire bending machine
CN107486536B (en) A kind of device and control method of long spiro nail heating occiput forming
CN209535583U (en) A kind of manual box press material collecting device
CN206436097U (en) Piston machining production line
KR100428722B1 (en) Apparatus for wire supply in machine bending wire
EP4347150A1 (en) Loading assembly for oblong, in particular metallic, elements
CN211386928U (en) Material feeding unit behind bar
CN107457453A (en) A kind of blanking, pushing positioner and the beveler using the device
JP2001122429A (en) Continuous supply device for tooth brush handle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191029

Address after: 404100 No.166 Lanxi Road, degan street, Jiangjin District, Chongqing (complex building)

Patentee after: CHONGQING LONGJIAN METAL MANUFACTURING CO., LTD.

Address before: Haishu Shiqi street after 315100 Zhejiang city of Ningbo Province Cang Cun

Patentee before: Ningbo Yinzhou Fengming Industrial Product Design Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200201

Address after: 243100 Anhui city of Ma'anshan province Dangtu Economic Development Zone

Patentee after: Anhui Shengda Qianliang Aluminum Co., Ltd.

Address before: 404100 No.166 Lanxi Road, degan street, Jiangjin District, Chongqing (complex building)

Patentee before: CHONGQING LONGJIAN METAL MANUFACTURING CO., LTD.