[go: up one dir, main page]

CN107339773A - Control method, controller, air conditioner and computer-readable recording medium - Google Patents

Control method, controller, air conditioner and computer-readable recording medium Download PDF

Info

Publication number
CN107339773A
CN107339773A CN201710444676.3A CN201710444676A CN107339773A CN 107339773 A CN107339773 A CN 107339773A CN 201710444676 A CN201710444676 A CN 201710444676A CN 107339773 A CN107339773 A CN 107339773A
Authority
CN
China
Prior art keywords
gear
current
complete machine
air conditioner
ion wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710444676.3A
Other languages
Chinese (zh)
Other versions
CN107339773B (en
Inventor
唐亚林
谭周衡
黎辉玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Midea Group Co Ltd
GD Midea Air Conditioning Equipment Co Ltd
Original Assignee
Midea Group Co Ltd
Guangdong Midea Refrigeration Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Midea Group Co Ltd, Guangdong Midea Refrigeration Equipment Co Ltd filed Critical Midea Group Co Ltd
Priority to CN201710444676.3A priority Critical patent/CN107339773B/en
Publication of CN107339773A publication Critical patent/CN107339773A/en
Application granted granted Critical
Publication of CN107339773B publication Critical patent/CN107339773B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The invention discloses a kind of control method, controller, air conditioner and computer-readable recording medium.Air conditioner includes ion wind generator, the multiple gears of the operating voltage of ion wind generator including with maximum gear and minimum gear, and the variation tendency of gear is consistent with the variation tendency of the operating voltage.The operating current of air conditioner includes complete machine electric current.Control method includes:Obtain the current gear of the complete machine electric current at current time and the present operating voltage of ion wind generator;Compare whether current gear is maximum gear or minimum gear;It is less than the complete machine electric current of last moment in the complete machine electric current at current time, and when current gear be minimum gear, adjusts ion wind generator and run with the operating voltage less than one gear of current gear;It is more than or equal to the complete machine electric current of last moment in the complete machine electric current at current time, and when current gear be maximum gear, adjusts ion wind generator and run with the operating voltage more than one gear of current gear.

Description

Control method, controller, air conditioner and computer-readable recording medium
Technical field
The present invention relates to household electrical appliance technical field, more particularly to a kind of control method, controller, air conditioner and computer Readable storage medium storing program for executing.
Background technology
Existing air conditioner can not Intelligent adjustment ion wind generator voltage series, the power consumption of air conditioner is larger.
The content of the invention
It is contemplated that at least solves one of technical problem present in prior art.Therefore, the present invention provides a kind of control Method, controller, air conditioner and computer-readable recording medium processed.
The control method of embodiment of the present invention is used for air conditioner.The air conditioner includes ion wind generator, it is described from Multiple gears of the operating voltage of sub- air generator including with maximum gear and minimum gear, the change of the gear become Gesture is consistent with the variation tendency of the operating voltage, and the operating current of the air conditioner includes complete machine electric current;The control method Including:
Obtain the current gear of the complete machine electric current at current time and the present operating voltage of the ion wind generator;
Compare whether the current gear is the maximum gear or the minimum gear;
It is less than the complete machine electric current of last moment in the complete machine electric current at the current time, and the current gear is not described During minimum gear, adjust the ion wind generator and run with operating voltage less than one gear of current gear;With
It is more than or equal to the complete machine electric current of last moment in the complete machine electric current at current time, and the current gear is not institute When stating maximum gear, adjust the ion wind generator and run with operating voltage more than one gear of current gear.
In some embodiments, before the predetermined instant of the air conditioner after power-up, the ion wind generator with The operating voltage of maximum gear is run, and the control method also includes:
It is more than or equal to the complete machine electric current of last moment in the complete machine electric current at current time, and the current gear is equal to institute When stating maximum gear, adjust the ion wind generator and maintain to run with the operating voltage of the current gear.
In some embodiments, before the predetermined instant of the air conditioner after power-up, the ion wind generator with The operating voltage of maximum gear is run, and the control method also includes:
When the air conditioner reaches the predetermined instant in start, the ion wind generator is adjusted to work as less than described The operating voltage of preceding one gear of gear is run.
In some embodiments, the control method also includes:
It is less than the complete machine electric current of last moment in the complete machine electric current at the current time, and the current gear is minimum shelves During position, adjust the ion wind generator and maintain to run with the operating voltage of current gear.
In some embodiments, the span of the time difference at the current time and last moment is [5,10] point Clock.
In some embodiments, the span at the start moment and the time difference of the predetermined instant of the air conditioner For [25,35] minute.
The controller of embodiment of the present invention is used for air conditioner.The air conditioner includes ion wind generator, the ion Multiple gears of the operating voltage of air generator including with maximum gear and minimum gear, the variation tendency of the gear Consistent with the variation tendency of the operating voltage, the operating current of the air conditioner includes complete machine electric current;The controller includes Acquisition device, comparison means and adjusting apparatus.The acquisition device is used to obtain the complete machine electric current at current time and the ion The current gear of the present operating voltage of air generator;The comparison means be used for the current gear whether be it is described most Big gear or the minimum gear;The complete machine electric current that the adjusting apparatus is used at the current time is less than the whole of last moment Electromechanics stream, and when the current gear is not the minimum gear, the ion wind generator is adjusted with less than the current shelves The operating voltage of one gear in position is run;The complete machine electric current that the adjusting apparatus was additionally operable at current time is more than or equal to upper The complete machine electric current at one moment, the and when current gear is not the maximum gear, adjust the ion wind generator with more than The operating voltage of one gear of current gear is run.
In some embodiments, before the predetermined instant of the air conditioner after power-up, the ion wind generator with The operating voltage of maximum gear is run, and the adjusting apparatus is additionally operable to:
It is more than or equal to the complete machine electric current of last moment in the complete machine electric current at current time, and the current gear is equal to institute When stating maximum gear, adjust the ion wind generator and maintain to run with the operating voltage of the current gear.
In some embodiments, before the predetermined instant of the air conditioner after power-up, the ion wind generator with The operating voltage of maximum gear is run, and the adjusting apparatus is additionally operable to:
When the air conditioner reaches the predetermined instant in start, the ion wind generator is adjusted to work as less than described The operating voltage of preceding one gear of gear is run.
In some embodiments, the adjusting apparatus is additionally operable to:
It is less than the complete machine electric current of last moment in the complete machine electric current at the current time, and the current gear is minimum shelves During position, adjust the ion wind generator and maintain to run with the operating voltage of current gear.
In some embodiments, the span of the time difference at the current time and last moment is [5,10] point Clock.
In some embodiments, the span at the start moment and the time difference of the predetermined instant of the air conditioner For [25,35] minute.
The air conditioner of embodiment of the present invention includes:Ion wind generator;Described in above-mentioned any one embodiment Controller.
The air conditioner of embodiment of the present invention includes ion wind generator, and the operating voltage of the ion wind generator includes With multiple gears including maximum gear and minimum gear, the change of the variation tendency of the gear and the operating voltage becomes Gesture is consistent, and the operating current of the air conditioner includes complete machine electric current;The air conditioner also include ion wind generator, one or more Individual processor storage and one or more memories, wherein one or more of programs are stored in the memory, And it is configured to by one or more of computing devices, described program includes being used for the instruction for performing following steps:
Obtain the current gear of the complete machine electric current at current time and the present operating voltage of the ion wind generator;
Compare whether the current gear is the maximum gear or the minimum gear;
It is less than the complete machine electric current of last moment in the complete machine electric current at the current time, and the current gear is not described During minimum gear, adjust the ion wind generator and run with operating voltage less than one gear of current gear;With
It is more than or equal to the complete machine electric current of last moment in the complete machine electric current at current time, and the current gear is not institute When stating maximum gear, adjust the ion wind generator and run with operating voltage more than one gear of current gear.
In some embodiments, before the predetermined instant of the air conditioner after power-up, the ion wind generator with The operating voltage of maximum gear is run, and described program also includes being used for the instruction for performing following steps:
It is more than or equal to the complete machine electric current of last moment in the complete machine electric current at current time, and the current gear is equal to institute When stating maximum gear, adjust the ion wind generator and maintain to run with the operating voltage of the current gear.
In some embodiments, before the predetermined instant of the air conditioner after power-up, the ion wind generator with The operating voltage of maximum gear is run, and described program also includes being used for the instruction for performing following steps:
When the air conditioner reaches the predetermined instant in start, the ion wind generator is adjusted to work as less than described The operating voltage of preceding one gear of gear is run.
In some embodiments, described program also includes being used for the instruction for performing following steps:
It is less than the complete machine electric current of last moment in the complete machine electric current at the current time, and the current gear is minimum shelves During position, adjust the ion wind generator and maintain to run with the operating voltage of current gear.
In some embodiments, the span of the time difference at the current time and last moment is [5,10] point Clock.
In some embodiments, the span at the start moment and the time difference of the predetermined instant of the air conditioner For [25,35] minute.
The computer-readable recording medium of embodiment of the present invention includes making with that can adjust the electronic installation of temperature and be combined Computer program, the computer program can be executed by processor to complete the control described in above-mentioned any one embodiment Method processed.
Control method, controller, air conditioner and the computer-readable recording medium of embodiment of the present invention pass through complete machine electricity Stream controls the voltage of ion wind generator to limit, so as to reduce the power consumption of air conditioner.
The additional aspect and advantage of the present invention will be set forth in part in the description, and will partly become from the following description Obtain substantially, or recognized by the practice of the present invention.
Brief description of the drawings
Of the invention above-mentioned and/or additional aspect and advantage will become from the following description of the accompanying drawings of embodiments Substantially and it is readily appreciated that, wherein:
Fig. 1 is the schematic flow sheet of the control method of some embodiments of the present invention.
Fig. 2 is the module diagram of the air conditioner of some embodiments of the present invention.
Fig. 3 is the module diagram of the air conditioner of some embodiments of the present invention.
Fig. 4 is the schematic flow sheet of the control method of some embodiments of the present invention.
Fig. 5 is the schematic flow sheet of the control method of some embodiments of the present invention.
Fig. 6 is the schematic flow sheet of the control method of some embodiments of the present invention.
Fig. 7 is the schematic flow sheet of the control method of some embodiments of the present invention.
Fig. 8 is the dimensional structure diagram of the air conditioner of some embodiments of the present invention.
Fig. 9 is the diagrammatic cross-section of VIII-VIII along air conditioner in Fig. 8.
Figure 10 is the floor map after the outlet section expansion of some embodiments of the present invention.
Figure 11 is another floor map after the outlet section expansion of some embodiments of the present invention.
Figure 12 is another floor map after the outlet section expansion of some embodiments of the present invention.
Figure 13 is another floor map after the outlet section expansion of some embodiments of the present invention.
Embodiment
Embodiments of the invention are described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached The embodiment of figure description is exemplary, it is intended to for explaining the present invention, and is not considered as limiting the invention.
Also referring to Fig. 1 and Fig. 2, the control method of embodiment of the present invention is used for air conditioner 100.Air conditioner 100 wraps Include ion wind generator 20.Multiple shelves of the voltage of ion wind generator 20 including with maximum gear and minimum gear Position, the variation tendency of gear are consistent with the variation tendency of operating voltage.The operating current of air conditioner 100 includes complete machine electric current.Control Method processed includes:
S11:Obtain the current gear of the complete machine electric current at current time and the present operating voltage of ion wind generator 20;
S13:Compare whether current gear is maximum gear or minimum gear;
S15:It is less than the complete machine electric current of last moment in the complete machine electric current at current time, and current gear is not minimum gear When, adjustment ion wind generator 20 is run with operating voltage less than one gear of current gear;With
S17:It is more than or equal to the complete machine electric current of last moment in the complete machine electric current at current time, and current gear is not for most During big gear, adjustment ion wind generator 20 is run with operating voltage more than one gear of current gear.
Referring again to Fig. 2, the control method of embodiment of the present invention can be real by the controller 91 of embodiment of the present invention It is existing.The controller 91 of embodiment of the present invention includes acquisition device 911, comparison means 912 and adjusting apparatus 913.Step S11 can To be realized by acquisition device 911, step S13 can be realized by comparison means 912, and step S15 and step S17 can be filled by adjustment Put 913 realizations.
In other words, acquisition device 911 be used for obtain current time complete machine electric current and ion wind generator 20 it is current The current gear of operating voltage;Comparison means 912 is used to compare whether current gear is maximum gear or minimum gear;Adjustment dress The complete machine electric currents that the 913 complete machine electric currents being used at current time are less than last moment are put, and when current gear is not minimum gear, Adjustment ion wind generator 20 is run with operating voltage less than one gear of current gear;Adjustment was additionally operable at current time Complete machine electric current be more than or equal to the complete machine electric current of last moment, and when current gear be maximum gear, adjustment ion wind is sent out Raw device 20 is run with the operating voltage more than one gear of current gear.
The controller 91 of embodiment of the present invention can apply to the air conditioner 100 of embodiment of the present invention.In other words, The air conditioner 100 of embodiment of the present invention includes the controller 91 of embodiment of the present invention.The air conditioner of embodiment of the present invention 100 also include ion wind generator 20.
Referring to Fig. 3, the air conditioner 100 of embodiment of the present invention includes ion wind generator 20.One or more processing Device 92, memory 93 and one or more programs 931.Wherein one or more programs 931 are stored in memory 93, and It is configured to be performed by one or more processors 92.Program 931 includes being used for the instruction for performing following steps:
S11:Obtain the current gear of the complete machine electric current at current time and the present operating voltage of ion wind generator 20;
S13:Compare whether current gear is maximum gear or minimum gear;
S15:It is less than the complete machine electric current of last moment in the complete machine electric current at current time, and current gear is not minimum gear When, adjustment ion wind generator 20 is run with operating voltage less than one gear of current gear;With
S17:It is more than or equal to the complete machine electric current of last moment in the complete machine electric current at current time, and current gear is not for most During big gear, adjustment ion wind generator 20 is run with operating voltage more than one gear of current gear.
The air conditioner 100 of line of connecting with the mains starts and during normal work, the live wire of the power line often room with air conditioner 100 Transformer in interior machine is connected.With the change for the load being connected with transformer, the current value on transformer also can corresponding real estate Changing.Complete machine electric current in embodiment of the present invention refers to the current value of the complete machine of air conditioner 100 under operation, It that is to say the current value on the transformer detected.The size of complete machine electric current changes with the change of the load of air conditioner 100.When When the load of air conditioner 100 becomes big, complete machine electric current will also become greatly to meet the operation demand of air conditioner 100 therewith, work as air conditioner 100 load becomes hour, and complete machine electric current also will be with diminishing.In some embodiments, electric current inspection is provided with air conditioner 100 Slowdown monitoring circuit, current detection circuit are connected with transformer.After the complete machine electric current of current detection circuit detection air conditioner, filled by obtaining 911 are put to be read out.The control method of embodiment of the present invention is carried out by the value of the complete machine electric current of the air conditioner 100 detected The restriction of the operating voltage of ion wind generator 20, increase the operating voltage of ion wind generator 20 when complete machine electric current becomes big, Become the voltage of hour reduction ion wind generator 20 in complete machine electric current, so as to intelligently adjust the work electricity of ion wind generator 20 Press to reach the effect for the power consumption for reducing air conditioner 100.
In some embodiments, the span of the time difference of current time and last moment are [5,10] minute. I other words the value of the time difference of current time and last moment can be 5 minutes, 6 minutes, 7.5 minutes, 9 minutes, 10 minutes etc. Value.
It is appreciated that the change of the complete machine electric current of air conditioner 100 determines that it changed by the payload of air conditioner 100 Journey is incremental.In other words, in the complete machine electric current of two time differences less air-conditionings detected down at different moments Change is smaller.Therefore, the time difference takes the value in [5,10] minute more suitable, the change of the complete machine electric current now detected compared with Greatly, limitation is then carried out to the operating voltage of ion wind generator 20 by complete machine electric current just has substantive significance.And if The value of time difference is too big, such as larger than 10 minutes, then the operating voltage of ion wind generator 20 can not be adjusted timely, then The effect for the power consumption for reducing air conditioner 100 can not be played.
Referring to Fig. 4, in some embodiments, before the predetermined instant of air conditioner 100 after power-up, ion wind occurs Device 20 is run with the operating voltage of maximum gear, and the control method of embodiment of the present invention also includes:
S14:It is more than or equal to the complete machine electric current of last moment in the complete machine electric current at current time, and current gear is equal to most During big gear, adjustment ion wind generator 20 maintains to run with the operating voltage of current gear.
Referring again to Fig. 2, in some embodiments, step S14 can be realized by adjusting apparatus 913.In other words, adjust The complete machine electric current that engagement positions 913 can be additionally used at current time is more than or equal to the complete machine electric current of last moment, and current gear During equal to maximum gear, adjustment ion wind generator 20 maintains to run with the operating voltage of current gear.
Referring again to Fig. 3, in some embodiments, program 931 also includes being used for the instruction for performing following steps:
S14:It is more than or equal to the complete machine electric current of last moment in the complete machine electric current at current time, and current gear is equal to most During big gear, adjustment ion wind generator 20 maintains to run with the operating voltage of current gear.
In a period of time of air conditioner 100 after power-up, ion wind generator 20 is generally with the work electricity of maximum gear Press to run, so as to accelerate the change of environment temperature so that environment temperature rises or falls to reach design temperature instruction as early as possible Temperature value.If the current gear of the operating voltage of the ion wind generator 20 detected at current time is in maximum gear, and The complete machine electric current at current time is more than the complete machine electric current of last moment, then ion wind generator 20 is still maximum with current gear The operating voltage of gear is run.It is appreciated that the complete machine electric current that the complete machine electric current under current time measures more than last moment, Illustrate the load increase of air conditioner 100, need in the unit interval heat that exchanges more.And now ion wind generator 20 work as Preceding gear has been maximum gear.Therefore, ion wind generator 20 still with the operating voltage of maximum gear come run with meet The operation demand of air conditioner 100.
In some embodiments, the span of the start moment of air conditioner 100 and the time difference of predetermined instant are [25,35] minute.In other words, air conditioner 100 start the moment and predetermined instant time difference value can be 25 minutes, 28.5 minutes, 29 minutes, 33 minutes, 35 minutes equivalences.
It can quickly be freezed in a period of time of air conditioner 100 after powering or heat processing so that environment temperature is use up Reach the temperature value of design temperature instruction soon.And after the temperature value that environment temperature reaches design temperature instruction, air conditioner 100 is held Reforwarding row so that environment temperature position near the temperature value, now environment temperature tends to be steady.Environment temperature is set to reach pre- The span for the time that the temperature value of design temperature instruction needs is [25,35] minute, when that is to say the start of air conditioner 100 It is [25,35] minute to carve with the span of the time difference of predetermined instant.In this way, carry out complete machine electric current again after predetermined instant Detection, and the operating voltage of the change adjustment ion wind generator 20 according to complete machine electric current, to reduce the power consumption of air conditioner 100.
Referring to Fig. 5, in some embodiments, before the predetermined instant of air conditioner 100 after power-up, ion wind occurs Device 20 is run with the operating voltage of maximum gear, and the control method of embodiment of the present invention also includes:
S12:When air conditioner 100 reaches predetermined instant in start, adjustment ion wind generator 20 is with less than current gear The operating voltage of one gear is run.
Referring again to Fig. 2, in some embodiments, step S12 can be realized by adjusting apparatus 913.In other words, adjust Engagement positions 913 are additionally operable to when air conditioner 100 reaches predetermined instant in start, and adjustment ion wind generator 20 is with less than current shelves The operating voltage of one gear in position is run.
Referring again to Fig. 3, in some embodiments, program 931 also includes the instruction for performing following steps:
S12:When air conditioner 100 reaches predetermined instant in start, adjustment ion wind generator 20 is with less than current gear The operating voltage of one gear is run.
Specifically, air conditioner 100 is before start reaches predetermined instant, and ion wind generator 20 is all the time with the work of maximum gear Run as voltage.When the start of air conditioner 100 reaches predetermined instant, acquisition device 911 obtains under predetermined instant first Complete machine electric current, then, adjusting module lowers the current gear of ion wind generator 20 at once so that ion wind generator 20 is with small Run in the operating voltage of maximum one gear of gear.It is appreciated that when the start of air conditioner 100 reaches predetermined instant, now Environment temperature has generally been closer to design temperature, and therefore, the load of air conditioner 100 is relatively reduced, can now descend distancing The current gear of sub- air generator 20 is to reduce the operating voltage of ion wind generator 20, so that the operation of air conditioner 100 Power consumption reduces.
Referring to Fig. 6, in some embodiments, the control method of embodiment of the present invention also includes:
S18:It is less than the complete machine electric current of last moment in the complete machine electric current at the current time, and the current gear is most During small gear, adjust the ion wind generator 20 and maintain to run with the operating voltage of current gear.
Referring again to Fig. 2, in some embodiments, step S18 can be realized by adjusting apparatus 913.In other words, adjust The complete machine electric current that engagement positions 913 can be additionally used at the current time is less than the complete machine electric current of last moment, and the current shelves Position is when being minimum gear, adjusts the ion wind generator 20 and maintains to run with the operating voltage of current gear.
Referring again to Fig. 3, in some embodiments, program 931 also includes being used for the instruction for performing following steps:
S18:It is less than the complete machine electric current of last moment in the complete machine electric current at the current time, and the current gear is most During small gear, adjust the ion wind generator 20 and maintain to run with the operating voltage of current gear.
Specifically, acquisition device 911 detects ion wind generator 20 with the operating voltage of minimum gear at current time To run, and the complete machine electric current at current time is smaller than the complete machine electric current that last moment detects, illustrates the negative of current air conditioner 100 Lotus diminishes relative to the load of last moment air conditioner 100, and the heat exchange in the unit interval also reduces.But due to now ion Air generator 20 is run with the operating voltage of minimum gear, if the operating voltage for continuing to reduce ion wind generator 20 can Minimum operating voltage of the operating voltage less than ion wind generator 20 can occur and cause ion wind generator 20 can not normal work The problem of making.If ion wind generator 20, which is stopped, possibly can not meet the operation demand of air conditioner 100, that is, it is unable to maintain that and works as The environment temperature inscribed when preceding.Therefore, adjusting module control ion wind generator 20 is still come with the operating voltage of minimum gear Operation, to ensure the stable maintenance of the normal operation and environment temperature that meet air conditioner 100.
Referring to Fig. 7, the operating voltage of ion wind generator 20 has multiple gears, this sentences the first gear V1 shelves to the 4th The implementation procedure of the control method of embodiment of the present invention is described in detail exemplified by this four gears of gear V4 shelves.Wherein, The operating voltage of first gear (V1 shelves) is less than the operating voltage of the second gear (V2 shelves), the operating voltage of the second gear (V2 shelves) Less than the operating voltage of third gear (V3 shelves), the operating voltage of third gear (V3 shelves) is less than the work of fourth speed position (V4 shelves) Voltage.First gear (V1 shelves) is minimum gear, and fourth speed position (V4 shelves) are maximum gear.In other words, gear is higher, work Voltage is also bigger, and the variation tendency of gear is consistent with the variation tendency of operating voltage.The complete machine electricity that whole process may relate to Stream is respectively the complete machine electric current I1 of the first moment record, the complete machine electric current I2 of the second moment record, the complete machine of the 3rd moment record Electric current I3, the 4th moment record complete machine electric current I4.The start moment of air conditioner 100 and the time that predetermined instant was the first moment Difference is 30 minutes.Time difference between the two neighboring moment is 5 minutes.
Specifically, in 30 minutes that air conditioner 100 is started shooting, ion wind generator 20 is with work that maximum gear is V4 shelves Voltage is run.When the available machine time of air conditioner 100 reached for the first moment, acquisition device 911 obtains the complete machine electric current at the first moment I1, and the operating voltage of ion wind generator 20 is adjusted downward to V3 shelves from V4 shelves at once.After 5 minutes, the available machine time of air conditioner 100 Reached for the second moment, now acquisition device 911 obtains the complete machine electric current I2 at the second moment, and compares complete machine electric current I2 and complete machine electricity Flow I1 size.When complete machine electric current I2 is less than complete machine electric current I2, adjusting apparatus 913 is by the operating voltage of ion wind generator 20 V2 shelves are adjusted downward to from V3 shelves.If complete machine electric current I2 is more than complete machine electric current I1, adjusting apparatus 913 is by the work of ion wind generator 20 Make voltage and V4 shelves are adjusted to from V3 shelves, then, acquisition device 911 no longer carries out the detection of complete machine electric current, and adjusting apparatus 913 is not yet The gear of the operating voltage of ion wind generator 20 is adjusted again.Since when the available machine time of air conditioner 100 reached for the second moment, air-conditioning Environment residing for machine 100 has tended towards stability, if now complete machine electric current I2 increases show that ion wind generator 20 is needed with larger Operating voltage could meet the operation demand of air conditioner 100 to run, environment temperature is maintained near design temperature.Cause This, now the operating voltage of V4 shelves is considered as the optimum voltage of this ion wind generator 20 operation, ion wind generator 20 The gear of operating voltage no longer enters line translation.The operating voltage of ion wind generator 20 is dropped into V2 from V3 shelves at the second moment After shelves, acquisition device 911 continues executing with the step of detecting complete machine electric current.In other words, begun to pass through 5 minutes from the second moment Afterwards, the time of air conditioner 100 reached for the 3rd moment, and now acquisition device 911 obtains the complete machine electric current I3 at the 3rd moment, and more whole Electromechanics stream I3 and complete machine electric current I2 size.When complete machine electric current I3 is less than complete machine electric current I2, adjusting apparatus 913 sends out ion wind The operating voltage of raw device 20 is adjusted downward to V1 shelves from V2 shelves.If complete machine electric current I3 is more than complete machine electric current I2, adjusting apparatus 913 will be from The operating voltage of sub- air generator 20 is adjusted to V3 shelves from V2 shelves, and hereafter, acquisition device 911 equally no longer carries out complete machine electric current Detection, adjusting apparatus 913 also no longer adjust the gear of the operating voltage of ion wind generator 20.In the available machine time of air conditioner 100 When reaching for four moment, acquisition device 911 obtains the complete machine electric current I4 at the 4th moment, and compares complete machine electric current I4 and complete machine electric current I3 size.When complete machine electric current I4 is less than complete machine electric current I3, adjusting apparatus 913 controls the operating voltage of ion wind generator 20 V1 shelves are maintained, hereafter, because the operating voltage of ion wind generator 20 is in minimum gear, therefore, acquisition device 911 is not The detection of complete machine electric current is carried out again, and adjusting apparatus 913 also no longer adjusts the gear of the operating voltage of ion wind generator 20.It is if whole Electromechanics stream I4 is more than complete machine electric current I3, then the operating voltage of ion wind generator 20 is adjusted to V2 by adjusting apparatus 913 from V1 shelves Shelves, hereafter, acquisition device 911 equally no longer carry out the detection of complete machine electric current, and adjusting apparatus 913 also no longer adjusts ion wind The gear of the operating voltage of device 20.
If in addition, at the first moment, the operating voltage of ion wind generator 20 is not adjusted downward to by adjusting apparatus 913 from V4 shelves V3 shelves, then at the second moment, if complete machine electric current I2 is more than complete machine electric current I1, adjusting apparatus 913 controls ion wind generator 20 maintain to run with the operating voltage of V4 shelves, and hereafter, acquisition device 911 no longer carries out the detection of complete machine electric current, adjusting apparatus 913 no longer adjust the gear of the operating voltage of ion wind generator 20.
In this way, when air conditioner 100 is run, the work of ion wind generator 20 electricity is adjusted according to the change of complete machine electric current Pressure, eventually find the operating voltage of an ion wind generator 20 the most suitable and make ion wind generator 20 with work electricity Press to run, so as to reach the effect for saving energy consumption.
The computer-readable recording medium of embodiment of the present invention includes making with that can adjust the electronic installation of temperature and be combined Computer program 931.Computer program 931 can be performed by processor 92 to complete described in above-mentioned any one embodiment Control method.
For example, computer program 931 can be performed by processor 92 to complete the control method described in following steps:
S11:Obtain the current gear of the complete machine electric current at current time and the present operating voltage of ion wind generator 20;
S13:Compare whether current gear is maximum gear or minimum gear;
S15:It is less than the complete machine electric current of last moment in the complete machine electric current at current time, and current gear is not minimum gear When, adjustment ion wind generator 20 is run with operating voltage less than one gear of current gear;With
S17:It is more than or equal to the complete machine electric current of last moment in the complete machine electric current at current time, and current gear is not for most During big gear, adjustment ion wind generator 20 is run with operating voltage more than one gear of current gear.
Fig. 8 and Fig. 9 is referred to, the air conditioner 100 of embodiment of the present invention includes housing 10, ion generator 20, heat exchange Device 30.
Housing 10 includes body 12 and cover plate 14, and housing 10 is substantially cylindrical, and housing 10 has been internally formed host cavity 16。
Body 12 is in cylinder tubbiness.Body 12 includes the outlet section 122 that adjoins one another and non-outlet section 124, toward each other And the open end 126 being disposed opposite to each other and sealed end 128.
Incorporated by reference to Figure 10, outlet section 122 is formed with multiple air outlets 1222.Along open end 126 to the side of sealed end 128 To the 1222 gradual density of multiple air outlets on outlet section 122.Specifically, outlet section 122 is launched into plan, outlet section The aperture size size of air outlet 1222 on 122 is basically identical, along open end 126 to the direction of sealed end 128, outlet section The quantity of multiple air outlets 1222 gradually increases in 122 unit areas (for example, 100 square centimeters).
Open end 126 is one end of the remote outlet section 122 of non-outlet section 124, and sealed end 128 is the remote of outlet section 122 From one end of non-outlet section 124, open end 126 formed with air inlet 1260, cover plate 14 be movably mounted at open end 126 with The sealing of selectivity or open air inlet 1260.
Ion generator 20 is arranged in the host cavity 16 of housing 10.Ion generator 20 includes pole 22 and colelctor electrode occurs 24.Generation pole 22 and colelctor electrode 24 are spaced and be oppositely arranged.Ion generator 20 is in arc-shaped structure or bending ring junction Structure simultaneously forms an accommodation space 26, and it is in lattice-shaped or mesh-like that pole 22, which occurs, with colelctor electrode 24.
Heat exchanger 30 is arranged in the host cavity 16 of housing 10, heat exchanger 30 be located at ion generator 20 and housing 10 it Between, heat exchanger 30 is oppositely arranged with ion generator 20 and pole 22 relatively occurs for colelctor electrode 24 closer to heat exchanger 30.Multiple air-out Mouth 1222 is relative with heat exchanger 30.Heat exchanger 30 includes matrix 32 and the heat exchanger tube 34 being arranged on inside matrix 32, heat exchanger tube 34 For refrigerant to be transferred on heat exchanger 30 and carries out heat exchange with matrix 32, matrix 32 is used to increase heat exchanger 30 and air Contact area fully carry out heat exchange so as to air and heat exchanger 30.Heat exchanger 30 be in arc-shaped structure jaggy or With bending loop configuration jaggy and form an accommodating cavity 36.Ion generator 20 is housed in accommodating cavity 36.Matrix 32 is in Lattice-shaped.Now, housing 10 is only set in the range of circular arc corresponding with the arc structure of heat exchanger 30 or bending loop configuration Multiple air outlets 1222, and it is not provided with air outlet 1222 in the range of circular arc corresponding with the breach of heat exchanger 30.
Specifically, the air outside air conditioner 100 is sequentially entered in host cavity 16 by the air inlet 1260 of housing 10 And in accommodation space 26, and sequentially pass through and pole 22, colelctor electrode 24, heat exchanger 30 and air outlet 1222 and then discharge housing 10 occurs Outside.
When ion generator 20 works, air conditioner 100 provides positive voltage to generation pole 22 and provided to colelctor electrode 24 negative Voltage, that is to say, that the positive electrode of air conditioner 100 is connected with pole 22 and colelctor electrode 24 occurs respectively with negative electrode.Air is by entering When flowing through ion generator 20 in the entrance of air port 1260 housing 10, under voltage effect of the air on pole 22 and colelctor electrode 24 occurs It is in positive charge and negative electrical charge to be ionized, and pole 22 occurs for negative electrical charge flow direction under the positive voltage effect that pole 22 occurs, and positive charge is collecting Colelctor electrode 24 is flowed under the negative voltage effect of the colelctor electrode 24 of electrode 24 and produces ion wind.Wherein, the air after ionization can Dust and bacterium in absorption air to reach purification air and biocidal efficacies, furthermore, bacterium also can be by the presence of voltage Kill.Then, ion wind sequentially passes through colelctor electrode 24, heat exchanger 30 and air outlet 1222.In this way, air conditioner 100 can give stream Enter air cooling in housing 10 or heating and to air disinfection.
The air conditioner 100 of embodiment of the present invention makes to enter air conditioner by setting ion generator 20 and heat exchanger 30 Air in 100 can be ionized by ion generator 20 and produce ion wind, and the ion wind for flowing through heat exchanger 30 can be by Refrigeration or heating, wherein, the air after ionization can adsorb dust in air and bacterium to reach purification air and sterilization work( Effect, furthermore, bacterium can also be killed in the presence of voltage.Therefore, the air conditioner 100 of embodiment of the present invention can either be realized To air cooling and the function of heating, and can is enough realized to be purified and sterilizing function to air, improves the quality of air.
The air conditioner 100 of embodiment of the present invention also has the advantages that:First, air in housing 10 is along open End 126 to the direction of sealed end 128 is flowed, although the air outlet 1222 close to air inlet 1260 is easier air-out, however, going out Multiple air outlets 1222 in wind portion 122 open end 126 to sealed end 128 the gradual density in direction, therefore, outlet section 122 The air output sum of multiple air outlets 1222 on circumferencial direction in unit area (such as 100 square centimeters) is basically identical, from And make it that the air-out of air conditioner 100 is uniform.
Second, it is in lattice-shaped or mesh-like due to pole 22 occurs with colelctor electrode 24, and the matrix 32 of heat exchanger 30 is in grid Trellis, therefore air can sequentially pass through and pole 22, colelctor electrode 24 and heat exchanger 30 occurs and discharges housing 10 from air outlet 1222.
3rd, ion generator 20 is oppositely arranged with heat exchanger 30, and the air for flowing through ion generator 20 substantially can Inflow heat exchanger 30, that is to say, that ionized by ion generator 20 and the air after purifying can carry out heat with heat exchanger 30 Amount exchanges, thus air conditioner 100 can give the air cooling flowed into housing 10 or heating and give air disinfection.
4th, the wind speed of ion wind is relatively low caused by ion generator 20, thus air conditioner 100 exports milder process Refrigeration or the ion wind of heating.
Fig. 8 and Fig. 9 is referred to, in some embodiments, the shape of housing 10 is also not necessarily limited to cylindric, and housing 10 also may be used With in semi-cylindrical, rectangular box-like.The generation pole 22 of ion generator 20 and colelctor electrode 24, heat exchanger 30 can not also be in circular arc Shape structure or bending loop configuration, generation pole 22, colelctor electrode 24 can also be in circular, tabular, and heat exchanger 30 can also be in plate Shape.
Refer to Fig. 8 and Figure 11, in some embodiments, multiple air outlets 1222 on outlet section 122 it is close Spend constant, along open end 126 to the direction of sealed end 128, the aperture of multiple air outlets 1222 on outlet section 122 gradually increases Greatly.Specifically, outlet section 122 is launched into plan, in the unit area of outlet section 122 (for example, 100 square centimeters) it is multiple go out The quantity in air port 1222 is basically identical, gradual along open end 126 to the direction of sealed end 128, the aperture size of air outlet 1222 Increase.In the case, direction flowing of the air in housing 10 along open end 126 to sealed end 128, although close to air inlet 1260 air outlet 1222 is easier air-out, however, due to along open end 126 to the direction of sealed end 128, air outlet 1222 Aperture size gradually increases, then multiple air-out on the circumferencial direction of outlet section 122 in unit area (for example, 100 square centimeters) The air output sum of mouth 1222 can be basically identical, so that the air-out of air conditioner 10 is uniform.
Fig. 8 and Figure 12 is referred to, in some embodiments, outlet section 122, which divides, the first air-out region to connect 1224 and the second air-out region 1226, it is less than positioned at the density of multiple air outlets 1222 in the first air-out region 1224 and is located at second The density of multiple air outlets 1222 in air-out region 1226.Specifically, outlet section 122 is launched into plan, the first wind outlet area Domain 1224 compared with the second air-out region 1226 closer to open end 126, and the first air-out region 1224 and the second air-out region 1226 On air outlet 1222 aperture size size it is basically identical, the unit area of the first air-out region 1224 is (for example, 100 squares lis Rice) on the quantity of multiple air outlets 1222 be less than in the unit area of the second air-out region 1226 (for example, 100 square centimeters) Multiple air outlets 1222 quantity.In the case, the air in housing 10 is along open end 126 to the direction of sealed end 128 Flowing, although the air outlet 1222 close to the first air-out region 1224 of air inlet 1260 goes out further away from the second of air inlet 1260 The air outlet 1222 in wind region 1226 is easier air-out, however, the number due to the air outlet 1222 on the first air-out region 1224 Amount is less than the quantity of the air outlet 1222 on the second air-out region 1226, then the first air-out region 1224 and the second air-out region The air output sum basic one of 1226 multiple air outlets 1222 in unit area (such as 100 square centimeters) in a circumferential direction Cause, so that the air-out of air conditioner 10 is uniform.
Fig. 8 and Figure 13 is referred to, in some embodiments, outlet section 122, which divides, the first air-out region to connect 1224 and the second air-out region 1226, positioned at the first air-out region 1224 multiple air outlets 1222 density with going out positioned at second The density of multiple air outlets 1224 in wind region 1226 is identical, positioned at the hole of each air outlet 1222 in the first air-out region 1224 Footpath is less than the aperture of each air outlet 1224 positioned at the second air-out region 1226.Specifically, outlet section 122 is launched into plane Scheme, multiple air outlets on the first air-out region 1224 and the unit area of the second air-out region 1226 (for example, 100 square centimeters) 1222 quantity is basically identical.In the case, direction flowing of the air in housing 10 along open end 126 to sealed end 128, Although the air outlet 1222 in the first air-out region 1224 of close air inlet 1260 is further away from the second wind outlet area of air inlet 1260 The air outlet 1222 in domain 1226 is easier air-out, however, the aperture chi due to the air outlet 1222 on the first air-out region 1224 The aperture size of the very little air outlet 1222 being less than on the second air-out region 1226, then the first air-out region 1224 and the second wind outlet area The air output sum base of the multiple air outlets 1222 in unit area (for example, 100 square centimeters) in a circumferential direction of domain 1226 This is consistent, so that the air-out of air conditioner 10 is uniform.
Referring to Fig. 8, in some embodiments, air conditioner 100 also include the drive division 40 being arranged in housing 10 and Processor 50, drive division 40 are located at non-outlet section 124 and are all connected with cover plate 14 and processor 50, and processor 50 is used to send control System instruction, drive division 40 are used to drive cover plate 14 to move according to control instruction so that cover plate 14 is sealing the state of air inlet 1260 Switch between the state of open air inlet 1260.
Specifically, in one example, the driving that drive division 40 includes support component 42 and drives support component 42 to move Element 44, support component 42 is fixedly connected with cover plate 14 and support component 42 can be slidably mounted on non-outlet section 124, is driven Dynamic element 44 is arranged on non-outlet section 124 and is connected with support component 42 and drives support component 42 to move.Support component 42 The support frame being connected with cover plate 14 can be included, driving element 44 can include the linear electric motors being connected with support frame, straight-line electric The mover of machine is connected with support frame and is used to control support frame and cover plate 14 for linear motion, and then cover plate 14 is being sealed Switch between the state of air inlet 1260 and the state of open air inlet 1260.Control instruction includes being used to control drive division 40 to open Put the open instruction in air port 1260 into and for controlling drive division 40 to seal the sealed orders of air inlet 1260, specifically, driving Portion 40 is used to control cover plate 14 to move so that cover plate 14 and open end 126 towards the direction away from open end 126 according to open instruct Gap be present, drive division 40 is used to control cover plate 14 to move so that cover plate towards close to the direction of open end 126 according to sealed orders 14 sealing open ends 126.
Specifically, when air conditioner 100 is in original state (when namely without using air conditioner 100), cover plate 14 is in close The state of air inlet 1260 is sealed, when user opens air conditioner 100, processor 50, which is sent, open to be instructed and control cover plate 14 towards remote Direction from open end 126 is moved so that cover plate 14 and open end 126 have gap, when user closes air conditioner 100, processing Device 50 sends sealed orders and controls cover plate 14 to be moved towards the direction of close open end 126 so that cover plate 14 seals open end 126. In this way, without using can be avoided during air conditioner 100 dust by air inlet 1260 enter housing 10 in.
Referring to Fig. 8, in some embodiments, air conditioner 100 also includes the fan 60 being arranged in housing 10, fan 60 are used to suck air from air inlet 1260 and are oriented to ion generator 20.
Specifically, fan 60 can be arranged on outlet section 122 or non-outlet section 124, because the wind speed of ion wind is slower, And then the flow velocity for the air for entering in housing 10 and being flowed out out of housing 10 is slower, by setting fan 60, improves air and enters The speed for entering in housing 10 and being flowed out out of housing 10, and then (such as 10 minutes) pass through ion generator 20 within a certain period of time Increase with the air of heat exchanger 30, and then more clean airs and the air Jing Guo heat exchange can be produced.
Referring to Fig. 8, in some embodiments, air conditioner 100 also includes the fan 60 being arranged in housing 10, fan 60 are used to suck air from air inlet 1260 and are oriented to ion generator 20.Fan 60 is centrifugal fan or diagonal flow fan, fan 60 is at outlet section 122 and corresponding with ion generator 20.Specifically, the axis side of the airintake direction of fan 60 and housing 10 To consistent, the outgassing direction of fan 60 is radially consistent with housing 10.In this way, in the presence of fan 60, it is easy to air by entering Air port 1260 enters inside housing 10 and final by flowing through ion generator 20, heat exchanger 30 and air outlet 1222 inside housing 10 Flow out outside housing 10.
In some embodiments, air conditioner 100 also includes being arranged on fan 60 in housing 10, and fan 60 is used for from entering Air port 1260 sucks air and is oriented to ion generator 20.Fan 60 is aerofoil fan, and fan 60 is located at non-outlet section 124. Specifically, the airintake direction of fan 60 and outgassing direction are consistent with the axis direction of housing 10.In this way, in the effect of fan 60 Under, it is easy to air to enter the inside of housing 10 and by flowing through ion generator 20, heat exchanger 30 inside housing 10 by air inlet 1260 And air outlet 1222 is finally flowed out outside housing 10.
Referring to Fig. 9, in some embodiments, air conditioner 100 may also include screen pack 70, screen pack 70, which is arranged on, to be changed Between hot device 30 and housing 10, screen pack 70 is used to be filtered through the ion wind after the progress heat exchange of heat exchanger 30.Specifically Ground, the air inside housing 10 produce ion wind after flowing through ion generator 20, and ion wind flows through after flowing through heat exchanger 30 Filter 70 is simultaneously flowed out outside housing 10 from air outlet 1222.In this way, big that screen pack 70 can be carried in filter ions wind Grain impurity, and then improve the air quality of the ion wind as caused by air conditioner 100.
Referring to Fig. 9, in some embodiments, air conditioner 100 also includes screen pack 70, screen pack 70 is arranged on heat exchange Between device 30 and housing 10, screen pack 70 is used to be filtered through the ion wind after the progress heat exchange of heat exchanger 30.Screen pack 70 in a ring or circular configuration and form a receiving space 72, and heat exchanger 30 and ion generator 20 are located in receiving space 72. Heat exchanger 30 is corresponding with screen pack 70.In this way, the air by heat exchange 30 can be filtered by screen pack 70, and then lift stream Go out the air quality of air conditioner 100.
Referring to Fig. 9, in some embodiments, ion generator 20, heat exchanger 30 and screen pack 70 mutually correspond to. In this way, ion wind caused by ion generator 20 can carry out heat exchange in heat exchange 30 and can be by the mistake of screen pack 70 Filter, and then lift the air quality of outflow air conditioner 100.
Referring to Fig. 9, in some embodiments, ion generator 20, heat exchanger 30 and housing 10 are coaxially disposed, ion The edge of generator 20 aligns with the edge of heat exchanger 30, and multiple air outlets 1222 are relative with heat exchanger 30.In this way, by air inlet 1260 air entered in housing 10 can pass through ion generator 20, heat exchanger 30 and air outlet 1222, ion generator successively Ion wind caused by 20 can carry out heat exchange in heat exchanger 30.
Referring to Fig. 9, in some embodiments, 30 two ends of heat exchanger are provided with and the connecting partition of housing 10 80, two dividing plates 80 are used to completely cutting off multiple air outlets 1222 into the scope surrounded in 10, two dividing plates 80 of housing and heat exchanger 30 It is interior, avoid by the air that air inlet 1260 is flowed into housing 10 without ion generator 20 and heat exchanger 30 directly from air outlet 1222 outflow housings 10.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means specific features, structure, material or the spy for combining the embodiment or example description Point is contained at least one embodiment or example of the present invention.In this manual, to the schematic representation of above-mentioned term not Identical embodiment or example must be directed to.Moreover, specific features, structure, material or the feature of description can be with office Combined in an appropriate manner in one or more embodiments or example.In addition, in the case of not conflicting, the skill of this area Art personnel can be tied the different embodiments or example and the feature of different embodiments or example described in this specification Close and combine.
In addition, term " first ", " second " are only used for describing purpose, and it is not intended that instruction or hint relative importance Or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ", the feature of " second " can be expressed or Implicitly include at least one this feature.In the description of the invention, " multiple " are meant that at least two, such as two, three It is individual etc., unless otherwise specifically defined.
Any process or method described otherwise above description in flow chart or herein is construed as, and represents to include Module, fragment or the portion of the code of the executable instruction of one or more the step of being used to realize specific logical function or process Point, and the scope of the preferred embodiment of the present invention includes other realization, wherein can not press shown or discuss suitable Sequence, including according to involved function by it is basic simultaneously in the way of or in the opposite order, carry out perform function, this should be of the invention Embodiment person of ordinary skill in the field understood.
Expression or logic and/or step described otherwise above herein in flow charts, for example, being considered use In the order list for the executable instruction for realizing logic function, may be embodied in any computer-readable medium, for Instruction execution system, device or equipment (such as computer based system including the system of processor or other can be held from instruction The system of row system, device or equipment instruction fetch and execute instruction) use, or combine these instruction execution systems, device or set It is standby and use.For the purpose of this specification, " computer-readable medium " can any can be included, store, communicate, propagate or pass Defeated program is for instruction execution system, device or equipment or the dress used with reference to these instruction execution systems, device or equipment Put.The more specifically example (non-exhaustive list) of computer-readable medium includes following:Electricity with one or more wiring Connecting portion (electronic installation), portable computer diskette box (magnetic device), random access memory (RAM), read-only storage (ROM), erasable edit read-only storage (EPROM or flash memory), fiber device, and portable optic disk is read-only deposits Reservoir (CDROM).In addition, computer-readable medium, which can even is that, to print the paper of described program thereon or other are suitable Medium, because can then enter edlin, interpretation or if necessary with it for example by carrying out optical scanner to paper or other media His suitable method is handled electronically to obtain described program, is then stored in computer storage.
It should be appreciated that each several part of the present invention can be realized with hardware, software, firmware or combinations thereof.Above-mentioned In embodiment, software that multiple steps or method can be performed in memory and by suitable instruction execution system with storage Or firmware is realized.If, and in another embodiment, can be with well known in the art for example, realized with hardware Any one of row technology or their combination are realized:With the logic gates for realizing logic function to data-signal Discrete logic, have suitable combinational logic gate circuit application specific integrated circuit, programmable gate array (PGA), scene Programmable gate array (FPGA) etc..
Those skilled in the art are appreciated that to realize all or part of step that above-described embodiment method carries Suddenly it is that by program the hardware of correlation can be instructed to complete, described program can be stored in a kind of computer-readable storage medium In matter, the program upon execution, including one or a combination set of the step of embodiment of the method.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing module, can also That unit is individually physically present, can also two or more units be integrated in a module.Above-mentioned integrated mould Block can both be realized in the form of hardware, can also be realized in the form of software function module.The integrated module is such as Fruit is realized in the form of software function module and as independent production marketing or in use, can also be stored in a computer In read/write memory medium.
Storage medium mentioned above can be read-only storage, disk or CD etc..Although have been shown and retouch above Embodiments of the invention are stated, it is to be understood that above-described embodiment is exemplary, it is impossible to be interpreted as the limit to the present invention System, one of ordinary skill in the art can be changed to above-described embodiment, change, replace and become within the scope of the invention Type.

Claims (20)

1. a kind of control method, for air conditioner, it is characterised in that the air conditioner includes ion wind generator, the ion Multiple gears of the operating voltage of air generator including with maximum gear and minimum gear, the variation tendency of the gear Consistent with the variation tendency of the operating voltage, the operating current of the air conditioner includes complete machine electric current;The control method bag Include:
Obtain the current gear of the complete machine electric current at current time and the present operating voltage of the ion wind generator;
Compare whether the current gear is the maximum gear or the minimum gear;
It is less than the complete machine electric current of last moment in the complete machine electric current at the current time, and the current gear is not the minimum During gear, adjust the ion wind generator and run with operating voltage less than one gear of current gear;With
Be more than or equal to the complete machine electric current of last moment in the complete machine electric current at current time, and the current gear for it is described most During big gear, adjust the ion wind generator and run with operating voltage more than one gear of current gear.
2. control method according to claim 1, it is characterised in that the predetermined instant of the air conditioner after power-up Before, the ion wind generator is run with the operating voltage of maximum gear, and the control method also includes:
Be more than or equal to the complete machine electric current of last moment in the complete machine electric current at current time, and the current gear be equal to it is described most During big gear, adjust the ion wind generator and maintain to run with the operating voltage of the current gear.
3. control method according to claim 1, it is characterised in that the predetermined instant of the air conditioner after power-up Before, the ion wind generator is run with the operating voltage of maximum gear, and the control method also includes:
When the air conditioner reaches the predetermined instant in start, the ion wind generator is adjusted with less than the current shelves The operating voltage of one gear in position is run.
4. control method according to claim 1, it is characterised in that the control method also includes:
It is less than the complete machine electric current of last moment in the complete machine electric current at the current time, and the current gear is minimum gear When, adjust the ion wind generator and maintain to run with the operating voltage of current gear.
5. control method according to claim 1, it is characterised in that the time difference at the current time and last moment Span is [5,10] minute.
6. the control method according to Claims 2 or 3, it is characterised in that the start moment of the air conditioner with it is described pre- The span for the time difference that timing is carved is [25,35] minute.
7. a kind of controller, for air conditioner, it is characterised in that the air conditioner includes ion wind generator, the ion wind The operating voltage of generator including with multiple gears including maximum gear and minimum gear, the variation tendency of the gear with The variation tendency of the operating voltage is consistent, and the operating current of the air conditioner includes complete machine electric current;The controller includes:
Acquisition device, the acquisition device are used to obtain the complete machine electric current at current time and the current work of the ion wind generator Make the current gear of voltage;
Whether comparison means, the comparison means are the maximum gear or the minimum shelves for the current gear Position;
Adjusting apparatus, the complete machine electric current that the adjusting apparatus was used at the current time are less than the complete machine electric current of last moment, And the current gear adjusts the ion wind generator with less than described one shelves of current gear when not being the minimum gear The operating voltage of position is run;
The complete machine electric current that the adjusting apparatus was additionally operable at current time is more than or equal to the complete machine electric current of last moment, and described When current gear is not the maximum gear, the ion wind generator is adjusted with the work more than one gear of current gear Run as voltage.
8. controller according to claim 7, it is characterised in that before the predetermined instant of the air conditioner after power-up, The ion wind generator is run with the operating voltage of maximum gear, and the adjusting apparatus is additionally operable to:
Be more than or equal to the complete machine electric current of last moment in the complete machine electric current at current time, and the current gear be equal to it is described most During big gear, adjust the ion wind generator and maintain to run with the operating voltage of the current gear.
9. controller according to claim 7, it is characterised in that before the predetermined instant of the air conditioner after power-up, The ion wind generator is run with the operating voltage of maximum gear, and the adjusting apparatus is additionally operable to:
When the air conditioner reaches the predetermined instant in start, the ion wind generator is adjusted with less than the current shelves The operating voltage of one gear in position is run.
10. controller according to claim 7, it is characterised in that the adjusting apparatus is additionally operable to:
It is less than the complete machine electric current of last moment in the complete machine electric current at the current time, and the current gear is minimum gear When, adjust the ion wind generator and maintain to run with the operating voltage of current gear.
11. controller according to claim 7, it is characterised in that the time difference at the current time and last moment Span is [5,10] minute.
12. controller according to claim 8 or claim 9, it is characterised in that the start moment of the air conditioner makes a reservation for described The span of the time difference at moment is [25,35] minute.
13. a kind of air conditioner, it is characterised in that the air conditioner includes:
Ion wind generator;With
Controller described in claim 7 to 12 any one.
14. a kind of air conditioner, it is characterised in that the air conditioner includes ion wind generator, the work of the ion wind generator Make multiple gears of the voltage including with maximum gear and minimum gear, the variation tendency of the gear and work electricity The variation tendency of pressure is consistent, and the operating current of the air conditioner includes complete machine electric current;The air conditioner also includes:
Ion wind generator;
One or more processors;
Memory;With
One or more memories, wherein one or more of programs are stored in the memory, and it is configured to By one or more of computing devices, described program includes being used for the instruction for performing following steps:
Obtain the current gear of the complete machine electric current at current time and the present operating voltage of the ion wind generator;
Compare whether the current gear is the maximum gear or the minimum gear;
It is less than the complete machine electric current of last moment in the complete machine electric current at the current time, and the current gear is not the minimum During gear, adjust the ion wind generator and run with operating voltage less than one gear of current gear;With
Be more than or equal to the complete machine electric current of last moment in the complete machine electric current at current time, and the current gear for it is described most During big gear, adjust the ion wind generator and run with operating voltage more than one gear of current gear.
15. air conditioner according to claim 14, it is characterised in that the predetermined instant of the air conditioner after power-up Before, the ion wind generator is run with the operating voltage of maximum gear, and described program also includes being used to perform following steps Instruction:
Be more than or equal to the complete machine electric current of last moment in the complete machine electric current at current time, and the current gear be equal to it is described most During big gear, adjust the ion wind generator and maintain to run with the operating voltage of the current gear.
16. air conditioner according to claim 14, it is characterised in that the predetermined instant of the air conditioner after power-up Before, the ion wind generator is run with the operating voltage of maximum gear, and described program also includes being used to perform following steps Instruction:
When the air conditioner reaches the predetermined instant in start, the ion wind generator is adjusted with less than the current shelves The operating voltage of one gear in position is run.
17. air conditioner according to claim 14, it is characterised in that described program also includes being used to perform following steps Instruction:
It is less than the complete machine electric current of last moment in the complete machine electric current at the current time, and the current gear is minimum gear When, adjust the ion wind generator and maintain to run with the operating voltage of current gear.
18. air conditioner according to claim 14, it is characterised in that the time difference at the current time and last moment Span is [5,10] minute.
19. the air conditioner according to claim 15 or 16, it is characterised in that the start moment of the air conditioner with it is described pre- The span for the time difference that timing is carved is [25,35] minute.
20. a kind of computer-readable recording medium, it is characterised in that be used in combination including the electronic installation with temperature can be adjusted Computer program, the computer program can be executed by processor to complete the control described in claim 1 to 6 any one Method.
CN201710444676.3A 2017-06-13 2017-06-13 The control method and its controller of air conditioner, air conditioner and readable storage medium storing program for executing Active CN107339773B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710444676.3A CN107339773B (en) 2017-06-13 2017-06-13 The control method and its controller of air conditioner, air conditioner and readable storage medium storing program for executing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710444676.3A CN107339773B (en) 2017-06-13 2017-06-13 The control method and its controller of air conditioner, air conditioner and readable storage medium storing program for executing

Publications (2)

Publication Number Publication Date
CN107339773A true CN107339773A (en) 2017-11-10
CN107339773B CN107339773B (en) 2019-08-30

Family

ID=60220745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710444676.3A Active CN107339773B (en) 2017-06-13 2017-06-13 The control method and its controller of air conditioner, air conditioner and readable storage medium storing program for executing

Country Status (1)

Country Link
CN (1) CN107339773B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112628959A (en) * 2020-11-27 2021-04-09 珠海格力电器股份有限公司 Control method and device of purification module, purification equipment and readable storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005265374A (en) * 2004-03-22 2005-09-29 Matsushita Electric Ind Co Ltd Air conditioner
JP2014126287A (en) * 2012-12-26 2014-07-07 Daikin Ind Ltd Air conditioning system
CN105066360A (en) * 2015-08-19 2015-11-18 广东美的暖通设备有限公司 Heat recovery air conditioning and water heating unit and control method of outdoor fan in heat recovery air conditioning and water heating unit
CN105864970A (en) * 2016-04-12 2016-08-17 青岛海尔空调器有限总公司 Method and device used for regulating consumption power of air conditioner
CN106500250A (en) * 2016-10-24 2017-03-15 邯郸美的制冷设备有限公司 Blower control method, blower fan control system and air-conditioner

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005265374A (en) * 2004-03-22 2005-09-29 Matsushita Electric Ind Co Ltd Air conditioner
JP2014126287A (en) * 2012-12-26 2014-07-07 Daikin Ind Ltd Air conditioning system
CN105066360A (en) * 2015-08-19 2015-11-18 广东美的暖通设备有限公司 Heat recovery air conditioning and water heating unit and control method of outdoor fan in heat recovery air conditioning and water heating unit
CN105864970A (en) * 2016-04-12 2016-08-17 青岛海尔空调器有限总公司 Method and device used for regulating consumption power of air conditioner
CN106500250A (en) * 2016-10-24 2017-03-15 邯郸美的制冷设备有限公司 Blower control method, blower fan control system and air-conditioner

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112628959A (en) * 2020-11-27 2021-04-09 珠海格力电器股份有限公司 Control method and device of purification module, purification equipment and readable storage medium

Also Published As

Publication number Publication date
CN107339773B (en) 2019-08-30

Similar Documents

Publication Publication Date Title
CN108736351A (en) A kind of adjustable heat radiating type switchgear
CN201852224U (en) Portable air conditioner
CN107289518A (en) Air conditioner
CN203037684U (en) High-temperature power-on ageing oven
MX2020010217A (en) Arc resistant device and method.
CN107314503B (en) control method, control device, air conditioner, and computer-readable storage medium
CN107339773A (en) Control method, controller, air conditioner and computer-readable recording medium
CN205070239U (en) High radiating low -voltage switchgear
CN204316303U (en) A kind of current transformer power cabinet
WO2006126240A1 (en) An electronic apparatus for the optimised control of the electrical power of a public lighting system and operating method thereof
CN207081089U (en) Air conditioner
CN107339774A (en) Control method, control device, air conditioner and computer-readable recording medium
CN107328018A (en) Control method, controller, air conditioner and computer-readable recording medium
CN207146527U (en) Air conditioner
CN105320170A (en) Transformer station humidity automatic control device
CN116850478A (en) Irradiation device, method and system with continuously adjustable dose rate and controllable temperature
CN202364485U (en) Cabinet with regional temperature control function and fully-digital monitoring function
CN105119350A (en) Solar energy household energy storage system
CN211184758U (en) Constant temperature box body of power box
CN205119311U (en) Multi -stage filtration speed governing air inlet machine
CN107120810B (en) Control method, control device, air conditioner, and computer-readable storage medium
CN202835684U (en) Ventilating control system of solar inverting booster engine room
CN113514725A (en) Intelligent debugging device for aging test of shore power supply power unit and its control method
CN219305214U (en) Soft starter compatible with internal connection method and external connection method
CN208817433U (en) A kind of LED drive power of perfect heat-dissipating

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant