[go: up one dir, main page]

CN107386118A - A kind of suspension apparatus and guider for the decentralization installation of large-scale steel jacket box - Google Patents

A kind of suspension apparatus and guider for the decentralization installation of large-scale steel jacket box Download PDF

Info

Publication number
CN107386118A
CN107386118A CN201710619556.2A CN201710619556A CN107386118A CN 107386118 A CN107386118 A CN 107386118A CN 201710619556 A CN201710619556 A CN 201710619556A CN 107386118 A CN107386118 A CN 107386118A
Authority
CN
China
Prior art keywords
steel
plate
pile foundation
arc
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710619556.2A
Other languages
Chinese (zh)
Inventor
何前途
陈孝诚
肖黎
陈俊
胡钧宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201710619556.2A priority Critical patent/CN107386118A/en
Publication of CN107386118A publication Critical patent/CN107386118A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/08Sinking workpieces into water or soil inasmuch as not provided for elsewhere
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/08Lowering or sinking caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Architecture (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及钢套箱下放安装施工领域,尤其涉及一种用于大型钢套箱下放安装的悬吊装置兼导向装置。它具有悬吊装置和导向装置,悬吊装置具有连续千斤顶,连续千斤顶上连接有悬吊钢绞线,连续千斤顶下方设有承重梁,导向装置包括设置在承重梁下方的桩基钢护筒,桩基钢护筒左侧设有同心贴壁弧形板,桩基刚护筒和同心贴臂弧形板之间形成同心间隔,同心贴壁弧形板左侧连接有贴靠在钢套箱内壁上的底板和顶板,底板下方连接有锚垫板,锚垫板上方具有设置在底板上的连接板,同心贴壁弧形板与钢套箱内壁之间还设有腹板。本发明的有益之处在于:结构简单,下料加工方便,原材利用率高,施工绿色环保;施工难度低,与钢套箱共同加工安装,提高施工效率。

The invention relates to the field of lowered installation and construction of steel casings, in particular to a suspension device and guiding device for the lowered installation of large steel casings. It has a suspension device and a guide device, the suspension device has a continuous jack, a suspension steel strand is connected to the continuous jack, and a load-bearing beam is arranged under the continuous jack, and the guide device includes a pile foundation steel casing arranged under the load-bearing beam. The left side of the steel casing of the pile foundation is provided with a concentric wall-attached arc-shaped plate, and a concentric interval is formed between the pile foundation steel casing and the concentrically-attached arm arc-shaped plate, and the left side of the concentric wall-attached arc-shaped plate is connected with a steel casing The bottom plate and the top plate on the inner wall are connected with an anchor backing plate under the bottom plate, a connecting plate arranged on the bottom plate above the anchor backing plate, and a web is also provided between the concentric wall-adhering arc plate and the inner wall of the steel box. The invention has the advantages of simple structure, convenient blanking and processing, high utilization rate of raw materials, green and environment-friendly construction, low construction difficulty, and joint processing and installation with the steel sleeve box to improve construction efficiency.

Description

一种用于大型钢套箱下放安装的悬吊装置兼导向装置A suspension device and guide device for the lowering installation of a large steel box

技术领域:Technical field:

本发明涉及钢套箱下放安装施工领域,尤其涉及一种用于大型钢套箱下放安装的悬吊装置兼导向装置。The invention relates to the field of lowered installation and construction of steel casings, in particular to a suspension device and guiding device for the lowered installation of large steel casings.

背景技术:Background technique:

随着高速公路、铁路、市政等桥梁工程在我国普遍修建,其中大型钢套箱定位及下放安装已成为跨海及跨江工程的关键技术控制点。为保证钢套箱准确定位及下放安装,需要在套箱各方位设置下放悬吊装置及导向装置。传统大型钢套箱下放主悬吊装置与导向装置均分别设置,因此钢材浪费较多,施工工作量大,施工便利性差,施工进度较慢。With the widespread construction of highways, railways, municipal bridges and other bridge projects in my country, the positioning and lowering of large steel casings have become key technical control points for cross-sea and cross-river projects. In order to ensure the accurate positioning and lowering installation of the steel casing, it is necessary to set lowering suspension devices and guiding devices in all directions of the casing. The main suspension device and guide device of the traditional large-scale steel casing are installed separately, so there is more waste of steel, the construction workload is large, the construction convenience is poor, and the construction progress is slow.

因此,有必要对悬吊装置及导向装置进行优化设置,以达到降低施工难度、提升施工安全、减少施工工作量、提高施工便利性、加快施工进度、节减材料使用、减少环境污染等目的。Therefore, it is necessary to optimize the settings of the suspension device and the guide device to achieve the goals of reducing construction difficulty, improving construction safety, reducing construction workload, improving construction convenience, speeding up construction progress, saving material use, and reducing environmental pollution.

发明内容:Invention content:

本发明所要解决的技术问题是,提供一种施工效率高,结构简单,材料利用率高的用于大型钢套箱下放安装的悬吊装置兼导向装置。The technical problem to be solved by the present invention is to provide a suspension device and guide device for the lowered installation of large steel casings with high construction efficiency, simple structure and high material utilization rate.

为了解决上述技术问题,本发明是通过以下技术方案实现的:一种用于大型钢套箱下放安装的悬吊装置兼导向装置,具有悬吊装置和导向装置,所述悬吊装置具有连续千斤顶,所述连续千斤顶上连接有悬吊钢绞线,所述连续千斤顶下方设有承重梁,所述导向装置包括设置在承重梁下方的桩基钢护筒,所述桩基钢护筒左侧设有同心贴壁弧形板,所述桩基刚护筒和同心贴臂弧形板之间形成同心间隔,所述同心贴壁弧形板左侧连接有底板和顶板,所述底板和顶板左侧贴靠在钢套箱内壁上,所述底板下方连接有锚垫板,所述锚垫板上方具有设置在底板上的连接板,所述同心贴壁弧形板与钢套箱内壁之间还设有腹板。In order to solve the above-mentioned technical problems, the present invention is achieved through the following technical proposals: a suspension device and guide device for the installation of a large steel casing, which has a suspension device and a guide device, and the suspension device has a continuous jack , the continuous jack is connected with a suspension steel strand, a load-bearing beam is arranged under the continuous jack, and the guide device includes a pile foundation steel casing arranged under the load-bearing beam, and the left side of the pile foundation steel casing is A concentric wall-attached arc-shaped plate is provided, and a concentric interval is formed between the pile foundation rigid casing and the concentric wall-attached arc-shaped plate. The left side of the concentric wall-attached arc-shaped plate is connected with a bottom plate and a top plate, and the bottom plate and the top plate The left side leans against the inner wall of the steel sleeve box. An anchor backing plate is connected under the bottom plate, and a connecting plate is arranged on the bottom plate above the anchor backing plate. There are also webs.

作为优选,所述桩基钢护筒上设有用于实现与承重梁固定的承重牛腿和反压牛腿,通过承重牛腿和反压牛腿的设置可以有效加强承重梁对钢套箱的支撑,进而提高钢套箱下放的安全性。As a preference, the steel casing of the pile foundation is provided with load-bearing corbels and counter-pressure corbels for fixing to the load-bearing beam, and the arrangement of the load-bearing corbels and counter-pressure corbels can effectively strengthen the load-bearing beam to the steel casing. support, thereby improving the safety of the lowering of the steel box.

作为优选,所述承重牛腿焊接在桩基钢护筒左侧,反压牛腿焊接在桩基钢护筒右侧。Preferably, the load-bearing corbel is welded on the left side of the steel casing of the pile foundation, and the counter-pressure corbel is welded on the right side of the steel casing of the pile foundation.

作为优选,所述承重梁对称设置在桩基钢护筒的前后两端,数量为2根,对称设置可以提高整体结构的稳定性,进而提高钢套箱下方的施工效率。Preferably, the load-bearing beams are symmetrically arranged at the front and rear ends of the steel casing of the pile foundation, and the number is two. The symmetrical arrangement can improve the stability of the overall structure, thereby improving the construction efficiency under the steel casing.

相对于现有技术,本发明的有益之处在于:结构简单,下料加工方便,原材利用率高,施工绿色环保;施工难度低,与钢套箱共同加工安装,提高施工效率;加工厂安装,减少桥址现场施工,降低安全风险;减少钢套箱损伤,提高整体施工质量;减少下放用悬吊装置及导向装置设置数量,节减工程量,节约成本。Compared with the prior art, the present invention has the advantages of simple structure, convenient blanking and processing, high utilization rate of raw materials, and green construction; low construction difficulty, and can be processed and installed together with steel casings to improve construction efficiency; Installation, reduce on-site construction at the bridge site, reduce safety risks; reduce damage to steel casings, improve overall construction quality; reduce the number of suspension devices and guide devices for lowering, reduce engineering quantities, and save costs.

附图说明:Description of drawings:

下面结合附图对本发明进一步说明。The present invention will be further described below in conjunction with the accompanying drawings.

图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;

图2为本发明俯视结构示意图;Fig. 2 is a schematic view of the top view structure of the present invention;

图3是承重梁安装结构示意图。Figure 3 is a schematic diagram of the installation structure of the load-bearing beam.

图中:1、锚垫板;2、底板;3、腹板;4、连接板;5、同心贴壁弧形板;6、顶板;7、钢套箱内壁;8、桩基钢护筒;9、反压牛腿;10、承重牛腿;11、承重梁;12、连续千斤顶;13、悬吊钢绞线。In the figure: 1. Anchor backing plate; 2. Bottom plate; 3. Web plate; 4. Connecting plate; 5. Concentric arc-shaped plate attached to the wall; 6. Top plate; ; 9, anti-pressure corbel; 10, load-bearing corbel; 11, load-bearing beam; 12, continuous jack; 13, suspension steel strand.

具体实施方式:detailed description:

下面结合附图及具体实施方式对本发明进行详细描述:The present invention is described in detail below in conjunction with accompanying drawing and specific embodiment:

如图1、图2和图3所示的一种用于大型钢套箱下放安装的悬吊装置兼导向装置,具有悬吊装置和导向装置,所述悬吊装置具有连续千斤顶12,所述连续千斤顶12上连接有悬吊钢绞线11,所述连续千斤顶12下方设有承重梁11,所述导向装置包括设置在承重梁11下方的桩基钢护筒8,所述桩基钢护筒8左侧设有同心贴壁弧形板5,所述桩基刚护筒8和同心贴臂弧形板5之间形成同心间隔14,所述同心贴壁弧形板5左侧连接有底板2和顶板6,所述底板5和顶板6左侧贴靠在钢套箱内壁7上,所述底板2下方连接有锚垫板1,所述锚垫板1上方具有设置在底板2内侧的连接板4,所述同心贴壁弧形板5与钢套箱内壁7之间还设有腹板3。As shown in Fig. 1, Fig. 2 and Fig. 3, a kind of suspension device and guide device used for the installation of large-scale steel box under the ground has a suspension device and a guide device, and the suspension device has a continuous jack 12. A suspension steel strand 11 is connected to the continuous jack 12, a load-bearing beam 11 is arranged under the continuous jack 12, and the guide device includes a pile foundation steel casing 8 arranged under the load-bearing beam 11, and the pile foundation steel casing 8 is arranged below the load-bearing beam 11. The left side of the tube 8 is provided with a concentric wall-attached arc-shaped plate 5, and a concentric interval 14 is formed between the pile foundation rigid casing 8 and the concentric arm-attached arc-shaped plate 5, and the left side of the concentric wall-attached arc-shaped plate 5 is connected with The bottom plate 2 and the top plate 6, the left side of the bottom plate 5 and the top plate 6 are attached to the inner wall 7 of the steel box, the anchor pad 1 is connected under the bottom plate 2, and the anchor pad 1 is arranged on the inner side of the bottom plate 2. The connecting plate 4 is provided, and a web 3 is also provided between the concentric arc-shaped plate 5 and the inner wall 7 of the steel box.

作为优选,所述桩基钢护筒8上设有用于实现与承重梁11固定的承重牛腿10和反压牛腿9,通过承重牛腿10和反压牛腿9的设置可以有效加强承重梁11对钢套箱的支撑,进而提高钢套箱下放的安全性。As a preference, the pile foundation steel casing 8 is provided with a load-bearing corbel 10 and a counter-pressure corbel 9 for fixing to the load-bearing beam 11, and the load-bearing can be effectively strengthened by setting the load-bearing corbel 10 and the counter-pressure corbel 9 The beam 11 supports the steel box, thereby improving the safety of the lowering of the steel box.

作为优选,所述承重牛腿10焊接在桩基钢护筒8左侧,反压牛腿9焊接在桩基钢护筒8右侧。Preferably, the load-bearing corbel 10 is welded on the left side of the pile foundation steel casing 8 , and the counter pressure corbel 9 is welded on the right side of the pile foundation steel casing 8 .

作为优选,所述承重梁11对称设置在桩基钢护筒8的前后两端,数量为2根,对称设置的桩基钢护筒8可以提高整体结构的稳定性,进而提高钢套箱下方的施工效率。As a preference, the load-bearing beams 11 are symmetrically arranged at the front and rear ends of the pile foundation steel casing 8, and the number is two. The symmetrically arranged pile foundation steel casing 8 can improve the stability of the overall structure, thereby improving the construction efficiency.

用于大型钢套箱下放安装的悬吊装置兼导向装置的大型钢套箱定位及下放安装过程是,先在桩基钢护,8上设置悬臂承重梁11,并在承重梁11上安装下放用连续千斤顶12,然后将下锚点锚盘固定在的锚垫板1下方,将挤压好的悬吊钢绞线11依次穿过下锚点锚盘、悬臂承重梁11、下放用连续千斤顶12。调整钢套箱各处下放用连续千斤顶12,通过本发明将钢套箱自重传递至下放用连续千斤顶12、悬臂承重梁11及桩基钢护筒8,同时利用本发明中的同心间隔14进行下放安装过程的定位及导向,直至完成钢套箱下放施工完成。Suspension device and guiding device for large-scale steel box-down installation. The positioning and lower-down installation process of large-scale steel box is as follows. Use the continuous jack 12, then fix the lower anchor point anchor plate under the anchor plate 1, pass the extruded suspension steel strand 11 through the lower anchor point anchor plate, the cantilever load-bearing beam 11, and the continuous jack for lowering. 12. Adjust the continuous jack 12 for lowering the steel casing everywhere, and transfer the self-weight of the steel casing to the continuous jack 12 for lowering, the cantilever load-bearing beam 11 and the pile foundation steel casing 8 through the present invention, and use the concentric interval 14 in the present invention to carry out The positioning and guidance of the lowering installation process will be completed until the lowering of the steel box is completed.

需要强调的是:以上仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。It should be emphasized that: the above are only preferred embodiments of the present invention, and are not intended to limit the present invention in any form. Any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention are valid. Still belong to the scope of the technical solution of the present invention.

Claims (4)

1. a kind of suspension apparatus and guider for the decentralization installation of large-scale steel jacket box, there is suspension apparatus and guider, It is characterized in that:The suspension apparatus has continuous jack(12), the continuous jack(12)On be connected with suspention steel twist Line(13), the continuous jack(12)Lower section is provided with spandrel girder(11), the guider is including being arranged on spandrel girder(11) The pile foundation steel pile casting of lower section(8), the pile foundation steel pile casting(8)Left side is provided with concentric adherent arc(5), the firm casing of pile foundation (8)With concentric patch arm arc(5)Between form concentric spacing(14), the adherent arc with one heart(5)Left side is connected with bottom Plate(2)And top plate(6), the bottom plate(2)And top plate(6)Left side abuts in steel bushing chamber interior wall(7)On, the bottom plate(2)Lower section It is connected with anchor plate(1), the anchor plate(1)Top, which has, is arranged on bottom plate(2)The connecting plate of inner side(4), the patch with one heart Wall arc(5)With steel bushing chamber interior wall(7)Between be additionally provided with web(3).
2. the suspension apparatus and guider according to claim 1 for the decentralization installation of large-scale steel jacket box, its feature exists In:The pile foundation steel pile casting(8)It is provided with for realization and spandrel girder(11)Fixed load-bearing bracket(10)With back-pressure bracket (9).
3. the suspension apparatus and guider according to claim 2 for the decentralization installation of large-scale steel jacket box, its feature exists In:The load-bearing bracket(10)It is welded on pile foundation steel pile casting(8)Left side, back-pressure bracket(9)It is welded on pile foundation steel pile casting(8)It is right Side.
4. the suspension apparatus and guider according to claim 1 for the decentralization installation of large-scale steel jacket box, its feature exists In:The spandrel girder(11)It is symmetricly set on pile foundation steel pile casting(8)Rear and front end, quantity be 2.
CN201710619556.2A 2017-07-26 2017-07-26 A kind of suspension apparatus and guider for the decentralization installation of large-scale steel jacket box Withdrawn CN107386118A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710619556.2A CN107386118A (en) 2017-07-26 2017-07-26 A kind of suspension apparatus and guider for the decentralization installation of large-scale steel jacket box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710619556.2A CN107386118A (en) 2017-07-26 2017-07-26 A kind of suspension apparatus and guider for the decentralization installation of large-scale steel jacket box

Publications (1)

Publication Number Publication Date
CN107386118A true CN107386118A (en) 2017-11-24

Family

ID=60341058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710619556.2A Withdrawn CN107386118A (en) 2017-07-26 2017-07-26 A kind of suspension apparatus and guider for the decentralization installation of large-scale steel jacket box

Country Status (1)

Country Link
CN (1) CN107386118A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108396754A (en) * 2018-04-08 2018-08-14 中交路桥建设有限公司 A kind of floating construction method for spelling steel cofferdam and its lower water of suspention
CN111636459A (en) * 2020-06-02 2020-09-08 中国建筑工程(香港)有限公司 Immersed tube sinking device with adjustable clamping distance
CN111636457A (en) * 2020-06-02 2020-09-08 中国建筑工程(香港)有限公司 Immersed tube sinking device with adjustable distance
CN111636458A (en) * 2020-06-02 2020-09-08 中国建筑工程(香港)有限公司 Immersed tube sinking device
CN111636460A (en) * 2020-06-02 2020-09-08 中国建筑工程(香港)有限公司 Recyclable immersed tube sinking device
CN111636456A (en) * 2020-06-02 2020-09-08 中国建筑工程(香港)有限公司 Immersed tube sinking device that can resist water buoyancy

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101182718A (en) * 2007-12-05 2008-05-21 中铁大桥局股份有限公司 Under water putting down construction method of large-sized double-walled steel suspension box-cofferdam
JP2008255683A (en) * 2007-04-05 2008-10-23 Tobishima Corp Caisson and caisson press-in method
CN201241333Y (en) * 2008-08-05 2009-05-20 中铁大桥局集团第五工程有限公司 Large-scale steel suspension box cofferdam elevating device with load
CN103821157A (en) * 2014-02-27 2014-05-28 山东省路桥集团有限公司 Wallboard lattice type steel cover box and method for constructing underwater bearing platform steel cover box
CN204491640U (en) * 2015-03-17 2015-07-22 中交二公局第二工程有限公司 A kind of circular single-arm steel hanging box being applicable to strong tidal bore district
CN207032054U (en) * 2017-07-26 2018-02-23 中交一公局第二工程有限公司 Suspension apparatus and guider for the decentralization installation of large-scale steel jacket box

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008255683A (en) * 2007-04-05 2008-10-23 Tobishima Corp Caisson and caisson press-in method
CN101182718A (en) * 2007-12-05 2008-05-21 中铁大桥局股份有限公司 Under water putting down construction method of large-sized double-walled steel suspension box-cofferdam
CN201241333Y (en) * 2008-08-05 2009-05-20 中铁大桥局集团第五工程有限公司 Large-scale steel suspension box cofferdam elevating device with load
CN103821157A (en) * 2014-02-27 2014-05-28 山东省路桥集团有限公司 Wallboard lattice type steel cover box and method for constructing underwater bearing platform steel cover box
CN204491640U (en) * 2015-03-17 2015-07-22 中交二公局第二工程有限公司 A kind of circular single-arm steel hanging box being applicable to strong tidal bore district
CN207032054U (en) * 2017-07-26 2018-02-23 中交一公局第二工程有限公司 Suspension apparatus and guider for the decentralization installation of large-scale steel jacket box

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108396754A (en) * 2018-04-08 2018-08-14 中交路桥建设有限公司 A kind of floating construction method for spelling steel cofferdam and its lower water of suspention
CN111636459A (en) * 2020-06-02 2020-09-08 中国建筑工程(香港)有限公司 Immersed tube sinking device with adjustable clamping distance
CN111636457A (en) * 2020-06-02 2020-09-08 中国建筑工程(香港)有限公司 Immersed tube sinking device with adjustable distance
CN111636458A (en) * 2020-06-02 2020-09-08 中国建筑工程(香港)有限公司 Immersed tube sinking device
CN111636460A (en) * 2020-06-02 2020-09-08 中国建筑工程(香港)有限公司 Recyclable immersed tube sinking device
CN111636456A (en) * 2020-06-02 2020-09-08 中国建筑工程(香港)有限公司 Immersed tube sinking device that can resist water buoyancy
CN111636457B (en) * 2020-06-02 2021-07-20 中国建筑工程(香港)有限公司 Immersed tube sinking device with adjustable distance
CN111636458B (en) * 2020-06-02 2021-08-17 中国建筑工程(香港)有限公司 Immersed tube sinking device
CN111636456B (en) * 2020-06-02 2021-08-17 中国建筑工程(香港)有限公司 Sinking pipe sinking device capable of resisting water flow buoyancy
CN111636460B (en) * 2020-06-02 2021-08-17 中国建筑工程(香港)有限公司 Recyclable immersed tube sinking device

Similar Documents

Publication Publication Date Title
CN107386118A (en) A kind of suspension apparatus and guider for the decentralization installation of large-scale steel jacket box
CN201686972U (en) Variable arc steel formwork for dam corridor top arch
CN207032054U (en) Suspension apparatus and guider for the decentralization installation of large-scale steel jacket box
CN209585630U (en) Building construction formwork adjustable support frame
CN206158763U (en) Install convenient tunnel invert end template
CN206128634U (en) Air conditioner shelf and window one -piece casting template support structure that wafts
CN113445739A (en) Adjustable unilateral template supporting device
CN207863185U (en) A kind of Novel steel pipe concrete pole splicing apparatus of band edge sleeve-board cylinder
CN206902768U (en) A kind of post-cast strip adjustable supporting
CN201535071U (en) Retractor for quickly adjusting verticality of steel column
CN114717956A (en) Bridge pier column diaphragm construction umbrella-type support system
CN104652837B (en) A kind of method and structure for increasing steel pipe frame newly on former concrete pipe support
CN207862974U (en) The quick support shuttering system of city integrated piping lane construction
CN207227959U (en) Overall peace is torn open connects high construction platform built in formula radial pattern colyliform steel pile casting
CN206266083U (en) Prefabricated reinforced concrete septic tank dedicated lifting hook
CN206625561U (en) A kind of novel building engineering forming module support meanss
CN207633330U (en) Filling pile cage of reinforcement absolute altitude and verticality control device under a kind of concrete water
CN205224579U (en) Steel framework template and self -supporting truss board combination concrete quick detach system
CN205636752U (en) Shoring of trench prestressing force axle power ware mounting structure
CN216194067U (en) Novel wet seam of bridge hangs mould and supports device
CN219528473U (en) Assembled wall body reinforcing bar is to hole device
CN108590165A (en) A kind of construction method of deep basal pit concrete of basement exterior wall
CN211541661U (en) Concrete internal mold supporting device
CN216305370U (en) Basement outer wall single-side formwork system under limited space
CN205617249U (en) Increase arched bridge supporting tool of arched bridge construction stability

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20171124