Invention content
In order to need disk coal or manual cleaning and bring inconvenience after solving the problem of coal pulverizer tripping, the embodiment of the present invention
Purpose be to provide the method and apparatus resumed operation after a kind of tripping for coal pulverizer.
To achieve the goals above, on the one hand, the embodiment of the present invention provides a kind of for the coal-grinding with dynamic separator
The method resumed operation after machine tripping, the method includes:Coal pulverizer startup before start to the coal pulverizer be passed through cold wind with
Coal dust in the coal pulverizer is cooled down and purged;Start dynamic separator, the dynamic separator rotating speed is increased to
First rotating speed;Start the coal pulverizer, with the decline of the coal pulverizer electric current, continuously decreases turning for the dynamic separator
Speed, until the dynamic separator rotating speed is down to the second rotating speed and the electric current of the coal pulverizer is down to no-load current;Open institute
The hot air isolating baffle for stating coal pulverizer is normal to the coal pulverizer with the entrance air quantity and outlet wind-warm syndrome that improve the coal pulverizer
Runtime value;And start feeder.
Optionally, the method further includes:The steam for fire xtinguishing of the second duration is put into the coal pulverizer before being passed through cold wind.
Optionally, described second when it is 3 minutes a length of.
Optionally, the time for being passed through cold wind is more than or equal to 10 minutes.
Optionally, first rotating speed is more than or equal to 1000 revs/min.
Optionally, second rotating speed is more than or equal to 500 revs/min and is less than or equal to 600 revs/min.
Optionally, the method further includes before coal pulverizer startup, after starting and/or opens the coal pulverizer hot wind
Deslagging is carried out to coal pulverizer before isolating baffle.
Optionally, after the startup feeder, according to the coal pulverizer operating condition, adjust or close the cold wind tune
Save baffle.
On the other hand, the application also provides a kind of for executing according to above-mentioned for the coal pulverizer with dynamic separator
The device for the method resumed operation after tripping.
Through the above technical solutions, after solving coal pulverizer tripping, disk coal or manual cleaning are needed and asking for bringing inconvenience
Topic.Cost of labor, environmental protection can be saved under the premise of not influencing boiler operatiopn safety, and can be straight after coal pulverizer startup
It connects and puts into operation, save unit or pulverized coal preparation system time, simplify operation link, improve working efficiency.
The other feature and advantage of the embodiment of the present invention will be described in detail in subsequent specific embodiment part.
Specific implementation mode
The specific implementation mode of the embodiment of the present invention is described in detail below in conjunction with attached drawing.It should be understood that this
The described specific implementation mode in place is merely to illustrate and explain the present invention embodiment, is not intended to restrict the invention embodiment.
Fig. 1 is recovery fortune after a kind of coal pulverizer tripping for carrying dynamic separator that an embodiment of the present invention provides
The flow chart of capable method, as shown in Figure 1, in one embodiment of the application, the method may include following steps:
In step S101, it can start to be passed through cold wind to coal pulverizer with to the coal dust in coal pulverizer before coal pulverizer startup
It is cooled down and is purged, so that the coal dust in coal pulverizer is gradually cooled down and is purged part coal dust and enter burner hearth.
In step s 102, start dynamic separator, dynamic separator rotating speed can be increased to the first rotating speed, with limitation
Coal dust enters the speed of burner hearth, reduces the disturbance to coal dust to burner hearth.
In step s 103, start coal pulverizer, with the reduction of the coal dust amount in coal pulverizer, under the meeting gradually of coal pulverizer electric current
Drop, can follow the decline of coal pulverizer electric current, continuously decrease the rotating speed of dynamic separator, so that more coal dusts can enter stove
Thorax, until dynamic separator rotating speed is down to the second rotating speed and the electric current of coal pulverizer is down to no-load current.
In step S104, the hot air isolating baffle of coal pulverizer is opened, to improve the entrance air quantity of coal pulverizer and go out one's intention as revealed in what one says
Temperature to coal pulverizer carries out normal operating value when normal coal-grinding operation;And
In step S105, start feeder, completes pulverized coal preparation system and restore normal operation.
In one embodiment of the application, the first rotating speed and the second rotating speed can according to the actual conditions of coal pulverizer and/or
Experience is preset.First rotating speed may, for example, be 1000 revs/min or other rotating speeds higher than 1000 revs/min.
Second rotating speed may, for example, be a certain rotating speed more than or equal to 500 revs/min and less than or equal to 600 revs/min.
Fig. 2 is restored after a kind of coal pulverizer for carrying dynamic separator that another embodiment of the present invention provides trips
The flow chart of the method for operation.As shown in Fig. 2, the optional embodiment as an embodiment of the present invention, the method may be used also
To include the following steps:
In step s 201, before being passed through cold wind, the steam for fire xtinguishing of the second duration is put into coal pulverizer.
The making time of coal pulverizer steam for fire xtinguishing will be controlled strictly, and explosion of Coal Pulverizing System, another party are on the one hand prevented
Face prevents from overstocking the excessive grinding for influencing coal pulverizer of coal dust humidity in coal pulverizer, goes out powder.Second duration can for example be set as 3
Minute.
Fig. 3 is extensive after a kind of coal pulverizer for carrying dynamic separator that a preferred embodiment of the invention provides trips
The flow chart of the method run again.As shown in figure 3, the preferred embodiment as an embodiment of the present invention, the method is also
An at least step in may comprise steps of:
In step S301, before coal pulverizer startup, deslagging is carried out to coal pulverizer.
In step s 302, after coal pulverizer startup, deslagging is carried out to coal pulverizer.
In step S303, before preparing to open coal pulverizer hot air isolating baffle, deslagging is carried out to coal pulverizer.
It will be appreciated by persons skilled in the art that the above-mentioned deslagging opportunity to coal pulverizer can also be according to coal pulverizer inner product
The case where coal, selects other rational opportunitys.
Optionally, above-mentioned tapping process by coal pulverizer dreg removing system and/or can be accomplished manually, and its object is to prevent wind
Indoor accumulation coal cinder.
Preferably, after starting feeder, cold wind controllable register can be adjusted or close according to coal pulverizer operating condition,
To reduce cold wind.To ensure that the time for being passed through cold wind to the cooling of coal dust in coal pulverizer and the effect of purging should be greater than being equal to 10
Minute.
The application one embodiment also provides a kind of for resuming operation after the coal pulverizer tripping with dynamic separator
The device of method, the device can control coal pulverizer, feeder, dynamic separator, cold wind controllable register and hot air isolating baffle.
And by executing the above method, to complete to resume operation after coal pulverizer trips.
In one embodiment of the application, described device is configured as executing following steps:
In step S101, it can start to be passed through cold wind to coal pulverizer with to the coal dust in coal pulverizer before coal pulverizer startup
It is cooled down and is purged, so that the coal dust in coal pulverizer is gradually cooled down and is purged part coal dust and enter burner hearth.
In step s 102, start dynamic separator, dynamic separator rotating speed can be increased to the first rotating speed, with limitation
Coal dust enters the speed of burner hearth, reduces the disturbance to coal dust to burner hearth.
In step s 103, start coal pulverizer, with the reduction of the coal dust amount in coal pulverizer, under the meeting gradually of coal pulverizer electric current
Drop, can follow the decline of coal pulverizer electric current, continuously decrease the rotating speed of dynamic separator, so that more coal dusts can enter stove
Thorax, until dynamic separator rotating speed is down to the second rotating speed and the electric current of coal pulverizer is down to no-load current.
In step S104, the hot air isolating baffle of coal pulverizer is opened, to improve the entrance air quantity of coal pulverizer and go out one's intention as revealed in what one says
Temperature to coal pulverizer carries out normal operating value when normal coal-grinding operation;And
In step S105, start feeder, completes pulverized coal preparation system and restore normal operation.
Through the above technical solutions, after solving coal pulverizer tripping, disk coal or manual cleaning are needed and asking for bringing inconvenience
Topic.Cost of labor, environmental protection can be saved under the premise of not influencing boiler operatiopn safety, and can be straight after coal pulverizer startup
It connects and puts into operation, save unit or pulverized coal preparation system time, simplify operation link, improve working efficiency.
The optional embodiment of example of the present invention, still, the embodiment of the present invention and unlimited are described in detail above in association with attached drawing
Detail in the above embodiment can be to the embodiment of the present invention in the range of the technology design of the embodiment of the present invention
Technical solution carry out a variety of simple variants, these simple variants belong to the protection domain of the embodiment of the present invention.
It is further to note that specific technical features described in the above specific embodiments, in not lance
In the case of shield, it can be combined by any suitable means.In order to avoid unnecessary repetition, the embodiment of the present invention pair
Various combinations of possible ways no longer separately illustrate.
It will be appreciated by those skilled in the art that it is that can pass through to implement the method for the above embodiments
Program is completed to instruct relevant hardware, which is stored in a storage medium, including some instructions are used so that one
A (can be microcontroller, chip etc.) or processor (processor) execute the whole of each embodiment the method for the application
Or part steps.And storage medium above-mentioned includes:USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only
Memory), random access memory (RAM, Random Access Memory), magnetic disc or CD etc. are various can store journey
The medium of sequence code.
In addition, arbitrary combination can also be carried out between a variety of different embodiments of the embodiment of the present invention, as long as it is not