[go: up one dir, main page]

CN107317346B - The fault-tolerance approach for avoiding power network fluctuation that governor power transducer is caused to be alarmed - Google Patents

The fault-tolerance approach for avoiding power network fluctuation that governor power transducer is caused to be alarmed Download PDF

Info

Publication number
CN107317346B
CN107317346B CN201710705872.1A CN201710705872A CN107317346B CN 107317346 B CN107317346 B CN 107317346B CN 201710705872 A CN201710705872 A CN 201710705872A CN 107317346 B CN107317346 B CN 107317346B
Authority
CN
China
Prior art keywords
governor
power
mains frequency
power transducer
controller pcc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710705872.1A
Other languages
Chinese (zh)
Other versions
CN107317346A (en
Inventor
谭中美
高山
雷立超
刘钦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YALONGJIANG RIVER BASIN HYDROPOWER DEVELOPMENT Co Ltd
Original Assignee
YALONGJIANG RIVER BASIN HYDROPOWER DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YALONGJIANG RIVER BASIN HYDROPOWER DEVELOPMENT Co Ltd filed Critical YALONGJIANG RIVER BASIN HYDROPOWER DEVELOPMENT Co Ltd
Priority to CN201710705872.1A priority Critical patent/CN107317346B/en
Publication of CN107317346A publication Critical patent/CN107317346A/en
Application granted granted Critical
Publication of CN107317346B publication Critical patent/CN107317346B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/24Arrangements for preventing or reducing oscillations of power in networks
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/086Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

The present invention is the fault-tolerance approach for avoiding power network fluctuation that governor power transducer is caused to be alarmed, and solves the problems, such as that power network fluctuation leads to the error of governor report power transducer failure.Sensor false alarm caused by evading as auxiliary judgment present invention introduces mains frequency because of grid power fluctuation.Implementation method are as follows: when mains frequency and 50Hz deviation are more than a definite value A or be more than the overproof alarm of definite value A timing set time B inner shield power transducer.Definite value A and definite value B can be adjusted according to the actual situation.The governor power transducer false alarm because of caused by power network fluctuation can thus be effectively reduced.The mains frequency used in method is the mains frequency before filtering.

Description

The fault-tolerance approach for avoiding power network fluctuation that governor power transducer is caused to be alarmed
Technical field
The present invention relates to the fault-tolerance approaches of power transducer alarm, more particularly to power network fluctuation is avoided to lead to governor power The fault-tolerance approach of transmitter alarm.
Background technique
Former governor power transducer alarming logic are as follows: 1, it is continuous 10 times sampling lower than alarm lower bound;2, it adopts for continuous 10 times Sample is higher than the high limit of alarm;Continuous 4 periodic samplings are overproof to be all larger than 21MW, add up it is overproof be greater than 84MW, report overproof alarm.It is easy The place for generating false alarm is overproof alarm, and during the fluctuation of certain super high voltage direct current electricity transmission system loading, generate electricity by way of merging two or more grid systems unit Governor power transducer will report power transducer failure, and power transducer itself is without exception.
Former control logic is as follows:
Governor controller PCC acquires that (sampling period 10ms) generating set is active, mains frequency signal in real time, and program is opened Begin to judge, its step are as follows:
1. generating set is active between lower limit, the upper limit, governor controller PCC is tentatively judging power transducer just Often;
2. generating set is active to be greater than the upper limit, continuous 10 samplings are in this way, governor controller PCC output power pick-up Device alarm;Less than 10 times, governor controller PCC does not alarm;
3. generating set is active to be less than lower limit, continuous 10 samplings are in this way, governor controller PCC output power becomes Device is sent to alarm;Less than 10 times, governor controller PCC does not alarm;
4. the active double sampling deviation of generating set is less than 21MW, governor controller PCC judgement on the basis of step 1 Power transducer is normal;
5. the active double sampling deviation of generating set is more than or equal to 21MW, continuous 4 periodic samplings on the basis of step 1 It is overproof to be all larger than 21MW, add up it is overproof be greater than 84MW, then governor controller PCC judges power transducer failure.
Some hydropower station possesses the turbine-generator units that 8 nominal outputs are 600,000 kilowatts, the diversion system in the power station It is made of 4 about 16.5 kilometers of average length of the long diversion tunnel.The power station speed regulator system uses the conduct of Feedback of Power mode Longtime running mode.Since operation, the power station unit is during certain super high voltage direct current electricity transmission system loading fluctuates, grid-connected hair The governor power transducer of motor group will report power transducer failure.Power transducer is detected in governor control system When failure, aperture mode operation can be switched to by currently running power mode.It runs smoothly to super high voltage direct current electricity transmission system Afterwards, then operations staff's hand resetting governor alert event operates governor by centralized control center and is switched again by aperture mode It is run to power mode.The power transducer false alarm frequently occurred is adjusted to the steady load of unit and the load wave of power grid Dynamic control brings larger hidden danger.
According to Adaptive System of Water-Turbine Engine primary frequency modulation principle: in super high voltage direct current electricity transmission system fluctuation, unit function Rate significantlys change, and simultaneity factor frequency significantlys change, by collecting and surveying the annual 2 years superelevation straightenings of power station 2014-2015 The fault recorder data for flowing the power station unit during transmission system fluctuates, can also confirm this point.
Summary of the invention
It is an object of the invention to provide a kind of power network fluctuations that is effectively reduced to lead to the appearance of governor report power transducer failure Wrong method, by the logical foundations that power judges pull-in frequency can effectively reduce power transducer as assistant criteria False alarm.
The present invention is implemented as follows:
Governor power transducer GLB uses three-phase four-wire system connection, and input signal is mutual from generator outlet voltage Sensor PT1, generator outlet Current Transmit 1, governor power transducer GLB output signal are 4-20mA analog quantity, are connect The analog quantity mixing module for entering governor controller PCC, as active power signal, mains frequency signal source is main transformer low-pressure side Voltage transformer pt 2, the signal access waveform shaping plate ZX10 by the 1st isolating transformer BV10, and generator outlet voltage is mutual Sensor PT1 accesses waveform shaping plate ZX10 through the 2nd isolating transformer BV11, the fluted disc speed measuring probe beside generator fluted disc The input of the output welding wave trim panel ZX10 of PROX1, the output signal of waveform shaping plate ZX10 are connected to governor controller PCC High speed counting module, as mains frequency signal.
Improved programed logic is as follows:
Governor controller PCC acquires that (sampling period 10ms) generating set is active, mains frequency signal in real time, and program is opened Begin to judge, its step are as follows:
1. generating set is active between lower limit, the upper limit, governor controller PCC is tentatively judging power transducer just Often;
2. generating set is active to be greater than the upper limit, continuous 10 samplings are in this way, governor controller PCC output power pick-up Device alarm;Less than 10 times, governor controller PCC does not alarm;
3. generating set is active to be less than lower limit, continuous 10 samplings are in this way, governor controller PCC output power becomes Device is sent to alarm;Less than 10 times, governor controller PCC does not alarm;
4. the active double sampling deviation of generating set is less than 21MW, governor controller PCC judgement on the basis of step 1 Power transducer is normal;
5. the active double sampling deviation of generating set is more than or equal to 21MW on the basis of step 1, program judgement is as follows:
5.1 continuous 4 times so, it is accumulative be more than or equal to 84MW, at this time if mains frequency is continually and steadily in (50 ± A) Hz Between, the alarm of governor controller PCC output power transmitter;
5.2 continuous 4 times so, it is accumulative be more than or equal to 84MW, at this time if mains frequency exceeds (50 ± A) Hz range, Or be in mains frequency and start in the time B of timing beyond (50 ± A) Hz, governor controller PCC judges power transducer Normally;
The active double sampling deviation of 5.3 generating sets is 4 times discontented beyond 21MW, and governor controller PCC judges that power becomes Send device normal.
6. definite value A is 0.1Hz, B 80ms.The mains frequency used is the mains frequency before filtering.
Sensor false alarm caused by evading as auxiliary judgment present invention introduces mains frequency because of grid power fluctuation. Implementation method are as follows: when mains frequency and 50Hz deviation are more than a definite value A or be more than definite value A timing set time B inner shield The overproof alarm of power transducer.Definite value A and definite value B can be adjusted according to the actual situation.Such as: some hydropower station governor at present The definite value A used is 0.1Hz, B 80ms.The governor power because of caused by power network fluctuation can thus be effectively reduced Transmitter false alarm.The mains frequency used in method is the mains frequency before filtering.
Application effect of the invention:
After some hydropower station #8 units above method, this unit was from 2 months in November, 2016 in 2016, Stable operation 9 months, governor power transducer false alarm does not occur again, during which the unit of other unmodified programs is in power grid Still the alarm of governor power transducer is quoted when fluctuation, and governor is caused to switch to aperture mode operation by power mode.Through 4 secondary undulations occur altogether for statistics, the power grid of the submitting route in the power station in 2016, in addition to power transducer wrong report does not occur for #8 unit Alert, other units still report power transducer failure by mistake in each power network fluctuation.It can be seen that the above method can drop significantly The case where low-power transmitter false alarm, improves Genset governor system stable operation ability and unit load stability contorting Ability, powerful guarantee and promotion network load stability contorting.
Detailed description of the invention
Fig. 1 is governor hardware block diagram (power transducer is related)
Fig. 2 is governor software flow pattern (power transducer is related)
Fig. 3 is that the present invention relates to former governor power transducer alarming logic figures.
Fig. 4 is that the present invention relates to pull-in frequency auxiliary judgment governor power transducer alarming logic figures.
Specific embodiment
Here is a embodiment of the invention, is described further in conjunction with attached drawing to the principle of the present invention.
Using three-phase four-wire system connection, (terminal of GLB:1,3,4,6,7,9 connects governor power transducer as shown in Figure 1 respectively CT1 secondary side: A, N, B, N, C, N phase, the terminal of GLB:2,5,8,11 meet PT1 secondary side: A, B, C, N phase, GLB:14,13 ends respectively Son connects external DC24V power supply+,-power supply, GLB:41, the output of 42 terminals 4~20mA active power analog signals all the way), GLB Output signal (GLB:41,42 terminals) accesses governor controller PCC analog quantity mixing module (PCC-AM:3,4 terminals), as Active power signal.Mains frequency signal source is the secondary side (A, B phase) of main transformer low-pressure side PT2, signal access isolation transformation Device BV10 input side (1,2 terminal) accesses waveform shaping plate ZX10(4,5 ends by BV10 outlet side (3,4 terminal) after being isolated Son), governor controller PCC high speed counting module (PCC- is connected to by ZX10 outlet side (17,19 terminal) after waveform shaping AM:3,1 terminal), as mains frequency signal.
Wherein, the 3CP340.60-2 of the model Bei Jialai of governor controller PCC, the type of the 1st isolating transformer BV10 Number for magnificent electronics of shining PE4117-I-E69 5VA;
The PE4117-I-E69 5VA of the magnificent electronics of model credit of 2nd isolating transformer BV11;
The NSD_TS_00001B that the model what one is particularly good at of waveform shaping plate ZX10 reaches;
Model SINEAX CAM, CAMILLE the BAUER standard type of power transducer GLB;
The LMZ34-20 of model Shenyang Transformer Co., Ltd. of generator outlet Current Transmit 1;
The JDZX4-20 of model Shenyang Transformer Co., Ltd. of generator outlet voltage transformer pt 1.
Speed regulator system acquires that (sampling period 10ms) unit is active, mains frequency signal in real time, and program starts to judge:
1. unit is active between lower limit (0MW), the upper limit (700MW), system tentatively judges that power transducer is normal;
2. unit is active to be greater than the upper limit, continuous 10 samplings are in this way, system output power transmitter is alarmed;Less than 10 Secondary, system is not alarmed;
3. unit is active to be less than lower limit, continuous 10 samplings are in this way, system output power transmitter is alarmed;Less than 10 Secondary, system is not alarmed;
4. the active double sampling deviation of unit is less than 21MW on the basis of step 1, system judges that power transducer is normal;
5. the active double sampling deviation of unit is more than or equal to 21MW on the basis of step 1
5.1 continuous 4 times so, it is accumulative be more than or equal to 84MW, at this time if mains frequency is continually and steadily in (50 ± A) Hz Between (live A takes 0.1Hz), system output power transmitter alarm;
5.2 continuous 4 times so, it is accumulative be more than or equal to 84MW, at this time if mains frequency exceeds (50 ± A) Hz range, Or be in mains frequency and start in the time B of timing (live B takes 80ms) beyond (50 ± A) Hz, system judges power pick-up Device is normal;
The active double sampling deviation of 5.3 units is 4 times discontented beyond 21MW, and system judges that power transducer is normal.

Claims (2)

1. the fault-tolerance approach for avoiding power network fluctuation that governor power transducer is caused to be alarmed, governor power transducer GLB is used Three-phase four-wire system connection, input signal come from generator outlet voltage transformer pt 1, generator outlet Current Transmit 1, Governor power transducer GLB output signal is 4-20mA analog quantity, accesses the analog quantity hybrid guided mode of governor controller PCC Block, as active power signal, governor controller PCC acquires that generating set is active, mains frequency signal in real time, and program starts Judgement, its step are as follows:
1) generating set is active between lower limit, the upper limit, and governor controller PCC tentatively judges that power transducer is normal,
2) generating set is active is greater than the upper limit, and continuous 10 samplings are in this way, governor controller PCC output power transmitter report It is alert;Less than 10 times, governor controller PCC does not alarm,
3) generating set is active is less than lower limit, and continuous 10 samplings are in this way, governor controller PCC output power transmitter report It is alert;Less than 10 times, governor controller PCC does not alarm,
4) on the basis of step 1), the active double sampling deviation of generating set is less than 21MW, and governor controller PCC judges power Transmitter is normal,
It is characterized in that, mains frequency signal source is main transformer low-pressure side voltage transformer pt 2, the signal is by the 1st isolation transformation Device BV10 accesses waveform shaping plate ZX10, and generator outlet voltage transformer pt 1 is whole through the 2nd isolating transformer BV11 access waveform Shape plate ZX10, the output signal of waveform shaping plate ZX10 is connected to governor controller PCC high speed counting module, as mains frequency Signal, mains frequency are as follows as auxiliary judgment:
5) on the basis of step 1), the active double sampling deviation of generating set is more than or equal to 21MW, and program judgement is as follows:
A. continuous 4 times so, it is accumulative be more than or equal to 84MW, at this time if mains frequency is continually and steadily between (50 ± A) Hz, The alarm of governor controller PCC output power transmitter;
B. continuous 4 times so, it is accumulative be more than or equal to 84MW, at this time if mains frequency exceeds (50 ± A) Hz range, or place In the time B that mains frequency starts timing beyond (50 ± A) Hz, governor controller PCC judges that power transducer is normal;
C. the active double sampling deviation of generating set is 4 times discontented beyond 21MW, and governor controller PCC judges power transducer just Often, definite value A is 0.1Hz, B 80ms.
2. the fault-tolerance approach according to claim 1 for avoiding power network fluctuation that governor power transducer is caused to be alarmed, special Sign is the mains frequency used for the mains frequency before filtering.
CN201710705872.1A 2017-08-17 2017-08-17 The fault-tolerance approach for avoiding power network fluctuation that governor power transducer is caused to be alarmed Active CN107317346B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710705872.1A CN107317346B (en) 2017-08-17 2017-08-17 The fault-tolerance approach for avoiding power network fluctuation that governor power transducer is caused to be alarmed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710705872.1A CN107317346B (en) 2017-08-17 2017-08-17 The fault-tolerance approach for avoiding power network fluctuation that governor power transducer is caused to be alarmed

Publications (2)

Publication Number Publication Date
CN107317346A CN107317346A (en) 2017-11-03
CN107317346B true CN107317346B (en) 2019-10-29

Family

ID=60176157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710705872.1A Active CN107317346B (en) 2017-08-17 2017-08-17 The fault-tolerance approach for avoiding power network fluctuation that governor power transducer is caused to be alarmed

Country Status (1)

Country Link
CN (1) CN107317346B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113339184A (en) * 2021-06-06 2021-09-03 中国长江电力股份有限公司 Active power control device and processing method for speed regulator of giant hydroelectric generating set
CN114498765B (en) * 2021-11-01 2024-01-26 华能济宁运河发电有限公司 Control method and system for power transmitter of generator

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103426491A (en) * 2012-05-24 2013-12-04 中国核动力研究设计院 Nuclear power plant process parameter reliability processing method
CN106301095A (en) * 2016-08-29 2017-01-04 江苏大学 A kind of multi-motor coordination control system nerve network reverse fault tolerant control method
CN106969266A (en) * 2017-04-13 2017-07-21 浙江大学 The pipeline pressure monitoring device on-line operation method for diagnosing status of public supply mains

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8731027B2 (en) * 2011-12-05 2014-05-20 Battelle Energy Alliance, Llc Methods and apparatuses using filter banks for multi-carrier spread-spectrum signals

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103426491A (en) * 2012-05-24 2013-12-04 中国核动力研究设计院 Nuclear power plant process parameter reliability processing method
CN106301095A (en) * 2016-08-29 2017-01-04 江苏大学 A kind of multi-motor coordination control system nerve network reverse fault tolerant control method
CN106969266A (en) * 2017-04-13 2017-07-21 浙江大学 The pipeline pressure monitoring device on-line operation method for diagnosing status of public supply mains

Also Published As

Publication number Publication date
CN107317346A (en) 2017-11-03

Similar Documents

Publication Publication Date Title
Centeno et al. An adaptive out-of-step relay [for power system protection]
Mehrizi-Sani Distributed control techniques in microgrids
Souza et al. Grid-connected and seamless transition modes for microgrids: an overview of control methods, operation elements, and general requirements
US11070060B2 (en) Predictive grid control system and method based on sensitivity of variance with respect to electric power prediction
CN107390023B (en) Broadband multi-frequency measuring device for electric quantity of power grid and implementation method thereof
CN105388783A (en) Electric power system operation and safety monitoring system
CN103728949B (en) A kind of Hydropower Unit integrated control unit
Novosel et al. Benefits of synchronized-measurement technology for power-grid applications
CN103197131B (en) Performance test system for photovoltaic power generation system
CN107317346B (en) The fault-tolerance approach for avoiding power network fluctuation that governor power transducer is caused to be alarmed
CN102709948B (en) Comprehensive controlling and protecting device and comprehensive controlling and protecting method for waste heat recovery turbo generator set
CN103117597A (en) Wind power generation box type transformer intelligent monitoring system and control method thereof
Decker et al. System wide model validation of the Brazilian interconnected power system
CN112421671A (en) Method and system for power control of photovoltaic power station
Parizad Dynamic stability analysis for Damavand power plant considering PMS functions by DIgSILENT software
Martin Phasor measurement systems in the WECC
CN211928045U (en) Automatic test system for intelligent terminal of power distribution network
Valibeygi et al. Microgrid control using remote controller hardware-in-the-loop over the internet
CN105785267B (en) Torsional oscillation protection test device
CN103576014B (en) The clock monitor device of transformer station and monitoring method
Davies et al. Latest control and protection innovations applied to the Basslink HVDC interconnector
Hauer et al. Information, reliability, and control in the new power system
Pazdcrin et al. Platform for testing IEC 61850 control systems using real-time simulator
CN208608738U (en) A kind of device of achievable power electronics isolated island detection and simulating grid alternating current source
Gong et al. Synchrophasor-based online modal analysis to mitigate power system interarea oscillation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant