CN107289198A - It is a kind of to clear up the device that concrete ground pump conveys kinetic energy - Google Patents
It is a kind of to clear up the device that concrete ground pump conveys kinetic energy Download PDFInfo
- Publication number
- CN107289198A CN107289198A CN201710558179.6A CN201710558179A CN107289198A CN 107289198 A CN107289198 A CN 107289198A CN 201710558179 A CN201710558179 A CN 201710558179A CN 107289198 A CN107289198 A CN 107289198A
- Authority
- CN
- China
- Prior art keywords
- pushing tow
- fastening
- clear
- rod
- cuff
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/08—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
- F16L3/10—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two members engaging the pipe, cable or protective tubing
- F16L3/1075—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two members engaging the pipe, cable or protective tubing with two members, the two members being joined with a hinge on one side and fastened together on the other side
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/04—Devices for both conveying and distributing
- E04G21/0418—Devices for both conveying and distributing with distribution hose
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/16—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
- F16L3/20—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction
- F16L3/205—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction having supporting springs
- F16L3/2056—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction having supporting springs the axis of at least one spring being oblique or perpendicular to the direction of the movement of the pipe
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/16—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
- F16L3/20—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction
- F16L3/215—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction the movement being hydraulically or electrically controlled
- F16L3/217—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction the movement being hydraulically or electrically controlled hydraulically
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/22—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals
- F16L3/237—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals for two pipes
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The present invention clears up the device that concrete ground pump conveys kinetic energy, it is related to technical field of building construction, component is covered including fastening hoop, rod can just be cleared up, complementary energy is dissolved box, bottom plate, fastening hoop set component includes the fastening rubber ring for binding round fastening cuff rounded outside concrete pump pipe and being connected on the inside of fastening cuff, fastening cuff lateral wall is connected with multipair earclip, complementary energy box of dissolving includes mounting seat and the vibration absorber that is connected in mounting seat, rod upper end can just be cleared up and be connected with fastening the earclip of cuff, the dissolve vibration absorber of box of rod lower end and complementary energy can be just cleared up to be connected, the dissolve mounting seat of box of complementary energy is connected to the upper surface of bottom plate.The conveying kinetic energy of pump line can be cleared up, be absorbed to the device, so as to which the shearing impact for bringing pump line to part-structure of having constructed is reduced to minimum degree, reduce impact failure of the delivery pump pipe to part concrete structure of first constructing, so as to be effectively ensured the structure that finished, so integrated engineering project concrete construction quality.
Description
Technical field
It is more particularly to a kind of to mitigate the dress of concrete ground pump conveying vibration the present invention relates to technical field of building construction
Put.
Background technology
With the development that city makes rapid progress, more buildings of getting up are using high-rise or Super High form, job site coagulation
Soil turns into preferred manner using pumping mode.In current concrete works, in some length away from, high-rise Concrete Pumping Construction
When, more use ground pump mode of movement.Concrete ground pump feed form has another pumping mode(Concrete mixer is fed
Mode)Not available advantage, i.e. cloth are apart from farther, higher, and ground pump is to the requirement such as parking stall foundation bearing capacity, scope of operation
It is relatively low, with flexible arrangement, pours many advantages such as ability height, is current high-rise, high-rise building concrete conveyance
A kind of construction method generally used.
The Main of current ground pump mode of movement is as described below, pump line cloth form of tubes:Horizontal segment pump line is laid general
It is to combine to pour to smash requirement and be arranged, is placed between pump line by cuff connection on flooring or component;Vertical section pump line
Distribution method is:The reserved opening at floor, pump line is passed through from reserved opening.The fixed form of vertical section pump line has two kinds:First,
Pump line and reserved opening periphery space use lumps of wood wedging, two, reserved opening upper and lower set up steel pipe branch for fastening pump line
Frame.
But, the drawbacks of fixing means of the vertical pump line of both the above and horizontal pump line has extremely serious:Concrete
In pumping procedure, pump line constantly comes repercussion, disturbance early stage casting concrete knot in the presence of ground pump conveying kinetic energy
Structure, the distance of conveying is longer, higher, ground pump conveying kinetic energy require it is bigger, accordingly, to the concrete structure for part of first constructing
Influence is just even more serious.Some engineering projects are after being delivered for use, the quality problems, significant portion cause such as cracking, infiltration
In this.
The content of the invention
The purpose of the present invention clears up concrete ground pump conveying kinetic energy for above-mentioned the deficiencies in the prior art there is provided a kind of
The conveying kinetic energy of pump line can be cleared up, be absorbed to device, the device, so that by pump line to part-structure of having constructed(Component)That brings cuts
Cut impact and be reduced to minimum degree, impact failure of the delivery pump pipe to part concrete structure of first constructing is reduced, so as to effectively protect
Demonstrate,prove the structure that finished(Component)Or even, the concrete construction quality of integrated engineering project.
The technical scheme that uses to achieve the above object of the present invention is:It is a kind of to clear up the dress that concrete ground pump conveys kinetic energy
Put, including fastening hoop set component, can just clear up rod, complementary energy and dissolve box, bottom plate, fastening hoop set component includes hoop in concrete pump
The outer rounded fastening cuff of pipe and the fastening rubber ring being connected on the inside of fastening cuff, fastening cuff lateral wall is connected with multipair
Earclip, complementary energy box of dissolving includes mounting seat and the vibration absorber that is connected in mounting seat, can just clear up rod upper end and fastening
The earclip connection of cuff, can just clear up the dissolve vibration absorber of box of rod lower end and complementary energy and be connected, and complementary energy is dissolved the mounting seat of box
It is connected to the upper surface of bottom plate.
The present invention further technical scheme be:The fastening cuff of the fastening hoop set component is by two semicircular clampings
Hoop composition, two ferrule one end are connected by articulated manner, and two ferrule other ends are arranged in the prominent part of docking arm respectively, docking
It is provided with the butt hole I being oppositely arranged on arm, fastening bolt is through the butt hole I on two docking arms again by fastening nut by two
Docking arm is locked, and the ferrule madial wall is provided with the detent being outwards recessed, and fastening rubber ring is positioned in detent.
The present invention further technical scheme be:The rod that can just clear up includes ram pot, hydraulic stem, connecting rod I, connecting rod
IIth, cuff I is screwed, hydraulic stem one end is connected with ram pot, and the hydraulic stem other end is connected with connecting rod I, by being enclosed on hydraulic stem
The relative position for screwing the fixer depression bar of cuff I and connecting rod I, connecting rod I is provided with connecting hole I, connecting rod away from hydraulic stem one end
II is connected with ram pot away from the one end of connecting rod I, and connecting rod II is provided with connecting hole II away from ram pot one end.
The present invention further technical scheme be:The rod that can just clear up includes connection bearing sleeve, sealing bolt I, envelope
Mouthful bolt II, pushing tow slider I, pushing tow sliding block II, transmission rod, scalable loop bar, connecting rod III, cuff II, high strong spring I are screwed,
Sealing bolt I and sealing bolt II are fixedly connected with being connected the two ends of bearing sleeve respectively, and pushing tow slider I and pushing tow sliding block II are equal
It is round slider, pushing tow slider I and pushing tow sliding block II are slidably disposed in connection bearing sleeve, transmission rod one end and pushing tow
Connected in the middle part of slider I, the pilot hole that the transmission rod other end passes the middle part of sealing bolt I is extended to outside connection bearing sleeve, can be stretched
Contracting loop bar one end is connected with the middle part of pushing tow sliding block II, and the scalable loop bar other end passes the pilot hole extension at the middle part of sealing bolt II
To outside connection bearing sleeve, one end that scalable loop bar stretches out connection bearing sleeve is connected with connecting rod III, scalable by being enclosed on
The relative position that cuff II fixes scalable loop bar and connecting rod III is screwed on loop bar, the sealing spiral shell on the inside of connection bearing sleeve
Set respectively between bolt I and pushing tow slider I, between pushing tow slider I and pushing tow sliding block II, between pushing tow sliding block II and sealing bolt II
There is high strong spring I.
The present invention further technical scheme be:The dissolve mounting seat of box of the complementary energy includes bottom substrate and by bottom
Substrate both sides of the edge upwardly extend the channel-section steel flank to be formed, provided with two fixed sides on the inside of two channel-section steel flanks, and two solid
Determine side plate to be connected with bottom substrate upper surface respectively, two fixed sides are parallel to each other and also simultaneously mutual with two channel-section steel flanks
It is parallel, it is additionally provided with the guide rail for being connected to bottom substrate upper surface, bottom substrate and is additionally provided between two fixed sides
Multiple positioning holes for being easy to be connected with bottom plate.
The present invention further technical scheme be:The complementary energy dissolve box vibration absorber include spring spool, pushing tow justify
It is solid on post, transmission slide plate, high strong spring II, end plate, sealing bolt III, each piece of channel-section steel flank and fixed side on the inside of it
Surely it is connected with the inside of a spring spool, each spring spool and is provided with pushing tow cylinder in a pushing tow cylinder, each spring spool
Two ends be respectively equipped with the high strong spring II mutually compressed with pushing tow cylinder, bottom substrate one end end is provided with two spring housings
The end plate that cylinder one end port closed gets up, two spring spools have been also respectively connected with for closing bullet away from end plate one end
The screwing bolts of spring sleeve sealing, the barrel of each spring spool in the inner part is slided provided with a guiding through spring spool barrel
Groove, transmission slide plate is arranged between two spring spools, and transmission slide plate two ends are each passed through the guide chute of two spring spools
It is connected with two pushing tow cylinders, transmission slide plate upper surface is connected with can just clear up under the attachment means that rod is connected, transmission slide plate
Surface is connected with the directive wheel being engaged with the guide rail in mounting seat.
The present invention further technical scheme be:The lower surface of the transmission slide plate is fixedly connected with directive wheel and installs branch
Frame, directive wheel is positioned in directive wheel mounting bracket, and directive wheel is the raised matrix pressure-bearing directive wheel in medial recess two ends, is oriented to
Depressed part in the middle of wheel is engaged with the guide rail of mounting seat upper surface.
The present invention further technical scheme be:The attachment means include horseshoe clamp face mounting head and anti-avulsion latch, U-shaped
Plane Installation head includes the connection flat board being connected with transmission slide plate upper surface and extends formed two pieces by connection flat board upper surface
The vertical connecting plate being oppositely arranged, two pieces of vertical connecting plates are provided with position mutually corresponding transfer hole, and anti-avulsion latch, which is passed through, to be turned
Connect hole can just will clear up rod be connected to transmission slide plate on.
The present invention further technical scheme be:The bottom plate is connected by two pieces of semi-circular sheet steels and formed, two pieces of semicircles
Steel plate one end is connected by articulated manner, two pieces of semi-circular sheet steel other end upper surfaces be connected to be oppositely arranged against solid
Fixed board, two pieces are provided with the butt hole II being oppositely arranged in fixed plate, and bolt is threaded through two pieces in fixed plate
Butt hole II, then make two pieces to be interfixed against fixed Board position by nut.
The device that the present invention clears up concrete ground pump conveying kinetic energy has the advantages that:
1st, the present invention clear up concrete ground pump conveying kinetic energy device by fastening hoop cover component, can just clear up rod, complementary energy dissolve box,
Bottom plate constitutes composite energy dissipation device, and the fastening rubber ring of fastening hoop set component can play fastening, cushioning effect, can just clear up rod
Ram pot and connection bearing sleeve in high strong spring I also can be good at absorbing kinetic energy effect, complementary energy box of dissolving can enter one
Step absorbs, clears up and can just clear up the remaining kinetic energy of rod transmission, and the present invention can effectively clear up(Dissolve)The conveying kinetic energy of pump line,
Avoid impact damage of the existing way to engineering structure;
2nd, the present invention clears up the package unit of the device of concrete ground pump conveying kinetic energy and existing just can clear up rod, complementary energy and dissolve box
Flexible limit, also has steel plate to make the rigid limit of bottom plate, and the fixation, firm supporting to pump line are reliable, have prevented security incident
Occur;
3rd, using the present invention clear up concrete ground pump conveying kinetic energy device can accelerating construction progress, because of package unit and engineering knot
Structure reaches that 1.2Mpa can be installed without direct forced contact, generally concrete surface intensity, reviews prior art, needs
Treat that concrete strength reaches the 70% of design strength(It can generally meet within 7-10 days), fastening timber wedge can be just installed;
4th, the present invention clears up the device that concrete ground pump conveys kinetic energy, and energy-dissipating tech and energy dissipating are further developed for building trade
Method, with positive facilitation and reference.
The device for clearing up concrete ground pump conveying kinetic energy to the present invention with reference to the accompanying drawings and examples is made further
It is bright.
Brief description of the drawings
Fig. 1 is that the fastening hoop for the device that the present invention clears up concrete ground pump conveying kinetic energy covers the structural representation of component;
Fig. 2 is the partial sectional view that fastening hoop set component is connected to outside pump line;
Fig. 3 is that device first of the invention for clearing up concrete ground pump conveying kinetic energy can clear up the structural representation of rod embodiment one
Figure;
Fig. 4 is that device first of the invention for clearing up concrete ground pump conveying kinetic energy can clear up the structural representation of rod embodiment two
Figure;
Fig. 5 is that the complementary energy for the device that the present invention clears up concrete ground pump conveying kinetic energy is dissolved the structural representation of box;
Fig. 6 is that complementary energy is dissolved the sectional view of box;
Fig. 7 is the facade structures schematic diagram for being driven attachment means on slide plate
Fig. 8 is the planar structure schematic diagram for being driven attachment means on slide plate;
Fig. 9 is the structural representation of the bottom plate for the device that the present invention clears up concrete ground pump conveying kinetic energy;
Figure 10 is the structural representation of bottom plate hinged place shown in Fig. 9;
Figure 11 is that bottom plate two shown in Fig. 9 piece abuts the structural representation that fixed plate is connected;
Figure 12 is the front view that the device of the invention for clearing up concrete ground pump conveying kinetic energy is installed on horizontal pump line;
Figure 13 is the front view that the device of the invention for clearing up concrete ground pump conveying kinetic energy is installed on vertical pump line;
Figure 14 is the plan view that the device of the invention for clearing up concrete ground pump conveying kinetic energy is installed on vertical pump line;
Drawing reference numeral explanation:1- fastens cuff, 2- earclips, 3- hinging pin shafts, 4- docking arms, 5- pump lines, 6- fastening rubber rings, 7-
Connecting rod I, 8- screws cuff I, and 9- hydraulic stems, 10- ram pots, 11- connecting rods II, 12- connecting rods III, 13- screws cuff II, and 14- can
Telescopic sleeving rod, 15- sealing bolts II, 16- pushing tows sliding block II, 17- pushing tow slider Is, 18- sealing bolts I, 19- transmission rods, 20-
Connect bearing sleeve, the high strong springs I of 21-, 22- sealing bolts III, 23- spring spools, the high strong springs II of 24-, 25- pushing tows circle
Post, 26-U shape Plane Installation heads, 27- end plates, 28- transmission slide plates, 29- guide rails, 30- channel-section steel flanks, 31- bottom substrates, 32-
Fixed side, 33- directive wheels, 34- directive wheel mounting brackets, 35- connection flat boards, the vertical connecting plates of 36-, 37- anti-avulsion latches,
38- semi-circular sheet steels, 39- rivets, 40- articulated slabs, 41- abuts fixed plate, and 42- concrete floors, 43- bottom plates, 44- complementary energy disappears
Rod, the horizontal pump lines of 46-, 47- fastening hoops set component, the vertical pump lines of 48- can be cleared up at the beginning of case, 45-.
Embodiment
As shown in Fig. 1 to Figure 14, the present invention clears up the device that concrete ground pump conveys kinetic energy(Referred to as " energy dissipator "), bag
Fastening hoop set component 47 is included, rod 45, complementary energy can be just cleared up and dissolves box 44, bottom plate 43.
As shown in Figure 1, 2, fastening hoop set component includes hoop fastening cuff 1 rounded outside concrete pump pipe 5 and connection
Fastening rubber ring 6 in the inner side of fastening cuff 1, the fastening lateral wall of cuff 1 is connected with multipair earclip 2.In the present embodiment, fasten
The fastening cuff 1 of cuff component 47 is made up of two semicircular ferrules, and ferrule is light steel, and certain ferrule can also be
The high-strength composite material such as cast iron and PVC, PU.Two ferrule one end are connected by articulated manner, and hinging pin shaft 3 presss from both sides two
Hold hoop one end hinged, two ferrule other ends are arranged in the prominent part of on docking arm 4, docking arm 4 respectively is provided with relative set
The butt hole I put, fastening bolt is again locked two docking arms 4 by fastening nut through the butt hole I on two docking arms 4, institute
State ferrule madial wall and be provided with the detent being outwards recessed, fastening rubber ring 6 is positioned in detent.
The present embodiment, which is listed, can clear up the structure of rod at the beginning of two kinds.The embodiment one of rod 45 can just be cleared up(It refer to Fig. 3 institutes
Show)Structure is as follows:Can just clear up rod including ram pot 10, hydraulic stem 9, connecting rod I 7, connecting rod II 11, screw cuff I 8, hydraulic stem 9
One end is connected with ram pot 10, and the other end of hydraulic stem 9 is connected with connecting rod I 7, is consolidated by the cuff I 8 that screws being enclosed on hydraulic stem 9
Determine the relative position of hydraulic stem 9 and connecting rod I 7, hydraulic stem 9 is enclosed on connecting rod I 7 in the sleeve pipe of the one end of ram pot 10, realizes liquid
Depression bar 9 can be flexible with respect to connecting rod I 7, and connecting rod I 7 is provided with connecting hole I away from the one end of hydraulic stem 9, and connecting rod II 11 and ram pot 10 are remote
From the connection of the one end of connecting rod I 7, connecting rod II 11 is provided with connecting hole II away from the one end of ram pot 10.
The embodiment two of rod can just be cleared up(It refer to shown in Fig. 4)Structure is as follows:Rod, which can just be cleared up, includes connection bearing
Sleeve pipe 20, sealing bolt I 18, sealing bolt II 15, pushing tow slider I 17, pushing tow sliding block II 16, transmission rod 19, scalable loop bar
14th, connecting rod III 12, screw cuff II 13, high strong spring I 21.Bolt I 18 and sealing bolt II 15 are sealed respectively with being connected bearing
The two ends of sleeve pipe 20 are fixedly connected, and connection bearing sleeve 20 two ends inwall is provided with internal thread, sealing bolt I 18 and sealing bolt II
15 are connected by screw thread with being connected bearing sleeve 20, and the middle part of sealing bolt I 18 and sealing bolt II 15 has pilot hole.
Pushing tow slider I 17 and pushing tow sliding block II 16 are round sliders, and pushing tow slider I 17 and pushing tow sliding block II 16 are slidably disposed in
Connect in bearing sleeve 20, the one end of transmission rod 19 is connected with the middle part of pushing tow slider I 17, and the other end of transmission rod 19 passes sealing bolt
The pilot hole at I 18 middle parts is extended to outside connection bearing sleeve 20, and the end of transmission rod 19 stretched out outside connection bearing sleeve 20 is provided with
Inner bolt hole is opened at hinge hole, the middle part of pushing tow slider I 17, and transmission rod 19 is connected with pushing tow slider I 17 by thread.Scalable loop bar 14
One end is connected with the middle part of pushing tow sliding block II 16, and the scalable other end of loop bar 14 passes the pilot hole extension at the middle part of sealing bolt II 15
To outside connection bearing sleeve 20, inner bolt hole is also opened at the middle part of pushing tow sliding block II 16, and scalable loop bar 14 passes through with pushing tow sliding block II 16
Thread is connected.One end that scalable loop bar 14 stretches out connection bearing sleeve 20 is connected with connecting rod III 12, and scalable loop bar 14 stretches out
Bearing sleeve 20 is connected with the sleeve pipe of connecting rod III 12, realizing that scalable loop bar 14 can be flexible with respect to connecting rod III 12.By being enclosed on
The relative position that cuff II 13 fixes scalable loop bar 14 and connecting rod III 12 is screwed on scalable loop bar 14.In connection bearing holder (housing, cover)
Between the sealing bolt I 18 and pushing tow slider I 17 of the inner side of pipe 20, between pushing tow slider I 17 and pushing tow sliding block II 16, pushing tow sliding block
High strong spring I 21 is respectively equipped between II 16 and sealing bolt II 15.
Complementary energy box of dissolving includes mounting seat and the vibration absorber that is connected in mounting seat.Complementary energy is dissolved the peace of box
Dress base includes bottom substrate 31 and upwardly extends the channel-section steel flank 30 formed by the both sides of the edge of bottom substrate 31, in two channel-section steels
The inner side of flank 30 is provided with two fixed sides 32, and two fixed sides 32 are connected with the upper surface of bottom substrate 31 respectively, and two solid
Determine side plate 32 to be parallel to each other and be also parallel to each other with two channel-section steel flanks 30 simultaneously, be additionally provided between two fixed sides 32
Two guide rails 29 of the upper surface of bottom substrate 31 are connected to, two guide rails 29 are parallel to each other.It is additionally provided with bottom substrate 31 many
The individual positioning hole for being easy to be connected with bottom plate 43.
As shown in Fig. 5 to Fig. 8, the complementary energy dissolve box vibration absorber include spring spool 23, pushing tow cylinder 25, transmission
Slide plate 28, high strong spring II 24, end plate 27, sealing bolt III 22, each piece of channel-section steel flank 30 and the fixed side on the inside of it
A spring spool 23 is fixedly connected with 32, each inner side of spring spool 23 is provided with a pushing tow cylinder 25, each spring housing
The two ends of pushing tow cylinder 25 are respectively equipped with the high strong spring II 24 mutually compressed with pushing tow cylinder 25, bottom substrate 31 1 in cylinder 23
End end is provided with the end plate 27 that two one end port closeds of spring spool 23 get up, and two spring spools 23 are away from termination
The one end of plate 27 is also respectively connected with the screwing bolts for closing the sealing of spring spool 23.The each cylinder of spring spool 23 in the inner part
Wall is arranged between two spring spools 23, passed provided with a guide chute for running through the barrel of spring spool 23, transmission slide plate 28
The guide chute that the dynamic two ends of slide plate 28 are each passed through two spring spools 23 is connected with two pushing tow cylinders 25, on transmission slide plate 28
Surface is connected with can just clear up the attachment means that rod 45 is connected, and the transmission lower surface of slide plate 28 is connected with and leading in mounting seat
Two groups of directive wheels 33 that rail 29 is engaged.The lower surface of the transmission slide plate 28 is fixedly connected with two groups of directive wheel mounting brackets
34, directive wheel 33 is positioned in directive wheel mounting bracket 34, and directive wheel 33 is that the raised matrix pressure-bearing in medial recess two ends is oriented to
Depressed part in the middle of wheel, directive wheel 33 is engaged with the guide rail 29 of mounting seat upper surface.The attachment means include horseshoe clamp face
Mounting head 26 and anti-avulsion latch 37, horseshoe clamp face mounting head 26 include the connection flat board 35 being connected with transmission slide plate 28 upper surface and
Formed two pieces of vertical connecting plates 36 being oppositely arranged are extended by the upper surface of connection flat board 35, two pieces of vertical connecting plates 36 are provided with
Position mutually corresponding transfer hole, anti-avulsion latch 37 will can just clear up rod 45 through transfer hole and be connected on transmission slide plate 28.Peace
During dress, the two high strong spring II 24 close to end plate 27 is first put into spring spool 23, then in spring spool 23
The guide chute of side is put into driving block, is placing the two high strong spring II 24 in the outside of pushing tow cylinder 25 afterwards, is finally screwing
Seal bolt III 22.
As shown in Figures 9 to 11, bottom plate is connected by two pieces of semi-circular sheet steels 38 and formed, the inner ring of two pieces of semi-circular sheet steels 38
It is more bigger than pump line external diameter, position-limiting action is risen to pump line.Two pieces of one end of semi-circular sheet steel 38 are connected by articulated manner, one of
The end upper surface of semi-circular sheet steel 38 is connected with articulated slab 40, and rivet 39 is passed through on articulated slab 40 and another piece of semi-circular sheet steel 38
Hinge hole so that two pieces of semi-circular sheet steels 38 are hinged.Two pieces of other end upper surfaces of semi-circular sheet steel 38 are connected respectively
There is what is be oppositely arranged to abut fixed plate 41, two pieces are provided with the butt hole II being oppositely arranged in fixed plate 41, and bolt is passed through
Two pieces are made to be interfixed against the position of fixed plate 41 by two pieces of butt holes II in fixed plate 41, then by nut.Apply
In man-hour, base is fixed on using expansion bolt has poured final set concrete floor 42.
In use, the fastening cuff 1 of fastening hoop set component is enclosed on outside pump line 5, rod upper end can be just cleared up by bolt or is inserted
Pin etc. with fasten cuff 1 earclip 2 be connected, can just clear up rod lower end by bolt or latch etc. and complementary energy dissolve box vibration damping fill
Put connection, the dissolve mounting seat of box of complementary energy is connected to the upper surface of bottom plate 43.Rod can be cleared up originally using embodiment one
During structure:The connecting hole I that rod connecting rod I 7 can just be cleared up is connected by bolt or latch etc. with fastening the earclip 2 of cuff 1, can just be disappeared
The connecting hole II of solution rod connecting rod II 11 passes through bolt or latch etc. and the vertical connecting plate of the horseshoe clamp face mounting head 26 of vibration absorber
36 connections.Can clear up originally rod use embodiment two structure when:The connecting rod III 12 that can just clear up passes through bolt or latch etc.
It is connected with the earclip 2 for fastening cuff 1, the transmission rod 19 that can just clear up rod passes through the horseshoe clamp of bolt or latch etc. and vibration absorber
The vertical connecting plate 36 of face mounting head 26 is connected.
When energy dissipator is installed on horizontal pump line 46, as shown in figure 12, installed during construction according to following order:Bottom plate 43 is pacified
Dress-complementary energy dissolve box 44 install-driving block at the top of install and just can clear up rod 45-horizontal segment pump line and install-fasten cuff
Component 47 is installed.Bottom plate 43, which is fixed on, has poured final set concrete floor 42, and the fastening cuff 1 of fastening hoop set component 47 is enclosed on pump line
Outside, can just clear up the upper end of rod 45 by bolt with fasten cuff 1 earclip 2 be connected, can just clear up the lower end of rod 45 by bolt with
Complementary energy is dissolved the vibration absorber connection of box 44, and the dissolve mounting seat of box 44 of complementary energy is connected to the upper surface of bottom plate 43.Horizontal pump
The vibration that pipe 46 is produced in delivering concrete, covers component 47 by fastening hoop, can just clear up rod 45, complementary energy and dissolve box 44, bottom
After plate 43, vibration is substantially seldom passed on pouring concrete flooring 42, reduces delivery pump pipe to part concrete knot of first constructing
The impact failure of structure.
When energy dissipator is installed on vertical pump line 48, as shown in Figure 13,14, according to following order during construction:Floor is reserved
Hole-vertical pump line 48 installs-floor installation-complementary energy dissolve box 44 install-driving block at the top of install and just can clear up rod
45-fastening hoop set component 47 installs-entirety debugging-application.Using the center line of reserved opening as control datum line, vertical
The surrounding of pump line 48 is vertical, be arranged symmetrically four groups at the beginning of can clear up rod 45 and complementary energy is dissolved box 44.Rod 45 and fastening cuff can just be cleared up
Component 47, complementary energy box 44 of dissolving are to be articulated and connected.Base is connected with concrete floor 42 using expansion bolt.Vertical pump line 48
The vibration produced in delivering concrete, covers component 47 by fastening hoop, can just clear up rod 45, complementary energy and dissolve box 44, bottom plate 43
Afterwards, vibration is substantially seldom passed on pouring concrete flooring 42, reduces delivery pump pipe to part concrete structure of first constructing
Impact failure.
Above example is only presently preferred embodiments of the present invention, and structure of the invention is not limited to what above-described embodiment was enumerated
Form, any modification, the equivalent substitution made within the spirit and principles of the invention etc., it should be included in the guarantor of the present invention
Within the scope of shield.
Claims (9)
1. a kind of clear up the device that concrete ground pump conveys kinetic energy, it is characterised in that covers component including fastening hoop(47), just can disappear
Solve rod(45), complementary energy dissolves box(44), bottom plate(43), fastening hoop set component(47)It is rounded outside concrete pump pipe including binding round
Fastening cuff(1)Be connected to fastening cuff(1)The fastening rubber ring of inner side(6), fasten cuff(1)Lateral wall is connected with many
To earclip(2), complementary energy dissolves box(44)Including mounting seat and the vibration absorber being connected in mounting seat, rod can be just cleared up
(45)Upper end and fastening cuff(1)Earclip(2)Connection, can just clear up rod(45)Lower end and complementary energy are dissolved box(44)Vibration damping dress
Put connection, complementary energy is dissolved box(44)Mounting seat be connected to bottom plate(43)Upper surface.
2. as claimed in claim 1 clear up the device that concrete ground pump conveys kinetic energy, it is characterised in that the fastening hoop set group
Part(47)Fastening cuff(1)It is made up of two semicircular ferrules, two ferrule one end are connected by articulated manner, two
The individual ferrule other end is arranged in the prominent part of docking arm respectively(4), docking arm(4)On be provided with the butt hole I being oppositely arranged, fasten spiral shell
Bolt passes through two docking arms(4)On butt hole I again by fastening nut by two docking arms(4)Locking, the ferrule madial wall
Provided with the detent being outwards recessed, rubber ring is fastened(6)It is positioned in detent.
3. as claimed in claim 1 clear up the device that concrete ground pump conveys kinetic energy, it is characterised in that described just to clear up rod
(45)Including ram pot(10), hydraulic stem(9), connecting rod I(7), connecting rod II(11), screw cuff I(8), hydraulic stem(9)One end with
Ram pot(10)Connection, hydraulic stem(9)The other end and connecting rod I(7)Connection, by being enclosed on hydraulic stem(9)On screw cuff I
(8)Fixer depression bar(9)With connecting rod I(7)Relative position, connecting rod I(7)Away from hydraulic stem(9)One end is provided with connecting hole I,
Connecting rod II(11)With ram pot(10)Away from connecting rod I(7)One end is connected, connecting rod II(11)Away from ram pot(10)One end is provided with
Connecting hole II.
4. as claimed in claim 1 clear up the device that concrete ground pump conveys kinetic energy, it is characterised in that described just to clear up rod
(45)Including connection bearing sleeve(20), sealing bolt I(18), sealing bolt II(15), pushing tow slider I(17), pushing tow sliding block
Ⅱ(16), transmission rod(19), scalable loop bar(14), connecting rod III(12), screw cuff II(13), high strong spring I(21), sealing
Bolt I(18)With sealing bolt II(15)Respectively with being connected bearing sleeve(20)Two ends be fixedly connected, pushing tow slider I(17)With
Pushing tow sliding block II(16)It is round slider, pushing tow slider I(17)With pushing tow sliding block II(16)It is slidably disposed in connecting shaft
Cartridge(20)It is interior, transmission rod(19)One end and pushing tow slider I(17)Middle part is connected, transmission rod(19)The other end passes sealing spiral shell
Bolt I(18)The pilot hole at middle part extends to connection bearing sleeve(20)Outside, scalable loop bar(14)One end and pushing tow sliding block II
(16)Middle part is connected, scalable loop bar(14)The other end passes sealing bolt II(15)The pilot hole at middle part extends to connection bearing
Sleeve pipe(20)Outside, scalable loop bar(14)Stretch out connection bearing sleeve(20)One end and connecting rod III(12)Connection, by being enclosed on
Scalable loop bar(14)On screw cuff II(13)Fixed scalable loop bar(14)With connecting rod III(12)Relative position, even
Spindle cartridge(20)The sealing bolt I of inner side(18)With pushing tow slider I(17)Between, pushing tow slider I(17)With pushing tow sliding block
Ⅱ(16)Between, pushing tow sliding block II(16)With sealing bolt II(15)Between be respectively equipped with high strong spring I(21).
5. as claimed in claim 1 clear up the device that concrete ground pump conveys kinetic energy, it is characterised in that the complementary energy is dissolved box
(44)Mounting seat include bottom substrate(31)And by bottom substrate(31)Both sides of the edge upwardly extend the channel-section steel flank to be formed
(30), in two channel-section steel flanks(30)Inner side is provided with two fixed sides(32), two fixed sides(32)Respectively with bottom base
Plate(31)Upper surface is connected, two fixed sides(32)Be parallel to each other and also simultaneously with two channel-section steel flanks(30)It is parallel to each other,
In two fixed sides(32)Between be additionally provided with and be connected to bottom substrate(31)The guide rail of upper surface(29), bottom substrate(31)
On be additionally provided with multiple be easy to and bottom plate(43)The positioning hole of connection.
6. as claimed in claim 5 clear up the device that concrete ground pump conveys kinetic energy, it is characterised in that the complementary energy is dissolved box
(44)Vibration absorber include spring spool(23), pushing tow cylinder(25), transmission slide plate(28), high strong spring II(24), termination
Plate(27), sealing bolt III(22)(22), each piece of channel-section steel flank(30)With the fixed side on the inside of it(32)On be fixedly connected
There is a spring spool(23), each spring spool(23)Inner side is provided with a pushing tow cylinder(25), each spring spool(23)
Interior pushing tow cylinder(25)Two ends be respectively equipped with and pushing tow cylinder(25)The high strong spring II mutually compressed(24), bottom substrate
(31)One end end is provided with two spring spools(23)The end plate that one end port closed gets up(27), two spring spools
(23)Away from end plate(27)One end has been also respectively connected with for closing spring spool(23)The screwing bolts of sealing, each bullet
Spring sleeve(23)Barrel in the inner part runs through spring spool provided with one(23)The guide chute of barrel, is driven slide plate(28)Set
In two spring spools(23)Between, it is driven slide plate(28)Two ends are each passed through two spring spools(23)Guide chute and two
Individual pushing tow cylinder(25)Connection, is driven slide plate(28)Upper surface is connected with and can just clear up rod(45)The attachment means of connection, are passed
Dynamic slide plate(28)Lower surface is connected with and the guide rail in mounting seat(29)The directive wheel being engaged(33).
7. as claimed in claim 6 clear up the device that concrete ground pump conveys kinetic energy, it is characterised in that the transmission slide plate
(28)Lower surface be fixedly connected with directive wheel mounting bracket(34), directive wheel(33)It is positioned at directive wheel mounting bracket(34)
On, directive wheel(33)It is the raised matrix pressure-bearing directive wheel in medial recess two ends, directive wheel(33)Middle depressed part and installation
The guide rail of base upper surface(29)It is engaged.
8. as claimed in claim 6 clear up the device that concrete ground pump conveys kinetic energy, it is characterised in that the attachment means bag
Include horseshoe clamp face mounting head(26)And anti-avulsion latch(37), horseshoe clamp face mounting head(26)Including with being driven slide plate(28)Upper surface connects
The connection flat board connect(35)And by connection flat board(35)Upper surface extends the vertical connecting plate that to be formed two pieces are oppositely arranged(36),
Two pieces of vertical connecting plates(36)Provided with position mutually corresponding transfer hole, anti-avulsion latch(37)It can just will be cleared up through transfer hole
Rod(45)It is connected to transmission slide plate(28)On.
9. as claimed in claim 1 clear up the device that concrete ground pump conveys kinetic energy, it is characterised in that the bottom plate(43)By
Two pieces of semi-circular sheet steels(38)Connection is formed, two pieces of semi-circular sheet steels(38)One end is connected by articulated manner, two pieces of semicircles
Steel plate(38)Other end upper surface be connected to be oppositely arranged abut fixed plate(41), two pieces abut fixed plate(41)On set
The butt hole II being oppositely arranged is equipped with, bolt is threaded through two pieces and abuts fixed plate(41)On butt hole II, then pass through nut
Two pieces are made to abut fixed plate(41)Position interfixes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710558179.6A CN107289198B (en) | 2017-07-10 | 2017-07-10 | Device for resolving kinetic energy of concrete pump |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710558179.6A CN107289198B (en) | 2017-07-10 | 2017-07-10 | Device for resolving kinetic energy of concrete pump |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107289198A true CN107289198A (en) | 2017-10-24 |
CN107289198B CN107289198B (en) | 2023-08-04 |
Family
ID=60101366
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710558179.6A Active CN107289198B (en) | 2017-07-10 | 2017-07-10 | Device for resolving kinetic energy of concrete pump |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107289198B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107883068A (en) * | 2017-12-06 | 2018-04-06 | 高佳 | A kind of support of pipelines for being easy to regulation for being used to build |
CN108657880A (en) * | 2018-06-01 | 2018-10-16 | 江西机电职业技术学院 | Umbilical drags load Wheels group arrangement |
CN109027416A (en) * | 2018-09-17 | 2018-12-18 | 詹哲品 | A kind of building water pipe laying pipe special Intelligentized mechanical grafting robot |
CN111895182A (en) * | 2020-07-13 | 2020-11-06 | 中国二十二冶集团有限公司 | Vertical pump pipe fixer and using method |
CN113108132A (en) * | 2021-03-25 | 2021-07-13 | 中国一冶集团有限公司 | Pipe clamp type floor hole plugging and supporting device and using method thereof |
CN113356592A (en) * | 2021-06-28 | 2021-09-07 | 新兴栈(绵阳)建材有限公司 | Concrete conveying pipe terminal anti-splash device |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11141747A (en) * | 1997-11-10 | 1999-05-28 | Ishikawajima Harima Heavy Ind Co Ltd | Pipe support device |
ES2331552A1 (en) * | 2008-02-04 | 2010-01-07 | Moises Fernandez Sierra | Adjustable guardrail post |
CN102829247A (en) * | 2012-08-16 | 2012-12-19 | 北京市三一重机有限公司 | Multi-level conveying system and high-altitude operation engineering machine |
CN203052136U (en) * | 2012-12-13 | 2013-07-10 | 中国科学院宁波材料技术与工程研究所 | Base type locking hose clamp |
CN203257960U (en) * | 2013-05-03 | 2013-10-30 | 东北大学 | Modular-parameter-adjustable dynamic shock absorber |
CN104295660A (en) * | 2014-09-18 | 2015-01-21 | 中国地震局工程力学研究所 | One-sided bidirectional guide rail disc spring large-displacement seismic isolation pedestal |
CN104358822A (en) * | 2014-09-18 | 2015-02-18 | 中国地震局工程力学研究所 | Three-way seismic isolation pedestal with two-way guide rail disc springs |
CN105114704A (en) * | 2015-09-10 | 2015-12-02 | 西安市建筑工程总公司 | Pump pipe damping device |
CN105822841A (en) * | 2016-06-08 | 2016-08-03 | 洛阳海惠新材料股份有限公司 | Ground damping device of ethylene glycol antimony raw material conveying pipeline |
CN105937572A (en) * | 2016-07-12 | 2016-09-14 | 安徽工程大学 | Vibration isolation platform with quasi-zero stiffness |
CN106224434A (en) * | 2016-08-05 | 2016-12-14 | 张辰啸 | There is antitorque and resistance to plucking function three-dimensional shock insulation device |
CN206280682U (en) * | 2017-04-12 | 2017-06-27 | 珠海市英特路机械设备有限公司 | A kind of suspension type automatically controlled AC Lub oil pump of pneumatic multithreading for lifting output pressure |
CN207316241U (en) * | 2017-07-10 | 2018-05-04 | 广西建工集团第三建筑工程有限责任公司 | A kind of device for clearing up concrete ground pump conveying kinetic energy |
-
2017
- 2017-07-10 CN CN201710558179.6A patent/CN107289198B/en active Active
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11141747A (en) * | 1997-11-10 | 1999-05-28 | Ishikawajima Harima Heavy Ind Co Ltd | Pipe support device |
ES2331552A1 (en) * | 2008-02-04 | 2010-01-07 | Moises Fernandez Sierra | Adjustable guardrail post |
CN102829247A (en) * | 2012-08-16 | 2012-12-19 | 北京市三一重机有限公司 | Multi-level conveying system and high-altitude operation engineering machine |
CN203052136U (en) * | 2012-12-13 | 2013-07-10 | 中国科学院宁波材料技术与工程研究所 | Base type locking hose clamp |
CN203257960U (en) * | 2013-05-03 | 2013-10-30 | 东北大学 | Modular-parameter-adjustable dynamic shock absorber |
CN104295660A (en) * | 2014-09-18 | 2015-01-21 | 中国地震局工程力学研究所 | One-sided bidirectional guide rail disc spring large-displacement seismic isolation pedestal |
CN104358822A (en) * | 2014-09-18 | 2015-02-18 | 中国地震局工程力学研究所 | Three-way seismic isolation pedestal with two-way guide rail disc springs |
CN105114704A (en) * | 2015-09-10 | 2015-12-02 | 西安市建筑工程总公司 | Pump pipe damping device |
CN105822841A (en) * | 2016-06-08 | 2016-08-03 | 洛阳海惠新材料股份有限公司 | Ground damping device of ethylene glycol antimony raw material conveying pipeline |
CN105937572A (en) * | 2016-07-12 | 2016-09-14 | 安徽工程大学 | Vibration isolation platform with quasi-zero stiffness |
CN106224434A (en) * | 2016-08-05 | 2016-12-14 | 张辰啸 | There is antitorque and resistance to plucking function three-dimensional shock insulation device |
CN206280682U (en) * | 2017-04-12 | 2017-06-27 | 珠海市英特路机械设备有限公司 | A kind of suspension type automatically controlled AC Lub oil pump of pneumatic multithreading for lifting output pressure |
CN207316241U (en) * | 2017-07-10 | 2018-05-04 | 广西建工集团第三建筑工程有限责任公司 | A kind of device for clearing up concrete ground pump conveying kinetic energy |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107883068A (en) * | 2017-12-06 | 2018-04-06 | 高佳 | A kind of support of pipelines for being easy to regulation for being used to build |
CN108657880A (en) * | 2018-06-01 | 2018-10-16 | 江西机电职业技术学院 | Umbilical drags load Wheels group arrangement |
CN109027416A (en) * | 2018-09-17 | 2018-12-18 | 詹哲品 | A kind of building water pipe laying pipe special Intelligentized mechanical grafting robot |
CN111895182A (en) * | 2020-07-13 | 2020-11-06 | 中国二十二冶集团有限公司 | Vertical pump pipe fixer and using method |
CN113108132A (en) * | 2021-03-25 | 2021-07-13 | 中国一冶集团有限公司 | Pipe clamp type floor hole plugging and supporting device and using method thereof |
CN113356592A (en) * | 2021-06-28 | 2021-09-07 | 新兴栈(绵阳)建材有限公司 | Concrete conveying pipe terminal anti-splash device |
CN113356592B (en) * | 2021-06-28 | 2022-10-11 | 新兴栈(绵阳)建材有限公司 | Concrete conveying pipe terminal anti-splash device |
Also Published As
Publication number | Publication date |
---|---|
CN107289198B (en) | 2023-08-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107289198A (en) | It is a kind of to clear up the device that concrete ground pump conveys kinetic energy | |
CN104196222B (en) | The suspension scaffold of tools type section steel builder's jack | |
CN103510640B (en) | A kind of fabricated shear wall and assembly method thereof | |
CN105113716B (en) | The many floors of major diameter are high to throw self-compaction steel tube concrete superposed column construction method | |
CN206815666U (en) | A kind of connecting node of multilayer wallboard and wallboard and floor | |
CN107059880B (en) | Reinforcing structure of concrete-fabricated section steel mixed support system of ultra-large deep foundation pit and construction method thereof | |
WO2016112585A1 (en) | Pile frame and mounting method thereof | |
CN202596743U (en) | Formwork trolley for underground tunnel pull-rod-free side wall construction | |
CN207316241U (en) | A kind of device for clearing up concrete ground pump conveying kinetic energy | |
CN205858379U (en) | A kind of scalable steelframe joint being applicable to serious deformation | |
CN105804649B (en) | A kind of dynamical system of long-spiral drilling machine | |
CN110963420B (en) | Support connecting structure of tower crane supporting beam | |
CN206554483U (en) | A kind of full fabricated scaffold is encorbelmented component | |
CN210712857U (en) | Easy dismouting formula underground structure | |
CN207453479U (en) | Retaining wall formwork support system and retaining wall formwork support system | |
CN206477581U (en) | Formwork reinforcement corner key | |
CN109322253A (en) | Method and device for repairing and strengthening damaged piers | |
CN208748838U (en) | Cantilever steel girder anchor structure | |
CN208487279U (en) | Anchoring type pump line bracing means after can having enough to meet the need | |
CN205976140U (en) | Side fascia installation node | |
CN205976148U (en) | Side fascia installation node | |
CN211572655U (en) | Building outer wall super-high large cantilever lifting structure | |
CN112376600A (en) | Safe anti-seismic building pile | |
CN111719888B (en) | Method for additionally arranging ring beam and constructional column in existing masonry building body | |
CN219654283U (en) | Novel wood form fastening device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |