[go: up one dir, main page]

CN107269864B - A gate valve and gate valve control method - Google Patents

A gate valve and gate valve control method Download PDF

Info

Publication number
CN107269864B
CN107269864B CN201710558332.5A CN201710558332A CN107269864B CN 107269864 B CN107269864 B CN 107269864B CN 201710558332 A CN201710558332 A CN 201710558332A CN 107269864 B CN107269864 B CN 107269864B
Authority
CN
China
Prior art keywords
gate
speed
gate valve
hydraulic power
state data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710558332.5A
Other languages
Chinese (zh)
Other versions
CN107269864A (en
Inventor
寇子明
吴娟
寇彦飞
高贵军
张鹏
张静
高鑫宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan University of Technology
Original Assignee
Taiyuan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan University of Technology filed Critical Taiyuan University of Technology
Priority to CN201710558332.5A priority Critical patent/CN107269864B/en
Priority to AU2017422789A priority patent/AU2017422789B2/en
Priority to PCT/CN2017/093026 priority patent/WO2019010708A1/en
Publication of CN107269864A publication Critical patent/CN107269864A/en
Application granted granted Critical
Publication of CN107269864B publication Critical patent/CN107269864B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K3/00Gate valves or sliding valves, i.e. cut-off apparatus with closing members having a sliding movement along the seat for opening and closing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K31/00Actuating devices; Operating means; Releasing devices
    • F16K31/12Actuating devices; Operating means; Releasing devices actuated by fluid
    • F16K31/14Actuating devices; Operating means; Releasing devices actuated by fluid for mounting on, or in combination with, hand-actuated valves
    • F16K31/143Actuating devices; Operating means; Releasing devices actuated by fluid for mounting on, or in combination with, hand-actuated valves the fluid acting on a piston
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K31/00Actuating devices; Operating means; Releasing devices
    • F16K31/44Mechanical actuating means
    • F16K31/60Handles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K47/00Means in valves for absorbing fluid energy
    • F16K47/02Means in valves for absorbing fluid energy for preventing water-hammer or noise

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Indication Of The Valve Opening Or Closing Status (AREA)
  • Fluid-Driven Valves (AREA)
  • Fluid-Pressure Circuits (AREA)
  • Details Of Valves (AREA)

Abstract

本发明公开了一种闸阀及闸阀控制方法,所述闸阀包括闸板、闸阀控制装置和驱动闸板启闭的液压动力装置,所述闸阀控制装置包括控制所述液压动力装置运动的控制部件和检测所述闸阀状态的检测部件;所述检测部件,用于按预设时间间隔检测所述闸阀的实际状态数据;所述控制部件,用于根据检测部件检测到的实际状态数据调整输入所述液压动力装置的控制参数,直至所述实际状态数据符合预设状态数据。

Figure 201710558332

The invention discloses a gate valve and a gate valve control method. The gate valve includes a gate plate, a gate valve control device and a hydraulic power device for driving the gate to open and close. The gate valve control device includes a control component for controlling the movement of the hydraulic power device and a hydraulic power device. A detection component for detecting the state of the gate valve; the detection component is used to detect the actual state data of the gate valve at preset time intervals; the control component is used to adjust the input to the gate valve according to the actual state data detected by the detection component control parameters of the hydraulic power unit until the actual state data conforms to the preset state data.

Figure 201710558332

Description

一种闸阀及闸阀控制方法A gate valve and gate valve control method

技术领域technical field

本发明涉及煤矿井下、石油管道给排水领域,具体涉及一种闸阀及闸阀控制方法。The invention relates to the field of water supply and drainage of underground coal mines and oil pipelines, in particular to a gate valve and a gate valve control method.

背景技术Background technique

闸阀由于其结构简单,密封性好等优势,广泛应用于矿山等给排水系统。市场上闸阀执行机构比较常见的为手轮开关。随着闸阀向高压、大通径及自动化方向发展,手轮开关执行机构已不能满足需求。因此,出现了自动执行方案,主要通过电机旋转运动及减速机增扭,替代手轮机构,一方面可以减少劳动强度,另一方面易于实现远程控制。Gate valves are widely used in mines and other water supply and drainage systems due to their simple structure and good sealing properties. The most common gate valve actuator on the market is the handwheel switch. With the development of gate valves in the direction of high pressure, large diameter and automation, the handwheel switch actuator can no longer meet the demand. Therefore, an automatic execution scheme has emerged, mainly through the rotation of the motor and the torque increase of the reducer, instead of the handwheel mechanism. On the one hand, it can reduce the labor intensity, and on the other hand, it is easy to realize remote control.

但是,现有的自动执行方案还存在较多的问题:主要是带载启动困难、过载保护不易实现带来的可靠性差、故障率高的问题,其次是通过电机等自动方式启闭闸阀往往会造成严重的水锤现象,致使闸阀、管道冲击损坏。However, there are still many problems in the existing automatic execution scheme: mainly the problems of poor reliability and high failure rate caused by the difficulty of starting with load and the difficulty in realizing overload protection; Cause serious water hammer phenomenon, resulting in impact damage to gate valves and pipelines.

针对上述问题,目前业界也提出有解决方案,如:公开号为CN102182838A、发明名称为“一种矿用潜水电液控制闸阀”的发明专利,不再使用电机加丝杆的传动方式,而是采用液压缸驱动闸板,省去了复杂的机械传动结构,并且通过接近开关限制闸板的极限位置,基本解决了带载启动困难和过载问题,也就解决了电机驱动闸阀带来的可靠性差、故障率高的问题,但无法避免水锤现象的发生。In response to the above problems, the industry has also proposed solutions at present, such as the invention patent with the publication number CN102182838A and the invention titled "A Mine Submersible Electro-hydraulic Control Gate Valve", which no longer uses the transmission method of motor and screw, but The hydraulic cylinder is used to drive the gate, which saves the complicated mechanical transmission structure, and the limit position of the gate is limited by the proximity switch, which basically solves the problem of difficulty in starting with load and overload, and also solves the problem of poor reliability caused by the motor-driven gate valve. , The problem of high failure rate, but the occurrence of water hammer cannot be avoided.

再如,公开号为CN105003715A、发明名称为“一种具有应急关阀功能的闸阀电液驱动系统及闸阀”的发明专利,通过在执行机构末端设置缓冲装置,能避免一部分水锤现象的发生,但由于缓冲装置的缓冲力是固定的,不能根据管道内具体情况调整,还是不能完全避免水锤现象。Another example is the invention patent with the publication number CN105003715A and the invention titled “An Electro-hydraulic Gate Valve Drive System and Gate Valve with Emergency Valve Closing Function”. By setting a buffer device at the end of the actuator, the occurrence of some water hammer can be avoided. However, since the buffer force of the buffer device is fixed, it cannot be adjusted according to the specific conditions in the pipeline, and the water hammer phenomenon cannot be completely avoided.

发明内容SUMMARY OF THE INVENTION

有鉴于此,本发明实施例期望提供一种闸阀及闸阀控制方法,能解决闸阀可靠性差、故障率高的问题,且能有效避免水锤现象的发生。In view of this, the embodiments of the present invention are expected to provide a gate valve and a gate valve control method, which can solve the problems of poor reliability and high failure rate of the gate valve, and can effectively avoid the occurrence of the water hammer phenomenon.

为达到上述目的,本发明的技术方案是这样实现的:In order to achieve the above object, the technical scheme of the present invention is achieved in this way:

本发明实施例提供了一种闸阀,所述闸阀包括闸板、闸阀控制装置和驱动闸板启闭的液压动力装置,所述闸阀控制装置包括控制所述液压动力装置运动的控制部件和检测所述闸阀状态的检测部件;其中,An embodiment of the present invention provides a gate valve, the gate valve includes a gate, a gate valve control device and a hydraulic power device for driving the gate to open and close, the gate valve control device includes a control component for controlling the movement of the hydraulic power device and a detection device The detection component of the state of the gate valve; wherein,

所述检测部件,用于按预设时间间隔检测所述闸阀的实际状态数据;The detection component is used to detect the actual state data of the gate valve at preset time intervals;

所述控制部件,用于根据检测部件检测到的实际状态数据调整输入所述液压动力装置的控制参数,直至所述实际状态数据符合预设状态数据。The control component is configured to adjust the control parameters input to the hydraulic power device according to the actual state data detected by the detection component, until the actual state data conforms to the preset state data.

优选地,所述液压动力装置包括液压缸,所述液压缸的活塞杆与所述闸板连接。Preferably, the hydraulic power device includes a hydraulic cylinder, and the piston rod of the hydraulic cylinder is connected with the gate.

优选地,所述控制部件为PLC,所述检测部件包括检测所述活塞杆位移的位移检测部件。Preferably, the control part is a PLC, and the detection part includes a displacement detection part for detecting the displacement of the piston rod.

优选地,所述检测部件还包括:检测闸板移动速度的第一速度检测部件、检测管道内液体流动速度的第二速度检测部件、以及检测管道内壁压力的压力检测部件和检测管道振动值的振动检测部件。Preferably, the detection component further comprises: a first speed detection component for detecting the moving speed of the shutter, a second speed detection component for detecting the liquid flow speed in the pipeline, a pressure detection component for detecting the pressure on the inner wall of the pipeline, and a pressure detection component for detecting the vibration value of the pipeline Vibration detection part.

优选地,所述液压动力装置还包括驱动电机,所述驱动电机的电机轴连接有手摇装置;Preferably, the hydraulic power device further comprises a drive motor, and the motor shaft of the drive motor is connected with a hand crank device;

所述手摇装置包括手摇杆、建立或松开所述手摇杆与所述电机轴之间联动连接的离合部件。The hand crank device includes a hand rocker, a clutch part for establishing or releasing the linkage connection between the hand rocker and the motor shaft.

优选地,所述手摇装置还包括行星齿轮机构,所述行星齿轮机构包括箱体、内齿圈、行星架、行星齿轮和太阳齿轮;Preferably, the hand crank device further includes a planetary gear mechanism, the planetary gear mechanism includes a casing, a ring gear, a planet carrier, a planetary gear and a sun gear;

所述内齿圈固定于所述箱体内壁,所述手摇杆与所述行星架固定连接,所述电机轴套设有所述太阳齿轮;所述离合部件用于将所述电机轴和太阳齿轮在圆周向联动连接。The inner gear ring is fixed on the inner wall of the box, the hand rocker is fixedly connected with the planet carrier, and the motor shaft is sleeved with the sun gear; the clutch part is used to connect the motor shaft and the planetary carrier. The sun gears are linked in the circumferential direction.

优选地,所述行星架一端设有两个行星齿轮轴,每个所述行星齿轮轴上设置有轴向排列分布、且与所述行星齿轮轴同步转动的第一行星齿轮和第二行星齿轮;Preferably, one end of the planet carrier is provided with two planetary gear shafts, and each of the planetary gear shafts is provided with a first planetary gear and a second planetary gear that are axially arranged and distributed and rotate synchronously with the planetary gear shaft ;

所述第一行星齿轮与所述内齿圈啮合,所述第二行星齿轮与所述太阳齿轮啮合;所述第一行星齿轮的齿数小于所述内齿圈的齿数和第二行星齿轮的齿数,所述太阳齿轮的齿数小于所述第二行星齿轮的齿数。The first planetary gear is meshed with the ring gear, and the second planetary gear is meshed with the sun gear; the number of teeth of the first planetary gear is smaller than the number of teeth of the ring gear and the number of teeth of the second planetary gear , the number of teeth of the sun gear is smaller than the number of teeth of the second planetary gear.

本发明实施例还提供了一种闸阀控制方法,所述方法包括:The embodiment of the present invention also provides a gate valve control method, the method includes:

在所述闸阀启动后,按预设时间间隔检测所述闸阀的实际状态数据;After the gate valve is started, the actual state data of the gate valve is detected at preset time intervals;

根据所述实际状态数据调整输入液压动力装置的控制参数,直至所述实际状态数据符合预设状态数据。The control parameters input to the hydraulic power device are adjusted according to the actual state data until the actual state data conforms to the preset state data.

优选地,所述按预设时间间隔检测所述闸阀的实际状态数据,包括:Preferably, the detection of the actual state data of the gate valve at preset time intervals includes:

按预设时间间隔定时检测所述液压动力装置传动部件的实际位移数据。The actual displacement data of the transmission components of the hydraulic power unit are regularly detected at preset time intervals.

优选地,所述根据所述实际状态数据调整输入所述液压动力装置的控制参数,直至所述实际状态数据符合预设状态数据,包括:Preferably, the adjusting the control parameters input to the hydraulic power device according to the actual state data until the actual state data conforms to the preset state data, including:

将所述液压动力装置传动部件的实际位移数据与预设位移数据进行比较,获得位移误差值;Comparing the actual displacement data of the transmission part of the hydraulic power device with the preset displacement data to obtain a displacement error value;

根据所述位移误差值调整输入所述液压动力装置的控制参数,直至所述位移误差值小于预设位移误差阈值。The control parameters input to the hydraulic power device are adjusted according to the displacement error value until the displacement error value is smaller than a preset displacement error threshold.

优选地,所述按预设时间间隔检测所述闸阀的实际状态数据,还包括:Preferably, the detecting the actual state data of the gate valve at preset time intervals further includes:

按预设时间间隔定时检测闸板的实际移动速度、管道内液体流动速度、管道内壁压力和管道振动值。The actual moving speed of the gate, the liquid flow speed in the pipeline, the pressure on the inner wall of the pipeline and the vibration value of the pipeline are regularly detected at preset time intervals.

优选地,所述方法还包括:Preferably, the method further includes:

对检测到的管道内液体流动速度、管道内壁压力和管道振动值进行模糊计算,确定所述闸板的目标移动速度。A fuzzy calculation is performed on the detected liquid flow velocity in the pipeline, the pressure on the inner wall of the pipeline and the vibration value of the pipeline to determine the target moving speed of the gate.

优选地,所述根据所述实际状态数据调整输入所述液压动力装置的控制参数,直至所述实际状态数据符合预设状态数据,还包括:Preferably, the adjusting the control parameters input to the hydraulic power device according to the actual state data until the actual state data conforms to the preset state data, further includes:

将所述闸板的实际移动速度与闸板的目标移动速度进行比较,获得速度误差值;Comparing the actual moving speed of the gate with the target moving speed of the gate to obtain a speed error value;

根据所述速度误差值调整输入所述液压动力装置的控制参数,直至所述速度误差值小于预设速度误差阈值。The control parameters input to the hydraulic power unit are adjusted according to the speed error value until the speed error value is less than a preset speed error threshold.

优选地,所述根据所述速度误差值调整输入所述液压动力装置的控制参数,包括:Preferably, the adjustment of the control parameters input to the hydraulic power device according to the speed error value includes:

将所述速度误差值,输入比例-积分-微分控制部件,并通过所述比例-积分-微分控制部件调整输入液压动力装置的控制参数。The speed error value is input into the proportional-integral-derivative control part, and the control parameter input to the hydraulic power device is adjusted by the proportional-integral-derivative control part.

本发明实施例提供的闸阀及闸阀控制方法,包括闸板、闸阀控制装置和驱动闸板启闭的液压动力装置,所述闸阀控制装置包括控制所述液压动力装置运动的控制部件和检测所述闸阀状态的检测部件;所述检测部件,用于按预设时间间隔检测所述闸阀的实际状态数据;所述控制部件,用于根据检测部件检测到的实际状态数据调整输入所述液压动力装置的控制参数,直至所述实际状态数据符合预设状态数据;可见,本发明实施例的闸阀控制装置,根据检测部件的检测结果调整对液压动力装置的控制参数,能精确地控制液压动力装置的运动,从而有效解决闸阀可靠性差、故障率高的问题,并能有效避免水锤现象的发生。The gate valve and the gate valve control method provided by the embodiments of the present invention include a gate, a gate valve control device, and a hydraulic power device for driving the gate to open and close, the gate valve control device including a control component for controlling the movement of the hydraulic power device and for detecting the A gate valve state detection component; the detection component is used to detect the actual state data of the gate valve at preset time intervals; the control component is used to adjust the input to the hydraulic power device according to the actual state data detected by the detection component until the actual state data conforms to the preset state data; it can be seen that the gate valve control device of the embodiment of the present invention adjusts the control parameters of the hydraulic power device according to the detection results of the detection components, and can accurately control the hydraulic power device. It can effectively solve the problems of poor reliability and high failure rate of the gate valve, and can effectively avoid the occurrence of water hammer.

附图说明Description of drawings

图1为本发明实施例一闸阀的组成结构示意图;1 is a schematic diagram of the composition and structure of a gate valve according to an embodiment of the present invention;

图2为本发明实施例二闸阀的组成结构示意图;FIG. 2 is a schematic diagram of the composition structure of the second gate valve according to the embodiment of the present invention;

图3为本发明实施例三闸阀的液压动力装置的示意图;3 is a schematic diagram of a hydraulic power device of a three-gate valve according to an embodiment of the present invention;

图4为图3中手摇装置的剖视示意图;Fig. 4 is the cross-sectional schematic diagram of the hand crank device in Fig. 3;

图5为图4中手摇装置的行星齿轮啮合示意图;Fig. 5 is the planetary gear meshing schematic diagram of the hand crank device in Fig. 4;

图6为本发明实施例四闸阀控制方法的流程示意图;6 is a schematic flowchart of a four-gate valve control method according to an embodiment of the present invention;

图7为本发明实施例五通过监控活塞杆位移来控制闸阀的流程示意图;7 is a schematic flow chart of controlling the gate valve by monitoring the displacement of the piston rod according to the fifth embodiment of the present invention;

图8为本发明实施例六带自学习模糊控制器的闸阀控制装置的结构示意图;8 is a schematic structural diagram of a gate valve control device with a self-learning fuzzy controller according to Embodiment 6 of the present invention;

图9为本发明实施例六带自学习模糊控制器的闸阀控制装置关闭闸板的流程示意图。FIG. 9 is a schematic flow chart of the gate valve control device with the self-learning fuzzy controller to close the gate according to the sixth embodiment of the present invention.

具体实施方式Detailed ways

本发明实施例提供了一种闸阀,所述闸阀包括闸板、闸阀控制装置和驱动闸板启闭的液压动力装置,所述闸阀控制装置包括控制所述液压动力装置运动的控制部件和检测所述闸阀状态的检测部件;所述检测部件,用于按预设时间间隔检测所述闸阀的实际状态数据;所述控制部件,用于根据检测部件检测到的实际状态数据调整输入所述液压动力装置的控制参数,直至所述实际状态数据符合预设状态数据。An embodiment of the present invention provides a gate valve, the gate valve includes a gate, a gate valve control device and a hydraulic power device for driving the gate to open and close, the gate valve control device includes a control component for controlling the movement of the hydraulic power device and a detection device The detection component for the state of the gate valve; the detection component is used to detect the actual state data of the gate valve at preset time intervals; the control component is used to adjust and input the hydraulic power according to the actual state data detected by the detection component control parameters of the device until the actual state data conforms to the preset state data.

本发明实施例的原理是:检测闸阀的实际状态数据,并将检测结果反馈到闸阀控制装置,调整输入所述液压动力装置的控制参数,直至所述实际状态数据符合预设状态数据;也就是说,通过负反馈的控制原理,精确的控制液压动力装置的运动;能解决闸阀可靠性差、故障率高的问题,有效避免水锤现象的发生。The principle of the embodiment of the present invention is to detect the actual state data of the gate valve, and feed back the detection result to the gate valve control device, and adjust the control parameters input to the hydraulic power device until the actual state data conforms to the preset state data; that is, It is said that through the control principle of negative feedback, the movement of the hydraulic power device can be accurately controlled; the problems of poor reliability and high failure rate of the gate valve can be solved, and the occurrence of water hammer can be effectively avoided.

为了能够更加详尽地了解本发明实施例的特点与技术内容,下面结合附图以及具体的应用实施例对本发明做进一步的阐述,所附附图仅供参考说明之用,并非用来限定本发明实施例。In order to be able to understand the features and technical contents of the embodiments of the present invention in more detail, the present invention will be further described below with reference to the accompanying drawings and specific application embodiments. The accompanying drawings are for reference only and are not intended to limit the present invention. Example.

实施例一Example 1

图1为本发明实施例一闸阀的组成结构示意图,如图1所示,所述闸阀包括闸阀控制装置11、液压动力装置12和闸板13;FIG. 1 is a schematic structural diagram of a gate valve according to an embodiment of the present invention. As shown in FIG. 1 , the gate valve includes a gate valve control device 11 , a hydraulic power device 12 and a gate 13 ;

所述闸阀控制装置11包括:控制所述液压动力装置12运动的控制部件和检测所述闸阀状态的检测部件,所述控制部件和检测部件相连接;其中,The gate valve control device 11 includes: a control part for controlling the movement of the hydraulic power device 12 and a detection part for detecting the state of the gate valve, the control part and the detection part are connected; wherein,

所述检测部件,用于按预设时间间隔检测所述闸阀的实际状态数据;The detection component is used to detect the actual state data of the gate valve at preset time intervals;

所述控制部件,用于根据检测部件检测到的实际状态数据调整输入所述液压动力装置12的控制参数,直至所述实际状态数据符合预设状态数据。The control component is configured to adjust the control parameters input to the hydraulic power device 12 according to the actual state data detected by the detection component, until the actual state data conforms to the preset state data.

所述液压动力装置12包括:液压泵121和液压缸122,所述液压缸122的活塞杆与所述闸板13连接,这样通过所述液压缸122活塞杆的直线往复运动,可以驱动闸板13的启闭;The hydraulic power unit 12 includes a hydraulic pump 121 and a hydraulic cylinder 122. The piston rod of the hydraulic cylinder 122 is connected to the gate 13, so that the gate can be driven by the linear reciprocating motion of the piston rod of the hydraulic cylinder 122. 13 opening and closing;

相应的,本发明实施例中,所述控制部件为可编程逻辑控制器(PLC,ProgrammableLogic Controller)111,所述检测部件为检测所述液压缸122活塞杆位移的位移检测部件112;Correspondingly, in the embodiment of the present invention, the control component is a programmable logic controller (PLC, Programmable Logic Controller) 111, and the detection component is a displacement detection component 112 that detects the displacement of the piston rod of the hydraulic cylinder 122;

具体地,所述位移检测部件112可以是位移传感器,具体可以是光栅式位移传感器。Specifically, the displacement detection component 112 may be a displacement sensor, specifically a grating type displacement sensor.

这样,基于本发明实施例,所述闸阀控制装置11通过位移检测部件112按预设时间间隔检测所述液压缸122活塞杆实际位移数据,并通过所述PLC111根据检测到的所述实际位移数据调整输入所述液压动力装置12的控制参数,直至所述实际位移数据符合预设位移数据,达到精确控制控制液压动力装置12运动的目的。能解决闸阀可靠性差、故障率高的问题,有效避免水锤现象的发生。In this way, based on the embodiment of the present invention, the gate valve control device 11 detects the actual displacement data of the piston rod of the hydraulic cylinder 122 at preset time intervals through the displacement detection component 112, and uses the PLC 111 to detect the actual displacement data according to the detected actual displacement data. The control parameters input to the hydraulic power device 12 are adjusted until the actual displacement data conforms to the preset displacement data, so as to achieve the purpose of precisely controlling the movement of the hydraulic power device 12 . It can solve the problems of poor reliability and high failure rate of gate valves, and effectively avoid the occurrence of water hammer.

实施例二Embodiment 2

图2为本发明实施例二闸阀的组成结构示意图,如图2所示,所述闸阀包括闸阀控制装置21、液压动力装置22和闸板23;FIG. 2 is a schematic diagram of the composition structure of the second gate valve according to the embodiment of the present invention. As shown in FIG. 2 , the gate valve includes a gate valve control device 21 , a hydraulic power device 22 and a gate 23 ;

所述闸阀控制装置21包括:控制所述液压动力装置22运动的控制部件和检测所述闸阀状态的检测部件,所述控制部件和检测部件相连接;其中,The gate valve control device 21 includes: a control part for controlling the movement of the hydraulic power device 22 and a detection part for detecting the state of the gate valve, the control part and the detection part are connected; wherein,

所述述检测部件,用于按预设时间间隔检测所述闸阀的实际状态数据;The detection component is used to detect the actual state data of the gate valve at preset time intervals;

所述控制部件,用于根据检测部件检测到的实际状态数据调整输入所述液压动力装置22的控制参数,直至所述实际状态数据符合预设状态数据。The control component is configured to adjust the control parameters input to the hydraulic power device 22 according to the actual state data detected by the detection component, until the actual state data conforms to the preset state data.

所述液压动力装置22包括:液压泵221和液压缸222,所述液压缸222的活塞杆与所述闸板23连接,这样通过所述液压缸222活塞杆的直线往复运动,可以驱动闸板23的启闭;The hydraulic power unit 22 includes a hydraulic pump 221 and a hydraulic cylinder 222. The piston rod of the hydraulic cylinder 222 is connected to the gate 23, so that the gate can be driven by the linear reciprocating motion of the piston rod of the hydraulic cylinder 222. 23 opening and closing;

本发明实施例中,所述控制部件为PLC211,所述检测部件包括:位移检测部件212、第一速度检测部件213、第二速度检测部件214、压力检测部件215和振动检测部件216;其中,In the embodiment of the present invention, the control component is PLC211, and the detection component includes: a displacement detection component 212, a first speed detection component 213, a second speed detection component 214, a pressure detection component 215, and a vibration detection component 216; wherein,

所述位移检测部件212,用于检测所述液压缸222活塞杆的位移;the displacement detection part 212 is used to detect the displacement of the piston rod of the hydraulic cylinder 222;

所述第一速度检测部件213,用于检测闸板23的移动速度;The first speed detection part 213 is used to detect the moving speed of the shutter 23;

所述第二速度检测部件214,用于检测管道内液体流动速度;the second speed detection part 214 is used to detect the liquid flow speed in the pipeline;

所述压力检测部件215,用于检测管道的内壁压力;The pressure detection part 215 is used to detect the inner wall pressure of the pipeline;

所述振动检测部件216,用于检测管道的振动值。The vibration detection component 216 is used to detect the vibration value of the pipeline.

具体地,所述位移检测部件212可以是位移传感器,所述第一速度检测部件213可以是速度传感器,所述第二速度检测部件214可以是流量计,先测流量再计算流速,所述压力检测部件215可以是压力传感器,所述振动检测部件216可以是振动监测器。Specifically, the displacement detection component 212 may be a displacement sensor, the first speed detection component 213 may be a speed sensor, and the second speed detection component 214 may be a flow meter. The detection component 215 may be a pressure sensor, and the vibration detection component 216 may be a vibration monitor.

同实施例一,本发明实施例的闸阀控制装置21能精确的控制液压动力装置22的运动,能解决闸阀可靠性差、故障率高的问题,有效避免水锤现象的发生。Similar to the first embodiment, the gate valve control device 21 of the embodiment of the present invention can precisely control the movement of the hydraulic power device 22, can solve the problems of poor reliability and high failure rate of the gate valve, and effectively avoid the occurrence of water hammer.

进一步地,本发明实施例还设有自学习模糊控制器;Further, the embodiment of the present invention is also provided with a self-learning fuzzy controller;

所述自学习模糊控制器,用于对检测到的管道内液体流动速度、管道内壁压力和管道振动值进行模糊计算,确定所述闸板23的目标移动速度;The self-learning fuzzy controller is used to perform fuzzy calculation on the detected liquid flow velocity in the pipeline, the pressure on the inner wall of the pipeline and the vibration value of the pipeline, and determine the target moving speed of the gate 23;

具体地,所述自学习模糊控制器可以是采用模糊控制原理的模糊控制器结合闸阀控制方法制作而成。Specifically, the self-learning fuzzy controller may be manufactured by using a fuzzy controller based on the fuzzy control principle combined with a gate valve control method.

这样,本发明实施例的闸阀控制装置21通过第二速度检测部件214、压力检测部件215和振动检测部件216确定所述闸板23的目标移动速度,并通过所述第一速度检测部件213按预设时间间隔检测所述闸板23的实际移动速度,然后通过所述PLC211根据闸板23的实际移动速度与目标移动速度的速度误差值,调整输入所述液压动力装置22的控制参数,直至所述速度误差值小于预设速度误差阈值,达到精确控制控制液压动力装置22运动的目的。能解决闸阀可靠性差、故障率高的问题,有效避免水锤现象的发生。In this way, the gate valve control device 21 of the embodiment of the present invention determines the target moving speed of the gate plate 23 through the second speed detection part 214 , the pressure detection part 215 and the vibration detection part 216 , and uses the first speed detection part 213 to press The actual moving speed of the gate 23 is detected at a preset time interval, and then the PLC 211 adjusts the control parameters input to the hydraulic power device 22 according to the speed error value between the actual moving speed of the gate 23 and the target moving speed, until The speed error value is smaller than the preset speed error threshold, so as to achieve the purpose of precisely controlling the movement of the hydraulic power device 22 . It can solve the problems of poor reliability and high failure rate of gate valves, and effectively avoid the occurrence of water hammer.

具体地,所述液压动力装置22的工作原理为:驱动电机驱动液压泵221排油,排出的油进入液压缸222,驱动液压缸222的活塞杆移动,也就能启闭闸板23;Specifically, the working principle of the hydraulic power device 22 is as follows: the drive motor drives the hydraulic pump 221 to discharge oil, the discharged oil enters the hydraulic cylinder 222, and drives the piston rod of the hydraulic cylinder 222 to move, so that the gate 23 can be opened and closed;

进一步地,所述液压缸222的内腔包括有杆腔和无杆腔,开启闸板23时,活塞杆从无杆腔向有杆腔移动,关闭闸板23时,活塞杆的移动方向从有杆腔向无杆腔移动;这样在电机功率和液压缸缸径不变的情况下,闸板23开启时的供油量更大,因此闸阀开启闸板23的开启力大于关闭闸板23的关闭力,更好的利用了闸阀的动力;因为由于存在水垢等因素,导致开启闸板23比关闭闸板23更困难;Further, the inner cavity of the hydraulic cylinder 222 includes a rod cavity and a rodless cavity. When the gate 23 is opened, the piston rod moves from the rodless cavity to the rod cavity. When the gate 23 is closed, the piston rod moves from The rod cavity moves to the rodless cavity; in this way, when the motor power and the cylinder diameter of the hydraulic cylinder remain unchanged, the oil supply when the gate 23 is opened is larger, so the opening force of the gate valve to open the gate 23 is greater than that of closing the gate 23. The closing force makes better use of the power of the gate valve; because of the existence of scale and other factors, it is more difficult to open the gate 23 than to close the gate 23;

进一步地,所述驱动电机可以是防爆电机,这样更安全。Further, the drive motor can be an explosion-proof motor, which is safer.

可以理解的是,所述液压动力装置不限于实施例一和实施例二所述液压泵和液压缸的组合,也可以是其它能提供动力的液压设备,如液压马达加丝杆等;It can be understood that the hydraulic power device is not limited to the combination of the hydraulic pump and the hydraulic cylinder described in the first and second embodiments, and can also be other hydraulic equipment that can provide power, such as a hydraulic motor plus a screw rod, etc.;

所述控制部件也可以是除PLC外的其它部件,例如单片机、工业控制计算机等;所述检测部件可以根据控制的需要,设置更多的检测部件。The control component may also be other components other than PLC, such as a single-chip microcomputer, an industrial control computer, etc.; the detection component may be provided with more detection components according to control requirements.

实施例三Embodiment 3

图3为本发明实施例三闸阀的液压动力装置的示意图,如图3所示,所述液压动力装置包括液压泵31和液压缸32,所述液压缸32的活塞杆与闸板(图3中不可见)连接;所述闸板设置于管道33中;FIG. 3 is a schematic diagram of a hydraulic power device of a three-gate valve according to an embodiment of the present invention. As shown in FIG. 3 , the hydraulic power device includes a hydraulic pump 31 and a hydraulic cylinder 32. The piston rod of the hydraulic cylinder 32 and the gate ( FIG. 3 ) (not visible in the middle) connection; the gate is arranged in the pipeline 33;

所述液压泵31包括驱动电机34,所述驱动电机34的电机轴连接有手摇装置35;The hydraulic pump 31 includes a drive motor 34, and the motor shaft of the drive motor 34 is connected with a hand crank device 35;

所述手摇装置35,用于停电或故障等紧急情况下的对闸阀进行手动开启或关闭;The hand crank device 35 is used to manually open or close the gate valve in emergency situations such as power failure or failure;

在正常情况下,本发明实施例的液压动力装置根据闸阀控制装置的指令,启闭闸板,也就是根据闸阀控制装置的指令,通过驱动电机34驱动液压泵31排油,排出的油进入液压缸32,驱动液压缸32的活塞杆移动,也就能启闭闸板;但是在停电或故障等紧急情况下,所述液压动力装置失去动力,无法启闭闸板,需要通过手摇装置35完成闸板的启闭。Under normal circumstances, the hydraulic power device of the embodiment of the present invention opens and closes the gate according to the instructions of the gate valve control device, that is, according to the instructions of the gate valve control device, the hydraulic pump 31 is driven by the driving motor 34 to discharge oil, and the discharged oil enters the hydraulic pressure The cylinder 32, which drives the piston rod of the hydraulic cylinder 32 to move, can also open and close the gate; but in emergency situations such as power failure or failure, the hydraulic power device loses power and cannot open and close the gate. Complete the opening and closing of the gate.

可以理解的是,手动开启或关闭所述闸阀,可以是与所述驱动电机34没有任何关联的机构,如可以是手动液压泵;相比手动液压泵,本发明实施例的手摇装置35直接与所述电机轴连接,无需另外铺设管道、电磁阀等部件,结构更简单。It can be understood that manually opening or closing the gate valve may be a mechanism not associated with the drive motor 34, such as a manual hydraulic pump; compared with the manual hydraulic pump, the hand crank device 35 in the embodiment of the present invention directly Connected to the motor shaft, there is no need to lay additional components such as pipes, solenoid valves, etc., and the structure is simpler.

图4为图3中手摇装置35的剖视示意图,如图4所示,所述手摇装置35包括手摇杆351、建立或松开所述手摇杆351与电机轴341之间联动连接的离合部件352。FIG. 4 is a schematic cross-sectional view of the hand crank device 35 in FIG. 3 . As shown in FIG. 4 , the hand crank device 35 includes a hand rocker 351 to establish or release the linkage between the hand rocker 351 and the motor shaft 341 Connected clutch member 352 .

为使手摇装置35更有效率,所述手摇装置35还包括行星齿轮机构,所述行星齿轮机构包括箱体353、内齿圈354、行星架355、行星齿轮和太阳齿轮356;所述内齿圈354固定于所述箱体353内壁,所述手摇杆351与所述行星架355固定连接,所述电机轴341套设有所述太阳齿轮356;所述离合部件352用于将所述电机轴341和太阳齿轮356在圆周向联动连接。In order to make the hand crank device 35 more efficient, the hand crank device 35 also includes a planetary gear mechanism, and the planetary gear mechanism includes a casing 353, a ring gear 354, a planet carrier 355, a planetary gear and a sun gear 356; the The inner gear 354 is fixed on the inner wall of the box body 353 , the hand rocker 351 is fixedly connected with the planet carrier 355 , the motor shaft 341 is sleeved with the sun gear 356 ; the clutch member 352 is used to connect the The motor shaft 341 and the sun gear 356 are linked in a circumferential direction.

本发明实施例中,所述行星架355一端设有两个行星齿轮轴357,两个行星齿轮轴357基于电机轴341轴对称;In the embodiment of the present invention, one end of the planet carrier 355 is provided with two planetary gear shafts 357, and the two planetary gear shafts 357 are axially symmetrical based on the motor shaft 341;

每个所述行星齿轮轴357上设置有轴向排列分布、且与所述行星齿轮轴357同步转动的第一行星齿轮358和第二行星齿轮359;所述第一行星齿轮358与所述内齿圈354啮合,所述第二行星齿轮359与所述太阳齿轮356啮合;所述第一行星齿轮358的齿数小于所述内齿圈354的齿数和第二行星齿轮359的齿数,所述太阳齿轮356的齿数小于所述第二行星齿轮359的齿数。Each of the planetary gear shafts 357 is provided with a first planetary gear 358 and a second planetary gear 359 which are axially arranged and distributed and rotate synchronously with the planetary gear shaft 357 ; the first planetary gear 358 and the inner The ring gear 354 meshes with the second planetary gear 359 and the sun gear 356; the number of teeth of the first planetary gear 358 is smaller than the number of teeth of the ring gear 354 and the number of teeth of the second planetary gear 359, the sun gear The number of teeth of the gear 356 is smaller than that of the second planetary gear 359 .

这样,通过手摇装置35,可以获得比较大的增速比,使手摇装置35更有效率;In this way, through the hand crank device 35, a relatively large speed-up ratio can be obtained, making the hand crank device 35 more efficient;

进一步地,所述电机轴341还套设有离合连接套342,所述离合连接套342的外圆套设所述太阳齿轮356;所述离合连接套342通过键固定在所述电机轴341上;Further, the motor shaft 341 is also sleeved with a clutch connection sleeve 342, and the outer circle of the clutch connection sleeve 342 is sleeved with the sun gear 356; the clutch connection sleeve 342 is fixed on the motor shaft 341 by a key ;

正常情况下,拉出手摇杆351,离合部件352松开,所述离合连接套342与所述太阳齿轮356径向脱离,这样,所述驱动电机34运转时,所述行星齿轮机构静止;Under normal circumstances, when the hand rocker 351 is pulled out, the clutch member 352 is released, and the clutch connecting sleeve 342 is radially separated from the sun gear 356, so that when the drive motor 34 is running, the planetary gear mechanism is stationary;

当出现停电或故障等紧急情况时,手摇杆351推入行星齿轮机构,离合部件352工作,所述离合连接套342与所述太阳齿轮356径向固定,这样,所述转动手摇杆351,通过行星齿轮机构带动所述电机轴341转动,驱动液压动力装置动作。When emergencies such as power failure or failure occur, the hand rocker 351 is pushed into the planetary gear mechanism, the clutch member 352 works, and the clutch connecting sleeve 342 is radially fixed with the sun gear 356, so that the rotating hand rocker 351 , the motor shaft 341 is driven to rotate through the planetary gear mechanism, and the hydraulic power device is driven to act.

可以理解的是,所述手摇装置35与所述电机轴之间也可以是其它方式的传动连接,如普通的齿轮传动、蜗轮蜗杆传动、带传动、链传动等。It can be understood that, the hand crank device 35 and the motor shaft can also be connected by other means of transmission, such as common gear transmission, worm gear transmission, belt transmission, chain transmission and so on.

为了能够更加详尽地了解本发明实施例中手摇装置的特点与技术内容,下面以图5为例,做进一步说明:In order to be able to understand the characteristics and technical content of the hand crank device in the embodiment of the present invention in more detail, take FIG. 5 as an example to further illustrate:

图5为图4中手摇装置35的行星齿轮啮合示意图;所述第一行星齿轮358与所述内齿圈354啮合,所述第二行星齿轮359与所述太阳齿轮356啮合;5 is a schematic diagram of the planetary gear meshing of the hand crank device 35 in FIG. 4; the first planetary gear 358 meshes with the ring gear 354, and the second planetary gear 359 meshes with the sun gear 356;

图5中所述齿轮的模数均为2,第一行星齿轮358的齿数为8,第二行星齿轮359的齿数为29,太阳齿轮356齿数为10,内齿圈354的齿数为48,这样,传动达到18.4,也就是增速比为18.4;The modules of the gears in FIG. 5 are all 2, the number of teeth of the first planetary gear 358 is 8, the number of teeth of the second planetary gear 359 is 29, the number of teeth of the sun gear 356 is 10, and the number of teeth of the ring gear 354 is 48, so that , the transmission reaches 18.4, that is, the speed increase ratio is 18.4;

具体地,所述增速比的计算过程如下:Specifically, the calculation process of the speed increase ratio is as follows:

设太阳齿轮356为齿轮1,第二行星齿轮359为齿轮2,第一行星齿轮358为齿轮3,内齿圈354为齿轮4,行星架为H,根据行星齿轮传动比计算原理可得:Assuming that the sun gear 356 is gear 1, the second planetary gear 359 is gear 2, the first planetary gear 358 is gear 3, the ring gear 354 is gear 4, and the planet carrier is H, according to the calculation principle of the planetary gear ratio, it can be obtained:

Figure BDA0001346414430000101
Figure BDA0001346414430000101

其中,

Figure BDA0001346414430000102
表示假设行星架静止情况下,齿轮1和齿轮4之间的传动比,n表示转速,Z表示齿数,如n1表示齿轮1的转速,Z1表示齿轮1的齿数,以此类推;in,
Figure BDA0001346414430000102
Indicates the transmission ratio between gear 1 and gear 4 under the assumption that the planet carrier is stationary, n represents the rotational speed, Z represents the number of teeth, such as n 1 represents the rotational speed of gear 1, Z 1 represents the number of teeth of gear 1, and so on;

因为内齿圈固定不动,因此n4为零,由表达式(1)可得:Because the ring gear is fixed, n 4 is zero, which can be obtained from expression (1):

Figure BDA0001346414430000103
Figure BDA0001346414430000103

将齿数代入计算:Substitute the number of teeth into the calculation:

Figure BDA0001346414430000104
Figure BDA0001346414430000104

由(3)可得:From (3) we can get:

Figure BDA0001346414430000105
Figure BDA0001346414430000105

由(4)可得:From (4) we can get:

Figure BDA0001346414430000111
Figure BDA0001346414430000111

也就是表示齿轮1,即太阳齿轮356的转速是行星架355的18.4倍,而行星架355和手摇杆351是固定连接的,因此,手摇装置35的增速比18.4。That is to say, the rotation speed of gear 1, that is, the sun gear 356 is 18.4 times that of the planet carrier 355, and the planet carrier 355 and the hand rocker 351 are fixedly connected, so the speed increase ratio of the manual device 35 is 18.4.

在样机测试中,在管道水压为4.5MPa时,当手摇杆351达到每秒1转的速度时,可以带动电机转动18.4转,液压缸的活塞杆可以移动1.73mm,完成整个关阀操作所用时间为104秒,能满足紧急情况下的关阀操作;In the prototype test, when the water pressure in the pipeline is 4.5MPa, when the hand lever 351 reaches the speed of 1 revolution per second, it can drive the motor to rotate 18.4 revolutions, and the piston rod of the hydraulic cylinder can move 1.73mm to complete the entire valve closing operation. The time used is 104 seconds, which can meet the valve closing operation in emergency situations;

当然,速度可以通过手臂施加的转矩随时调节。Of course, the speed can be adjusted at any time by the torque applied by the arm.

可以理解的是,行星齿轮机构中的齿轮可以根据需要,设计与本实施例不同的齿数。It can be understood that, the gears in the planetary gear mechanism can be designed with different numbers of teeth from the present embodiment as required.

为表达简洁,也符合行业规范,图5中齿轮的模数用字母M表示、齿数用字母Z表示,例如,第一行星齿轮358的模数为2,齿轮为8,可以表达为“M=2,Z=8”。In order to express concisely and conform to industry standards, the module of the gear in Figure 5 is represented by the letter M, and the number of teeth is represented by the letter Z. For example, the module of the first planetary gear 358 is 2 and the gear is 8, which can be expressed as "M= 2, Z = 8".

实施例四Embodiment 4

图6为本发明实施例四闸阀控制方法的流程示意图,所述方法的执行主体可以是闸阀控制装置,如图6所示,所述方法包括:FIG. 6 is a schematic flowchart of a fourth gate valve control method according to an embodiment of the present invention. The execution body of the method may be a gate valve control device. As shown in FIG. 6 , the method includes:

步骤601:在所述闸阀启动后,按预设时间间隔检测所述闸阀的实际状态数据;Step 601: After the gate valve is started, the actual state data of the gate valve is detected at preset time intervals;

具体地,所述按预设时间间隔检测所述闸阀的实际状态数据,包括:Specifically, the detection of the actual state data of the gate valve at preset time intervals includes:

按预设时间间隔定时检测所述液压动力装置传动部件的实际位移数据。The actual displacement data of the transmission components of the hydraulic power unit are regularly detected at preset time intervals.

更具体地,检测所述闸阀的实际状态数据的是闸阀控制装置中的检测部件,所述检测部件在检测的实际状态数据后,将所述实际状态数据发送给闸阀控制装置中的控制部件;More specifically, what detects the actual state data of the gate valve is a detection component in the gate valve control device, and the detection component sends the actual state data to the control component in the gate valve control device after detecting the actual state data;

这里,所述检测部件可以是位移检测部件;控制部件可以是PLC;Here, the detection component may be a displacement detection component; the control component may be a PLC;

也就是位移检测部件会将液压动力装置传动部件的实际位移数据发送给PLC,PLC进行进一步的处理,也就是执行步骤602。That is, the displacement detection component will send the actual displacement data of the transmission component of the hydraulic power device to the PLC, and the PLC will perform further processing, that is, step 602 is executed.

进一步地,所述按预设时间间隔检测所述闸阀的实际状态数据,还包括:Further, the detection of the actual state data of the gate valve at preset time intervals further includes:

按预设时间间隔定时检测闸板的实际移动速度、管道内液体流动速度、管道内壁压力和管道振动值。The actual moving speed of the gate, the liquid flow speed in the pipeline, the pressure on the inner wall of the pipeline and the vibration value of the pipeline are regularly detected at preset time intervals.

这里,检测部件可以是检测闸板移动速度的第一速度检测部件、检测管道内液体流动速度的第二速度检测部件、以及检测管道内壁压力的压力检测部件和检测管道振动值的振动检测部件;控制部件可以是PLC;Here, the detection component may be a first speed detection component for detecting the moving speed of the shutter, a second speed detection component for detecting the liquid flow speed in the pipeline, a pressure detection component for detecting the pressure of the inner wall of the pipeline, and a vibration detection component for detecting the vibration value of the pipeline; The control part can be a PLC;

同理,检测部件将上述检测数据发送给PLC,PLC进行进一步的处理,也就是执行步骤602。Similarly, the detection component sends the above detection data to the PLC, and the PLC performs further processing, that is, step 602 is executed.

步骤602:根据所述实际状态数据调整输入液压动力装置的控制参数,直至所述实际状态数据符合预设状态数据。Step 602: Adjust the control parameters input to the hydraulic power device according to the actual state data until the actual state data conforms to the preset state data.

具体地,所述根据所述实际状态数据调整输入所述液压动力装置的控制参数,直至所述实际状态数据符合预设状态数据,包括:Specifically, adjusting the control parameters input to the hydraulic power device according to the actual state data until the actual state data conforms to the preset state data includes:

将所述液压动力装置传动部件的实际位移数据与预设位移数据进行比较,获得位移误差值;Comparing the actual displacement data of the transmission part of the hydraulic power device with the preset displacement data to obtain a displacement error value;

根据所述位移误差值调整输入所述液压动力装置的控制参数,直至所述位移误差值小于预设位移误差阈值。The control parameters input to the hydraulic power device are adjusted according to the displacement error value until the displacement error value is smaller than a preset displacement error threshold.

这里,所述预设位移数据可以是根据液压动力装置的传动部件在每一时间段的移动速度计算得到;而液压动力装置的传动部件在每一时间段的移动速度可以是根据计算或试验得到的;液压动力装置的传动部件在每一时间段的移动速度可以是相同的,也可以是不同的;Here, the preset displacement data can be calculated according to the moving speed of the transmission part of the hydraulic power device in each time period; and the moving speed of the transmission part of the hydraulic power device in each time period can be obtained according to calculation or experimentation The moving speed of the transmission parts of the hydraulic power unit in each time period can be the same or different;

优选地,为了使闸阀的启闭顺利,不过载,所述液压动力装置的传动部件可以设置为:在闸板启闭开始时是慢速,中间快速,到快完成启闭时也是慢速;Preferably, in order to make the opening and closing of the gate valve smooth and not overloaded, the transmission components of the hydraulic power device can be set to be slow at the beginning of opening and closing of the gate, fast in the middle, and also slow when the opening and closing are completed quickly;

进一步地,所述液压动力装置传动部件的预设位移数据可以表示为横轴为时间、纵轴为位移的曲线图;Further, the preset displacement data of the transmission component of the hydraulic power device can be represented as a graph with time on the horizontal axis and displacement on the vertical axis;

更进一步地,所述液压动力装置传动部件的预设位移数据可以根据计算或试验确定,也可以在实际使用中不断总结运行状况确定。Further, the preset displacement data of the transmission components of the hydraulic power unit may be determined according to calculation or experiment, or may be determined by continuously summarizing the operating conditions in actual use.

所述预设位移误差阈值为根据液压缸运动的精度而设定,小于预设位移误差阈值就不必再作调整,这样更节能。The preset displacement error threshold value is set according to the precision of the movement of the hydraulic cylinder, and if it is smaller than the preset displacement error threshold value, no further adjustment is necessary, which is more energy-saving.

根据所述位移误差值调整输入所述液压动力装置的控制参数,可以包括:根据所述位移误差值,调整进入所述液压缸的液压油流量;具体地,调整控制参数可以通过伺服阀;Adjusting the control parameters input to the hydraulic power device according to the displacement error value may include: adjusting the flow of hydraulic oil entering the hydraulic cylinder according to the displacement error value; specifically, adjusting the control parameters may be through a servo valve;

调整进入所述液压缸的液压油流量,可以调整液压缸活塞杆的移动速度,进而减少位移误差值。Adjusting the flow of hydraulic oil entering the hydraulic cylinder can adjust the movement speed of the piston rod of the hydraulic cylinder, thereby reducing the displacement error value.

进一步地,所述闸板设有压力检测部件(图中未示出)检测闸板底部的压力,以便及时停止液压动力装置的动作;同时,液压动力装置的液压管道中还设置有溢流阀,这样,在闸板的开启或关闭完成,即到达预定位置后,液压动力装置可以及时停止动作,液压管道中的液压油通过溢流阀卸荷,避免发生电机堵转、闸板过行程导致闸板或其它零部件变形的问题。Further, the gate is provided with a pressure detection component (not shown in the figure) to detect the pressure at the bottom of the gate, so as to stop the action of the hydraulic power device in time; meanwhile, a relief valve is also provided in the hydraulic pipeline of the hydraulic power device. In this way, after the opening or closing of the gate is completed, that is, after reaching the predetermined position, the hydraulic power device can stop in time, and the hydraulic oil in the hydraulic pipeline is unloaded through the relief valve to avoid the occurrence of motor stall and gate overtravel. The problem of deformation of the gate or other parts.

基于本发明实施例,所述液压缸活塞杆的位移可以精确的符合预设的要求,避免了滞后或超前带来的过载对液压动力装置的损伤,也可以避免液压动力装置中驱动电机的堵转,还可以根据所述液压动力装置传动部件的预设位移数据,调整所述液压动力装置传动部件的实际位移,避免水锤现象的发生。可以理解的是,为达成对液压动力装置运动的精确控制,也可以检测除液压缸活塞杆之外的其它传动部件的位移或速度。Based on the embodiment of the present invention, the displacement of the piston rod of the hydraulic cylinder can precisely meet the preset requirements, which avoids the damage to the hydraulic power device caused by the overload caused by lag or advance, and also avoids the blockage of the driving motor in the hydraulic power device. The actual displacement of the transmission part of the hydraulic power device can also be adjusted according to the preset displacement data of the transmission part of the hydraulic power device, so as to avoid the occurrence of the water hammer phenomenon. It can be understood that, in order to achieve precise control of the movement of the hydraulic power unit, the displacement or speed of other transmission components other than the piston rod of the hydraulic cylinder can also be detected.

进一步地,所述根据所述实际状态数据调整输入所述液压动力装置的控制参数,直至所述实际状态数据符合预设状态数据,还包括:Further, the adjusting the control parameters input to the hydraulic power device according to the actual state data until the actual state data conforms to the preset state data, further includes:

将闸板的实际移动速度与闸板的目标移动速度进行比较,获得速度误差值;Compare the actual moving speed of the gate with the target moving speed of the gate to obtain the speed error value;

根据所述速度误差值调整输入所述液压动力装置的控制参数,直至所述速度误差值小于预设速度误差阈值。The control parameters input to the hydraulic power unit are adjusted according to the speed error value until the speed error value is less than a preset speed error threshold.

这里,所述闸板的实际移动速度是通过第一速度检测部件检测得到的,第一速度检测部件会将检测数据发送给PLC;Here, the actual moving speed of the shutter is detected by the first speed detection component, and the first speed detection component will send the detection data to the PLC;

闸板的目标移动速度是对检测到的管道内液体流动速度、管道内壁压力和管道振动值进行模糊计算得到。The target moving speed of the gate is obtained by fuzzy calculation of the detected liquid flow velocity in the pipeline, the pressure on the inner wall of the pipeline and the vibration value of the pipeline.

也就是说,所述闸板的目标移动速度是不断变化的,会根据管道内的具体情况做相应的修正。That is to say, the target moving speed of the gate is constantly changing, and corresponding corrections will be made according to the specific conditions in the pipeline.

根据上述方式确定闸板的目标移动速度,可以最大限度的避免水锤现象;所述管道内液体流动速度、管道内壁压力和管道振动值是通过试验确定的决定水锤现象的关键因素。Determining the target moving speed of the gate according to the above method can avoid the water hammer phenomenon to the greatest extent; the liquid flow speed in the pipeline, the pressure of the inner wall of the pipeline and the vibration value of the pipeline are the key factors to determine the water hammer phenomenon determined through experiments.

更具体地,根据所述速度误差值调整输入所述液压动力装置的控制参数,包括:根据所述速度误差值,运用比例-积分-微分(PID,proportion、integral、derivative)控制部件调节伺服阀的流量,进而调整液压缸的移动速度。More specifically, adjusting the control parameters input to the hydraulic power device according to the speed error value includes: using proportional-integral-derivative (PID, proportional, integral, derivative) control components to adjust the servo valve according to the speed error value flow, and then adjust the movement speed of the hydraulic cylinder.

PID控制部件是一个在工业控制应用中常见的反馈回路部件,由比例单元P、积分单元I和微分单元D组成。PID控制的基础是比例控制;积分控制可消除稳态误差,但可能增加超调;微分控制可加快大惯性系统响应速度以及减弱超调趋势。PID控制部件适用于需要进行高精度测量控制的系统,可根据被控对象自动演算出最佳PID控制参数,使用简单易懂,不需精确的系统模型等先决条件,因而成为应用最为广泛的控制器。PID control part is a common feedback loop part in industrial control applications, which consists of proportional unit P, integral unit I and differential unit D. The basis of PID control is proportional control; integral control can eliminate steady-state errors, but may increase overshoot; differential control can speed up the response speed of large inertia systems and reduce the tendency of overshoot. PID control components are suitable for systems that require high-precision measurement and control. They can automatically calculate the optimal PID control parameters according to the controlled object. The use is simple and easy to understand, and does not require precise system models and other prerequisites, thus becoming the most widely used control device.

所述PID控制部件可以通过PLC实现,例如可以是PLC的一个模块,也可以是单独的部件。The PID control component can be realized by PLC, for example, it can be a module of PLC, or it can be a separate component.

所述预设速度误差阈值为根据液压缸移动的精度设定,小于预设速度误差阈值就不必再作调整,这样更节能。The preset speed error threshold value is set according to the accuracy of the movement of the hydraulic cylinder, and if it is smaller than the preset speed error threshold value, no further adjustment is required, which is more energy-saving.

进一步地,所述闸阀设有自学习模糊控制器,所述自学习模糊控制器用于对检测到的管道内液体流动速度、管道内壁压力和管道振动值进行模糊计算,获得所述闸板的目标移动速度,这样无需通过人工计算或试验确定目标移动速度,这样,确定闸板的目标移动速度更科学、更智能。Further, the gate valve is provided with a self-learning fuzzy controller, and the self-learning fuzzy controller is used to perform fuzzy calculation on the detected liquid flow velocity in the pipeline, the pressure on the inner wall of the pipeline and the vibration value of the pipeline, so as to obtain the target of the gate. The moving speed of the gate does not need to be determined by manual calculation or experiment, so that it is more scientific and intelligent to determine the target moving speed of the gate.

基于本发明实施例,可以最大限度的避免水锤现象,避免闸阀、管道被冲击损坏;Based on the embodiment of the present invention, the water hammer phenomenon can be avoided to the greatest extent, and the gate valve and the pipeline are prevented from being damaged by impact;

可以理解的是,确定闸板的目标移动速度,可以在管道内液体流动速度、管道内壁压力和管道振动值之外增加更多的监控项目。It can be understood that, by determining the target moving speed of the gate, more monitoring items can be added in addition to the liquid flow speed in the pipeline, the pressure on the inner wall of the pipeline and the vibration value of the pipeline.

实施例五Embodiment 5

图7为本发明实施例五通过监控活塞杆位移来控制闸阀的流程示意图,如图7所示,所述流程包括:FIG. 7 is a schematic diagram of the process of controlling the gate valve by monitoring the displacement of the piston rod according to the fifth embodiment of the present invention. As shown in FIG. 7 , the process includes:

步骤701:读取活塞杆的位移数据;Step 701: read the displacement data of the piston rod;

具体的,位移检测部件检测所述液压缸活塞杆的位移,获取活塞杆的位移数据。Specifically, the displacement detection component detects the displacement of the piston rod of the hydraulic cylinder, and obtains displacement data of the piston rod.

步骤702:闸板开启或关闭是否完成;Step 702: Whether the opening or closing of the shutter is completed;

本步骤中,根据活塞杆的位移数据,确定闸板开启或关闭是否完成,如果闸板开启或关闭完成,则流程结束;如果未完成,则进入步骤703。In this step, according to the displacement data of the piston rod, it is determined whether the opening or closing of the gate is completed, if the opening or closing of the gate is completed, the process ends;

步骤703:将位移数据发送给PLC;Step 703: Send the displacement data to the PLC;

具体的,将获取的活塞杆的位移数据发送给PLC。Specifically, the acquired displacement data of the piston rod is sent to the PLC.

步骤704:将位移数据与预设活塞杆位移数据比较;Step 704: Compare the displacement data with the preset piston rod displacement data;

具体的,将活塞杆的位移数据与预设活塞杆位移数据比较,获得位移误差值;Specifically, comparing the displacement data of the piston rod with the preset displacement data of the piston rod to obtain a displacement error value;

步骤705:判断位移误差值是否小于预设位移误差阈值,如果位移误差值小于预设位移误差阈值,则进入步骤701;反之,进入步骤706。Step 705 : Determine whether the displacement error value is smaller than the preset displacement error threshold, if the displacement error value is smaller than the preset displacement error threshold, go to step 701 ; otherwise, go to step 706 .

步骤706:将调整指令发送给伺服阀;Step 706: Send the adjustment instruction to the servo valve;

具体的,将调整指令发送给伺服阀,通过伺服阀对液压缸的活塞杆进行调整。Specifically, the adjustment instruction is sent to the servo valve, and the piston rod of the hydraulic cylinder is adjusted through the servo valve.

步骤707:调整活塞杆的移动速度。Step 707: Adjust the movement speed of the piston rod.

具体的,伺服阀调整进入所述液压缸的液压油流量,进而调整液压缸活塞杆的移动速度。Specifically, the servo valve adjusts the flow of hydraulic oil entering the hydraulic cylinder, thereby adjusting the movement speed of the piston rod of the hydraulic cylinder.

实施例六Embodiment 6

图8为本发明实施例六带自学习模糊控制器的闸阀控制装置的结构示意图,如图8所示,闸阀控制装置包括PLC、自学习模糊控制器和电动伺服液控阀,其中:8 is a schematic structural diagram of a gate valve control device with a self-learning fuzzy controller according to Embodiment 6 of the present invention. As shown in FIG. 8 , the gate valve control device includes a PLC, a self-learning fuzzy controller and an electric servo hydraulic control valve, wherein:

所述PLC,用于接收自学习模糊控制器发送的“闸板理论速度”,与检测的闸板实际速度比较获得速度误差值,根据速度误差值调整电动伺服液控阀,也就是通过PID控制实现对闸阀的闭环控制;The PLC is used to receive the "theoretical speed of the gate" sent by the self-learning fuzzy controller, compare it with the actual speed of the gate to obtain the speed error value, and adjust the electric servo hydraulic control valve according to the speed error value, that is, through PID control. Realize closed-loop control of gate valve;

所述自学习模糊控制器,用于采集管路中的液体流速、管路振动和冲击压力,根据管路中的液体流速、管路振动和冲击压力计算出“闸板理论速度”发送给PLC;The self-learning fuzzy controller is used to collect the liquid flow rate, pipeline vibration and impact pressure in the pipeline, and calculate the "theoretical speed of the gate" according to the liquid flow rate, pipeline vibration and impact pressure in the pipeline and send it to the PLC ;

所述电动伺服液控阀,用于接收PLC的控制信号,调整闸板的移动速度。The electric servo hydraulic control valve is used for receiving the control signal of the PLC to adjust the moving speed of the gate.

由于闸阀的关闭更容易引起水锤现象,因此,下面将介绍本发明实施例六带自学习模糊控制器的闸阀控制装置的关闭闸板流程;当然,可以理解的是,本实施例的控制方法同样也可用于闸板的开启控制。Since the closing of the gate valve is more likely to cause the water hammer phenomenon, the following will introduce the gate closing process of the gate valve control device with the self-learning fuzzy controller in the sixth embodiment of the present invention; of course, it can be understood that the control method of this embodiment is It can also be used for gate opening control.

图9为本发明实施例六带自学习模糊控制器的闸阀控制装置关闭闸板的流程示意图,如图9所示,所述流程包括:9 is a schematic flowchart of a gate valve control device with a self-learning fuzzy controller to close a gate according to Embodiment 6 of the present invention. As shown in FIG. 9 , the process includes:

步骤901:初始化程序;Step 901: initialization procedure;

这里,所述初始化包括:控制装置启动,启动主程序。Here, the initialization includes: starting the control device and starting the main program.

步骤902:开启闸阀关闭程序;Step 902: start the gate valve closing procedure;

具体是指控制装置指令液压动力装置启动。Specifically, the control device commands the hydraulic power unit to start.

步骤903:是否开启自学习功能,如果不开启,则进入步骤904;如果开启,则进入步骤905。Step 903 : whether to enable the self-learning function, if not, proceed to step 904 ; if it is enabled, proceed to step 905 .

步骤904:读取预设的闸板目标移动速度,执行步骤907;Step 904: Read the preset shutter target moving speed, and execute Step 907;

这里,所述预设的闸板目标移动速度可以是横轴为时间、纵轴为速度的曲线图;Here, the preset target moving speed of the gate may be a graph with time on the horizontal axis and speed on the vertical axis;

所述曲线图可以是可以根据计算或试验确定,也可以在实际使用中不断总结运行状况确定。The graph may be determined according to calculations or experiments, or may be determined by continuously summarizing the operating conditions in actual use.

步骤905:采集管道内的数据;Step 905: collect data in the pipeline;

本发明实施例中,管道内的数据包括:管道内液体流动速度、管道内壁压力和管道振动值。In the embodiment of the present invention, the data in the pipeline includes: the liquid flow velocity in the pipeline, the pressure on the inner wall of the pipeline, and the vibration value of the pipeline.

步骤906:根据采集的管道内的数据,进行模糊计算;Step 906: perform fuzzy calculation according to the collected data in the pipeline;

本步骤中,根据预设的数据模型,将管道内液体流动速度、管道内壁压力和管道振动值输入数据模型进行计算。In this step, according to a preset data model, the liquid flow velocity in the pipeline, the pressure on the inner wall of the pipeline and the vibration value of the pipeline are input into the data model for calculation.

步骤907:确定闸板目标移动速度;Step 907: Determine the target moving speed of the gate;

本步骤中,根据预设的闸板目标移动速度或模糊计算的结果,确定闸板目标移动速度。In this step, the target moving speed of the gate is determined according to the preset moving speed of the gate target or the result of the fuzzy calculation.

步骤908:检测闸板的实际移动速度;Step 908: Detect the actual moving speed of the gate;

这里,通过速度检测部件,检测出闸板的实际移动速度。Here, the actual moving speed of the shutter is detected by the speed detection means.

步骤909:判断闸阀是否完成关闭;Step 909: determine whether the gate valve is closed;

本步骤中,根据闸板的实际移动速度,判断出闸阀是否完成关闭,如果完成,则流程结束;如果未完成,则进入步骤910。In this step, according to the actual moving speed of the gate plate, it is determined whether the gate valve has been closed.

步骤910:速度误差值小于预设速度误差阈值;Step 910: the speed error value is less than the preset speed error threshold;

本步骤中,比较实际移动速度和目标移动速度,得到速度误差值,如果速度误差值小于预设速度误差阈值,则进入步骤903;反之,进入步骤911。In this step, the actual moving speed and the target moving speed are compared to obtain a speed error value. If the speed error value is less than the preset speed error threshold, go to step 903 ; otherwise, go to step 911 .

步骤911:进行PID运算;Step 911: perform PID operation;

这里,将速度误差值进行比例-积分-微分运算,获得相应的反馈控制参数。Here, the proportional-integral-derivative operation is performed on the speed error value to obtain the corresponding feedback control parameters.

步骤912:调节伺服阀的流量;Step 912: adjust the flow of the servo valve;

这里,根据反馈控制参数,调节伺服阀的流量,也就是调整液压缸的移动速度;Here, according to the feedback control parameters, the flow rate of the servo valve is adjusted, that is, the moving speed of the hydraulic cylinder is adjusted;

步骤912执行完,重新进入步骤903。After step 912 is executed, step 903 is re-entered.

以上所述,仅为本发明的较佳实施例而已,并非用于限定本发明的保护范围,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。The above are only preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention shall be included in the within the protection scope of the present invention.

Claims (9)

1.一种闸阀,其特征在于,所述闸阀包括闸板、闸阀控制装置和驱动闸板启闭的液压动力装置,所述闸阀控制装置包括控制所述液压动力装置运动的控制部件和检测所述闸阀状态的检测部件;其中,1. A gate valve, characterized in that, the gate valve comprises a gate, a gate valve control device and a hydraulic power device that drives the opening and closing of the gate, and the gate valve control device includes a control component and a detection unit that control the movement of the hydraulic power device. The detection component of the state of the gate valve; wherein, 所述检测部件,用于按预设时间间隔检测所述闸阀的实际状态数据;The detection component is used to detect the actual state data of the gate valve at preset time intervals; 所述控制部件,用于根据检测部件检测到的实际状态数据调整输入所述液压动力装置的控制参数,直至所述实际状态数据符合预设状态数据;The control component is configured to adjust the control parameters input to the hydraulic power device according to the actual state data detected by the detection component, until the actual state data conforms to the preset state data; 所述闸板设有检测闸板底部的压力的压力检测部件,所述压力检测部件连接所述控制部件;在所述闸板底部的压力超过预设值时,所述控制部件控制所述液压动力装置停止运行;The gate is provided with a pressure detection part for detecting the pressure at the bottom of the gate, and the pressure detection part is connected to the control part; when the pressure at the bottom of the gate exceeds a preset value, the control part controls the hydraulic pressure The power plant stops running; 所述控制部件为PLC,所述检测部件包括检测活塞杆位移的位移检测部件,还包括检测闸板移动速度的第一速度检测部件、检测管道内液体流动速度的第二速度检测部件、以及检测管道内壁压力的所述压力检测部件和检测管道振动值的振动检测部件;The control component is a PLC, and the detection component includes a displacement detection component for detecting the displacement of the piston rod, a first speed detection component for detecting the moving speed of the gate, a second speed detection component for detecting the liquid flow speed in the pipeline, and a detection component. the pressure detecting component for the pressure of the inner wall of the pipeline and the vibration detecting component for detecting the vibration value of the pipeline; 所述闸阀控制装置通过所述第二速度检测部件、所述压力检测部件和所述振动检测部件确定所述闸板的目标移动速度,并通过所述第一速度检测部件按预设时间间隔检测所述闸板的实际移动速度,然后通过所述PLC根据所述闸板的实际移动速度与目标移动速度的速度误差值,调整输入所述液压动力装置的控制参数,直至所述速度误差值小于预设速度误差阈值,达到精确控制所述液压动力装置运动的目的;The gate valve control device determines the target moving speed of the gate plate through the second speed detection part, the pressure detection part and the vibration detection part, and detects the target moving speed of the gate plate at preset time intervals through the first speed detection part The actual moving speed of the gate, and then adjust the control parameters input to the hydraulic power device through the PLC according to the speed error value between the actual moving speed of the gate and the target moving speed, until the speed error value is less than Presetting the speed error threshold to achieve the purpose of precisely controlling the movement of the hydraulic power device; 所述液压动力装置还包括驱动电机,所述驱动电机的电机轴连接有手摇装置;The hydraulic power device further includes a drive motor, and the motor shaft of the drive motor is connected with a hand crank device; 所述手摇装置包括手摇杆、建立或松开所述手摇杆与所述电机轴之间联动连接的离合部件;The hand crank device includes a hand rocker, a clutch component for establishing or releasing the linkage between the hand rocker and the motor shaft; 所述手摇装置还包括行星齿轮机构,所述行星齿轮机构包括箱体、内齿圈、行星架、行星齿轮和太阳齿轮;The hand crank device further includes a planetary gear mechanism, the planetary gear mechanism includes a casing, an inner gear, a planet carrier, a planetary gear and a sun gear; 所述内齿圈固定于所述箱体内壁,所述手摇杆与所述行星架固定连接,所述电机轴套设有所述太阳齿轮;所述离合部件用于将所述电机轴和太阳齿轮在圆周向联动连接;The inner gear ring is fixed on the inner wall of the box, the hand rocker is fixedly connected with the planet carrier, and the motor shaft is sleeved with the sun gear; the clutch part is used to connect the motor shaft and the planetary carrier. The sun gear is linked in the circumferential direction; 所述行星架一端设有两个行星齿轮轴,每个所述行星齿轮轴上设置有轴向排列分布、且与所述行星齿轮轴同步转动的第一行星齿轮和第二行星齿轮;One end of the planet carrier is provided with two planetary gear shafts, and each of the planetary gear shafts is provided with a first planetary gear and a second planetary gear that are axially arranged and distributed and rotate synchronously with the planetary gear shaft; 所述第一行星齿轮与所述内齿圈啮合,所述第二行星齿轮与所述太阳齿轮啮合;所述第一行星齿轮的齿数小于所述内齿圈的齿数和第二行星齿轮的齿数,所述太阳齿轮的齿数小于所述第二行星齿轮的齿数。The first planetary gear is meshed with the ring gear, and the second planetary gear is meshed with the sun gear; the number of teeth of the first planetary gear is smaller than the number of teeth of the ring gear and the number of teeth of the second planetary gear , the number of teeth of the sun gear is smaller than the number of teeth of the second planetary gear. 2.根据权利要求1所述的闸阀,其特征在于,所述液压动力装置包括液压缸,所述液压缸的活塞杆与所述闸板连接。2 . The gate valve according to claim 1 , wherein the hydraulic power device comprises a hydraulic cylinder, and the piston rod of the hydraulic cylinder is connected with the gate plate. 3 . 3.一种闸阀控制方法,其特征在于,所述方法包括:3. A gate valve control method, wherein the method comprises: 在闸阀启动后,按预设时间间隔检测所述闸阀的实际状态数据;After the gate valve is started, the actual state data of the gate valve is detected at preset time intervals; 根据所述实际状态数据调整输入液压动力装置的控制参数,直至所述实际状态数据符合预设状态数据;Adjust the control parameters input to the hydraulic power device according to the actual state data until the actual state data conforms to the preset state data; 在闸板底部的压力超过预设值时,控制部件控制所述液压动力装置停止运行;When the pressure at the bottom of the gate exceeds a preset value, the control component controls the hydraulic power device to stop running; 所述闸板设有检测闸板底部的压力的压力检测部件,所述压力检测部件连接所述控制部件;所述控制部件为PLC,检测部件包括检测活塞杆位移的位移检测部件,还包括检测闸板移动速度的第一速度检测部件、检测管道内液体流动速度的第二速度检测部件、以及检测管道内壁压力的所述压力检测部件和检测管道振动值的振动检测部件;The gate is provided with a pressure detection part for detecting the pressure at the bottom of the gate, and the pressure detection part is connected to the control part; the control part is a PLC, and the detection part includes a displacement detection part for detecting the displacement of the piston rod, and a detection part for detecting the displacement of the piston rod. a first speed detection component for the moving speed of the gate, a second speed detection component for detecting the liquid flow speed in the pipeline, the pressure detection component for detecting the pressure of the inner wall of the pipeline, and the vibration detection component for detecting the vibration value of the pipeline; 闸阀控制装置通过所述第二速度检测部件、所述压力检测部件和所述振动检测部件确定所述闸板的目标移动速度,并通过所述第一速度检测部件按预设时间间隔检测所述闸板的实际移动速度,然后通过所述PLC根据所述闸板的实际移动速度与目标移动速度的速度误差值,调整输入所述液压动力装置的控制参数,直至所述速度误差值小于预设速度误差阈值,达到精确控制所述液压动力装置运动的目的。The gate valve control device determines the target moving speed of the gate plate through the second speed detection part, the pressure detection part and the vibration detection part, and detects the speed of the gate at preset time intervals through the first speed detection part The actual moving speed of the gate, and then the PLC adjusts the control parameters input to the hydraulic power device according to the speed error value between the actual moving speed of the gate and the target moving speed, until the speed error value is less than the preset value The speed error threshold is used to precisely control the movement of the hydraulic power unit. 4.根据权利要求3所述的方法,其特征在于,所述按预设时间间隔检测所述闸阀的实际状态数据,包括:4. The method according to claim 3, wherein the detecting the actual state data of the gate valve at preset time intervals comprises: 按预设时间间隔定时检测所述液压动力装置传动部件的实际位移数据。The actual displacement data of the transmission components of the hydraulic power unit are regularly detected at preset time intervals. 5.根据权利要求4所述的方法,其特征在于,所述根据所述实际状态数据调整输入所述液压动力装置的控制参数,直至所述实际状态数据符合预设状态数据,包括:5. The method according to claim 4, wherein the adjusting the control parameters input to the hydraulic power device according to the actual state data until the actual state data conforms to the preset state data, comprising: 将所述液压动力装置传动部件的实际位移数据与预设位移数据进行比较,获得位移误差值;Comparing the actual displacement data of the transmission part of the hydraulic power device with the preset displacement data to obtain a displacement error value; 根据所述位移误差值调整输入所述液压动力装置的控制参数,直至所述位移误差值小于预设位移误差阈值。The control parameters input to the hydraulic power device are adjusted according to the displacement error value until the displacement error value is smaller than a preset displacement error threshold. 6.根据权利要求3所述的方法,其特征在于,所述按预设时间间隔检测所述闸阀的实际状态数据,还包括:6. The method according to claim 3, wherein the detecting the actual state data of the gate valve at preset time intervals further comprises: 按预设时间间隔定时检测闸板的实际移动速度、管道内液体流动速度、管道内壁压力和管道振动值。The actual moving speed of the gate, the liquid flow speed in the pipeline, the pressure on the inner wall of the pipeline and the vibration value of the pipeline are regularly detected at preset time intervals. 7.根据权利要求6所述的方法,其特征在于,所述方法还包括:7. The method according to claim 6, wherein the method further comprises: 对检测到的管道内液体流动速度、管道内壁压力和管道振动值进行模糊计算,确定所述闸板的目标移动速度。A fuzzy calculation is performed on the detected liquid flow velocity in the pipeline, the pressure on the inner wall of the pipeline and the vibration value of the pipeline to determine the target moving speed of the gate. 8.根据权利要求7所述的方法,其特征在于,所述根据所述实际状态数据调整输入所述液压动力装置的控制参数,直至所述实际状态数据符合预设状态数据,还包括:8. The method according to claim 7, wherein the adjusting the control parameters input to the hydraulic power device according to the actual state data until the actual state data conforms to the preset state data, further comprising: 将所述闸板的实际移动速度与闸板的目标移动速度进行比较,获得速度误差值;Comparing the actual moving speed of the gate with the target moving speed of the gate to obtain a speed error value; 根据所述速度误差值调整输入所述液压动力装置的控制参数,直至所述速度误差值小于预设速度误差阈值。The control parameters input to the hydraulic power unit are adjusted according to the speed error value until the speed error value is less than a preset speed error threshold. 9.根据权利要求8所述的方法,其特征在于,所述根据所述速度误差值调整输入所述液压动力装置的控制参数,包括:9. The method according to claim 8, wherein the adjusting the control parameters input to the hydraulic power device according to the speed error value comprises: 将所述速度误差值,输入比例-积分-微分控制部件,并通过所述比例-积分-微分控制部件调整输入液压动力装置的控制参数。The speed error value is input into the proportional-integral-derivative control part, and the control parameter input to the hydraulic power device is adjusted by the proportional-integral-derivative control part.
CN201710558332.5A 2017-07-10 2017-07-10 A gate valve and gate valve control method Active CN107269864B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201710558332.5A CN107269864B (en) 2017-07-10 2017-07-10 A gate valve and gate valve control method
AU2017422789A AU2017422789B2 (en) 2017-07-10 2017-07-14 Gate valve and gate valve control method
PCT/CN2017/093026 WO2019010708A1 (en) 2017-07-10 2017-07-14 Gate valve and gate valve control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710558332.5A CN107269864B (en) 2017-07-10 2017-07-10 A gate valve and gate valve control method

Publications (2)

Publication Number Publication Date
CN107269864A CN107269864A (en) 2017-10-20
CN107269864B true CN107269864B (en) 2021-07-02

Family

ID=60071752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710558332.5A Active CN107269864B (en) 2017-07-10 2017-07-10 A gate valve and gate valve control method

Country Status (3)

Country Link
CN (1) CN107269864B (en)
AU (1) AU2017422789B2 (en)
WO (1) WO2019010708A1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049950A (en) * 2020-07-08 2020-12-08 广州市昊力工具有限公司 Gate valve
CN112253783B (en) * 2020-09-23 2022-05-13 江苏理工学院 Pump-controlled motor-driven large-caliber fixed ball valve
CN114294434B (en) * 2020-10-07 2023-12-19 株式会社岛津制作所 Pressure regulating vacuum valve
CN112594404A (en) * 2020-12-23 2021-04-02 李旭 Multi-gear stroke gate valve
CN112963560B (en) * 2021-04-16 2022-03-29 江苏理工学院 An electro-hydraulic driven gas gate valve and control system with stress detection function
CN118548265A (en) * 2024-05-30 2024-08-27 北京少仕科技有限公司 A gearbox proportional electromagnetic overflow valve

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101307840A (en) * 2008-06-27 2008-11-19 浙江大学 Spool control system for anti-shock control valve
CN102606786A (en) * 2012-03-09 2012-07-25 三一重工股份有限公司 Electric-hydraulic valve as well as control device and control method thereof
CN202646869U (en) * 2012-05-16 2013-01-02 江南阀门有限公司 High voltage (HV) fast switch valve
CN104565506A (en) * 2015-01-14 2015-04-29 重庆川仪自动化股份有限公司 Explosion-proof hybrid electro-hydraulic integrated actuator for valve
CN105257889A (en) * 2015-07-17 2016-01-20 湖南山源安自控系统有限公司 Electro-hydraulic driving system for sluice valve and sluice valve
CN105736796A (en) * 2016-03-30 2016-07-06 太原理工大学 Electromechanical linkage hydraulic-control gate valve driver

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8467907B2 (en) * 2009-01-17 2013-06-18 Certus Process Solutions Automated valve with self-contained valve actuator system
CN102155444A (en) * 2011-03-08 2011-08-17 太原理工大学 Hydraulic actuator for automatic drainage system of coal mine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101307840A (en) * 2008-06-27 2008-11-19 浙江大学 Spool control system for anti-shock control valve
CN102606786A (en) * 2012-03-09 2012-07-25 三一重工股份有限公司 Electric-hydraulic valve as well as control device and control method thereof
CN202646869U (en) * 2012-05-16 2013-01-02 江南阀门有限公司 High voltage (HV) fast switch valve
CN104565506A (en) * 2015-01-14 2015-04-29 重庆川仪自动化股份有限公司 Explosion-proof hybrid electro-hydraulic integrated actuator for valve
CN105257889A (en) * 2015-07-17 2016-01-20 湖南山源安自控系统有限公司 Electro-hydraulic driving system for sluice valve and sluice valve
CN105736796A (en) * 2016-03-30 2016-07-06 太原理工大学 Electromechanical linkage hydraulic-control gate valve driver

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
基于水锤防护的矿井水安全排放控制系统研究;寇彦飞;《太原理工大学博士学位论文》;20161231;正文第47-79页 *
寇彦飞.基于水锤防护的矿井水安全排放控制系统研究.《太原理工大学博士学位论文》.2016,47-79. *

Also Published As

Publication number Publication date
AU2017422789B2 (en) 2020-12-24
AU2017422789A1 (en) 2020-01-02
WO2019010708A1 (en) 2019-01-17
CN107269864A (en) 2017-10-20

Similar Documents

Publication Publication Date Title
CN107269864B (en) A gate valve and gate valve control method
CN109910020B (en) A closed-loop control system for a hydraulically driven rotary joint of a robot
CN103925400B (en) A kind of servomotor directly drives the diaphragm type pneumatic proportional pressure-reducing valve of ball-screw
CN106468605A (en) A kind of torque limiter breakaway torque Calibrating experimental bench on wind driven generator coupler
EP3862604B1 (en) Proportional control valve system and method
CN206496066U (en) A kind of valve opening control device
CN209025789U (en) System is directly controlled in a kind of hydraulic motor rotary motion
CN104295543A (en) Hybrid power engineering machine composite motion control method
CN108131341A (en) The adjustment method of the electrohydraulic actuator of one key automatic debugging system, its driving method and the debugging system
CN104595553A (en) Counting manual electric hydraulic control sluice valve
CN110260027A (en) Valve actuator based on electro-hydraulic servo direct-drive type
CN103925399B (en) A kind of actuating motor directly drives the diaphragm type pneumatic proportional pressure-reducing valve of end cam
CN105736073B (en) Monitoring mechanism of hydraulic servo-motor
CN210003900U (en) automatic throttle valve controller
CN202597325U (en) Direct drive electro-hydraulic servo actuator
CN102607843A (en) Improved hydraulic oil circuit structure for marine gearbox test bench and operating method for improved hydraulic oil circuit structure
RU147580U1 (en) ELECTRIC DRIVE MECHANISM OF PIPELINE FITTINGS
CN102628511A (en) Worm automatic speed regulating mechanism
JP2006009876A (en) Electric and hydraulic actuator for driving valve
CN110821920B (en) Method for converting linear displacement of TRT hydraulic bypass valve into angular displacement
CN209012167U (en) A kind of hydraulic cylinder motion state control system
CN116006752A (en) Intelligent actuator, control method, vehicle and storage medium
CN205383332U (en) Can monitor device of servomotor stroke automatically
CN203822697U (en) Hydraulic adjustable shaft tubular pump structure
UA113105U (en) TORQUE MEASUREMENT AND DIFFERENTIATION DEVICE

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant