[go: up one dir, main page]

CN107464185B - Risk monitoring and control method, apparatus, storage medium and computer equipment - Google Patents

Risk monitoring and control method, apparatus, storage medium and computer equipment Download PDF

Info

Publication number
CN107464185B
CN107464185B CN201710601960.7A CN201710601960A CN107464185B CN 107464185 B CN107464185 B CN 107464185B CN 201710601960 A CN201710601960 A CN 201710601960A CN 107464185 B CN107464185 B CN 107464185B
Authority
CN
China
Prior art keywords
project
risk
risk monitoring
financing
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710601960.7A
Other languages
Chinese (zh)
Other versions
CN107464185A (en
Inventor
何晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zeng Yuhui
Original Assignee
Shenzhen Qianhai Windmill Science And Technology Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Qianhai Windmill Science And Technology Service Co Ltd filed Critical Shenzhen Qianhai Windmill Science And Technology Service Co Ltd
Priority to CN201710601960.7A priority Critical patent/CN107464185B/en
Publication of CN107464185A publication Critical patent/CN107464185A/en
Application granted granted Critical
Publication of CN107464185B publication Critical patent/CN107464185B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/06Asset management; Financial planning or analysis

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Finance (AREA)
  • Accounting & Taxation (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Technology Law (AREA)
  • Human Resources & Organizations (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Strategic Management (AREA)
  • Game Theory and Decision Science (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of risk monitoring and control method, apparatus, storage medium and computer equipment, wherein method includes periodically obtaining the business datum of financing project in multiple platforms;Determine the risk monitoring and control item value of corresponding financing project respectively according to the business datum for project of managing money matters in multiple platforms;The risk alert status of corresponding financing project is determined with the relation of predetermined threshold value according to the risk monitoring and control item value of corresponding financing project;According to the risk alert status generation Risk Monitoring report of corresponding financing project.So that user can intuitively, comprehensively understand each platform and the risk assessment data for project of managing money matters.

Description

Risk monitoring and control method, apparatus, storage medium and computer equipment
Technical field
The present invention relates to technical field of Internet information, more particularly to a kind of risk monitoring and control method, apparatus, storage medium And computer equipment.
Background technology
With developing rapidly for Internet technology, internet has become a part indispensable in people's life.With Family can obtain various resources and the service that network provides, such as internet financing by internet.
It is all more or less there are certain risk however, for numerous financing platforms and financing project, therefore, User's premise for how avoiding risk rational investment is to need to know these risks.Based on this, at present internet financing the 3rd There is some scattered Risk Monitoring mechanism or Risk Monitoring measure in the instrumentality or advisory organization of side, still, these The reference resources that scattered Risk Monitoring mode can be provided are all more unilateral, so as to be difficult to provide to the user relatively comprehensively, effectively Risk assessment data.
The content of the invention
Based on this, it is necessary to be difficult to provide more comprehensive, effective risk to the user for current Risk Monitoring mode and comment The problem of estimating data, there is provided a kind of risk monitoring and control method, apparatus, storage medium and computer equipment.
A kind of risk monitoring and control method, including:
Periodically obtain the business datum for project of managing money matters in multiple platforms;
Determine the risk monitoring and control item value of corresponding financing project respectively according to the business datum for project of managing money matters in multiple platforms;
The wind of corresponding financing project is determined with the relation of predetermined threshold value according to the risk monitoring and control item value of corresponding financing project Dangerous alert status;
According to the risk alert status generation Risk Monitoring report of corresponding financing project.
In one of the embodiments, the business datum for project of managing money matters in multiple platforms includes project of managing money matters in multiple platforms Project name, current interest corresponding with project name, upper cycle interest rate.
In one of the embodiments, corresponding financing item is determined according to the business datum for project of managing money matters in multiple platforms respectively Purpose risk monitoring and control item value, including:
According to project name, current interest corresponding with project name and the upper cycle of project of managing money matters in multiple platforms Interest rate calculates fluctuation of interest rate ratio;
It is fluctuation of interest rate ratio to determine risk monitoring and control item value.
In one of the embodiments, risk alert status includes the first risk status and the second risk status, then basis The risk monitoring and control item value of corresponding financing project determines the risk alert status of corresponding financing project, bag with the relation of predetermined threshold value Include:
If fluctuation of interest rate ratio reaches preset first threshold value, the interest rate risk alert status for corresponding to financing project is first Risk status;
If fluctuation of interest rate ratio reaches default second threshold, the interest rate risk alert status for corresponding to financing project is second Risk status.
In one of the embodiments, the business datum for project of managing money matters in multiple platforms further includes corresponding with project name Project bid release date and project full scale time.
In one of the embodiments, corresponding financing item is determined according to the business datum for project of managing money matters in multiple platforms respectively Purpose risk monitoring and control item value, including:
According to project name, project bid release date corresponding with project name and the project of project of managing money matters in multiple platforms The full scale time calculates project full scale duration;
It is project full scale duration to determine risk monitoring and control item value.
In one of the embodiments, risk alert status includes the first risk status and the second risk status, then basis The risk monitoring and control item value of corresponding financing project determines the risk alert status of corresponding financing project, bag with the relation of predetermined threshold value Include:
If project full scale duration reaches default 3rd threshold value, the full scale progress alert status for corresponding to financing project is first Risk status;
If project full scale duration reaches default 4th threshold value, the full scale progress alert status for corresponding to financing project is second Risk status.
In one of the embodiments, further include:
Obtain the transaction data for project of managing money matters in multiple platforms;
Then according to the risk alert status generation Risk Monitoring report of corresponding financing project, including:
According to the risk alert status of corresponding financing project and transaction data generation Risk Monitoring report.
In one of the embodiments, further include:
The notice information of multiple platform issues is monitored, and records the issuing time and content of notice information;
Keyword is determined according to the content of notice information;
By keyword search and obtain with the relevant public opinion information of keyword, and record public opinion information issuing time and Content.
A kind of risk monitoring and control device, including:
Data monitoring module, for periodically obtaining the business datum for project of managing money matters in multiple platforms;
Risk monitoring and control item value determining module, for according in multiple platforms manage money matters project business datum respectively determine pair The risk monitoring and control item value for the project that should manage money matters;
Risk alert status determining module, for according to the risk monitoring and control item value and predetermined threshold value for corresponding to financing project Relation determines the risk alert status of corresponding financing project;
Risk Monitoring report generation module, for generating Risk Monitoring report according to the risk alert status of corresponding financing project Accuse.
A kind of computer-readable recording medium, is stored thereon with computer program, which is executed by processor The step of Shi Shixian methods as described above.
A kind of computer equipment, including memory, processor and storage can be run on a memory and on a processor Computer program, the step of when processor executive program realizes method as described above.
Above-mentioned risk monitoring and control method, apparatus, storage medium and computer equipment, by periodically obtaining in multiple platforms The business datum of financing project, so that it is determined that the risk monitoring and control item value of corresponding financing project, then according to corresponding financing project Risk monitoring and control item value the risk alert status of corresponding financing project is determined with the relation of predetermined threshold value, and generate Risk Monitoring Report, so that user can intuitively, comprehensively understand each platform and the risk assessment data for project of managing money matters.
Brief description of the drawings
Fig. 1 is the flow chart of one embodiment risk monitoring method;
Fig. 2 is the schematic diagram of one embodiment risk monitoring report;
Fig. 3 is the flow chart of one embodiment risk monitoring method;
Fig. 4 is the structure diagram of one embodiment risk monitoring device.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, the technical solution in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, instead of all the embodiments.
An embodiment of the present invention provides a kind of risk monitoring and control method, it is applied to risk monitoring and control system, as shown in Figure 1, can To include the following steps:
Step S101, periodically obtains the business datum for project of managing money matters in multiple platforms.
In the present embodiment, risk monitoring and control system monitors the business datum for project of managing money matters in multiple platforms in real time, So as to periodically obtain the business datum for project of managing money matters in multiple platforms.Wherein, business datum can include the base of financing project The interest rate information and project progress message of this information, corresponding financing project.Cycle can be then using day as the cycle, or with solid Section of fixing time is the cycle.
Step S102, the risk for determining corresponding financing project respectively according to the business datum for project of managing money matters in multiple platforms are supervised Control item value.
Wherein, risk monitoring and control item value can be fluctuation of interest rate ratio, can also be project full scale duration.In the present embodiment In, risk monitoring and control system can determine interest rate according to the essential information of financing project and the interest rate information of corresponding financing project Variation ratio, and identified project full scale duration according to corresponding project progress message.
Step S103, corresponding financing is determined according to the risk monitoring and control item value of corresponding financing project with the relation of predetermined threshold value The risk alert status of project.
In the present embodiment, risk alert status can include various states, such as the first risk status and the second risk shape State, predetermined threshold value can also include a variety of threshold values, and the difference of threshold value is corresponded to according to the risk monitoring and control item value of corresponding financing project, So that risk monitoring and control system sends different risk alert status.
Step S104, according to the risk alert status generation Risk Monitoring report of corresponding financing project.
Risk monitoring and control system generates Risk Monitoring report according to the risk alert status that financing project is corresponded in multiple platforms Accuse, wherein, Risk Monitoring report includes the essential information of corresponding each financing project, corresponding financing in multiple platforms The interest rate information and project progress message of project and corresponding risk alert status, so that user can intuitively, comprehensively Each platform of understanding and financing project risk assessment data.
In one embodiment, the essential information for project of managing money matters can include project name, the corresponding item of financing project The information such as mesh numbering, item types, involved item amount and the corresponding platform of project.The interest rate information of financing project can The project arrived with the project current interest corresponding with project name and a upper cycle monitoring that are monitored including this is last Interest rate.Therefore, what risk monitoring and control system can be last according to the project that project current interest and a upper cycle monitoring arrive Interest rate calculates the corresponding fluctuation of interest rate ratio of project, and the fluctuation of interest rate ratio that the risk monitoring and control item value identified project is project Example.
For example, it is assumed that the current interest that risk monitoring and control system monitoring numbers the financing project for being 1 into platform A is a, and it is right The interest rate for the project last time that a cycle monitoring arrives is a in the financing project1, then the corresponding fluctuation of interest rate ratio of the financing project av=(a-a1)/a1* 100%.
In one embodiment, risk alert status can include the first risk status and the second risk status, it is used for Distinguish different degrees of risk.It is assumed that the first risk status corresponds to relatively low risk, the second risk status corresponds to higher wind Danger.In the present embodiment, predetermined threshold value can also include a variety of threshold values, can pre-set the first threshold for fluctuation of interest rate ratio Value and second threshold, and different threshold values corresponds to different risk alert status.For example, it is based on fluctuation of interest rate ratio avIf Pre-set first threshold is ± 10%, and pre-set second threshold is ± 30%.For example, if what is calculated is above-mentioned The corresponding fluctuation of interest rate ratio a of financing project that numbering is 1 in platform AvReach preset first threshold value, then correspond to financing project Interest rate risk alert status is the first risk status, therefore, amber light warning can be sent by risk monitoring and control system.If calculate Above-mentioned platform A in numbering be 1 the corresponding fluctuation of interest rate ratio a of financing projectvReach default second threshold, then corresponding financing The interest rate risk alert status of project is the second risk status, therefore, can send red light warning by risk monitoring and control system, from And realize the purpose that overall monitor is carried out to the interest rate information for project of managing money matters.
In one embodiment, the corresponding project progress message of project of managing money matters can specifically include corresponding with project name Project bid release date and project full scale time.Therefore, risk monitoring and control system can expire according to project bid release date and project Respective items purpose full scale duration is calculated between timestamp, and the full scale duration that the risk monitoring and control item value identified project is project.Example Such as, it is assumed that the bid release date that risk monitoring and control system monitoring numbers the financing project for being 1 into platform A is m1, while monitor this The full scale time of project is m2, then the full scale duration m=m of the project2-m1.Wherein, the unit of m is hour, m1And m2It is at least accurate To specific date and division of day and night.
In one embodiment, the 3rd threshold value and the 4th threshold value can also be pre-set for full scale duration, and it is different Threshold value corresponds to different risk alert status.For example, full scale duration m is based on, if pre-set 3rd threshold value and the 4th threshold When value is 24 small respectively and when 48 is small.For example, if m is small more than 24, the full scale progress warning of financing project is corresponded to State is the first risk status, therefore, amber light warning can be sent by risk monitoring and control system.It is right if m is small more than 48 The full scale progress alert status for the project that should manage money matters is the second risk status, therefore, can send red light by risk monitoring and control system Warning.The purpose of overall monitor is carried out so as to fulfill the project process to project of managing money matters.
In one embodiment, the Risk Monitoring report such as Fig. 2 generated according to the risk alert status of corresponding financing project It is shown, the essential information of project, the interest rate information of corresponding project, progress msg etc. can be included in Risk Monitoring report. Specifically, platform names, the numbering of financing project corresponding with platform names, entry name can be included in the essential information of project The information such as title, item types, item amount, project issue of bidding documents time limit, can also include the interest rate information of corresponding project, such as monitor Project current interest, a upper cycle monitoring interest rate, fluctuation of interest rate ratio and the risk alert status of the project last time that arrive Etc. information, the progress msg of corresponding project can also be included, such as the respective items purpose bid release date of monitoring, full scale time, throw The information such as money progress, full scale duration and risk alert status.So that user can comprehensively understand each platform and financing The risk assessment data of project, and the degree of risk of each financing project can be got information about by risk alert status, with reality Now provide effective warning information to the user.
In one embodiment, risk monitoring and control system can also obtain the transaction data for project of managing money matters in multiple platforms, its Middle transaction data includes each transaction flowing water of respective items purpose, the classification of such as transaction categories, that is, investment deal or transaction of borrowing money, The information such as transaction amount, time limit, earning rate.So as to according to the transaction data of monitoring per diem or moon statistics respective items purpose transaction into Friendship amount, the due-in amount of money, comprehensive income rate, loaning bill number and investment number, the quantity of issue of bidding documents project and the amount of money, averagely borrow money the phase The information such as limit and fund disengaging inbound traffics, and corresponding diagrammatic representation is formed to user, so that user can be more straight The trading situation of each project of understanding of sight.
In one embodiment, as shown in figure 3, risk monitoring and control method can also include the following steps:
Step S301, monitors the notice information of multiple platform issues, and records the issuing time and content of notice information.
In the present embodiment, risk monitoring and control system can also monitor the notice information of multiple platform issues, and to monitoring Notice information carry out filtration treatment, such as the returned money notice information and issue of bidding documents notice information of routine work are filtered, from And the notice information after filtering is extracted, and the issuing time and content of the notice information after record filtering, and bulletin can be generated Monitor daily paper.So as to facilitate user to understand the more information on platform.
Step S302, keyword is determined according to the content of notice information.
Step S303, by keyword search and acquisition and the relevant public opinion information of keyword, and records public opinion information Issuing time and content.
In the present embodiment, risk monitoring and control system determines keyword according to the particular content of the notice information after filtering, from And according to keyword in the relevant public opinion information of other site searches, and the issuing time and content of public opinion information are recorded, generate Public opinion monitors daily paper.So as to facilitate user to understand more relevant public opinion information.
The embodiment of the present invention additionally provides a kind of risk monitoring and control device, as shown in figure 4, including data monitoring module 401, wind Danger monitoring item value determining module 402, risk alert status determining module 403 and Risk Monitoring report generation module 404, its In:
Data monitoring module 401, for periodically obtaining the business datum for project of managing money matters in multiple platforms;
Risk monitoring and control item value determining module 402, it is true for the business datum difference according to project of managing money matters in multiple platforms The risk monitoring and control item value of fixed corresponding financing project;
Risk alert status determining module 403, for the risk monitoring and control item value according to corresponding financing project and default threshold The relation of value determines the risk alert status of corresponding financing project;
Risk Monitoring report generation module 404, for the risk alert status generation risk prison according to corresponding financing project Observe and predict announcement.
In one embodiment, the business datum for project of managing money matters in multiple platforms includes the item of financing project in multiple platforms Mesh title, current interest corresponding with the project name, upper cycle interest rate.Then risk monitoring and control item value determining module 402 It is specifically used for, according to the project name of project of managing money matters in multiple platforms, current interest corresponding with project name and one week upper Phase interest rate calculates fluctuation of interest rate ratio;It is fluctuation of interest rate ratio to determine risk monitoring and control item value.
In one embodiment, risk alert status includes the first risk status and the second risk status, then risk warns State determining module 403 is specifically used for, if fluctuation of interest rate ratio reaches preset first threshold value, corresponds to the interest rate wind of financing project Dangerous alert status is the first risk status;If fluctuation of interest rate ratio reaches default second threshold, the interest rate of financing project is corresponded to Risk alert status is the second risk status.
In one embodiment, the business datum for project of managing money matters in multiple platforms further includes project corresponding with project name Bid release date and project full scale time, then risk monitoring and control item value determining module 402 be specifically used for, managed according in multiple platforms When the project name of wealth project, project bid release date corresponding with project name and project full scale time calculate project full scale It is long;It is project full scale duration to determine risk monitoring and control item value.
In one embodiment, risk alert status includes the first risk status and the second risk status, then risk warns State determining module 403 is specifically used for, if project full scale duration reaches default 3rd threshold value, correspond to the full scale of financing project into Degree alert status is the first risk status;If project full scale duration reaches default 4th threshold value, the full scale of financing project is corresponded to Progress alert status is the second risk status.
The embodiment of the present invention additionally provides a kind of computer-readable recording medium, is stored thereon with computer program, the meter Calculation machine program realizes following steps when being executed by processor:Periodically obtain the business datum for project of managing money matters in multiple platforms;Root The risk monitoring and control item value of corresponding financing project is determined respectively according to the business datum for project of managing money matters in multiple platforms;Managed according to corresponding The risk monitoring and control item value of wealth project determines the risk alert status of corresponding financing project with the relation of predetermined threshold value;According to correspondence The risk alert status generation Risk Monitoring report of financing project.
In one embodiment, the business datum for project of managing money matters in multiple platforms includes the item of financing project in multiple platforms Mesh title, current interest corresponding with project name, upper cycle interest rate.
In one embodiment, corresponding financing project is determined according to the business datum for project of managing money matters in multiple platforms respectively Risk monitoring and control item value, including:According to project name, the current interest corresponding with project name of project of managing money matters in multiple platforms And upper cycle interest rate calculates fluctuation of interest rate ratio;It is fluctuation of interest rate ratio to determine risk monitoring and control item value.
In one embodiment, risk alert status includes the first risk status and the second risk status, then according to correspondence The risk monitoring and control item value of financing project determines the risk alert status of corresponding financing project with the relation of predetermined threshold value, including: If fluctuation of interest rate ratio reaches preset first threshold value, the interest rate risk alert status for corresponding to financing project is the first risk shape State;If fluctuation of interest rate ratio reaches default second threshold, the interest rate risk alert status for corresponding to financing project is the second risk State.
In one embodiment, the business datum for project of managing money matters in multiple platforms further includes project corresponding with project name Bid release date and project full scale time.
In one embodiment, corresponding financing project is determined according to the business datum for project of managing money matters in multiple platforms respectively Risk monitoring and control item value, including:According to the project name for project of managing money matters in multiple platforms, project issue of bidding documents corresponding with project name Time and project full scale time calculate project full scale duration;It is project full scale duration to determine risk monitoring and control item value.
In one embodiment, risk alert status includes the first risk status and the second risk status, then according to correspondence The risk monitoring and control item value of financing project determines the risk alert status of corresponding financing project with the relation of predetermined threshold value, including: If project full scale duration reaches default 3rd threshold value, the full scale progress alert status for corresponding to financing project is the first risk shape State;If project full scale duration reaches default 4th threshold value, the full scale progress alert status for corresponding to financing project is the second risk State.
In one embodiment, further include:Obtain the transaction data for project of managing money matters in multiple platforms;Then according to the correspondence The risk alert status generation Risk Monitoring report of financing project, including:According to the risk alert status of corresponding financing project with And transaction data generation Risk Monitoring report.
In one embodiment, further include:The notice information of multiple platform issues is monitored, and records the issue of notice information Time and content;Keyword is determined according to the content of notice information;By keyword search and obtain and the relevant carriage of keyword By information, and record the issuing time and content of public opinion information.
The embodiment of the present invention additionally provides a kind of computer equipment, including memory, processor and is stored in memory Computer program that is upper and can running on a processor, wherein, processor realizes following steps when performing described program:Periodically Obtain the business datum for project of managing money matters in multiple platforms;Determine to correspond to respectively according to the business datum for project of managing money matters in multiple platforms The risk monitoring and control item value of financing project;Determined according to the relation of the risk monitoring and control item value of corresponding financing project and predetermined threshold value The risk alert status of corresponding financing project;According to the risk alert status generation Risk Monitoring report of corresponding financing project.
In one embodiment, the business datum for project of managing money matters in multiple platforms includes the item of financing project in multiple platforms Mesh title, current interest corresponding with project name, upper cycle interest rate.
In one embodiment, corresponding financing project is determined according to the business datum for project of managing money matters in multiple platforms respectively Risk monitoring and control item value, including:According to project name, the current interest corresponding with project name of project of managing money matters in multiple platforms And upper cycle interest rate calculates fluctuation of interest rate ratio;It is fluctuation of interest rate ratio to determine risk monitoring and control item value.
In one embodiment, risk alert status includes the first risk status and the second risk status, then according to correspondence The risk monitoring and control item value of financing project determines the risk alert status of corresponding financing project with the relation of predetermined threshold value, including: If fluctuation of interest rate ratio reaches preset first threshold value, the interest rate risk alert status for corresponding to financing project is the first risk shape State;If fluctuation of interest rate ratio reaches default second threshold, the interest rate risk alert status for corresponding to financing project is the second risk State.
In one embodiment, the business datum for project of managing money matters in multiple platforms further includes project corresponding with project name Bid release date and project full scale time.
In one embodiment, corresponding financing project is determined according to the business datum for project of managing money matters in multiple platforms respectively Risk monitoring and control item value, including:According to the project name for project of managing money matters in multiple platforms, project issue of bidding documents corresponding with project name Time and project full scale time calculate project full scale duration;It is project full scale duration to determine risk monitoring and control item value.
In one embodiment, risk alert status includes the first risk status and the second risk status, then according to correspondence The risk monitoring and control item value of financing project determines the risk alert status of corresponding financing project with the relation of predetermined threshold value, including: If project full scale duration reaches default 3rd threshold value, the full scale progress alert status for corresponding to financing project is the first risk shape State;If project full scale duration reaches default 4th threshold value, the full scale progress alert status for corresponding to financing project is the second risk State.
In one embodiment, further include:Obtain the transaction data for project of managing money matters in multiple platforms;Then according to the correspondence The risk alert status generation Risk Monitoring report of financing project, including:According to the risk alert status of corresponding financing project with And transaction data generation Risk Monitoring report.
In one embodiment, further include:The notice information of multiple platform issues is monitored, and records the issue of notice information Time and content;Keyword is determined according to the content of notice information;By keyword search and obtain and the relevant carriage of keyword By information, and record the issuing time and content of public opinion information.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the present invention, its description is more specific and detailed, but simultaneously Cannot therefore it be construed as limiting the scope of the patent.It should be pointed out that come for those of ordinary skill in the art Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (9)

  1. A kind of 1. risk monitoring and control method, it is characterised in that including:
    Periodically obtain the business datum for project of managing money matters in multiple platforms;
    Determine the risk monitoring and control item value of corresponding financing project respectively according to the business datum for project of managing money matters in the multiple platform;
    The wind of corresponding financing project is determined with the relation of predetermined threshold value according to the risk monitoring and control item value of the corresponding financing project Dangerous alert status;
    According to the risk alert status generation Risk Monitoring report of the corresponding financing project;
    The business datum for project of managing money matters in the multiple platform includes the project name of financing project and the item in multiple platforms The corresponding current interest of mesh title, upper cycle interest rate, then it is described according in the multiple platform manage money matters project business datum The risk monitoring and control item value of corresponding financing project is determined respectively, including:
    According to project name, the current interest corresponding with the project name and upper one of project of managing money matters in the multiple platform Cycle interest rate calculates fluctuation of interest rate ratio;
    It is fluctuation of interest rate ratio to determine the risk monitoring and control item value.
  2. 2. risk monitoring and control method according to claim 1, it is characterised in that the risk alert status includes the first risk State and the second risk status, then it is described according to the risk monitoring and control item value of the corresponding financing project and the relation of predetermined threshold value Determine the risk alert status of corresponding financing project, including:
    If the fluctuation of interest rate ratio reaches preset first threshold value, the interest rate risk alert status for corresponding to financing project is first Risk status;
    If the fluctuation of interest rate ratio reaches default second threshold, the interest rate risk alert status for corresponding to financing project is second Risk status.
  3. 3. risk monitoring and control method according to claim 1 or 2, it is characterised in that project of managing money matters in the multiple platform Business datum further includes project bid release date corresponding with the project name and project full scale time, then described in the basis The business datum for project of managing money matters in multiple platforms determines the risk monitoring and control item value of corresponding financing project respectively, including:
    According to the project name of project of managing money matters in the multiple platform, project bid release date corresponding with the project name and The project full scale time calculates project full scale duration;
    It is project full scale duration to determine the risk monitoring and control item value.
  4. 4. risk monitoring and control method according to claim 3, it is characterised in that the risk alert status includes the first wind Dangerous state and the second risk status, then it is described according to the risk monitoring and control item value of the corresponding financing project and the pass of predetermined threshold value System determines the risk alert status of corresponding financing project, including:
    If the project full scale duration reaches default 3rd threshold value, the full scale progress alert status for corresponding to financing project is first Risk status;
    If the project full scale duration reaches default 4th threshold value, the full scale progress alert status for corresponding to financing project is second Risk status.
  5. 5. risk monitoring and control method according to claim 1, it is characterised in that further include:
    Obtain the transaction data for project of managing money matters in multiple platforms;
    The then risk alert status generation Risk Monitoring report according to the corresponding financing project, including:
    According to the risk alert status of the corresponding financing project and transaction data generation Risk Monitoring report.
  6. 6. risk monitoring and control method according to claim 1, it is characterised in that further include:
    The notice information of the multiple platform issue is monitored, and records the issuing time and content of the notice information;
    Keyword is determined according to the content of the notice information;
    By the keyword search and acquisition and the relevant public opinion information of the keyword, and record the hair of the public opinion information Cloth time and content.
  7. A kind of 7. risk monitoring and control device, it is characterised in that including:
    Data monitoring module, for periodically obtaining the business datum for project of managing money matters in multiple platforms;
    Risk monitoring and control item value determining module, for according in the multiple platform manage money matters project business datum respectively determine pair The risk monitoring and control item value for the project that should manage money matters;
    Risk alert status determining module, for the risk monitoring and control item value according to the corresponding financing project and predetermined threshold value Relation determines the risk alert status of corresponding financing project;
    Risk Monitoring report generation module, for generating Risk Monitoring report according to the risk alert status of the corresponding financing project Accuse;
    The business datum for project of managing money matters in the multiple platform includes the project name of financing project and the item in multiple platforms The corresponding current interest of mesh title, upper cycle interest rate, then the risk monitoring and control item value determining module be specifically used for, according to institute State project name, current interest corresponding with the project name and the upper cycle interest rate meter for project of managing money matters in multiple platforms Calculate fluctuation of interest rate ratio;It is fluctuation of interest rate ratio to determine the risk monitoring and control item value.
  8. 8. a kind of computer-readable recording medium, is stored thereon with computer program, it is characterised in that the computer program is located Manage and realized when device performs such as the step of any one of claim 1~6 the method.
  9. 9. a kind of computer equipment, including memory, processor and storage can be run on a memory and on a processor Computer program, it is characterised in that the processor realizes the side as described in any one of claim 1~6 when performing described program The step of method.
CN201710601960.7A 2017-07-21 2017-07-21 Risk monitoring and control method, apparatus, storage medium and computer equipment Expired - Fee Related CN107464185B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710601960.7A CN107464185B (en) 2017-07-21 2017-07-21 Risk monitoring and control method, apparatus, storage medium and computer equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710601960.7A CN107464185B (en) 2017-07-21 2017-07-21 Risk monitoring and control method, apparatus, storage medium and computer equipment

Publications (2)

Publication Number Publication Date
CN107464185A CN107464185A (en) 2017-12-12
CN107464185B true CN107464185B (en) 2018-05-15

Family

ID=60543933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710601960.7A Expired - Fee Related CN107464185B (en) 2017-07-21 2017-07-21 Risk monitoring and control method, apparatus, storage medium and computer equipment

Country Status (1)

Country Link
CN (1) CN107464185B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108230140A (en) * 2017-12-29 2018-06-29 阿里巴巴集团控股有限公司 The method and apparatus of pushed information, the method and apparatus for determining input default value
CN108520318A (en) * 2018-04-02 2018-09-11 深圳前海桔子信息技术有限公司 A kind of method for safety monitoring, device, server and storage medium
CN108681969A (en) * 2018-04-24 2018-10-19 深圳市众投邦股份有限公司 Terminal, the determination method of investment project and its device and readable storage medium storing program for executing
CN108564349A (en) * 2018-04-24 2018-09-21 深圳市众投邦股份有限公司 Terminal, the method for pushing of investing tip and its device and readable storage medium storing program for executing
CN109492885B (en) * 2018-10-25 2024-02-09 平安医疗健康管理股份有限公司 Medical insurance risk project analysis method and device, terminal and readable medium
CN110458396A (en) * 2019-07-05 2019-11-15 阿里巴巴集团控股有限公司 The monitoring method and device of risk data

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101976419A (en) * 2010-10-19 2011-02-16 中国工商银行股份有限公司 Processing method and system for risk monitoring and controlling of transaction data
CN105335815A (en) * 2015-10-09 2016-02-17 上海瀚银信息技术有限公司 Risk control system and method
CN106504098A (en) * 2016-12-07 2017-03-15 柳文龙 A kind of capitalized method of the financial investment system based on big data technology

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060218078A1 (en) * 2005-03-28 2006-09-28 Jackson Freeman A Method and apparatus for renting, customizing, and delivering risk and/or volatility products
CN102236869A (en) * 2010-04-20 2011-11-09 中国工商银行股份有限公司 Real-time risk monitoring system for bank entrusted assets
US8438101B2 (en) * 2010-12-10 2013-05-07 Sang Woo BARK Virtual trading market provision system and method using synthesis of instruments
CN105894376A (en) * 2016-03-07 2016-08-24 浙江爱贷金融服务外包股份有限公司 Financial account capital management system and method
CN106204269A (en) * 2016-07-18 2016-12-07 四川君逸易视科技有限公司 Financing risk management and control software approach

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101976419A (en) * 2010-10-19 2011-02-16 中国工商银行股份有限公司 Processing method and system for risk monitoring and controlling of transaction data
CN105335815A (en) * 2015-10-09 2016-02-17 上海瀚银信息技术有限公司 Risk control system and method
CN106504098A (en) * 2016-12-07 2017-03-15 柳文龙 A kind of capitalized method of the financial investment system based on big data technology

Also Published As

Publication number Publication date
CN107464185A (en) 2017-12-12

Similar Documents

Publication Publication Date Title
CN107464185B (en) Risk monitoring and control method, apparatus, storage medium and computer equipment
US9454855B2 (en) Monitoring and planning for failures of vehicular components
CN106100937A (en) System monitoring method and apparatus
KR20180108446A (en) System and method for management of ict infra
US20020194042A1 (en) Method of business analysis
US8918345B2 (en) Network analysis system
CN103189849B (en) Display processing system, display processing method and program
CN113806171A (en) Server health assessment method, system, equipment and medium
CN108873056A (en) Seismic prospecting scene real-time quality monitoring method, client, apparatus and system
US20160132798A1 (en) Service-level agreement analysis
US20150142506A1 (en) Account Health Assessment, Risk Identification, and Remediation
CN106254137A (en) The alarm root-cause analysis system and method for supervisory systems
CN106019087A (en) Intermittent electricity stealing monitoring system
Omidi et al. Estimating accident-related traumatic injury rate by future studies models in Semnan Province, Iran
JP2021508096A (en) Monitoring multiple system indicators
CN116777633A (en) Financial asset management system based on data management
TW200428250A (en) A project control system and method
CN115994814A (en) Novel media equipment lease management system based on data analysis
CN110347694A (en) A kind of apparatus monitoring method based on Internet of Things, apparatus and system
CN109003047A (en) Performance statistical method, device and server
JP7145242B2 (en) Diagnostic system and diagnostic method
CN111625437A (en) Monitoring method and device of wind control model
CN115858291A (en) System index detection method and device, electronic equipment and storage medium thereof
CN110222905A (en) A kind of method and device for predicting flow of the people
JP2010231376A (en) Equipment quality control method and equipment quality control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211220

Address after: 518000 31, 1 building, 1002 news tower, Shennan Middle Road, Futian District, Shenzhen, Guangdong.

Patentee after: Zeng Yuhui

Address before: 518000 Room 201, building a, No. 1, Qianwan 1st Road, Qianwan Shenzhen Hong Kong cooperation zone, Shenzhen, Guangdong

Patentee before: SHENZHEN QIANHAI FENGCHE TECHNOLOGY CO.,LTD.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180515

CF01 Termination of patent right due to non-payment of annual fee